Tar storage tank tail gas recovery device and method
By replenishing nitrogen into the tar storage tank and using the blower system, it can operate under positive pressure, and discharge exhaust gas through the negative pressure of the exhaust gas emission main pipe, the explosion risk caused by air inhalation under the negative pressure of the tar storage tank is solved, and the risk of explosion caused by air inhalation under the negative pressure of the tar storage tank is achieved. Safe and efficient exhaust gas treatment.
Patent Information
- Application Number
- CN202411101464.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-01
AI Technical Summary
The tar storage tank is prone to inhalation of air when operating at negative pressure, causing oxygen to mix with combustible gases volatile from the tar, producing explosive gases, and increasing the risk of physical or chemical explosion accidents.
By adding nitrogen to the tar storage tank, it runs under positive pressure, using blowers and nitrogen to connect to the pipeline system, adjusting the regulating valve to ensure that the exhaust emission main pipe is operated under negative pressure, reducing the risk of air inhalation, and stirring through tar The pump quickly discharges the exhaust gas.
It effectively reduces the risk of physical or chemical explosion accidents in tar storage tanks, ensures that the system operates within a safe pressure range, and improves the efficiency of exhaust gas treatment.
Smart Images

Figure CN118877397A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tail gas recovery and treatment, and in particular to a tar storage tank tail gas recovery device and method. Background Art
[0002] In the tar tail gas recovery process, the tail gas is recovered through the tar tail gas recovery process to the desulfurization process for desulfurization treatment.
[0003] The tar storage tank in the current tar tail gas recovery process operates under negative pressure, which easily inhales air. The oxygen in the inhaled air will mix with the combustible gas volatilized from the tar in the tar storage tank to produce explosive gas, which is prone to physical or chemical explosion accidents.
[0004] Therefore, the prior art still needs to be improved and developed. Summary of the invention
[0005] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide a tar storage tank tail gas recovery device and method to solve the problem in the prior art that the tar storage tank is prone to inhale air when operating at negative pressure, and the oxygen in the inhaled air will mix with the combustible gas volatilized by the tar in the tar storage tank to produce explosive gas, which is prone to physical or chemical explosion accidents.
[0006] The technical solution adopted by the present invention to solve the technical problem is: to provide a tar storage tank tail gas recovery device, comprising:
[0007] Blower;
[0008] A first nitrogen access pipeline, one end of which is connected to a nitrogen source;
[0009] a first tar storage tank, connected to the other end of the first nitrogen access pipeline, wherein a first regulating valve is provided on the connection between the first tar storage tank and the first nitrogen access pipeline;
[0010] a second nitrogen access pipeline, wherein one end of the second nitrogen access pipeline is connected to a nitrogen source;
[0011] a second tar storage tank, used for pouring oil from the first tar storage tank, the second tar storage tank being connected to the other end of the second nitrogen access pipeline, and a second regulating valve being arranged on the connection between the second tar storage tank and the second nitrogen access pipeline;
[0012] An exhaust gas discharge pipe, one end of which is in communication with the second tar storage tank, and the other end of which is in communication with the inlet of the blower, a third regulating valve and a first pressure gauge are provided on the exhaust gas discharge pipe, the first pressure gauge is arranged between the third regulating valve and the second tar storage tank, the first pressure gauge is used to monitor the pressure of the exhaust gas discharge pipe, and the third regulating valve is used to adjust the exhaust gas discharge pipe to operate under negative pressure;
[0013] An exhaust gas discharge branch pipe, one end of which is connected to the first tar storage tank, and the other end of which is connected to the exhaust gas discharge main pipe;
[0014] Tar mixing pumps;
[0015] a first pipeline, one end of which is in communication with the first tar storage tank, and the other end of which is in communication with the inlet of the tar stirring pump;
[0016] a second pipeline, one end of which is in communication with the second tar storage tank, and the other end of which is in communication with the outlet of the tar stirring pump;
[0017] When nitrogen is added to the first tar storage tank, the first regulating valve is adjusted to make the first tar storage tank operate under positive pressure; when nitrogen is added to the second tar storage tank, the second regulating valve is adjusted to make the second tar storage tank operate under positive pressure.
[0018] A further configuration of the present invention further includes:
[0019] A third pipe, one end of the third pipe is connected to the top of the first tar storage tank, and the other end of the third pipe is connected to the top of the second tar storage tank.
[0020] In a further configuration of the present invention, the tar storage tank tail gas recovery device further includes: a fourth pipeline and a fifth pipeline, one end of the fourth pipeline is connected to the first tar storage tank, the other end of the fourth pipeline is connected to the second pipeline, one end of the fifth pipeline is connected to the second tar storage tank, and the other end of the fifth pipeline is connected to the first pipeline;
[0021] Among them, a shut-off valve is provided on the first pipeline, and the shut-off valve on the first pipeline is located between the first tar storage tank and the other end of the fifth pipeline, a shut-off valve is provided on the second pipeline, and the shut-off valve on the second pipeline is located between the second tar storage tank and the other end of the fourth pipeline, a shut-off valve is provided on the fourth pipeline, and a shut-off valve is provided on the fifth pipeline.
[0022] A further configuration of the present invention is that a first ventilation duct connected to the storage chamber of the first tar storage tank is provided on the top of the first tar storage tank, and a first single call valve, a first breathing valve, a first discharge valve and a second pressure gauge are provided on the first ventilation duct, and the first discharge valve is provided at one end of the first ventilation duct away from the first tar storage tank.
[0023] According to a further configuration of the present invention, a second ventilation pipe connected to the second tar storage tank is provided on the top of the second tar storage tank, a second single call valve, a second breathing valve, a second discharge valve and a third pressure gauge are provided on the second ventilation pipe, and the second discharge valve is provided at an end of the second ventilation pipe away from the second tar storage tank;
[0024] One end of the third duct is communicated with the first ventilation duct, and the other end of the third duct is communicated with the second ventilation duct.
[0025] The present invention is further configured such that shut-off valves are respectively arranged on both sides of the first regulating valve, a first branch pipe is further arranged on the first nitrogen access pipeline, one end of the first branch pipe is connected to the first nitrogen access pipeline and is located between the nitrogen source and the shut-off valve on the first nitrogen access pipeline close to the nitrogen source, the other end of the first branch pipe is connected to the first nitrogen access pipeline and is located between the first tar storage tank and the shut-off valve on the first nitrogen access pipeline close to the first tar storage tank, and a first traffic valve and a first flow limiting orifice are arranged on the first branch pipe;
[0026] Shut-off valves are respectively arranged on both sides of the second regulating valve, a second branch pipe is arranged on the second nitrogen access pipeline, one end of the second branch pipe is connected to the second nitrogen access pipeline and is located between the nitrogen source and the shut-off valve on the second nitrogen access pipeline close to the nitrogen source, the other end of the second branch pipe is connected to the second nitrogen access pipeline and is located between the second tar storage tank and the shut-off valve on the second nitrogen access pipeline close to the second tar storage tank, and a second traffic valve and a second flow limiting orifice are arranged on the second branch pipe.
[0027] According to a further configuration of the present invention, shut-off valves are respectively provided on both sides of the third regulating valve;
[0028] A fourth pressure gauge and a third branch pipe are also provided on the exhaust gas emission main pipe. One end of the third branch pipe is connected to the exhaust gas emission main pipe and is located between the second tar storage tank and the shut-off valve on the exhaust gas emission main pipe close to the second tar storage tank. The other end of the third branch pipe is connected to the exhaust gas emission main pipe and is located between the blower and the shut-off valve on the exhaust gas emission main pipe close to the blower. A third traffic valve is provided on the third branch pipe.
[0029] According to a further configuration of the present invention, a cut-off valve and an oxygen analyzer are further provided on the exhaust gas discharge main pipe, wherein the oxygen analyzer is used to analyze the oxygen content in the exhaust gas in the exhaust gas discharge main pipe, wherein when the oxygen content in the exhaust gas in the exhaust gas discharge main pipe is greater than a first preset value, the cut-off valve is closed;
[0030] The tar storage tank tail gas recovery device also includes a post-electrostatic precipitator gas pipeline, one end of which is connected to the tail gas emission main pipe, and one end of the post-electrostatic precipitator gas pipeline is located on the tail gas emission main pipe between the shut-off valve and the blower.
[0031] According to a further configuration of the present invention, the first regulating valve and the second regulating valve are self-supporting regulating valves, and the third regulating valve is an automatic regulating valve, wherein the self-supporting regulating valve and the cut-off valve are air-open valves.
[0032] The present invention also provides a tar storage tank tail gas recovery method, which uses the tar storage tank tail gas recovery device as described above, and the tar storage tank tail gas recovery method comprises:
[0033] Turning on the tar stirring pump to pour oil from the first tar storage tank into the second tar storage tank;
[0034] Regulating the first regulating valve and the second regulating valve so that the nitrogen source replenishes nitrogen into the first tar storage tank and the second tar storage tank, and regulating the first tar storage tank and the second tar storage tank to operate under positive pressure;
[0035] Open the third regulating valve and adjust the third regulating valve to make the exhaust gas discharge main pipe operate under negative pressure;
[0036] The blower is turned on to recover the tail gas generated by the first tar storage tank and the second tar storage tank to the desulfurization process for desulfurization treatment.
[0037] The beneficial effects of the present invention are:
[0038] The present invention discloses a tar storage tank tail gas recovery device and method, the tar storage tank tail gas recovery device comprises a blower; a first nitrogen access pipeline, one end of the first nitrogen access pipeline is connected to a nitrogen source; a first tar storage tank is connected to the other end of the first nitrogen access pipeline, and a first regulating valve is arranged on the connection road between the first tar storage tank and the first nitrogen access pipeline; a second nitrogen access pipeline, one end of the second nitrogen access pipeline is connected to the nitrogen source; a second tar storage tank is used for pouring oil from the first tar storage tank, the second tar storage tank is connected to the other end of the second nitrogen access pipeline, and a second regulating valve is arranged on the connection road between the second tar storage tank and the second nitrogen access pipeline; a tail gas discharge main pipe, one end of the tail gas discharge main pipe is communicated with the second tar storage tank, the other end of the tail gas discharge main pipe is communicated with the inlet of the blower, a third regulating valve and a first pressure gauge are arranged on the tail gas discharge main pipe, and the first pressure gauge is arranged on the tail gas discharge main pipe. a pressure gauge is arranged between the third regulating valve and the second tar storage tank, the first pressure gauge is used to monitor the pressure of the exhaust gas emission main pipe, and the third regulating valve is used to adjust the exhaust gas emission main pipe to operate under negative pressure; an exhaust gas emission branch pipe, one end of the exhaust gas emission branch pipe is connected to the first tar storage tank, and the other end of the exhaust gas emission branch pipe is connected to the exhaust gas emission main pipe; a tar stirring pump; a first pipeline, one end of the first pipeline is connected to the first tar storage tank, and the other end of the first pipeline is connected to the inlet of the tar stirring pump; a second pipeline, one end of the second pipeline is connected to the second tar storage tank, and the other end of the second pipeline is connected to the outlet of the tar stirring pump; wherein, when nitrogen is added to the first tar storage tank, the first regulating valve is adjusted to make the first tar storage tank operate under positive pressure; when nitrogen is added to the second tar storage tank, the second regulating valve is adjusted to make the second tar storage tank operate under positive pressure. In the technical solution of the present invention, the tar in the first tar storage tank is poured into the second tar storage tank by a tar stirring pump. When the first tar storage tank is in operation, the first tar storage tank is operated under positive pressure by adjusting the first regulating valve, and the second tar tank is operated under positive pressure by adjusting the second regulating valve. Under positive pressure, the first tar storage tank and the second tar storage tank are not easy to inhale air, thereby reducing the risk of physical or chemical explosion accidents. At the same time, the exhaust gas emission main pipe is operated under negative pressure by adjusting the third regulating valve, so that the exhaust gas in the first tar storage tank and the second tar storage tank can be quickly discharged through the exhaust gas emission main pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary personnel in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.
[0040] Figure 1 It is a structural diagram of the tar storage tank tail gas recovery device of the present invention.
[0041] Figure 2 The present invention is a flow chart of the tar storage tank tail gas recovery method.
[0042] The marks in the attached drawings are: 1, blower; 2, first nitrogen access pipeline; 3, first tar storage tank; 4, second nitrogen access pipeline; 5, second tar storage tank; 6, tail gas discharge main pipe; 7, tail gas discharge branch pipe; 8, tar stirring pump; 9, first pipeline; 10, second pipeline; 11, first regulating valve; 12, third regulating valve; 13, second regulating valve; 14, third pipeline; 15, fourth pipeline; 16, fifth pipeline; 17, first ventilation pipeline; 18, first single call valve; 19, first breathing valve; 20, first discharge valve; 21, Flange; 22, second single-call valve; 23, second breathing valve; 24, second discharge valve; 25, second ventilation duct; 26, shut-off valve; 27, first flow-limiting orifice; 28, first traffic valve; 29, first branch pipe; 30, second flow-limiting orifice; 31, second traffic valve; 32, second branch pipe; 33, third branch pipe; 34, third traffic valve; 35, shut-off valve; 36, gas pipeline after electric capture; 37, oxygen content analyzer; PT1, first pressure gauge; PT2, second pressure gauge; PT3, third pressure gauge; PT4, fourth pressure gauge. DETAILED DESCRIPTION
[0043] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific embodiments of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "back", "up", "down", "left", "right", "longitudinal", "horizontal", "vertical", "horizontal", "top", "bottom", "inside", "outside", "head", "tail", etc. are based on the directions or positional relationships shown in the accompanying drawings, are constructed and operated in a specific direction, and are only for the convenience of describing the present technical solution, rather than indicating that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.
[0044] like Figure 1 As shown, a tar storage tank tail gas recovery device provided by the present invention may include a blower 1, a first nitrogen access pipeline 2, a first tar storage tank 3, a second nitrogen access pipeline 4, a tail gas emission main pipe 6, a tail gas emission branch pipe 7, a tar stirring pump 8, a first pipeline 9 and a second pipeline 10.
[0045] Among them, one end of the first nitrogen access pipeline 2 is connected to the nitrogen source; the first tar storage tank 3 is connected to the other end of the first nitrogen access pipeline 2, and a first regulating valve 11 is arranged on the connection road between the first tar storage tank 3 and the first nitrogen access pipeline 2; one end of the second nitrogen access pipeline 4 is connected to the nitrogen source; the second tar storage tank 5 is used for pouring oil from the first tar storage tank 3, the second tar storage tank 5 is connected to the other end of the second nitrogen access pipeline 4, and a second regulating valve 13 is arranged on the connection road between the second tar storage tank 5 and the second nitrogen access pipeline 4; one end of the exhaust gas discharge main pipe 6 is connected to the second tar storage tank 5, and the other end of the exhaust gas discharge main pipe 6 is connected to the inlet of the blower 1, and the exhaust gas discharge main pipe 6 is connected to the second tar storage tank 5. A third regulating valve 12 and a first pressure gauge PT1 are provided on the pipe 6. The first pressure gauge PT1 is arranged between the third regulating valve 12 and the second tar storage tank 5. The first pressure gauge PT1 is used to monitor the pressure of the exhaust emission main pipe 6, and the third regulating valve 12 is used to adjust the pressure of the exhaust emission main pipe 6; one end of the exhaust emission branch pipe 7 is connected to the first tar storage tank 3, and the other end of the exhaust emission branch pipe 7 is connected to the exhaust emission main pipe 6; one end of the first pipeline 9 is connected to the first tar storage tank 3, and the other end of the first pipeline 9 is connected to the inlet of the tar stirring pump 8; one end of the second pipeline 10 is connected to the second tar storage tank 5, and the other end of the second pipeline 10 is connected to the outlet of the tar stirring pump 8.
[0046] Specifically, when pouring oil from the first tar storage tank 3 into the second tar storage tank 5, the first regulating valve 11 can be adjusted to make the first tar storage tank 3 operate under positive pressure, such as, under a pressure less than 200Pa, when nitrogen is added to the first tar storage tank 3, the pressure in the first tar storage tank 3 is between 200-500Pa. When the pressure in the first tar storage tank 3 is higher than 200Pa, the first regulating valve 11 is closed and the addition of nitrogen into the first tar storage tank 3 is stopped.
[0047] Similarly, the second regulating valve 13 can be adjusted to make the second tar storage tank 5 operate under positive pressure. For example, when nitrogen is added to the second tar storage tank 5 at a pressure less than 200 Pa, the pressure in the second tar storage tank 5 is between 200-500 Pa. When the pressure in the second tar storage tank 5 is higher than 200 Pa, the second regulating valve 13 is closed and the addition of nitrogen into the second tar storage tank 5 is stopped.
[0048] Among them, when adjusting the pressure in the first tar storage tank 3 and the second tar storage tank 5, the pressure of the exhaust gas emission main pipe 6 can also be adjusted according to the pressure value monitored by the first pressure gauge PT1 (the first pressure gauge PT1 is linked with the third regulating valve 12), and the pressure on the exhaust gas emission main pipe 6 is adjusted to operate within the pressure range of -500Pa to -2500Pa, so that the exhaust gas in the first tar storage tank 3 and the second tar storage tank 5 can be quickly discharged through the exhaust gas emission main pipe 6.
[0049] It can be seen that when nitrogen is added to the first tar storage tank 3 during the process of pouring oil from the first tar storage tank 3 to the second tar storage tank 5, the first tar storage tank 3 is operated under positive pressure by adjusting the first regulating valve 11, and the second tar storage tank 5 is operated under positive pressure by adjusting the second regulating valve 13. Under positive pressure, the first tar storage tank 3 and the second tar storage tank 5 are not easy to inhale air, which reduces the risk of physical or chemical explosion accidents. At the same time, the exhaust gas emission main pipe 6 is operated under negative pressure by adjusting the third regulating valve 12, so that the exhaust gas in the first tar storage tank 3 and the second tar storage tank 5 can be quickly discharged through the exhaust gas emission main pipe 6.
[0050] Among them, the tar stirring pump 8 can use a pump with a flow rate of less than 600m3 / h; when nitrogen is added to the first tar storage tank 3 and the second tar storage tank 5, the pressure of the nitrogen can be between 0.4-0.6MPa; the first regulating valve 11, the second regulating valve 13 and the third regulating valve 12 can balance the 200m3 / h exhaust gas fluctuation between the first tar storage tank 3 and the second tar storage tank 5.
[0051] Furthermore, if Figure 1 As shown, the tar storage tank tail gas recovery device also includes a third pipe 14, one end of the third pipe 14 is connected to the top of the first tar storage tank 3, and the other end of the third pipe 14 is connected to the top of the second tar storage tank 5.
[0052] In this embodiment, since the third pipeline 14 is connected to the first tar storage tank 3 and the second tar storage tank 5 respectively, and the connecting position of the third pipeline 14 and the first tar storage tank 3 is at the top of the first tar storage tank 3, and the connecting position of the third pipeline 14 and the second tar storage tank 5 is at the top of the second tar storage tank 5, when pouring oil from the first tar storage tank 3 to the second tar storage tank 5, the gas in the second tar storage tank 5 will be discharged into the first tar storage tank 3 through the third pipeline 14 under the squeezing of tar, thereby achieving a balance between the tail gas in the first tar storage tank 3 and the second tar storage tank 5, making the pressure in the first tar storage tank 3 and the second tar storage tank 5 more stable, and at the same time reducing the amount of nitrogen replenished and the operating cost when replenishing nitrogen.
[0053] Furthermore, if Figure 1 As shown, the tar storage tank tail gas recovery device also includes a fourth pipeline 15 and a fifth pipeline 16, one end of the fourth pipeline 15 is connected to the first tar storage tank 3, the other end of the fourth pipeline 15 is connected to the second pipeline 10, one end of the fifth pipeline 16 is connected to the second tar storage tank 5, and the other end of the fifth pipeline 16 is connected to the first pipeline 9;
[0054] Among them, a shut-off valve 26 is provided on the first pipeline 9, and the shut-off valve 26 on the first pipeline 9 is located between the first tar storage tank 3 and the other end of the fifth pipeline 16, a shut-off valve 26 is provided on the second pipeline 10, and the shut-off valve 26 on the second pipeline 10 is located between the second tar storage tank 5 and the other end of the fourth pipeline 15, a shut-off valve 26 is provided on the fourth pipeline 15, and a shut-off valve 26 is provided on the fifth pipeline 16.
[0055] Specifically, when the shut-off valve 26 is provided on the first pipeline 9, two shut-off valves 26 may be provided, but not limited to, one of which is provided close to the first tar storage tank 3 and the other is provided close to the inlet of the tar stirring pump 8. When the shut-off valve 26 is provided on the second pipeline 10, one shut-off valve 26 may be provided, but not limited to, and the shut-off valve 26 is provided close to the second tar storage tank 5. When the shut-off valve 26 is provided on the fourth pipeline 15, one shut-off valve 26 may be provided, but not limited to. When the shut-off valve 26 is provided on the fifth pipeline 16, two shut-off valves 26 may be provided, but not limited to, one of which is provided close to the first pipeline 9 and the other is provided close to the second tar storage tank 5.
[0056] In this embodiment, when the tar in the first tar storage tank 3 is stirred, the shutoff valve 26 on the fifth pipeline 16 and the shutoff valve 26 on the second pipeline 10 can be closed, and the shutoff valves 26 on the first pipeline 9 and the fourth pipeline 15 can be opened, and the tar stirring pump 8 can be opened to stir the tar in the first tar storage tank 3; when the tar in the second tar storage tank 5 is stirred, the shutoff valves 26 on the first pipeline 9 and the fourth pipeline 15 can be closed, and the shutoff valves 26 on the second pipeline 10 and the fifth pipeline 16 can be opened, and the tar stirring pump 8 can be opened to stir the tar in the first tar storage tank 3. When the first tar storage tank 3 and the second tar storage tank 5 are poured, the shutoff valves 26 on the fourth pipeline 15 and the fifth pipeline 16 are closed, and the shutoff valves 26 on the first pipeline 9 and the second pipeline 10 are opened, and the tar stirring pump 8 can be opened to pour the tar in the first tar storage tank 3 into the second tar storage tank 5. It can be seen from this that when pouring oil or stirring tar, a tar stirring pump 8 can be shared, so that the cost is reduced.
[0057] In some embodiments, Figure 1 As shown, a first ventilation duct 17 connected to the first tar storage tank 3 is provided on the top of the first tar storage tank 3, and a first single call valve 18, a first breathing valve 19, a first discharge valve 20 and a second pressure gauge PT2 are provided on the first ventilation duct 17. The first discharge valve 20 is arranged at one end of the first ventilation duct 17 away from the first tar storage tank 3, and the second pressure gauge PT2 is used to monitor the pressure in the first tar storage tank 3.
[0058] Specifically, the first ventilation duct 17 is arranged at the top of the first tar storage tank 3, and the other end of the first ventilation duct 17 extends upward, wherein the first discharge valve 20 is arranged at the other end of the first ventilation duct 17, and the second pressure gauge PT2, the first breathing valve 19 and the first single call valve 18 are all arranged on the first ventilation duct 17. When the first discharge valve 20 is installed, it can be installed on the first ventilation duct 17 by connecting with a flange 21.
[0059] In a specific embodiment, the pressure in the first tar storage tank 3 can be monitored by the second pressure gauge PT2. The pressure that the first tar storage tank 3 can withstand is about 2000Pa, wherein, when the first regulating valve 11 and the second regulating valve 13 are turned off, the pressure in the first tar storage tank 3 will continue to decrease. When the pressure in the first tar storage tank 3 decreases to -200Pa (the pressure value monitored by the second pressure gauge PT2), the first breathing valve 19 is opened to allow the first breathing valve 19 to replenish air into the first tar storage tank 3 to prevent the first tar storage tank 3 from being deflated; when the first tar storage tank 3 is in operation, when the pressure of the first tar storage tank 3 is greater than 500Pa (the pressure value monitored by the second pressure gauge PT2), the opening of the third regulating valve 12 is adjusted to allow more exhaust gas in the first tar storage tank 3 to enter the exhaust gas discharge main pipe 6; when the pressure in the first tar storage tank 3 exceeds 1000Pa, the exhaust gas in the first tar storage tank 3 is discharged into the exhaust gas discharge main pipe 6. pa (the pressure value monitored by the second pressure gauge PT2), the tail gas in the first tar storage tank 3 is released by opening the first single call valve 18 to prevent the first tar storage tank 3 from being damaged due to excessive pressure; when the pressure in the first tar storage tank 3 further rises, such as exceeding 1500pa (the pressure value monitored by the second pressure gauge PT2), the pressure in the first tar storage tank 3 is further reduced by opening the first breathing valve 19; when the pressure in the first tar storage tank 3 further rises when the first breathing valve 19 and the first single call valve 18 are opened, the exhaust gas in the first tar storage tank 3 is further released by opening the first discharge valve 20. Since the discharge area of the discharge valve is large, the pressure in the first tar storage tank 3 can be reduced after the first discharge valve 20 is opened.
[0060] In this embodiment, the first tar storage tank 3 is protected by a gradient-increasing balancing method according to the pressure, that is, the first breathing valve 19, the first single-call valve 18 and the first discharge valve 20 can also be controlled according to the pressure value monitored by the second pressure gauge PT2 to prevent the first tar storage tank 3 from being deflated during the oil pouring process or being damaged by excessive pressure, causing the first tar storage tank 3 to be deflated or bulged.
[0061] Here, it should be noted that when the first relief valve 20 is set, the specification of the first relief valve 20 can be determined according to actual needs to meet the relief requirements when the pressure is too high. Of course, other methods can also be used to meet the relief requirements.
[0062] Exemplarily, when the first ventilation duct 17 is set, two first ventilation ducts 17 can be set, wherein one first ventilation duct 17 is provided with a first discharge valve 20, a first breathing valve 19, a first single call valve 18 and a second pressure gauge PT2, and the other first ventilation duct 17 is only provided with a first discharge valve 20; the second pressure gauge PT2 can select a pressure gauge with a measuring range of +3000Pa to -500Pa; the first breathing valve 19 can select a breathing valve with a measuring range of -295Pa to 1500Pa.
[0063] In some embodiments, Figure 1 As shown, a second ventilation duct 25 connected to the storage cavity of the second tar storage tank 5 is provided on the top of the second tar storage tank 5, and a second single call valve 22, a second breathing valve 23, a second discharge valve 24 and a third pressure gauge PT3 are provided on the second ventilation duct 25. The second discharge valve 24 is arranged at one end of the second ventilation duct 25 away from the second tar storage tank 5, and the third pressure gauge PT3 is used to monitor the pressure in the second tar storage tank 5; one end of the third pipe 14 is connected to the first ventilation duct 17, and the other end of the third pipe 14 is connected to the second ventilation duct 25.
[0064] Specifically, the second ventilation duct 25 is arranged at the top of the second tar storage tank 5, and the other end of the second ventilation duct 25 extends upward, wherein the second discharge valve 24 is arranged at the other end of the second ventilation duct 25, and the third pressure gauge PT3, the second breathing valve 23 and the second single call valve 22 are all arranged on the second ventilation duct 25. When the second discharge valve 24 is installed, it can be installed on the second ventilation duct 25 by connecting with the flange 21.
[0065] In this embodiment, the second tar storage tank 5 is protected by a gradient-increasing balance method according to the pressure, that is, the second breathing valve 23, the second single-call valve 22 and the second discharge valve 24 can also be controlled according to the pressure value monitored by the third pressure gauge PT3 to prevent the second tar storage tank 5 from being deflated during the oil pouring process or being damaged by excessive pressure, causing the second tar storage tank 5 to be deflated or bulge. The specific process can refer to the working process of the second pressure gauge PT2, the first single-call valve 18, the first breathing valve 19 and the first discharge valve 20 when protecting the first tar storage tank 3, which will not be repeated here.
[0066] Similarly, when the second relief valve 24 is set, the specification of the second relief valve 24 can be determined according to actual needs to meet the relief requirement when the pressure is too high. Of course, other methods can also be used to meet the relief requirement.
[0067] Exemplarily, when the second ventilation duct 25 is set, two second ventilation ducts 25 can be set, wherein one second ventilation duct 25 is provided with a second discharge valve 24, a second breathing valve 23, a second single call valve 22 and a third pressure gauge PT3, and the other second ventilation duct 25 is only provided with a second discharge valve 24; wherein, when the three ducts are connected with the first tar storage tank 3 and the second tar storage tank 5, one end of the third duct 14 can be connected with the first ventilation duct 17 which is only provided with the first discharge valve 20, and the other end of the third duct 14 can be connected with the second ventilation duct 25 which is only provided with the second discharge valve 24.
[0068] The second breathing valve 23 can be a breathing valve with a measuring range of -295Pa to 1500Pa.
[0069] In this embodiment, the third pipeline 14 can be but not limited to a DN200-DN500 pipeline, and the 600m3 / h tail gas pressure fluctuation between the first tar storage tank 3 and the second tar storage tank 5 is balanced through the third pipeline 14; the third pressure gauge PT3 can be a pressure gauge with a range of +3000 to -500Pa.
[0070] In some embodiments, Figure 1 As shown, shut-off valves 26 are respectively arranged on both sides of the first regulating valve 11, and a first branch pipe 29 is also arranged on the first nitrogen access pipeline 2. One end of the first branch pipe 29 is connected to the first nitrogen access pipeline 2 and is located between the nitrogen source and the shut-off valve 26 on the first nitrogen access pipeline close to the nitrogen source. The other end of the first branch pipe 29 is connected to the first nitrogen access pipeline 2 and is located between the first tar storage tank 3 and the shut-off valve 26 on the first nitrogen access pipeline close to the first tar storage tank 3. The first branch pipe 29 is provided with a first traffic valve 28 and a first flow limiting orifice 27. ; Shut-off valves 26 are respectively arranged on both sides of the second regulating valve 13, and a second branch pipe 32 is arranged on the second nitrogen access pipeline 4. One end of the second branch pipe 32 is connected to the second nitrogen access pipeline 4 and is located between the nitrogen source and the shut-off valve 26 on the second nitrogen access pipeline 4 close to the nitrogen source. The other end of the second branch pipe 32 is connected to the second nitrogen access pipeline 4 and is located between the second tar storage tank 5 and the shut-off valve 26 on the second nitrogen access pipeline 4 close to the second tar storage tank 5. A second traffic valve 31 and a second flow limiting orifice 30 are arranged on the second branch pipe 32.
[0071] In this embodiment, the first regulating valve 11 may fail or be overhauled. When the first regulating valve 11 fails, the shut-off valves 26 on both sides of the first regulating valve 11 can be shut off, and the first flow limiting orifice 27 and the first traffic valve 28 can be opened at the same time, and the normal operation of the first tar storage tank 3 can be continued through the first branch pipe 29. At this time, the first regulating valve 11 can be replaced and overhauled. Similarly, the second regulating valve 13 may fail or be overhauled. When the second regulating valve 13 fails, the shut-off valves 26 on both sides of the second regulating valve 13 can be shut off, and the second flow limiting orifice 30 and the second traffic valve 31 can be opened at the same time, and the normal operation of the second tar storage tank 5 can be continued through the second branch pipe 32. At this time, the second regulating valve 13 can be replaced and overhauled. Among them, the specifications of the first flow limiting orifice 27 and the second flow limiting orifice 30 can be but not limited to 3-10mm.
[0072] In some embodiments, Figure 1 As shown, shut-off valves 26 are respectively arranged on both sides of the third regulating valve 12; a fourth pressure gauge PT4 and a third branch pipe 33 are also arranged on the exhaust gas emission main pipe 6, one end of the third branch pipe 33 is connected to the exhaust gas emission main pipe 6, and is located between the second tar storage tank 5 and the shut-off valve 26 on the exhaust gas emission main pipe 6 close to the second tar storage tank 5, the other end of the third branch pipe 33 is connected to the exhaust gas emission main pipe 6, and is located between the blower 1 and the shut-off valve 26 on the exhaust gas emission main pipe 6 close to the blower 1, and a third traffic valve 34 is arranged on the third branch pipe 33.
[0073] In this embodiment, the third regulating valve 12 may fail or be overhauled during operation. When the third regulating valve 12 fails or is under overhaul, the shut-off valves 26 on both sides of the third regulating valve 12 can be closed. At the same time, the third traffic valve 34 is opened, and the exhaust gas is discharged through the third branch pipe 33. At this time, the third regulating valve 12 can be overhauled, replaced, etc.
[0074] Furthermore, the fourth pressure gauge PT4 can be selected to have a higher accuracy than the first pressure gauge PT1. The fourth pressure gauge PT4 can not only calibrate the accuracy of the first pressure gauge PT1, but also continue to monitor the pressure on the exhaust emission main pipe 6 when the first pressure gauge PT1 fails.
[0075] The first pressure gauge PT1 and the fourth pressure gauge PT4 can monitor a pressure range of +1000Pa to -3000Pa.
[0076] In some embodiments, Figure 1 As shown, a shut-off valve 35 and an oxygen analyzer 37 are also provided on the exhaust gas emission main pipe 6. The oxygen analyzer 37 is used to analyze the oxygen content in the exhaust gas in the exhaust gas emission main pipe 6. When the oxygen content in the exhaust gas in the exhaust gas emission main pipe 6 is greater than a first preset value, the shut-off valve 35 is closed.
[0077] The tar storage tank tail gas recovery device also includes a post-electrostatic precipitator gas pipeline 36, one end of which is connected to the tail gas emission main pipe 6, and one end of the post-electrostatic precipitator gas pipeline 36 is located on the tail gas emission main pipe 6 between the shut-off valve 35 and the blower 1.
[0078] Specifically, electric sparks may be generated during the use of the electric tar precipitator. When the oxygen content of the exhaust gas in the exhaust emission main pipe 6 is high, there may be a risk of explosion. Therefore, an oxygen content analyzer 37 is provided to detect the oxygen content of the exhaust gas in the exhaust emission main pipe 6. When the oxygen content is greater than a first preset value, the shut-off valve 35 is closed. At this time, the electric tar precipitator is safely isolated from the exhaust gas, further ensuring the safe operation of the tar storage tank exhaust gas recovery device.
[0079] The first preset value may be set according to actual needs. For example, the first preset value may be set to 2%, 1.5%, 1.3%, etc.
[0080] In some embodiments, the first regulating valve 11 and the second regulating valve 13 may be self-supporting regulating valves, and the third regulating valve 12 may be an automatic regulating valve.
[0081] In some embodiments, the automatic regulating valve and the shut-off valve 35 are air-open settings, ensuring that they are in a fully closed state when the instruments (oxygen analyzer 37, first pressure gauge PT1, fourth pressure gauge PT4) lose control and when the nitrogen supply is cut off, thereby avoiding the danger of a large amount of air entering the gas pipeline 36 after the electric capture.
[0082] In some embodiments, the first pressure gauge PT1, the second pressure gauge PT2, the third pressure gauge PT3 and the fourth pressure gauge PT4 are all connected to the central control room, and the pressures of the first pressure gauge PT1, the second pressure gauge PT2, the third pressure gauge PT3 and the fourth pressure gauge PT4 are monitored in real time through the control system in the central control room. When the pressure is abnormal, the problem can be found through human intervention, such as monitoring through DCS (Distributed Control System).
[0083] Example 1: When the tar storage tank tail gas recovery device recovers tail gas, the pressure in the first tar storage tank 3 can be adjusted to 300pa through the first regulating valve 11, and the pressure in the second tar storage tank 5 can be operated at 320pa. The third regulating valve 12 is adjusted to make the monitoring value of the first pressure gauge PT1 to be -500pa, the monitoring value of the fourth pressure gauge PT4 to be -520pa, the monitoring value of the oxygen content analyzer 37 to be 1.2%, and the pressure of the nitrogen supplemented to be 0.5Mpa. The flow limiting orifice 30 is set as a flow limiting orifice with an inner hole of 5mm. The first single suction valve and the second single suction valve are opened at 1000Pa, the first breathing valve 19 and the second breathing valve 23 inhale air at -295Pa, and discharge exhaust gas to the outside at 1500Pa, the first discharge valve 20 and the second discharge valve 24 are opened to discharge exhaust gas at 1800Pa, the first regulating valve 11 and the second regulating valve 13 are opened when they are between 200Pa and 500Pa, and are closed when they are greater than 500Pa or less than 200Pa.
[0084] Example 2: When the tar storage tank tail gas recovery device recovers tail gas, the pressure in the first tar storage tank 3 can be adjusted to 400pa through the first regulating valve 11, and the pressure in the second tar storage tank 5 can be operated at 380pa. The third regulating valve 12 is adjusted to make the monitoring value of the first pressure gauge PT1 to be -580pa, the monitoring value of the fourth pressure gauge PT4 to be -600pa, the monitoring value of the oxygen content analyzer 37 to be 1.1%, and the pressure of the nitrogen added to be 0.5Mpa. The flow limiting orifice 30 is set as a flow limiting orifice with an inner hole of 5mm. The first single suction valve and the second single suction valve are opened at 1000Pa, the first breathing valve 19 and the second breathing valve 23 inhale air at -295Pa, and discharge exhaust gas to the outside at 1500Pa, the first discharge valve 20 and the second discharge valve 24 are opened to discharge exhaust gas at 1800Pa, the first regulating valve 11 and the second regulating valve 13 are opened when they are between 200Pa and 500Pa, and are closed when they are greater than 500Pa or less than 200Pa.
[0085] Example 3: When the tar storage tank tail gas recovery device recovers tail gas, the pressure in the first tar storage tank 3 can be adjusted to 260pa through the first regulating valve 11, and the pressure in the second tar storage tank 5 can be operated at 280pa. The third regulating valve 12 is adjusted to make the monitoring value of the first pressure gauge PT1 to be -480pa, the monitoring value of the fourth pressure gauge PT4 to be -500pa, the monitoring value of the oxygen content analyzer 37 to be 1.3%, and the pressure of the nitrogen added to be 0.5Mpa. The flow limiting orifice 30 is set as a flow limiting orifice with an inner hole of 5mm. The first single suction valve and the second single suction valve are opened at 1000Pa, the first breathing valve 19 and the second breathing valve 23 inhale air at -295Pa, and discharge exhaust gas to the outside at 1500Pa, the first discharge valve 20 and the second discharge valve 24 are opened to discharge exhaust gas at 1800Pa, the first regulating valve 11 and the second regulating valve 13 are opened when they are between 200Pa and 500Pa, and are closed when they are greater than 500Pa or less than 200Pa.
[0086] In some embodiments, Figure 2 As shown, the present invention also provides a tar storage tank tail gas recovery method, which uses the tar storage tank tail gas recovery device as described above. The tar storage tank tail gas recovery method may include:
[0087] S100, turning on the tar stirring pump to pour oil from the first tar storage tank into the second tar storage tank;
[0088] S200, adjusting the first regulating valve and the second regulating valve so that the nitrogen source replenishes nitrogen into the first tar storage tank and the second tar storage tank, and adjusting the first tar storage tank and the second tar storage tank to operate under positive pressure;
[0089] S300, opening the third regulating valve, and adjusting the third regulating valve to make the exhaust gas discharge main pipe operate under negative pressure;
[0090] S400, turning on the blower to recover the tail gas generated by the first tar storage tank and the second tar storage tank to the desulfurization process for desulfurization treatment.
[0091] In this embodiment, when pouring tar from the first tar storage tank to the second tar storage tank, the tar stirring pump is first turned on. At this time, under the action of the tar stirring pump, the tar in the first tar storage tank is poured into the second tar storage tank, and the first regulating valve and the second regulating valve are opened and adjusted so that the first tar storage tank and the second tar storage tank operate under positive pressure. When adjusting the pressure of the first tar storage tank, the pressure of the first tar storage tank can be adjusted by the first regulating valve to be between 200 and 500 p a, when adjusting the pressure of the second tar storage tank, the pressure of the second tar storage tank can be adjusted between 200-500 Pa by the second regulating valve; thereafter, the third regulating valve is opened and adjusted to make the exhaust gas emission main pipe operate under negative pressure, wherein the exhaust gas emission main pipe can be adjusted to operate within the pressure range of -500 Pa to -2500 Pa, and the blower is further turned on to discharge the exhaust gas in the first tar storage tank and the second tar storage tank through the exhaust gas emission main pipe to the desulfurization process for desulfurization treatment.
[0092] Here, it should be pointed out that the description of the above embodiment of the tar storage tank tail gas recovery method is similar to the description of the above embodiment of the tar storage tank tail gas recovery device, and has similar beneficial effects as the above tar storage tank tail gas recovery device. For technical details not disclosed in the embodiment of the tar storage tank tail gas recovery method in this embodiment, please refer to the description of the embodiment of the tar storage tank tail gas recovery device of the present invention for understanding.
[0093] In summary, the present invention provides a tar storage tank tail gas recovery device and method, which has the following beneficial effects:
[0094] The tar in the first tar storage tank is poured into the second tar storage tank through a tar stirring pump. When the first tar storage tank is in operation, the first regulating valve is adjusted to make the first tar storage tank operate under positive pressure, and the second regulating valve is adjusted to make the second tar tank operate under positive pressure. Under positive pressure, the first tar storage tank and the second tar storage tank are not easy to inhale air, which reduces the risk of physical or chemical explosion accidents. At the same time, the third regulating valve is adjusted to make the exhaust gas emission main pipe operate under negative pressure, so that the exhaust gas in the first tar storage tank and the second tar storage tank can be quickly discharged through the exhaust gas emission main pipe.
[0095] It can be understood that the above embodiments only express the preferred implementation modes of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the present invention. It should be pointed out that, for ordinary technicians in this field, the above technical features can be freely combined without departing from the concept of the present invention, and several deformations and improvements can be made, which all belong to the protection scope of the present invention. Therefore, all equivalent changes and modifications made to the scope of the claims of the present invention should belong to the coverage of the claims of the present invention.
Claims
1. A tar storage tank tail gas recovery device, characterized in that: include: Blower; A first nitrogen access pipeline, one end of which is connected to a nitrogen source; a first tar storage tank, connected to the other end of the first nitrogen access pipeline, wherein a first regulating valve is provided on the connection between the first tar storage tank and the first nitrogen access pipeline; a second nitrogen access pipeline, wherein one end of the second nitrogen access pipeline is connected to a nitrogen source; a second tar storage tank, used for pouring oil from the first tar storage tank, the second tar storage tank being connected to the other end of the second nitrogen access pipeline, and a second regulating valve being arranged on the connection between the second tar storage tank and the second nitrogen access pipeline; An exhaust gas discharge pipe, one end of which is in communication with the second tar storage tank, and the other end of which is in communication with the inlet of the blower, a third regulating valve and a first pressure gauge are provided on the exhaust gas discharge pipe, the first pressure gauge is arranged between the third regulating valve and the second tar storage tank, the first pressure gauge is used to monitor the pressure of the exhaust gas discharge pipe, and the third regulating valve is used to adjust the exhaust gas discharge pipe to operate under negative pressure; An exhaust gas discharge branch pipe, one end of which is connected to the first tar storage tank, and the other end of which is connected to the exhaust gas discharge main pipe; Tar mixing pumps; a first pipeline, one end of which is in communication with the first tar storage tank, and the other end of which is in communication with the inlet of the tar stirring pump; a second pipeline, one end of which is in communication with the second tar storage tank, and the other end of which is in communication with the outlet of the tar stirring pump; When nitrogen is added to the first tar storage tank, the first regulating valve is adjusted to make the first tar storage tank operate under positive pressure; when nitrogen is added to the second tar storage tank, the second regulating valve is adjusted to make the second tar storage tank operate under positive pressure.
2. The tar storage tank tail gas recovery device according to claim 1, characterized in that: Also includes: A third pipe, one end of the third pipe is connected to the top of the first tar storage tank, and the other end of the third pipe is connected to the top of the second tar storage tank.
3. The tar storage tank tail gas recovery device according to claim 2, characterized in that: The tar storage tank tail gas recovery device further includes: a fourth pipeline and a fifth pipeline, one end of the fourth pipeline is connected to the first tar storage tank, the other end of the fourth pipeline is connected to the second pipeline, one end of the fifth pipeline is connected to the second tar storage tank, and the other end of the fifth pipeline is connected to the first pipeline; Among them, a shut-off valve is provided on the first pipeline, and the shut-off valve on the first pipeline is located between the first tar storage tank and the other end of the fifth pipeline, a shut-off valve is provided on the second pipeline, and the shut-off valve on the second pipeline is located between the second tar storage tank and the other end of the fourth pipeline, a shut-off valve is provided on the fourth pipeline, and a shut-off valve is provided on the fifth pipeline.
4. The tar storage tank tail gas recovery device according to claim 2 or 3, characterized in that: A first ventilation pipe connected to the storage chamber of the first tar storage tank is arranged on the top of the first tar storage tank, and a first single-call valve, a first breathing valve, a first discharge valve and a second pressure gauge are arranged on the first ventilation pipe. The first discharge valve is arranged at one end of the first ventilation pipe away from the first tar storage tank.
5. The tar storage tank tail gas recovery device according to claim 4, characterized in that: A second ventilation pipe communicating with the second tar storage tank is disposed on the top of the second tar storage tank, a second single-call valve, a second breathing valve, a second discharge valve and a third pressure gauge are disposed on the second ventilation pipe, and the second discharge valve is disposed at an end of the second ventilation pipe away from the second tar storage tank; One end of the third duct is communicated with the first ventilation duct, and the other end of the third duct is communicated with the second ventilation duct.
6. The tar storage tank tail gas recovery device according to claim 1, characterized in that: Shut-off valves are respectively arranged on both sides of the first regulating valve, and a first branch pipe is further arranged on the first nitrogen access pipeline, one end of the first branch pipe is connected to the first nitrogen access pipeline and is located between the nitrogen source and the shut-off valve on the first nitrogen access pipeline close to the nitrogen source, and the other end of the first branch pipe is connected to the first nitrogen access pipeline and is located between the first tar storage tank and the shut-off valve on the first nitrogen access pipeline close to the first tar storage tank, and a first traffic valve and a first flow limiting orifice are arranged on the first branch pipe; Shut-off valves are respectively arranged on both sides of the second regulating valve, a second branch pipe is arranged on the second nitrogen access pipeline, one end of the second branch pipe is connected to the second nitrogen access pipeline and is located between the nitrogen source and the shut-off valve on the second nitrogen access pipeline close to the nitrogen source, the other end of the second branch pipe is connected to the second nitrogen access pipeline and is located between the second tar storage tank and the shut-off valve on the second nitrogen access pipeline close to the second tar storage tank, and a second traffic valve and a second flow limiting orifice are arranged on the second branch pipe.
7. The tar storage tank tail gas recovery device according to claim 1, characterized in that: Shut-off valves are respectively arranged on both sides of the third regulating valve; A fourth pressure gauge and a third branch pipe are also provided on the exhaust gas emission main pipe. One end of the third branch pipe is connected to the exhaust gas emission main pipe and is located between the second tar storage tank and the shut-off valve on the exhaust gas emission main pipe close to the second tar storage tank. The other end of the third branch pipe is connected to the exhaust gas emission main pipe and is located between the blower and the shut-off valve on the exhaust gas emission main pipe close to the blower. A third traffic valve is provided on the third branch pipe.
8. The tar storage tank tail gas recovery device according to claim 1, characterized in that: The exhaust gas main pipe is also provided with a shut-off valve and an oxygen analyzer, wherein the oxygen analyzer is used to analyze the oxygen content in the exhaust gas in the exhaust gas main pipe, wherein when the oxygen content in the exhaust gas in the exhaust gas main pipe is greater than a first preset value, the shut-off valve is closed; The tar storage tank tail gas recovery device also includes a post-electrostatic precipitator gas pipeline, one end of which is connected to the tail gas emission main pipe, and one end of the post-electrostatic precipitator gas pipeline is located on the tail gas emission main pipe between the shut-off valve and the blower.
9. The tar storage tank tail gas recovery device according to claim 8, characterized in that: The first regulating valve and the second regulating valve are self-supporting regulating valves, and the third regulating valve is an automatic regulating valve, wherein the self-supporting regulating valve and the cut-off valve are air-opening valves.
10. A method for recovering tail gas from a tar storage tank, using the tail gas recovery device for a tar storage tank as claimed in any one of claims 1 to 9, characterized in that: The tar storage tank tail gas recovery method comprises: Turning on the tar stirring pump to pour oil from the first tar storage tank into the second tar storage tank; Regulating the first regulating valve and the second regulating valve so that the nitrogen source replenishes nitrogen into the first tar storage tank and the second tar storage tank, and regulating the first tar storage tank and the second tar storage tank to operate under positive pressure; Open the third regulating valve and adjust the third regulating valve to make the exhaust gas discharge main pipe operate under negative pressure; The blower is turned on to recover the tail gas generated by the first tar storage tank and the second tar storage tank to the desulfurization process for desulfurization treatment.
Citation Information
Patent Citations
Storage tank nitrogen sealing system
CN107472739A
Anti-blocking device and method for closed collection of tail gas of tar tank in coal tar deep processing tank area
CN113716233A
Device and method for centralized collection and purification treatment of tail gas of coal tar deep processing storage tank
CN117504543A
Storage tank vapor recovery system system
CN204957454U
Ordinary pressure storage tank device
CN205441542U