Material preparation and transfer system and method

By designing the material preparation transfer system, using the material preparation transfer device and pallet recycling device, the pallet and material preparation are automatically transferred to the feeding assembly, which solves the continuous loading and pallet recycling problems of heavy materials such as steel plates in automated production, and realizes the automated assembly line Stable operation and efficient production.

CN118877464AActive Publication Date: 2024-11-01GUANGDONG RUIHUI INTELLIGENT TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411166514.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-01
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

During the automated production process, high-weight materials such as steel plates are directly sent to the working station without buffering stations, making it difficult to achieve continuous loading, and the prior art has failed to effectively solve the problem of subsequent stacking transfer of materials.

Method used

A material preparation transfer system was designed, including a material preparation transfer device, a load cart, a pallet recycling device and a pallet. The pallet and material preparation are transferred to the load cart through the material preparation transfer device. After unloading, the pallet without material preparation is recycled to realize the automatic transfer of material preparation and Automatic recycling of pallets ensures stable loading of the automated assembly line.

Benefits of technology

It realizes the automatic transfer of material preparation and the automatic recycling of pallets, maintains the stable efficiency of production, and provides a buffer interval before loading, solving the automation problems of material preparation and pallet recycling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118877464A_ABST
    Figure CN118877464A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of automatic production lines, and discloses a prepared material transferring system and method.The system comprises a prepared material transferring device, a bearing trolley, a tray recycling device, a tray and a first guide rail; the tray is used for placing prepared materials; the prepared material transfer device is arranged on the side of the first guide rail; the tray recovery device is arranged at the tail end of the first guide rail. According to the scheme, trays and prepared materials borne by the trays are borne through the prepared material transferring device, the trays and the prepared materials are transferred to the bearing trolley of the first track, the bearing trolley loads the trays and the prepared materials to the feeding assembly for discharging, the bearing trolley carries the trays to move to the tray recycling device after discharging, and the tray recycling device recycles the trays; and the bearing trolley moves to the prepared material transferring device to receive the materials, the processes are repeated, automatic transferring of the prepared materials and automatic recycling of the trays are achieved, stable feeding of the automatic assembly line work is kept, stable production efficiency is maintained, and the prepared material transferring process further provides a temporary storage interval before feeding.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of automated production lines, and in particular to a material preparation and transfer system and method. Background Art

[0002] The automated production process usually includes procedures such as loading, sorting, operation, and unloading. In the conventional loading process, the material is usually transported to the sorting station through a conveyor belt and then transported to the operation station for operation production, or directly transported to the operation station for operation production. However, for heavy materials such as steel plates, it is difficult to achieve continuous loading if they are directly sent to the operation station without a buffer station. Therefore, it is necessary to reserve materials in advance at the preparation station and how to move the prepared materials to the loading station.

[0003] Chinese patent CN202020617972.6 discloses a transfer device for a steel plate logistics supply chain, including an electric forklift, a controller is connected to the electric box on the side wall of the electric forklift, an electric telescopic fork plate is provided on the fork plate of the electric forklift, and an adjustable stacking structure is connected to the side wall of the electric forklift. This solution solves the problem of not being able to stack and transfer, but does not disclose how to transfer the subsequent stacking, which needs to be improved.

[0004] The present invention overcomes the shortcomings of the prior art and provides a system and method for transferring prepared materials, which are used to realize the automatic transfer of prepared materials so as to continuously load materials for subsequent operations. Summary of the invention

[0005] The main purpose of the present invention is to provide a material preparation transfer system, including a material preparation transfer device, a carrying trolley, a pallet recovery device, a pallet and a first guide rail; the pallet is used to place the prepared materials; the material preparation transfer device is arranged on the side of the first guide rail, and is used to transfer the pallet to the carrying trolley; the pallet recovery device is arranged at the end of the first guide rail, and is used to recover the pallet without prepared materials, and the head end of the first guide rail is connected to the loading assembly; the carrying trolley is arranged on the first guide rail and moves along the first guide rail, and the carrying trolley is used to carry the pallet or the pallet and its prepared materials.

[0006] Optionally, the carrying trolley moves along the first guide rail to the corresponding position of the material preparation transfer device, the material preparation transfer device moves the pallet carrying the prepared materials to the carrying trolley, and the carrying trolley loaded with the pallet and the prepared materials moves along the first guide rail to the loading assembly to unload; after unloading, the carrying trolley loads the pallet without prepared materials and moves to the pallet recovery device, and the pallet recovery device separates the pallet from the carrying trolley and recycles the pallet.

[0007] Optionally, the material transfer device comprises a first moving component, a second moving component, a third moving component and a bearing component, the second moving component and the third moving component are arranged on the bearing component, and the first moving component is connected to the bearing component to drive the bearing component to move;

[0008] The second moving assembly includes a conveyor belt, which is arranged on the carrying assembly and is used to move the pallet carrying the prepared materials;

[0009] The third moving assembly includes a pushing block, which is arranged on the carrying assembly and is used to push the tray carrying the prepared materials.

[0010] Optionally, the first moving assembly drives the bearing assembly to approach the first guide rail, so that the tray is located at the edge of the first guide rail, and the conveyor belt is connected to the bearing space of the bearing trolley;

[0011] The conveyor belt conveys the pallet portion into the carrying space of the carrying trolley;

[0012] The pushing block pushes the tray to completely enter the carrying space of the carrying trolley, and pushes the tray to separate from the material preparation and transfer device.

[0013] Optionally, the bearing assembly includes a first bearing plate, a second bearing plate and a plurality of sliders, wherein the second bearing plate is disposed above the first bearing plate and connected to the first bearing plate, the sliders are connected below the first bearing plate, and the sliders are matched and connected with the second guide rails in the first moving assembly; the conveyor belt and the push block are disposed on the second bearing plate;

[0014] A rotating assembly is provided between the first bearing plate and the second bearing plate. The rotating assembly is fixedly connected to the first bearing plate, and the rotating assembly drives the second bearing plate to rotate.

[0015] Optionally, the carrying trolley includes a carrying frame, a roller row and a roller assembly; the interior of the carrying frame is hollow; the roller row is arranged on the upper side of the carrying frame, and when the carrying trolley carries a pallet, the pallet is in rolling contact with the roller row, the roller row and the conveyor belt in the material preparation and transfer device are located in the same straight line, and the setting direction of the roller row is parallel to the moving direction of the conveyor belt in the material preparation and transfer device to transport the pallet; the roller assembly is arranged on the lower side of the carrying frame and is in rolling contact with the first guide rail, and the roller assembly drives the carrying frame to move along the first guide rail.

[0016] Optionally, the pallet recovery device comprises a frame and a lifting assembly; the frame is divided into two upper and lower areas, the lower area of ​​the frame is a recovery area, and the upper area is a storage area, the recovery area is connected to the storage area, the storage area is used to store a plurality of stacked pallets, and the stacked pallets are moved out through an exit of the storage area;

[0017] The first guide rail covers the interior of the recycling area, and the recycling area is used to accommodate the carrying trolley, and the carrying trolley drives the pallet to pass through the entrance of the recycling area and move to the interior of the recycling area;

[0018] The lifting assembly is arranged on the frame and is located below the recovery area, and is used to lift the pallet and separate it from the carrying trolley, and move it from the bottom of the storage area to the inside of the storage area.

[0019] Optionally, vertical limit rods are provided on both sides of the storage area exit direction, the limit rods are fixedly connected to the frame and are used for limiting the two sides of the pallet, and a material receiving shaft is provided at the bottom of the limit rods, the material receiving shaft supports the bottom of the pallet, and the material receiving shaft is distributed at four corners at the bottom of the storage area.

[0020] Optionally, the tray includes a bottom frame and a plurality of supporting cross bars, the bottom frame is a hollow structure, the supporting cross bars are arranged on the upper side of the bottom frame and fixedly connected to the bottom frame, the plurality of supporting cross bars are distributed at intervals, and a notch is provided on the lower side of the bottom frame.

[0021] The present invention also provides a material transfer method, which is implemented by the above-mentioned material transfer system and includes the following steps:

[0022] S100, moving the prepared materials and the pallet to a prepared material transfer device, wherein the prepared material transfer device is in a first position to receive the prepared materials and the pallet;

[0023] S200, the material transfer device moves to the second position, the carrying trolley moves to the third position, and the material transfer device moves the material and the pallet to the carrying trolley;

[0024] S300, the carrying trolley carries the prepared materials and the pallet to the fourth position to complete the unloading of the prepared materials;

[0025] S400, the carrying trolley carries the pallet to the fifth position, the pallet recovery device separates the pallet from the carrying trolley, recovers the pallet, and after a predetermined number of pallets are accumulated, the pallet is transferred from the pallet recovery device.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The material preparation transfer system provided by the present invention receives the pallet and the prepared materials carried by the pallet through the material preparation transfer device, and transfers the pallet and the prepared materials to the carrying trolley on the first track, the carrying trolley loads the pallet and the prepared materials to the loading assembly for unloading, and after unloading, the carrying trolley carries the pallet to the pallet recovery device, the pallet recovery device recovers the pallet, and the carrying trolley moves to the material preparation transfer device to receive the materials, and the above process is repeated to realize the automated transfer of prepared materials and the automated recovery of pallets, thereby maintaining stable loading of the automated assembly line and maintaining stable production efficiency, and the material preparation transfer process also provides a buffer interval before loading. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] One or more embodiments are exemplarily described by corresponding drawings, which do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and the figures in the drawings do not constitute proportional limitations unless otherwise stated.

[0029] Figure 1 This is a schematic diagram of an embodiment of a material preparation and transfer system of the present invention;

[0030] Figure 2 A side view of an embodiment of a material preparation and transfer system of the present invention;

[0031] Figure 3 This is a schematic diagram of a material transfer device in an embodiment of a material transfer system of the present invention;

[0032] Figure 4 It is a top view of a material transfer device of an embodiment of a material transfer system of the present invention;

[0033] Figure 5 It is a side view of a material transfer device of an embodiment of a material transfer system of the present invention;

[0034] Figure 6 It is an exploded view of a material transfer device of a material transfer system embodiment of the present invention;

[0035] Figure 7 It is a partial enlarged view of the material transfer device A in the embodiment of the material transfer system of the present invention;

[0036] Figure 8 It is a cross-sectional view of a material transfer device of an embodiment of a material transfer system of the present invention;

[0037] Fig. 9 It is a partial enlarged view of the material transfer device B in the material transfer system embodiment of the present invention;

[0038] Fig.10 Schematic diagram of the pallet recovery device of the material transfer system embodiment of the present invention Figure 1 ;

[0039] Fig.11A side view of a pallet recovery device of a material transfer system embodiment of the present invention Figure 1 ;

[0040] Fig.12 A side view of a pallet recovery device of a material transfer system embodiment of the present invention Figure 2 ;

[0041] Fig.13 Schematic diagram of the pallet recovery device of the material transfer system embodiment of the present invention Figure 2 ;

[0042] Fig.14 This is a partial enlarged view of the C portion of the pallet recovery device of the material preparation and transfer system embodiment of the present invention;

[0043] Fig.15 It is a schematic diagram of the rotation of the material receiving shaft in the pallet recovery device of the material preparation and transfer system embodiment of the present invention;

[0044] Fig.16 This is a cross-sectional view of the material receiving shaft in the pallet recovery device of the material preparation and transfer system embodiment of the present invention.

[0045] Reference numerals:

[0046] 100-material transfer device; a-inclined surface; b-limiting surface; c-pushing surface; 110-first moving assembly; 111-second guide rail; 112-base; 113-sliding cylinder; 120-second moving assembly; 121-conveyor belt; 1211-chain; 1212-sprocket; 122-second motor; 123-sprocket drive belt; 124-linkage shaft; 130-third moving assembly; 131-pushing block; 1311-pushing block; 1312-spring; 1313-fixed seat; 132-pulling cylinder; 140-bearing assembly; 141-first bearing plate; 142-second bearing plate; 143-sliding block; 144-side baffle; 150-rotating assembly; 151-gear ring; 152-driving gear; 153-bearing; 154-first motor ;200-first guide rail;300-tray;310-bottom frame;311-notch;320-support cross bar;400-tray recovery device;410-frame;411-recovery area;412-storage area;413-limit rod;414-material receiving shaft;4141-connecting seat;4142-connecting shaft;4143-rotating surface;4144-arc surface;4145-plane;420-carrying trolley;421-carrying frame;422-roller row;423-roller assembly;4231-driving motor;4232-motor transmission belt;4233-driving wheel;4234-driven wheel;424-baffle;430-lifting assembly;431-first push plate;432-lifting cylinder;440-adjusting cylinder;441-second push plate. DETAILED DESCRIPTION

[0047] In order to facilitate the understanding of the present invention, the present invention is described in more detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that when an element is described as "fixed to" another element, it can be directly on another element, or there can be one or more centered elements therebetween. When an element is described as "connected" to another element, it can be directly connected to another element, or there can be one or more centered elements therebetween. The terms "vertical", "horizontal", "left", "right", "inside", "outside" and similar expressions used in this specification are only for illustrative purposes. In the description of the present invention, the terms "first" and "second" are used only for descriptive purposes and cannot be understood as indicating relative importance or implicitly indicating the number of technical features indicated. Therefore, unless otherwise specified, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; "multiple" means two or more. The term "include" and any variation thereof means non-exclusive inclusion, and one or more other features, integers, steps, operations, units, components and / or combinations thereof may be present or added.

[0048] In addition, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, an indirect connection through an intermediate medium, or a connection between two components. All technical and scientific terms used in this specification have the same meaning as those generally understood by technicians in the technical field of the present invention. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used in this specification includes any and all combinations of one or more related listed items.

[0049] In addition, the technical features involved in different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0050] The stock transfer system provided by the present invention is used for transferring the stock and recovering the pallet loaded with the stock. The stock can be stacked metal sheets, such as aluminum sheets, steel sheets, etc. The stock can be moved to the stock transfer device by a forklift or a mechanical arm. After the stock is transferred, the subsequent operation process can be stamping, laser cutting and other processes.

[0051] like Figure 1-16 The figure is a schematic diagram of an embodiment of the material preparation and transfer system provided by the present invention.

[0052] Please refer to Figure 1-16, this embodiment includes a material preparation transfer device 100, a first guide rail 200, a pallet 300, a pallet recovery device 400 and a carrying trolley 420. The pallet 300 is used to place the prepared materials. The material preparation transfer device 100 is arranged on the side of the first guide rail 200, and is used to transfer the pallet 300 to the carrying trolley 420. The pallet recovery device 400 is arranged at the end of the first guide rail 200, and is used to recover the pallet 300 without prepared materials. The head end of the first guide rail 200 is connected to the loading assembly. The carrying trolley 420 is arranged on the first guide rail 200 and moves along the first guide rail 200. The carrying trolley 420 is used to carry the pallet 300 or the pallet 300 and its prepared materials.

[0053] In one embodiment, the carrying trolley 420 moves along the first guide rail 200 to the corresponding position of the prepared material transfer device 100, and the prepared material transfer device 100 moves the pallet 300 carrying the prepared material to the carrying trolley 420. The carrying trolley 420 is loaded with the pallet 300 and the prepared material and moves along the first guide rail 200 to the loading assembly (not shown) for unloading. After unloading, the carrying trolley 420 is loaded with the pallet 300 without the prepared material and moves to the pallet recovery device 400, and the pallet recovery device 400 separates the pallet 300 from the carrying trolley 420 and recovers the pallet 300. At this point, the transfer of the prepared material and the recovery of the pallet are completed.

[0054] In one embodiment, if Figure 3-9 As shown, the material transfer device 100 includes a first moving assembly 110, a second moving assembly 120, a third moving assembly 130 and a bearing assembly 140. The second moving assembly 120 and the third moving assembly 130 are arranged on the bearing assembly 140. The first moving assembly 110 is connected to the bearing assembly 140, and drives the bearing assembly 140 to move, specifically driving the bearing assembly 140 to move close to or away from the second guide rail. The second moving assembly 120 includes a conveyor belt 121, which is arranged on the bearing assembly 140. The conveyor belt 121 is used to carry and transport the prepared materials, specifically, the conveyor belt 121 drives the pallet carrying the prepared materials to move to the bearing trolley of the second guide rail. The third moving assembly 130 includes a push block 131, which is arranged on the bearing assembly 140. The push block 130 is used to push the pallet 300 carrying the prepared materials, specifically, to push the entire pallet 300 to be located on the bearing trolley 420, so that the pallet 300 is separated from the conveyor belt 121.

[0055] The first moving assembly 110 drives the bearing assembly 140 to approach the first guide rail 200, so that the tray 300 is located at the edge of the first guide rail 200, and the conveyor belt 121 is connected to the bearing space of the bearing trolley 420. The conveyor belt 121 conveys the tray 300 partially into the bearing space of the bearing trolley 420. The pushing block 131 pushes the tray 300 to completely enter the bearing space of the bearing trolley 420, and pushes the tray 300 to separate from the material preparation transfer device 100.

[0056] The bearing assembly 140 includes a first bearing plate 141, a second bearing plate 142 and a plurality of sliders 143. The second bearing plate 142 is disposed above the first bearing plate 141 and connected to the first bearing plate 141. The sliders 143 are connected below the first bearing plate 141, and the sliders 143 are matched and connected with the first guide rails 111 in the first moving assembly 110. The conveyor belt 121 and the push block 131 are disposed on the second bearing plate 142. Side guard plates 144 are disposed on both sides of the second bearing plate 142.

[0057] The first carrier plate 141 and the second carrier plate 142 may be rectangular in shape, and there are four sliders 143 distributed at four corners, with two sliders 143 on each side matching and connecting with the single-side track of the first guide rail 111. The side baffles 144 are used to limit the positions of the tray 300 and the prepared materials on both sides.

[0058] The material transfer device 100 further includes a rotating assembly 150, which is located between the first carrier plate 141 and the second carrier plate 142, and is fixedly connected to the first carrier plate 141. The rotating assembly 150 drives the second carrier plate 142 to rotate, thereby driving the conveyor belt 121 and the push block 131 located on the second carrier plate 142 to rotate together. The rotating assembly 150 can adjust the material receiving direction of the conveyor belt 121 according to the incoming material direction, making the material receiving direction more flexible. After receiving the material, the material transfer direction is adjusted by the rotating assembly 150.

[0059] The rotating assembly 150 includes a ring gear 151, a driving gear 152, a bearing 153 and a first motor 154. The ring gear 151, the driving gear 152 and the bearing 153 are located between the first supporting plate 141 and the second supporting plate 142. The first motor 154 is disposed on the second supporting plate 142. The ring gear 151 is sleeved on the outside of the bearing 153, and the upper end surface of the ring gear 151 is fixedly connected to the lower side of the second supporting plate 142, so that the second supporting plate 142 rotates together with the ring gear 151. The bearing 153 is disposed on the first supporting plate 141, and the driving gear 152 is meshed with the ring gear 151. The output end of the first motor 154 passes through the second supporting plate 142 and is connected to the driving gear 152, driving the driving gear 152 to rotate.

[0060] The first motor 154 drives the driving gear 152 to rotate, and the driving gear 152 meshes with the ring gear 151, thereby driving the ring gear 151 to rotate around the bearing 153. Since the gear 151 is fixedly connected to the second supporting plate 142, the second supporting plate 142 and various components disposed on the second supporting plate 142 are driven to rotate accordingly.

[0061] The first moving assembly 110 includes a second guide rail 111, a base 112, and a sliding cylinder 113. The second guide rail 111 and the sliding cylinder 113 are arranged on the base 112, the first bearing plate 141 is arranged on the second guide rail 111, and the slider 143 of the first bearing plate 141 is matched and connected with the second guide rail 111. The telescopic end of the sliding cylinder 113 is connected to the first bearing plate 141, driving the first bearing plate 141 to move along the direction of the second guide rail 111.

[0062] The base 112 is fixedly connected to the horizontal plane, the setting direction of the second guide rail 111 is perpendicular to the setting direction of the first guide rail 200, and the telescopic end of the sliding cylinder 113 is connected to the farther side of the first bearing plate 141. When the sliding cylinder 113 is extended to the maximum stroke, the first bearing plate 141 is located at the head end of the second guide rail 111, away from the first guide rail 200; when the sliding cylinder 113 is retracted to the shortest stroke, the first bearing plate 141 is located at the tail end of the second guide rail 111, close to the first guide rail 200, and the conveyor belt 121 on the second bearing plate 142 is connected to the bearing trolley, and the conveyor belt 121 and the roller row 422 of the bearing trolley 420 are in the same straight line.

[0063] The second moving assembly 120 further includes a second motor 122 and a sprocket belt 123. The conveyor belt 121 includes a chain 1211 and a sprocket 1212, and the chain 1211 is wound around two sprockets 1212. The second motor 122 is disposed on the second bearing plate 142, and the output end of the second motor 122 is connected to the sprocket belt 123, driving the sprocket belt 123 to rotate, and the sprocket belt 123 is linked to the sprocket 1212, driving the sprocket 1212 to rotate.

[0064] The moving direction of the chain 1211 is parallel to the direction of the first moving assembly 110 , that is, the moving direction of the chain 1211 is parallel to the setting direction of the second guide rail 111 and perpendicular to the setting direction of the first guide rail 200 .

[0065] There are multiple conveyor belts 121, and the sprockets in the multiple conveyor belts 121 are connected by a linkage shaft 124. In this embodiment, there are four conveyor belts 121, which are arranged in parallel. The conveyor belts 121 contact the bottom of the tray 300, driving the tray 300 and the prepared materials carried by the tray 300 to move to the carrying trolley 420.

[0066] The third moving device 130 includes a pulling cylinder 132, which is arranged on the second supporting plate 142. The telescopic end of the pulling cylinder 132 is connected to the pushing block 131. The pulling cylinder 132 pulls the pushing block 131 to move. The moving direction of the pushing block 131 is parallel to the moving direction of the first moving component 110. When pushing the prepared material, the pushing block 131 extends from the upper side surface of the chain 1211.

[0067] The conveyor belt 121 is used to move the stock to the carrying trolley 420 of the first guide rail 200. However, the power of the conveyor belt 121 is limited. As more of the stock moves to the carrying trolley, the contact area between the conveyor belt 121 and the stock becomes smaller, and the conveying power received by the stock becomes smaller, making it difficult to completely transfer the stock to the carrying trolley. Therefore, when the conveyor belt power is insufficient, the material pulling cylinder 132 of the third moving device 130 needs to pull the push block 131 to push the stock, so as to completely transfer the stock in the conveyor belt 121 area to the carrying trolley 420.

[0068] The push block 131 includes a push block 1311, a spring 1312 and a fixed seat 1313. The push block 1311 is hinged to the fixed seat 1313. One end of the spring 1312 is connected to the push block 1311, and the other end is connected to the fixed seat 1313. The fixed seat 1313 is connected to the telescopic end of the pulling cylinder 132. The push block 1311 is provided with an inclined surface a, a limiting surface b and a push surface c. When the push block 1311 pushes the prepared material, the push surface c contacts the tray 300 carrying the prepared material, and the limiting surface b fits the surface of the fixed seat 1313. The inclined surface a faces the incoming direction of the prepared material.

[0069] When the upper side or inclined surface a of the push block 1311 is subjected to pressure, the push block 1311 rotates around the hinge point, driving the push surface c to rotate below the upper surface of the chain 1211, and the push block 1311 stretches the spring 1312, and the limiting surface b is set at an angle with the surface of the fixed seat 1313. When the pressure on the upper side or inclined surface a of the push block 1311 disappears, the spring 1312 retracts and pulls the push block 1311 to rotate back to its original position, driving the push surface c to extend out of the upper surface of the chain 1211, and the limiting surface b is fitted with the surface of the fixed seat 1313. The limiting surface b is set at an angle with the surface of the fixed seat 1313, and the angle setting limits the rotation range of the push block 1311. The limiting surface b limits the rotation direction of the push block 1311.

[0070] The active range of the pulling cylinder 132 pushing the push block 131 is from the middle to the end of the chain 1211. After the conveyor belt 121 conveys the prepared material to the middle of the chain 1211 and exceeds the push block 1311, the push block 1311 supplements power to push the tray 300 and its prepared material to continue moving along the chain 1211 and completely transfer to the carrying trolley.

[0071] The rebound design of the push block 1311 is located under the chain 1211 when the conveyor belt 121 transports the stock, and does not interfere with the movement of the conveyor belt 121. When the conveyor belt 121 transports the stock for a distance exceeding the push block 1311, the push block 1311 rebounds from under the chain 1211 under the action of elastic force, pushes the edge of the stock, and continues to drive the stock to move completely to the carrying trolley.

[0072] The working process of the material transfer device 100 is as follows: the bearing assembly 140 is at the head end of the second guide rail 111 as the initial position, the rotating assembly 150 drives the conveyor belt 121 to rotate to adapt to the direction of the incoming materials, and the pallet loaded with the prepared materials is transferred to the conveyor belt 121 by a forklift. Then the rotating assembly 150 drives the conveyor belt 121 to rotate perpendicular to the first guide rail 200, and the sliding cylinder 113 pulls the bearing assembly 140 from the head end of the second guide rail 111 to the end, and the conveyor belt 121 is connected to the roller row of the carrying trolley. The conveyor belt 121 drives the pallet and the prepared materials to move into the carrying trolley. After moving beyond the push block 1311, the push block 1311 pops out from under the chain 1211, and the pulling cylinder 132 pulls the push block 1311 to push the pallet and the prepared materials along the conveyor belt to be completely transferred to the carrying trolley. After the transfer, the pulling cylinder 132 drives the push block 1311 back to the middle original position, and the sliding cylinder 113 drives the bearing assembly 140 back to the head end of the second guide rail 111. Repeat the above process to achieve continuous transfer of the prepared materials between the bearing trolleys.

[0073] In one embodiment, the carrying trolley 420 includes a carrying frame 421, a roller row 422 and a roller assembly 423. The interior of the carrying frame 421 is hollow. The roller row 422 is arranged on the upper side of the carrying frame 421. When the carrying trolley 420 carries the pallet 300, the pallet 300 rolls in contact with the roller row 422. When the carrying trolley 420 moves to the material transfer device 100 to receive the material, the roller row 122 and the chain 1211 in the material transfer device 100 are in the same straight line (that is, the setting direction of the roller row 422 is parallel to the moving direction of the conveyor belt 121 in the material transfer device 100 to convey the pallet 300). The roller assembly 423 is arranged on the lower side of the carrying frame 421 and rolls in contact with the first guide rail 200. The roller assembly 423 drives the carrying frame 421 to move along the first guide rail 200.

[0074] The roller row 422 includes a plurality of rollers arranged in sequence, and is used to reduce the friction force when the tray 300 moves on the carrying trolley 420. There are a plurality of roller rows 422, and they are arranged in parallel.

[0075] The roller assembly 423 includes a driving motor 4231, a motor transmission belt 4232, two driving wheels 4233 and a plurality of driven wheels 4234. The driving motor 4231 is arranged on the carrying frame 421, the driving motor 4231 is connected to the motor transmission belt 4232 by power, the motor transmission belt 4232 is connected to the driving wheel 4233 by power, the two driving wheels 4233 are linked by a linkage shaft, the two driving wheels 4233 and the plurality of driven wheels 4234 are distributed on both sides of the lower side of the carrying frame 421, and are in contact with the first guide rail 200. The roller assembly 423 drives the carrying trolley 420 to move in the direction of the first guide rail 200. In addition, the carrying trolley 420 includes a baffle 424, which is arranged on both sides of the carrying frame 421 and is parallel to the setting direction of the roller row 422. The baffle 424 is used to limit the two sides of the tray 300.

[0076] In one embodiment, if Figure 10-16 As shown, the pallet recovery device 400 includes a frame 410 and a lifting assembly 430. The frame 410 is divided into two upper and lower areas. The lower area of ​​the frame 410 is the recovery area 411, and the upper area is the storage area 412. The recovery area 411 is connected to the storage area 412. The storage area 412 is used to store a plurality of stacked pallets 300. The stacked pallets 300 are moved out through the exit of the storage area 412. The first guide rail 200 covers the inside of the recovery area 411. The recovery area 411 is used to accommodate a carrying trolley 420. The carrying trolley 420 is used to carry the pallet 300 and drive the pallet 300 to pass through the entrance of the recovery area 411 and move to the inside of the recovery area 411. The direction of the entrance of the recovery area 411 in this embodiment is perpendicular to the direction of the exit of the storage area 412.

[0077] The lifting assembly 430 is disposed on the frame 410 and is located below the recycling area 411 . It is used to lift the pallet 300 and separate it from the carrying trolley 420 , and move the pallet 300 from the bottom of the storage area 412 to the inside of the storage area 412 , so as to realize the recycling and collection of the pallet 300 .

[0078] Vertical limiting rods 413 are provided on both sides of the storage area 412 in the exit direction. The limiting rods 413 are fixedly connected to the frame 410 and are used to limit the positions of the two sides of the pallet 300. The bottom of the limiting rods 413 is provided with a material receiving shaft 414, which supports the bottom of the pallet 300. The material receiving shaft 414 is distributed at four corners at the bottom of the storage area 412. There are four limiting rods 413, two limiting rods 413 are provided on each side, and the limiting rods 413 are used to limit the two sides of the pallet 300. The material receiving shaft 414 supports the bottom of the pallet 300 and limits the pallet 300 inside the storage area 412.

[0079] When the lifting assembly 430 drives the pallet 300 to move from the recycling area 411 to the storage area 412, the top of the pallet 300 contacts the material receiving shaft 414, driving the material receiving shaft 414 to flip upward, and the pallet 300 enters the storage area 412. When the pallet 300 is lifted by the lifting assembly 430 to a height higher than the material receiving shaft 414, the lifting assembly 430 returns to its original position, and the bottom of the pallet 300 contacts the material receiving shaft 414, driving the material receiving shaft 414 to flip downward to a horizontal position, and the material receiving shaft 414 supports the bottom of the pallet 300, so that the pallet 300 is located in the storage area 412.

[0080] Specifically, the material receiving shaft 414 includes a connecting seat 4141, a connecting shaft 4142 and a rotating surface 4143. One end of the connecting shaft 4142 is hinged to the connecting seat 4141, and the other end is connected to the rotating surface 4143. The rotating surface 4143 covers the circumference of the connecting shaft 4142, rotates around the connecting shaft 4142, and the rotating surface 4143 contacts the tray 300. The connecting seat 4141 is fixedly connected to the frame 110. An arc surface 4144 and a plane 4145 are provided at the hinge between the connecting shaft 4142 and the connecting seat 4141, and the connecting shaft 4142 rotates within the range of the arc surface 4144. The material receiving shaft 414 can rotate upward, and return to a horizontal position. Fig.15 As shown, when the tray 300 moves from bottom to top, the tray 300 contacts the horizontal receiving shaft 414, driving the receiving shaft 414 to rotate upward, and the tray 300 enters the storage area 412. Thereafter, the receiving shaft 414 rotates downward under the action of the gravity of the tray 300 and returns to its horizontal original position, thereby supporting the tray 300.

[0081] When the lifting assembly 430 drives the pallet 300 to move from the recovery area 411 to the storage area 412, the top of the pallet 300 contacts the rotating surface 4143, driving the connecting shaft 4142 to rotate upward, and the plane 4145 separates from the surface of the connecting seat 4141. When the pallet 300 is lifted by the lifting assembly 430 to a height higher than the material receiving shaft 414, the gravity of the pallet pressing down causes the lifting assembly 430 to return to its original position, and the bottom of the pallet 300 contacts the rotating surface 4143, driving the connecting shaft 4142 to rotate downward, the material receiving shaft 414 supports the bottom of the pallet 300, the plane 4145 fits the surface of the connecting seat 4141, and the connecting shaft 4142 is in a horizontal position.

[0082] In addition, when the receiving shaft 414 is in a horizontal state, it is perpendicular to the exit direction of the storage area 412. When the stacked pallets 300 move along the exit direction, they contact the rotating surface 4143 of the receiving shaft 414 in a rolling contact manner, which can reduce the friction of the movement of the pallets 300.

[0083] The lifting assembly 430 includes a first push plate 431 and a lifting cylinder 432. The telescopic end of the lifting cylinder 432 is connected to the first push plate 431. The lifting cylinder 432 drives the first push plate 431 to move from the lower part of the recovery area 411 to the upper storage area 412. During the movement, the lifting cylinder 432 passes through the hollow area of ​​the carrying frame 421, lifts the pallet 300 carried by the carrying trolley 420, separates the pallet 300 from the carrying trolley 420, and lifts the pallet 300 to the storage area 412. In this embodiment, the number of the lifting cylinder 432 and the number of the first push plate 431 are two respectively.

[0084] The pallet recovery device 400 further includes an adjustment cylinder 440, and each of the recovery area 411 and the storage area 412 is provided with an adjustment cylinder 440, and the telescopic end of the adjustment cylinder 440 is connected to the second push plate 441. The adjustment cylinder 440 drives the second push plate 441 to push the pallet 300, so as to adjust the position of the pallet 300 in the recovery area 411 and the storage area 412, or compensate the power for the horizontal movement of the pallet 300.

[0085] In one embodiment, the tray 300 includes a bottom frame 310 and a plurality of support bars 320. The bottom frame 310 is a hollow structure, and the hollow structure can facilitate the unloading assembly to lift the prepared materials upward from the bottom of the tray 300. The support bars 320 are arranged on the upper side of the bottom frame 310 and are fixedly connected to the bottom frame 310. The plurality of support bars 320 are distributed at intervals, and a notch 311 is provided on the lower side of the bottom frame 310.

[0086] The present invention also provides an embodiment of a material preparation transfer method, which is implemented by the above-mentioned material preparation transfer system embodiment and includes the following steps:

[0087] S100, moving the prepared materials and the pallet to a prepared material transfer device, which is in a first position to receive the prepared materials and the pallet.

[0088] Specifically, the pallet and the prepared materials can be transferred to the prepared material transfer device by a forklift, and the first position is located at the head end of the second guide rail.

[0089] S200, the material transfer device moves to the second position, the carrying trolley moves to the third position, and the material transfer device moves the material and the pallet to the carrying trolley.

[0090] The second position refers to the end of the second guide rail, and the third position is located at the first guide rail. At this time, the carrying space of the carrying trolley is connected with the carrying space of the material preparation transfer device.

[0091] S300, the carrying trolley carries the prepared materials and the pallet to the fourth position to complete the unloading of the prepared materials.

[0092] The fourth position is the head end of the first guide rail, where a loading assembly, a material dividing assembly or other operating assembly is provided.

[0093] S400, the carrying trolley carries the pallet to the fifth position, the pallet recovery device separates the pallet from the carrying trolley, recovers the pallet, and after the pallet accumulates a predetermined number, the pallet is transferred from the pallet recovery device.

[0094] The fifth position is the end of the first guide rail, which is located in the recovery area of ​​the pallet recovery device. The stacked pallets can be transferred from the pallet recovery device by a forklift.

[0095] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may also be combined, the steps may be implemented in any order, and there are many other changes in different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A material transfer system, It is characterized in that It includes a material transfer device, a carrying trolley, a pallet recovery device, a pallet and a first guide rail; the pallet is used to place the prepared materials; the material transfer device is arranged on the side of the first guide rail, and is used to transfer the pallet to the carrying trolley; the pallet recovery device is arranged at the end of the first guide rail, and is used to recover the pallet without prepared materials, and the head end of the first guide rail is connected to the loading component; the carrying trolley is arranged on the first guide rail and moves along the first guide rail, and the carrying trolley is used to carry the pallet or the pallet and its prepared materials.

2. The material transfer system according to claim 1, It is characterized in that The carrying trolley moves along the first guide rail to the corresponding position of the material preparation transfer device, and the material preparation transfer device moves the pallet carrying the prepared materials to the carrying trolley. The carrying trolley loaded with the pallet and the prepared materials moves along the first guide rail to the loading assembly to unload the materials. After unloading, the carrying trolley loads the pallet without prepared materials and moves to the pallet recovery device, and the pallet recovery device separates the pallet from the carrying trolley and recovers the pallet.

3. The material transfer system according to claim 1, It is characterized in that The material transfer device comprises a first moving assembly, a second moving assembly, a third moving assembly and a bearing assembly, wherein the second moving assembly and the third moving assembly are arranged on the bearing assembly, and the first moving assembly is connected to the bearing assembly to drive the bearing assembly to move; The second moving assembly includes a conveyor belt, which is arranged on the carrying assembly and is used to move the pallet carrying the prepared materials; The third moving assembly includes a pushing block, which is arranged on the carrying assembly and is used to push the tray carrying the prepared materials.

4. The material transfer system according to claim 3, It is characterized in that The first moving assembly drives the bearing assembly to approach the first guide rail, so that the tray is located at the edge of the first guide rail, and the conveyor belt is connected to the bearing space of the bearing trolley; The conveyor belt conveys the pallet portion into the carrying space of the carrying trolley; The pushing block pushes the tray to completely enter the carrying space of the carrying trolley, and pushes the tray to separate from the material preparation and transfer device.

5. The material transfer system according to claim 3, It is characterized in that The bearing assembly comprises a first bearing plate, a second bearing plate and a plurality of sliders, wherein the second bearing plate is arranged above the first bearing plate and connected to the first bearing plate, the sliders are connected below the first bearing plate, and the sliders are matched and connected with the second guide rails in the first moving assembly; the conveyor belt and the push block are arranged on the second bearing plate; A rotating assembly is provided between the first bearing plate and the second bearing plate. The rotating assembly is fixedly connected to the first bearing plate, and the rotating assembly drives the second bearing plate to rotate.

6. The material transfer system according to claim 1, It is characterized in that The load-bearing trolley includes a load-bearing frame, a roller row and a roller assembly; the interior of the load-bearing frame is hollow; the roller row is arranged on the upper side of the load-bearing frame, and when the load-bearing trolley carries a pallet, the pallet is in rolling contact with the roller row, the roller row and the conveyor belt in the material preparation and transfer device are located in the same straight line, and the setting direction of the roller row is parallel to the moving direction of the conveyor belt in the material preparation and transfer device to transport the pallet; the roller assembly is arranged on the lower side of the load-bearing frame and is in rolling contact with the first guide rail, and the roller assembly drives the load-bearing frame to move along the first guide rail.

7. The material transfer system according to claim 1, It is characterized in that The pallet recovery device comprises a frame and a lifting assembly; the frame is divided into two upper and lower areas, the lower area of ​​the frame is a recovery area, and the upper area is a storage area, the recovery area is connected to the storage area, the storage area is used to store a plurality of stacked pallets, and the stacked pallets are moved out through the exit of the storage area; The first guide rail covers the interior of the recycling area, and the recycling area is used to accommodate the carrying trolley, and the carrying trolley drives the pallet to pass through the entrance of the recycling area and move to the interior of the recycling area; The lifting assembly is arranged on the frame and is located below the recovery area, and is used to lift the pallet and separate it from the carrying trolley, and move it from the bottom of the storage area to the inside of the storage area.

8. The material transfer system according to claim 7, It is characterized in that Vertical limit rods are provided on both sides of the storage area exit direction, the limit rods are fixedly connected to the frame and are used to limit the two sides of the pallet, and a material receiving shaft is provided at the bottom of the limit rods, the material receiving shaft supports the bottom of the pallet, and the material receiving shaft is distributed at four corners at the bottom of the storage area.

9. The material transfer system according to claim 1, It is characterized in that The tray includes a bottom frame and a plurality of supporting cross bars. The bottom frame is a hollow structure. The supporting cross bars are arranged on the upper side of the bottom frame and are fixedly connected to the bottom frame. The plurality of supporting cross bars are distributed at intervals, and a notch is arranged on the lower side of the bottom frame.

10. A method for transferring prepared materials, It is characterized in that The method is implemented by the material transfer system according to any one of claims 1 to 9, comprising the following steps: S100, moving the prepared materials and the pallet to a prepared material transfer device, wherein the prepared material transfer device is in a first position to receive the prepared materials and the pallet; S200, the material transfer device moves to the second position, the carrying trolley moves to the third position, and the material transfer device moves the material and the pallet to the carrying trolley; S300, the carrying trolley carries the prepared materials and the pallet to the fourth position to complete the unloading of the prepared materials; S400, the carrying trolley carries the pallet to the fifth position, the pallet recovery device separates the pallet from the carrying trolley, recovers the pallet, and after a predetermined number of pallets are accumulated, the pallet is transferred from the pallet recovery device.

Citation Information

Patent Citations

  • Multi-section belt supporting and conveying device and laser cutting system

    CN212526542U

  • Multifunctional rail shuttling trolley

    CN114194735A

  • Tray stacking device

    CN114890153A

  • Transfer device

    CN117361045A

  • Wood tray stacking device

    CN117533797A