Cable tightening and wire winding all-in-one machine for suspension bridge and construction method
Through the design of suspension bridge cable tightening and wire wrapping machine, the coordinated cooperation of multiple units is used to solve the problems of automation and low space utilization efficiency of cable tightening and wire wrapping construction in the existing technology, and achieve efficient and safe construction results .
Patent Information
- Application Number
- CN202411051832.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-08-01
AI Technical Summary
The existing suspension bridge main cable tightening and wire wrapping construction has problems such as low equipment integration, low automation level, high construction cost, high safety risks and low space utilization efficiency, especially in construction sites with complex terrain or narrow spaces.
Design a suspension bridge cable tightening and wire wrapping machine, including walking unit, cable tightening unit and wire wrapping unit. Through the coordinated cooperation of multiple units, the cable tightening and wire wrapping operations are automated and intelligent, eliminating unnecessary intermediates. Steps and conversion processes to improve construction efficiency and optimize construction space utilization.
It improves the automation level and efficiency of tightening cables and wire wrapping construction, reduces labor costs and construction time, enhances construction safety and accuracy, adapts to the construction needs of complex terrain and narrow spaces, and reduces project risks.
Smart Images

Figure CN118880743A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of main cable clamping of suspension bridges, and more specifically, relates to a cable tightening and wire winding all-in-one machine for suspension bridges and a construction method. Background Art
[0002] The main cable of a suspension bridge is one of the most important structural components of a suspension bridge, and plays a key role in carrying the bridge load, including the bridge's own weight, vehicle load, wind load and other loads; by transferring these loads to the bridge tower, the main cable of a suspension bridge effectively ensures the stability and safety of the bridge. The main cable of a suspension bridge is usually composed of a high-strength steel cable made of multiple steel wires twisted together and arranged in parallel. It is arranged along the direction of the bridge span to provide sufficient strength and stiffness to bear the load of the bridge. Therefore, in order to make the main cable have stable structural performance when bearing the bridge load, it is necessary to tighten the cable and wind the wire to ensure that the main cable is uniformly stressed and reduce the influence of the external environment, so that the bridge can maintain good stability under various loads. For example, when bearing wind load, the tightened main cable can effectively reduce the vibration amplitude of the bridge, reduce the impact of wind-induced vibration on the bridge structure, and ensure the safety performance of the bridge. The steel wire is wound around the outside of the main cable by a wire winding machine to form a protective layer, which can improve the wind resistance of the main cable. The cable tightening and wire winding construction of the main cable of a suspension bridge usually requires large-scale lifting equipment and special machinery, such as lifting cranes, cable traction machines and wire winding machines. These equipment have certain limitations in terms of operating space and environmental conditions at the construction site, especially for construction sites with complex terrain or narrow spaces, which may face some difficulties; at the same time, its construction involves high-altitude operations and the operation of large equipment, so there are certain safety risks.
[0003] The Chinese patent with the document number CN105507129B provides a main cable tightening tooling structure and design method for a suspension bridge, wherein the structure is an upper semicircular cable tightener 1, a lower semicircular cable tightener 2, a cable tightening distribution beam 3, a tensioning rod 4, and a 30t jack 5 installed on the main cable 6, wherein the 30t jack 5 is between the cable tightening distribution beam 3 and the lower semicircular cable tightener 2; the tensioning tensioning rod 4 receives the cross section of the tightened main cable 6, and there is a gap of 1 to 2 mm between the upper semicircular cable tightener 1 and the lower semicircular cable tightener 2. Advantages: The tooling equipment has light components, can be carried by a single person, and can be operated by a group of two people, which can save operators, improve construction efficiency, and save construction costs; the main cable cross section of the tooling equipment after tightening is out of roundness, and the cable clamp can be installed smoothly, which improves the installation efficiency of the cable clamp, improves work efficiency and saves costs. The tooling structure is simple, the components are light, easy to use, quick and simple, safe and reliable, has high construction efficiency, good cable tightening effect, and has great promotion value.
[0004] The cable tightening tooling structure of the main cable of the suspension bridge of the Chinese patent with the document number CN105507129B can play the role of tightening the main cable, but the tooling structure cannot realize the wire winding operation of the main cable at the same time; and it also does not solve some problems existing in the traditional cable tightening and wire winding construction, such as: (1) it cannot provide additional safety measures for high-altitude construction workers; (2) it usually requires a lot of manpower, material resources and time investment, including the cost of equipment rental, engineering personnel training, construction plan adjustment, etc.; (3) the automation level is relatively low, which increases the construction cost and may also cause human errors during the construction process; (4) the integration of construction machinery and equipment is not high, and the coordination between various types of equipment is poor. Summary of the invention
[0005] In view of the above defects or improvement needs of the prior art, the present invention provides an all-in-one cable tightening and wire winding machine and a construction method for a suspension bridge. Through the coordinated cooperation of multiple units, after the main cable tightening operation is completed, the wire winding operation is facilitated, unnecessary intermediate steps and conversion processes are eliminated, and the overall automation level and construction efficiency of the equipment are improved; at the same time, the construction space occupied by the all-in-one machine is relatively small, which is conducive to solving the problem of limited construction space for the main cable wire winding operation and realizing optimized space utilization.
[0006] In order to achieve the above-mentioned object, the present invention provides a suspension bridge cable tightening and wire winding integrated machine, comprising a traveling unit, a cable tightening unit and a wire winding unit, wherein: The walking unit comprises: a first walking frame, an electric winch for pulling the integrated machine, a first connecting beam, a second walking frame, a vertical lifting device for moving the walking unit above the main cable, a third walking frame, a walking motor, a reducer, a gear, a transmission shaft and a bearing support; the first connecting beam passes through a through hole fixed to the second walking frame and is movably connected to the second walking frame, and one end of the first connecting beam is fixedly connected to the first walking frame, and the other end is fixedly connected to the third walking frame; the electric winch is fixedly provided at both ends of the upper left side of the first walking frame; the vertical lifting device is fixedly provided at the middle of the upper ends of the first walking frame, the second walking frame and the third walking frame; the walking motor, the reducer, the gear, the transmission shaft and the bearing support are all fixedly provided on both sides of the cable tightening unit and the wire winding unit; the walking motor is connected to the reducer through a first chain; the transmission shaft is fixedly provided at the lower end of the reducer; the transmission shaft is fixedly provided with the gear at the through hole, and one end of the transmission shaft is also movably connected to the bearing support; The cable tightening unit is arranged in the middle of the walking unit, and comprises: a cable tightening frame, a cable tightening rack and a cable tightening rack support plate; the cable tightening frame is movably connected with the first connecting beam through the fixed through hole; the cable tightening frame is fixedly connected with the cable tightening rack through the cable tightening rack support plate; The wire winding unit is arranged in the middle of the walking unit, including: a wire winding frame, a support plate, a transmission gear, a large gear ring assembly, and an operation console; the wire winding frame is movably connected to the first connecting beam through the fixed through hole, and is fixedly connected to the second walking frame through a connecting steel; the support plate is fixedly arranged inside the wire winding frame, and the transmission gear is fixedly arranged on the lower left end thereof; the outer ring of the transmission gear is meshed with the outer ring surface of the large gear ring assembly; the operation console is fixedly connected to the PLC control box through a signal line; the wire winding unit cooperates with multiple units to realize the intelligent wire winding operation and improve the construction efficiency.
[0007] Furthermore, the walking unit includes: an operating platform, a platform guardrail, a platform escalator, a PLC control box, a second connecting beam, a rack and a lifting ring; the operating platform is fixedly arranged on the upper and lower ends of both sides of the first walking frame and the third walking frame; a platform guardrail is fixedly arranged on the outer side of the operating platform, and the middle parts of the two upper and lower operating platforms on the same side are fixedly connected by the platform escalator; the PLC control box is fixedly arranged on one side of the second walking frame; the second connecting beam is fixedly arranged on the first walking frame, the second walking frame, the third walking frame and the inner side of the lower end of the wire winding frame; the rack is fixedly arranged on the inner side surface of the first connecting beam and meshes with the gear; the lifting ring is fixedly arranged on both ends of the upper part of the first walking frame and the third walking frame.
[0008] Furthermore, the walking unit includes: an electric hydraulic oil pump, a first hydraulic pump station, a first hydraulic jack and a first fastening shoe; one end of the first hydraulic jack is fixedly connected to the first fastening shoe; the first hydraulic pump station is fixedly arranged above one side of the first hydraulic jack, and the first electric hydraulic oil pump is fixedly connected above it.
[0009] Furthermore, the vertical jacking device includes: a drum, a drum mounting frame, a second hydraulic jack and a second electric hydraulic oil pump; the second hydraulic jack is fixedly arranged on one side of the second electric hydraulic oil pump, and one end thereof is fixedly connected to the drum mounting frame; the drum is fixedly arranged in the middle of the lower end of the drum mounting frame.
[0010] Furthermore, the cable tightening unit includes: a second hydraulic pump station, a reaction frame, a first slider, a first slide rail, a third hydraulic jack, a second slide rail, a second slider, a connecting block, a fourth hydraulic jack, a reaction frame pin and a second fastening shoe; the second hydraulic pump station is fixedly arranged on the outer surfaces of both sides of the cable tightening frame; a plurality of reaction frames are fixedly connected and assembled into the cable tightening frame through the reaction frame pin; the fourth hydraulic jack is fixedly arranged on the reaction frame, and one end of the reaction frame passing through the reaction frame is fixedly provided with the second fastening shoe; the first slide rail is fixedly arranged on the inner outer surface of the cable tightening frame, and is adapted to the first slide rail fixedly arranged on the outer surface of the reaction frame; the third hydraulic jack is fixedly arranged on both sides of the cable tightening frame, and it passes through one end of the cable tightening frame and is fixedly connected with the connecting block fixedly arranged on the outer surface of the reaction frame; the second slide rail is fixedly arranged on the outer outer surface of the cable tightening frame, and is adapted to the second slide rail fixedly arranged on the outer surface of the connecting block.
[0011] Furthermore, when the wire winding operation starts, the distance between the cable tightening unit and the wire winding unit is the width of one cable tightening unit.
[0012] Furthermore, the large ring gear assembly includes a support shaft, a ring gear body and a wire winding tension device under the control of the operating console, the ring gear body is fixed to the middle of the support plate through the support shaft, and the wire winding tension device is fixed to the lower left end or the upper right end of the ring gear body.
[0013] Another aspect of the present invention provides a construction method of a suspension bridge cable tightening and wire winding integrated machine, comprising the following steps: S1: Check the cable tightening and winding machine and the wire winding cables of the suspension bridge, and remove debris, dust or other obstacles in the area of the machine; S2: hoisting the integrated machine to a proper position on the main cable so that the plurality of rollers are all above the main cable; the first hydraulic jacks on the left and right sides of the traveling frame operate to clamp the first tightening shoe on the main cable, and then installing the second connecting beam; during the wire winding operation, the integrated machine moves on the main cable in a walking manner and crosses the cable clamp; S3: After cleaning the main cable winding position between the cable clamps, the main cable winding operation is performed by controlling the operation console until the winding unit reaches the cable tightening unit position; at the same time, during the winding process, the cable tension is adjusted so that the winding introduction force is maintained within the range of 1.0t~1.2t; S4: when the cable tightening unit and the wire winding unit move to one side of the first traveling frame, the wire winding operation is suspended, the cable tightening unit and the second traveling frame are kept clamping the main cable, and the traveling unit is pulled by the electric winch to move along the axial direction of the main cable to the third traveling frame close to the second traveling frame, and steps S2-S4 are repeated; S5: After the winding operation is completed, check the quality and working status of the winding; at the same time, perform tension test and vibration test, and record the installation information of the winding, such as the winding date, location, equipment and materials used, and installation inspection information.
[0014] Furthermore, the step-by-step method in step S2 includes the following steps: S201: the wire winding unit maintains a posture of crossing the cable clamp by pulling out a plurality of pins and removing the gear ring movable door, the cable tightening unit and the second traveling frame maintain a posture of clamping the main cable, the first hydraulic jacks of the first traveling frame and the third traveling frame work to move the first tightening shoe away from the main cable until the first traveling frame and the third traveling frame can cross the cable clamp, and the third traveling frame is driven by the electric winch to move to the vicinity of the second traveling frame; S202: The first hydraulic jacks of the first traveling frame and the third traveling frame operate to make the first tightening shoe clamp the main cable, the first hydraulic jack of the second traveling frame operates to make the first tightening shoe move away from the main cable until the second traveling frame can cross the cable clamp, the fourth hydraulic jack is reset, the reaction frame pin is withdrawn, the third hydraulic jack operates to translate the reaction frame to form a channel so that the cable tightening unit can cross the cable clamp, and driven by the traveling motor, the cable tightening unit, the wire winding unit and the second traveling frame move axially along the main cable to the other side of the cable clamp, and the cable tightening unit and the second traveling frame clamp the main cable again; S203: Repeat the above steps, the integrated machine moves on the main cable in a walking manner and passes through the cable clamp, and moves to the next wire winding operation surface.
[0015] Furthermore, the wire winding operation method in step S3 includes the following steps: S301: the integrated machine is located at the position to be wound, at which time the first traveling frame and the third traveling frame maintain a posture of clamping the main cable, the winding unit is located on one side of the third traveling frame, the first fastening shoe of the second traveling frame is away from the main cable and maintains a posture of crossing the cable clamp; the cable tightening unit is at a distance of one width of the cable tightening unit from the winding unit, the third hydraulic jack works to translate and splice the cable tightening frame and uses the reaction frame pin to fix it, the fourth hydraulic jack works to make the second fastening shoe clamp the main cable, and the cable tightening operation is performed on the local position of the main cable to be wound; S302: The wire winding unit is driven by the traveling motor to perform a wire winding operation on the main cable while moving toward the direction of the third traveling frame. When the wire winding operation of one width of the cable tightening unit is completed, the wire winding operation is stopped, and the cable tightening unit is switched to a posture of crossing the cable clamp, and after being driven by the traveling motor to move away from the wire winding unit by a distance of the cable tightening unit width, the cable tightening unit is switched to a posture of clamping the main cable; S303: repeating step S302 until the cable tightening unit moves to the vicinity of the first traveling frame, stopping the wire winding operation, the cable tightening unit and the second traveling frame switch to the posture of clamping the main cable, the first traveling frame and the third traveling frame switch to the posture of crossing the cable clamp, and driven by the electric winch, move along the main cable axis to the third traveling frame, which is located near the second traveling frame; S304: Repeat the above steps, and the integrated machine completes the wire winding operation on the main cable between the cable clamps at the position to be wire wound.
[0016] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art: 1. The all-in-one machine of the present invention, through the coordinated cooperation of multiple units, is convenient for wire winding operations after completing the main cable tightening operation, improves the intelligence and automation of wire winding construction, reduces the total operation time, and improves construction efficiency; at the same time, the all-in-one machine integrates the cable tightening operation and the wire winding operation, eliminates unnecessary intermediate steps and conversion processes, helps to simplify the work process, reduces waiting time and repeated operations at work, and improves construction efficiency; compared with the use of scattered equipment for cable tightening and wire winding operations, the integrated method improves the overall automation level of the equipment, and requires fewer staff to operate and monitor, thereby saving labor costs; through the coordinated cooperation of the all-in-one machine, it helps to improve the accuracy and consistency of the wire winding operation, reduce possible errors and defects in construction, and ensure the quality and stability of the main cable; the all-in-one machine integrates multiple units together, and occupies a relatively small construction space, which is conducive to solving the problem of limited main cable construction space, optimizes space utilization, and improves overall construction efficiency.
[0017] 2. The all-in-one machine of the present invention is convenient for operating and controlling the equipment by setting up multiple operating platforms, which is beneficial to improving work efficiency, and also provides a safe working environment and reduces the risk of accidents.
[0018] 3. The integrated machine of the present invention realizes flexible movement on the first connecting beam by configuring walking unit components in the cable tightening unit and the wire winding unit, thereby improving the flexibility and adaptability of the equipment, improving work efficiency and reducing costs.
[0019] 4. The integrated machine of the present invention, by pulling out multiple reaction frame pins and using a third hydraulic jack to translate and splice the reaction frames to form a channel, allows the cable tightening unit to easily cross the cable clamp, thereby reducing the process, saving time and labor costs, improving construction efficiency, reducing engineering risks, improving construction safety, and facilitating subsequent maintenance and inspection.
[0020] 5. The integrated machine of the present invention, by pulling out a plurality of pins and removing the gear ring movable door, allows the wire winding unit to conveniently cross the cable clamp to perform wire winding operations on the main cable after the cable clamp is installed, thereby reducing the number of working procedures, saving time and labor costs, improving construction efficiency, reducing engineering risks, improving construction safety, and facilitating subsequent maintenance and inspection.
[0021] 6. The all-in-one machine of the present invention adjusts the tension of the wire winding tension device by adjusting the pressure on the oil pressure gauge fixed inside the third hydraulic pump station, and determines the calibration equation input system by calibrating the relationship between the oil pressure and the tension, so that the wire winding tension can be monitored in real time during the wire winding operation and can be adjusted at any time, effectively ensuring the wire winding quality.
[0022] 7. The all-in-one machine of the present invention monitors and controls the operation of the all-in-one machine through an operation console, thereby realizing automation and intelligence of the all-in-one machine and improving safety and construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic structural diagram of a cable tightening and wire winding integrated machine for a suspension bridge according to an embodiment of the present invention; Figure 2 This is a schematic structural diagram of a cable tightening unit according to an embodiment of the present invention; Figure 3 It is a side view of a cable tightening unit according to an embodiment of the present invention; Figure 4 It is a three-dimensional structural diagram of a wire winding unit according to an embodiment of the present invention; Figure 5 It is a front view of a wire winding unit according to an embodiment of the present invention; Figure 6 A front view of an operating console according to an embodiment of the present invention; Figure 7 This is a flowchart of the construction method of the integrated machine according to an embodiment of the present invention; Figure 8 This is a flow chart of the steps of moving the integrated machine in a step-by-step manner according to an embodiment of the present invention; Fig. 9 The present invention is a flowchart of the wire winding operation steps of the integrated machine according to the embodiment of the present invention.
[0024] In all the drawings, the same reference numerals represent the same technical features, specifically: 100-travel unit, 101-first travel frame, 102-electric winch, 103-first connecting beam, 104-operating platform, 105-platform guardrail, 106-platform escalator, 107-PLC control box, 108-connecting steel, 109-second travel frame, 110-electric hydraulic oil pump, 111-first hydraulic pump station, 112-first hydraulic jack, 113-first fastening shoe, 114-second connecting beam, 115-vertical lifting device, 116-drum, 117-rack, 118-drum mounting frame, 119-second hydraulic jack, 120-lifting ring, 121-third walking frame, 122-walking motor, 123-reducer, 124-first chain, 125-gear, 126-through hole, 127-drive shaft, 128-bearing support, 129-second electric hydraulic oil pump, 200-tightening cable unit, 201-tightening cable frame, 202-first Second hydraulic pump station, 203-reaction frame, 204-first slider, 205-first slide rail, 206-third hydraulic jack, 207-second slide rail, 208-second slider, 209-connecting block, 210-fourth hydraulic jack, 211-reaction frame pin, 212-tightening cable rack, 213-second fastening shoe, 214-tightening cable rack support plate, 300-wire winding unit, 301-wire winding frame, 302-support plate, 303-support seat, 304-support shaft, 305- Transmission gear, 306-large gear ring assembly, 307-front wire outlet guide device, 308-gear ring movable door, 309-wire storage wheel and damping device, 310-steering wire guide device, 311-rear wire outlet guide device, 312-rear wire outlet wheel transition guide wheel device, 313-wire winding tension device, 314-gear ring body, 315-third hydraulic pump station, 316-operation console, 317-display end, 318-input end, 319-communication interface, 401-main cable, 402-cable clamp. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0026] like Figures 1 to 6As shown, an embodiment of the present invention provides a suspension bridge cable tightening and wire winding integrated machine, comprising a traveling unit 100, a cable tightening unit 200 and a wire winding unit 300. The traveling unit 100 is arranged above the main cable 401, and an operating platform 104 for ensuring safe operation is fixed on both sides; the cable tightening unit 200 is arranged on one side of the wire winding unit 300, and both are arranged in the middle of the traveling unit 100 through the first connecting beam 103; the upper parts of the cable tightening unit 200 and the wire winding unit 300 are fixed with a traveling unit 100 component for driving them to walk, so that they can move along the first connecting beam 103, and flexibly perform the main cable tightening and wire winding operations. The all-in-one machine of the present invention facilitates the wire winding operation after completing the main cable tightening operation through the coordinated cooperation of multiple units, thereby reducing the total operation time and improving construction efficiency; at the same time, the all-in-one machine integrates the cable tightening operation and the wire winding operation, eliminating unnecessary intermediate steps and conversion processes, helping to simplify the work process, reduce waiting time and repeated operations at work, and improve construction efficiency; compared with the use of scattered equipment for cable tightening and wire winding operations, the integrated method improves the overall automation level of the equipment, and requires fewer staff to operate and monitor, thereby saving labor costs; through the coordinated cooperation of the all-in-one machine, it helps to improve the accuracy and consistency of the wire winding operation, reduce possible errors and defects in construction, and ensure the quality and stability of the main cable; the all-in-one machine integrates multiple units together, and occupies a relatively small construction space, which is conducive to solving the problem of limited main cable construction space, optimizes space utilization, and improves overall construction efficiency.
[0027] like Figures 1 to 5As shown, the walking unit 100 includes: a first walking frame 101, an electric winch 102, a first connecting beam 103, an operating platform 104, a platform guardrail 105, a platform escalator 106, a PLC control box 107, a connecting steel 108, a second walking frame 109, an electric hydraulic oil pump 110, a first hydraulic pump station 111, a first hydraulic jack 112, a first fastening shoe 113, a second connecting beam 114, a vertical jacking device 115, a roller 116, a rack 117, a roller mounting frame 118, a second hydraulic jack 119, a lifting ring 120, a third walking frame 121, a walking motor 122, a reducer 123, a first chain 124, a gear 125, a through hole 126, a transmission shaft 127, a bearing support 128 and a second electric hydraulic oil pump 129. The traveling frame includes a first traveling frame 101, a second traveling frame 109 and a third traveling frame 121; an electric winch 102 for pulling the traveling unit is fixedly provided on the upper left side of the first traveling frame 101; the traveling frame is a portal frame, a detachable second connecting beam 114 is fixedly provided on the inner side of the bottom, a first hydraulic jack 112 is fixedly provided on both sides, and one end of the first hydraulic jack 112 is fixedly connected to a first fastening shoe 113; a first hydraulic pump station 111 is fixedly provided on the outer surface of the traveling frame above one side of the first hydraulic jack 112 The first hydraulic pump station 111 is fixedly connected to the first electric hydraulic oil pump 110 above; a vertical jacking device 115 is fixedly provided at the middle of the upper end of the traveling frame; the vertical jacking device 115 also includes a roller 116, a roller mounting frame 118, a second hydraulic jack 119 and a second electric hydraulic oil pump 129; the second hydraulic jack 119 is fixedly provided on one side of the second electric hydraulic oil pump 129, and is fixedly connected to the roller mounting frame 118 through one end of the traveling frame; the roller 116 is fixedly provided at the middle of the lower end of the roller mounting frame 118, so that the entire The crane moves on the upper end of the main cable 401; the right side of the first traveling frame 101 is fixedly connected to the left side of the third traveling frame 121 through a plurality of first connecting beams 103; both ends of the upper parts of the first traveling frame 101 and the third traveling frame 121 are fixedly provided with lifting rings 120 for lifting, and the upper and lower ends of both sides are fixedly provided with operating platforms 104; the outer side of the operating platform 104 is fixedly provided with a platform guardrail 105, and the middle parts of the two upper and lower operating platforms 104 on the same side are fixedly connected by a platform escalator 106; the second traveling frame 109 is fixedly provided with a plurality of first connecting beams 103 connected to the first traveling frame 101 and the third traveling frame 121. 3, one side of which is fixedly connected to the wire winding frame 301 through a plurality of connecting steels 108, and the PLC control box 107 is fixedly arranged on one side of the wire winding frame 301; the travel motor 122 is fixedly arranged at the middle of the upper end of the cable tightening frame 201 and the wire winding frame 301, and is connected to a plurality of reducers 123 fixedly arranged on both sides of the upper end of the cable tightening frame 201 and the wire winding frame 301 through the first chain 124; the lower end of the reducer 123 is fixedly provided with a transmission shaft 127; the transmission shaft 127 is fixedly provided with a gear 125 at the position of the through hole 126;The gear 125 meshes with the rack 117 fixed on the inner side of the first connecting beam 103; the bearing support 128 is fixed on the upper and lower ends of both sides of the cable tightening frame 201 and the wire winding frame 301, and is movably connected with the transmission shaft 127 to support the transmission shaft 127; during the construction process, the electric winch 102 and the vertical jacking device 115 are used to move the entire integrated machine on the main cable, which is efficient and convenient to operate, reducing manpower input and time costs; by setting up multiple operating platforms 104, it is convenient to operate and control the equipment, which is conducive to improving work efficiency, and also provides a safe working environment and reduces the risk of accidents; by configuring the walking unit 100 components on the cable tightening unit 200 and the wire winding unit 300, it is realized that it is flexible to move on the first connecting beam 103, which improves the flexibility and adaptability of the equipment, improves work efficiency, and reduces costs. ;
[0028] Preferably, the length of the connecting steel 108 is 80-100 cm.
[0029] Preferably, the reducer 123 comprises a gear reducer.
[0030] like Figures 1 to 3As shown, the cable tightening unit 200 includes: a cable tightening frame 201, a second hydraulic pump station 202, a reaction frame 203, a first slider 204, a first slide rail 205, a third hydraulic jack 206, a second slide rail 207, a second slider 208, a connecting block 209, a fourth hydraulic jack 210, a reaction frame pin 211, a cable tightening frame 212, a second tightening shoe 213 and a cable tightening frame support plate 214. Among them, the cable tightening frame 201 is movably connected with the first connecting beam 103 through a fixed through hole 126, and a second hydraulic pump station 202 is fixed on the outer surface of both sides of the cable tightening frame 201; the cable tightening frame 212 is fixedly arranged in the middle of the cable tightening frame 201 through a cable tightening frame support plate 214, and it also includes a reaction frame 203, a fourth hydraulic jack 210, a reaction frame pin shaft 211 and a second fastening shoe 213; a plurality of reaction frames 203 are fixedly connected and assembled into a cable tightening frame 212 through a reaction frame pin shaft 211; the fourth hydraulic jack 210 is fixedly arranged on the reaction frame 203, and a second fastening shoe 213 is fixedly arranged on one end of the reaction frame 203 passing through the reaction frame 203; the first slide rail 205 is fixedly arranged on the inner outer surface of the cable tightening frame 201, and is adapted to the first slider 204 fixedly arranged on the outer surface of the reaction frame 203; the third hydraulic jack 206 is fixedly arranged on both sides of the cable tightening frame 201, and passes through the tightening frame 203. One end of the cable frame 201 is fixedly connected to a connecting block 209 fixedly arranged on the outer surface of the reaction frame 203; the second slide rail 207 is fixedly arranged on the outer surface of the cable tightening frame 201, and is adapted to the second slider 208 fixedly arranged on the outer surface of the connecting block 209; during the construction process, multiple reaction frames 203 are assembled into a cable tightening frame 212 through the reaction frame pin shaft 211, so that multiple fourth hydraulic jacks 210 surround and squeeze the main cable 401, complete the cable tightening operation and control the out-of-roundness of the main cable 401, which is used for the installation of auxiliary cables; by pulling out multiple reaction frame pin shafts 211 and using the third hydraulic jack 206 to translate the assembled reaction frame 203 to form a channel, the cable tightening unit 200 can easily cross the cable clamp 402, thereby reducing the process, saving time and labor costs, improving construction efficiency, reducing engineering risks, improving construction safety, and facilitating subsequent maintenance and inspection.
[0031] Preferably, the out-of-roundness of the main cable 401 is ≤2%.
[0032] like Figure 1 , Figures 4 to 6As shown, the wire winding unit 300 includes: a wire winding frame 301, a support plate 302, a support seat 303, a support shaft 304, a transmission gear 305, a large ring gear assembly 306, a front wire outlet guide device 307, a ring gear movable door 308, a wire storage wheel and damping device 309, a steering wire guide device 310, a rear wire outlet guide device 311, a rear wire outlet wheel transition guide wheel device 312, a wire winding tension device 313, a ring gear body 314, a third hydraulic pump station 315 and an operating console 316. The wire winding frame 301 is movably connected to the first connecting beam 103 through a fixed through hole 126, a PLC control box 107 is fixed on the outer surface of one side, a detachable second connecting beam 114 is fixed on the lower inner side, and the rear side is fixedly connected to the second walking frame 109 through a plurality of connecting steel sections 108; the support plate 302 is fixedly arranged inside the wire winding frame 301, including the upper side and the left and right sides; the support seat 303 is fixedly arranged on the inner side of the support plate on the left and right sides; the support shaft 304 is fixedly arranged on the support plates 302 and the support seat 303 on both sides, and one end of the support shaft 304 is fixedly provided with a gear ring body 314 that is adapted to the support plate 302 and the support seat 303 on both sides. The transmission gear 305 is fixedly arranged at the lower end of the left side of the upper support plate 302, and a gear matched with the gear ring body 314 is fixedly arranged on its outer periphery, which is used to drive the large gear ring assembly 306 to rotate, and its rear side passes through the support plate 302 and is fixedly connected with the driving motor fixedly arranged on the wire winding frame 301; the large gear ring assembly 306 is fixedly arranged in the middle of the wire winding frame 301 through multiple support shafts 304, and it also includes a front wire guide device 307, a gear ring movable door 308, a wire storage wheel and a damping device 309, a steering wire guide device 310, a rear wire guide device 311, and a rear wire wheel transition guide wheel device 312, a wire winding tension device 313, a gear ring body 314, and a third hydraulic pump station 315; wherein, the outer ring of the gear ring body 314 is fixedly provided with a gear adapted to the transmission gear 305, and is fixed to the middle of the wire winding frame 301 through a circular protrusion and a groove adapted to the support shaft 304 provided on the inner side of the outer ring; the inner ring diameter of the gear ring body 314 is larger than the diameter of the approximate circle of the main cable 401 and the cable clamp 402 after the cable clamp 402 is assembled, and there is a gap, and a gear ring movable door 308 is fixed at the gap through a pin shaft to facilitate the wire winding unit to pass through the cable clamp 402; the gear ring body 314 is also fixed A plurality of components of the same type are provided, which are symmetrical with the center of the gear ring body 314 as the center, and are used for winding the main cable 401; wherein, when the large gear ring assembly 306 is in a posture of pre-passing through the cable clamp 402, a plurality of rear wire guide devices 311 are respectively fixedly arranged at the middle of the rear side of the upper end of the gear ring body 314 and the middle of the rear side of the lower end gear ring movable door 308; a rear wire wheel transition guide wheel device 312 is fixedly arranged at the middle of the left and right sides of the inner ring of the gear ring body 314, and is used to cooperate with the rear wire guide device 311; a front wire guide device 307 is fixedly arranged at the inner ring of the gear ring body 314 and one side of the rear wire wheel transition guide wheel device 312;The steering wire guide device 310 is fixedly arranged on the outer surface of the outer side of the gear ring body 314 and one side of the transition guide wheel device 312 of the rear wire outlet wheel; one end of the wire storage wheel and damping device 309 is fixedly arranged on the upper left end or the lower right end of the gear ring body 314, which is mainly composed of two circular steel plates and hollow cylindrical steel pipes with two ends fixedly connected to the middle of the circular steel plates; the wire winding tension device 313 is fixedly arranged on the lower left end or the upper right end of the gear ring body 314, and is used to control and maintain the tension of the cable; the third hydraulic pump station 315 is fixedly arranged on one side of the wire winding frame 301, and corresponds to the position of the PLC control box, and is fixedly connected to the wire winding tension device 313 through a pipeline; during the construction process, after the gear ring movable door 308 is fixed to the lower end of the gear ring body 314 by multiple pins, the transmission gear 305 drives the large gear ring assembly 306 to pull the wire storage wheel and damping device 30 with a certain tension. The cables in the 9 are firmly, evenly and densely wound around the main cable 401, and are driven by the travel motor 122 to move along the axial direction of the main cable 401, thereby completing the winding operation; and the third hydraulic pump station 315 can adjust the tension of the winding tension device 313 by adjusting the pressure on the oil pressure gauge fixed inside it, and determine the calibration equation input system by calibrating the relationship between oil pressure and tension, so that the winding tension can be monitored in real time during the winding operation and can be adjusted at any time, effectively ensuring the winding quality; in addition, by extracting multiple pins and removing the gear ring movable door 308, the winding unit 300 can easily cross the cable clamp 402 to perform the winding operation on the main cable 401 after the cable clamp is installed, thereby reducing the process, saving time and labor costs, improving construction efficiency, reducing engineering risks, improving construction safety, and facilitating subsequent maintenance and overhaul. ;
[0033] Preferably, the operation console 316 can be used to monitor and control the operation of the all-in-one machine. It also includes a display terminal 317 for real-time display of the operating status of the all-in-one machine, an input terminal 318 for adjusting the operation of the all-in-one machine, and a communication interface 319 for fixed connection with the PLC control box 107 via a signal line, thereby realizing the automation and intelligence of the all-in-one machine and improving safety and construction efficiency.
[0034] Preferably, during the wire winding operation, the wire winding introduction force is maintained within the range of 1.0 t to 1.2 t by operating the control console 316 and the wire winding tension device 313 to improve the wire winding effect.
[0035] Preferably, during the winding operation, the comprehensive speed of the equipment moving along the axial direction of the main cable 401 is 28-32 km / h.
[0036] Preferably, the maximum wire capacity of a single wire storage wheel and damping device 309 is ≤500kg.
[0037] Preferably, the wire winding unit is adapted to a main cable diameter of 1200-1550 mm.
[0038] Preferably, the large gear ring assembly 306 includes two wire storage wheels and a damping device 309, so that two cables can be wound at the same time.
[0039] Preferably, the cable comprises galvanized mild steel wire.
[0040] like Figures 7 to 9 As shown, another embodiment of the present invention provides a construction method of a suspension bridge cable tightening and cable clamp screw tensioning integrated machine, comprising the following steps: S1: Check the cable tightening and winding machine and the wire winding cables of the suspension bridge to ensure they are intact and meet the requirements and specifications; remove debris, dust or other obstacles in the area of the machine to facilitate smooth lifting; S2: hoist the integrated machine to a proper position on the main cable 401, so that the multiple rollers 116 are all above the main cable 401; the first hydraulic jacks 112 on the left and right sides of the traveling frame work to make the first fastening shoe 113 clamp the main cable 401, and then install the second connecting beam 114; during the winding operation, the integrated machine moves on the main cable 401 in a walking manner and crosses the cable clamp 402; S3: After cleaning the main cable 401 between the cable clamps 402, the main cable 401 is wound by controlling the operation console 316 until the winding unit 300 reaches the position of the cable tightening unit 200; at the same time, during the winding process, the cable tension is adjusted to maintain the winding guide force within the range of 1.0t~1.2t, and the winding is ensured to be uniform and tight; S4: When the cable tightening unit 200 and the wire winding unit 300 move to one side of the first traveling frame 101, the wire winding operation is suspended, the cable tightening unit 200 and the second traveling frame 109 are kept clamping the main cable 401, and the traveling unit 100 is pulled by the electric winch 102 to move axially along the main cable 401 to the third traveling frame 121 close to the second traveling frame 109, and steps S2-S4 are repeated; S5: After the wire winding operation is completed, check the quality and working status of the wire winding to ensure that the wire winding is uniform, tight, and meets the design requirements and specifications; at the same time, perform tension test and vibration test to verify the stability and reliability of the wire winding, and record the installation information of the wire winding, such as the wire winding date, location, equipment and materials used, and installation inspection information, for subsequent maintenance and management.
[0041] Specifically, the step-by-step method in step S2 includes the following steps: S201: The wire winding unit 300 maintains a posture of crossing the cable clamp 402 by pulling out a plurality of pins and removing the gear ring movable door 308, the cable tightening unit 200 and the second traveling frame 109 maintain a posture of clamping the main cable 401, the first hydraulic jacks 112 of the first traveling frame 101 and the third traveling frame 121 work to move the first tightening shoe 113 away from the main cable 401 until the first traveling frame 101 and the third traveling frame 121 can cross the cable clamp 402, and the third traveling frame 121 is driven by the electric winch 102 to move to the vicinity of the second traveling frame 109; S202: The first hydraulic jacks 112 of the first traveling frame 101 and the third traveling frame 121 work to make the first fastening shoe 113 clamp the main cable 401, the first hydraulic jack 112 of the second traveling frame 109 works to make the first fastening shoe 113 move away from the main cable 401 until the second traveling frame 109 can cross the cable clamp 402, the fourth hydraulic jack 210 is reset, the reaction frame pin 211 is withdrawn, the third hydraulic jack 206 works to translate the reaction frame 203 to form a channel so that the cable tightening unit 200 can cross the cable clamp 402, driven by the traveling motor 122, the cable tightening unit 200, the wire winding unit 300 and the second traveling frame 109 move axially along the main cable 401 to the other side of the cable clamp 402, and the cable tightening unit 200 and the second traveling frame 109 clamp the main cable again; S203: Repeat the above steps, the integrated machine moves on the main cable 401 in a walking manner and passes through the cable clamp, and moves to the next wire winding operation surface.
[0042] Specifically, the wire winding operation method in step S3 includes the following steps: S301: the integrated machine is located at the position to be wound, at which time the first traveling frame 101 and the third traveling frame 121 maintain the posture of clamping the main cable 401, the winding unit 300 is located on one side of the third traveling frame 121, the first fastening shoe 113 of the second traveling frame 109 is away from the main cable 401 and maintains the posture of crossing the cable clamp 402; the cable tightening unit 200 is at a distance of a cable tightening unit 200 width from the winding unit 300, the third hydraulic jack 206 works to translate and splice the cable tightening frame 212 and uses the reaction frame pin 211 to fix it, the fourth hydraulic jack 210 works to make the second fastening shoe 213 clamp the main cable 401, and the cable tightening operation is performed on the local position of the main cable 401 to be wound; S302: The wire winding unit 300, driven by the traveling motor 122, performs a wire winding operation on the main cable 401 while moving toward the third traveling frame 121. When the wire winding operation of a width of the cable tightening unit 200 is completed, the wire winding operation is stopped, and the cable tightening unit 200 switches to a posture of crossing the cable clamp 402. After moving away from the wire winding unit 300 by a distance of the width of the cable tightening unit 200 driven by the traveling motor 122, the cable tightening unit 200 switches to a posture of clamping the main cable 401. S303: Repeat step S302 until the cable tightening unit 200 moves to the vicinity of the first traveling frame 101, stop the wire winding operation, switch the cable tightening unit 200 and the second traveling frame 109 to the posture of clamping the main cable 401, switch the first traveling frame 101 and the third traveling frame 121 to the posture of crossing the cable clamp 402, and move along the axial direction of the main cable 401 to the third traveling frame 121 and be located near the second traveling frame 109 under the drive of the electric winch 102; S304: Repeat the above steps, and the integrated machine completes the wire winding operation on the main cable 401 between the cable clamps 402 at the position to be wire wound.
[0043] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0044] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0045] In this patent, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, the elements defined by the sentence "includes..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Those skilled in the art will readily understand that the above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.
Claims
1. A suspension bridge cable tightening and wire winding machine, characterized in that: It comprises a walking unit (100), a cable tightening unit (200) and a wire winding unit (300), wherein: The walking unit (100) comprises: a first walking frame (101), an electric winch (102) for pulling the integrated machine, a first connecting beam (103), a second walking frame (109), a vertical lifting device (115) for moving the walking unit (100) above the main cable, a third walking frame (121), a walking motor (122), a reducer (123), a gear (125), a transmission shaft (127) and a bearing support (128); the first connecting beam (103) passes through a through hole (126) fixedly provided on the second walking frame (109) and is movably connected to the second walking frame (109), and one end of the first connecting beam (103) is fixedly connected to the first walking frame (101), and the other end is fixedly connected to the third walking frame (121); the electric winch (102) is fixedly provided at both ends of the upper left side of the first walking frame (101); The first traveling frame (101), the second traveling frame (109) and the third traveling frame (121) are all fixedly provided with the vertical lifting device (115) at the middle of the upper end; the traveling motor (122), the reducer (123), the gear (125), the transmission shaft (127) and the bearing support (128) are all fixedly provided at the upper and lower ends of both sides of the cable tightening unit (200) and the wire winding unit (300); the traveling motor (122) is connected to the reducer (123) through a first chain (124); the transmission shaft (127) is fixedly provided at the lower end of the reducer (123); the transmission shaft (127) is fixedly provided with the gear (125) at the through hole (126), and is also movably connected to the bearing support (128); The cable tightening unit (200) is arranged in the middle of the walking unit (100), and comprises: a cable tightening frame (201), a cable tightening rack (212), and a cable tightening rack support plate (214); the cable tightening frame (201) is movably connected to the first connecting beam (103) via the fixed through hole (126); the cable tightening frame (201) is fixedly connected to the cable tightening rack (212) via the cable tightening rack support plate (214); The wire winding unit (300) is arranged in the middle of the walking unit (100), and comprises: a wire winding frame (301), a support plate (302), a transmission gear (305), a large gear ring assembly (306), and an operation console (316); the wire winding frame (301) is movably connected to the first connecting beam (103) through the fixed through hole (126), and is fixedly connected to the second walking frame (109) through the connecting steel (108); the support plate (302) is fixedly arranged inside the wire winding frame (301), and the transmission gear (305) is fixedly arranged at the lower left end of the support plate (302); the outer ring of the transmission gear (305) is meshed with the outer ring surface of the large gear ring assembly (306); the operation console (316) is fixedly connected to the PLC control box (107) through a signal line; the wire winding unit (300) cooperates with multiple units to realize intelligent wire winding operation and improve construction efficiency.
2. The all-in-one machine according to claim 1, characterized in that: The walking unit (100) comprises: an operating platform (104), a platform guardrail (105), a platform ladder (106), a PLC control box (107), a second connecting beam (114), a rack (117) and a lifting ring (120); the operating platform (104) is fixedly arranged at the upper and lower ends of both sides of the first walking frame (101) and the third walking frame (121); a platform guardrail (105) is fixedly arranged on the outer side of the operating platform (104); the middle parts of the two upper and lower operating platforms (104) on the same side are fixedly connected by the platform ladder (106) The PLC control box (107) is fixedly mounted on one side of the second walking frame (109); the second connecting beam (114) is fixedly mounted on the inner side of the lower ends of the first walking frame (101), the second walking frame (109), the third walking frame (121) and the wire winding frame (301); the rack (117) is fixedly mounted on the inner side of the first connecting beam (103) and meshed with the gear (125); the lifting ring (120) is fixedly mounted on both ends of the upper parts of the first walking frame (101) and the third walking frame (121).
3. The all-in-one machine according to claim 1, characterized in that: The walking unit (100) comprises: an electric hydraulic oil pump (110), a first hydraulic pump station (111), a first hydraulic jack (112), and a first fastening shoe (113); one end of the first hydraulic jack (112) is fixedly connected to the first fastening shoe (113); the first hydraulic pump station (111) is fixedly arranged above one side of the first hydraulic jack (112), and the first electric hydraulic oil pump (110) is fixedly connected above the first hydraulic jack (112).
4. The integrated machine according to any one of claims 1 to 3, characterized in that: The vertical lifting device (115) comprises: a roller (116), a roller mounting frame (118), a second hydraulic jack (119) and a second electric hydraulic oil pump (129); the second hydraulic jack (119) is fixedly arranged on one side of the second electric hydraulic oil pump (129), and one end of the second hydraulic jack is fixedly connected to the roller mounting frame (118); the roller (116) is fixedly arranged at the middle part of the lower end of the roller mounting frame (118).
5. The all-in-one machine according to any one of claims 1 to 3, characterized in that: The cable tightening unit (200) comprises: a second hydraulic pump station (202), a reaction frame (203), a first slider (204), a first slide rail (205), a third hydraulic jack (206), a second slide rail (207), a second slider (208), a connecting block (209), a fourth hydraulic jack (210), a reaction frame pin shaft (211) and a second tightening shoe (213); the second hydraulic pump station (202) is fixedly arranged on the outer surfaces of both sides of the cable tightening frame (201); a plurality of reaction frames (203) are fixedly connected and assembled into the cable tightening frame (212) via the reaction frame pin shaft (211); the fourth hydraulic jack (210) is fixedly arranged on the reaction frame (203), and its The second fastening shoe (213) is fixedly provided through one end of the reaction frame (203); the first slide rail (205) is fixedly provided on the inner outer surface of the cable tightening frame (201) and is adapted to the first slider (204) fixedly provided on the outer surface of the reaction frame (203); the third hydraulic jack (206) is fixedly provided on both sides of the cable tightening frame (201), passes through one end of the cable tightening frame (201) and is fixedly connected to the connecting block (209) fixedly provided on the outer surface of the reaction frame (203); the second slide rail (207) is fixedly provided on the outer outer surface of the cable tightening frame (201) and is adapted to the second slider (208) fixedly provided on the outer surface of the connecting block (209).
6. The all-in-one machine according to any one of claims 1 to 3, characterized in that: When the wire winding operation begins, the distance between the cable tightening unit (200) and the wire winding unit (300) is equal to the width of one cable tightening unit (200).
7. The all-in-one machine according to any one of claims 1 to 3, characterized in that: The large ring gear assembly (306) comprises a support shaft (304), a ring gear body (314), and a wire winding tension device (313) controlled by the operating console (316); the ring gear body (314) is fixed to the middle of the support plate (302) via the support shaft (304); and the wire winding tension device (313) is fixed to the lower left end or the upper right end of the ring gear body (314).
8. A construction method of a suspension bridge cable tightening and wire winding integrated machine, implemented by using the integrated machine as described in any one of claims 1 to 7, characterized in that: The steps include: S1: Check the cable tightening and winding machine and the wire winding cables of the suspension bridge, and remove debris, dust or other obstacles in the area of the machine; S2: hoisting the integrated machine to a suitable position on the main cable (401) so that the plurality of rollers (116) are all located above the main cable (401); the first hydraulic jacks (112) on the left and right sides of the traveling frame operate to allow the first tightening shoes (113) to clamp the main cable (401), and then installing the second connecting beam (114); during the wire winding operation, the integrated machine moves on the main cable (401) in a walking manner and crosses over the cable clamp (402); S3: After cleaning the position of the main cable (401) between the cable clamps (402) to be wound, the main cable (401) is wound by controlling the operation console (316) until the winding unit (300) reaches the position of the cable tightening unit (200); at the same time, during the winding process, the cable tension is adjusted so that the winding introduction force is maintained within the range of 1.0 t to 1.2 t; S4: when the cable tightening unit (200) and the wire winding unit (300) move to one side of the first traveling frame (101), the wire winding operation is suspended, the cable tightening unit (200) and the second traveling frame (109) are kept clamping the main cable (401), and the traveling unit (100) is pulled by the electric winch (102) to move axially along the main cable (401) to the third traveling frame (121) close to the second traveling frame (109), and steps S2-S4 are repeated; S5: After the winding operation is completed, check the quality and working status of the winding; at the same time, perform tension test and vibration test, and record the installation information of the winding, such as the winding date, location, equipment and materials used, and installation inspection information.
9. The construction method according to claim 8, characterized in that: The step-by-step method in step S2 includes the following steps: S201: the wire winding unit (300) maintains a posture of crossing the cable clamp (402) by pulling out a plurality of pins and removing the gear ring movable door (308); the cable tightening unit (200) and the second traveling frame (109) maintain a posture of clamping the main cable (401); the first hydraulic jack (112) of the first traveling frame (101) and the third traveling frame (121) operate to move the first tightening shoe (113) away from the main cable (401) until the first traveling frame (101) and the third traveling frame (121) can cross the cable clamp (402); and the third traveling frame (121) is driven by the electric winch (102) to move to the vicinity of the second traveling frame (109); S202: the first hydraulic jack (112) of the first walking frame (101) and the third walking frame (121) operates to make the first fastening shoe (113) clamp the main cable (401), the first hydraulic jack (112) of the second walking frame (109) operates to make the first fastening shoe (113) move away from the main cable (401) until the second walking frame (109) can cross the cable clamp (402), the fourth hydraulic jack (210) is reset, and the reaction frame pin is withdrawn (211), the third hydraulic jack (206) works to translate the reaction frame (203) to form a channel so that the cable tightening unit (200) can cross the cable clamp (402), and driven by the travel motor (122), the cable tightening unit (200), the wire winding unit (300) and the second travel frame (109) move axially along the main cable (401) to the other side of the cable clamp (402), and the cable tightening unit (200) and the second travel frame (109) clamp the main cable again; S203: Repeat the above steps, the integrated machine moves on the main cable (401) in a walking manner and passes through the cable clamp, and moves to the next wire winding operation surface.
10. The construction method according to claim 8, characterized in that: The wire winding operation method in step S3 includes the following steps: S301: the integrated machine is located at a position to be wound, at which time the first traveling frame (101) and the third traveling frame (121) maintain a posture of clamping the main cable (401), the winding unit (300) is located on one side of the third traveling frame (121), the first fastening shoe (113) of the second traveling frame (109) is away from the main cable (401) and maintains a posture of crossing the cable clamp (402); the cable tightening unit (200) is at a distance of one width of the cable tightening unit (200) from the winding unit (300), the third hydraulic jack (206) works to translate and splice the cable tightening frame (212) and fix it using the reaction frame pin (211), the fourth hydraulic jack (210) works to make the second fastening shoe (213) clamp the main cable (401), and perform a cable tightening operation on the local position of the main cable (401) to be wound; S302: the wire winding unit (300), driven by the traveling motor (122), performs a wire winding operation on the main cable (401) while moving toward the third traveling frame (121). When the wire winding operation of a width of the cable tightening unit (200) is completed, the wire winding operation is stopped, and the cable tightening unit (200) switches to a posture of crossing the cable clamp (402). After moving away from the wire winding unit (300) by a distance of a width of the cable tightening unit (200) driven by the traveling motor (122), the cable tightening unit (200) switches to a posture of clamping the main cable (401); S303: repeating step S302 until the cable tightening unit (200) moves to the vicinity of the first traveling frame (101), stopping the wire winding operation, the cable tightening unit (200) and the second traveling frame (109) switch to a posture of clamping the main cable (401), the first traveling frame (101) and the third traveling frame (121) switch to a posture of crossing the cable clamp (402), and driven by the electric winch (102), move axially along the main cable (401) to the third traveling frame (121) and be located near the second traveling frame (109); S304: Repeat the above steps, and the integrated machine completes the wire winding operation on the position to be wire wound of the main cable (401) between the cable clamps (402).
Citation Information
Patent Citations
Main cable wrapping machine and wrapping method therefor
CN101200875A
On-cable walking-type self-walking system
CN102154987A
Wire winding machine applied to wire winding of main cable of four-main-cable integrated cable clamp suspension bridge
CN112554033A
Main cable tightening machine for main cable strand erection construction and use method of main cable tightening machine
CN115573265A
Main cable pre-tightening machine and using method thereof
CN115961553A