Integrated prefabricated mounting device for launder well
Through the integrated prefabricated installation device of the flow channel well, the rapid fixation of the flow channel well is achieved by combining the arc-shaped slot and the annular slide rod. Combined with the use of hydraulic motor and stirrer, the problem of low installation efficiency of the flow channel well is solved, and the implementation of the realization of the flow channel well is achieved. Efficient installation and cement treatment.
Patent Information
- Application Number
- CN202411055561.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, the installation method of the flow channel well is complicated, and the efficiency is low when multiple flow channel wells are installed, making it difficult to improve the installation efficiency.
An integrated prefabricated installation device for flow channel wells is designed, including pre-embedded pits, fixing mechanisms, electric telescopic rods, electric suction cups and stirring mechanisms. The rapid flow channel wells are achieved through the cooperation of arc-shaped slots, annular slide rods and springs. Fix and install, and uniform stirring of cement and unblocking of discharge pipes through hydraulic motors and stirring rods.
The rapid installation of the flow trench well and uniform stirring of cement are achieved, the installation efficiency is improved, and the smoothness of the discharge pipe and the smooth laying of cement are ensured.
Smart Images

Figure CN118880892A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flow channel wells, and in particular to an integrated prefabricated installation device for a flow channel well. Background Art
[0002] A flume well is a special well structure used primarily for groundwater collection and monitoring. It is typically designed as a long, narrow channel or slot that allows water to flow from the surrounding aquifer into the well. This design helps reduce the impact of the well wall on groundwater flow, allowing for more accurate measurements of groundwater flow rate and direction, as well as the collection of representative water samples.
[0003] According to a Chinese patent with the announcement number "CN220013933U", a water trough mounting bracket for an inspection well is disclosed, which solves the problem that it is inconvenient to disassemble and assemble the prefabricated water trough template using the current water trough mounting bracket, thereby affecting work efficiency. The mounting bracket comprises a base plate, the upper end of the base plate is connected to a support bracket, both sides of the inner top wall of the support bracket are symmetrically slidably connected with an electric telescopic rod, the lower end of the electric telescopic rod is connected to a support plate, the lower end of the support plate is clamped with the support plate, and the lower end of the support plate is connected to the prefabricated water trough template. The utility model, through the arrangement of the support plate, the motor, the threaded rod, the threaded sleeve and the fixing bracket, the motor drives the threaded rod to rotate, because the threaded rod is threadedly connected to the threaded sleeve, with the cooperation of the threaded sleeve, the threaded rod is rotated to the outside of the threaded sleeve, so that the support plate is no longer fixedly connected to the support plate, and the prefabricated water trough template is disassembled, replaced or cleaned at this time. The mounting bracket can also be used for the installation of the flow trough well.
[0004] However, when carrying out municipal engineering projects, it is necessary to install multiple flow slot wells for collecting and monitoring groundwater. However, in the prior art, the installation method of the flow slot well is very cumbersome, and when multiple flow slot wells need to be installed, they can only be installed one by one. Therefore, the installation efficiency of the flow slot well needs to be improved. Therefore, an integrated prefabricated installation device for the flow slot well is proposed to solve the above-mentioned problems. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a flow channel well integrated prefabricated installation device in view of the deficiencies in the above-mentioned prior art.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a flow channel well integrated prefabricated installation device, comprising: a foundation, a pre-buried pit is opened on the top of the foundation, and a fixing mechanism is arranged inside the pre-buried pit;
[0007] The fixing mechanism comprises a fixing frame, two arc-shaped slots, two sliding sleeves, two annular sliding rods, two first springs, and two slots;
[0008] The fixing frame is fixedly connected to the bottom inner wall of the embedded pit, the interior of the fixing frame is hollow, the arc-shaped slot is opened at the top of the fixing frame, the sliding sleeve is fixedly connected to the interior of the fixing frame, the two annular slide bars are respectively slidably connected to the interior of the two sliding sleeves, the two first springs are respectively sleeved on the outside of the two annular slide bars, the top ends of the two first springs are respectively fixedly connected to the opposite ends of the two annular slide bars, the bottom ends of the two first springs are respectively fixedly connected to the two sliding sleeves, and the slot is fixedly connected to the top of the fixing frame. The bottoms of the two flow slots to be installed are fixed by setting the arc-shaped slot, the movement of the annular slide bar is limited by setting the sliding sleeve, the annular slide bar is inserted into the slot under the elastic force of the first spring, and the tops of the two flow slots to be installed are fixed.
[0009] Preferably, the bottom inner wall of the fixed frame is fixedly connected with an electric telescopic rod, the top of the electric telescopic rod is fixedly connected with a second limit block, the opposite ends of the two annular sliding bars are fixedly connected with a first limit block, and the first limit block is slidably connected with the second limit block. The two first limit blocks are supported by the second limit block.
[0010] Preferably, a switch button is installed on the arc-shaped slot, and the switch button is electrically connected to the electric telescopic rod. By pressing the switch button, the electric telescopic rod is retracted and the second limit block is driven to move downward.
[0011] Preferably, the top of the foundation is fixedly connected with a first bracket, the bottom of the first bracket is fixedly connected with an electric push rod, the bottom of the electric push rod is fixedly connected with a movable plate, the bottom four corners of the movable plate are fixedly connected with electric suction cups, the two electric suction cups on the front are arranged at the top of the front arc-shaped slot, and the two electric suction cups on the back are arranged at the top of the back arc-shaped slot. The two flow slots to be installed are adsorbed by four electric suction cups.
[0012] Preferably, a tank body is fixedly connected to the foundation via three supporting legs, a stirring mechanism is arranged inside the tank body, cement is arranged inside the tank body, the stirring mechanism comprises a transmission shaft, the bottom end of the transmission shaft is rotatably connected to the bottom inner wall of the tank body via a bearing, and three groups of stirring rods are fixedly connected to the middle of the transmission shaft. The cement inside the tank body is stirred by the rotation of the stirring rods.
[0013] Preferably, the other end of the stirring rod away from the transmission shaft is fixedly connected with a scraper, the scraper is slidably connected to the inner wall of the tank body, the top of the tank body is fixedly connected with a third bracket, the top of the third bracket is fixedly connected with a hydraulic motor, the bottom output end of the hydraulic motor passes through the third bracket and is fixedly connected to the top of the transmission shaft. The scraper is provided to scrape off impurities adhering to the inner wall of the tank body.
[0014] Preferably, the bottom of the tank body is fixedly connected with a discharge pipe, the inner wall of the tank body is fixedly connected with a second bracket, the top of the second bracket is rotatably penetrated by a tamping rod through a linear bearing, the tamping rod is arranged at the top of the discharge pipe, the top of the tamping rod is fixedly connected with a first trapezoidal slider, the bottom of the stirring rod is fixedly connected with a second trapezoidal slider, the first trapezoidal slider is slidably connected with the second trapezoidal slider, the outer sleeve of the tamping rod is provided with a second spring, the top of the second spring is fixedly connected with the first trapezoidal slider, and the bottom of the second spring is fixedly connected with the second bracket. The blockage in the discharge pipe is tamped out by arranging the tamping rod to move up and down.
[0015] Preferably, a reciprocating mechanism is provided on the top of the foundation, the reciprocating mechanism includes a half-tooth gear and two slide grooves, the slide grooves are opened on the top of the foundation, a slider is slidably connected in the middle of the slide groove, a roller is rotatably connected to one side of the slider through a bearing, and the roller is slidably connected to the upper surface of the foundation. The movement of the slider is limited by providing the slide grooves.
[0016] Preferably, the tops of the two left sliders are fixedly connected to a movable bracket via a fourth bracket, the inner walls of the movable bracket are fixedly connected to transmission teeth on both sides, the half-tooth gear is fixedly connected to the middle of the transmission shaft, and the half-tooth gear is meshed with the movable bracket via the transmission teeth, and the tops of the two right sliders are fixedly connected to a fan via a fifth bracket. The movable bracket is limited by setting the fourth bracket, and the cement solidification speed is accelerated by setting the fan.
[0017] The present invention adopts the above technical solution, which can bring the following beneficial effects:
[0018] 1. This kind of integrated prefabricated installation device for flow slot wells drives the movable plate to move downward by turning on the electric push rod, and the electric suction cup and the two flow slot wells to be installed move downward to the two arc-shaped slots, and presses the switch button. After the switch button is pressed, the two annular sliding rods pop out and are inserted into the slots, so that the two flow slot wells can be installed and fixed at the same time, which improves the installation efficiency.
[0019] 2. This integrated prefabricated installation device for a flow trough well drives the transmission shaft to rotate through a hydraulic motor. The rotation of the transmission shaft drives three sets of stirring rods to rotate simultaneously. During the rotation of the stirring rods, the cement inside the tank body is evenly stirred to prevent the cement from solidifying. During the rotation of the stirring rods, the tamping rod is driven to press down repeatedly and the discharge pipe is unblocked, thereby ensuring the smooth flow of the discharge pipe.
[0020] 3. This integrated prefabricated installation device for a flow channel well drives the half-toothed gear to rotate through the rotation of the transmission shaft. The rotation of the half-toothed gear drives the two rollers to roll repeatedly on the cement through the transmission teeth and flatten the cement. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0022] Figure 2 It is a schematic diagram of the back structure of the present invention;
[0023] Figure 3 It is a schematic diagram of the structure of the pre-buried pit area in the present invention;
[0024] Figure 4 It is a side cross-sectional view of the pre-buried pit area in the present invention;
[0025] Figure 5 It is a cross-sectional view of the interior of the tank area in the present invention;
[0026] Figure 6 It is a cross-sectional view of the reciprocating mechanism area in the present invention.
[0027] In the figure: 1, foundation; 2, pre-buried pit; 3, fixing mechanism; 4, tank body; 5, stirring mechanism; 6, reciprocating mechanism; 301, fixing frame; 302, arc-shaped slot; 303, sliding sleeve; 304, annular sliding rod; 305, first spring; 306, slot; 307, first limit block; 308, electric telescopic rod; 309, second limit block; 310, switch button; 311, first bracket; 312, electric push rod; 313, movable plate; 314, electric suction cup; 501, Transmission shaft; 502, stirring rod; 503, scraper; 504, discharge pipe; 505, second bracket; 506, tamping rod; 507, first trapezoidal slider; 508, second trapezoidal slider; 509, second spring; 510, third bracket; 511, hydraulic motor; 601, half-tooth gear; 602, slide; 603, slider; 604, roller; 605, fourth bracket; 606, movable bracket; 607, transmission gear; 608, fifth bracket; 609, fan. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "setting" should be understood in a broad sense, for example, they can be fixedly connected or set, or detachably connected or set, or integrally connected or set. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0031] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "several" is two or more, unless otherwise clearly and specifically defined.
[0032] See also Figure 1-6One embodiment of the present invention is: a prefabricated installation device for an integrated flow channel well, comprising: a foundation 1, a pre-buried pit 2 is opened on the top of the foundation 1, and a fixing mechanism 3 is arranged inside the pre-buried pit 2; the fixing mechanism 3 comprises a fixing frame 301, two arc-shaped slots 302, two sliding sleeves 303, two annular sliding rods 304, two first springs 305, and two slots 306; the fixing frame 301 is fixedly connected to the bottom inner wall of the pre-buried pit 2, the interior of the fixing frame 301 is hollow, and the arc-shaped slot 302 The top of the fixed frame 301 is opened, the sliding sleeve 303 is fixedly connected to the inside of the fixed frame 301, the two annular slide bars 304 are respectively slidably connected to the inside of the two sliding sleeves 303, the two first springs 305 are respectively sleeved on the outside of the two annular slide bars 304, the top ends of the two first springs 305 are respectively fixedly connected to the opposite ends of the two annular slide bars 304, the bottom ends of the two first springs 305 are respectively fixedly connected to the two sliding sleeves 303, and the clamping groove 306 is fixedly connected to the top of the fixed frame 301. The bottom of the two flow slots to be installed is fixed by setting the arc clamping groove 302, the movement of the annular slide bar 304 is limited by setting the sliding sleeve 303, the annular slide bar 304 is inserted into the clamping groove 306 under the elastic force of the first spring 305, and the top of the two flow slots to be installed is fixed. The bottom inner wall of the fixed frame 301 is fixedly connected with an electric telescopic rod 308, the top of the electric telescopic rod 308 is fixedly connected with a second limit block 309, and the opposite ends of the two annular sliding bars 304 are fixedly connected with a first limit block 307, and the first limit block 307 is slidably connected with the second limit block 309. The two first limit blocks 307 are supported by the second limit block 309. A switch button 310 is installed on the arc-shaped card slot 302, and the switch button 310 is electrically connected to the electric telescopic rod 308. By pressing the switch button 310, the electric telescopic rod 308 is retracted, and the second limit block 309 is driven to move downward. The top of the foundation 1 is fixedly connected with a first bracket 311, the bottom of the first bracket 311 is fixedly connected with an electric push rod 312, the bottom of the electric push rod 312 is fixedly connected with a movable plate 313, the bottom four corners of the movable plate 313 are fixedly connected with electric suction cups 314, the two front electric suction cups 314 are arranged on the top of the front arc-shaped slot 302, and the two back electric suction cups 314 are arranged on the top of the back arc-shaped slot 302. The four electric suction cups 314 are used to adsorb the two flow slot wells that need to be installed.
[0033] Working principle: first, the two flow trough wells that need to be installed are respectively adsorbed and fixed on the bottom of the electric suction cup 314, then the electric push rod 312 is turned on to extend, and the movable plate 313 moves downward, and the movable plate 313 moves downward to drive the electric suction cup 314 to move downward, and the electric suction cup 314 moves downward to drive the two flow trough wells that need to be installed to move downward to the two arc-shaped slots 302, and press the switch button 310. After the switch button 310 is pressed, the electric telescopic rod 308 is controlled to contract, and the second limit block 309 moves downward. After the second limit block 309 moves downward, it loses its supporting effect on the two first limit blocks 307. At this time, the two first springs 305 release their elastic force to drive the two annular slide bars 304 to pop out, and insert them into the two slots 306 respectively, and lock the two flow trough wells between the two annular slide bars 304 and the two arc-shaped slots 302 respectively, thereby completing the simultaneous fixation of the two flow trough wells and improving the installation efficiency.
[0034] See also Figure 1-6 On the basis of the above embodiment, in another embodiment of the present invention, a tank body 4 is fixedly connected to the foundation 1 through three supporting legs, a stirring mechanism 5 is arranged inside the tank body 4, cement is arranged inside the tank body 4, and the stirring mechanism 5 includes a transmission shaft 501, the bottom end of the transmission shaft 501 is rotatably connected to the bottom inner wall of the tank body 4 through a bearing, and three groups of stirring rods 502 are fixedly connected to the middle of the transmission shaft 501. The cement inside the tank body 4 is stirred by the rotation of the stirring rods 502. The other end of the stirring rod 502 away from the transmission shaft 501 is fixedly connected to a scraper 503, and the scraper 503 is slidably connected to the inner wall of the tank body 4. The top of the tank body 4 is fixedly connected to a third bracket 510, and the top of the third bracket 510 is fixedly connected to a hydraulic motor 511, and the bottom output end of the hydraulic motor 511 passes through the third bracket 510 and is fixedly connected to the top of the transmission shaft 501. The impurities adhering to the inner wall of the tank body 4 are scraped off by setting the scraper 503. The bottom of the tank body 4 is fixedly connected with a discharge pipe 504, the inner wall of the tank body 4 is fixedly connected with a second bracket 505, the top of the second bracket 505 is rotatably penetrated by a tamping rod 506 through a linear bearing, the tamping rod 506 is arranged at the top of the discharge pipe 504, the top of the tamping rod 506 is fixedly connected with a first trapezoidal slider 507, the bottom of the stirring rod 502 is fixedly connected with a second trapezoidal slider 508, the first trapezoidal slider 507 is slidably connected with the second trapezoidal slider 508, the outer sleeve of the tamping rod 506 is provided with a second spring 509, the top of the second spring 509 is fixedly connected with the first trapezoidal slider 507, and the bottom of the second spring 509 is fixedly connected with the second bracket 505. The blockage in the discharge pipe 504 is tamped out by setting the tamping rod 506 to move up and down.
[0035] Working principle: The transmission shaft 501 is driven to rotate by the hydraulic motor 511, and the rotation of the transmission shaft 501 drives the three sets of stirring rods 502 to rotate simultaneously. During the rotation of the stirring rods 502, the cement inside the tank body 4 is evenly stirred to prevent the cement from solidifying. During the rotation of the stirring rods 502, the second trapezoidal slider 508 is driven to rotate. During the rotation of the second trapezoidal slider 508, it contacts the first trapezoidal slider 507 and presses it down. The first trapezoidal slider 507 moves downward and drives the tamping rod 506 to move downward. During the downward movement of the bottom end of the tamping rod 506, it is inserted into the discharge pipe 504, thereby tamping out the blockage in the discharge pipe 504.
[0036] See also Figure 1-6 On the basis of the above embodiment, in another embodiment of the present invention, a reciprocating mechanism 6 is provided on the top of the foundation 1, and the reciprocating mechanism 6 includes a half-toothed gear 601 and two slide grooves 602. The slide grooves 602 are provided on the top of the foundation 1, and a slider 603 is slidably connected in the middle of the slide grooves 602. A roller 604 is rotatably connected to one side of the slider 603 through a bearing, and the roller 604 is slidably connected to the upper surface of the foundation 1. The movement of the slider 603 is limited by providing the slide grooves 602. The tops of the two left sliders 603 are fixedly connected to a movable bracket 606 through a fourth bracket 605, and the inner walls of the movable bracket 606 are fixedly connected to transmission teeth 607 on both sides. The half-toothed gear 601 is fixedly connected to the middle of the transmission shaft 501, and the half-toothed gear 601 is meshed with the movable bracket 606 through the transmission teeth 607. The tops of the two right sliders 603 are fixedly connected to a fan 609 through a fifth bracket 608. The movable bracket 606 is limited by setting the fourth bracket 605, and the cement solidification speed is accelerated by setting the fan 609.
[0037] Working principle: After the flow channel well is installed, sand is backfilled into the embedded pit 2, and cement is laid on the top layer of the sand. The transmission shaft 501 rotates to drive the half-tooth gear 601 to rotate. The rotation of the half-tooth gear 601 drives the movable bracket 606 to move forward and backward through the transmission gear 607. The movable bracket 606 moves forward and backward and drives the left slider 603 to move left and right through the fourth bracket 605. The left slider 603 moves left and right to drive the two rollers 604 to roll repeatedly on the cement and flatten the cement.
[0038] It is worth noting that: in this embodiment, the switch button 310 and the electric telescopic rod 308 are both commonly used equipment in the prior art, and the models used can be customized according to actual usage requirements. The power supply interface of the electrical equipment in this utility model is connected to the power supply system through a switch diagram not shown and a wire diagram not shown, so as to realize its control. The circuits and controls involved are all prior art and are well known in the current field of technology, so they will not be elaborated here.
[0039] The present invention provides a prefabricated installation device for an integrated flow channel well. There are many methods and ways to implement the technical solution. The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention. All components not specified in this embodiment can be implemented by existing technologies.
Claims
1. A flow channel well integrated prefabricated installation device, comprising: The foundation (1) is characterized in that: a pre-buried pit (2) is provided on the top of the foundation (1), and a fixing mechanism (3) is provided inside the pre-buried pit (2); The fixing mechanism (3) comprises a fixing frame (301), two arc-shaped slots (302), two sliding sleeves (303), two annular sliding rods (304), two first springs (305), and two slots (306); The fixing frame (301) is fixedly connected to the bottom inner wall of the embedded pit (2); the interior of the fixing frame (301) is hollow; the arc-shaped slot (302) is opened at the top of the fixing frame (301); the sliding sleeve (303) is fixedly connected to the interior of the fixing frame (301); the two annular sliding bars (304) are respectively slidably connected to the interior of the two sliding sleeves (303); the two first springs (305) are respectively sleeved on the outside of the two annular sliding bars (304); the top ends of the two first springs (305) are respectively fixedly connected to the opposite ends of the two annular sliding bars (304); the bottom ends of the two first springs (305) are respectively fixedly connected to the two sliding sleeves (303); and the slot (306) is fixedly connected to the top of the fixing frame (301).
2. The integrated prefabricated installation device for a flow channel well according to claim 1, characterized in that: An electric telescopic rod (308) is fixedly connected to the inner wall of the bottom of the fixed frame (301), a second limit block (309) is fixedly connected to the top of the electric telescopic rod (308), and a first limit block (307) is fixedly connected to the opposite ends of the two annular sliding bars (304), and the first limit block (307) is slidably connected to the second limit block (309).
3. The integrated prefabricated installation device for a flow channel well according to claim 2, characterized in that: A switch button (310) is installed on the arc-shaped slot (302), and the switch button (310) is electrically connected to the electric telescopic rod (308).
4. The integrated prefabricated installation device for a flow channel well according to claim 3, characterized in that: The top of the foundation (1) is fixedly connected to a first bracket (311), the bottom of the first bracket (311) is fixedly connected to an electric push rod (312), the bottom of the electric push rod (312) is fixedly connected to a movable plate (313), the four corners of the bottom of the movable plate (313) are fixedly connected to electric suction cups (314), the two electric suction cups (314) on the front are arranged on the top of the front arc-shaped slot (302), and the two electric suction cups (314) on the back are arranged on the top of the back arc-shaped slot (302).
5. The integrated prefabricated installation device for a flow channel well according to claim 4, characterized in that: A tank body (4) is fixedly connected to the foundation (1) via three supporting legs, a stirring mechanism (5) is arranged inside the tank body (4), cement is arranged inside the tank body (4), and the stirring mechanism (5) comprises a transmission shaft (501), the bottom end of the transmission shaft (501) is rotatably connected to the bottom inner wall of the tank body (4) via a bearing, and three groups of stirring rods (502) are fixedly connected to the middle of the transmission shaft (501).
6. The integrated prefabricated installation device for a flow channel well according to claim 5, characterized in that: The other end of the stirring rod (502) away from the transmission shaft (501) is fixedly connected to a scraper (503), and the scraper (503) is slidably connected to the inner wall of the tank body (4). The top of the tank body (4) is fixedly connected to a third bracket (510), and the top of the third bracket (510) is fixedly connected to a hydraulic motor (511). The bottom output end of the hydraulic motor (511) passes through the third bracket (510) and is fixedly connected to the top of the transmission shaft (501).
7. The integrated prefabricated installation device for a flow channel well according to claim 6, characterized in that: The bottom of the tank body (4) is fixedly connected to a discharge pipe (504), the inner wall of the tank body (4) is fixedly connected to a second bracket (505), the top of the second bracket (505) is rotatably penetrated by a tamping rod (506) through a linear bearing, the tamping rod (506) is arranged at the top of the discharge pipe (504), the top end of the tamping rod (506) is fixedly connected to a first trapezoidal slider (507), the bottom of the stirring rod (502) is fixedly connected to a second trapezoidal slider (508), the first trapezoidal slider (507) and the second trapezoidal slider (508) are slidably connected, the outer portion of the tamping rod (506) is sleeved with a second spring (509), the top end of the second spring (509) is fixedly connected to the first trapezoidal slider (507), and the bottom end of the second spring (509) is fixedly connected to the second bracket (505).
8. The integrated prefabricated installation device for a flow channel well according to claim 7, characterized in that: A reciprocating mechanism (6) is arranged on the top of the foundation (1), and the reciprocating mechanism (6) comprises a half-tooth gear (601) and two slide grooves (602). The slide grooves (602) are opened on the top of the foundation (1), and a slider (603) is slidably connected in the middle of the slide groove (602). A roller (604) is rotatably connected to one side of the slider (603) via a bearing, and the roller (604) is slidably connected to the upper surface of the foundation (1).
9. The integrated prefabricated installation device for a flow channel well according to claim 8, characterized in that: The tops of the two left sliders (603) are fixedly connected to a movable bracket (606) via a fourth bracket (605); the left and right sides of the inner wall of the movable bracket (606) are fixedly connected to transmission teeth (607); the half-tooth gear (601) is fixedly connected to the middle of the transmission shaft (501); the half-tooth gear (601) is meshed with the movable bracket (606) via the transmission teeth (607); and the tops of the two right sliders (603) are fixedly connected to a fan (609) via a fifth bracket (608).
10. The method for prefabricating and installing an integrated flow channel well according to claim 8 is applied to the prefabricating and installing an integrated flow channel well according to claim 9, characterized in that: Step 1: First, the two flow slot wells to be installed are respectively adsorbed and fixed on the bottom of the electric suction cup (314), and then the electric push rod (312) drives the electric suction cup (314) and the flow slot well to move downward to the two arc-shaped grooves (302), and the two annular sliding rods (304) are inserted into the two grooves (306) to fix the two flow slot wells. Step 2: After the launder well is installed, sand is backfilled into the pre-buried pit (2), and the cement in the tank body (4) is poured onto the sand through the discharge pipe (504). Step 3: The transmission shaft (501) rotates to drive the half-toothed gear (601) to rotate, and the half-toothed gear (601) rotates to drive the two rollers (604) to roll repeatedly on the cement and smooth the cement.
Citation Information
Patent Citations
Mounting rack for gutter channel of inspection well
CN220013933U
