Damping protection device and method for existing structure in percussion drill construction
By using a combination device of shock absorbing cushion and shock absorbing groove in impact drill construction, the problem of structure cracking caused by large vibration of impact drill is solved, and vibration reduction of impact drilling equipment is achieved and effective pouring of light concrete is reduced. Noise and ensures the normal progress of construction.
Patent Information
- Application Number
- CN202411184187.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-01
AI Technical Summary
The vibration is high during the impact drilling process, which leads to cracking of the structure, especially the use is limited around sensitive structures.
A combination of shock absorbing cushion and shock absorbing grooves is adopted. The shock absorbing cushion includes foundation pits, steel brackets, sandbags and filling materials. The shock absorbing cushion includes grooves and lightweight concrete. The impact drilling equipment is reduced by pouring lightweight concrete. Effects on vibration of structures.
It effectively reduces the damage impact of impact drills on the structure, realizes underwater pouring of lightweight concrete, reduces noise, and ensures the normal operation of impact drills.
Smart Images

Figure CN118880946A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a shock-absorbing protection device and method for existing structures in impact drilling construction. Background Art
[0002] With the rapid development of urban and highway transportation, infrastructure construction is also changing with each passing day. Municipal and highway transportation systems are becoming more and more developed. The rapid development of transportation networks has brought more and more convenience to people's travel. New roads and bridges will inevitably overlap with the existing infrastructure in space, and the construction of new roads and bridges will have an impact on existing structures.
[0003] For example, in the process of bridge construction, the drilling of bridge pile foundations is generally divided into rotary drilling, rotary drilling, rotary drilling, manual bored pile drilling and impact drilling. Impact drilling has a simple structure, light weight, strong terrain adaptability and low cost, and has become a common choice for pile foundation construction under various environmental conditions. However, the vibration of impact drilling is large, which affects the daily rest of residents and is more likely to damage the structure, causing the structure to crack. Therefore, its use around sensitive structures is limited. Summary of the invention
[0004] Based on this, it is necessary to provide a shock-absorbing protection device and method for existing structures in impact drilling construction to address the above-mentioned problems, so as to solve the problem of large vibrations during the impact drilling process, which may lead to cracking of the structure.
[0005] A shock-absorbing and protective device for existing structures during impact drilling construction, comprising:
[0006] A shock-absorbing cushion layer is arranged on one side of the construction pile foundation, the shock-absorbing cushion layer comprises a foundation pit, a steel support, sandbags and filling materials, the steel support is arranged in the foundation pit and used to carry the impact drilling equipment, the sandbags are filled in the foundation pit, and the filling materials fill the gaps between the foundation pit, the steel support and the sandbags;
[0007] The shock-absorbing trench is arranged between the impact drilling equipment and the existing structure, and the shock-absorbing trench comprises a trench body and lightweight concrete poured in the trench body.
[0008] In one embodiment, the lightweight concrete is poured into the trench body through grouting equipment, and the grouting equipment includes a pumping device, a pump pipe and a baffle. The pump pipe is inserted into the trench body, and the pump pipe is connected to the pumping equipment. The pumping equipment injects the lightweight concrete into the trench body through the pump pipe. The baffle is installed on the pump pipe, and the lightweight concrete lifts the baffle to discharge the mud in the trench body.
[0009] In one embodiment, the baffle includes a telescopic bracket and a flexible panel, the telescopic bracket is installed on the pump tube, the flexible panel covers the telescopic bracket, and the telescopic bracket has a first state in which the flexible panel is contracted and a second state in which the flexible panel is unfolded.
[0010] In one embodiment, the telescopic bracket includes an upper movable ring, a lower movable ring, a vertical strut, a horizontal strut and a diagonal strut, the upper movable ring is fixed on the pump pipe, the lower movable ring is sleeved on the pump pipe, the vertical strut connects the lower movable ring and the upper movable ring, the horizontal strut is hinged to the lower movable ring, the flexible panel is installed on the horizontal strut, the two ends of the diagonal strut are respectively hinged to the upper movable ring and the horizontal strut, and at least one of the diagonal strut and the vertical strut is capable of telescoping.
[0011] In one of the embodiments, the baffle further includes a limiting device, wherein the limiting device is installed on the lower movable ring, and the limiting device is used to lock the horizontal strut after the horizontal strut is unfolded.
[0012] A method for shock absorption and protection of existing structures during impact drilling construction comprises the following steps:
[0013] Determine the plane position of the shock absorbing trench according to the location of the existing structure;
[0014] A trench body is constructed at the designed position of the shock-absorbing trench, and then lightweight concrete is poured into the trench body; wherein, during the pouring of the lightweight concrete, the lightweight concrete lifts a baffle to discharge the mud in the shock-absorbing trench;
[0015] A foundation pit for a shock-absorbing cushion layer is excavated, a steel support is installed in the foundation pit, and then sandbags and filling materials are alternately backfilled, and an impact drill device is installed on the steel support.
[0016] In one embodiment, the steps of constructing a trench body at the designed position of the shock-absorbing trench and then pouring lightweight concrete into the trench body are specifically as follows:
[0017] A hole is drilled at the designed position of the shock-absorbing ditch, and then the lightweight concrete is poured into the hole. The interlocking bored pile process is adopted, and the construction is carried out in the order of the holes, and the pile foundations in all the holes are constructed to connect the shock-absorbing ditch.
[0018] In one embodiment, the step of pouring lightweight concrete into the trench body is specifically:
[0019] Before the pump tube is inserted into the hole, the telescopic bracket is folded to shrink the flexible panel;
[0020] During the process of inserting the pump tube into the hole, the flexible panel remains in a contracted state due to the upward force exerted by water on the flexible panel;
[0021] After the pump tube is inserted into place, the telescopic bracket is reset to unfold the flexible panel, and the flexible panel covers the cross section of the hole;
[0022] External pumping equipment injects the lightweight concrete into the hole through the pump pipe, and the lightweight concrete lifts the flexible panel upward and discharges the mud in the hole.
[0023] In one embodiment, the steps of folding the telescopic bracket to shrink the flexible panel and resetting the telescopic bracket to unfold the flexible panel are specifically as follows:
[0024] The horizontal support rod is compressed to move closer to the pump tube, and the flexible panel is contracted along with the horizontal support rod. During the insertion of the pump tube, the upward force exerted by water on the flexible panel keeps the flexible panel contracted;
[0025] After the pump tube is inserted into place, the springs of the oblique support rod and / or the vertical support rod provide elastic force to reset the horizontal support rod to a horizontal state, and the limiting device pops out to lock the horizontal support rod.
[0026] In one embodiment, the step of installing the steel support in the foundation pit is specifically as follows:
[0027] Anchor bars are embedded in the foundation pit, and the steel support is connected to the embedded anchor bars.
[0028] The above-mentioned existing structure shock absorption protection device and method in impact drilling construction have at least the following advantages:
[0029] 1. The shock-absorbing groove is used to weaken the damage to the structure caused by the vibration shock wave generated by the impact drill bit, and the shock-absorbing cushion layer is used to reduce the vibration of the impact drill body on the ground when the winch lifts the drill bit to brake. Under the condition of being restricted by sensitive structures, the present invention solves the problem that the impact drill cannot be used and reduces the destructive effect of the impact operation on the existing structure.
[0030] 2. The present invention realizes underwater pouring of lightweight foam concrete, solves the problem that lightweight concrete is difficult to pour underwater, and satisfies the functions of supporting and reinforcing the shock-absorbing ditch and reducing vibration shock waves.
[0031] 3. The baffle in the present invention can automatically shrink during the downward movement and automatically expand after being in place, with a simple structure and strong practicality.
[0032] 4. The shock-absorbing cushion layer of the present invention not only ensures the normal operation of the impact drill, but also reduces the noise during the operation of the impact drill. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the specific implementation of the present invention, the following will briefly introduce the drawings required for use in the specific implementation. In all the drawings, each element or part is not necessarily drawn according to the actual scale.
[0034] Figure 1 A plan view of a shock-absorbing protection device for an existing structure during impact drilling construction in one embodiment;
[0035] Figure 2 for Figure 1 Schematic diagram of the structure of the middle shock-absorbing cushion layer;
[0036] Figure 3 for Figure 1 Schematic diagram of the structure of the middle shock absorbing groove;
[0037] Figure 4 Schematic diagram of grouting equipment injecting lightweight concrete into the trench;
[0038] Figure 5 This is a schematic structural diagram of a baffle in one implementation mode;
[0039] Figure 6 This is a schematic structural diagram of a position limiting device in one embodiment;
[0040] Figure 7 A flowchart of a method for shock absorption and protection of existing structures during impact drilling construction in one embodiment;
[0041] Figure 8 A schematic diagram for determining the plane position of the shock absorbing groove;
[0042] Fig. 9 The schematic diagram of the hole-engaging drilling and the sequential construction of the separation holes for the shock-absorbing trench;
[0043] Fig.10 This is a schematic diagram of the pump tube being inserted into the trench body;
[0044] Fig.11 It is a schematic diagram of the structure of the unfolded baffle;
[0045] Fig.12 Schematic diagram of pumping equipment injecting lightweight concrete into the trench;
[0046] Fig.13 Schematic diagram of lifting baffles and baffles to drain slurry for lightweight concrete;
[0047] Fig.14 This is a schematic diagram of the construction of the shock-absorbing cushion layer;
[0048] Fig.15 Schematic diagram of pile foundation construction for impact drilling equipment.
[0049] Reference numerals:
[0050] 1- construction pile foundation, 2- existing structure, 3- impact drilling equipment, 10- shock-absorbing cushion, 11- foundation pit, 12- steel support, 13- sandbag, 14- filling material, 20- shock-absorbing ditch, 21- ditch body, 22- lightweight concrete, 23- mud, 24- straight section, 25- covering section, 30- grouting equipment, 31- pumping equipment, 32- pump pipe, 33- baffle, 34- telescopic bracket, 341- upper movable ring, 342- lower movable ring, 343- vertical support rod, 344- horizontal support rod, 345- oblique support rod, 346- wedge-shaped limit block, 347- installation groove, 348- hinge shaft, 349- slide groove, 35- flexible panel, 40- limit device, 41- tongue, 42- limit spring, 43- guide slope. DETAILED DESCRIPTION
[0051] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the invention is not limited by the specific implementation disclosed below.
[0052] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only and do not represent the only implementation method.
[0053] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0054] See also Figure 1 In one embodiment, the existing structure shock-absorbing protection device in the impact drilling construction includes a shock-absorbing cushion layer 10 and a shock-absorbing groove 20.
[0055] The shock-absorbing pad 10 is arranged on one side of the construction pile foundation 1. The shock-absorbing pad 10 can reduce the vibration of the impact drill body on the ground when the winch lifts the drill bit and brakes. The shock-absorbing pad 10 must meet the requirements of its own deformation stability after supporting the reaction force of the impact drill, and at the same time meet the requirements of not being higher than the ground.
[0056] Please also read Figure 2 Specifically, the shock-absorbing cushion layer 10 includes a foundation pit 11, a steel support 12, a sandbag 13 and a filling material 14. The steel support 12 is arranged in the foundation pit 11, and the steel support 12 is used to carry the impact drilling equipment 3. In one embodiment, after the excavation of the foundation pit 11 is completed, concrete is poured on the surface of the foundation pit 11 to maintain the shape of the foundation pit 11. During the pouring of concrete, anchor bars are embedded in the concrete, and the steel support 12 is connected to the embedded anchor bars.
[0057] The sandbags 13 are filled in the foundation pit 11, and the filling material 14 is filled in the foundation pit 11. The filling material 14 can fill the gaps between the foundation pit 11, the steel support 12 and the sandbags 13. The filling material 14 is coarse sand, and the sandbags 13 and the filling material 14 are backfilled alternately. The excavation depth of the foundation pit 11 is about 1-1.5m, and the surface of the steel support 12 is covered with noise reduction material.
[0058] Please also read Figure 3 The shock-absorbing groove 20 is provided between the impact drill 3 and the existing structure 2, and the shock-absorbing groove 20 is used to weaken the damage to the structure caused by the shock wave generated by the impact drill bit. The shock-absorbing groove 20 includes a groove body 21 and a lightweight concrete 22 poured in the groove body 21. In one embodiment, there are existing structures 2 on both sides of the impact drill 3, and two groups of shock-absorbing grooves 20 are provided, and the two groups of shock-absorbing grooves 20 are symmetrically arranged about the construction pile foundation 1. The shock-absorbing groove 20 includes a straight section 23 and a covering section 24 at both ends of the straight section 23, and the covering section 24 gradually approaches the construction pile foundation 1, so that the two groups of shock-absorbing grooves 20 surround the impact drill 3 circumferentially.
[0059] Please also read Figure 4 In one embodiment, the lightweight concrete 22 is poured into the trench body 21 through a grouting device 30. The grouting device 30 includes a pumping device 31 and a pump pipe 32. The pump pipe 32 is inserted into the trench body 21. The pump pipe 32 is connected to the pumping device 31. The pumping device 31 pours the lightweight concrete 22 into the trench body 21 through the pump pipe 32.
[0060] In this embodiment, lightweight foam concrete is used as the backfill material, and its density is 500 kg / m 3 , which is less than the density of mud 23 (1050kg / m 3 ), directly pouring underwater, the lightweight concrete 22 will float upward, and the lightweight concrete 22 cannot rely on its own weight to remove the mud 23 in the conduit, so the traditional conduit method cannot be used for pouring.
[0061] Therefore, in this embodiment, the pumping device 31 further includes a baffle 33, which is installed at the top of the pump pipe 32. During the lowering process of the pump pipe 32, the baffle 33 is kept in a folded state, and after the pump pipe 32 is lowered into place, the baffle 33 is unfolded. The size of the baffle 33 is adapted to the cross-section of the ditch body 21, and the baffle 33 separates the mud 23 from the lightweight concrete 22. Since the density of the lightweight concrete 22 is smaller than that of the mud 23, and at the same time, it is subjected to the pressure of pumping, the lightweight concrete 22 will lift the baffle 33 to discharge the mud 23 in the ditch body 21. This not only solves the problem of underwater pouring of the lightweight concrete 22, but also realizes the discharge of the mud 23 in the ditch body 21.
[0062] Please also read Figure 5 On the basis of the above embodiment, further, the baffle 33 includes a telescopic bracket 34 and a flexible panel 35, the telescopic bracket 34 is installed on the pump tube 32, and the flexible panel 35 covers the telescopic bracket 34. The telescopic bracket 34 has a first state in which the flexible panel 35 is contracted and a second state in which the flexible panel 35 is unfolded.
[0063] Specifically, the telescopic bracket 34 includes an upper movable ring 341, a lower movable ring 342, a vertical support rod 343, a horizontal support rod 344 and an oblique support rod 345. The upper movable ring 341 is fixed on the pump tube 32, the lower movable ring 342 is sleeved on the pump tube 32, the lower movable ring 342 is located below the upper movable ring 341, and the vertical support rod 343 connects the upper movable ring 341 and the lower movable ring 342. In one embodiment, a wedge-shaped limit block 346 is provided on the pump tube 32, the wedge-shaped limit block 346 is located on the side of the upper movable ring 341 away from the lower movable ring 342, and the small end of the wedge-shaped limit block 346 is inserted into the upper movable ring 341 to realize the positioning and fixing of the upper movable ring 341. The horizontal support rod 344 is hinged to the lower movable ring 342, and the flexible panel 35 is installed on the horizontal support rod 344. The two ends of the oblique support rod 345 are respectively hinged with the upper movable ring 341 and the horizontal support rod 344. The oblique support rod 345 has a spring so that the oblique support rod 345 can be extended and retracted. For example, the two ends of the oblique support rod 345 are rod bodies, and the middle is connected by a spring, and the extension and retraction of the spring realizes the extension and shortening of the oblique support rod 345.
[0064] Before the baffle 33 and the pump tube 32 are inserted into the ditch body 21, the horizontal strut 344 is compressed toward the direction of the upward movable ring 341 by manpower. During the upward rotation of the horizontal strut 344, the oblique strut 345 is compressed and shortened. Finally, the horizontal strut 344 is folded and contracted to a nearly vertical state, and the flexible panel 35 is contracted along with the horizontal strut 344. During the insertion of the pump tube 32 into the ditch body 21, the upward force exerted by water on the flexible panel 35 is greater than the elastic force of the spring in the oblique strut 345, so that the flexible panel 35 is kept contracted. After the pump tube 32 is inserted into place, the spring of the oblique strut 345 provides elastic force to reset the horizontal strut 344 to a horizontal state, so as to unfold the flexible panel 35.
[0065] In one embodiment, the vertical support rod 343 may also be designed as a telescopic structure. In this case, the oblique support rod 345 may not be designed as a telescopic structure. The oblique support rod 345 is hinged to the middle of the horizontal support rod 344. By sliding the lower movable ring 342 up and down, the horizontal support rod 344 can be folded and unfolded similar to the folding and unfolding of an umbrella. The telescopic form of the vertical support rod 343 is similar to that of the oblique support rod 345. The two ends of the vertical support rod 343 are rod bodies, and the two rod bodies are connected by springs. Of course, it can be understood that both the vertical support rod 343 and the oblique support rod 345 can also be designed as telescopic structures, and the folding and automatic unfolding of the telescopic bracket 34 can also be achieved.
[0066] In one embodiment, in order to prevent the lifting force of the lightweight concrete 22 on the flexible panel 35 from causing the horizontal strut 344 to be folded and retracted, the baffle 33 also includes a limiting device 40, which is installed on the lower movable ring 342. The limiting device 40 can limit the horizontal strut 344 after the horizontal strut 344 is unfolded to prevent the horizontal strut 344 from folding upward.
[0067] Please also read Figure 6 Specifically, the lower movable ring 342 is provided with a mounting groove 347, a hinge shaft 348 is designed at the bottom of the mounting groove 347, and the horizontal support rod 344 is rotatably connected to the hinge shaft 348. The limiting device 40 includes a tongue 41 and a limiting spring 42. The groove wall of the mounting groove 347 is provided with a sliding groove 349, and the sliding groove 349 is located above the hinge shaft 348. The tongue 41 is slidably installed in the sliding groove 349, and the limiting spring 42 is installed in the sliding groove 349, and the two ends of the limiting spring 42 are in contact with the bottom wall of the sliding groove 349 and the tongue 41. The insert tongue 41 is provided with a guiding inclined surface 43. When the horizontal strut 344 is unfolded and reset, the horizontal strut 344 slides along the guiding inclined surface 43, compressing the insert tongue 41 and retracting it into the slide groove 349. After the horizontal strut 344 passes through the insert tongue 41, the insert tongue 41 extends out of the slide groove 349 and is located above the horizontal strut 344 under the action of the limit spring 42, thereby preventing the horizontal strut 344 from folding upward.
[0068] Please refer to 7. The present invention also provides a method for shock absorption protection of existing structures during impact drilling construction. The method can be used to construct the shock absorption protection device for existing structures during impact drilling construction. Specifically, the method includes the following steps:
[0069] Step S110: Determine the plane position of the shock absorbing groove 20 according to the position of the existing structure 2.
[0070] Please also read Figure 8 Specifically, according to the number and position of the construction pile foundation 1 and the orientation of the structure to be protected, the plane layout position of the shock-absorbing trench 20 is determined, and the construction of the shock-absorbing trench 20 is prepared. The diameter of the shock-absorbing trench 20 is 0.8-1.2m, the depth of the shock-absorbing trench 20 exceeds the elevation of the main structure pile foundation by 1.5m, and the shape is a double broken line.
[0071] Step S120: construct a trench body 21 at the designed position of the shock-absorbing trench 20, and then pour lightweight concrete 22 into the trench body 21; during the pouring of the lightweight concrete 22, the lightweight concrete 22 lifts the baffle 33 to discharge the mud 23 in the shock-absorbing trench 20.
[0072] Please also read Fig. 9 Specifically, a hole is drilled at the designed position of the shock-absorbing groove 20, and then lightweight concrete 22 is poured into the hole. The interlocking bored pile process is used, and the construction is carried out in the order of the holes, and the pile foundations in all the holes are constructed to connect the shock-absorbing groove 20. For example, after the No. 1 pile is drilled and the lightweight concrete 22 is poured, the No. 3 pile is drilled and poured, and then the No. 2 pile is drilled and poured, and the three pile foundations are interlocked with each other.
[0073] The shock-absorbing trench 20 is drilled to the designed bottom elevation (1.5 m below the main pile bottom elevation), and the lightweight concrete 22 is poured into the trench body 21 using the grouting equipment 30. The specific process is as follows:
[0074] Please also read Fig.10, connect the pump tube 32 to the pumping equipment 31, and install the telescopic bracket 34 on the pump tube 32. Before the pump tube 32 is inserted into the hole, the telescopic bracket 34 is folded to make the flexible panel 35 converge. Among them, the process of folding the telescopic bracket 34 is specifically as follows: the horizontal support rod 344 is compressed in the direction of the upward movable ring 341 by manpower, and the oblique support rod 345 is compressed and shortened during the upward rotation of the horizontal support rod 344, and finally the horizontal support rod 344 is folded and contracted to a nearly vertical state, and the flexible panel 35 is converged with the horizontal support rod 344. Alternatively, the lower movable ring 342 is pushed by manpower to slide the upper movable ring 341, at which time the vertical support rod 343 is compressed, and the horizontal support rod 344 is rotated upward and folded and contracted to a nearly vertical state, and the flexible panel 35 is converged with the horizontal support rod 344. In the process of inserting the pump tube 32 into the hole, due to the resistance of water, the water exerts an upward force on the flexible panel 35, and the flexible panel 35 remains in a converged state.
[0075] Please also read Fig.11 After the pump tube 32 is inserted into place, the telescopic bracket 34 is reset to unfold the flexible panel 35, and the flexible panel 35 covers the cross section of the hole. The process of resetting the telescopic bracket 34 to unfold the flexible panel 35 is as follows: the spring of the oblique support rod 345 provides elastic force to reset the horizontal support rod 344 to a horizontal state, so as to unfold the flexible panel 35, and the limit device 40 limits and locks the horizontal support rod 344. Alternatively, the vertical support rod 343 provides elastic force to slide the lower movable ring 342 away from the upper movable ring 341, and the horizontal support rod 344 rotates downward to gradually restore the horizontal state, so as to unfold the flexible panel 35.
[0076] When both the vertical support rod 343 and the oblique support rod 345 are capable of extension and retraction, the folding and unfolding process of the telescopic bracket 34 is a combination of the above processes, including the shortening of the oblique support rod 345 , the shortening of the vertical support rod 343 and the sliding of the lower movable ring 342 .
[0077] Please also read Fig.12 and Fig.13 Finally, the lightweight concrete 22 is poured, and the lightweight concrete 22 gradually accumulates upward from the bottom of the hole. During the upward accumulation of the lightweight concrete 22, the baffle 33 can be pushed to move upward, and during the upward movement of the baffle 33, the mud 23 in the hole can be discharged.
[0078] Step S130 : excavating a foundation pit 11 for the shock-absorbing cushion layer 10 , installing a steel support 12 in the foundation pit 11 , then alternately backfilling with sandbags 13 and filling materials 14 , and installing the impact drilling equipment 3 on the steel support 12 .
[0079] Please also read Fig.14 and Fig.15Specifically, a foundation pit 11 of the shock-absorbing cushion layer 10 is excavated. After the foundation pit 11 is excavated, concrete is poured on the surface of the foundation pit 11 to maintain the shape of the foundation pit 11. During the pouring of concrete, anchor bars are embedded in the concrete, and the steel bracket 12 is connected to the embedded anchor bars. Then, sandbags 13 and filling materials 14 are backfilled alternately, and the impact drill equipment 3 is installed on the steel bracket 12, and traditional pile foundation construction can be carried out. After the construction is completed, the sandbags 13, the steel bracket 12, and the concrete base are removed, and the cushion foundation pit 11 is backfilled.
[0080] The above-mentioned shock-absorbing protection device and method for existing structures in impact drilling construction solves the problem that the impact drill cannot be used under the condition of being restricted by sensitive structures, reduces the destructive effect of impact operation on the existing structure 2, realizes the underwater pouring of lightweight foam concrete, solves the problem that lightweight concrete 22 is difficult to pour underwater, and satisfies the function of supporting and reinforcing the shock-absorbing groove 20 and reducing the shock wave. The baffle 33 can automatically shrink during the downward movement and automatically expand after being in place. It has a simple structure and strong practicality. The shock-absorbing cushion layer 10 not only ensures the normal operation of the impact drill, but also reduces the noise during the impact drill operation.
[0081] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A shock-absorbing protection device for existing structures during impact drilling construction, characterized in that: include: A shock-absorbing cushion layer is arranged on one side of the construction pile foundation, the shock-absorbing cushion layer comprises a foundation pit, a steel support, sandbags and filling materials, the steel support is arranged in the foundation pit and used to carry the impact drilling equipment, the sandbags are filled in the foundation pit, and the filling materials fill the gaps between the foundation pit, the steel support and the sandbags; The shock-absorbing trench is arranged between the impact drilling equipment and the existing structure, and the shock-absorbing trench comprises a trench body and lightweight concrete poured in the trench body.
2. The shock-absorbing protection device for existing structures in impact drilling construction according to claim 1 is characterized in that: The lightweight concrete is poured into the trench body through grouting equipment, and the grouting equipment includes a pumping device, a pump pipe and a baffle. The pump pipe is inserted into the trench body, and the pump pipe is connected to the pumping device. The pumping equipment injects the lightweight concrete into the trench body through the pump pipe. The baffle is installed on the pump pipe. The lightweight concrete lifts the baffle to discharge the mud in the trench body.
3. The shock-absorbing protection device for existing structures in impact drilling construction according to claim 2 is characterized in that: The baffle includes a telescopic bracket and a flexible panel, the telescopic bracket is installed on the pump tube, the flexible panel covers the telescopic bracket, and the telescopic bracket has a first state in which the flexible panel is contracted and a second state in which the flexible panel is unfolded.
4. The shock-absorbing protection device for existing structures in impact drilling construction according to claim 3 is characterized in that: The telescopic bracket includes an upper movable ring, a lower movable ring, a vertical strut, a horizontal strut and a diagonal strut. The upper movable ring is fixed on the pump pipe, the lower movable ring is sleeved on the pump pipe, the vertical strut connects the lower movable ring and the upper movable ring, the horizontal strut is hinged to the lower movable ring, the flexible panel is installed on the horizontal strut, the two ends of the diagonal strut are respectively hinged to the upper movable ring and the horizontal strut, and at least one of the diagonal strut and the vertical strut can be telescopic.
5. The shock-absorbing protection device for existing structures in impact drilling construction according to claim 3 is characterized in that: The baffle further comprises a limiting device, wherein the limiting device is mounted on the lower movable ring and is used for locking the horizontal support rod after the horizontal support rod is unfolded.
6. A method for shock absorption and protection of existing structures during impact drilling construction, characterized in that: The following steps are involved: Determine the plane position of the shock absorbing trench according to the location of the existing structure; A trench body is constructed at the designed position of the shock-absorbing trench, and then lightweight concrete is poured into the trench body; wherein, during the pouring of the lightweight concrete, the lightweight concrete lifts a baffle to discharge the mud in the shock-absorbing trench; A foundation pit for a shock-absorbing cushion layer is excavated, a steel support is installed in the foundation pit, and then sandbags and filling materials are alternately backfilled, and an impact drill device is installed on the steel support.
7. The shock-absorbing and protecting method for existing structures during impact drilling construction according to claim 6 is characterized in that: The steps of constructing a trench body at the designed position of the shock-absorbing trench and then pouring lightweight concrete into the trench body are specifically as follows: A hole is drilled at the designed position of the shock-absorbing ditch, and then the lightweight concrete is poured into the hole. The interlocking bored pile process is adopted, and the construction is carried out in the order of the holes, and the pile foundations in all the holes are constructed to connect the shock-absorbing ditch.
8. The shock-absorbing and protecting method for existing structures during impact drilling construction according to claim 7 is characterized in that: The specific steps of pouring lightweight concrete into the trench body are: Before the pump tube is inserted into the hole, the telescopic bracket is folded to shrink the flexible panel; During the process of inserting the pump tube into the hole, the flexible panel remains in a contracted state due to the upward force exerted by water on the flexible panel; After the pump tube is inserted into place, the telescopic bracket is reset to unfold the flexible panel, and the flexible panel covers the cross section of the hole; External pumping equipment injects the lightweight concrete into the hole through the pump pipe, and the lightweight concrete lifts the flexible panel upward and discharges the mud in the hole.
9. The shock-absorbing and protecting method for existing structures during impact drilling construction according to claim 8 is characterized in that: The steps of folding the telescopic bracket to shrink the flexible panel and resetting the telescopic bracket to unfold the flexible panel are specifically as follows: The horizontal support rod is compressed to move closer to the pump tube, and the flexible panel is contracted along with the horizontal support rod. During the insertion of the pump tube, the upward force exerted by water on the flexible panel keeps the flexible panel contracted; After the pump tube is inserted into place, the springs of the oblique support rod and / or the vertical support rod provide elastic force to reset the horizontal support rod to a horizontal state, and the limiting device pops out to lock the horizontal support rod.
10. The shock-absorbing and protecting method for existing structures during impact drilling construction according to claim 6, characterized in that: The steps of installing the steel support in the foundation pit are specifically as follows: Anchor bars are embedded in the foundation pit, and the steel support is connected to the embedded anchor bars.