Pressure inspection well structure
By increasing the containment chamber and installing a composite vent valve in the pressure inspection well structure, the problem of easy clogging of the vent valve in sewage pipelines was solved, achieving efficient venting and safe maintenance, and reducing the maintenance cost of sewage pipelines.
Patent Information
- Application Number
- CN202411056974.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-01
AI Technical Summary
Existing sewage pipes' air vents are easily clogged by pollutants, affecting their air venting capacity and causing the sewage pipes to malfunction.
A flange sleeve is installed in the pressure inspection well structure to increase the volume of the receiving chamber, and a composite exhaust valve and gate valve are equipped. The exhaust valve and gate valve are connected to the receiving chamber of the flange sleeve through pipelines to remove gas from the well in a timely manner.
It effectively prevents pollutants from clogging the exhaust valve, improves exhaust capacity, reduces the frequency of sewage pipe maintenance, and enhances safety and practicality.
Smart Images

Figure CN118880993A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of inspection wells, and in particular to a pressure inspection well structure. Background Art
[0002] In the construction of municipal sewage pressure pipelines, a pressure inspection well structure needs to be set up at certain intervals for the inspection, maintenance and dredging of the pipelines.
[0003] In the prior art, a pressure inspection well structure is generally set on the sewage pressure pipeline. By setting a tee with a flange blind plate on the sewage pipeline in the pressure inspection well structure, when the pipeline is regularly inspected, the flange blind plate is opened, and the dirt and blockages in the pipeline are removed by flushing and cleaning to ensure that the pipeline is unobstructed.
[0004] However, considering that sewage pipes contain a large amount of organic pollutants, and the fermentation of organic pollutants will produce a large amount of gas, these enriched gases in the pipeline need to be discharged in time. Although an exhaust valve well is also provided on the pressure pipeline, the space of the tee with flange blind plate is small, and the pollutants in the sewage pipe are easy to clog the exhaust valve, resulting in a decrease in the exhaust capacity of the exhaust valve, which in turn affects the daily operation of the sewage pipe. Summary of the invention
[0005] In view of this, the present invention provides a pressure inspection well structure to solve the problem of pollutants blocking the exhaust valve.
[0006] The present invention provides a pressure inspection well structure, comprising a pressure well chamber and a flange casing, wherein a first opening is arranged at the top of the pressure well chamber; the flange casing is installed at the first opening, and the flange casing is provided with a circumferentially closed accommodating chamber, wherein the volume of the accommodating chamber is greater than the internal volume of a tee piece.
[0007] Beneficial effect: By arranging a flange sleeve at the first opening at the top of the pressure well chamber, since the volume of the accommodating chamber inside the flange sleeve is larger than the internal volume of the tee piece in the existing solution, the structure inside the well can be optimized, and by increasing the space for storing pollutants, it is more difficult for pollutants to clog the flange sleeve, thereby reducing the impact of pollutants on the exhaust valve, thereby avoiding the phenomenon of pollutants clogging the exhaust valve.
[0008] In an optional embodiment, the top of the flange sleeve is closed; the pressure inspection well structure also includes a composite exhaust valve, the air inlet of the composite exhaust valve is connected to the accommodating chamber of the flange sleeve through a pipeline, and the air outlet of the composite exhaust valve is connected to the environment of the pressure well chamber.
[0009] Beneficial effects: By adding a composite exhaust valve and connecting the air inlet of the composite exhaust valve with the accommodating chamber of the flange casing through a pipeline, it is convenient for operators to conduct pressure checks. At the same time, the air can be discharged in time to remove the methane and other flammable gases in the well, avoiding accidents caused by excessive pressure and improving the safety performance of the pressure inspection well structure.
[0010] In an optional embodiment, the pressure inspection well structure further includes a gate valve, which is installed on the pipeline between the composite exhaust valve and the flange sleeve to control the opening or closing of the pipeline.
[0011] Beneficial effect: By installing a gate valve between the pipe between the composite exhaust valve and the flange sleeve, it is convenient for operators to timely control the on-off of the pipe between the composite exhaust valve and the flange sleeve.
[0012] In an optional embodiment, the pressure inspection well structure also includes a maintenance well chamber, which is arranged above the pressure well chamber in the height direction; wherein the top of the flange casing passes through the bottom of the maintenance well chamber and extends to the interior of the maintenance well chamber, so that the maintenance chamber inside the maintenance well chamber is connected with the accommodating chamber inside the flange casing.
[0013] Beneficial effect: By setting the inspection well chamber above the pressure well chamber in the height direction, and at the same time, allowing the top of the flange casing to pass through the bottom of the inspection well chamber and extend to the inside of the inspection well chamber, the inspection well chamber is connected with the pressure well chamber, so that the pressure inspection well structure has inspection function and exhaust function, and the inspection function and exhaust function are combined in one well structure, which can prevent sewage overflow and sewage pipe blockage, and can discharge waste gas in time, reducing the maintenance cycle and maintenance cost of the sewage pressure pipeline.
[0014] In an optional embodiment, a second opening is provided above the inspection well chamber; the pressure inspection well structure further comprises a well cover, and the well cover is provided at the second opening to separate the inspection chamber from the external environment.
[0015] Beneficial effect: By arranging a pit cover plate, and arranging the pit cover plate cover at the second opening opened above the inspection pit chamber, it is convenient to close the inspection chamber when no inspection is needed.
[0016] In an optional embodiment, the top of the pit cover is flush with the ground.
[0017] Beneficial effect: By making the top of the manhole cover flush with the ground, the manhole cover is prevented from protruding from the ground, thereby avoiding interference with pedestrians and vehicles, and improving the practicality of the pressure inspection well structure.
[0018] In an optional embodiment, the pressure inspection well structure further includes a water inlet pipe and a water outlet pipe, the water outlet of the water inlet pipe is connected to the pressure well chamber; the water inlet of the water outlet pipe is connected to the pressure well chamber.
[0019] Beneficial effect: By connecting the water outlet of the water inlet pipe with the pressure well chamber, the water inlet of the water outlet pipe is connected with the pressure well chamber, so that sewage can flow in the pressure well chamber. At the same time, it is convenient for the operating personnel to use sealing parts to seal the pipes where the pressure well chambers are located before and after the pipeline to be inspected during subsequent maintenance, and it is convenient for the operating personnel to inspect the sewage after it is drained.
[0020] In an optional embodiment, the pressure inspection well structure further includes a support platform, and the support platform is arranged at the bottom of the pressure well chamber.
[0021] Beneficial effect: By setting a support platform at the bottom of the pressure well chamber, the pressure well chamber, inspection well chamber and other structures are supported to avoid sinking, further improving the safety performance of the pressure inspection well structure.
[0022] In an optional embodiment, a third opening is provided at the top of the flange sleeve; the pressure inspection well structure also includes a cover, which is detachably mounted at the third opening to separate the accommodating chamber from the environment where the pressure well chamber is located.
[0023] Beneficial effect: By adding a cover to cover the third opening arranged on the top of the flange casing, it is convenient to separate the accommodating chamber inside the flange casing from the environment where the pressure well chamber is located.
[0024] In an optional embodiment, the pressure inspection well structure further includes a height transition piece, at least two of which are provided, and at least two of the height transition pieces are installed on one or more of the inner walls of the pressure well chamber and the inner walls of the flange casing.
[0025] Beneficial effect: By arranging height transition pieces in one or more areas of the inner wall of the pressure well chamber and the inner wall of the flange casing, it is convenient to provide a stable support surface for operators when going down the well, ensuring that the operators move to the inspection chamber. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the specific implementation modes of the present invention, the drawings required for use in the description of the specific implementation modes will be briefly introduced below. Obviously, the drawings described below are some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0027] Figure 1A top view of a pressure inspection well structure according to an embodiment of the present invention;
[0028] Figure 2 for Figure 1 Cross-sectional view of section AA.
[0029] Description of reference numerals:
[0030] 11. Pressure well chamber; 12. Inspection well chamber; 121. Inspection chamber;
[0031] 21. flange sleeve; 211. accommodating chamber; 22. cover; 23. fastener; 231. abutment portion; 232. external thread portion;
[0032] 31. Compound exhaust valve; 32. Gate valve;
[0033] 4. Cellar manhole cover;
[0034] 51. Water inlet pipe; 52. Water outlet pipe;
[0035] 6. Height transition piece. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0037] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0038] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0040] In the prior art, a pressure inspection well structure is generally set on the sewage pressure pipe. By setting a tee with a flange blind plate on the sewage pipe in the pressure inspection well structure, the flange blind plate is opened during regular pipeline maintenance, and the dirt and blockages in the pipeline are removed by flushing and cleaning to ensure that the pipeline is unobstructed. However, considering that the sewage pipeline contains a large amount of organic pollutants, and the fermentation of organic pollutants will produce a large amount of gas, these enriched gases in the pipeline need to be discharged in time. Although an exhaust valve well is also set on the pressure pipeline, because the space of the tee with a flange blind plate is small, the pollutants in the sewage pipe are easy to block the exhaust valve, resulting in a decrease in the exhaust capacity of the exhaust valve, which in turn affects the daily operation of the sewage pipe.
[0041] To this end, the present application reserves a larger accommodating chamber to slow down the speed at which pollutants clog the exhaust valve and pipeline, reduce the maintenance frequency of the pipeline and improve the exhaust capacity of the exhaust valve.
[0042] See also Figure 1 and Figure 2 ,in, Figure 1 A top view of the pressure inspection well structure provided by the present application is shown; Figure 2 for Figure 1 Cross-sectional view of section AA.
[0043] Combine the following Figure 1 and Figure 2 , describing an embodiment of the present invention.
[0044] According to an embodiment of the present invention, a pressure inspection well structure is provided, including a pressure well chamber 11 and a flange casing 21, wherein a first opening is provided at the top of the pressure well chamber 11; the flange casing 21 is installed at the first opening, and the flange casing 21 is provided with a circumferentially closed accommodating chamber 211, wherein the volume of the accommodating chamber 211 is greater than the internal volume of the tee.
[0045] By utilizing the technical solution of the present embodiment, a flange sleeve 21 is provided at the first opening at the top of the pressure well chamber 11. Since the volume of the accommodating chamber 211 inside the flange sleeve 21 is larger than the internal volume of the tee in the existing solution, the structure inside the well can be optimized. By increasing the space for storing pollutants, it is more difficult for pollutants to clog the flange sleeve 21, thereby reducing the impact of pollutants on the exhaust valve, thereby avoiding the phenomenon of pollutants clogging the exhaust valve.
[0046] It can be explained that in the present application, the top of the flange sleeve 21 is closed; at this time, the pressure inspection well structure also includes a compound exhaust valve 31, the air inlet of the compound exhaust valve 31 is connected to the accommodating chamber 211 of the flange sleeve 21 through a pipeline, and the air outlet of the compound exhaust valve 31 is connected to the environment where the pressure well chamber 11 is located.
[0047] By utilizing the technical solution of the present embodiment, a composite exhaust valve 31 is added, and the air inlet of the composite exhaust valve 31 is connected to the accommodating chamber 211 of the flange sleeve 21 through a pipeline, so that the operating personnel can conduct pressure checks. At the same time, the air can be exhausted in time to remove the biogas and other flammable gases in the well, avoiding accidents caused by excessive pressure, thereby improving the safety performance of the pressure inspection well structure.
[0048] Furthermore, the pressure inspection well structure further includes a gate valve 32, which is installed on the pipeline between the composite exhaust valve 31 and the flange sleeve 21 to control the opening or closing of the pipeline.
[0049] By utilizing the technical solution of this embodiment, by installing a gate valve 32 between the pipeline between the composite exhaust valve 31 and the flange sleeve 21, it is convenient for operators to timely control the on-off of the pipeline between the composite exhaust valve 31 and the flange sleeve 21.
[0050] It can be explained that, in order to facilitate maintenance, the pressure inspection well structure also includes an inspection well chamber 12 .
[0051] Specifically, the inspection well chamber 12 is arranged above the pressure well chamber 11 in the height direction; wherein the top of the flange casing 21 passes through the bottom of the inspection well chamber 12 and extends to the inside of the inspection well chamber 12, so that the inspection chamber 121 inside the inspection well chamber 12 is connected with the accommodating chamber 211 inside the flange casing 21.
[0052] By utilizing the technical solution of the present embodiment, the inspection well chamber 12 is arranged above the pressure well chamber 11 in the height direction, and at the same time, the top of the flange casing 21 passes through the bottom of the inspection well chamber 12 and extends to the inside of the inspection well chamber 12, so that the inspection well chamber 12 is connected with the pressure well chamber 11, so that the pressure inspection well structure has inspection function and exhaust function, and the inspection function and exhaust function are combined in one well structure, which can prevent sewage overflow and sewage pipe blockage, and can discharge waste gas in time, thereby reducing the maintenance cycle and maintenance cost of the sewage pressure pipeline.
[0053] It can be explained that a second opening is provided above the inspection well chamber 12; the pressure inspection well structure also includes a well cover 4, which is provided at the second opening to separate the inspection chamber 121 from the external environment.
[0054] By utilizing the technical solution of this embodiment, a pit cover 4 is provided, and the pit cover 4 is provided to cover the second opening opened above the inspection pit chamber 12, so that the inspection chamber 121 can be closed when no inspection is required.
[0055] Furthermore, during installation, the top of the pit cover 4 is flush with the ground.
[0056] By utilizing the technical solution of this embodiment, the top of the manhole cover 4 is made flush with the ground, thereby preventing the manhole cover 4 from protruding from the ground, thereby avoiding interference with pedestrians and vehicles, and improving the practicality of the pressure inspection well structure.
[0057] like Figure 1 and Figure 2 As shown, the pressure inspection well structure also includes a water inlet pipe 51 and a water outlet pipe 52 . The water outlet of the water inlet pipe 51 is connected to the pressure well chamber 11 ; the water inlet of the water outlet pipe 52 is connected to the pressure well chamber 11 .
[0058] By utilizing the technical solution of the present embodiment, the water outlet of the water inlet pipe 51 is connected to the pressure well chamber 11, and the water inlet of the water outlet pipe 52 is connected to the pressure well chamber 11, so that sewage can flow in the pressure well chamber 11. At the same time, it is convenient for the operating personnel to use sealing parts to seal the pipes where the pressure well chamber 11 is located before and after the pipeline to be inspected during subsequent maintenance, and it is convenient for the operating personnel to inspect the sewage after it is drained.
[0059] like Figure 1 and Figure 2 As shown, the pressure inspection well structure also includes a support platform, which is arranged at the bottom of the pressure well chamber 11.
[0060] By utilizing the technical solution of this embodiment, a support platform is provided at the bottom of the pressure well chamber 11 to support structures such as the pressure well chamber 11 and the inspection well chamber 12 to avoid sinking, thereby further improving the safety performance of the pressure inspection well structure.
[0061] It can be explained that, in the present application, the specific structure of the flange sleeve 21 is not specifically limited.
[0062] As one of the embodiments, a third opening is opened at the top of the flange sleeve 21; the pressure inspection well structure also includes a cover 22, which is detachably installed at the third opening to separate the accommodating chamber 211 from the environment where the pressure well chamber 11 is located.
[0063] By utilizing the technical solution of this embodiment, a cover 22 is added to cover the third opening arranged at the top of the flange sleeve 21, so as to separate the accommodating chamber 211 inside the flange sleeve 21 from the environment where the pressure well chamber 11 is located.
[0064] It can be explained that, in the present application, there is no specific limitation on the fixing method of the cover 22 and the flange sleeve 21 .
[0065] As one embodiment, in the sealing cover 22 and the flange sleeve 21, one of them is provided with a through hole, and the other of them is provided with an internal threaded hole.
[0066] At this time, the pressure inspection well structure also includes a fastener 23, which is provided with an abutment portion 231 and an external threaded protrusion. The external threaded protrusion is inserted into the through hole and then screwed into the internal threaded hole until the abutment portion 231 abuts against the surface of the entrance of the through hole after being tightened.
[0067] Preferably, if Figure 2 As shown, the cover 22 is provided with a through hole, and the opening of the flange sleeve 21 is provided with an internal threaded hole. During installation, the fastener 23 is located on the side of the cover 22 away from the flange sleeve 21, and the external threaded protrusion is passed through the through hole and then screwed into the internal threaded hole until the abutment portion 231 abuts against the end face of the cover 22 away from the flange sleeve 21 in the height direction.
[0068] Of course, in other optional embodiments, both the cover 22 and the flange sleeve 21 are provided with through holes. In this case, the two through holes are coaxially arranged. During installation, the external threaded portion 232 is passed through the through hole of the cover 22 and then through the through hole of the flange sleeve 21, and a nut is used to tighten the external threaded protrusion on the side of the through hole of the flange sleeve 21 away from the cover 22.
[0069] like Figure 1 and Figure 2As shown, the pressure inspection well structure also includes a height transition piece 6 , and at least two height transition pieces 6 are provided. The at least two height transition pieces 6 are installed on one or more of the inner walls of the pressure well chamber 11 and the inner walls of the flange casing 21 .
[0070] By utilizing the technical solution of this embodiment, a height transition piece 6 is set in one or more areas of the inner wall of the pressure well chamber 11 and the inner wall of the flange casing 21, so as to provide a stable support surface for the operators during the process of going down the well, ensuring that the operators move to the inspection chamber 121.
[0071] It can be explained that, in the above embodiment, when the number of the height transition pieces 6 is greater than two, at least two height transition pieces 6 are connected along the Figure 1 The circumferential direction is shown as spaced apart.
[0072] Furthermore, in the present application, the structure of the height transition piece 6 is not specifically limited.
[0073] Exemplarily, the height transition piece 6 is a hierarchical structure, and any height transition piece 6 has one, two or more horizontal platforms. When the number of horizontal platforms is greater than two, any height transition piece 6 also includes an inclined or vertically arranged support surface connected between two adjacent horizontal platforms.
[0074] Furthermore, it is necessary to install handrails at the edge of any height transition piece 6 to prevent workers from falling.
[0075] Similarly, to prevent workers from slipping, the surface of the height transition piece 6 is provided with an anti-slip structure, anti-slip texture, anti-slip strips, anti-slip bumps or anti-slip coating to increase the friction between the foot and the platform to prevent slipping.
[0076] Similarly, a drainage structure, such as a drainage through hole, is provided on the surface of the height transition piece 6 to quickly drain the accumulated water or the infiltrated liquid in the well, keep the tread surface dry and clean, and further enhance the anti-slip effect.
[0077] Similarly, in order to make the workers safer when entering the well, additional safety structures are also provided. For example, lighting devices such as electric lights are provided in the well, or warning signs such as markers are provided in the well, or emergency call buttons are provided in the well, or safety rope fixing points are provided in the well to improve the safety and emergency response capabilities of the workers.
[0078] In addition, in order to improve the applicability of the height transition piece 6, an adjustment structure is also provided. For example, an electric hydraulic lever structure is added at the connection between the height transition piece 6 and the inner wall of the pressure well chamber 11 or at the connection between the height transition piece 6 and the inner wall of the flange casing 21, allowing the height, inclination angle or shape of the platform to be adjusted according to the specific needs of the well operation to adapt to different working scenarios and personnel needs.
[0079] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A pressure inspection well structure, characterized in that: include: A pressure well chamber (11), wherein a first opening is provided at the top of the pressure well chamber (11); A flange sleeve (21) is installed at the first opening, and the flange sleeve (21) is provided with a circumferentially closed accommodation chamber (211), the volume of the accommodation chamber (211) being greater than the internal volume of the tee.
2. The pressure inspection well structure according to claim 1 is characterized in that: The flange sleeve (21) is closed at the top; The pressure inspection well structure also includes a composite exhaust valve (31), the air inlet of the composite exhaust valve (31) is connected to the accommodating chamber (211) of the flange sleeve (21) through a pipeline, and the air outlet of the composite exhaust valve (31) is connected to the environment where the pressure well chamber (11) is located.
3. The pressure inspection well structure according to claim 2 is characterized in that: Also includes: A gate valve (32) is installed on the pipeline between the composite exhaust valve (31) and the flange sleeve (21) to control the opening or closing of the pipeline.
4. The pressure inspection well structure according to any one of claims 1 to 3, characterized in that: Also includes: A maintenance well chamber (12), wherein the maintenance well chamber (12) is arranged above the pressure well chamber (11) in the height direction; The top of the flange sleeve (21) passes through the bottom of the inspection well chamber (12) and extends into the interior of the inspection well chamber (12), so that the inspection chamber (121) inside the inspection well chamber (12) is connected with the accommodating chamber (211) inside the flange sleeve (21).
5. The pressure inspection well structure according to claim 4 is characterized in that: A second opening is provided above the inspection well chamber (12); The pressure inspection well structure further comprises a well cover plate (4), wherein the well cover plate (4) is arranged at the second opening to separate the inspection chamber (121) from the external environment.
6. The pressure inspection well structure according to claim 5 is characterized in that: The top of the pit cover (4) is flush with the ground.
7. The pressure inspection well structure according to any one of claims 1 to 3, characterized in that: Also includes: A water inlet pipe (51), the water outlet of the water inlet pipe (51) being in communication with the pressure well chamber (11); A water outlet pipe (52), wherein the water inlet of the water outlet pipe (52) is in communication with the pressure well chamber (11).
8. The pressure inspection well structure according to any one of claims 1 to 3, characterized in that: Also includes: A support platform is arranged at the bottom of the pressure well chamber (11).
9. The pressure inspection well structure according to any one of claims 1 to 3, characterized in that: A third opening is formed on the top of the flange sleeve (21); The pressure inspection well structure further comprises a cover (22), wherein the cover (22) is detachably mounted at the third opening to separate the accommodating chamber (211) from the environment where the pressure well chamber (11) is located.
10. The pressure inspection well structure according to any one of claims 1 to 3, characterized in that: Also includes: A height transition piece (6), wherein at least two of the height transition pieces (6) are provided, and at least two of the height transition pieces (6) are installed on one or more of the inner walls of the pressure well chamber (11) and the flange sleeve (21).