Pipeline flushing device

By setting up a linkage device between floating parts group and gate panel in the inspection well, the through holes are opened using the buoyancy and gravity of the water flow to achieve the erosion of sediments in the branch pipe, the sediment adhesion caused by insufficient water conditions in the inspection well is solved, and the drainage is improved System cleanliness and sewage treatment efficiency.

CN118881004AActive Publication Date: 2024-11-01CHINA THREE GORGES CORPORATION +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411118460.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-01
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

When the water conditions in the inspection well are insufficient, the sediments in the branch pipe are prone to adhere to the inner wall of the pipe, forming a plate-clad sediment layer that is difficult to clean, affecting urban drainage.

Method used

A pipe flushing device is designed, including a bracket, gate door panel, linkage assembly and locking door assembly. The vertical movement of the floating member group in the inspection well is opened or closed by the buoyancy and gravity of the water flow, and a large amount of water flow is introduced to erode. Sediments.

Benefits of technology

It effectively reduces the possibility that sediments in the branch pipe adhere to the wall surface, improves the cleanliness of the drainage system, and reduces branch pipe blockage and water inlet concentration in sewage treatment plant.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118881004A_ABST
    Figure CN118881004A_ABST
Patent Text Reader

Abstract

The invention relates to a pipeline flushing device which comprises a support, a gate plate and a door locking assembly, and a through hole is formed in the support; the gate plate is connected to one side of the support. The linkage assembly comprises a floating piece set, and the floating piece set is slidably arranged on the side, away from the gate plate, of the support. The door locking assembly comprises a gate inhaul cable, one end of the gate inhaul cable is connected with the floating piece set, the other end of the gate inhaul cable is connected with the gate door plate, and the door locking assembly is configured to lock the gate door plate on the support when the gate door plate seals the through hole. The floating piece set is configured to move upwards relative to the support under the buoyancy effect of water, and the gate inhaul cable drives the gate plate to open the through hole. Under the action of water level drop in the inspection well and self gravity, the gate plate moves downwards relative to the support, and the gate inhaul cable drives the gate plate to rotate relative to the support so as to seal the through hole. According to the pipeline flushing device, the possibility that sediments in the branch pipe are attached to the inner wall of the pipeline is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipeline cleaning, and more specifically, to a pipeline flushing device. Background Art

[0002] Drainage pipes are one of the essential infrastructures in cities. During long-term service, the sediments in the pipes will accumulate more and more. The sediments include pipe fragments, soil and gravel introduced by pipe damage. The sediments come from particulate matter in domestic sewage, which contains a large amount of fat, protein, carbonate and other substances.

[0003] In the related art, water flows into the inspection well, and the water in the inspection well is collected into the main pipe through the branch pipe, and then transported to the sewage treatment plant through the main pipe for treatment. Since the inner diameter of the branch pipe is smaller than that of the main pipe, the probability of pollutants depositing in the branch pipe is higher than that in the main pipe. After entering the drainage pipe, these sediments will be deposited at the bottom of the drainage pipe when the hydraulic conditions are poor. The sediments will form a hard-to-clean sediment layer under the action of consolidation, which seriously affects the drainage of the city. Summary of the invention

[0004] The purpose of the present application is to provide a pipeline flushing device to solve the problem that sediments in the branch pipe adhere to the inner wall of the pipeline during drainage when the water condition in the inspection well is insufficient.

[0005] The present application provides a pipeline flushing device, comprising:

[0006] A bracket, the bracket is arranged in the inspection well, and the bracket is provided with a through hole for connecting the branch pipe;

[0007] A gate plate, wherein the gate plate is connected to one side of the bracket;

[0008] A linkage assembly, the linkage assembly comprising a floating member group, the floating member group being slidably arranged on a side of the bracket away from the gate plate;

[0009] A door lock assembly, wherein the door lock assembly comprises a gate cable, one end of which is connected to the floating member assembly, and the other end of which passes through the bracket and is connected to the gate panel;

[0010] The floating member group is configured to move upward relative to the bracket under the buoyancy of water in the inspection well, and drive the gate door plate to rotate relative to the bracket through the gate cable to open the through hole; and move downward relative to the bracket under the action of the water level in the inspection well and its own gravity, and drive the gate door plate to rotate relative to the bracket through the gate cable to close the through hole.

[0011] In a possible implementation manner, the linkage assembly further includes a connecting rod, a first sliding track and a second sliding track, wherein the first sliding track and the second sliding track are arranged on the bracket and are respectively located on both sides of the through hole;

[0012] The floating member group includes a first floating member slidably arranged on a first sliding track, and a second floating member slidably arranged on a second sliding track. The first floating member and the second floating member are connected through the connecting rod, and the gate cable is connected to the connecting rod.

[0013] In a possible implementation, it further includes:

[0014] A connecting component is installed on the bracket, the connecting component is connected to the first floating member, and the connecting component is used to connect to the second floating member after the gate panel opens the through hole to fix the second floating member.

[0015] In a possible implementation, the connection component includes:

[0016] A connecting member rotatably connected to the bracket, wherein the second floating member is provided with a connecting portion;

[0017] A positioning cable, one end of which is connected to the connecting member, and the other end of which is connected to the first floating member;

[0018] When the floating member group moves upward to a first preset position relative to the bracket, the connecting member is engaged with the connecting portion, and the positioning cable is relaxed;

[0019] The first floating member is configured to drive the positioning cable to be tightened when it moves downward to the second preset position relative to the bracket, and drive the connecting member to rotate relative to the bracket through the positioning cable, so that the connecting member is disengaged from the connecting portion;

[0020] The second floating member is configured to move downward to the second preset position under the weight of the second floating member when the connecting member is disengaged from the connecting portion.

[0021] In a possible implementation, the connection assembly further includes: a reset member, one end of which is connected to the connection member, and the other end of which is connected to the bracket;

[0022] The reset member is configured to extend and drive the connecting member to rotate relative to the bracket toward the positioning cable when the connecting member is disengaged from the connecting portion.

[0023] In a possible implementation manner, the connection assembly further includes a first pulley, the first pulley is rotatably disposed on the bracket, and the positioning cable is wound around the first pulley.

[0024] In a possible implementation, the door locking assembly further includes a second pulley, the second pulley is disposed on the top of the bracket, and the gate cable is wound around the second pulley.

[0025] In a possible implementation, the door lock assembly further includes: a gate opening lock and a trigger member, the bracket is fixedly connected to two parallel sliding seats, and two ends of the trigger member are respectively slidably disposed in the corresponding sliding seats;

[0026] The trigger member is configured to move upward relative to the sliding seat under the drive of the connecting rod and contact the gate opening lock so that the gate opening lock unlocks the gate door panel;

[0027] The gate opening lock is configured to be connected to the bracket when the gate door panel closes the through hole, so as to lock the gate door panel on the bracket.

[0028] In a possible implementation, a baffle is fixedly connected to a side of the trigger member facing away from the bracket, and when the connecting rod moves upward relative to the bracket, it abuts against the baffle and pushes the trigger member upward, so that the trigger member contacts the gate opening lock.

[0029] In a possible implementation, the gate opening lock is a spring press lock.

[0030] In summary of the above technical solutions, the present application provides a pipeline flushing device, which can move vertically in the inspection well by setting a floating component group. When the water level in the inspection well is low, the floating component group is affected by its own gravity and moves downward in the inspection well, pulling the gate cable. The end of the gate cable away from the floating component group pulls the gate door plate, so that the gate door plate rotates relative to the bracket, thereby closing the through hole, and then the water flow in the inspection well cannot flow out to the branch pipe through the through hole. When the water flow in the inspection well continues to increase, the floating component is affected by the buoyancy of the water flow and gradually moves upward in the inspection well. At this time, the gate cable is relaxed, and the gate door plate rotates relative to the bracket, thereby opening the through hole, and a large amount of water flows into the branch pipe instantly. The impact force of the water flow is large, and the sediment in the branch pipe is flushed into the main pipe, thereby reducing the possibility of the sediment in the branch pipe adhering to the inner wall of the branch pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0032] Figure 1 It is a schematic diagram of the structure of the pipeline flushing device of the embodiment of the present application;

[0033] Figure 2 is a structural schematic diagram of the pipeline flushing device of the embodiment of the present application from another perspective;

[0034] Figure 3 yes Figure 2 A schematic diagram of the enlarged structure of part A;

[0035] Figure 4 This is a diagram of the use status of the pipeline flushing device according to an embodiment of the present application;

[0036] Figure 5 is a state diagram of the pipeline flushing device in the closing stage of the embodiment of the present application;

[0037] Figure 6 is a state diagram of the pipeline flushing device in the water storage stage of the embodiment of the present application;

[0038] Figure 7 This is a state diagram of the pipeline flushing device in the embodiment of the present application during the flushing start-up phase;

[0039] Figure 8 It is a state diagram of the pipeline flushing device in the embodiment of the present application maintaining the flushing stage.

[0040] Description of reference numerals:

[0041] 100: bracket; 110: through hole; 120: perforation;

[0042] 200: linkage assembly; 210: first floating member; 220: second floating member; 230: connecting rod; 240: first sliding track; 250: second sliding track;

[0043] 300: door lock assembly; 310: gate cable; 320: second pulley; 330: gate lock; 340: trigger; 350: sliding seat; 360: baffle;

[0044] 400: connecting assembly; 410: connecting member; 420: connecting portion; 430: positioning cable; 440: resetting member; 450: first pulley;

[0045] 500: Gate panel;

[0046] 10: Community sewage outlet; 20: Junction node; 30: Normally operating branch pipe; 40: Branch pipe with poor hydraulic conditions; 50: Main pipe; 60: Polluted area; 70: Inspection well.

[0047] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0048] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0049] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can, for example, be implemented in an order other than those illustrated or described herein.

[0050] In the embodiments of the present application, the words "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0051] The inspection well 70 is used to collect sewage. Water flows into the inspection well 70. The water in the inspection well 70 flows into the main pipe 50 through the branch pipe and is transported to the sewage treatment plant for treatment through the main pipe 50. Since the inner diameter of the branch pipe is small, when the water flow is weak, the sediment in the water flow is easy to adhere to the inner wall of the branch pipe. The sediment forms a hardened sediment layer under the action of consolidation, which is difficult to clean, thus affecting the drainage of the city.

[0052] Based on this, an embodiment of the present application provides a pipeline flushing device. By setting a floating member group, the floating member group can move vertically in the inspection well 70. When the water level in the inspection well 70 is low, the floating member group is affected by its own gravity. When it moves downward in the inspection well 70, it pulls the gate cable 310. The end of the gate cable 310 away from the floating member group pulls the gate door plate 500, so that the gate door plate 500 rotates relative to the bracket 100, thereby closing the through hole 110, and preventing the water flow in the inspection well 70 from flowing out to the branch pipe through the through hole 110. When the water flow in the inspection well 70 continues to increase, the floating assembly is affected by the buoyancy of the water flow and gradually moves upward in the inspection well 70. At this time, the gate cable 310 is relaxed, and the gate door plate 500 rotates relative to the bracket 100, thereby opening the through hole 110. A large amount of water flows into the branch pipe instantly. The impact force of the water flow is relatively large, which washes the sediment in the branch pipe into the main pipe 50, thereby reducing the possibility of the sediment in the branch pipe adhering to the inner wall of the branch pipe.

[0053] like Figure 1-8 As shown, the present application provides a pipeline flushing device, including: a bracket 100, a gate door plate 500, a linkage assembly 200 and a door locking assembly 300.

[0054] The bracket 100 is disposed in the inspection well 70 , and a through hole 110 for connecting the branch pipe is opened on the bracket 100 .

[0055] The gate door plate 500 is connected to one side of the bracket 100 .

[0056] The linkage assembly 200 includes a floating member group, and the floating member group is slidably arranged on a side of the bracket 100 away from the gate door panel 500.

[0057] The door lock assembly 300 includes a gate cable 310 , one end of the gate cable 310 is connected to the floating member assembly, and the other end of the gate cable 310 passes through the bracket 100 and is connected to the gate door panel 500 .

[0058] The floating member group is configured to move upward relative to the bracket 100 under the buoyancy of water in the inspection well 70, and drive the gate door plate 500 to rotate relative to the bracket 100 through the gate cable 310 to open the through hole 110; when the water level in the inspection well 70 drops and under the action of its own gravity, it moves downward relative to the bracket 100, and drives the gate door plate 500 to rotate in the opposite direction relative to the bracket 100 through the gate cable 310 to close the through hole 110.

[0059] In an embodiment of the present application, the gate door plate 500 is arranged on one side of the branch pipe, and the gate door plate 500 is rotatably connected to the bracket 100. The gate door plate 500 can be rotatably connected to the bracket 100 through a pin shaft and a hinge, so that the gate door plate 500 closes or opens the through hole 110, thereby realizing the isolation and connection between the branch pipe and the inspection well 70.

[0060] Reference Figure 1 and Figure 2 A through hole 120 is provided on the bracket 100 for the gate cable 310 to pass through. The through hole 120 is arranged on the upper part of the through hole 110. The floating member group is arranged in the inspection well 70, and the gate door plate 500 is arranged in the branch pipe. The arrangement of the through hole 110 facilitates the gate cable 310 to be connected to the gate door plate 500 and the floating member group respectively.

[0061] Reference Figure 5 and Figure 7 The floating assembly can move vertically in the inspection well 70. When the water level in the inspection well 70 is low, the floating assembly is affected by its own gravity and moves downward in the inspection well 70, pulling the gate cable 310. The end of the gate cable 310 away from the floating assembly pulls the gate plate 500, causing the gate plate 500 to rotate relative to the bracket 100, thereby closing the through hole 110, and further preventing the water flow in the inspection well 70 from flowing out to the branch pipe through the through hole 110. When the water flow in the inspection well 70 continues to increase, the floating assembly is affected by the buoyancy of the water flow and gradually moves upward in the inspection well 70 (such as Figure 2 At this time, the gate cable 310 is relaxed, and the gate door plate 500 rotates relative to the bracket 100, thereby opening the through hole 110, and a large amount of water flows into the branch pipe instantly. The impact force of the water flow is relatively large, and the sediment in the branch pipe is washed into the main pipe 50 connected to the branch pipe, thereby reducing the possibility of the sediment in the branch pipe adhering to the inner wall of the branch pipe.

[0062] Reference Figure 6 When the water level in the inspection well 70 is low, the water flow is intercepted in the inspection well 70 for water storage until the floating member group moves up to open the through hole 110. The accumulated water flow can then flow into the branch pipe through the through hole 110. Since the water flow after water storage is large, the flow rate of the water entering the branch pipe is faster, making it difficult for sediment to solidify in the branch pipe, reducing the possibility of the branch pipe being blocked.

[0063] It should be noted that Figure 4 This is a diagram of the use status of the pipeline flushing device of the embodiment of the present application, from Figure 4It can be seen that when in use, the branch pipes connected to the main pipe 50 are divided into a normal operating branch pipe 30 and a branch pipe with poor hydraulic conditions. The connection point between the normal operating branch pipe 30, the branch pipe with poor hydraulic conditions and the main pipe 50 is the intersection node 20. The normal operating branch pipe 30 and the branch pipe with poor hydraulic conditions are distributed in the pollution receiving area 60. The normal operating branch pipe 30 and the branch pipe with poor hydraulic conditions have an inspection well 70 equipped with a pipeline flushing device; the pipeline flushing device in the above embodiment is dispersedly arranged in the inspection well 70 downstream of the community sewage outlet 10 and upstream of the branch pipe 40 with poor hydraulic conditions, forming a distributed pipeline flushing system from the community sewage outlet 10 to the sewage main pipe 50, forming effective sediment flushing and transportation in multiple pollution receiving areas 60 where the main pipe 50 receives sewage, gradually transporting the sediment to the main pipe 50, and entering the sewage treatment plant with the water flow, which can reduce the dredging frequency of the poor branch pipe, reduce the settlement of the sediment, slow down the hardening of the sediment layer, and help improve the influent concentration of the sewage treatment plant.

[0064] In the pipeline flushing device in the embodiment of the present application, the linkage assembly 200 further includes a connecting rod 230, a first sliding track 240 and a second sliding track 250, and the first sliding track 240 and the second sliding track 250 are arranged on the bracket 100 and are respectively located on both sides of the through hole 110.

[0065] The floating member group includes a first floating member 210 slidably disposed on a first sliding track 240 , and a second floating member 220 slidably disposed on a second sliding track 250 . The first floating member 210 and the second floating member 220 are connected by a connecting rod 230 , and a gate cable 310 is connected to the connecting rod 230 .

[0066] Reference Figure 2 In the present embodiment, the first sliding track 240 and the second sliding track 250 are arranged in parallel on both sides of the through hole 110, and sliding members (not shown in the figure) are slidably arranged on the first sliding track 240 and the second sliding track 250, and the first floating member 210 and the second floating member 220 are connected to the corresponding sliding members. The volume of the first floating member 210 and the second floating member 220 is larger than the volume of the sliding members, thereby enhancing the contact surface between the first floating member 210, the second floating member 220 and the water, thereby improving the buoyancy of the first floating member 210 and the second floating member 220.

[0067] One end of the connecting rod 230 is hinged on the first floating member 210, and the other end is hinged on the second floating member 220. The connecting rod 230 can be a telescopic rod. The connecting rod 230 can move with the first floating member 210 and the second floating member 220, thereby tightening or loosening the gate cable 310.

[0068] Exemplarily, the first floating member 210 and the second floating member 220 may be hollow buoys, buoys, floating plates or floating balls, etc., which are structures with a certain mass that can naturally fall along the first sliding track 240 and the second sliding track 250 and can float in the water.

[0069] In a possible embodiment, two slide grooves are opened on the bracket 100 , and the first floating member 210 and the second floating member 220 can slide in the corresponding slide grooves respectively, so that the floating member group can slide in the vertical direction of the bracket 100 .

[0070] It can be understood that when the first floating member 210 and the second floating member 220 slide down the first sliding track 240 and the second sliding track 250 respectively due to their own gravity, the connecting rod 230 moves downward together to pull the gate cable 310 to drive the gate door plate 500 to rotate along the rotating shaft to close the through hole 110; when the first floating member 210 and the second floating member 220 rise relative to the bracket 100 due to buoyancy, the gate cable 310 relaxes and the gate door plate 500 rotates relative to the bracket 100 to open the through hole 110.

[0071] The pipeline flushing device in the embodiment of the present application also includes:

[0072] The connecting component 400 is installed on the bracket 100 . The connecting component 400 is connected to the first floating member 210 . The connecting component 400 is used to connect to the second floating member 220 to fix the second floating member 220 after the through hole 110 of the gate door panel 500 is opened.

[0073] In the pipeline flushing device of the embodiment of the present application, the connecting assembly 400 includes:

[0074] The connecting member 410 connected to the bracket 100 is rotatably connected, and a connecting portion 420 is provided on the second floating member 220 .

[0075] A positioning cable 430 , one end of which is connected to the connecting member 410 , and the other end of which is connected to the first floating member 210 .

[0076] When the floating member assembly moves upward to the first preset position relative to the bracket 100 , the connecting member 410 is engaged with the connecting portion 420 , and the positioning cable 430 is relaxed.

[0077] The first floating member 210 is configured to tighten the positioning cable 430 when it moves downward to the second preset position relative to the bracket 100, and drive the connecting member 410 to rotate relative to the bracket 100 through the positioning cable 430, so that the connecting member 410 and the connecting portion 420 are disengaged.

[0078] The second floating member 220 is configured to move downward to a second preset position under the weight of the second floating member 220 when the connecting member 410 is disengaged from the connecting portion 420 .

[0079] In the embodiment of the present application, the first preset position may be the top of the first sliding track 240, and the second preset position may be the bottom of the first sliding track 240. When the first floating member 210 and the second floating member 220 rise to the first preset position together with the buoyancy, the gate door plate 500 is opened, the positioning cable 430 is relaxed, the connecting member 410 is engaged with the connecting portion 420, and the connecting member 410 plays a fixing role on the second floating member 220, so that the through hole 110 remains in an open state, and the water flows from the through hole 110 into the branch pipe.

[0080] Reference Figure 8 When the water in the inspection well 70 is discharged, the first floating member 210 moves downward due to its own gravity, while the second floating member 220 is fixed by the connecting member 410 and its position remains unchanged. Since the distance between the first floating member 210 and the second floating member 220 increases, the connecting rod 230 extends. At this time, the middle part of the connecting rod 230 is located between the first preset position and the second preset position, and the through hole 110 remains open.

[0081] When the first floating member 210 moves down to the second preset position, the positioning cable 430 is tightened, and the positioning cable 430 drives the connecting member 410 to rotate relative to the bracket 100, so that the connecting member 410 and the connecting portion 420 are disconnected, and the second floating member 220 moves up and down on the second sliding track 250 under the action of its own gravity. Figure 5 When the second floating member 220 moves down to the second preset position, the connecting rod 230 pulls the gate cable 310 to drive the gate door plate 500 to close the through hole 110, so that the inspection well 70 enters a water storage state.

[0082] Furthermore, the connecting assembly 400 further includes: a restoring member 440 , one end of which is connected to the connecting member 410 , and the other end of which is connected to the bracket 100 .

[0083] The reset member 440 is configured to extend and drive the connection member 410 to rotate relative to the bracket 100 toward the positioning cable 430 when the connection member 410 is disengaged from the connection portion 420. In this embodiment, the reset member 440 is a spring.

[0084] Reference Figure 8It can be understood that when the first floating member 210 and the second floating member 220 float up due to the buoyancy of the water flow to open the through hole 110, the water flow in the inspection well 70 flows into the branch pipe, the positioning cable 430 is relaxed, the reset member 440 is in a free state, the first floating member 210 and the second floating member 220 are located at the first preset position, and the connecting member 410 is engaged with the connecting portion 420. The connecting member 410 thus fixes the second floating member 220, reducing the possibility of the second floating member 220 moving up and down on the second sliding track 250;

[0085] The water level in the inspection well 70 drops, and the first floating member 210 follows the water flow and moves up and down on the first sliding track 240, while the second floating member 220 does not change its position due to the pulling force of the connecting member 410, and the connecting rod 230 stretches. When the first floating member 210 moves to the second preset position, the positioning cable 430 is straightened, and the water level continues to drop below the first floating member 210. After the first floating member 210 loses the buoyancy of the water, the first floating member 210 stretches the reset member 440 by its own gravity, and the connecting member 410 rotates toward the direction of the positioning cable 430, so that the connecting member 410 is separated from the connecting part 420. After the second floating member 220 loses the fixing effect of the connecting member 410, the second floating member 220 moves down on the second sliding track 250. When the second floating member 220 moves to the second preset position, the connecting rod 230 pulls the gate cable 310 so that the gate door plate 500 completely closes the through hole 110.

[0086] In the pipeline flushing device of the embodiment of the present application, the connecting assembly 400 further includes a first pulley 450 , which is rotatably disposed on the bracket 100 , and the positioning cable 430 is wound around the first pulley 450 .

[0087] In the pipeline flushing device of the embodiment of the present application, the door lock assembly 300 further includes a second pulley 320 . The second pulley 320 is disposed on the top of the bracket 100 , and the gate cable 310 is wound around the second pulley 320 .

[0088] The first pulley 450 and the second pulley 320 are provided to prevent the gate cable 310 and the positioning cable 430 from being cross-entangled during the movement.

[0089] In the pipeline flushing device of the embodiment of the present application, the door lock assembly 300 also includes: a gate opening lock 330 and a trigger member 340. Two parallel sliding seats 350 are fixedly connected to the bracket 100, and the two ends of the trigger member 340 are respectively slidably set in the corresponding sliding seats 350.

[0090] The trigger member 340 is configured to move upward relative to the sliding seat 350 under the drive of the connecting rod 230 and contact the gate opening lock 330 so that the gate opening lock 330 unlocks the gate door panel 500 .

[0091] The gate opening lock 330 is configured to be connected to the bracket 100 when the gate door plate 500 closes the through hole 110 , so as to lock the gate door plate 500 on the bracket 100 .

[0092] Reference Figure 3 In the pipeline flushing device of the embodiment of the present application, the trigger member 340 is fixedly connected to a baffle 360 ​​on a side facing away from the bracket 100. When the connecting rod 230 moves upward relative to the bracket 100, it abuts against the baffle 360 ​​and pushes the trigger member 340 to move upward, so that the trigger member 340 contacts the gate opening lock 330.

[0093] In the pipeline flushing device of the embodiment of the present application, the gate opening lock 330 is a spring pressing lock.

[0094] It is understandable that when the connecting rod 230 moves up to the first preset position following the floating member group, the connecting rod 230 pushes the baffle 360, so that the trigger member 340 slides in the sliding seat 350. When the trigger member 340 moves in the sliding seat 350 to contact the gate lock 330, the gate lock 330 unlocks the gate plate 500, so that the gate plate 500 opens the through hole 110, so that the water flow in the inspection well 70 flows into the branch pipe. The setting of the gate lock 330 can make the gate plate 500 open the through hole 110 only when the water level in the inspection well 70 rises to the first preset height, thereby ensuring the water storage capacity of the inspection well 70, so that when the through hole 110 is opened, the flow rate of water in the branch pipe can flush the sediment, reducing the possibility of the sediment in the branch pipe adhering to the inner wall of the branch pipe.

[0095] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the invention disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.

[0096] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A pipeline flushing device, characterized in that: include: A support (100), the support (100) being arranged in the inspection well (70), and the support (100) being provided with a through hole (110) for connecting with a branch pipe; A gate door plate (500), wherein the gate door plate (500) is connected to one side of the bracket (100); A linkage assembly (200), the linkage assembly (200) comprising a floating member group, the floating member group being slidably arranged on a side of the bracket (100) away from the gate door plate (500); A door lock assembly (300), the door lock assembly (300) comprising a gate cable (310), one end of the gate cable (310) being connected to the floating member assembly, and the other end of the gate cable (310) passing through the bracket (100) and being connected to the gate door plate (500); The floating member group is configured to move upward relative to the bracket (100) under the buoyancy of water in the inspection well (70), and drive the gate door plate (500) to rotate relative to the bracket (100) through the gate cable (310) to open the through hole (110); and move downward relative to the bracket (100) under the action of the water level in the inspection well (70) and its own gravity, and drive the gate door plate (500) to rotate relative to the bracket (100) through the gate cable (310) to close the through hole (110).

2. The pipeline flushing device according to claim 1, characterized in that: The linkage assembly (200) further comprises a connecting rod (230), a first sliding track (240) and a second sliding track (250), wherein the first sliding track (240) and the second sliding track (250) are arranged on the bracket (100) and are respectively located on both sides of the through hole (110); The floating member group comprises a first floating member (210) slidably arranged on a first sliding track (240), and a second floating member (220) slidably arranged on a second sliding track (250), the first floating member (210) and the second floating member (220) being connected via the connecting rod (230), and the gate cable (310) is connected to the connecting rod (230).

3. The pipeline flushing device according to claim 2, characterized in that: Also includes: A connecting component (400), wherein the connecting component (400) is mounted on the bracket (100), and the connecting component (400) is connected to the first floating component (210). The connecting component (400) is used to connect to the second floating component (220) after the gate plate (500) opens the through hole (110) to fix the second floating component (220).

4. The pipeline flushing device according to claim 3, characterized in that: The connection assembly (400) comprises: A connecting member (410) is rotatably connected to the bracket (100), wherein the second floating member (220) is provided with a connecting portion (420); a positioning cable (430), one end of the positioning cable (430) being connected to the connecting member (410), and the other end of the positioning cable (430) being connected to the first floating member (210); When the floating member group moves upward to a first preset position relative to the bracket (100), the connecting member (410) is engaged with the connecting portion (420), and the positioning cable (430) is relaxed; The first floating member (210) is configured to, when moving downward to a second preset position relative to the bracket (100), drive the positioning cable (430) to be tightened, and drive the connecting member (410) to rotate relative to the bracket (100) through the positioning cable (430), so that the connecting member (410) and the connecting portion (420) are disengaged from each other; The second floating member (220) is configured to move downward to the second preset position under the weight of the second floating member (220) when the connecting member (410) is disengaged from the connecting portion (420).

5. The pipeline flushing device according to claim 4, characterized in that: The connecting assembly (400) further comprises: a reset member (440), one end of the reset member (440) being connected to the connecting member (410), and the other end of the reset member (440) being connected to the bracket (100); The reset member (440) is configured to extend and drive the connecting member (410) to rotate relative to the bracket (100) toward the positioning cable (430) when the connecting member (410) is disengaged from the connecting portion (420).

6. The pipeline flushing device according to claim 5, characterized in that: The connection assembly (400) further comprises a first pulley (450), wherein the first pulley (450) is rotatably disposed on the bracket (100), and the positioning cable (430) is wound around the first pulley (450).

7. The pipeline flushing device according to any one of claims 2 to 6, characterized in that: The door lock assembly (300) further comprises a second pulley (320), wherein the second pulley (320) is arranged on the top of the bracket (100), and the gate cable (310) is wound around the second pulley (320).

8. The pipeline flushing device according to any one of claims 2 to 6, characterized in that: The door lock assembly (300) further comprises: a gate opening lock (330) and a trigger member (340); two parallel sliding seats (350) are fixedly connected to the bracket (100); two ends of the trigger member (340) are respectively slidably disposed in the corresponding sliding seats (350); The trigger member (340) is configured to move upward relative to the sliding seat (350) under the drive of the connecting rod (230) and contact the gate opening lock (330) so that the gate opening lock (330) unlocks the gate door panel (500); The gate opening lock (330) is configured to be connected to the bracket (100) when the gate door plate (500) closes the through hole (110) so as to lock the gate door plate (500) on the bracket (100).

9. The pipeline flushing device according to claim 8, characterized in that: A baffle (360) is fixedly connected to a side of the trigger member (340) facing away from the bracket (100); when the connecting rod (230) moves upward relative to the bracket (100), it abuts against the baffle (360) and pushes the trigger member (340) upward, so that the trigger member (340) contacts the gate opening lock (330).

10. The pipeline flushing device according to claim 8, characterized in that: The gate opening lock (330) is a spring-loaded lock.

Citation Information

Patent Citations

  • Rainwater and sewage switching device applied to separate-system type rainwater pipeline

    CN103572826A

  • Automatic cleaning device for sewer pipeline

    CN108505614A

  • Buoyancy type instantaneous gate opening and closure and backwash slit filtering pond

    CN110448943A

  • Pipeline flow limiting and sediment flushing device, using method and sewage discharging system

    CN116733096A

  • Flat -gate that turns over by float drive

    CN207880087U