Freeze damage simulation test device for tunnel drainage system in cold region
Through the transparent mountain shell module and mobile structure, the problem that the frost damage simulation device in the cold zone tunnel in the existing technology is difficult to accurately simulate the shape and temperature difference of the mountain, achieving more accurate frost damage experiments and all-round observations, improving the accuracy of the experiment and Convenience.
Patent Information
- Application Number
- CN202410952098.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-01
AI Technical Summary
In the process of simulating the frost damage of the drainage system in the cold zone, it is difficult to accurately simulate the frost damage caused by the shape of the mountain and the temperature difference between the two sides, resulting in errors in experimental results and inconvenient observation.
A cold-damage simulation test device for drainage system in the cold area of tunnels including transparent mountain shell module and mobile structure was designed. The mountain shape is spliced through thin sheets and grooves, and simulated tunnels and seepage components are installed by reserved holes, and the electric telescopic rods and cameras are used to achieve the Observe the frost damage situation in all aspects.
More accurate mountain shape simulation and two-side temperature difference simulation are achieved, which reduces experimental errors and improves the observation convenience and accuracy of frost damage.
Smart Images

Figure CN118883546A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of railway tunnel test devices, in particular to a freezing damage simulation test device for a tunnel drainage system in a cold region. Background Art
[0002] my country is one of the countries with the most extensive permafrost area in the world. With the improvement of road network, railway and highway infrastructure is extending to cold areas with harsh climatic conditions such as high latitudes and high altitudes. Due to design or construction reasons, tunnel frost damage in many high-altitude and cold areas can easily lead to ice hanging on equipment, lining peeling, and even ice blockage and abandonment, which seriously threatens the safety and efficient operation of tunnels in cold areas.
[0003] The Chinese patent authorization publication number is CN117554412A, which discloses a multifunctional test device for simulating the freezing process of a tunnel drainage system in a cold region, including: a test box, whose internal space is a filling cavity for filling surrounding rock materials, and a seepage pipeline system is installed on the cavity wall of the filling cavity; a transparent tunnel scale test model, which is installed inside the filling cavity through a bracket, and a plurality of cameras for photographing images of the transparent drainage system on the transparent tunnel scale test model are arranged in a ring on the inner wall of the transparent tunnel scale test model; a test environment fan, whose air outlet is connected to an air duct, and the end of the air duct leads to the tunnel interior of the transparent tunnel scale test model; and a plurality of temperature sensors and seepage sensors arranged on the outer peripheral side of the scale model.
[0004] Although the above patent can simulate the freezing process of the tunnel drainage system and the seepage conditions and temperature field conditions of the tunnel surrounding rock, making the test device multifunctional and improving the convenience of tunnel frost damage research; however, the shape of the mountain fails to conform to the original appearance of the mountain, and the seepage pipeline system is also arranged in a square around the mountain. The results of the experiment will have certain errors, and it is too costly to install multiple cameras inside the tunnel, and it is also difficult to observe the frost damage inside the tunnel in all directions. The different degrees of frost damage caused by the temperature difference on both sides of the tunnel were not considered during the design.
[0005] In summary, the present invention provides a freezing damage simulation test device for a cold region tunnel drainage system to solve the above-mentioned problems. Summary of the invention
[0006] In order to solve the above technical problems, the present invention provides a freezing damage simulation test device for a cold region tunnel drainage system to solve the deficiencies in the prior art.
[0007] A freezing damage simulation test device for a tunnel drainage system in a cold region comprises: a base plate, a mountain shell and a simulation tunnel, wherein the mountain shell is arranged above the base plate, the simulation tunnel runs through the mountain shell, a drainage system is arranged inside the simulation tunnel, a water seepage component is connected to the top of the mountain shell, test environment fans are arranged at both ends of the simulation tunnel, a moving structure is arranged at one end of the test environment fan close to the simulation tunnel, and a rotating component is arranged on one side of the moving structure.
[0008] Furthermore, the mountain shell is composed of multiple shell modules, and the shell modules of the mountain shell are divided into two types. The first type has a thin sheet protrusion at the middle connection, and the second type has a groove at the middle connection. The depth of the groove is the same as the size of the thin sheet, and the mountain shell is made of transparent material. The interior of the mountain shell is provided with filling soil, and each shell module combination of the mountain shell is connected with a sealing strip.
[0009] Furthermore, the water seepage component includes a cavity, which is arranged on the top of the fill, and a nozzle is connected to the top of the inner part of the mountain shell.
[0010] Furthermore, the mobile structure includes a fixed block 1, a motor 1 and a threaded rod 1, the fixed block 1 is arranged at a corner of one end of the simulated tunnel, the motor 1 is arranged on a side of the fixed block 1 away from the simulated tunnel, the threaded rod 1 passes through the fixed block 1 and is fixedly connected to the output end of the motor 1, the simulated tunnel is provided with a fixed block 2 at the other corner of the end of the fixed block 1, a positioning block 1 is arranged on the side of the fixed block 2 away from the simulated tunnel, the positioning block 1 is rotatably connected to a threaded rod 3 at one end close to the simulated tunnel, the threaded rod is provided with an O-belt, the end of the threaded rod 1 away from the fixed block 1 is rotatably connected to a fixed block 3, and the fixed block 3 is arranged at the other end of the simulated tunnel.
[0011] Furthermore, a slider is slidably connected to the threaded rod one, an arc-shaped groove is provided in the middle of a side of the slider facing the top of the simulated tunnel, a threaded rod two is provided in the arc-shaped groove, an electric telescopic rod is slidably connected to the threaded rod two, a camera is provided at the end of the electric telescopic rod, one end of the threaded rod two extends out of the slider, and a worm is provided at the end of the threaded rod two extending out of the slider.
[0012] Furthermore, the rotating assembly includes a fixed block four, a motor two is arranged on the side of the fixed block four away from the simulated tunnel, a rotating rod is fixedly connected to the output end of the motor two, a positioning block two is fixedly connected to one end of the slider, two positioning blocks two are arranged in total, a turbine two is arranged between the two positioning blocks two, and the turbine two is meshed with the turbine one.
[0013] Furthermore, a long strip is provided on the rotating rod to control the rotation of the second turbine, and the second turbine is slidably connected to the rotating rod.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] 1. The present invention can splice the approximate shape of the mountain to the maximum extent according to the shape of different mountains through the thin sheets and grooves on the mountain shell, and reserve holes according to the position of the tunnel during the splicing process, and the top of the mountain does not need to be capped first. Then the staff will put the simulated tunnel into the mountain through the reserved holes, and pour the gravel and soil of the mountain into the mountain shell to simulate the shape of the mountain, and reserve some gaps. Then, the top module of the mountain shell is installed with a water seepage component, and the mountain shell is capped. After the capping is completed, the staff will stick the sealing strip on the connection of the combined modules of each mountain shell to increase the sealing and prevent water from seeping out during the experiment.
[0016] 2. The present invention controls the flow rate of water in the nozzle through a controller, and turns on the test environment fans on both sides at the same time. Since there is a temperature difference between the windward side and the leeward side of the mountain, the air volume of the two test environment fans can be adjusted according to actual conditions to simulate the temperature difference between the two sides and the frost damage of the drainage system at different positions to the greatest extent, so as to facilitate understanding of the range of the freezing circle on both sides of the tunnel and take corresponding measures according to the range.
[0017] 3. The present invention drives the threaded rod one to rotate counterclockwise, drives the O-belt to slide on the threaded rod one, and drives the threaded rod two to rotate counterclockwise. At this time, the slider slides on the threaded rod one and the threaded rod two toward the inside of the simulated tunnel. During the sliding process, the staff observes the freezing damage of the drainage system through the camera on the electric telescopic rod. When the staff observes that there is less ice at the bottom of the drainage system in the middle part, the motor two is started to drive the rotating rod to rotate, and drives the turbine two on the rotating rod to rotate. The turbine two drives the turbine one to rotate, so that the electric telescopic rod slides to the middle position. At this time, the staff starts the electric telescopic rod and raises the camera to facilitate the observation of the freezing damage at the top. Since the water seepage conditions on the two sides of the mountain are different, the degree of freezing damage is also different. The electric telescopic rod slides left and right, which can more conveniently observe the degree of freezing damage on both sides and the top. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 is a stereogram of the device of the present invention;
[0019] Figure 2 It is a cross-sectional view of the outer shell of the mountain body of the device of the present invention;
[0020] Figure 3 It is a diagram of the internal structure of a simulated tunnel of some devices of the present invention;
[0021] Figure 4 The present invention Figure 2 The enlarged view of point A in the middle;
[0022] Figure 5 The present invention Figure 3 The enlarged view of point B in the middle;
[0023] Figure 6 It is a module diagram of the mountain shell of the present invention.
[0024] In the figure:
[0025] 1. Bottom plate; 11. Simulated tunnel; 12. Drainage system; 2. Mountain shell; 21. Fill; 22. Sealing strip; 3. Water seepage component; 31. Cavity; 32. Nozzle; 4. Test environment fan; 5. Mobile structure; 51. Fixed block one; 52. Motor one; 53. Threaded rod one; 531. Slider; 532. Threaded rod two; 533. Electric telescopic rod; 534. Turbine one; 54. Fixed block two; 55. Positioning block one; 56. Threaded rod three; 57. O-belt; 58. Fixed block three; 6. Rotating component; 61. Fixed block four; 62. Motor two; 63. Rotating rod; 64. Positioning block two. DETAILED DESCRIPTION
[0026] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0027] like Figure 1-6 As shown, the present invention provides a freezing damage simulation test device for a tunnel drainage system in a cold region, comprising: a base plate 1, a mountain shell 2 and a simulation tunnel 11, wherein the mountain shell 2 is arranged above the base plate 1, the simulation tunnel 11 runs through the mountain shell 2, a drainage system 12 is arranged inside the simulation tunnel 11, a water seepage component 3 is connected to the top of the mountain shell 2, test environment fans 4 are arranged at both ends of the simulation tunnel 11, a mobile structure 5 is arranged at one end of the test environment fan 4 close to the simulation tunnel 11, and a rotating component 6 is arranged on one side of the mobile structure 5.
[0028] As an embodiment of the present invention, the mountain shell 2 is composed of multiple shell modules, and the shell modules of the mountain shell 2 are divided into two types. The first type is provided with a thin sheet protrusion at the middle connection, and the second type is provided with a groove at the middle connection. The depth of the groove is the same as the size of the thin sheet, and the mountain shell 2 is made of transparent material. The interior of the mountain shell 2 is provided with fill 21, and each shell module combination of the mountain shell 2 is connected with a sealing strip 22.
[0029] As an embodiment of the present invention, the water seepage component 3 includes a cavity 31 , and the cavity 31 is arranged on the top of the fill 21 . A nozzle 32 is connected to the top of the mountain shell 2 .
[0030] As an embodiment of the present invention, the mobile structure 5 includes a fixed block 51, a motor 52 and a threaded rod 53, the fixed block 51 is arranged at a corner of one end of the simulation tunnel 11, the motor 52 is arranged on the side of the fixed block 51 away from the simulation tunnel 11, the threaded rod 53 passes through the fixed block 51 and is fixedly connected to the output end of the motor 52, the simulation tunnel 11 is provided with a fixed block 2 54 at the other corner of one end of the fixed block 51, the fixed block 2 54 is provided with a positioning block 55 on the side away from the simulation tunnel 11, the positioning block 55 is rotatably connected to a threaded rod 3 56 at one end close to the simulation tunnel 11, the threaded rod 53 is sleeved with an O-belt 57, the threaded rod 53 is rotatably connected to a fixed block 3 58 at one end away from the fixed block 51, and the fixed block 3 58 is arranged at the other end of the simulation tunnel 11.
[0031] As an embodiment of the present invention, a slider 531 is slidably connected to the threaded rod 1 53, an arc-shaped groove is provided in the middle of a side of the slider 531 facing the top of the simulated tunnel 11, a threaded rod 2 532 is provided in the arc-shaped groove, an electric telescopic rod 533 is slidably connected to the threaded rod 2 532, a camera is provided at the end of the electric telescopic rod 533, one end of the threaded rod 2 532 extends out of the slider 531, and a turbine 1 534 is provided at the end of the threaded rod 2 532 extending out of the slider 531.
[0032] As an embodiment of the present invention, the rotating assembly 6 includes a fixed block four 61, and a motor two 62 is arranged on the side of the fixed block four 61 away from the simulation tunnel 11. The output end of the motor two 62 is fixedly connected to a rotating rod 63, and one end of the slider 531 is fixedly connected to a positioning block two 64. There are two positioning blocks two 64 in total, and a turbine two is arranged between the two positioning blocks two 64, and the turbine two is meshed with the turbine one 534.
[0033] As an embodiment of the present invention, a long strip is provided on the rotating rod 63 to control the rotation of the turbine 2. When the rotating rod 63 rotates, the turbine 2 rotates accordingly, and the turbine 2 is slidably connected to the rotating rod 63.
[0034] Specific working principle:
[0035] The technical solution of the present invention is as follows: first, Figure 1-3 and Figure 6As shown, the staff can use the thin sheets and grooves on the mountain shell 2 to splice the approximate shape of the mountain to the maximum extent according to the shape of different mountains, and reserve holes according to the position of the tunnel during the splicing process, and the top of the mountain is not capped first. Then the staff puts the simulated tunnel 11 into the mountain through the reserved holes, and pours the gravel and soil of the mountain into the mountain shell 2 to simulate the shape of the mountain, and reserves some gaps. Then, the top module of the mountain shell 2 is installed with the seepage component 3, and the mountain shell 2 is capped. After the capping is completed, the staff The workers stick the sealing strips 22 on the joints of the combined modules of each mountain shell 2 to increase the sealing and prevent water from seeping out during the experiment; then the flow of water in the nozzle 32 is controlled by the controller, and the test environment fans 4 on both sides are turned on at the same time. Since there is a temperature difference between the windward side and the leeward side of the mountain, the air volume of the two test environment fans 4 can be adjusted according to the actual situation to simulate the temperature difference between the two sides and the freezing damage of the drainage system 12 at different positions to the greatest extent, so as to understand the range of the freezing circle on both sides of the tunnel and take corresponding measures according to the range.
[0036] Then, if Figure 1 and Figure 4-5 As shown, the motor 1 52 is started to drive the threaded rod 1 53 to rotate counterclockwise, drive the O-belt 57 to slide on the threaded rod 1 53, and drive the threaded rod 2 532 to rotate counterclockwise. At this time, the slider 531 slides on the threaded rod 1 53 and the threaded rod 2 532 toward the inside of the simulated tunnel 11. During the sliding process, the staff observes the freezing damage of the drainage system 12 through the camera on the electric telescopic rod 533. Since the freezing damage at the bottom of the drainage system 12 is different from that at the top, when the staff observes that there is less ice at the bottom of the drainage system 12 in the middle part, the motor 2 62 is started to drive the rotating rod 63 to rotate, and drive the turbine 2 on the rotating rod 63 to rotate. The turbine 2 drives the turbine 1 534 to rotate, so that the electric telescopic rod 533 slides to the middle position. At this time, the staff starts the electric telescopic rod 533 and raises the camera to facilitate the observation of the freezing damage at the top. Since the water seepage conditions on the two sides of the mountain are different, the degree of freezing damage is also different. The electric telescopic rod 533 slides left and right, which can more conveniently observe the degree of freezing damage on both sides and the top.
[0037] The embodiments of the present invention are provided for the purpose of illustration and description. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A freezing damage simulation test device for tunnel drainage system in cold regions, comprising: A base plate (1), a mountain shell (2) and a simulated tunnel (11), characterized in that: the mountain shell (2) is arranged above the base plate (1), the simulated tunnel (11) passes through the mountain shell (2), a drainage system (12) is arranged inside the simulated tunnel (11), the top of the mountain shell (2) is connected to a water seepage component (3), test environment fans (4) are arranged at both ends of the simulated tunnel (11), a mobile structure (5) is arranged at one end of the test environment fan (4) close to the simulated tunnel (11), and a rotating component (6) is arranged on one side of the mobile structure (5).
2. A freezing damage simulation test device for a tunnel drainage system in cold regions as claimed in claim 1, characterized in that: The mountain shell (2) is composed of a plurality of shell modules. The shell modules of the mountain shell (2) are divided into two types. The first type has a thin sheet protrusion at the middle connection, and the second type has a groove at the middle connection. The depth of the groove is the same as the size of the thin sheet. The mountain shell (2) is made of a transparent material. Filling (21) is provided inside the mountain shell (2). A sealing strip (22) is connected to each shell module combination of the mountain shell (2).
3. A freezing damage simulation test device for a tunnel drainage system in cold regions as claimed in claim 2, characterized in that: The water seepage component (3) comprises a cavity (31), the cavity (31) is arranged on the top of the fill (21), and a nozzle (32) is connected to the top of the mountain shell (2).
4. A freezing damage simulation test device for a tunnel drainage system in cold regions as claimed in claim 1, characterized in that: The mobile structure (5) comprises a fixed block (51), a motor (52) and a threaded rod (53); the fixed block (51) is arranged at a corner of one end of the simulation tunnel (11); the motor (52) is arranged on a side of the fixed block (51) away from the simulation tunnel (11); the threaded rod (53) penetrates the fixed block (51) and is fixedly connected to the output end of the motor (52); the simulation tunnel (11) is provided with a fixed block (51) at another corner of one end of the fixed block (51). A fixing block 2 (54) is arranged, and a positioning block 1 (55) is arranged on a side of the fixing block 2 (54) away from the simulated tunnel (11), and a threaded rod 3 (56) is rotatably connected to one end of the positioning block 1 (55) close to the simulated tunnel (11), and an O-shaped belt (57) is sleeved on the threaded rod 1 (53), and a fixing block 3 (58) is rotatably connected to one end of the threaded rod 1 (53) away from the fixing block 1 (51), and the fixing block 3 (58) is arranged at the other end of the simulated tunnel (11).
5. A freezing damage simulation test device for a tunnel drainage system in cold regions as claimed in claim 4, characterized in that: The threaded rod 1 (53) is slidably connected to a slider (531), an arc-shaped groove is arranged in the middle of a surface of the slider (531) facing the top of the simulated tunnel (11), a threaded rod 2 (532) is arranged in the arc-shaped groove, an electric telescopic rod (533) is slidably connected to the threaded rod 2 (532), a camera is arranged at the end of the electric telescopic rod (533), one end of the threaded rod 2 (532) extends out of the slider (531), and a turbine 1 (534) is arranged at the end of the threaded rod 2 (532) extending out of the slider (531).
6. A freezing damage simulation test device for a tunnel drainage system in cold regions as claimed in claim 5, characterized in that: The rotating assembly (6) comprises a fixed block four (61), a motor two (62) is arranged on a side of the fixed block four (61) away from the simulation tunnel (11), a rotating rod (63) is fixedly connected to the output end of the motor two (62), and a positioning block two (64) is fixedly connected to one end of the slider (531), two positioning blocks two (64) are arranged in total, a turbine two is arranged between the two positioning blocks two (64), and the turbine two is meshed with the turbine one (534).
7. A freezing damage simulation test device for a tunnel drainage system in cold regions as claimed in claim 6, characterized in that: The rotating rod (63) is provided with a long strip, and the turbine 2 is slidably connected to the rotating rod (63).