Power distribution network fault positioning method based on artificial intelligence and storage medium

By collecting electrical parameters in a multi-level distribution network and combining them with the power grid topology and fault identification model, the impedance method and traveling wave method are used for fault location. This solves the limitations of existing power grid fault location algorithms and enables accurate identification and rapid response to different levels and fault scenarios.

CN118884129AActive Publication Date: 2024-11-01GUANGDONG POWER GRID CO LTD +1

Patent Information

Application Number
CN202411131058.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-01
Estimated Expiration
2044-08-16

Smart Images

  • Figure CN118884129A_ABST
    Figure CN118884129A_ABST
Patent Text Reader

Abstract

The invention provides a power distribution network fault positioning method based on artificial intelligence and a storage medium, and the method comprises the steps: determining electrical parameters based on data collected by electric energy sensors in a multi-level power distribution network, the electric energy sensors being installed on each level branch and node, the electrical parameters including current and voltage; obtaining a preset working parameter, wherein the preset working parameter is a preset working parameter for keeping stable operation of the multi-level power distribution network; determining a characteristic value of each level according to the electrical parameters, and recognizing the fault type of the fault point according to the deviation between the electrical parameters and preset working parameters in combination with a power grid topological relation and a fault recognition model; according to the fault type and hierarchical information, a fault positioning method is determined, a fault point is positioned, and the fault positioning method comprises coarse positioning based on an impedance method and fine positioning based on a traveling wave method. According to the method, real-time communication optimization can be carried out, and transmission delay between fault data and a control command is minimized, so that quick response can be carried out when a fault occurs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of information technology, and in particular to an artificial intelligence-based distribution network fault location method and a computer-readable storage medium. Background Art

[0002] In the sophisticated multi-level division system of modern distribution networks, the current and voltage data monitoring and collection work at each level faces its own challenges, especially the accuracy of data collection and the sampling frequency vary significantly between different levels. This inconsistency is directly mapped to the fault diagnosis stage, resulting in the different levels of analysis accuracy and reliability of conclusions when making fault judgments. The diversity of electrical configurations, line parameters and network topologies at each level means that even the same type of fault has its own manifestations and characteristic signals in networks at different levels, which greatly increases the difficulty and complexity of fault type identification. In addition, existing fault location algorithms are usually designed based on specific network topologies and fault types, and cannot adapt to the flexibility and robustness of different levels and fault scenarios. Summary of the invention

[0003] The main purpose of the present application is to provide a distribution network fault location method and a computer-readable storage medium based on artificial intelligence, so as to at least solve the problem that the power grid fault location algorithm in the prior art can only be used for specific network topologies and fault types, and cannot accurately identify fault types at different levels and in different fault scenarios.

[0004] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a distribution network fault location method based on artificial intelligence is provided, comprising: determining the electrical parameters of the multi-level distribution network based on data collected by electric energy sensors in the multi-level distribution network, the electric energy sensors being installed on branches and nodes at each level, and the electrical parameters including current and voltage; obtaining preset working parameters of the multi-level distribution network, the preset working parameters being preset working parameters for maintaining stable operation of the multi-level distribution network; determining characteristic values ​​of each level of the multi-level distribution network based on the electrical parameters, and identifying the fault type of the fault point based on the deviation between the electrical parameters and the preset working parameters, combined with the power grid topology relationship and fault identification model of the multi-level distribution network; determining the fault location method based on the fault type of the fault point and the level information of the multi-level distribution network, and using the fault location method to locate the fault point, the fault location method comprising coarse positioning based on the impedance method and fine positioning based on the traveling wave method.

[0005] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute any one of the distribution network fault location methods based on artificial intelligence.

[0006] Applying the technical solution of the present application, the above-mentioned distribution network fault location method based on artificial intelligence first determines the electrical parameters of the multi-level distribution network based on the data collected by the electric energy sensor in the multi-level distribution network, and the electric energy sensor is installed on each level of the branch and node, and the electrical parameters include current and voltage; then obtain the preset working parameters of the multi-level distribution network, and the preset working parameters are the preset working parameters for maintaining the stable operation of the multi-level distribution network; then, according to the electrical parameters, determine the characteristic values ​​of each level of the multi-level distribution network, and according to the deviation between the electrical parameters and the preset working parameters, combine the grid topology relationship and fault identification model of the multi-level distribution network, identify the fault type of the fault point; finally, according to the fault type of the fault point and the hierarchical information of the multi-level distribution network, determine the fault location method, and use the fault location method to locate the fault point, and the fault location method includes coarse location based on the impedance method and fine location based on the traveling wave method. The method can optimize real-time communication, minimize the transmission delay between fault data and control commands, so as to respond quickly when a fault occurs, and solve the problem that the grid fault location algorithm in the prior art can only be used for specific network topologies and fault types, and cannot accurately identify fault types of different levels and different fault scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0008] Figure 1 A schematic diagram of a flow chart of a distribution network fault location method based on artificial intelligence provided according to an embodiment of the present application is shown;

[0009] Figure 2 A schematic diagram of a process for locating a fault position according to an embodiment of the present application is shown;

[0010] Figure 3 A schematic diagram of a process for configuring an isolating switch operation according to an embodiment of the present application is shown;

[0011] Figure 4 A flow chart of another method for locating distribution network faults based on artificial intelligence provided according to an embodiment of the present application is shown. DETAILED DESCRIPTION

[0012] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0013] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0014] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0015] As introduced in the background technology, the fault location algorithm in the prior art is usually designed based on specific network topology and fault type, and cannot adapt to the flexibility and robustness of different levels and fault scenarios. In order to solve the problem that the power grid fault location algorithm in the prior art can only be used for specific network topology and fault type, and cannot accurately identify the fault type of different levels and different fault scenarios, the embodiments of the present application provide a distribution network fault location method based on artificial intelligence and a computer-readable storage medium.

[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0017] In this embodiment, a distribution network fault location method based on artificial intelligence that runs on a mobile terminal, a computer terminal or a similar computing device is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.

[0018] Figure 1 1 is a flow chart of a method for locating a distribution network fault based on artificial intelligence according to an embodiment of the present application. Figure 1 As shown, the method comprises the following steps:

[0019] Step S201, determining electrical parameters of the multi-level distribution network based on data collected by power sensors in the multi-level distribution network, wherein the power sensors are installed on branches and nodes at each level, and the electrical parameters include current and voltage;

[0020] Specifically, according to the topological structure of the multi-level distribution network, voltage and current sensors are reasonably arranged to cover branches and nodes at each level. This method can obtain accurate and reliable monitoring data and ensure the comprehensiveness and representativeness of the monitoring points.

[0021] Wherein, based on the data collected by the electric energy sensors in the multi-level distribution network, the electrical parameters of the multi-level distribution network are determined, including the following steps:

[0022] Step S301, determining the installation position of the electric energy sensor according to the topological structure of the multi-level distribution network, the installation position of the electric energy sensor covers the branches and nodes of each level of the multi-level distribution network, and the electric energy sensor includes a voltage sensor and a current sensor;

[0023] Among them, an abnormal situation identification model is established to detect abnormal situations in the operation of the distribution network through real-time analysis of electrical parameters;

[0024] Combined with the distribution network topology and fault feature library, the changes in electrical parameters of each monitoring point under abnormal conditions are analyzed to locate the fault location.

[0025] Step S302, establishing a unified data collection and transmission protocol, and based on the data collection and transmission protocol, aggregating and synchronizing the data collected by the electric energy sensors at each monitoring point to obtain initial electric energy data;

[0026] In some instances, by establishing a unified data collection and transmission protocol, such as Modbus and IEC61850, the sensor data distributed at various monitoring points are aggregated and synchronized to achieve systematic integration and centralized management of electrical parameters.

[0027] Step S303, filtering, denoising and feature extraction are performed on the initial electric energy data to obtain the electrical parameters of the multi-level distribution network.

[0028] Specifically, the data collected by the sensors are preliminarily processed and summarized, and the data are time synchronized and format converted. This method can obtain accurate and reliable monitoring data, laying the foundation for subsequent analysis.

[0029] like Figure 2 As shown, Figure 2A schematic diagram of a process for locating a fault position according to an embodiment of the present application is shown; first, voltage and current sensors are arranged to cover branches and nodes at all levels, and a data collection and transmission protocol is established. Then, the sensor data is aggregated and synchronized, and the voltage and current data are filtered and denoised. Finally, data features are extracted, an abnormality recognition model is established, and the fault position is located.

[0030] In some instances, the collected voltage and current data are filtered, denoised and feature extracted for specific interference and noise types in the distribution network, such as electromagnetic interference and harmonic interference, and key electrical parameter characteristics are extracted, such as voltage waveform distortion and current harmonic content, to improve data quality and provide reliable input for abnormal situation identification and fault location.

[0031] Based on machine learning algorithms and pattern recognition technologies such as support vector machines (SVMs) and random forests, an abnormal situation recognition model is established. By analyzing the electrical parameters in real time, extracting key features and comparing them with the normal operating mode, abnormal situations in the distribution network operation can be discovered in time, and the intelligence level of the monitoring system can be improved. The fault location algorithm is applied in combination with the distribution network topology and fault feature library. When an abnormal situation is detected, the real-time monitoring data is matched and analyzed according to the typical fault mode in the fault feature library, and the fault location is inferred and located in combination with the distribution network topology. By analyzing the change trend of electrical parameters of the monitoring points around the fault point, the fault location can be accurately located and the fault handling time can be shortened. When arranging voltage and current sensors, a combination of centralized and distributed methods can be adopted.

[0032] In the data preprocessing stage, the combination of wavelet transform and Fourier transform is used to filter and denoise the voltage and current signals, and extract key features such as fundamental amplitude, phase angle, harmonic content, etc. Then, the support vector machine SVM algorithm is used to establish an abnormal situation recognition model, and the optimal decision boundary is obtained by training historical operation data. When the real-time monitoring data deviates from the normal operation mode, it can be determined as an abnormal situation. For fault location, first, according to the topology of the distribution network, a fault feature library is constructed, which contains the voltage and current feature patterns of various typical faults. When a fault occurs, the dynamic time warping algorithm is used to align and compare the voltage and current waveforms before and after the fault to extract the fault feature sequence. Then, the convolutional neural network algorithm is used to classify and identify the fault feature sequence to determine the fault type. Combined with the topology of the distribution network, the location coordinates of the fault point are calculated by combining the impedance method and the traveling wave method, with an accuracy of less than 50 meters. In terms of data storage, the time series database InfluxDB is used to store monitoring data every 5 minutes, and the data is backed up and distributed through the Kafka message queue. At the same time, the role-based access control (RBAC) mechanism is used to manage permissions for access to and operations on monitoring data to ensure data security.

[0033] On the trunk line of the distribution network, a centralized monitoring unit is installed every 500 meters. Each unit contains 3 voltage sensors and 3 current sensors to measure the three-phase voltage and current respectively. On the branch line and user end, a distributed monitoring method is adopted, and an intelligent micro monitoring unit is installed every 200 meters, with built-in high-precision voltage and current sensors. The sampling frequency of the sensor can be set to 5kHz, the measurement range is 0500V and 0100A, and the accuracy reaches 0.1 level. Through the Modbus communication protocol, the collected data is transmitted to the monitoring center in real time, and time synchronization and format conversion are performed.

[0034] Step S202, obtaining preset operating parameters of the multi-level distribution network, wherein the preset operating parameters are preset operating parameters for maintaining stable operation of the multi-level distribution network;

[0035] Specifically, for the preprocessed data, a feature extraction algorithm is used, such as frequency domain feature extraction based on Fast Fourier Transform (FFT) and time-frequency domain feature extraction based on wavelet transform, to extract key eigenvalues ​​reflecting the operating status of the distribution network from the current and voltage data, and the eigenvalues ​​are compared with the preset normal working parameters of the power grid. This method designs and optimizes a multi-level distribution network according to the preset working parameters, which can improve the performance and efficiency of the system and ensure the stable operation of the system.

[0036] Among them, according to the topological structure and load distribution of each level of distribution network, an abnormality detection model is established, and the normal operation mode of the power grid is learned by training historical operation data. When the real-time characteristic value deviates from the normal mode, it is judged as a potential abnormal situation;

[0037] In some instances, for the preprocessed data, feature extraction algorithms are used, such as frequency domain feature extraction based on fast Fourier transform (FFT) and time-frequency domain feature extraction based on wavelet transform, to extract key feature values ​​reflecting the operating status of the distribution network from the current and voltage data. Frequency domain features may include fundamental amplitude, harmonic amplitude, and total harmonic distortion, etc., and time-frequency domain features may include wavelet energy distribution, singular values, etc. The extracted feature values ​​are compared with the preset normal working parameters of the power grid to identify potential abnormalities. The detected abnormal data is clustered, classified, and retrospectively analyzed to determine the time, location, and scope of the abnormality.

[0038] Density-based clustering algorithms (such as Density-Based Spatial Clustering of Applications with Noise, referred to as DBSCAN) are used to cluster abnormal data and identify different types of abnormal patterns. Classification models such as Support Vector Machine (SVM) and random forest are used to classify abnormal data and determine the type of abnormality. Through the retrospective analysis of time series data, the propagation path and impact range of abnormal signals are tracked to provide a basis for subsequent fault diagnosis. According to the results of abnormal situation analysis, combined with expert knowledge and fault case library, a fault diagnosis model is constructed. A fault diagnosis method based on decision trees is used to generate a fault diagnosis decision tree by training historical fault data. The input features of the decision tree include abnormal feature values, power grid topology, equipment parameters, etc., and the output results are fault type and location.

[0039] At the same time, the case-based reasoning method is used to match the current abnormal situation with historical fault cases, find the most similar cases, and infer the cause and disposal measures of the current fault based on the diagnosis results of the cases. The collected data, extracted feature values, abnormal analysis results, and diagnostic results are stored and managed. A distributed time series database, such as InfluxDB or OpenTSDB, is used to design a reasonable data table structure and tag system to support efficient data writing and query. Structured metadata and diagnostic results can be stored in relational databases such as MySQL or PostgreSQL. The performance of data query is improved by establishing appropriate indexes and query optimization strategies. Data visualization technology, such as open source tools such as Grafana, is used to intuitively present information such as the operating status, abnormal conditions, and diagnostic results of the distribution network. Real-time monitoring and trend analysis of key indicators such as voltage, current, and power are achieved by designing intuitive dashboards and charts.

[0040] According to the results of anomaly detection and fault diagnosis, set reasonable alarm thresholds and notification strategies. When indicators exceed the threshold range or a specific abnormal mode occurs, promptly send an alarm to the on-duty personnel and notify relevant personnel through SMS, email, etc. to improve the system's response speed and processing efficiency. Regularly evaluate the effectiveness of the alarm strategy, optimize the threshold setting and notification method, and reduce the occurrence of false positives and false negatives.

[0041] At each node of the distribution network, current and voltage sensors, such as Hall current sensors and resistive voltage divider sensors, are deployed. The sampling frequency is set to 10kHz, and 10,000 data points are collected per second. The data is transmitted to the edge computing gateway in real time through the ModBus communication protocol. The gateway uses the Kalman filter algorithm to denoise the data, filter out high-frequency noise, and then forward the data to the cloud server at a frequency of one data packet per second. The cloud server uses the Apache Spark streaming processing framework to extract real-time features of the data, uses the FFT algorithm to extract the fundamental amplitude and phase angle of the voltage and current, and uses the wavelet transform to extract transient features such as voltage sag and surge. The extracted feature data is stored in the time series database InfluxDB and compared with the preset normal working parameter threshold. If the feature value is found to be out of the normal range, an abnormal alarm is triggered and the abnormal data is transferred to the abnormal analysis module.

[0042] The abnormal analysis module uses the density-based DBSCAN clustering algorithm to perform cluster analysis on abnormal data and identify different types of abnormal patterns, such as single-phase grounding and two-phase short circuit. The clustering results are stored in the MongoDB database. The clustering results are used as input and passed to the fault diagnosis model. The fault diagnosis model uses a decision tree algorithm to infer the fault type and location based on the clustering results, power grid topology, historical fault cases and other information. The diagnosis results are stored in the MySQL database in JSON format and trigger alarm information to notify the on-duty personnel through SMS, email and other means. Using the Grafana visualization tool, a distribution network operation status monitoring dashboard is designed to display key indicators such as voltage, current, and power of each node in real time, and to display the changing trend of indicators in the form of a curve chart. When an abnormality or fault occurs, the dashboard highlights the abnormal node and faulty equipment in red, and pops up the abnormal analysis and fault diagnosis result report to assist the on-duty personnel to quickly locate and deal with the problem.

[0043] Step S203, determining characteristic values ​​of each level of the multi-level distribution network according to the electrical parameters, and identifying the fault type of the fault point according to the deviation between the electrical parameters and the preset working parameters, combined with the grid topology relationship and fault identification model of the multi-level distribution network;

[0044] Specifically, for the detected abnormal situation, we combine expert knowledge and fault case library to build fault diagnosis rules. Through the rule reasoning engine, we analyze and diagnose the abnormal situation and determine the fault type and location, which improves the response speed and processing efficiency of the system.

[0045] According to the electrical parameters, characteristic values ​​of each level of the multi-level distribution network are determined, and according to the deviation between the electrical parameters and the preset working parameters, combined with the grid topology relationship and fault identification model of the multi-level distribution network, the fault type of the fault point is identified, including the following steps:

[0046] Step S401, extracting characteristic values ​​reflecting the operating state of the multi-level distribution network from the electrical parameters, wherein the characteristic values ​​at least include voltage deviation and current harmonic content;

[0047] Step S402, using Euclidean distance or Manhattan distance measurement method to calculate the target deviation value between the electrical parameters of each detection point and the preset working parameters, the preset working parameters at least include rated voltage, rated current and power factor, and the target deviation value at least includes current deviation value and voltage deviation value;

[0048] Step S403, storing the grid topology of the multi-level distribution network in a graph database in the form of an adjacency matrix, wherein each node represents a bus or a switch, each edge represents a connection relationship between two of the above nodes, and the attributes of the edge include electrical parameters of the conductor, and the electrical parameters of the conductor include at least resistance and reactance;

[0049] Step S404, using a decision tree algorithm to construct the above-mentioned fault identification model, inputting the above-mentioned power grid topology relationship and the target deviation value of each of the above-mentioned detection points into the above-mentioned fault identification model, and obtaining the fault type of the above-mentioned fault point, wherein the above-mentioned fault type includes one of overload, short circuit, open circuit and grounding.

[0050] Specifically, the operating status and abnormal conditions of the distribution network and the diagnostic result information are presented through a curve chart or a heat map, and an alarm threshold is set. When the characteristic value exceeds the threshold range, an alarm is issued to the on-duty personnel. This method improves the response speed and processing efficiency of the system.

[0051] In some instances, the deviation between the current and voltage data and the normal value is calculated based on the normal working parameters of the power grid, such as rated voltage, rated current, power factor, etc. The deviation is calculated using metrics such as Mahalanobis distance or cosine similarity, and different attributes are normalized to eliminate the dimension effect and obtain the deviation value of each measuring point. The power grid topology is stored in a graph database such as Neo4j in the form of an adjacency list or a compressed sparse matrix. Each node represents a bus or switch, and each edge represents the connection relationship between nodes. The attributes of the edge include the electrical parameters of the wire, such as resistance and reactance, to reduce memory usage and computational overhead.

[0052] The CART decision tree algorithm is used to build a fault diagnosis model. Through the steps of feature selection, tree generation and pruning, the Gini coefficient or information gain ratio is used as the division criterion. The current and voltage deviation values ​​of each measuring point, the power grid topology, historical fault cases, etc. are used as input features, and the output results are fault types, such as overload, short circuit, open circuit, grounding, etc. For different fault types, the corresponding fault features are extracted. The overload fault features include the current continuously exceeding the rated value and the temperature rise. The short circuit fault features include the current sudden increase and voltage drop. The open circuit fault features include the current zero and the voltage increase. The grounding fault features include the zero sequence current increase and the zero sequence voltage increase. The feature extraction uses time-frequency domain analysis methods such as wavelet transform. For example, Daubechies wavelet is used to perform a 5-layer decomposition of the current and voltage signals, extract the energy features of each frequency band, and splice the feature vectors of multiple measuring points into a high-dimensional feature matrix. The random forest algorithm is used to integrate multiple decision tree models, generate multiple decision trees through self-service sampling and attribute randomization, and perform integrated prediction by voting or averaging to improve the accuracy and robustness of fault diagnosis.

[0053] At the same time, other types of machine learning models such as support vector machines and neural networks are introduced to further improve the performance of fault diagnosis through model fusion. Use cross-validation and other methods to evaluate and optimize the model, establish a complete model update mechanism, and continuously iterate and update model parameters to adapt to the dynamic changes in power grid operating conditions. After identifying the type of fault, use the grid topology relationship and the spatial distribution information of the fault measurement point through graph theory algorithms such as the shortest path and connectivity analysis to infer the location or range of the fault, generate fault reports and maintenance suggestions, provide decision support for maintenance personnel, and improve the efficiency and accuracy of fault handling.

[0054] Current and voltage sensors, such as Hall current sensors and voltage transformers, are installed at the main nodes of the distribution network. The sampling frequency is set to 10kHz, and the data is transmitted to the edge gateway in real time through the RS485 bus. The gateway uses the adaptive Kalman filter algorithm to denoise the data, filter out the power frequency 50Hz and its harmonic interference, and then use the maximum absolute value normalization method to normalize the current and voltage data and map the data to the [-1,1] interval. The normalized data is compared with the preset normal operating threshold, and the Mahalanobis distance is used to calculate the distance between the data point and the threshold center. If the distance exceeds 3 standard deviations, it is judged as abnormal data, and the current and voltage values ​​at that moment are extracted as abnormal features. The abnormal feature data is sent to the cloud server in JSON format through the MQTT protocol and stored in the time series database InfluxDB. At the same time, the Neo4j graph database is used to store the topological structure of the distribution network, including the connection relationship and electrical parameters of components such as busbars, switches, and transformers. The abnormal feature data and topological structure data are taken as input and sent to the pre-trained CART decision tree model for fault diagnosis. The decision tree divides the features according to the information gain ratio criterion and generates a binary tree with a depth of 5. The leaf nodes of the tree correspond to different fault types, such as single-phase grounding, two-phase short circuit, etc.

[0055] For the diagnosed fault type, the typical waveform and wavelet energy distribution characteristics of this type of fault are extracted by querying the fault feature library. The Daubechies4 wavelet is used to decompose the fault waveform into 4 layers, and the root mean square value of each scale coefficient is extracted as the wavelet energy feature. The wavelet energy feature is matched with the feature of the current fault waveform for similarity, and the cosine similarity is calculated. If the similarity is greater than 0.8, the fault type is confirmed, otherwise the data sample is added to the training set and the decision tree model is retrained. According to the fault type and topological structure, the Dijkstra shortest path algorithm is used to calculate the electrical distance from the fault point to each monitoring point, and the location with the smallest electrical distance and consistent with the fault characteristics is selected as the fault point. The fault report and emergency repair plan are generated and pushed to the mobile terminal of the maintenance personnel through the Web service to guide the on-site fault handling work.

[0056] Step S204, determining a fault location method according to the fault type of the fault point and the hierarchical information of the multi-level distribution network, and locating the fault point using the fault location method, wherein the fault location method includes coarse location based on impedance method and fine location based on traveling wave method.

[0057] Specifically, according to the fault type information obtained by the fault diagnosis module, such as single-phase grounding, two-phase short circuit, etc., combined with the hierarchical structure of the power grid, such as trunk lines, branch lines, etc., the appropriate fault location technology is adaptively selected to improve the accuracy and reliability of traveling wave parameter measurement. Through simulation experiments and field tests, the location algorithm is optimized and verified to ensure its performance and stability under actual working conditions.

[0058] Among them, for different fault types, the time-frequency domain analysis method is used to extract the corresponding fault characteristics.

[0059] Wherein, according to the fault type of the above-mentioned fault point and the hierarchical information of the above-mentioned multi-level distribution network, a fault location method is determined, and the above-mentioned fault location method is used to locate the above-mentioned fault point, including the following steps:

[0060] Step S501, according to the fault type of the fault point and the hierarchical information of the multi-level distribution network, determine to use a coarse positioning method based on an impedance method to calculate the first position information of the fault point on the trunk line of the multi-level distribution network, and use a fine positioning method based on a traveling wave method to calculate the second position information of the fault point on the branch line of the multi-level distribution network;

[0061] Step S502, on the trunk line of the multi-level distribution network, according to the voltage data and current data at the time of the fault, the equivalent impedance between the fault point and the detection point is calculated, and according to the electrical parameters of the line where the fault point is located, the impedance equation group between the fault point and each of the detection points is established, and the impedance equation group is solved to obtain the first position information of the fault point, and the electrical parameters of the line include resistivity and reactance;

[0062] Step S503, on the branch line of the above-mentioned multi-level distribution network, the distance between the above-mentioned fault point and each of the above-mentioned detection points is calculated according to the propagation speed and time difference of the traveling wave on the line where the above-mentioned fault point is located, and the second position information of the above-mentioned fault point is determined according to the distance between the above-mentioned fault point and each of the above-mentioned detection points using a multi-point ranging method, and the accuracy of the above-mentioned second position information is greater than the accuracy of the above-mentioned first position information.

[0063] Specifically, different fault location methods are determined according to different hierarchical information and fault types to improve the location accuracy and adaptability and ensure its performance and stability under actual working conditions.

[0064] In some examples, rough positioning based on the impedance method is used on the trunk line. By measuring the voltage and current at the time of the fault, the equivalent impedance of the fault point is calculated, and then the fault distance is estimated according to the line parameters. Considering the double-end and multi-end measurement data, the positioning accuracy can reach within 100 meters. Precise positioning based on the traveling wave method is used on the branch line. According to the propagation time difference of the traveling wave generated by the fault on the line, the position of the fault point is calculated. By accurately identifying the traveling wave head, the problem of wave velocity changing with frequency is handled, and complex situations such as multi-branch and non-uniform lines are solved. The positioning accuracy is strived to reach within 50 meters. For complex line structures, such as multi-branch and non-homogeneous, improved impedance method and traveling wave method are used. For the impedance method, positioning algorithms that consider fault resistance are introduced, such as Takagi method and Eriksson method, to improve positioning accuracy and adaptability. For the traveling wave method, signal processing technologies such as wavelet transform and Hilbert transform are introduced to improve the accuracy and reliability of traveling wave parameter measurement. Through simulation experiments and field tests, the positioning algorithm is optimized and verified to ensure its performance and stability under actual working conditions.

[0065] Build a high-precision distribution network topology model, including line length, conductor model, tower location and other attributes, as well as parameters of switches, transformers and other equipment. Update the network's operating status in real time through state estimation and topology analysis algorithms to provide accurate input data for fault location. Summarize the laws and influencing factors of positioning errors through a large amount of simulation and measured data, perform adaptive corrections on positioning results, and continuously improve positioning accuracy and reliability.

[0066] Comprehensively utilize the advantages of the impedance method and the traveling wave method to achieve fast and accurate fault location. The fault location results are connected to the geographic information system GIS to automatically generate the geographical coordinates of the fault point and the surrounding environment information, providing intuitive and reliable support for emergency repair decisions, and ultimately achieving fault location accurate to the tower level, providing key support for the intelligent operation and management of the distribution network. In the distribution automation master station system, the fault recording data is collected from the substation intelligent electronic device IED in real time through the IEC61850 protocol. The sampling frequency can reach 10kHz, including the voltage and current waveforms in the three stages before the fault, during the fault, and after the fault. For the trunk line, the two-terminal impedance method is used for rough positioning. First, the positive sequence voltage drop ΔU and the positive sequence current I are calculated. Then, according to the line unit length impedance parameters R and X, the fault distance L is estimated as |ΔU| / (I×sqrt(R 2+X2)), the positioning accuracy is about 100 meters. For branch lines, the traveling wave method is used for precise positioning, and the fault traveling wave is detected and extracted by wavelet transform. The sampling data is decomposed into 5 layers by Db4 wavelet to extract the mutation position of the scale coefficient amplitude, determine the arrival time t of the traveling wave head, and then calculate the fault distance L = v × t / 2 according to the line wave velocity v and line length S, and the positioning accuracy can reach 50 meters. For complex lines with heterogeneity and branches, the Takagi method and wavelet traveling wave method are combined to introduce parameters such as fault resistance and distributed capacitance. Through iterative calculation and optimization solution, the positioning accuracy and reliability are improved.

[0067] At the same time, through artificial intelligence algorithms such as support vector machines (SVM), historical fault location data is trained and learned, a nonlinear mapping relationship between fault distance and influencing factors is established, the fault point location is predicted online, and the results of the impedance method and the traveling wave method are integrated and corrected, and the error is controlled within 20 meters. The location results of the fault point are associated with the geographic coordinates and line resource information, and displayed intuitively on the electronic map, and a fault analysis report is generated to guide the repair personnel to quickly and accurately find the fault point, and realize intelligent fault location and disposal.

[0068] Among them, a distribution network topology model is constructed, including the line length, conductor model and tower location attributes, as well as the parameters of switch and transformer equipment. Through topological analysis and power flow calculation methods, the network operation status is updated in real time.

[0069] After locating the fault point using the fault location method, the method further includes the following steps:

[0070] Step S601, according to the fault condition of the fault point and the corresponding fault impact assessment model, determine the fault impact range and impact severity corresponding to the fault condition, and determine the fault isolation priority of the fault point according to the fault impact range and impact severity, the fault condition including the fault type of the fault point and the location information of the fault point;

[0071] Among them, according to the results of fault diagnosis and positioning, the type and location of the fault are determined, including single-phase grounding fault and two-phase short circuit fault, as well as the line, bus and transformer equipment where the fault occurs, and the fault point information is obtained as input data for the fault impact domain assessment model.

[0072] According to the fault condition of the fault point and the corresponding fault impact assessment model, determining the fault impact scope and impact severity corresponding to the fault condition, and determining the fault isolation priority of the fault point according to the fault impact scope and impact severity, includes the following steps:

[0073] Step S701, starting from the fault point, traversing the topological structure of the multi-level distribution network, searching for all lines and devices directly or indirectly connected to the fault point, forming a fault impact tree with the fault point as the root node, so as to determine the impact range of the fault, wherein each node of the fault impact tree represents an affected component, and the number of layers of the fault impact tree represents the indirect degree of the impact of the component;

[0074] Step S702, according to the above fault impact tree, calculate the fault current and voltage deviation index of each of the above affected components, use the node voltage method and / or branch current method to perform power flow calculation, analyze the impact of the fault on the voltage, current and power parameters of each node and branch, and determine the severity of the above impact;

[0075] Step S703, constructing a fault sensitivity matrix, and evaluating the fault impact range and key influencing factors under different fault conditions through the fault sensitivity matrix, wherein the rows of the fault sensitivity matrix represent the fault type of the fault point and the location information of the fault point, the columns of the fault sensitivity matrix represent the affected components, and the elements of the fault sensitivity matrix represent the influence coefficient of a certain fault on a certain component;

[0076] Step S704: determining the fault isolation priority of the fault point based on the fault sensitivity matrix.

[0077] Specifically, based on the results of fault diagnosis and location, the type and location of the fault are determined, and detailed information of the fault point is obtained to provide input conditions for subsequent impact domain assessment, thereby improving the safety, reliability and resilience of the distribution network.

[0078] In some instances, the type and location of the fault, such as single-phase grounding fault, two-phase short circuit fault, etc., as well as the line, bus, transformer and other equipment where the fault occurs are determined according to the results of fault diagnosis and location, and detailed information of the fault point is obtained to provide input conditions for the subsequent impact domain evaluation. The breadth-first search (BFS) algorithm is adopted, starting from the fault point, traversing the topology of the distribution network layer by layer, searching all lines and equipment directly or indirectly connected to the fault point until all relevant nodes are visited, forming a fault impact tree with the fault point as the root node. Each node of the tree represents an affected component, and the number of layers of the tree represents the indirect degree of the component being affected, thereby determining the impact range of the fault. Based on the fault impact tree, the impedance matrix method is used for fault analysis. According to the fault type and location, the impedance matrix of the distribution network is modified, the node voltage and branch current distribution at the time of the fault are calculated, and the severity indicators such as voltage deviation and overcurrent are obtained, and the impact of the fault on each node and branch is quantitatively evaluated.

[0079] Construct a fault sensitivity matrix, where the matrix elements are voltage sensitivity coefficients and the current sensitivity coefficient They respectively represent the impact of the active power change of node j on the node i voltage and branch ij current, which are obtained by solving the Jacobian matrix.

[0080] Important loads in the distribution network are identified and classified, such as hospitals and transportation hubs. A combination of the Analytic Hierarchy Process (AHP) and the Delphi method is used to establish a hierarchical model, construct a pairwise comparison matrix, calculate the weight vector, and verify the consistency of the judgment matrix. Taking into account factors such as the capacity, type, and importance of the load, the importance weight of each load node is obtained and incorporated into the fault impact assessment model.

[0081] On the basis of fault impact assessment, combined with the topological constraints and operation objectives of the distribution network, such as the minimum power outage range and the fastest recovery time, a multi-objective optimization model is constructed to define the state variables of the disconnector and the load transfer switch, establish constraint equations such as voltage, current, and power, set weight coefficients for different fault types, and the objective functions include minimizing the impact range, minimizing the severity, and giving priority to important loads. Multi-objective optimization algorithms such as NSGA-II and MOPSO are used to solve the problem. The fault impact assessment model is self-learned and updated. By collecting and analyzing historical records of fault events, flow snapshots of the distribution network, expert experience and knowledge, and using machine learning algorithms such as support vector machines and decision trees, the parameters and structure of the assessment model are adaptively adjusted and optimized. Evaluation indicators such as accuracy, recall rate, and F1 score are selected to quantitatively evaluate the performance and generalization ability of the model.

[0082] The time dimension is introduced to dynamically model the propagation and evolution of fault impact on the time and space scale, analyze the critical path and cascading failure mode of fault propagation, identify key nodes and key edges, and optimize the resilience and vulnerability of the distribution network. The complex network theory is used to characterize the topological characteristics and dynamic behavior of the distribution network, reveal the propagation mechanism and evolution law of fault impact, provide theoretical basis and technical support for real-time monitoring, risk warning and defense control of the distribution network, and improve the safety, reliability and resilience of the distribution network. Assuming that the distribution network consists of 10 feeders and 100 nodes, when a single-phase grounding fault occurs at node 27, the BFS algorithm is first used to search the fault impact range, and the search depth is set to 3 layers. The search results show that the fault affects 3 nodes in the first layer, 8 nodes in the second layer, and 12 nodes in the third layer, a total of 23 nodes are affected. Then the impedance matrix method is used to calculate the short-circuit current and voltage deviation of the affected nodes. It is found that the short-circuit current of 2 nodes exceeds 1.5 times the rated value, and the voltage deviation of 5 nodes exceeds 10% of the rated value, which is determined to be a seriously affected node. Then the fault sensitivity matrix was calculated. Based on the active power injection change rate of the node of 0.1MW, the sensitivity coefficient of the node 27 fault to the voltage of all nodes was calculated, with a maximum value of -0.85, that is, for every 0.1MW increase in active power injection of node 27, the voltage of a certain node dropped by 0.085kV. The analytic hierarchy process (AHP) was used to evaluate the 10 key load nodes. By comprehensively considering eight key factors such as failure rate, load, customer type, and electricity price, a hierarchical evaluation system with three levels was constructed. In this process, five experts in the field were invited to carefully score the relative importance of each factor, with a scoring standard of 1 to 9 points. Based on this, a weight vector reflecting the importance of the load was calculated, in which the weight of the highest scoring item was 0.25, reflecting its prominent position in decision-making.

[0083] On this basis, a mixed integer nonlinear programming (MINLP) optimization model was further established to improve the fault response capability of the power grid by optimizing decision-making. The decision variables of the model involve the switch states of 23 disconnectors, and a series of basic constraints are set, including ensuring voltage stability, maintaining a single radial network structure, and giving priority to restoring power supply to important loads. To solve this model, the extreme climbing algorithm was used for iterative search. After 500 generations of operations, the population size of each generation was 50, the crossover probability was set to 0.8, and the mutation probability was 0.1. Finally, a set of Pareto optimal solutions was identified. By sorting and analyzing these solutions, a compromise solution that can meet multiple objectives and is relatively balanced was selected, and the corresponding fault isolation operation sequence was clarified. In order to verify the effectiveness of the model, 2000 real fault cases accumulated in the past 10 years were used for training, and 10-fold cross validation was implemented. The results showed that the average prediction accuracy exceeded 95%, indicating that the model has high practical value. Analysis based on complex network theory shows that the average degree of the original power grid network is 〈k〉=3.8. Once a fault occurs, the average degree drops sharply to 2.2, revealing a significant reduction in network connectivity and emphasizing the urgency of improving power grid resilience and taking effective measures. In addition, by simulating the removal of the top 10% of key nodes in degree, betweenness centrality, and closeness centrality in the network, it is found that the maximum reduction in network efficiency can reach 60%. This result clearly points out these structurally fragile key nodes, emphasizing that they are the focus of future enhanced monitoring and protection, which is of great significance to maintaining the stable operation of the power grid.

[0084] Step S602, based on the fault conditions of each of the fault points and the fault isolation priority, determining a fault isolation control strategy, the fault isolation control strategy being used to perform sequenced control on the switch devices in the fault area to minimize the impact range of the fault and the power outage time;

[0085] Wherein, based on the above-mentioned fault conditions of each of the above-mentioned fault points and the above-mentioned fault isolation priority, determining the fault isolation control strategy includes the following steps:

[0086] Step S801, judging the fault timeliness type of the fault point according to the position coordinates of the fault point and the topological area to which it belongs, the fault timeliness type being a permanent fault or a transient fault;

[0087] Step S802, when the fault timeliness type is the permanent fault, the fault urgency index is calculated in combination with the fault isolation priority, fault severity, impact scope and important load factors;

[0088] Step S803, according to the topological structure and real-time operation status of the multi-level distribution network, the location and status information of all switch devices in the fault area are obtained, and the decision variables and constraints of the switch operation are established to form an optimal configuration of the disconnector, wherein the switch devices include manual switches, automatic switches and disconnectors;

[0089] Step S804, according to the urgency index of the above-mentioned fault and the above-mentioned optimal configuration of the isolating switch, the corresponding state space, action space and reward function are set, with the goal of minimizing the impact range of the above-mentioned fault and the power outage time, generating the optimal switch operation sequence, and obtaining the above-mentioned fault isolation control strategy.

[0090] like Figure 3 As shown, Figure 3 A schematic diagram of a process for configuring the operation of an isolating switch provided in accordance with an embodiment of the present application is shown; first, the coordinates and area of ​​the fault point are obtained by diagnosis and positioning, and the fault type is determined to be permanent or transient. If it is a permanent fault, the isolation control strategy is initiated; if it is a transient fault, the state change is recorded and detected, and then the fault isolation priority is determined, the fault urgency index is calculated, and different levels of faults are processed according to the index, and finally the isolating switch operation is optimized.

[0091] Specifically, based on the fault impact assessment, combined with the topological constraints and operation objectives of the distribution network, such as the minimum power outage scope and the fastest recovery time, a multi-objective optimization model is constructed, constraint equations such as voltage, current, and power are established, and weight coefficients of different fault types are set. This method introduces the time dimension and dynamically models the propagation and evolution process of fault impact on the time and space scales, thereby optimizing the resilience and vulnerability of the distribution network.

[0092] In some examples, based on the fault impact assessment model, the fault isolation priority is determined, and the fault severity S, impact range A, number of important loads N and other factors are comprehensively considered to calculate the fault urgency index I = S × A × N. The hierarchical analysis method is used to determine the weight of each factor, and different levels of faults are handled in order from high to low. According to the topological structure and real-time operation status of the distribution network, the location and status information of all switchgear in the fault area are obtained, including manual switches, automatic switches, disconnectors, etc., and the decision variables and constraints of the switch operation are established. The decision variable is the state of the switch (0 / 1), such as 0 for the switch to be disconnected and 1 for the switch to be closed. The constraints include voltage amplitude U_min≤U≤U_max, power flow power P_ij≤P_max, feeder topology G_t∈T, etc., forming an optimal configuration problem of disconnectors. U_min represents the voltage lower limit, which is the lowest voltage value allowed when a node or line in the distribution network is running. A value lower than this value may affect the power supply quality and equipment safety. U_max represents the upper voltage limit, which is the highest voltage value allowed. Exceeding this value may cause overvoltage damage to equipment or power quality problems.

[0093] P_ij refers to the power flow from node i to node j, which indicates the active power flowing between these two nodes. P_max indicates the maximum allowable power flow of a certain line or device. If the actual power flow exceeds this value, it may cause overload, and measures such as reconfiguring the network or limiting the load need to be taken to avoid it. G_t represents the topological structure of the distribution network at time t (i.e., in real-time operation), represented by a graph in graph theory, including nodes (such as substations, load points) and edges (such as transmission lines). ∈T indicates that G_t belongs to one of the set T of all possible topological structures.

[0094] T includes all legal connection modes of the distribution network, that is, the network structure that complies with the physical connection rules and operation rules. The deep reinforcement learning algorithm DQN is used to model and solve the switch operation problem. The input state is the fault type, the isolation switch state, etc. The output action is the switch operation combination. The reward function R is the weighted sum of the fault isolation range A and the power outage time T R = -w1×A-w2×T. The weights w1 and w2 are used to balance the importance of these two factors. The neural network contains 3 hidden layers, each with 64 neurons. The activation function is ReLU, the learning rate is 0.001, the discount factor is 0.9, the experience replay capacity is 10000, and the target network update frequency is 100 steps. The training agent aims to minimize the fault impact range and power outage time to generate the optimal switch operation sequence. In the process of generating the switch operation sequence, the impact of each operation on the grid topology is evaluated in real time. Through power flow calculation and fault analysis, it is determined whether the operation will cause new faults or violate the constraints. The Newton-Raphson method is used for power flow calculation with an error of less than 1e-6. The sequential Monte Carlo method is used for fault analysis with 1000 fault scenarios. If the constraints are not met, the operation is backtracked and corrected. For important loads that are out of power, such as hospitals and transportation hubs, the backup power supply self-transfer or temporary transfer strategy is activated. The backup power supply capacity is not less than 80% of the important loads. The switching logic is to be put into use when the fault area and the adjacent area are out of power at the same time. The load priority is sorted according to importance. The transfer line selection is based on the minimum cut set algorithm. Through distributed energy, emergency power generation vehicles, etc., the power supply of important loads is restored as soon as possible to reduce the impact of the fault on key users.

[0095] While performing the fault isolation operation, the operating status of the power grid and the load recovery status are continuously monitored. According to the actual effect and environmental changes, the isolation control strategy is dynamically adjusted. An adaptive dynamic programming algorithm is used. The state transfer equation is s_t+1=f(s_t,a_t), which represents the rule of transferring from the current state s_t to the next state s_t+1 after the action a_t. The function f defines how the state changes with the action, reflecting the model of the dynamic behavior of the power grid. Among them, s_t represents the state of the power grid at time t, and a_t represents the specific operation taken at time t to isolate the fault or restore the normal operation of the power grid, such as opening or closing a certain isolation switch. The value function is approximated by a neural network. The strategy iteration cycle is 10 minutes, the time complexity is O(nlogn), and the space complexity is O(n). The adaptive capability indicators are the fault isolation range reduction rate and the load recovery time reduction rate. The strategy is optimized and updated online to improve the real-time and adaptability of fault handling. Through the information from the fault indicator and the microcomputer protection device, it is determined that the No. 2 main transformer has a B-phase instantaneous grounding fault. The fault duration is 0.2 seconds, and the fault current is 3.5 times the rated current. It is an instantaneous fault and will not be isolated temporarily. The reclosing will be delayed for 1 second and the fault status will continue to be monitored. If the fault occurs again within 1 minute, it will be determined as a permanent fault and isolation control will be initiated.

[0096] According to the fault severity S=3 (current exceeds 3 times the rated value), the impact range A=2 (2 10kV feeders), and the number of important loads N=1 (1 tertiary hospital), the fault urgency index I=6 is calculated, which is a high priority fault and needs to be isolated first. The state information of 5 boundary switches and 10 disconnectors in the fault area is collected through the all-fiber communication network, and the disconnector optimization model is established. The constraints are that the feeder voltage deviation does not exceed 5%, the line flow does not exceed 80% of the rated value, and the feeder maintains a tree topology. The DQN reinforcement learning network is built using TensorFlow, with an input state dimension of 15, an output action dimension of 10, 3 hidden layers, 64 nodes per layer, an activation function of ReLU, an optimizer of Adam, a learning rate of 0.001, a discount factor of 0.9, a replay capacity of 10000, and a target network update frequency of 100 steps. After 10,000 training iterations, the loss function converges to below 0.05, generating the optimal switch operation sequence. The operation sequence was evaluated in real time using the Pandapower power flow calculation program and fault analysis program. A hybrid algorithm of the Newton method and the fast decoupling method was used, with an error of less than 1e-6. 1,000 fault scenarios were sampled for risk assessment, and it was found that the third step operation would cause the No. 6 disconnector to overload, so it was corrected to disconnect the No. 6 switch and close the No. 7 switch. For the only Class III hospital load in the fault area, the local 500kW diesel generator and the backup line of the adjacent feeder were used for transfer. The diesel generator switching logic was to start when the hospital suddenly lost power and the backup line also lost power, and the load recovery time did not exceed 30 seconds. During the fault isolation process, the grid state and isolation / recovery strategy were re-evaluated every 5 minutes, and the policy iteration algorithm was used to update the Q value function. The state space dimension was 30, the action space dimension was 20, the discount factor was 0.95, and the convergence accuracy was 1e-4. By adaptively adjusting the control strategy of the disconnector and the backup power supply, the fault isolation range was reduced by 15%, and the recovery time of important loads was shortened.

[0097] Step S603, performing real-time communication optimization on the multi-level distribution network and establishing a data transmission scheduling strategy for the multi-level distribution network;

[0098] The real-time communication optimization of the multi-level distribution network and the establishment of a data transmission scheduling strategy for the multi-level distribution network include the following steps:

[0099] Step S901, establishing a communication network for distribution automation by combining optical fiber communication and 5G wireless communication;

[0100] Step S902, compressing and encrypting the fault data for transmission, and classifying and marking the fault data and control commands and scheduling their priorities according to the type and priority of the data;

[0101] Step S903, establishing redundant transmission links between key nodes of the above communication network, and switching to the backup link to continue transmitting data when the primary link fails or is congested;

[0102] Step S904, establishing a communication delay prediction model, and obtaining a communication delay prediction result according to the communication delay prediction model and the delay influencing factors, wherein the communication delay prediction model is constructed according to the historical delay data of the communication link, the delay influencing factors include network topology, data volume and priority, and the communication delay prediction model is used to predict the transmission delay under the current network state;

[0103] Step S905, dynamically adjusting the scheduling of data transmission according to the above communication delay prediction result and the priority of the data;

[0104] Step S906: adopt a multi-objective optimization algorithm to balance the two objectives of delay minimization and priority satisfaction, and generate the above data transmission scheduling strategy.

[0105] Specifically, the method can minimize the transmission delay between fault data and control commands so as to respond quickly when a fault occurs.

[0106] In some cases, a combination of optical fiber communication and 5G wireless communication is used to build a communication network for distribution automation, with optical fiber transmitting large-capacity fault recording data and 5G network transmitting low-latency control commands. The deployment location and density of 5G base stations are rationally planned, and network slicing technology is used to allocate dedicated transmission resources for fault data and control commands. The communication reliability and real-time performance are improved through the complementarity of multiple communication methods.

[0107] Compress the fault data and encrypt the transmission. Use the combination of wavelet transform and Huffman coding to compress the fault recording data. For example, compress 1MB of original data to less than 100KB, which greatly reduces the data transmission volume and shortens the transmission time. At the same time, the AES-256 encryption algorithm is used to control the additional delay introduced by the encryption operation within 1ms while ensuring the security of data transmission. Optimize the communication protocol stack and parameter settings, and use lightweight transmission protocols based on UDP, such as GOOSE and SV, to reduce protocol overhead and encapsulation time. Compared with traditional ModbusTCP, IEC104 and other protocols, the transmission delay of the GOOSE protocol can be reduced to less than 1ms, meeting the real-time requirements of fault protection actions. By optimizing TCP / IP parameters, such as setting the buffer size to 1MB and selecting BBR as the congestion control algorithm, the network throughput and transmission efficiency can be improved while ensuring reliable transmission.

[0108] According to the type and priority of data, the Differentiated Services (DiffServ) mechanism is used to classify and prioritize fault data and control commands. Fault data is marked as gold service, and control commands are marked as platinum service. The priority of platinum service is higher than that of gold service. During network transmission, queue scheduling and traffic shaping are used to ensure that the end-to-end delay of platinum service does not exceed 10ms, and the delay of gold service does not exceed 50ms, giving priority to key data. Redundant transmission links are established between key nodes of the communication network, and SDN technology is used to achieve flexible configuration and fast switching of primary and backup links. Combined with the topological structure of the distribution network, dual-link access is set up in each substation and switch station, and the link capacity meets 120% of the peak demand of the business. When the main link fails or is congested, the backup link can complete the switch within 20ms to ensure the continuity and reliability of data transmission. Through big data analysis and machine learning technology, a communication delay prediction model is established, historical delay data of communication links are collected, and key features affecting delay are extracted, such as network topology, routing hops, channel utilization, etc.

[0109] The features are preprocessed and dimensionally reduced using methods such as feature normalization and principal component analysis (PCA). The Gaussian kernel function is selected to construct a support vector regression (SVR) model. The model hyperparameters are optimized through grid search, such as the penalty coefficient C = 10 and the slack variable ξ = 0.1. The prediction model is trained and verified, and the average prediction error is controlled within 10%. The transmission delay under the current network status is predicted in real time to provide a basis for subsequent scheduling decisions. According to the communication delay prediction results and data priority, the scheduling of data transmission is dynamically adjusted, and the NSGA-III multi-objective optimization algorithm is used to balance the two objectives of delay minimization and priority satisfaction. The delay minimization objective function is defined as the weighted sum of all data transmission delays, and the priority satisfaction objective function is defined as the proportion of priority data that meets the delay requirements.

[0110] Through non-dominated sorting, congestion calculation and other operations, the optimal scheduling strategy parameters, such as data packet size, sending interval, etc., are searched. After 100 iterations, the Pareto front converges, the delay minimization target is improved by 20%, and the priority satisfaction target is improved by 15%. Edge computing nodes are deployed at the distribution end to analyze and process fault recording, alarm event and other data locally, extract key features and statistical indicators, and only upload the processed result data to the main station to reduce data transmission volume and delay. The highly reliable MQTT protocol is used for data synchronization between the edge node and the main station, and the transmission delay is controlled within 100ms. At the same time, a dynamic scheduling mechanism for communication resources is established, which comprehensively considers the real-time traffic, priority and network load of business data, dynamically allocates transmission bandwidth and computing resources, ensures the service quality of key businesses, and improves the overall efficiency of the communication network. A 24-core single-mode optical cable is laid between the substation and the switch station, with a transmission bandwidth of 10Gbps and a delay of 1ms / km. At the same time, a 5G micro base station with a radius of 500m is covered in each switch station, with an uplink peak rate of 1Gbps and a delay of 10ms. When a fault occurs, the nearest switch collects 96kHz, 16-bit current and voltage waveform data with a sampling period of 20ms. Each period collects 1.92MB of data. The data is decomposed into 8 layers using DB10 wavelet transform to extract the transient characteristics of the fault. The data is then compressed to 192KB with Huffman coding, with a compression ratio of 10:1. The data is encrypted using the AES-256 algorithm, with a key length of 256 bits and an encryption time of 0.5ms. The ciphertext data is transmitted in groups through the GOOSE protocol, with each group of data being 128 bytes long and a transmission delay of 0.2ms.

[0111] Fault data and control commands are marked as DSCP gold and platinum services respectively, and 4 priority queues are configured, with a platinum queue weight of 50% and a gold queue weight of 30%, to ensure that the fault data delay is within 20ms and the control command delay is within 5ms. SDN and OSPF protocols are used to build active-active links between the distribution master station and the substation. The main link bandwidth is 1Gbps, the backup link bandwidth is 500Mbps, the link fault detection time is 10ms, and the switching time is 20ms. The link delay data of the past year is collected, and 15 features such as network element CPU utilization, memory occupancy, link traffic, and packet loss rate are extracted with a period of 5 minutes. They are normalized to between 0 and 1, and the principal component analysis is used to reduce the features to 8 dimensions. The Gaussian kernel SVM regression model is trained, 5-fold cross validation, and grid search for penalty coefficient C and slack variables are performed. The optimal parameters are C=12.5, γ=0.08, and R 2The value reaches 0.95. Deploy edge gateways, configure 4-core CPUs, 8G memory, 512GSSD, run Docker containers, use Kafka stream processing framework, clean and statistically analyze fault data in real time, extract 10 characteristic parameters such as fault duration, amplitude, frequency, etc., use MQTT protocol to compress and upload, and control the transmission delay within 20ms. Train NSGA-III scheduling algorithm, with a population size of 50, a crossover probability of 0.8, a mutation probability of 0.1, and 200 iterations. The optimal delay under the Pareto frontier is reduced by 25%, the priority is increased by 10%, and the optimal scheduling parameters of 128-256B data packets and a sending interval of 5-10ms are generated.

[0112] Step S604: Based on the data transmission scheduling strategy and the fault isolation control strategy, an operation instruction is issued to the switch device in the fault area to isolate the fault point and restore power supply outside the fault area.

[0113] The method of issuing an operation instruction to the switch device in the fault area based on the data transmission scheduling strategy and the fault isolation control strategy to isolate the fault point and restore power supply outside the fault area includes the following steps:

[0114] Step 1001, based on the data transmission scheduling strategy and the fault isolation control strategy, an operation instruction is issued to the switch device in the fault area, and the switch device is controlled to perform a disconnection operation to isolate the fault area, thereby obtaining an isolated fault area and a non-fault area;

[0115] Step 1002, reconstructing the load and power supply of the isolated fault area, and generating a power supply restoration strategy with the minimum network transmission loss and the minimum number of operations as the goal;

[0116] Step 1003, using the real-time data and historical data of the distribution automation master station and a machine learning algorithm, the stability assessment and risk prediction of each of the above-mentioned non-fault areas after isolation are performed to obtain the feasibility and safety of the operation of the above-mentioned non-fault areas;

[0117] Step 1004: when the feasibility and safety of the operation in the non-fault area do not meet the preset conditions, start the load reduction or grid-connected operation strategy in the power supply restoration strategy;

[0118] Step 1005, obtaining voltage, current and power measurement data of the power distribution terminal in real time, calculating the power supply reliability index, and comparing it with the predetermined target value;

[0119] Step 1006: When the deviation between the power supply reliability index and the predetermined target value is greater than a deviation threshold, the power supply restoration strategy is adjusted to obtain an adjusted power supply restoration strategy.

[0120] Specifically, according to the results of fault diagnosis and location, the location coordinates of the fault point and the topological area to which it belongs are obtained, and the fault type is determined to be permanent or transient, and classified according to characteristics such as fault duration and fault current. For permanent faults, the fault isolation control strategy is started. For transient faults, they are not isolated temporarily, and the reclosing is delayed. Fault records and alarms are performed, and the state changes of the fault point are continuously monitored. This method can restore the power supply of important loads as soon as possible, reduce the impact of the fault on key users, and continuously monitor the operation status of the power grid and the load recovery while performing fault isolation operations.

[0121] Among them, the real-time operation model of the distribution network is constructed by combining the topological structure of the distribution network and the real-time load data;

[0122] Generate control strategies for fault isolation and recovery based on the results of fault diagnosis and location;

[0123] The generated control strategy is converted into a sequence of switch operation instructions, and the instructions are sent to the devices outside the fault area to perform disconnection operations, isolating the fault area from the surrounding healthy power grid;

[0124] Reconstruct the load and power supply of the isolated fault area to find the optimal power restoration solution;

[0125] With the goal of minimizing network loss and the least number of operations, generate the operation plan and sequence for power grid reconstruction, and convert the operation plan into control instructions;

[0126] Using the real-time and historical data of the distribution automation master station and machine learning algorithms, we can conduct stability assessment and risk prediction on each isolated island to determine the feasibility and safety of island operation.

[0127] For isolated islands that do not meet the requirements, load reduction or grid-connected operation strategies are initiated;

[0128] Dynamically evaluate the execution effect of grid reconstruction and island operation schemes, obtain voltage, current and power measurement data of distribution terminals in real time, calculate power supply reliability indicators, and compare them with predetermined target values;

[0129] When the deviation exceeds the threshold, the optimization control process is triggered to adjust the power supply restoration plan.

[0130] Specifically, the method can perform real-time communication optimization and minimize the transmission delay between fault data and control commands so as to respond quickly when a fault occurs.

[0131] After determining the fault area, the first thing to do is to disconnect the switches directly related to the fault in the fault area to prevent the fault current from continuing to flow and prevent the fault from further expanding. After isolating the fault point inside the fault area, the next step is to disconnect the switches located at the boundary of the fault area, which are usually located at the junction of the fault area and the healthy power grid. By disconnecting these switches, it can be ensured that the fault area is completely isolated and will not affect the healthy power grid. Controlling the disconnection of switches within the fault area is to directly isolate the source of the fault. Controlling the disconnection of switches outside the fault area is to prevent the fault from spreading to the healthy power grid. Both operations are to minimize the scope of the fault impact and restore normal power supply as soon as possible.

[0132] In some instances, by collecting the status information of each switch and monitoring point online in real time, combining the topological structure and real-time load data of the distribution network, and using graph theory methods such as the maximum flow-minimum cut algorithm and the shortest path algorithm, the real-time operation model of the distribution network is automatically constructed, taking into account the radial and weak ring characteristics of the distribution network, to achieve global situation awareness and visualization of the entire distribution network.

[0133] According to the results of fault diagnosis and location, a rule-based reasoning engine and deep reinforcement learning are combined to automatically generate control strategies for fault isolation and recovery. The rule base contains experience and expert knowledge in handling various types of faults. The deep reinforcement learning algorithm adopts the DDPG model. The state space includes fault type, location, switch status, etc. The action space includes the operation combination of each switch. The reward function considers factors such as fault isolation range, power outage time, and network loss. Through continuous trial and error and optimization, the control strategy is adjusted and improved online, and the algorithm convergence proof is given. The generated control strategy is converted into a specific switch operation instruction sequence. Through the IEC61850 communication protocol and MMS message service, the instructions are sent to the primary equipment near the fault area, such as circuit breakers, disconnectors, etc., to perform disconnection operations, isolate the fault area from the surrounding healthy power grid, and prevent the spread of the fault impact.

[0134] For scenarios that require fast switching, GOOSE messages are used for horizontal communication to ensure the real-time and reliability of command issuance. The load and power supply of the isolated fault area are reconstructed, and a mathematical model for power grid reconstruction is established. The objective function is to minimize network loss and operation times. The constraints include power flow constraints, voltage constraints, feeder capacity constraints, etc. The decision variables are the state combination of switches. The model is solved by the branch and bound method and taboo search algorithm, where the branch strategy is based on the depth-first principle, the taboo table length is 50, and the maximum number of iterations is 500. The optimal reconstruction scheme is converted into control instructions and executed by the automation control system. Using the real-time and historical data of the distribution automation master station, time domain simulation and small signal analysis methods are used to evaluate the stability of each isolated island after isolation. Considering the load characteristics and new energy penetration rate in the island, the frequency, voltage deviation and other indicators are calculated and compared with the standard threshold. If it exceeds the range, it is determined as an instability risk, and the load reduction or grid-connected operation strategy is automatically started. Dynamically evaluate the execution effect of the grid reconstruction and island operation plan, obtain the voltage, current, power and other measurement data of the distribution terminal in real time through the service-oriented architecture, and calculate the power supply reliability indicators such as the system average interruption time (SAIDI, System Average Interruption Duration Index), SAIFI, etc. Among them, SAIDI = ∑U_i*N_i / N_T, U_i is the time of the i-th power outage, N_i is the number of users affected by the i-th power outage, and N_T is the total number of users.

[0135] According to the actual situation of the distribution network, the thresholds of SAIDI not exceeding 2 hours / year and SAIFI not exceeding 3 times / year are set. When the actual indicators deviate from the thresholds, the optimization control process is automatically triggered and the recovery plan is adjusted. A two-way communication mechanism is established between the distribution automation master station and substations, switchgears and other substations, and the MQTT protocol is used for data transmission. The MQTT message adopts the JSON format and the QoS level is 2 to ensure that the message is only delivered once. The confidentiality and integrity of data transmission are guaranteed by the TLS / SSL secure communication protocol and the AES-256 data encryption algorithm. The interval of the heartbeat mechanism is 5 seconds, the timeout is 10 seconds, and it is automatically retransmitted 3 times after the timeout. The time synchronization adopts the IEEE1588 high-precision time protocol with a synchronization accuracy better than 1 millisecond. Introduce active operation control technologies of the distribution network, such as reactive power optimization and voltage control, use emerging technologies such as distribution Internet of Things and edge computing, build a distributed self-healing control architecture, deploy intelligent agents in distribution terminal equipment, and realize rapid fault location, isolation and recovery. Adopt secure communication protocols, intrusion detection, access control and other measures to prevent risks such as network attacks and data leakage, and improve the security and reliability of distribution automation systems.

[0136] The operating status data of 86 smart switches, 135 distribution transformer terminals, and 450 user smart meters on the 10kV distribution line are collected through optical fiber Ethernet and uploaded to the distribution master station. The Dijkstra shortest path algorithm is used to calculate the power supply recovery path when the fault occurs, forming a real-time simulation model of the distribution network. When a three-phase short circuit fault occurs in the Yuanbaoshan transformer of Line 1, the fault type and fault phase are inferred in parallel based on the 132 rules of the fault diagnosis expert system. At the same time, the DDPG algorithm generates the optimal isolation strategy after exploring 2000 iterations, isolates the faulty transformer, and performs loop closing operations on 9 healthy branch feeders, minimizing the isolation range to 300 households. The master station sends 18 control commands to the 4 smart switches near the fault, and achieves a tripping action of less than 10ms through GOOSE messages to isolate the fault point.

[0137] The optimal network reconstruction scheme was solved by using the taboo search algorithm. Through deep rule pruning, the optimal topology was obtained after searching 5,000 times. The 12 contact switches were operated to restore power supply to the non-faulty areas, and the network loss was reduced by 8%. The three isolated islands were subjected to transient simulation analysis. If the frequency deviation exceeded 0.5Hz or the voltage deviation exceeded 7%, it was determined to be unstable and 5% of the load was automatically cut off. During the actual measurement of this fault isolation process, SAIDI=25.6min, SAIFI=0.6 times, which is much better than the annual target of 2h and 3 times. This fault generated 36 alarm events in the SCADA system, which were transmitted to the master station through IEC61850MMS and automatically summarized into the fault management log. Subsequently, the machine learning algorithm was used to adaptively optimize the protection setting and protection logic to achieve fault self-healing closed-loop control.

[0138] The above-mentioned distribution network fault location method based on artificial intelligence of the present application, firstly, based on the data collected by the electric energy sensor in the multi-level distribution network, the electrical parameters of the multi-level distribution network are determined, the electric energy sensor is installed on each level branch and node, and the electrical parameters include current and voltage; then, the preset working parameters of the multi-level distribution network are obtained, and the preset working parameters are preset working parameters for maintaining the stable operation of the multi-level distribution network; then, according to the electrical parameters, the characteristic values ​​of each level of the multi-level distribution network are determined, and according to the deviation between the electrical parameters and the preset working parameters, the grid topology relationship and fault identification model of the multi-level distribution network are combined to identify the fault type of the fault point; finally, according to the fault type of the fault point and the hierarchical information of the multi-level distribution network, the fault location method is determined, and the fault location method is used to locate the fault point, and the fault location method includes coarse location based on the impedance method and fine location based on the traveling wave method. The method can optimize real-time communication, minimize the transmission delay between fault data and control commands, so as to respond quickly when a fault occurs, and solve the problem that the grid fault location algorithm in the prior art can only be used for specific network topologies and fault types, and cannot accurately identify fault types of different levels and different fault scenarios.

[0139] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the distribution network fault location method based on artificial intelligence of the present application will be described in detail below in combination with specific embodiments.

[0140] This embodiment relates to a specific distribution network fault location method based on artificial intelligence, such as Figure 4 As shown, the following steps are included:

[0141] Step S1: integrating various electrical parameters based on data collected by voltage and current sensors in a multi-level distribution network;

[0142] Step S2: by analyzing the collected current and voltage data, the characteristic values ​​of each level and the normal working parameters of the power grid are recorded at the same time;

[0143] Step S3: According to the deviation between the current and voltage data and the normal working parameters, combined with the grid topology, the fault type is identified, and the fault type includes overload, short circuit, open circuit, and grounding;

[0144] Step S4: combining the diagnosis result of the fault type and the hierarchical information of the power grid, selecting a corresponding fault location method, including coarse location based on the impedance method and fine location based on the traveling wave method;

[0145] Step S5: For each type of fault and location, a fault impact domain assessment model is set accordingly;

[0146] Step S6: Formulate a fault isolation control strategy based on different fault locations, types and priorities;

[0147] Step S7: Perform real-time communication optimization to minimize the transmission delay between fault data and control commands so as to quickly respond when a fault occurs;

[0148] Step S8: Based on the control strategy, an operation instruction is issued to isolate the located faulty power grid portion, and at the same time, the emergency plan is activated to deploy surrounding healthy power grid resources to restore power supply services outside the faulty area.

[0149] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0150] The embodiment of the present application also provides a distribution network fault location device based on artificial intelligence. It should be noted that the distribution network fault location device based on artificial intelligence in the embodiment of the present application can be used to execute the distribution network fault location method based on artificial intelligence provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been described will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0151] The above-mentioned distribution network fault location device based on artificial intelligence includes a processor and a memory. The above-mentioned first determination unit and the like are stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize the corresponding functions. The above-mentioned modules are all located in the same processor; or, the above-mentioned modules are located in different processors in any combination.

[0152] The processor includes a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and the kernel parameters are adjusted to solve the problem that the power grid fault location algorithm in the prior art can only be used for specific network topologies and fault types, and cannot accurately identify fault types at different levels and in different fault scenarios.

[0153] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0154] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the distribution network fault location method based on artificial intelligence.

[0155] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0156] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0157] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0158] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0159] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0160] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0161] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0162] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0163] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0164] 1) The above-mentioned distribution network fault location method based on artificial intelligence of the present application first determines the electrical parameters of the multi-level distribution network based on the data collected by the electric energy sensor in the multi-level distribution network. The electric energy sensor is installed on each level of the branch and node, and the electrical parameters include current and voltage; then obtains the preset working parameters of the multi-level distribution network, and the preset working parameters are the preset working parameters for maintaining the stable operation of the multi-level distribution network; then, according to the electrical parameters, the characteristic values ​​of each level of the multi-level distribution network are determined, and according to the deviation between the electrical parameters and the preset working parameters, the grid topology relationship and fault identification model of the multi-level distribution network are combined to identify the fault type of the fault point; finally, according to the fault type of the fault point and the hierarchical information of the multi-level distribution network, the fault location method is determined, and the fault location method is used to locate the fault point, and the fault location method includes coarse positioning based on the impedance method and fine positioning based on the traveling wave method. The method can optimize real-time communication, minimize the transmission delay between fault data and control commands, so as to respond quickly when a fault occurs, and solve the problem that the grid fault location algorithm in the prior art can only be used for specific network topologies and fault types, and cannot accurately identify fault types of different levels and different fault scenarios.

[0165] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A distribution network fault location method based on artificial intelligence, characterized in that: include: Determining electrical parameters of the multi-level distribution network based on data collected by power sensors in the multi-level distribution network, wherein the power sensors are installed on branches and nodes at each level, and the electrical parameters include current and voltage; Acquire preset operating parameters of the multi-level distribution network, wherein the preset operating parameters are preset operating parameters for maintaining stable operation of the multi-level distribution network; Determine the characteristic values ​​of each level of the multi-level distribution network according to the electrical parameters, and identify the fault type of the fault point according to the deviation between the electrical parameters and the preset working parameters, combined with the grid topology relationship and the fault identification model of the multi-level distribution network; According to the fault type of the fault point and the hierarchical information of the multi-level distribution network, a fault location method is determined, and the fault point is located using the fault location method. The fault location method includes coarse location based on the impedance method and fine location based on the traveling wave method.

2. The method according to claim 1, characterized in that: Based on data collected by electric energy sensors in the multi-level distribution network, electrical parameters of the multi-level distribution network are determined, including: According to the topological structure of the multi-level distribution network, determining the installation position of the electric energy sensor, the installation position of the electric energy sensor covers the branches and nodes of each level of the multi-level distribution network, and the electric energy sensor includes a voltage sensor and a current sensor; Establishing a unified data collection and transmission protocol, and based on the data collection and transmission protocol, aggregating and synchronizing the data collected by the electric energy sensors at each monitoring point to obtain initial electric energy data; The initial electric energy data is filtered, denoised and feature extracted to obtain electrical parameters of the multi-level distribution network.

3. The method according to claim 1, characterized in that: According to the electrical parameters, characteristic values ​​of each level of the multi-level distribution network are determined, and according to the deviation between the electrical parameters and the preset working parameters, combined with the power grid topology relationship and the fault identification model of the multi-level distribution network, the fault type of the fault point is identified, including: Extracting characteristic values ​​reflecting the operating state of the multi-level distribution network from the electrical parameters, the characteristic values ​​at least including voltage deviation and current harmonic content; Using Euclidean distance or Manhattan distance measurement method to calculate the target deviation value between the electrical parameter of each detection point and the preset working parameter, the preset working parameter at least includes the rated voltage, rated current and power factor, and the target deviation value at least includes the current deviation value and the voltage deviation value; The grid topology relationship of the multi-level distribution network is stored in a graph database in the form of an adjacency matrix, wherein each node represents a bus or a switch, each edge represents a connection relationship between two connected nodes, and the attributes of the edge include electrical parameters of the conductor, and the electrical parameters of the conductor include at least resistance and reactance; The fault identification model is constructed using a decision tree algorithm, and the power grid topology relationship and the target deviation value of each detection point are input into the fault identification model to obtain the fault type of the fault point, which includes one of overload, short circuit, open circuit and grounding.

4. The method according to claim 1, characterized in that: Determining a fault location method according to the fault type of the fault point and the level information of the multi-level distribution network, and using the fault location method to locate the fault point, including: According to the fault type of the fault point and the hierarchical information of the multi-level distribution network, determine to use a coarse positioning method based on an impedance method to calculate the first position information of the fault point on the trunk line of the multi-level distribution network, and use a fine positioning method based on a traveling wave method to calculate the second position information of the fault point on the branch line of the multi-level distribution network; On the trunk line of the multi-level distribution network, according to the voltage data and current data at the time of the fault, the equivalent impedance between the fault point and the detection point is calculated, and according to the electrical parameters of the line where the fault point is located, an impedance equation group between the fault point and each of the detection points is established, and the impedance equation group is solved to obtain the first position information of the fault point, and the electrical parameters of the line include resistivity and reactance; On the branch lines of the multi-level distribution network, the distance between the fault point and each of the detection points is calculated based on the propagation speed and time difference of the traveling wave on the line where the fault point is located, and the second position information of the fault point is determined based on the distance between the fault point and each of the detection points using a multi-point ranging method, and the accuracy of the second position information is greater than the accuracy of the first position information.

5. The method according to claim 1, characterized in that After locating the fault point using the fault locating method, the method further includes: Determine, according to the fault condition of the fault point and the corresponding fault impact assessment model, the fault impact scope and impact severity corresponding to the fault condition, and determine, according to the fault impact scope and impact severity, the fault isolation priority of the fault point, wherein the fault condition includes the fault type of the fault point and the location information of the fault point; Based on the fault conditions of each of the fault points and the fault isolation priority, a fault isolation control strategy is determined, wherein the fault isolation control strategy is used to perform serial control on the switching devices in the fault area to minimize the impact range of the fault and the power outage time; Performing real-time communication optimization on the multi-level distribution network and establishing a data transmission scheduling strategy for the multi-level distribution network; Based on the data transmission scheduling strategy and the fault isolation control strategy, operation instructions are issued to the switch devices in the fault area to isolate the fault point and restore power supply outside the fault area.

6. The method according to claim 5, characterized in that Determining a fault impact scope and impact severity corresponding to the fault situation according to the fault situation of the fault point and a corresponding fault impact assessment model, and determining a fault isolation priority of the fault point according to the fault impact scope and the impact severity, including: Taking the fault point as the starting point, traversing the topological structure of the multi-level distribution network, searching all the lines and devices directly or indirectly connected to the fault point, forming a fault impact tree with the fault point as the root node, so as to determine the fault impact range, wherein each node of the fault impact tree represents an affected element, and the number of layers of the fault impact tree represents the indirect degree of the element being affected; According to the fault impact tree, the fault current and voltage deviation index of each affected component are calculated, the node voltage method and / or the branch current method are used to perform power flow calculation, the impact of the fault on the voltage, current and power parameters of each node and branch is analyzed, and the severity of the impact is determined; Constructing a fault sensitivity matrix, and evaluating the fault impact range and key influencing factors under different fault conditions through the fault sensitivity matrix, wherein the rows of the fault sensitivity matrix represent the fault type of the fault point and the location information of the fault point, the columns of the fault sensitivity matrix represent the affected components, and the elements of the fault sensitivity matrix represent the influence coefficient of a certain fault on a certain component; Based on the fault sensitivity matrix, a fault isolation priority of the fault point is determined.

7. The method according to claim 5, characterized in that Determining a fault isolation control strategy based on the fault condition of each fault point and the fault isolation priority includes: According to the location coordinates of the fault point and the topological area to which it belongs, determine the fault timeliness type of the fault point, the fault timeliness type being a permanent fault or a transient fault; When the fault timeliness type is the permanent fault, the fault urgency index is calculated in combination with the fault isolation priority, fault severity, impact scope and important load factors; According to the topological structure and real-time operation status of the multi-level distribution network, the location and status information of all switch devices in the fault area are obtained, and the decision variables and constraints of the switch operation are established to form an optimal configuration of the disconnector, wherein the switch devices include manual switches, automatic switches and disconnectors; According to the urgency index of the fault and the optimal configuration of the isolating switch, the corresponding state space, action space and reward function are set, with the goal of minimizing the fault impact range and power outage time, generating the optimal switch operation sequence, and obtaining the fault isolation control strategy.

8. The method according to claim 5, characterized in that Performing real-time communication optimization on the multi-level distribution network and establishing a data transmission scheduling strategy for the multi-level distribution network includes: Use a combination of optical fiber communication and 5G wireless communication to establish a communication network for distribution automation; Compress and encrypt fault data for transmission, and classify and mark fault data and control commands and schedule them according to data type and priority; Establishing redundant transmission links between key nodes of the communication network, and switching to backup links to continue data transmission when a primary link fails or is congested; Establishing a communication delay prediction model, and obtaining a communication delay prediction result according to the communication delay prediction model and delay influencing factors, wherein the communication delay prediction model is constructed according to historical delay data of the communication link, the delay influencing factors include network topology, data volume and priority, and the communication delay prediction model is used to predict the transmission delay under the current network state; Dynamically adjust the scheduling of data transmission according to the communication delay prediction result and the priority of the data; A multi-objective optimization algorithm is used to balance the two objectives of delay minimization and priority satisfaction to generate the data transmission scheduling strategy.

9. The method according to claim 5, characterized in that Based on the data transmission scheduling strategy and the fault isolation control strategy, an operation instruction is issued to the switch device in the fault area to isolate the fault point and restore power supply outside the fault area, including: Based on the data transmission scheduling strategy and the fault isolation control strategy, an operation instruction is issued to the switch device in the fault area, and the switch device is controlled to perform a disconnection operation to isolate the fault area, thereby obtaining an isolated fault area and a non-fault area; Reconstructing the load and power supply of the isolated fault area, and generating a power supply restoration strategy with the minimum network transmission loss and the minimum number of operations as the goal; Using the real-time data and historical data of the distribution automation master station and a machine learning algorithm, the stability assessment and risk prediction of each of the isolated non-fault areas are performed to obtain the feasibility and safety of the operation of the non-fault areas; When the feasibility and safety of the operation in the non-fault area do not meet the preset conditions, starting the load reduction or grid-connected operation strategy in the power supply restoration strategy; Obtain voltage, current and power measurement data of distribution terminals in real time, calculate power supply reliability index, and compare it with the predetermined target value; When the deviation between the power supply reliability index and the predetermined target value is greater than a deviation threshold, the power supply restoration strategy is adjusted to obtain an adjusted power supply restoration strategy.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the distribution network fault location method based on artificial intelligence according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method for accurately locating a cable defect of a cable laid in the ground

    CN110446934A

  • Analysis method, device and system for time synchronization fault

    CN117221095A

  • Line fault maintenance method and device, storage medium and processor

    CN118191515A

  • Distribution network automation relay protection test system

    CN118226179A

  • Simultaneous Fault Detection and Location of Power Distribution Systems

    US20200326363A1

Cited By

  • Terrestrial heat development risk monitoring method and device combined with multi-dimensional data analysis

    CN119203011A

  • Fault detection method, device and equipment for low-voltage distribution area, and storage medium

    CN119395473A

  • Power distribution network fault processing method, system and device and storage medium

    CN119438804A

  • Substation override trip prevention self-adaptive protection system based on rapid message response

    CN119448151A

  • Acceptance and acceptance test method and system for substation station end

    CN119471193A