Progress feedback method and system based on image data, medium and product

By combining BIM technology with image data, the problem of untimely feedback on construction site progress information is solved, visual display of construction site progress and timely correction and adjustment of construction site progress are realized, and the progress control efficiency of the project is improved.

CN118886631APending Publication Date: 2024-11-01CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1

Patent Information

Application Number
CN202410778324.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-17
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The progress control of the construction site of existing engineering projects relies on manual inspection, resulting in untimely feedback on progress information, affecting the overall progress of the project, and traditional methods are time-consuming and wasteful manpower.

Method used

Using a progress feedback method based on BIM technology combined with image data, the actual start and completion time of construction plan task items is obtained, and the planned time nodes are displayed using the BIM model component coding standard, and the actual progress is identified through image data to form Visual progress feedback information.

Benefits of technology

It achieves timely, accurate and intuitive feedback on the construction site progress, reduces manpower waste, improves the efficiency of project progress control, and promptly corrects and adjusts the progress of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886631A_ABST
    Figure CN118886631A_ABST
Patent Text Reader

Abstract

The invention discloses a progress feedback method and system based on image data, a medium and a product. The method comprises the following steps: acquiring actual start time and actual completion time of a project construction plan task item; recording and displaying on the preprocessed BIM model according to the obtained actual start time and actual completion time, and forming visual progress feedback information in combination with plan time nodes of project construction plan task items; the preprocessing of the BIM model comprises the following steps: coding components of the engineering BIM model according to a pre-constructed BIM model component coding standard; compiling project construction plan task items according to a WBS task library; hooking components of the BIM model with project construction plan task items through a BIM model component coding standard; and displaying the plan time nodes of the project construction plan task items in different colors on the BIM model. Through combination of three-dimensional visualization of a BIM technology and a computer vision technology, the progress of a project construction site is analyzed and visualized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of BIM technology, and in particular relates to a progress feedback method, system, medium and product based on image data. Background Art

[0002] Progress control has always been one of the important goals of construction project management. Effective progress control depends to a large extent on timely and correct decisions made by managers, and timely, accurate and intuitive project site progress information is the key factor in successful decision-making by managers.

[0003] In the existing engineering technical plan, the project department still uses traditional manual inspection methods to understand the actual progress of the project construction site. It relies too much on manual experience, which is a waste of manpower and time-consuming. Moreover, most of the progress information is presented in the form of tables and text, which will lead to untimely feedback of progress information, affect the overall progress of the project, and is not conducive to the decision-making of managers. Summary of the invention

[0004] In order to overcome the deficiencies of the above-mentioned prior art, the present invention provides a progress feedback method, system, medium and product based on image data, which analyzes and visualizes the progress of the project construction site by combining the three-dimensional visualization of BIM technology with image data.

[0005] According to one aspect of the present invention, a progress feedback method based on image data is provided, comprising: Get the actual start time and actual completion time of the project construction plan task items; The actual start time and actual completion time are recorded and displayed on the pre-processed BIM model, and combined with the planned time nodes of the project construction plan task items to form visual progress feedback information; Among them, the preprocessing of BIM model includes: Encode the components of the engineering BIM model according to the pre-built BIM model component coding standard; Prepare project construction plan tasks according to the WBS task library; Link the components of the BIM model with the project construction plan task items through the BIM model component coding standard; The planned time nodes of the project construction plan task items are displayed in different colors on the BIM model.

[0006] As a further technical solution, the pre-construction of the BIM model component coding standard further includes: Establish BIM model, and carry out hierarchical splitting and structured management of BIM model; According to the hierarchical splitting results, a coding rule system for BIM model components is established; Coding information is constructed for each level in the coding rule system to form a BIM model component coding standard.

[0007] As a further technical solution, the BIM model component coding standard forms the following hierarchical structure: project name, division, sub-division, item, space, profession, family and serial number, and the coding information formed according to the hierarchical structure is used to uniquely identify the component.

[0008] As a further technical solution, the project construction plan task items are compiled according to the WBS task library, including: Establishing a WBS task library, wherein the WBS task library includes a hierarchical structure of a coding rule system for BIM model components; According to the WBS task library, the project construction plan task items are subdivided into process levels, and the planned start time and planned completion time of each construction plan task item are set in combination with the overall project schedule.

[0009] As a further technical solution, after the components of the BIM model are linked to the project construction plan task items, it also includes: lightweight processing of the BIM model with the linked construction plan task items.

[0010] As a further technical solution, the actual start time and actual completion time of the project construction plan task items are obtained, including: Regularly obtain image data of engineering projects at different locations, angles and time points; The image data acquired regularly are identified to obtain the actual start time and actual completion time of each construction plan task item.

[0011] As a further technical solution, identifying the image data acquired periodically also includes: The images of the current cycle are compared with the images of the previous cycle. Based on the comparison results and the shooting time marked on the images, the actual start time of the newly added construction plan task items and the actual completion time of the completed construction plan task items are recorded.

[0012] According to one aspect of the present invention, a computer vision-based progress feedback system is provided, comprising: The acquisition module is used to obtain the actual start time and actual completion time of the project construction plan task items; The progress feedback module is used to record and display the actual start time and actual completion time on the pre-processed BIM model, and form visual progress feedback information in combination with the planned time nodes of the project construction plan task items; Among them, the preprocessing of BIM model includes: Encode the components of the engineering BIM model according to the pre-built BIM model component coding standard; Prepare project construction plan tasks according to the WBS task library; Link the components of the BIM model with the project construction plan task items through the BIM model component coding standard; The planned time nodes of the project construction plan task items are displayed in different colors on the BIM model.

[0013] According to one aspect of the present invention, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the progress feedback method based on image data are implemented.

[0014] According to one aspect of the present invention, a computer program product is provided, comprising a computer program, which implements the steps of the image data-based progress feedback method when executed by a processor.

[0015] Compared with the prior art, the present invention has the following beneficial effects: The present invention is based on the BIM model data standard, establishes a set of coding standards for the components of the BIM model, and compiles the project construction plan task items based on the WBS task library, and uses the coding standard to link the components of the BIM model with the project construction plan task items, and uses the BIM model to display the nodes such as the planned start time and the planned completion time of the project construction plan task items in different progress colors. During the project construction process, the actual start time and the actual completion time of each construction plan task item are obtained by acquiring the image data of the project site, and these times are marked and displayed on the BIM model, so that the planned time nodes and the actual time nodes of each construction plan task item can be intuitively seen on the BIM model, thereby realizing the analysis and visualization of the progress of the project construction site.

[0016] The present invention can realize the display of actual progress information in the BIM model through data collection at the project site, realize early warning of the engineering project through the deviation between the planned progress and the actual progress of the BIM model, and make timely corrections and adjustments based on the early warning information. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 4 is a flow chart of a progress feedback method based on image data according to an embodiment of the present invention.

[0018] Figure 2 Schematic diagram of the working process of the progress feedback system based on image data according to an embodiment of the present invention. DETAILED DESCRIPTION

[0019] In view of the current situation that the actual progress of the construction site is obtained by manual experience and the progress information is not fed back in time, the present invention proposes a progress feedback method based on image data, which analyzes and visualizes the progress of the construction site of the project by combining the three-dimensional visualization of BIM technology with image data.

[0020] It should be noted that: Sub-items are engineering concepts. According to the logic of sub-items, the hierarchical structure of components is: sub-project-sub-project-sub-project-specific component category. The sub-projects are divided into: foundation and foundation, main structure, building decoration and renovation, roof, building water supply and drainage and heating, ventilation and air conditioning, building electrical, intelligent building, building energy conservation. Each sub-project is divided into multiple sub-projects. For example, the sub-project of foundation and foundation includes foundation, foundation, foundation pit support, groundwater control, earthwork, slope, and underground waterproofing. Each sub-project includes multiple sub-items. For example, the sub-project of underground waterproofing includes main structure waterproofing and roll waterproofing. The sub-project of roll waterproofing includes bottom plate waterproofing, exterior wall waterproofing, and top plate waterproofing. For example, bottom plate waterproofing can be divided into specific component categories such as cushion layer, waterproof layer, and protective layer.

[0021] BIM model component coding standards refer to a set of coding standards for BIM model components based on BIM model data standards, including project name, division, sub-division, sub-item, space, specialty, family, serial number, etc. This set of coding system draws on the division and sub-item logic of engineering to adapt to the decomposition structure in the WBS task library.

[0022] The WBS (Work Breakdown Structure) task library refers to the WBS task library of the construction plan of the construction project established with reference to the "Uniform Standard for Construction Quality Acceptance of Construction Projects". The WBS task library contains information such as project name, division, sub-division, space, etc. in the coding rule system.

[0023] Construction plan task items refer to tasks introduced through the WBS task library or tasks compiled through the WBS task library that contain combinations of project names, divisions, sub-divisions, spaces, etc. Each construction plan task item can be expressed as a construction plan by adding a start time and a completion time. It should be noted that construction plan task items and construction plan tasks have the same meaning.

[0024] In some of the processes described in the specification and claims of the present invention and the above-mentioned drawings, multiple operations appearing in a specific order are included, but it should be clearly understood that these operations may not be performed in the order in which they appear in this document or may be performed in parallel. For example, step 1, step 2, etc. are only used to distinguish different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations may be performed in sequence or in parallel.

[0025] The following will clearly and completely describe the technical solutions of various embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Example 1

[0026] This embodiment provides a progress feedback method based on image data, such as Figure 1 As shown, including: Step 1: Get the actual start time and actual completion time of the project construction plan task items.

[0027] Step 2: Record and display the actual start time and actual completion time on the pre-processed BIM model, and combine the planned time nodes of the project construction plan task items to form visual progress feedback information; Among them, the preprocessing of BIM model includes: Encode the components of the engineering BIM model according to the pre-built BIM model component coding standard; Prepare project construction plan tasks according to the WBS task library; Link the components of the BIM model with the project construction plan task items through the BIM model component coding standard; The planned time nodes of the project construction plan task items are displayed in different colors on the BIM model.

[0028] Before executing step 1, perform user login and authority authentication first. Specifically, use a user management module to manage user authority by having the user register by themselves or invite the relevant party of the coding plug-in model. Log in to Revit or PKPM software, authenticate with the user management module of the server, and obtain relevant authority after login is completed.

[0029] Before step 1, it also includes establishing a BIM model through a modeling step, specifically: using Revit or PKPM software to establish BIM models in the RVT or P3D format for each stage or each discipline of the project according to the design and construction drawings. The LOD level of the BIM model can be LOD200, LOD300, LOD400, etc.

[0030] Specifically, multiple designers can use BIM modeling software in multiple software to establish BIM models of various components or disciplines, and realize collaborative design on the BIM server through the internal network. Of course, if it involves subcontract design, collaborative design can also be realized on the server through the external network, and finally the BIM model of the entire project can be completed.

[0031] Before step 1, it also includes building a coding rule system for BIM model components through coding steps. The hierarchically identified BIM model elements are presented and hierarchically displayed in a three-dimensional view, forming an effective split and structured management for the BIM model, and establishing a coding rule system for BIM model components. The established coding rule system includes 8 levels of BIM model, including project name, division, sub-division, sub-item, space, specialty, family, and serial number.

[0032] By constructing a coding rule system, it is possible to achieve hierarchical identification and management of BIM model elements, refined management of BIM models in actual production applications, and visual maintenance of important components of BIM models throughout their life cycle.

[0033] Furthermore, after establishing the coding rule system for BIM model components, refer to the "Classification and Coding Standards for Building Information Modeling" to compile a BIM model component coding standard table. The BIM model component coding standard table = project name + division + sub-division + sub-item + space + specialty + family + serial number.

[0034] The code corresponding to the project name is obtained from the corresponding project system. If the project name is not filled in the standard code sample, a temporary root node is generated. In the actual function, the root node is automatically corrected and the actual project name code is set as the root node. This setting is mainly considered to be able to use the above method to check and correct in the later stage when the code corresponding to the project name cannot be found during BIM model coding, or the wrong code of the project name is selected.

[0035] Before step 1, it also includes preparing the project construction plan task items through the planning step. With reference to the "Uniform Standard for Construction Quality Acceptance of Construction Engineering", a WBS task library for the construction plan of the construction engineering is established, wherein the WBS task library contains information such as project name, division, sub-division, space, etc. in the coding rule system. Furthermore, the project name, division, sub-division and space information of the construction plan task item has a one-to-one correspondence with the project name, division, sub-division and space information of the coding standard table.

[0036] Furthermore, the construction plan task items are processed in detail according to the WBS task library, including divisions, sub-divisions, space information and specific processes, and the planned start time and planned completion time of each construction plan task item are set to meet the overall schedule. At the same time, the actual start and actual completion time of the project are obtained according to the data acquisition module.

[0037] After completing the construction of the coding rule system and the preparation of the project construction plan task items, it further includes: linking the plan task items of the planning step with the engineering BIM model of the modeling step through the BIM coding standard, and lightweighting the engineering BIM model with the plan task items.

[0038] Specifically, the model can be displayed at different levels according to user needs, the engineering BIM model can be divided into multiple levels according to the degree of accuracy and detail, and the appropriate LOD level can be selected according to the actual accuracy required to realize the loading and rendering of the engineering BIM model.

[0039] Optionally, data collection for the project department's engineering includes the following two methods: ① Using mobile camera equipment or fixed monitoring equipment to collect data from different directions, angles and time points of the engineering project, and provide real-time feedback on the actual situation of the project site. The data is generally image data or monitoring video, or according to the actual construction time of the project, the data is generally generated as picture data of the corresponding time; ② Feedback on the actual completion time of the construction plan of the planning management module and fill in the management background. The data is generally text data.

[0040] It should be noted that fixed monitoring equipment is used to obtain images of the exterior of the building under construction, such as image data of civil engineering projects. Since the construction plan task items of civil engineering projects are generally divided by floors, the floor of the building under construction can be identified based on these image data, and then the construction plan task item can be determined. In addition, the actual start time and actual completion time of the construction plan task item can be recorded in combination with the time marked on the image.

[0041] The time marked on the above-mentioned image refers to the shooting time automatically displayed on the image when the monitoring device or the camera device shoots the image.

[0042] Mobile cameras are used to obtain images of the interior of the building under construction, such as electromechanical and decoration image data. These image data are uploaded directly after being captured, and the background receives the uploaded images for recognition and progress display.

[0043] The above recognition can be understood as comparing the images taken in the previous and next cycles to find the newly added construction plan task items or the completed construction plan task items, and recording the actual start time and actual completion time of the construction plan task items according to the shooting time on the captured images.

[0044] Furthermore, the comparison can be done manually or by computer vision recognition. For construction plan task items with obvious start or end signs, computer vision can be used to perform target recognition; however, for construction plan task items with unclear start or end signs and complex construction targets, manual comparison is used.

[0045] The engineering BIM model after the planned task items are attached to the engineering BIM model according to the BIM coding standard is visualized according to the planned timeline.

[0046] Optionally, the visualization process includes: generating pictures, image materials or monitoring videos and other data of the actual project for the project through monitoring equipment or mobile camera equipment, using computer intelligent algorithms to identify and analyze the pictures, image materials and monitoring videos and other data, or manually comparing the images, annotating the project BIM model and recording the corresponding progress information according to the comparison results, and displaying the project BIM model in different colors in the lightweight module.

[0047] Optionally, when it is inconvenient to capture image data, the visualization process includes: obtaining the actual completion time text data obtained by the planning management, marking the components of the engineering BIM model and recording the corresponding progress information through the time node field of the construction plan task item attached to the components of the engineering BIM model, and displaying the engineering BIM model in different colors in the lightweight module.

[0048] In one embodiment, a comparative analysis step is also included. According to the planned completion engineering BIM model and the actual completion engineering BIM model of the engineering project displayed by the visualization module, the progress information of the engineering project is more intuitively expressed by dynamically analyzing the engineering BIM models of the two time nodes, and the deviation of the progress information of the actual completion and the planned completion is more clearly compared, so that the progress warning of the engineering project is made in time, which is convenient for project managers to adjust the time nodes and response measures in time. Example 2

[0049] Based on the same inventive concept as that of Embodiment 1, this embodiment provides a computer vision-based progress feedback system, including: The acquisition module is used to obtain the actual start time and actual completion time of the project construction plan task items; The progress feedback module is used to record and display the actual start time and actual completion time on the pre-processed BIM model, and form visual progress feedback information in combination with the planned time nodes of the project construction plan task items; Among them, the preprocessing of BIM model includes: Encode the components of the engineering BIM model according to the pre-built BIM model component coding standard; Prepare project construction plan tasks according to the WBS task library; Link the components of the BIM model with the project construction plan task items through the BIM model component coding standard; The planned time nodes of the project construction plan task items are displayed in different colors on the BIM model.

[0050] The above modules can be implemented by referring to the method embodiment, which will not be described in detail here. It should be noted that: like Figure 2 As shown, the workflow of the system also includes a modeling module, a coding module, a plan management module, a model and construction plan linkage, a data acquisition module, a visualization module and a comparison module.

[0051] Modeling module is used to establish BIM models. Specifically, according to the design and construction drawings, Revit or PKPM software is used to establish BIM models in RVT or P3D format for each stage or discipline of the project.

[0052] The coding module is used to construct the coding rule system for BIM model components. The established coding rule system includes 8 levels of BIM model project name, division, sub-division, sub-item, space, profession, family, serial number, etc. After establishing the coding rule system for BIM model components, refer to the "Classification and Coding Standards for Building Information Models" to compile a BIM model component coding standard table. The BIM model component coding standard table = project name + division + sub-division + sub-item + space + profession + family + serial number.

[0053] The plan management module is used to compile project construction plan tasks. With reference to the "Uniform Standard for Construction Quality Acceptance of Construction Engineering", a WBS task library for the construction plan of the construction project is established, where the WBS task library contains information such as project name, division, sub-division, space, etc. in the coding rule system. The planned start time and planned completion time that meet the overall schedule are set for each construction plan task item, and the actual start and actual completion time of the project are also obtained according to the data collection module.

[0054] The model is linked to the construction plan, which is used to link the planned task items of the planning step with the engineering BIM model of the modeling step through the BIM coding standard, and to perform lightweight processing on the engineering BIM model with the planned task items.

[0055] The data collection module is used to collect the actual start time and actual completion time of the project construction plan task items. It includes: ① Using mobile camera equipment or fixed monitoring equipment to collect data from different directions, angles and time points of the project, and real-time feedback of the actual situation of the project site. The data is generally image data or monitoring video, or according to the actual construction time of the project, the data is generally generated as picture data of the corresponding time; ② Feedback on the actual completion time of the construction plan of the plan management module and fill it in the management background. The data is generally text data.

[0056] The visualization module is used to visualize the engineering BIM model after the planned task items are attached to the engineering BIM model according to the BIM coding standard, according to the planned timeline.

[0057] Optionally, the visualization process includes: generating pictures, image materials or monitoring videos and other data of the actual project of the project through monitoring equipment or mobile camera equipment, using computer intelligent algorithms to identify and analyze the pictures, image materials and monitoring videos and other data, or manually performing image comparison, marking the project BIM model and recording the corresponding progress information according to the comparison results, and displaying the project BIM model in different colors in the lightweight module.

[0058] Optionally, the visualization process includes: obtaining the actual completion time text data obtained by the planning management, marking the components of the engineering BIM model and recording the corresponding progress information through the time node field of the construction plan task item attached to the components of the engineering BIM model, and displaying the engineering BIM model in different colors in the lightweight module.

[0059] The comparison module is used to express the progress information of the project more intuitively based on the planned completion BIM model and the actual completion BIM model of the project displayed by the visualization module. By dynamically analyzing the BIM models of the project at two time nodes, the deviation between the actual completion and the planned completion progress information can be more clearly compared, and progress warnings can be made for the project in a timely manner, so that project managers can adjust time nodes and response measures in a timely manner.

[0060] It should be noted that the implementation solution provided by the device to solve the problem is similar to the implementation solution recorded in the above method. Therefore, the specific limitations in the implementation methods of the aforementioned modules can be found in the limitations of the progress feedback method based on image data above, and will not be repeated here. Example 3

[0061] Based on the same inventive concept as the aforementioned embodiment, this embodiment provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the progress feedback method based on image data are implemented. Example 4

[0062] Based on the same inventive concept as the aforementioned embodiment, this embodiment provides a computer program product, including a computer program, which implements the steps of the image data-based progress feedback method when executed by a processor.

[0063] In summary, the present invention provides a progress feedback method based on image data, which solves the problem that the on-site project department has not provided timely warning information on the construction progress due to the untimely feedback of the construction progress information and the deviation between the planned time node and the actual time node, which affects the progress deviation adjustment measures of the entire project. The present invention uses a progress feedback method based on image data, which allows the on-site project department to visualize the progress status of the planned time and the actual time of the construction through the engineering BIM model. At the same time, by comparing the engineering BIM models of the planned progress and the actual progress, the deviation of the planned completion and the actual completion of the construction progress can be more clearly visualized, and the progress warning can be made in time through the visualized deviation information, so that the progress feedback based on the BIM model and the interaction with the on-site collected data are more convenient, so that the tool can create favorable conditions for the application of BIM as the construction progress of the building project.

[0064] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0065] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0066] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0067] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the technical solutions of the embodiments of the present invention.

Claims

1. A progress feedback method based on image data, characterized in that: include: Get the actual start time and actual completion time of the project construction plan task items; The actual start time and actual completion time are recorded and displayed on the pre-processed BIM model, and combined with the planned time nodes of the project construction plan task items to form visual progress feedback information; Among them, the preprocessing of BIM model includes: Encode the components of the engineering BIM model according to the pre-built BIM model component coding standard; Prepare project construction plan tasks according to the WBS task library; Link the components of the BIM model with the project construction plan task items through the BIM model component coding standard; The planned time nodes of the project construction plan task items are displayed in different colors on the BIM model.

2. The progress feedback method based on image data according to claim 1, characterized in that: The pre-construction of the BIM model component coding standard further includes: Establish BIM model, and carry out hierarchical splitting and structured management of BIM model; According to the hierarchical splitting results, a coding rule system for BIM model components is established; Coding information is constructed for each level in the coding rule system to form a BIM model component coding standard.

3. The progress feedback method based on image data according to claim 2, characterized in that: The BIM model component coding standard has the following hierarchical structure: project name, division, sub-division, sub-item, space, profession, family and serial number. The coding information formed according to the hierarchical structure is used to uniquely identify the component.

4. The progress feedback method based on image data according to claim 2, characterized in that: Prepare project construction plan tasks according to the WBS task library, including: Establishing a WBS task library, wherein the WBS task library includes a hierarchical structure of a coding rule system for BIM model components; According to the WBS task library, the project construction plan task items are subdivided into process levels, and the planned start time and planned completion time of each construction plan task item are set in combination with the overall project schedule.

5. The progress feedback method based on image data according to claim 1, characterized in that: After the components of the BIM model are linked to the project construction plan task items, the process also includes: lightweight processing of the BIM model to which the construction plan task items are linked.

6. The progress feedback method based on image data according to claim 1, characterized in that: Get the actual start time and actual completion time of the project construction plan task items, including: Regularly obtain image data of engineering projects at different locations, angles and time points; The image data acquired regularly are identified to obtain the actual start time and actual completion time of each construction plan task item.

7. The progress feedback method based on image data according to claim 6, characterized in that: Identifying the image data acquired periodically also includes: Compare the images of the current cycle with the images of the previous cycle. Based on the comparison results and the shooting time marked on the images, record the actual start time of the newly added construction plan task items and the actual completion time of the completed construction plan task items.

8. A computer vision-based progress feedback system, characterized in that: include: The acquisition module is used to obtain the actual start time and actual completion time of the project construction plan task items; The progress feedback module is used to record and display the actual start time and actual completion time on the pre-processed BIM model, and combine the planned time nodes of the project construction plan task items to form visual progress feedback information; Among them, the preprocessing of BIM model includes: Encode the components of the engineering BIM model according to the pre-built BIM model component coding standard; Prepare project construction plan tasks according to the WBS task library; Link the components of the BIM model with the project construction plan task items through the BIM model component coding standard; The planned time nodes of the project construction plan task items are displayed in different colors on the BIM model.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the progress feedback method based on image data described in any one of claims 1 to 7 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the progress feedback method based on image data described in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • A field progress monitoring system and a method based on a three-dimensional model

    CN109377066A

  • Engineering project Web end construction progress management method and device and readable storage medium

    CN112486613A

  • Automatic metering and accounting method and system based on BIM and GIS technologies

    CN113094794A

  • Construction progress visualization method based on BIM model and monitoring image comparison

    CN113360583A

  • Project management system and method based on BIM + WBS and readable storage medium

    CN116934243A

Cited By

  • BIM model loading processing method and system for construction progress record

    CN120337796A

  • BIM-based visual overpass support construction progress analysis method and system

    CN120373662A

  • BIM (Building Information Modeling) visualization method, system, equipment and medium

    CN121351199A