Channel utilization rate evaluation method and device based on wind power output uncertainty

By constructing a random timing output curve model of wind power and power system simulation, the impact of wind power output uncertainty on the transmission line is solved, the stability and flexibility of the transmission system are improved, and the effective evaluation of the utilization rate of the transmission line is achieved.

CN118886741APending Publication Date: 2024-11-01STATE GRID TIANJIN ELECTRIC POWER COMPANY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410914300.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The uncertainty of wind power output increases the operating risks and planning difficulties of transmission lines, affecting the safe and stable operation and management of the transmission system.

Method used

Based on the historical output data of wind power, a wind power stochastic timing output curve model is constructed, and a long-term timing production simulation is carried out in combination with relevant parameters of the power system to calculate the utilization index and average utilization rate of the transmission line.

Benefits of technology

By generating output characteristic curves for future evaluation years, performing power system simulation, outputting the transmission power value of the transmission line throughout the year, and evaluating the line utilization rate, the stability and flexibility of the transmission system are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886741A_ABST
    Figure CN118886741A_ABST
Patent Text Reader

Abstract

The invention provides a channel utilization rate evaluation method and device based on wind power output uncertainty. The method comprises the steps of obtaining a historical year time sequence power generation curve, historical year installed data of each wind power plant station, installed capacity of a future evaluation year and related parameters of a power system of each wind power plant station; constructing a wind power random time sequence output curve model, and generating an output curve of each wind power station in a future evaluation year; performing long-period time sequence production analog simulation to obtain the transmission power of each power transmission line in the system, and calculating the utilization rate index of each power transmission line and the average utilization rate index of each voltage level power transmission line; by deeply researching the fluctuation characteristics of wind power output, challenges caused by uncertainty of wind power output can be better handled, efficient and stable operation of a power transmission system is realized, and an energy structure is promoted to develop in a cleaner and sustainable direction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of wind power random output and transmission line utilization calculation, and in particular relates to a channel utilization evaluation method and device based on wind power output uncertainty. Background Art

[0002] With the introduction of carbon peak and carbon neutrality goals, wind power as a key renewable energy source is gradually becoming an important part of the energy structure. With the continuous increase in wind power installed capacity, its output volatility is becoming increasingly significant. This characteristic has brought new challenges and opportunities to the traditional transmission line utilization assessment. The uncertainty of wind power output refers to the volatility of its power generation in time and space, which is mainly affected by factors such as meteorological conditions, geographical environment, and the performance of wind power equipment. The uncertainty of wind power output means that when evaluating the utilization of transmission lines, it is necessary to consider the impact of wind power output fluctuations on the transmission system.

[0003] Specifically, the uncertainty of wind power output brings the following challenges to the evaluation of transmission line utilization: First, the uncertainty of wind power output increases the operating risk of transmission lines. Due to the volatility of wind power output, traditional transmission lines may face the risk of insufficient power supply or overload during certain periods of time, thus affecting the safe and stable operation of the lines. Secondly, the uncertainty of wind power output increases the difficulty of planning and designing transmission lines. Traditional line planning is often based on a stable power supply situation, but considering the volatility of wind power output, a more flexible and intelligent line design is needed to adapt to changes in power demand at different times. In addition, the uncertainty of wind power output also brings challenges to the operation and management of the transmission system.

[0004] Therefore, the evaluation of transmission line utilization based on wind power output uncertainty has become an important topic in the current context of energy transformation. By deeply studying the fluctuation characteristics of wind power output, we can better cope with the challenges brought by wind power output uncertainty, achieve efficient and stable operation of the transmission system, and promote the development of energy structure towards a cleaner and more sustainable direction. Summary of the invention

[0005] In view of this, the purpose of the present invention is to overcome the shortcomings of the prior art, propose a model that takes into account the uncertainty of wind power output based on historical wind power output data, and based on this, provide a channel utilization evaluation method based on wind power output uncertainty.

[0006] In a first aspect, an embodiment of the present invention provides a channel utilization evaluation method based on wind power output uncertainty, comprising:

[0007] S1. Obtain the historical time-series power generation curves of each wind farm station, historical installed capacity data of wind farm stations, installed capacity in future assessment years, and relevant parameters of the power system;

[0008] Among them, the power system related parameters include but are not limited to the installed capacity of various power sources, the nodes where the power sources are located, the photovoltaic timing power generation curve, the interconnection line timing power generation curve, the grid topology, the transmission limit of each transmission line, and the load timing power consumption curve.

[0009] S2. Based on the acquired historical time-series power generation curves of each wind farm station, the historical installed capacity data of each wind farm station and the installed capacity in the future evaluation year, a wind power random time-series output curve model is constructed, and the output curves of each wind farm station in the future evaluation year are generated according to the wind power output characteristics of wind power;

[0010] S3. Based on the acquired power system related parameters and the output curves of each wind farm in the future assessment year, a long-term time series production simulation is performed to obtain the transmission power of each transmission line in the system, and the utilization index of each transmission line and the average utilization index of each voltage level transmission line are calculated;

[0011] S4. Output the obtained utilization rate of each transmission line and the statistical average utilization rate index of each voltage level transmission line.

[0012] Preferably, the specific steps of constructing the wind power random time series output curve model in S2 are:

[0013] The wind power output curves of each wind farm are normalized and the calculation formula is:

[0014]

[0015] In the formula, represents the output of wind farm a at time t in year y after normalization based on the installed capacity of wind farm a in year y, P a,y,t represents the actual power output of wind farm station a at time t in year y, C a,y represents the installed capacity of wind farm station a in year y;

[0016] Clustering the wind power time series output data of each wind farm station according to the power generation output characteristics of each station, where the wind power power generation output characteristics include intra-day characteristics and seasonal characteristics;

[0017] Construct a wind power random time series output curve model for each wind farm.

[0018] Preferably, generating the output curve of each wind farm station in the future assessment year according to the wind power output characteristics in S2 also includes:

[0019] Calculate the initial value of the normalized wind power random time series output curve of each wind farm in the future assessment year;

[0020] Based on the initial values ​​and the wind power random time series output curve model, a normalized wind power time series output curve of a certain scale for each wind farm in the future assessment year is constructed;

[0021] The number of normalized wind power curves generated is selected according to the needs, and the average value of the generated curves at each moment is taken as the normalized wind power curve for subsequent calculations.

[0022] According to the normalized wind power time-series output curve and the installed capacity of each wind farm in the future assessment years, the time-series output curve of each wind farm in the future assessment years is constructed.

[0023] Specifically, the number of normalized wind power curves to be generated is selected according to the need, and the average value of the generated curves at each moment is taken as the normalized wind power curve for subsequent calculation;

[0024] Among them, the calculation formula for the initial value of the normalized wind power random time series output curve of each wind farm in the future assessment year is:

[0025]

[0026] In the formula, represents the normalized wind power output value of wind farm station a in the first period of the future assessment year, n a Indicates the number of years corresponding to the historical output data of wind farm station a, It represents the normalized output value of the pth normalized wind power curve of the generated wind farm a at time t in the future assessment year;

[0027] The calculation formula for the normalized average output value in future assessment years is:

[0028]

[0029] In the formula, represents the normalized average output value of wind farm station a at time t in the future evaluation year, m represents the number of normalized wind power curves required to be generated, It represents the normalized output value of the pth normalized wind power curve of the generated wind farm a at time t in the future assessment year;

[0030] The numerical calculation formula for wind power output in future assessment years is:

[0031]

[0032] Where P a,t represents the output of wind farm station a at time t in the future evaluation year, Represents the installed capacity of wind farm station a in the future assessment year.

[0033] Preferably, the calculation formula for the utilization index of each transmission line in S3 is:

[0034]

[0035] In the formula, represents the utilization rate of the jth transmission line in the future evaluation year, represents the power value transmitted by the jth transmission line at the i-th hour, represents the rated transmission capacity of the jth transmission line;

[0036] The calculation formula for the average utilization index of the transmission lines of each voltage level is:

[0037]

[0038] In the formula, represents the average utilization rate of transmission lines at voltage level k in the future assessment year, L k Represents the total number of transmission lines at voltage level k.

[0039] In a second aspect, a channel utilization evaluation device based on wind power output uncertainty is provided, comprising:

[0040] The data entry module is used to obtain the historical time-series power generation curves of each wind farm station, the historical installed capacity data of the wind farm station, the installed capacity of the future assessment year and the relevant parameters of the power system;

[0041] The wind power output construction module is used to construct a wind power random time-series output curve model based on the acquired historical time-series power generation curves of each wind farm station, the historical installed capacity data of each wind farm station and the installed capacity in the future evaluation year, and generate the output curve of each wind farm station in the future evaluation year according to the wind power generation output characteristics;

[0042] The line utilization calculation module is used to perform long-term time-series production simulation based on the acquired power system related parameters and the output curves of each wind farm station in the future evaluation year, obtain the transmission power of each transmission line in the system, and calculate the utilization index of each transmission line and the average utilization index of each voltage level transmission line;

[0043] The data output module is used to output the utilization rate of each transmission line and the statistical average utilization rate index of each voltage level transmission line.

[0044] It also includes a login authentication module for user self-identification.

[0045] The login authentication module, data entry module, wind power output configuration module, line utilization calculation module and data output module are connected in sequence;

[0046] The line utilization calculation module is also connected to the data entry module, and is used to directly obtain the power system related parameters transmitted by the data entry module;

[0047] The line utilization calculation module obtains the time-series output curves of each wind farm station in the power system in the future evaluation year transmitted by the wind power output construction module.

[0048] The embodiments of the present invention bring the following beneficial effects:

[0049] The present invention generates output characteristic curves for future evaluation years based on the historical output characteristics of each wind farm, considers the intraday and seasonal characteristics of wind power output, puts the constructed wind farm output curve into the power system for long-term production simulation, outputs the transmission power value of each transmission line throughout the year, and then calculates the line utilization index for evaluation.

[0050] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.

[0051] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 A connection diagram of a channel utilization evaluation device based on wind power output uncertainty according to the present invention;

[0053] Figure 2 This is a simplified flow chart of a channel utilization evaluation device based on wind power output uncertainty of the present invention;

[0054] Figure 3 This is a step diagram of a channel utilization evaluation method based on wind power output uncertainty of the present invention. DETAILED DESCRIPTION

[0055] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0056] Based on this, an embodiment of the present invention provides a channel utilization evaluation method based on wind power output uncertainty, comprising:

[0057] S1. Obtain the historical time-series power generation curves of each wind farm station, historical installed capacity data of wind farm stations, installed capacity in future assessment years, and relevant parameters of the power system;

[0058] Among them, the power system related parameters include but are not limited to the installed capacity of various power sources, the nodes where the power sources are located, the photovoltaic timing power generation curve, the interconnection line timing power generation curve, the grid topology, the transmission limit of each transmission line, and the load timing power consumption curve.

[0059] S2. Based on the historical time-series power generation curves of each wind farm station, the historical installed capacity data of wind farm stations and the installed capacity of future assessment years, a wind power random time-series output curve model is constructed.

[0060] Specifically, S2.1, normalizing the wind power output curves of each wind farm station;

[0061]

[0062] In the formula, represents the output of wind farm a at time t in year y after normalization based on the installed capacity of wind farm a in year y, P a,y,t represents the actual power output of wind farm station a at time t in year y, C a,y Represents the installed capacity of wind farm station a in year y.

[0063] S2.2, clustering the wind power time series output data of each wind farm station according to the power generation output characteristics of each wind farm station, wherein the power generation output characteristics include intra-day characteristics and seasonal characteristics;

[0064] In order to describe the seasonal characteristics of wind power generation, a year is divided into 12 units according to the month, represented by γ. In order to describe the intraday characteristics of wind power generation, the 24 time periods in the γ unit are divided into 8 time periods, represented by μ. In this way, for each wind farm station, all the historical wind power output data are clustered into 96 groups of data.

[0065] S2.3, constructing a wind power random time series output curve model for each wind farm station;

[0066] Among them, the number of discrete states is set according to the demand, and 96 groups of wind power time series power data after clustering are used to construct 96 Markov chains. The specific formulas of the state corresponding to each normalized power generation and the Markov chain constructed by each group are as follows:

[0067]

[0068]

[0069] Where N is the number of discrete states set, and the power range covered by each state is n is an integer, representing a discrete state, n∈{1, 2, ..., N}; x a,y,t is the discrete state corresponding to the normalized wind power output of wind farm a at time t in year y; γ represents the clustering unit, μ represents the clustering period, and X a,γ,μ represents the Markov chain of wind farm station a in the γ unit μ period, n a,y,γ,μ represents the normalized wind power output of wind farm a in the period of γ units μ in year y, then represents the number of wind farm a in year y, unit μ, and period n a,y,γ,μ The state corresponding to the normalized wind power at the moment; n a,γ,μ represents the total number of elements in the Markov process of wind farm a in the γ unit μ period, That is, wind farm station a in γ unit μ period n a,γ,μ The state corresponding to the normalized wind power at the moment.

[0070] Furthermore, the state transition probability matrix is ​​calculated. That is, the state transition probability matrix is ​​composed of the transition probabilities between different discrete states and is an N×N square matrix. The matrix form is as follows:

[0071]

[0072] The matrix element calculation formula is as follows:

[0073]

[0074] Where P a,γ,μ is the state transition probability matrix of wind farm station a in the γ unit μ period; x a,γ,μ,t and x a,γ,μ,t+1 They are Markov chains X a,γ,μ The discrete states corresponding to time t and time t+1; i, j∈{1, 2, ..., N}; p ij represents the probability that wind farm station a transfers from state i at time t to state j at time t+1; is the number of times that the wind farm a successively transfers from state i to state j in the γ unit μ period; It indicates the number of times that wind farm station a transfers from state i to state k in successive processes in unit μ period γ.

[0075] Furthermore, the cumulative state transfer probability matrix is ​​calculated, that is, the cumulative state transfer probability matrix is ​​calculated from the state transfer probability matrix, which is an N×N square matrix. The matrix form and the calculation method of each element are as follows:

[0076]

[0077] In the formula, Q a,γ,μ is the cumulative state transition probability matrix of wind farm station a in the γ unit μ period.

[0078] Furthermore, the discrete state at the current moment must be determined first during the calculation, and then the discrete state at the next moment is simulated based on the current moment and the cumulative state transfer probability matrix, and then the specific normalized power generation at the next moment is determined based on the discrete state at the next moment, as follows:

[0079] Assuming the current time is t, the calculation formula for the current state is:

[0080]

[0081] In the formula, is the normalized power output of wind farm station a at time t; x a,t is the discrete state of wind farm station a at time t; N is the set number of states; n is an integer, representing a discrete state, n∈{1, 2, ..., N}.

[0082] Set the current month to γ t , the current period is μ t ; Based on γ t With μ t , select the corresponding cumulative state transition probability matrix The specific formula for selecting the next state based on the cumulative state transition probability matrix is:

[0083]

[0084] In the formula, x a,t+1 is the discrete state of the simulated power generation of wind farm station a at time t+1, ε t is a random number that follows a uniform distribution, and ε t ∈[0, 1]; n is a discrete state; is the corresponding cumulative state transition probability matrix No. x a,t The element at row nth column.

[0085] After determining the discrete state at the next moment, it is also necessary to determine the specific normalized power output value. The specific calculation formula is as follows:

[0086]

[0087] In the formula, is the normalized output of wind farm station a at the constructed time t+1; N is the number of set states; ε 1,t is an independent t A random number that follows a uniform distribution, and ε 1,t∈[0, 1].

[0088] S3. Generate output curves of each wind farm station in future assessment years according to wind power output characteristics;

[0089] Specifically, S3.1, calculate the initial value of the normalized wind power random time series output curve of each wind farm in the future assessment year;

[0090] The calculation formula of the initial value is:

[0091]

[0092] In the formula, represents the normalized wind power output value of wind farm station a in the first period of the future assessment year, n a Indicates the number of years corresponding to the historical output data of wind farm station a;

[0093] S3.2. Based on the obtained initial values ​​and the wind power random time series output curve model, a normalized wind power time series output curve of a certain scale for each wind farm in the future assessment year is constructed;

[0094] The number of normalized wind power curves to be generated is selected as required, and the average output value of the generated curves at each moment is taken as the normalized wind power curve for subsequent calculation;

[0095] The calculation formula for the normalized average output value in future assessment years is:

[0096]

[0097] In the formula, represents the normalized average output value of wind farm station a at time t in the future evaluation year, m represents the number of normalized wind power curves required to be generated, It represents the normalized output value of the pth normalized wind power curve of the generated wind farm a at time t in the future assessment year;

[0098] S3.3. Based on the normalized wind power time-series output curve and the installed capacity of each wind farm in the future assessment year, construct the time-series output curve of each wind farm in the future assessment year.

[0099] The numerical calculation formula for wind power output in future assessment years is:

[0100]

[0101] Where P a,t represents the output of wind farm station a at time t in the future evaluation year, Represents the installed capacity of wind farm station a in the future assessment year.

[0102] S4. Based on the acquired power system related parameters and the output curves of each wind farm in the future assessment year, a long-term time series production simulation is performed. The transmission power of each transmission line for 8760 hours throughout the year is output through simulation, and the transmission power of each transmission line in the system is obtained. The utilization index of each transmission line and the average utilization index of each voltage level transmission line are calculated;

[0103] Specifically, the calculation formula for the utilization index of each transmission line is:

[0104]

[0105] In the formula, represents the utilization rate of the jth transmission line in the future evaluation year, represents the power value transmitted by the jth transmission line at the i-th hour, represents the rated transmission capacity of the jth transmission line;

[0106] The calculation formula for the average utilization index of each voltage level transmission line is:

[0107]

[0108] In the formula, represents the average utilization rate of transmission lines at voltage level k in the future assessment year, L k Represents the total number of transmission lines at voltage level k.

[0109] S5. Output the obtained utilization rate of each transmission line and the statistical average utilization rate index of each voltage level transmission line.

[0110] Embodiment 2 provides a channel utilization evaluation device based on wind power output uncertainty, comprising:

[0111] The data entry module is used to obtain the historical time-series power generation curves of each wind farm station, the historical installed capacity data of the wind farm station, the installed capacity of the future assessment year and the relevant parameters of the power system;

[0112] The wind power output construction module is used to construct a wind power random time-series output curve model based on the acquired historical time-series power generation curves of each wind farm station, the historical installed capacity data of each wind farm station and the installed capacity in the future evaluation year, and generate the output curve of each wind farm station in the future evaluation year according to the wind power generation output characteristics;

[0113] The line utilization calculation module is used to perform long-term time-series production simulation based on the acquired power system related parameters and the output curves of each wind farm station in the future evaluation year, obtain the transmission power of each transmission line in the system, and calculate the utilization index of each transmission line and the average utilization index of each voltage level transmission line;

[0114] The data output module is used to output the utilization rate of each transmission line and the statistical average utilization rate index of each voltage level transmission line.

[0115] It also includes a login authentication module for user self-identification.

[0116] like Figure 2 As shown, the login authentication module, data entry module, wind power output configuration module, line utilization calculation module and data output module are connected in sequence;

[0117] The line utilization calculation module is also connected to the data entry module, and is used to directly obtain the power system related parameters transmitted by the data entry module;

[0118] The line utilization calculation module obtains the time-series output curves of each wind farm station in the power system in the future evaluation year transmitted by the wind power output construction module.

[0119] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0120] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A channel utilization evaluation method based on wind power output uncertainty, characterized in that: include, S1. Obtain the historical time-series power generation curves of each wind farm station, historical installed capacity data of wind farm stations, installed capacity in future assessment years, and relevant parameters of the power system; S2. Based on the acquired historical time-series power generation curves of each wind farm station, the historical installed capacity data of each wind farm station and the installed capacity in the future evaluation year, a wind power random time-series output curve model is constructed, and the output curves of each wind farm station in the future evaluation year are generated according to the wind power output characteristics of wind power; S3. Based on the acquired power system related parameters and the output curves of each wind farm in the future assessment year, a long-term time series production simulation is performed to obtain the transmission power of each transmission line in the system, and the utilization index of each transmission line and the average utilization index of each voltage level transmission line are calculated; S4. Output the obtained utilization rate of each transmission line and the statistical average utilization rate index of each voltage level transmission line.

2. The channel utilization evaluation method according to claim 1, characterized in that: The power system related parameters include but are not limited to the installed capacity of various power sources, the nodes where the power sources are located, the photovoltaic time-series power generation curve, the interconnection line time-series power generation curve, the grid topology, the transmission limit of each transmission line, and the load time-series power consumption curve.

3. The channel utilization evaluation method according to claim 1, characterized in that: The method constructs a wind power random time series output curve model based on the acquired historical time series power generation curves of each wind farm station, historical installed capacity data of wind farm stations and installed capacity in future evaluation years, including: Normalize the wind power output curves of each wind farm station; Clustering the wind power time series output data of each wind farm station according to the power generation output characteristics of each station, where the wind power power generation output characteristics include intra-day characteristics and seasonal characteristics; Construct a wind power random time series output curve model for each wind farm.

4. The channel utilization evaluation method according to claim 3, characterized in that: The calculation formula for normalizing the wind power output curves of each wind farm is: In the formula, represents the output of wind farm a at time t in year y after normalization based on the installed capacity of wind farm a in year y, P a,y,t represents the actual power output of wind farm station a at time t in year y, C a,y It represents the installed capacity of wind farm a in year y.

5. The channel utilization evaluation method according to claim 1, characterized in that: The step of generating the output curve of each wind farm station in the future assessment year according to the wind power output characteristics includes: Calculate the initial value of the normalized wind power random time series output curve of each wind farm in the future assessment year; Based on the initial values ​​and the wind power random time series output curve model, a normalized wind power time series output curve of a certain scale for each wind farm in the future assessment year is constructed; According to the normalized wind power time-series output curve and the installed capacity of each wind farm in the future assessment years, the time-series output curve of each wind farm in the future assessment years is constructed. Specifically, the number of normalized wind power curves to be generated is selected according to needs, and the average value of the generated curves at each moment is taken as the normalized wind power curve for subsequent calculation.

6. The channel utilization evaluation method according to claim 5, characterized in that: include, The calculation formula for the initial value of the normalized wind power random time series output curve of each wind farm in the future assessment year is: In the formula, represents the normalized wind power output value of wind farm station a in the first period of the future assessment year, n a Indicates the number of years corresponding to the historical output data of wind farm station a; The calculation formula for the normalized average output value in future assessment years is: In the formula, represents the normalized average output value of wind farm station a at time t in the future evaluation year, m represents the number of normalized wind power curves required to be generated, It represents the normalized output value of the pth normalized wind power curve of the generated wind farm a at time t in the future assessment year; The numerical calculation formula for wind power output in future assessment years is: Where P a,t represents the output of wind farm station a at time t in the future evaluation year, Represents the installed capacity of wind farm station a in the future assessment year.

7. The channel utilization evaluation method according to claim 1, characterized in that: The calculation formula of the utilization index of each transmission line is: In the formula, represents the utilization rate of the jth transmission line in the future evaluation year, represents the power value transmitted by the jth transmission line at the i-th hour, represents the rated transmission capacity of the jth transmission line; The calculation formula for the average utilization index of the transmission lines of each voltage level is: In the formula, represents the average utilization rate of transmission lines at voltage level k in the future assessment year, L k Represents the total number of transmission lines at voltage level k.

8. A device for evaluating channel utilization based on wind power output uncertainty according to claim 1, characterized in that: include, The data entry module is used to obtain the historical time-series power generation curves of each wind farm station, the historical installed capacity data of the wind farm station, the installed capacity of the future assessment year and the relevant parameters of the power system; The wind power output construction module is used to construct a wind power random time-series output curve model based on the acquired historical time-series power generation curves of each wind farm station, the historical installed capacity data of each wind farm station and the installed capacity in the future evaluation year, and generate the output curve of each wind farm station in the future evaluation year according to the wind power generation output characteristics; The line utilization calculation module is used to perform long-term time-series production simulation based on the acquired power system related parameters and the output curves of each wind farm station in the future evaluation year, obtain the transmission power of each transmission line in the system, and calculate the utilization index of each transmission line and the average utilization index of each voltage level transmission line; The data output module is used to output the utilization rate of each transmission line and the statistical average utilization rate index of each voltage level transmission line.

9. The device according to claim 8, characterized in that It also includes a login authentication module for user self-identification. The login authentication module, data entry module, wind power output configuration module, line utilization calculation module and data output module are connected in sequence; The line utilization calculation module is also connected to the data entry module, and is used to directly obtain the power system related parameters transmitted by the data entry module; The line utilization calculation module obtains the time-series output curves of each wind farm station in the power system in the future evaluation year transmitted by the wind power output construction module.