Shallow natural gas cause analysis and risk assessment method and system
By deeply analyzing the allocation method and generation mechanism of shallow natural gas, combining hierarchical analysis method and fuzzy comprehensive evaluation method, a risk assessment model was constructed, which solved the problem of insufficient accuracy of shallow natural gas risk assessment in the existing technology, and improved engineering construction security.
Patent Information
- Application Number
- CN202410917821.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art has limitations in the causes, distribution patterns and their impact on engineering safety of shallow natural gas, making it difficult to accurately predict and evaluate the risks of shallow natural gas, and the occurrence of accidents cannot be effectively avoided.
The four methods of distribution of shallow natural gas are used to deeply analyze the four methods of storage, and the generation and migration paths are studied through geological surveys, drilling sampling, rock physics and chemical experiments. The risk assessment model is constructed in combination with improved hierarchical analysis method and fuzzy comprehensive evaluation method to identify Key factors are evaluated comprehensively to obtain the final risk level.
It improves the accuracy of shallow natural gas cause analysis and the reliability of risk assessment, helps engineering construction better respond to safety challenges, significantly reduces the possibility of engineering accidents, and improves the safety of construction and operation.
Smart Images

Figure CN118886744A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engineering geology and geochemistry, and in particular to a method and system for shallow natural gas genesis analysis and risk assessment. Background Art
[0002] With the rapid development of urbanization and infrastructure construction, more and more engineering construction projects such as tunnels and subways need to be carried out underground. During the construction of these projects, the existence of shallow natural gas has become a potential safety hazard that cannot be ignored. Shallow natural gas mainly refers to natural gas with a shallow burial depth, generally not exceeding 1,000 meters. Its occurrence characteristics and migration mechanism are different from those of traditional deep natural gas, which brings special challenges to engineering safety.
[0003] Existing technologies have limitations in understanding the causes and storage patterns of shallow natural gas and its impact on engineering safety, which makes it difficult to accurately predict and assess the risks of shallow natural gas in actual projects, and thus it is impossible to take effective measures to avoid accidents.
[0004] In the existing technology, the occurrence of unknown gas in a tunnel of the Sichuan-Tibet Railway was used as the research entry point, and the research methods and ideas of interdisciplinary disciplines such as engineering geology and geochemistry were combined to study the formation mechanism and evolution characteristics of shallow natural gas, summarize and analyze its composition characteristics and evolution laws, and demonstrate its organic and inorganic causes. In addition, fuzzy mathematics methods were introduced for gas safety evaluation methods and means in tunnel engineering to quantitatively judge the risk sources. Relevant researchers have also established a series of targeted risk assessment models and systems through field investigations and experimental verifications, such as risk factor identification and evaluation models based on fuzzy mathematics theory, fuzzy influence diagram risk evaluation computer methods, and tunnel gas outburst evaluation issues explored by set pair analysis theory and random simulation technology.
[0005] However, despite these research results, in actual engineering, more accurate and reliable methods are still needed to analyze the origin, occurrence mode and relationship of shallow natural gas with engineering safety, and to conduct corresponding risk assessment. Therefore, the present invention aims to provide a method for the origin analysis and risk assessment of shallow natural gas, so as to help better cope with the safety challenges brought by shallow natural gas in engineering construction. Summary of the invention
[0006] In view of the defects of the prior art, the present invention provides a method and system for shallow natural gas genesis analysis and risk assessment.
[0007] In order to achieve the above invention object, the technical solution adopted by the present invention is as follows:
[0008] A method for shallow natural gas genesis analysis and risk assessment comprises the following steps:
[0009] Step 1, storage mode analysis: In-depth analysis of the four storage modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, reveals the enrichment rules and distribution characteristics under different storage modes. This helps to identify the possible risks of different storage modes and provide a reference for targeted risk assessment.
[0010] Step 2, Exploration of Genesis Mechanism: Through geological surveys, drilling sampling, rock physics and chemical experiments, the generation of shallow natural gas, the path of migration to shallow layers, and the enrichment mechanism in specific geological structures are studied. This helps to gain a deeper understanding of the source, migration path and possible enrichment mechanism of shallow natural gas, and provides a scientific basis for subsequent risk assessment.
[0011] Step 3, risk factor identification: Identify the key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors.
[0012] Step 4, risk assessment: Use the improved analytic hierarchy process and fuzzy comprehensive evaluation method to build a risk assessment model. Determine the weight of each risk factor through analytic hierarchy process; use fuzzy comprehensive evaluation method to comprehensively evaluate each risk factor and obtain the final risk level.
[0013] Furthermore, step 4 specifically includes the following steps:
[0014] a) Collect geological survey and data: Use surface survey and historical data to organize geological information, including the distribution and properties of gas source rocks, reservoirs, and caprocks. Collect samples, including rock, soil, and water samples, for subsequent chemical and physical analysis.
[0015] b) Analysis of natural gas spill characteristics: Analyze the chemical composition of the collected samples to determine the source and cause of the natural gas. Combined with seismic data, analyze the geological structure near the spill point to explore its impact on the migration and enrichment of natural gas.
[0016] c) Constructing geological models: Based on the collected data, a three-dimensional geological model containing key geological units and structural elements is constructed. The model is verified and adjusted with new data obtained through drilling or other geophysical methods.
[0017] d) Research on migration and enrichment mechanisms: Analyze the possible migration paths of gas from source rocks to shallow reservoirs, focus on the role of faults and fractures, and study the impact of the physical properties of shallow reservoirs on the enrichment and preservation of natural gas.
[0018] e) Numerical simulation and field verification: Establish a numerical simulation model to simulate the migration and enrichment process of natural gas under different geological conditions. Design a drilling plan, conduct drilling verification in key areas, and evaluate the accuracy and reliability of the model.
[0019] f) Improved analytic hierarchy process to evaluate risk: Determine the weight of each risk factor through analytic hierarchy process and establish a risk assessment model.
[0020] g) Fuzzy comprehensive evaluation method to evaluate risks: Fuzzy comprehensive evaluation method is used to comprehensively evaluate various risk factors and obtain the final risk level.
[0021] h) Secondary comprehensive evaluation: A weighted average model is used to conduct a secondary comprehensive evaluation based on the weight distribution and the secondary evaluation indicator set to obtain the final risk level.
[0022] Furthermore, the specific steps of step g) are as follows:
[0023] 1) Establish a hierarchical model: First, determine the hierarchical structure of the evaluation object, divide the evaluation object into several levels, and determine the relationship between each level.
[0024] 2) Establish a comparison matrix A: For each factor in each level, establish a comparison matrix to compare the relative importance of each factor. Fill in the comparison matrix A based on the results of the pairwise comparison, where A ij Indicates the importance of the i-th factor relative to the j-th factor.
[0025] 3) Calculate the importance ranking index: Assume there are n criteria, and the importance ranking of each criterion is W i , which is the weight of the ith criterion. For the weight of each criterion, the comparison matrix A is normalized.
[0026] We can get the weighted sum of the comparison matrix A and calculate the importance ranking index W of each factor. i , Where W i is the sum of the elements in the i-th row of matrix A, and W max The maximum W i , W min The smallest W i .
[0027] 4) Construct judgment matrix B: sort by importance index W i , construct the judgment matrix B. According to the formula:
[0028]
[0029] Through the above steps, the value of each element in the judgment matrix B is calculated to determine the relative importance of each factor.
[0030] 5) Calculate the transfer matrix C of the judgment matrix B. For each element B in the judgment matrix B ij Calculate its logarithm log(B ij ), for each row of factors i and j, calculate log(B ij ) and log(B ji ), sum all these differences and divide them by the number of logarithmic values n, where n represents the order of the matrix, and the transfer matrix C formula is as follows:
[0031]
[0032] 6) Find the quasi-optimal consistent matrix D of the judgment matrix B: Calculate the quasi-optimal consistent matrix D based on the transfer matrix C. By performing exponential operations on the values of each element in C, the formula for the quasi-optimal consistent matrix D is as follows:
[0033] D ij =10 cij
[0034] 7) Find the maximum eigenvalue and corresponding eigenvector of D and obtain the weight: Calculate the maximum eigenvalue and corresponding eigenvector of the quasi-optimal consistent matrix D and extract the weight of each factor from it. Each element in the eigenvector is the weight value of the corresponding factor.
[0035] Furthermore, the detailed steps of step h) are as follows:
[0036] 1) Constructing the overall evaluation matrix from a single factor
[0037] Collect the single factor evaluation vectors of all factors [P i =(p i1 ,p i2 ,....p im )],P ik where represents the membership of the evaluation of the i-th factor to the k-th level of the review set Y. All single-factor evaluation vectors P i Arrange them row by row to get the total evaluation matrix P. Assuming there are n factors and each factor corresponds to an evaluation vector, the dimension of P will be n×m, where m is the size of the evaluation level set Y.
[0038]
[0039] 2) Determine the fuzzy set of factor importance
[0040] The weight ω of each factor is obtained according to the improved analytic hierarchy process.
[0041] 3) Determine the comprehensive evaluation model
[0042] By using the total evaluation matrix P and the weight of each factor ω for fuzzy transformation, the fuzzy comprehensive evaluation set is obtained. The comprehensive evaluation models include: V-Λ model, comprehensive constraint model and weighted average model.
[0043] 4) First-level comprehensive evaluation
[0044] According to the maximum membership principle, the evaluation level corresponding to bj with the maximum membership is selected from the fuzzy comprehensive evaluation set B = (b1, b2, ..., bn) as the final comprehensive evaluation result.
[0045] 5) Obtain the secondary evaluation index set
[0046] Select a variety of different calculation models for first-level fuzzy comprehensive evaluation to obtain various fuzzy comprehensive evaluation sets
[0047] B1=(b 11 ,b 12 ,…,b 1n ),B2=(b 21 ,b 22 ,...,b 2n )…,B n =(b n1 ,b n2 ,…,b nn )
[0048] Thus, we can obtain the secondary evaluation index set R0=(B1, B2,…, B n ), and suppose there is a weight distribution A0=(α1,α2,...,α n ), and α1≥0,
[0049] f. Conduct secondary comprehensive evaluation
[0050] The weighted average model is used to perform a secondary comprehensive evaluation on the weight set and secondary evaluation index set obtained above, and the comprehensive judgment result set B0=A0R0=(b 01 ,b 02 …,b 0n ),in Then, according to the maximum membership principle, find the b with the maximum value in the comprehensive evaluation result set B0 0j The corresponding level is the final risk level obtained.
[0051] The present invention also discloses a shallow natural gas genesis analysis and risk assessment system, which can be used to implement the above shallow natural gas genesis analysis and risk assessment method, specifically including:
[0052] Occurrence mode analysis module: used to deeply analyze the four occurrence modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, and reveal the enrichment rules and distribution characteristics under different occurrence modes.
[0053] Genesis mechanism exploration module: studies the generation of shallow natural gas, the path of its migration to shallow layers, and its enrichment mechanism in specific geological structures.
[0054] Risk factor identification module: used to identify key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors.
[0055] Risk assessment module: The risk assessment model is constructed by using the improved analytic hierarchy process and fuzzy comprehensive evaluation method. The weight of each risk factor is determined by the analytic hierarchy process, and then the fuzzy comprehensive evaluation method is used to comprehensively evaluate each risk factor, and finally the risk level is obtained.
[0056] Risk level output module: presents the calculated risk level to users in an intuitive manner, such as through reports, charts, visual interfaces, etc., so that decision makers can clearly understand the risk level of different areas or projects.
[0057] The present invention also discloses a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the above-mentioned shallow natural gas genesis analysis and risk assessment method is implemented.
[0058] The present invention also discloses a computer-readable storage medium on which a computer program is stored. When the program is executed by a processor, the above-mentioned shallow natural gas genesis analysis and risk assessment method is implemented.
[0059] Compared with the prior art, the advantages of the present invention are:
[0060] Combination of theory and practice: Through in-depth research on the causal mechanism and improved risk assessment methods, the present invention helps to more accurately predict and assess risks in engineering design and construction.
[0061] Comprehensiveness and accuracy: The present invention comprehensively considers the impact of geological environment and engineering factors on shallow natural gas risks, and improves the accuracy of the assessment through improved assessment methods. This helps managers make more reasonable decisions and reduce losses caused by misjudgment.
[0062] Improved safety: Through effective risk assessment and preventive measures, the possibility of engineering accidents caused by shallow natural gas can be significantly reduced. This helps to improve the safety of engineering construction and operations and ensure the safety of personnel and assets. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 It is a gas safety risk hierarchy diagram of an embodiment of the present invention. DETAILED DESCRIPTION
[0064] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and examples.
[0065] The present invention provides a shallow natural gas genesis analysis and risk assessment method, comprising the following steps:
[0066] Research on the cause mechanism:
[0067] Analysis of occurrence patterns: In-depth analysis of the four main occurrence patterns of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration through faults, to reveal the enrichment rules and distribution characteristics under different occurrence patterns.
[0068] Exploration of the causal mechanism: Through geological surveys, drilling sampling, rock physics and chemical experiments, etc., we study the generation of shallow natural gas, the path of its migration to shallow layers, and its enrichment mechanism in specific geological structures.
[0069] Risk factor identification: Identify the key factors that affect shallow natural gas risks, including geological environmental factors (such as fault distribution and lithology changes) and human engineering factors (such as construction methods and project layout).
[0070] Risk assessment: The improved analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) are used to construct a risk assessment model. First, the weight of each risk factor is determined by the analytic hierarchy process; then, the fuzzy comprehensive evaluation method is used to comprehensively evaluate each risk factor and obtain the final risk level.
[0071] The specific sub-steps of risk assessment are as follows:
[0072] Step 1: Collect geological surveys and data: Utilize surface surveys and historical data to collect geological information of the Sichuan Basin, including but not limited to the distribution and properties of source rocks, reservoirs, and caprocks; perform field sampling, including the collection of rock, soil, and water samples for subsequent chemical and physical analysis.
[0073] Step 2: Natural gas spill characteristics analysis phase: Conduct chemical composition analysis on the collected samples to determine the source and cause of the natural gas. Combined with seismic data, analyze the geological structure near the spill point to explore its impact on natural gas migration and enrichment.
[0074] Step 3: Build a geological model: Based on the collected data, a three-dimensional geological model containing key geological units and structural elements is constructed. The model is verified and adjusted with new data obtained through drilling or other geophysical methods.
[0075] Step 4: Migration and enrichment mechanism research phase: Analyze the possible migration paths of gas from source rocks to shallow reservoirs, focus on the role of faults and fractures, and study the impact of the physical properties of shallow reservoirs on natural gas enrichment and preservation.
[0076] Step 5: Numerical simulation and field verification phase: Establish a numerical simulation model to simulate the migration and enrichment process of natural gas under different geological conditions. Design a drilling plan, conduct drilling verification in key areas, and evaluate the accuracy and reliability of the model.
[0077] Step 6: Use the improved analytic hierarchy process to evaluate the gas safety risk of non-gas gas tunnels, and select geological environmental factors and construction human engineering factors as the criterion layer. The geological environmental factors include stratum gas storage conditions, geological structural characteristics, surrounding rock gas generation mode, natural gas concentration, underground gas migration law, and construction human engineering factors mainly include construction methods, ventilation technology and equipment integrity, natural gas monitoring and early warning system, emergency plan and rescue capabilities. See the attached hierarchy diagram for details. Figure 1 .
[0078] Step 7: Use the three-scaling method to scale the improved AHP, including the following sub-steps:
[0079] a. Establish a hierarchical model
[0080] b. Establish comparison matrix A
[0081] A ij :2The i-th factor is more important than the j-th factor
[0082] 1The i-th factor is as important as the j-th factor
[0083] 0The i-th factor is less important than the j-th factor
[0084] Among them A ij is the relative importance of factor i compared to factor j, and A jj =1 or A ii =1
[0085] c. Calculate the importance ranking index W i ,
[0086]
[0087] That is W i is the sum of the elements in the i-th row of matrix A, and W is taken max =max{W i}.W min =min{W i}
[0088] d. Construct judgment matrix B
[0089]
[0090] Where K m =W max / W min (Formula 2)
[0091] e. Find the transfer matrix C of the judgment matrix B
[0092]
[0093] f. Find the quasi-optimal consistent matrix D of the judgment matrix B.
[0094] D ij =10 Cij (Formula 4)
[0095] g. Find the maximum eigenvalue of D and the corresponding eigenvector to obtain the weight.
[0096] Step 8: Based on the fuzzy transformation principle, the total evaluation matrix obtained from the single factor evaluation is used to make a reasonable comprehensive evaluation based on the maximum membership principle, taking into account the various factors being evaluated, including the following sub-steps:
[0097] a. Constructing the overall evaluation matrix from a single factor
[0098] Collect the single factor evaluation vectors of all factors [P i =(p i1 ,p i2 ,....p im )], and make an evaluation, P ik where represents the membership of the evaluation of the i-th factor to the k-th level of the review set Y. All single-factor evaluation vectors P i Arrange them row by row to get the total evaluation matrix P.
[0099]
[0100] b. Determine the fuzzy set of factor importance
[0101] Because each factor has a different degree of influence on the system, it is necessary to determine the importance of each factor in the overall evaluation, that is, the weight ω of each factor, which is obtained through the improved hierarchical analysis method.
[0102] c. Determine the comprehensive evaluation model
[0103] Through the total evaluation matrix P and the weight of each factor ω, a fuzzy transformation can be performed to obtain a fuzzy comprehensive evaluation set. Commonly used comprehensive evaluation models include main factor type, comprehensive constraint type, and weighted average type.
[0104] 1) V-Λ model
[0105] This model actually only considers the main influencing factors and ignores the influence of other factors. Its advantages are that it is simple and easy to implement and can reflect the essence of more practical problems. However, due to ignoring the information of other factors, its disadvantages are also relatively obvious.
[0106] 2) Comprehensive Constraint Model
[0107] This model takes into account the prominence of secondary factors and is a comprehensive evaluation that considers the suddenness of secondary factors.
[0108] 3) Weighted average model
[0109] This model is one of the most commonly used models. By evaluating all factors according to their weights, it achieves a balanced consideration of primary and secondary factors.
[0110] d. Level 1 comprehensive evaluation
[0111] According to the maximum membership principle, the fuzzy comprehensive evaluation set B = (b1, b2, ... b n ) is the largest b j The corresponding evaluation level is used as the final comprehensive evaluation result.
[0112] e. Obtain the secondary evaluation index set
[0113] Considering the contribution of various factors to the overall impact, various calculation models are selected for first-level fuzzy comprehensive evaluation to obtain various fuzzy comprehensive evaluation sets.
[0114] B1=(b 11 ,b 12 ,…,b 1n ),B2=(b 21 ,b 22 ,...,b 2n )…,B n =(b n1 ,b n2 ,…,b nn )
[0115] Thus, we can obtain the secondary evaluation index set R0=(B1, B2,…, B n ), and suppose there is a weight distribution A0=(α1,α2,...,α n ), and α1≥0,
[0116] f. Conduct secondary comprehensive evaluation
[0117] The weighted average model is used to perform a secondary comprehensive evaluation on the weight set and secondary evaluation index set obtained above to obtain B0=A0R0=(b 01 ,b 02 …,b 0n ),in Then, according to the maximum membership principle, find the b with the maximum value in the comprehensive evaluation result set B0 0j The corresponding level is the required optimal evaluation result, that is, the final risk level obtained.
[0118] In order to better verify the rationality of the construction of the evaluation system and the accuracy of the final evaluation results, three shallow natural gas overflow tunnels, namely Lijiazui Tunnel, Changgangling Tunnel and Erlangshan Tunnel, were selected for risk assessment using the above risk assessment method.
[0119] Lijiazui Tunnel: The tunnel area is in the middle and low mountain terrain. The tunnel body passes through the stratum of the Cangxi Formation of the Lower Cretaceous System.
[0120] (K1c), the lithology is sandstone and silty mudstone, the rock formation dip is N80°E / SE∠3°
[0121] Changgangling Tunnel: The tunnel is located near Fenghuang Village, Lingjiang Town, Cangxi County, Guangyuan City, with medium and low mountain landforms. The tunnel passes through the Cangxi Formation (K1c) of the Lower Cretaceous System, with sandstone and silty mudstone, and the rock formation is N75°E / SE∠2°
[0122] Erlangshan Tunnel: Langshan Tunnel is located at the junction of Langzhong and Yilong County, Nanchong City, on the wing of Yilong anticline and Tumenpu syncline, and belongs to the low-middle mountain landform. The tunnel section passes through the strata of the Lower Cretaceous Cangxi Formation (K1c) and the Upper Jurassic Penglaizhen Formation (J3p), of which the Cangxi Formation is thick-layered sandstone interbedded with thin-layered silty mudstone, and the Penglaizhen Formation is silty mudstone interbedded with thin-layered sandstone and muddy siltstone.
[0123] By using the risk assessment method proposed in the present invention, a comparison matrix is constructed, and the weights of each factor are obtained according to the actual on-site investigation, as shown in Tables 1 and 2:
[0124] Table 1 Weight table of each factor
[0125]
[0126] Table 2 Tunnel risk assessment table
[0127]
[0128] The risk levels are divided into: low risk (≤10), medium risk (10<evaluation value≤15), high risk (15<evaluation value≤20), and extremely high risk (≥20). After obtaining the weights of each evaluation factor, the risk assessment levels of the three tunnels are calculated, as shown in Table 3:
[0129] Table 3 Tunnel risk assessment results
[0130]
[0131] The results of the hazardous gas tunnel risk assessment system constructed by the patent show that the Changgangling Tunnel and the Erlangshan Tunnel are of medium risk, with assessment values between 10 and 15; while the Lijiazui Tunnel is judged to be of high risk, with an assessment value between 15 and 20.
[0132] In another embodiment of the present invention, a shallow natural gas genesis analysis and risk assessment system is provided. The system can be used to implement the shallow natural gas genesis analysis and risk assessment method described above. Specifically, the system comprises: a module
[0133] Occurrence mode analysis module: used to deeply analyze the four occurrence modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, and reveal the enrichment rules and distribution characteristics under different occurrence modes.
[0134] Genesis mechanism exploration module: studies the generation of shallow natural gas, the path of its migration to shallow layers, and its enrichment mechanism in specific geological structures.
[0135] Risk factor identification module: used to identify key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors.
[0136] Risk assessment module: The risk assessment model is constructed by using the improved analytic hierarchy process and fuzzy comprehensive evaluation method. The weight of each risk factor is determined by the analytic hierarchy process, and then the fuzzy comprehensive evaluation method is used to comprehensively evaluate each risk factor, and finally the risk level is obtained.
[0137] Risk level output module: presents the calculated risk level to users in an intuitive manner, such as through reports, charts, visual interfaces, etc., so that decision makers can clearly understand the risk level of different areas or projects.
[0138] In another embodiment of the present invention, a terminal device is provided, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of a shallow natural gas genesis analysis and risk assessment method, including the following steps:
[0139] Step 1, storage mode analysis: In-depth analysis of the four storage modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, reveals the enrichment rules and distribution characteristics under different storage modes. This helps to identify the possible risks of different storage modes and provide a reference for targeted risk assessment.
[0140] Step 2, Exploration of Genesis Mechanism: Through geological surveys, drilling sampling, rock physics and chemical experiments, the generation of shallow natural gas, the path of migration to shallow layers, and the enrichment mechanism in specific geological structures are studied. This helps to gain a deeper understanding of the source, migration path and possible enrichment mechanism of shallow natural gas, and provides a scientific basis for subsequent risk assessment.
[0141] Step 3, risk factor identification: Identify the key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors.
[0142] Step 4, risk assessment: Use the improved analytic hierarchy process and fuzzy comprehensive evaluation method to build a risk assessment model. Determine the weight of each risk factor through analytic hierarchy process; use fuzzy comprehensive evaluation method to comprehensively evaluate each risk factor and obtain the final risk level.
[0143] In another embodiment of the present invention, the present invention further provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It can be understood that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory, or a non-volatile memory (non-volatile memory), such as at least one disk storage.
[0144] The processor may load and execute one or more instructions stored in a computer-readable storage medium to implement the corresponding steps of a shallow natural gas genesis analysis and risk assessment method in the above embodiment; the processor may load and execute the following steps:
[0145] Step 1, storage mode analysis: In-depth analysis of the four storage modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, reveals the enrichment rules and distribution characteristics under different storage modes. This helps to identify the possible risks of different storage modes and provide a reference for targeted risk assessment.
[0146] Step 2, Exploration of Genesis Mechanism: Through geological surveys, drilling sampling, rock physics and chemical experiments, the generation of shallow natural gas, the path of migration to shallow layers, and the enrichment mechanism in specific geological structures are studied. This helps to gain a deeper understanding of the source, migration path and possible enrichment mechanism of shallow natural gas, and provides a scientific basis for subsequent risk assessment.
[0147] Step 3, risk factor identification: Identify the key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors.
[0148] Step 4, risk assessment: Use the improved analytic hierarchy process and fuzzy comprehensive evaluation method to build a risk assessment model. Determine the weight of each risk factor through analytic hierarchy process; use fuzzy comprehensive evaluation method to comprehensively evaluate each risk factor and obtain the final risk level.
[0149] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0150] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0151] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0152] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0153] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the implementation methods of the present invention, and should be understood that the protection scope of the present invention is not limited to such special statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.
Claims
1. A method for shallow natural gas genesis analysis and risk assessment, characterized in that: The following steps are involved: Step 1, storage mode analysis: In-depth analysis of the four storage modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, to reveal the enrichment rules and distribution characteristics under different storage modes; this helps to identify the possible risks of different storage modes and provide a reference for targeted risk assessment; Step 2, Exploration of Genesis Mechanism: Through geological surveys, drilling sampling, rock physics and chemical experiments, the generation of shallow natural gas, the path of migration to shallow layers, and the enrichment mechanism in specific geological structures are studied; this helps to gain a deeper understanding of the source, migration path and possible enrichment mechanism of shallow natural gas, and provides a scientific basis for subsequent risk assessment; Step 3, risk factor identification: Identify the key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors; Step 4, risk assessment: Use the improved analytic hierarchy process and fuzzy comprehensive evaluation method to build a risk assessment model; determine the weight of each risk factor through analytic hierarchy process; The fuzzy comprehensive evaluation method is used to comprehensively evaluate each risk factor and obtain the final risk level.
2. A shallow natural gas genesis analysis and risk assessment method according to claim 1, characterized in that: Step 4 specifically includes the following steps: a) Collect geological surveys and data: Use surface surveys and historical data to organize geological information, including the distribution and properties of source rocks, reservoirs, and caprocks; collect samples, including rock, soil, and water samples, for subsequent chemical and physical analysis; b) Analysis of natural gas spill characteristics: chemical composition analysis of collected samples to determine the source and origin of natural gas; combined with seismic data, analysis of the geological structure near the spill point to explore its impact on natural gas migration and enrichment; c) Constructing geological models: Based on the collected data, construct a three-dimensional geological model containing key geological units and structural elements; verify and adjust the model through new data obtained through drilling or other geophysical methods; d) Research on migration and enrichment mechanisms: Analyze the possible migration paths of gas from source rocks to shallow reservoirs, focus on the role of faults and fractures, and study the impact of the physical properties of shallow reservoirs on the enrichment and preservation of natural gas; e) Numerical simulation and field verification: Establish numerical simulation models to simulate the migration and enrichment process of natural gas under different geological conditions; design drilling plans, conduct drilling verification in key areas, and evaluate the accuracy and reliability of the models; f) Improved analytic hierarchy process to evaluate risk: Determine the weight of each risk factor through analytic hierarchy process and establish a risk assessment model; g) Fuzzy comprehensive evaluation method to evaluate risk: Fuzzy comprehensive evaluation method is used to comprehensively evaluate various risk factors and obtain the final risk level; h) Secondary comprehensive evaluation: A weighted average model is used to conduct a secondary comprehensive evaluation based on the weight distribution and the secondary evaluation indicator set to obtain the final risk level.
3. A shallow natural gas genesis analysis and risk assessment method according to claim 2, characterized in that: The specific steps of step g) are as follows: 1) Establish a hierarchical model: First, determine the hierarchical structure of the evaluation object, divide the evaluation object into several levels, and determine the relationship between each level; 2) Establish a comparison matrix A: For each factor in each level, establish a comparison matrix to compare the relative importance of each factor; fill in the comparison matrix A based on the results of the pairwise comparison, where A ij Indicates the importance of the i-th factor relative to the j-th factor; 3) Calculate the importance ranking index: Assume there are n criteria, and the importance ranking of each criterion is W i , expressed as the weight of the i-th criterion; The weight of each criterion is obtained by normalizing the comparison matrix A, performing weighted summation on the comparison matrix A, and calculating the importance ranking index W of each factor. i , Where W i is the sum of the elements in the i-th row of matrix A, and W max The maximum W i , W min The smallest W i ; 4) Construct judgment matrix B: sort by importance index W i , construct the judgment matrix B; according to the formula as follows: Through the above steps, the value of each element in the judgment matrix B is calculated to determine the relative importance of each factor; 5) Calculate the transfer matrix C of the judgment matrix B. For each element B in the judgment matrix B ij Calculate its logarithm log(B ij ), for each row of factors i and j, calculate log(B ij ) and log(B ji ), sum all these differences and divide them by the number of logarithmic values n, where n represents the order of the matrix, and the transfer matrix C formula is as follows: 6) Find the quasi-optimal consistent matrix D of the judgment matrix B: Calculate the quasi-optimal consistent matrix D based on the transfer matrix C; By performing exponential operations on the values of each element in C, the formula for the quasi-optimal consistent matrix D is as follows 7) Find the maximum eigenvalue and corresponding eigenvector of D and obtain the weight: Calculate the maximum eigenvalue and corresponding eigenvector of the quasi-optimal consistent matrix D, and extract the weight of each factor from it; each element in the eigenvector is the weight value of the corresponding factor.
4. A shallow natural gas genesis analysis and risk assessment method according to claim 2, characterized in that: The detailed steps of step h) are as follows: 1) Constructing the overall evaluation matrix from a single factor Collect the single factor evaluation vectors of all factors [P i =(p i1 ,p i2 ,....p im )],P ik where represents the membership of the evaluation of the i-th factor to the k-th level of the review set Y. All single-factor evaluation vectors P i Arrange them row by row to get the total evaluation matrix P; assuming there are n factors and each factor corresponds to an evaluation vector, then the dimension of P will be n×m, where m is the size of the evaluation level set Y; 2) Determine the fuzzy set of factor importance The weight ω of each factor is obtained according to the improved analytic hierarchy process; 3) Determine the comprehensive evaluation model By using the total evaluation matrix P and the weights of each factor ω for fuzzy transformation, a fuzzy comprehensive evaluation set is obtained; the comprehensive evaluation models include: V-Λ model, comprehensive constraint model and weighted average model; 4) First-level comprehensive evaluation According to the maximum membership principle, the evaluation level corresponding to bj with the maximum membership is selected from the fuzzy comprehensive evaluation set B = (b1, b2, ..., bn) as the final comprehensive evaluation result; 5) Obtain the secondary evaluation index set Select a variety of different calculation models for first-level fuzzy comprehensive evaluation to obtain various fuzzy comprehensive evaluation sets B1=(b 11 ,b 12 ,…,b 1n ),B2=(b 21 ,b 22 ,...,b 2n )…,B n =(b n1 ,b n2 ,…,b nn ) Thus, we can obtain the secondary evaluation index set R0=(B1, B2,…, B n ), and suppose there is a weight distribution A0=(α1,α2,...,α n ), and α1≥0, f. Conduct secondary comprehensive evaluation The weighted average model is used to perform a secondary comprehensive evaluation on the weight set and secondary evaluation index set obtained above, and the comprehensive judgment result set B0=A0R0=(b 01 ,b 02 …,b 0n ),in Then, according to the maximum membership principle, find the b with the maximum value in the comprehensive evaluation result set B0 0j The corresponding level is the final risk level obtained.
5. A shallow natural gas genesis analysis and risk assessment system, characterized by: The system can be used to implement the shallow natural gas genesis analysis and risk assessment method according to any one of claims 1 to 4, specifically including: Storage mode analysis module: used to deeply analyze the four storage modes of shallow natural gas, including self-generation and self-storage, other-generation and self-storage, other-generation and other-storage, and direct migration of faults, and reveal the enrichment rules and distribution characteristics under different storage modes; Genesis mechanism exploration module: study the generation of shallow natural gas, the path of migration to shallow layers, and the enrichment mechanism in specific geological structures; Risk factor identification module: used to identify key factors affecting shallow natural gas risks, including geological environmental factors and human engineering factors; Risk assessment module: The risk assessment model is constructed by using the improved analytic hierarchy process and fuzzy comprehensive evaluation method. The weight of each risk factor is determined by analytic hierarchy process, and then the fuzzy comprehensive evaluation method is used to comprehensively evaluate each risk factor, and finally the risk level is obtained. Risk level output module: presents the calculated risk level to users in an intuitive manner, such as through reports, charts, visual interfaces, etc., so that decision makers can clearly understand the risk level of different areas or projects.
6. A computer device, characterized in that: The method comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method for shallow natural gas genesis analysis and risk assessment as described in one of claims 1 to 4 is implemented.
7. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the program is executed by a processor, the method for shallow natural gas genesis analysis and risk assessment as described in one of claims 1 to 4 is implemented.
Citation Information
Patent Citations
Shallow natural gas origin and source comprehensive judgment and identification method and identification system
CN110988239A
Method for evaluating harm of shallow natural gas in oil-gas-containing basin area to tunnel
CN111523795A
Non-coal tunnel harmful gas hazard evaluation method
CN111523796A
Lake health condition evaluation and diagnosis method and system
CN115496375A
Evaluation Method and Evaluation Device for Water Breakthrough Risk of Production Wells in Aquifer Drive Gas Reservoirs
US20160145994A1