By obtaining and analyzing assembly line output data in real time, monitoring data fluctuation thresholds, obtaining output influencing factors and performing abnormal analysis, the problem of lack of yield trend analysis and abnormal detection in the existing technology is solved, and effective analysis and abnormality of assembly line output is achieved. The status self-test alarm improves the stability and efficiency of production.

CN118886789AInactive Publication Date: 2024-11-01无锡云数工业技术有限公司

Patent Information

Application Number
CN202411312831.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing assembly line output monitoring system lacks the ability to analyze yield data trends and detect abnormalities, and cannot detect and respond to abnormal yield conditions in a timely manner, affecting production efficiency and quality.

Method used

Provide an assembly line yield analysis method, which can obtain the output data of the assembly line in real time, conduct data change analysis, monitor data fluctuation threshold, obtain data influencing factors of output, and use linear regression method to perform abnormal analysis, issue alarms and detect abnormalities in a timely manner.

Benefits of technology

Real-time analysis of assembly line output data and self-test alarm for abnormal states are realized, abnormal conditions can be detected and handled in a timely manner, and the stability and efficiency of production are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886789A_ABST
    Figure CN118886789A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of assembly line production management, and particularly discloses an assembly line yield analysis method and system. Yield analysis of an assembly line is carried out by obtaining a yield analysis data set after real-time yield data of the assembly line reaches a detection amount; and after the yield analysis data sets are in the descending trend, the subsequent yield analysis data sets are continuously monitored, and if the yield analysis data sets in the subsequent preset time are all in the descending trend, yield abnormity reason analysis is carried out, and an alarm is given out, so that the yield data of the assembly line can be effectively analyzed, namely abnormal state self-checking alarm is carried out; and abnormal conditions can be found and processed in time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of assembly line production management, and in particular to an assembly line output analysis method and an assembly line output analysis system. Background Art

[0002] Existing assembly line production monitoring systems can usually only provide real-time production data, but lack the ability to analyze production trends and automatically detect production anomalies. In the production process, timely detection and response to production anomalies is an important part of ensuring production efficiency and quality.

[0003] Therefore, providing a method that can analyze the production data trend of an assembly line in real time and provide abnormal alarms has become a technical problem that needs to be solved urgently by technicians in this field. Summary of the invention

[0004] The present invention provides an assembly line output analysis method and an assembly line output analysis system, which solve the problems existing in the related art such as lack of real-time analysis of assembly line output data and abnormal alarm.

[0005] As one aspect of the present invention, there is provided an assembly line yield analysis method, comprising:

[0006] Acquire the current production analysis data group of the assembly line in real time, the production analysis data group including the real-time production data of the assembly line and the historical production data within a first preset time period before the real-time production data, the real-time production data and the historical production data are both acquired according to a preset sampling period;

[0007] Performing data change analysis on the current yield analysis data group to obtain the data change analysis result of the current yield analysis data group;

[0008] When the data change analysis result of the current production analysis data group is greater than or equal to the data normal fluctuation threshold, repeat the above steps of acquiring the current production analysis data group of the assembly line in real time and performing data change analysis processing on the current production analysis data group;

[0009] When the data change analysis result of the current yield analysis data group is less than the normal data fluctuation threshold, monitoring and acquiring the yield analysis data group within a second preset time period after the current yield analysis data group;

[0010] Performing data change analysis processing on the production analysis data group within a second preset time period after the current production analysis data group, and obtaining a data change analysis result of the production analysis data group within a second preset time period after the current production analysis data group;

[0011] When the data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold, the production influencing factor data of the assembly line is obtained in real time, and the production influencing factor data at least includes the real-time motor speed, the actual total amount of materials, the real-time defective rate and the actual workstation output;

[0012] Perform abnormal analysis on the production of the assembly line according to the data of production influencing factors, obtain the abnormal analysis results of the production of the assembly line, and issue an alarm according to the abnormal analysis results of the production of the assembly line;

[0013] When the data change analysis result of the production analysis data group is greater than or equal to the normal data fluctuation threshold within the second preset time period after the current production analysis data group, repeat the above steps of real-time acquisition of the current production analysis data group of the assembly line to the current step.

[0014] Further, the current yield analysis data group is subjected to data change analysis processing to obtain the data change analysis result of the current yield analysis data group, including:

[0015] Perform data change analysis on the current yield analysis data group by using a linear regression method to obtain the slope of the current yield analysis data group;

[0016] Performing data change analysis processing on the production analysis data group within a second preset time period after the current production analysis data group to obtain data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group, including:

[0017] Performing data change analysis on the yield analysis data group within a second preset time period after the current yield analysis data group by a linear regression method to obtain a slope of the yield analysis data group within a second preset time period after the current yield analysis data group;

[0018] Among them, the expression of the slope of the yield analysis data set is:

[0019] ;

[0020] in, Represents the production data collected for the i-th time.

[0021] Further, an abnormal production analysis of the assembly line is performed based on the production influencing factor data to obtain an abnormal production analysis result of the assembly line, and an alarm is issued based on the abnormal production analysis result of the assembly line, including:

[0022] Determine whether the real-time motor speed of the assembly line is abnormal based on the real-time motor speed and the preset motor speed, and obtain the real-time motor speed analysis result;

[0023] Determine whether the actual total amount of materials in the assembly line is insufficient based on the actual total amount of materials and the preset production material demand, and obtain the actual total amount of materials analysis results;

[0024] Determine whether there is any abnormality in the production quality of the assembly line based on the real-time defective rate and the preset defective rate threshold, and obtain the production quality analysis result;

[0025] Determine whether the assembly line is understaffed based on the actual workstation output and the preset standard workstation output, and obtain the staffing analysis results;

[0026] The abnormal output analysis results of the assembly line are obtained based on the real-time motor speed analysis results, the actual total material quantity analysis results, the production quality analysis results and the staffing analysis results, and an alarm is issued based on the abnormal output analysis results of the assembly line.

[0027] Furthermore, judging whether the real-time motor speed of the assembly line is abnormal based on the real-time motor speed and the preset motor speed, and obtaining the real-time motor speed analysis result includes:

[0028] Comparing the real-time motor speed with the preset motor speed, if the real-time motor speed is greater than or equal to the preset motor speed, determining that there is no abnormality in the real-time motor speed;

[0029] If the real-time motor speed is less than the preset motor speed, it is determined that the real-time motor speed is abnormal.

[0030] Furthermore, judging whether the actual total amount of materials of the assembly line is insufficient based on the actual total amount of materials and the preset production material demand, and obtaining the actual total amount of materials analysis result includes:

[0031] Compare the actual total amount of materials with the preset production material demand. If the preset production material demand is less than the actual total amount of materials, determine that the actual total amount of materials for the assembly line is sufficient.

[0032] If the preset production material demand is greater than or equal to the actual total material quantity, it is determined that the actual total material quantity of the assembly line is insufficient.

[0033] Furthermore, whether the production quality of the assembly line is abnormal is determined based on the real-time defective rate and the preset defective rate threshold, and the production quality analysis results are obtained, including:

[0034] Compare the real-time defective rate with the preset defective rate threshold. If the real-time defective rate is less than the preset defective rate threshold, it is determined that there is no abnormality in the production quality of the assembly line.

[0035] If the real-time defective rate is greater than or equal to the preset defective rate threshold, it is determined that there is an abnormality in the production quality of the assembly line.

[0036] Furthermore, whether the staffing of the assembly line is insufficient is determined based on the actual workstation output and the preset standard workstation output, and the staffing analysis results are obtained, including:

[0037] Calculate the actual deviation between the actual workstation output and the preset standard workstation output;

[0038] Compare the actual deviation value with the preset deviation value. If the actual deviation value is less than or equal to the preset deviation value, it is determined that the assembly line is adequately staffed.

[0039] If the actual deviation value is greater than the preset deviation value, it is determined that the assembly line is understaffed.

[0040] Furthermore, the number of times the historical production data is collected within a first preset time period before the real-time production data is at least 5.

[0041] As another aspect of the present invention, there is provided an assembly line yield analysis system for implementing the above-mentioned assembly line yield analysis method, comprising:

[0042] A production analysis data group acquisition module is used to acquire the current production analysis data group of the assembly line in real time. The production analysis data group includes the real-time production data of the assembly line and the historical production data within a first preset time period before the real-time production data. Both the real-time production data and the historical production data are acquired according to a preset sampling period.

[0043] The first data analysis module is used to perform data change analysis processing on the current yield analysis data group to obtain the data change analysis result of the current yield analysis data group;

[0044] A first judgment module is used to judge whether the data change analysis result of the current production analysis data group is less than the normal data fluctuation threshold;

[0045] A data monitoring module, used for monitoring and acquiring a production analysis data group within a second preset time period after the current production analysis data group when the data change analysis result of the current production analysis data group is less than the normal data fluctuation threshold;

[0046] The second data analysis module is used to perform data change analysis on the production analysis data group within a second preset time period after the current production analysis data group, and obtain the data change analysis result of the production analysis data group within the second preset time period after the current production analysis data group;

[0047] The second judgment module is used to judge whether the data change analysis results of the production analysis data group within a second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold;

[0048] The production influencing factor data acquisition module is used to acquire the production influencing factor data of the assembly line in real time when the data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold, and the production influencing factor data at least includes the real-time motor speed, the real-time material surplus, the real-time defective rate and the actual workstation output;

[0049] The assembly line output abnormality analysis module is used to perform assembly line output abnormality analysis based on output influencing factor data, obtain assembly line output abnormality analysis results, and issue an alarm based on the assembly line output abnormality analysis results.

[0050] As another aspect of the present invention, a computer device is provided. The computer device includes a processor and a memory. The memory is used to store computer instructions. The computer instructions are loaded and executed by the processor to implement the assembly line output analysis method as described above.

[0051] The present invention performs production analysis on the assembly line by acquiring a production analysis data group after the real-time production data of the assembly line reaches the detection amount, and continuously monitors subsequent production analysis data groups after the production analysis data group shows a downward trend. If the production analysis data group within the subsequent preset time continues to show a downward trend, the cause of the production abnormality is analyzed and an alarm is issued. The production data of the assembly line can be effectively analyzed, that is, an abnormal state self-check alarm can be issued, so as to timely discover and handle abnormal conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present invention, but do not constitute a limitation of the present invention.

[0053] Figure 1 A simplified schematic diagram of the assembly line output analysis method provided by the present invention.

[0054] Figure 2 A schematic diagram of a simplified process for obtaining an abnormal analysis result of assembly line output provided by the present invention.

[0055] Figure 3 A schematic diagram of a simplified process for obtaining real-time motor speed analysis results provided by the present invention.

[0056] Figure 4 A simplified schematic diagram of the process for obtaining the actual material total amount analysis result provided by the present invention.

[0057] Figure 5 A schematic diagram of a simplified process for obtaining production quality analysis results provided by the present invention.

[0058] Figure 6A schematic diagram of a brief process for obtaining staffing analysis results provided by the present invention.

[0059] Figure 7 This is a structural block diagram of the assembly line output analysis system provided by the present invention. DETAILED DESCRIPTION

[0060] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0061] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present invention.

[0062] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so as to describe the embodiments of the present invention described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0063] The embodiment of the present invention provides an assembly line output analysis method, such as Figure 1 As shown, including:

[0064] S100, obtaining in real time a current production analysis data group of the assembly line, the production analysis data group including the real-time production data of the assembly line and the historical production data within a first preset time period before the real-time production data, the real-time production data and the historical production data are both obtained according to a preset sampling period;

[0065] Specifically, the embodiment of the present invention uses a preset sampling period. Obtain production data from the assembly line in real time, and after obtaining the real-time production data, determine whether the collection time before the real-time production data reaches a first preset time If it is reached, it means that the current data volume has reached the requirement for production analysis, and the first preset time before obtaining the real-time production data The historical production data within the period is collected to obtain the current production analysis data group of the assembly line; if it is not reached, the preset sampling period is continued. Obtain real-time production data of the assembly line until the collection time before the real-time production data has reached the first preset time .

[0066] S200, performing data change analysis processing on the current yield analysis data group to obtain the data change analysis result of the current yield analysis data group;

[0067] Specifically, an embodiment of the present invention can perform data change analysis on the current yield analysis data group by calculating the slope of the data in the current yield analysis data group to obtain a data change analysis result of the current yield analysis data group, which can reflect the change trend of the data in the current yield analysis data group.

[0068] S300, when the data change analysis result of the current production analysis data group is greater than or equal to the data normal fluctuation threshold, repeat the above steps of obtaining the current production analysis data group of the assembly line in real time and performing data change analysis processing on the current production analysis data group;

[0069] Specifically, in an embodiment of the present invention, when the data change analysis result of the current production analysis data group is greater than or equal to the normal data fluctuation threshold, it means that the production analysis data group does not show a downward trend, the assembly line output is normal, and the above S100 and S200 are repeated.

[0070] S400: when the data change analysis result of the current yield analysis data group is less than the normal data fluctuation threshold, monitor and obtain the yield analysis data group within a second preset time period after the current yield analysis data group;

[0071] Specifically, in the embodiment of the present invention, when the data change analysis result of the current yield analysis data group is less than the normal data fluctuation threshold, it means that the yield analysis data group is on a downward trend and the yield begins to show abnormal signs, but has not yet reached the level where an abnormal alarm needs to be issued. Therefore, the second preset time after continuing to monitor the current yield analysis data group is Each yield analysis data group in the output analysis data group, according to the second preset time after the current yield analysis data group Each output analysis data group in the system can further determine the production status of the assembly line to avoid false alarms and affect the production process of subsequent assembly lines.

[0072] S500, performing data change analysis processing on the production analysis data group within a second preset time period after the current production analysis data group, and obtaining a data change analysis result of the production analysis data group within a second preset time period after the current production analysis data group;

[0073] Similarly, the embodiment of the present invention can calculate the second preset time length after the current production analysis data group The slope of each yield analysis data group within the data set is calculated, and data change analysis processing is performed on each yield analysis data group to obtain data change analysis results of each yield analysis data group.

[0074] S600, when the data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold, the production influencing factor data of the assembly line is obtained in real time, and the production influencing factor data at least includes the real-time motor speed, the actual total amount of materials, the real-time defective rate and the actual workstation output;

[0075] Specifically, in the embodiment of the present invention, if the second preset time after the current production analysis data group If the data change analysis results of each yield analysis data group are less than the normal data fluctuation threshold, it means that the second preset time after the current yield analysis data group The production analysis data groups in the second preset time period all show a downward trend, which means that the production of the assembly line The output continues to decrease. At this time, the embodiment of the present invention obtains the production influencing factor data of the assembly line in real time. The production influencing factor data here at least includes the real-time motor speed, the actual total material amount, the real-time defective rate and the actual workstation output.

[0076] S700, performing an abnormal production analysis of the assembly line according to the production influencing factor data, obtaining an abnormal production analysis result of the assembly line, and issuing an alarm according to the abnormal production analysis result of the assembly line;

[0077] Specifically, compared to directly issuing an alarm when determining that the output of an assembly line is abnormal, the embodiment of the present invention further analyzes the cause of the abnormal output of the assembly line based on the real-time motor speed, the actual total amount of material, the real-time defective rate and the actual workstation output, obtains the abnormal output analysis result of the assembly line, and issues an alarm based on the abnormal output analysis result of the assembly line, which can reduce the time for investigation and maintenance, save time cost, and benefit production.

[0078] S800. When the data change analysis result of the production analysis data group is greater than or equal to the normal data fluctuation threshold within the second preset time period after the current production analysis data group, repeat the above-mentioned step of obtaining the current production analysis data group of the assembly line in real time to the current step.

[0079] Specifically, in the embodiment of the present invention, if the second preset time after monitoring the current production analysis data group When the data change analysis results of each production analysis data group in the output analysis data group are calculated, if a group of production analysis data groups appears whose data change analysis results are greater than or equal to the normal data fluctuation threshold, it means that the production of the assembly line has increased by the second preset time after the current production analysis data group. It is not a continuous decline, so the above steps S100-S800 are repeatedly executed from the moment when the data change analysis result of the yield analysis data group is greater than or equal to the data normal fluctuation threshold.

[0080] In summary, the embodiment of the present invention obtains a production analysis data group to perform production analysis on the assembly line after the real-time production data of the assembly line reaches the detection amount, and continuously monitors subsequent production analysis data groups after the production analysis data group shows a downward trend. If the production analysis data group within the subsequent preset time continues to show a downward trend, production abnormality analysis is performed and an alarm is issued. The production data of the assembly line can be effectively analyzed and abnormal status self-check alarms can be issued, so as to timely discover and handle abnormal conditions.

[0081] Further, the current yield analysis data group is subjected to data change analysis processing to obtain the data change analysis result of the current yield analysis data group, including:

[0082] Perform data change analysis on the current yield analysis data group by using a linear regression method to obtain the slope of the current yield analysis data group;

[0083] Performing data change analysis processing on the production analysis data group within a second preset time period after the current production analysis data group to obtain data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group, including:

[0084] Performing data change analysis on the yield analysis data group within a second preset time period after the current yield analysis data group by a linear regression method to obtain a slope of the yield analysis data group within a second preset time period after the current yield analysis data group;

[0085] The slope of the yield analysis data set is expressed as follows:

[0086] (1);

[0087] in, Represents the production data collected for the i-th time.

[0088] The slope of the yield data analysis group can reflect the changing trend of the data in the yield data analysis group. Specifically, when the slope of the current yield analysis data group is less than the normal data fluctuation threshold, that is, the data change analysis result of the current yield analysis data group is less than 0, it means that the current yield analysis data group is in a downward trend. Similarly, when the slope of each yield analysis data group within the second preset time period after the current yield analysis data group is less than the normal data fluctuation threshold 0, it means that each yield analysis data group within the second preset time period after the current yield analysis data group is in a downward trend.

[0089] Furthermore, if Figure 2 As shown, the abnormal production of the assembly line is analyzed based on the production influencing factor data, the abnormal production analysis result of the assembly line is obtained, and an alarm is issued based on the abnormal production analysis result of the assembly line, including:

[0090] S710, judging whether the real-time motor speed of the assembly line is abnormal according to the real-time motor speed and the preset motor speed, and obtaining the real-time motor speed analysis result;

[0091] Furthermore, if Figure 3 As shown, this step further includes:

[0092] S711, comparing the real-time motor speed with the preset motor speed, if the real-time motor speed is greater than or equal to the preset motor speed, determining that there is no abnormality in the real-time motor speed;

[0093] Specifically, if the real-time motor speed Greater than or equal to the preset motor speed , indicating that the real-time motor speed meets the requirements, and the possibility of the assembly line output being reduced due to the motor speed is small. Therefore, it is determined that the possibility of an abnormality in the real-time motor speed is very small, and no alarm is issued for the abnormality in the real-time motor speed.

[0094] S712: If the real-time motor speed is less than the preset motor speed, it is determined that the real-time motor speed is abnormal.

[0095] If the real-time motor speed Less than the preset motor speed , indicating that the real-time motor speed does not meet the requirements. There is a high possibility that the production line output will be reduced due to the motor speed. Therefore, it is determined that there is a high possibility that the real-time motor speed is abnormal, and an alarm for the abnormal real-time motor speed needs to be issued.

[0096] S720, judging whether the actual total amount of materials of the assembly line is insufficient based on the actual total amount of materials and the preset production material demand, and obtaining the analysis result of the actual total amount of materials;

[0097] Furthermore, if Figure 4 As shown, this step further includes:

[0098] S721, comparing the actual total amount of materials with the preset production material demand. If the preset production material demand is less than the actual total amount of materials, it is determined that the actual total amount of materials for the assembly line is sufficient.

[0099] Specifically, the actual total amount of materials needs to obtain the material balance and the amount of material used , if the preset production material demand Less than the actual total amount of material , it means that the actual total amount of materials meets the demand, and the possibility of a decrease in assembly line output due to the amount of materials is small. Therefore, no alarm is issued for insufficient actual total amount of materials on the assembly line.

[0100] S722. If the preset production material demand is greater than or equal to the actual total material quantity, it is determined that the actual total material quantity of the assembly line is insufficient.

[0101] If the preset production material demand Greater than or equal to the actual total amount of material , it means that the actual total amount of materials does not meet the demand, and there is a possibility that the assembly line output will be reduced due to lack of materials. Therefore, an alarm is issued that the actual total amount of materials on the assembly line is insufficient.

[0102] S730, judging whether there is any abnormality in the production quality of the assembly line according to the real-time defective rate and the preset defective rate threshold, and obtaining the production quality analysis result;

[0103] Furthermore, if Figure 5 As shown, this step further includes:

[0104] S731, comparing the real-time defective rate with the preset defective rate threshold, if the real-time defective rate is less than the preset defective rate threshold, determining that there is no abnormality in the production quality of the assembly line;

[0105] Specifically, the real-time defective rate is ,in, Indicates the real-time defective quantity, Indicates the real-time total output. If the real-time defective rate Less than the preset defective rate threshold , it means that there is no abnormality in the production quality of the assembly line, and the possibility of a decrease in the output of the assembly line due to production quality is low. Therefore, there is no need to issue an alarm that there is an abnormality in the production quality of the assembly line.

[0106] S732: If the real-time defective rate is greater than or equal to the preset defective rate threshold, it is determined that there is an abnormality in the production quality of the assembly line.

[0107] If the real-time defective rate Greater than or equal to the preset defective rate threshold , it means that there is an abnormality in the production quality of the assembly line, which leads to a decrease in the output of the assembly line. Therefore, it is necessary to issue an alarm that there is an abnormality in the production quality of the assembly line so that the operator can further investigate and repair in the relevant direction.

[0108] S740, judging whether the staffing of the assembly line is insufficient according to the actual workstation output and the preset standard workstation output, and obtaining a staffing analysis result;

[0109] Furthermore, if Figure 6 As shown, this step further includes:

[0110] S741, calculating the actual deviation value between the actual workstation output and the preset standard workstation output;

[0111] Specifically, the actual deviation between the actual workstation output and the preset standard workstation output is shown in the following formula (2):

[0112] (2);

[0113] in, To obtain the actual workstation output in real time, Output is preset for standard workstations.

[0114] S742, comparing the actual deviation value with the preset deviation value, if the actual deviation value is less than or equal to the preset deviation value, determining that the assembly line is adequately staffed;

[0115] If the actual deviation value P is less than or equal to the preset deviation value P', it is determined that the assembly line is adequately staffed. In the embodiment of the present invention, P' is specifically set to 0.1. If the actual deviation value P≤0.1, it means that the assembly line is adequately staffed, and the possibility of a reduction in assembly line output is low, and there is no need to issue an alarm for insufficient staffing.

[0116] S743. If the actual deviation value is greater than the preset deviation value, it is determined that the assembly line is understaffed.

[0117] On the contrary, if the actual deviation value P is greater than the preset deviation value P', in the embodiment of the present invention, that is, P>0.1, it means that the assembly line is understaffed and there is a high possibility that the assembly line output will be reduced due to insufficient staff. Therefore, it is necessary to issue an alarm for insufficient staffing of the assembly line.

[0118] S750, obtaining an abnormal output analysis result of the assembly line according to the real-time motor speed analysis result, the actual material quantity analysis result, the production quality analysis result and the staffing analysis result, and issuing an alarm according to the abnormal output analysis result of the assembly line.

[0119] Specifically, in an embodiment of the present invention, if the assembly line output abnormality analysis result obtained based on the real-time motor speed analysis result, the actual total material amount analysis result, the production quality analysis result and the staffing analysis result is: there is an abnormality in the real-time motor speed, the actual total material amount is sufficient, there is an abnormality in the production quality and there is sufficient staffing, then an alarm of abnormality in the real-time motor speed and an alarm of abnormality in the production quality will be issued.

[0120] Furthermore, the number of times the historical production data is collected within a first preset time period before the real-time production data is at least 5.

[0121] Specifically, the first preset time period referred to in the embodiment of the present invention does not include a preset rest period of the assembly line, and in order to ensure the accuracy of the production trend analysis of the first preset time period, only when the number of collection times of historical production data within the first preset time period before the real-time production data is at least 5, the current production analysis data group is subjected to data change analysis processing to obtain the data change analysis result of the current production analysis data group, thereby avoiding the situation in which abnormal data that may be eliminated or insufficient data due to data collection failure within the first preset time period before the real-time production data, thereby resulting in insufficient data within the first preset time period, affecting the accuracy of the production trend analysis of the assembly line.

[0122] Another embodiment of the present invention provides an assembly line yield analysis system 10, which is used to implement the above-mentioned assembly line yield analysis method. Figure 7 As shown, including:

[0123] The production analysis data group acquisition module 11 is used to acquire the current production analysis data group of the assembly line in real time. The production analysis data group includes the real-time production data of the assembly line and the historical production data within a first preset time period before the real-time production data. The real-time production data and the historical production data are both acquired according to a preset sampling period;

[0124] Specifically, in the embodiment of the present invention, the acquisition device performs sampling according to a preset sampling period. Obtain production data from the assembly line in real time, and after obtaining the real-time production data, determine whether the collection time before the real-time production data reaches a first preset time If it is reached, it means that the current data volume has reached the requirement for production analysis, and the production analysis data group acquisition module 11 acquires the first preset time before the real-time production data The historical production data within the period is collected to obtain the current production analysis data group of the assembly line; if it is not reached, the preset sampling period is continued. Obtain the real-time production data of the assembly line, and wait until the collection time before the real-time production data reaches the first preset time .

[0125] The first data analysis module 12 is used to perform data change analysis processing on the current yield analysis data group to obtain the data change analysis result of the current yield analysis data group;

[0126] Specifically, in the embodiment of the present invention, the first data analysis module 12 can perform data change analysis on the current yield analysis data group by calculating the slope of the data in the current yield analysis data group to obtain the data change analysis result of the current yield analysis data group, which can reflect the change trend of the data in the current yield data analysis group.

[0127] The first judgment module 13 is used to judge whether the data change analysis result of the current production analysis data group is less than the normal data fluctuation threshold;

[0128] The data monitoring module 14 is used to monitor and obtain the production analysis data group within a second preset time period after the current production analysis data group when the data change analysis result of the current production analysis data group is less than the normal data fluctuation threshold;

[0129] Specifically, in the embodiment of the present invention, when the slope of the current yield analysis data group is less than the normal data fluctuation threshold, it means that the yield analysis data group is on a downward trend, and the yield begins to show abnormal signs, but has not yet reached the level where an abnormal alarm needs to be issued. Therefore, the data monitoring module 14 continues to monitor the current yield analysis data group for a second preset time period. Each yield analysis data group in the output analysis data group, according to the second preset time after the current yield analysis data group Each output analysis data group in the system can further determine the production status of the assembly line to avoid false alarms and affect the production process of subsequent assembly lines.

[0130] The second data analysis module 15 is used to perform data change analysis on the production analysis data group within a second preset time after the current production analysis data group, and obtain the data change analysis result of the production analysis data group within the second preset time after the current production analysis data group;

[0131] Similarly, the embodiment of the present invention can calculate the second preset time after the current production analysis data group through the second data analysis module 15 The slope of each yield analysis data group within the data set is calculated, and data change analysis processing is performed on each yield analysis data group to obtain data change analysis results for each yield analysis data group.

[0132] The second judgment module 16 is used to judge whether the data change analysis results of the production analysis data group within a second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold;

[0133] The production influencing factor data acquisition module 17 is used to acquire the production influencing factor data of the assembly line in real time when the data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold, and the production influencing factor data at least includes the real-time motor speed, the real-time material surplus, the real-time defective rate and the actual workstation output;

[0134] Specifically, in the embodiment of the present invention, if the second preset time after the current production analysis data group If the data change analysis results of each yield analysis data group in the output analysis data group are all less than the normal data fluctuation threshold, it means that the second preset time after the current yield analysis data group The production analysis data groups in the second preset time period all show a downward trend, which means that the production of the assembly line The output influencing factor data acquisition module 17 acquires the output influencing factor data of the assembly line in real time. The output influencing factor data here at least includes the real-time motor speed, the actual total material volume, the real-time defective rate and the actual workstation output.

[0135] The assembly line output abnormality analysis module 18 is used to perform assembly line output abnormality analysis based on output influencing factor data, obtain assembly line output abnormality analysis results, and issue an alarm based on the assembly line output abnormality analysis results.

[0136] Specifically, compared to directly issuing an alarm when determining that the output of an assembly line is abnormal, the assembly line output abnormality analysis module 18 in the embodiment of the present invention further analyzes the cause of the assembly line output abnormality based on the real-time motor speed, the actual total amount of material, the real-time defective rate and the actual workstation output, obtains the assembly line output abnormality analysis result, and issues an alarm based on the assembly line output abnormality analysis result, which can reduce the investigation and maintenance time, save time cost, and is beneficial to production.

[0137] In summary, the embodiment of the present invention obtains a production analysis data group to perform production analysis on the assembly line after the real-time production data of the assembly line reaches the detection amount, and continuously monitors subsequent production analysis data groups after the production analysis data group shows a downward trend. If the production analysis data group within the subsequent preset time continues to show a downward trend, a production abnormality analysis is performed and an alarm is issued. The production data of the assembly line can be effectively analyzed, i.e., an abnormal state self-detection alarm can be issued, so as to promptly discover and handle abnormal conditions.

[0138] The specific working principle and effect of the assembly line production analysis system 10 provided in the embodiment of the present invention can be referred to the description of the assembly line production analysis method above, and will not be elaborated here.

[0139] Yet another embodiment of the present invention provides a computer device, including a processor and a memory, wherein the memory is used to store computer instructions, and the computer instructions are loaded and executed by the processor to implement the above-mentioned assembly line output analysis method.

[0140] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.

Claims

1. A method for analyzing assembly line output, characterized in that: include: Acquire a current production analysis data group of the assembly line in real time, the production analysis data group comprising real-time production data of the assembly line and historical production data within a first preset time period before the real-time production data, the real-time production data and the historical production data are both acquired according to a preset sampling period; Performing data change analysis processing on the current yield analysis data group to obtain a data change analysis result of the current yield analysis data group; When the data change analysis result of the current production analysis data group is greater than or equal to the data normal fluctuation threshold, the steps of acquiring the current production analysis data group of the assembly line in real time and performing data change analysis processing on the current production analysis data group are repeated; When the data change analysis result of the current yield analysis data group is less than the normal data fluctuation threshold, monitoring and acquiring a yield analysis data group within a second preset time period after the current yield analysis data group; Performing data change analysis processing on the production analysis data group within a second preset time period after the current production analysis data group, and obtaining a data change analysis result of the production analysis data group within a second preset time period after the current production analysis data group; When the data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold, the production influencing factor data of the assembly line are obtained in real time, and the production influencing factor data at least includes the real-time motor speed, the actual total amount of materials, the real-time defective rate and the actual workstation output; Performing an abnormal production analysis of the assembly line according to the production influencing factor data, obtaining an abnormal production analysis result of the assembly line, and issuing an alarm according to the abnormal production analysis result of the assembly line; When the data change analysis result of the production analysis data group is greater than or equal to the normal data fluctuation threshold within the second preset time period after the current production analysis data group, repeat the above-mentioned steps of real-time acquisition of the current production analysis data group of the assembly line to the current step.

2. The method according to claim 1, characterized in that The performing data change analysis processing on the current yield analysis data group to obtain the data change analysis result of the current yield analysis data group includes: Performing data change analysis on the current yield analysis data group by a linear regression method to obtain the slope of the current yield analysis data group; The step of performing data change analysis on the production analysis data group within a second preset time period after the current production analysis data group to obtain the data change analysis result of the production analysis data group within a second preset time period after the current production analysis data group includes: Performing data change analysis on the yield analysis data group within a second preset time period after the current yield analysis data group by a linear regression method to obtain a slope of the yield analysis data group within a second preset time period after the current yield analysis data group; Wherein, the expression of the slope of the yield analysis data set is: ; in, Represents the production data collected for the i-th time.

3. The method according to claim 1, characterized in that The performing of an abnormal production analysis of the assembly line according to the production influencing factor data, obtaining an abnormal production analysis result of the assembly line, and issuing an alarm according to the abnormal production analysis result of the assembly line, includes: Determine whether the real-time motor speed of the assembly line is abnormal based on the real-time motor speed and the preset motor speed, and obtain a real-time motor speed analysis result; Determine whether the actual total amount of materials of the assembly line is insufficient based on the actual total amount of materials and the preset production material demand, and obtain an analysis result of the actual total amount of materials; Determine whether there is any abnormality in the production quality of the assembly line according to the real-time defective rate and the preset defective rate threshold, and obtain a production quality analysis result; Determine whether the staffing of the assembly line is insufficient based on the actual workstation output and the preset standard workstation output, and obtain a staffing analysis result; The abnormal analysis result of the assembly line output is obtained according to the real-time motor speed analysis result, the actual total material quantity analysis result, the production quality analysis result and the staffing analysis result, and an alarm is issued according to the abnormal analysis result of the assembly line output.

4. The method according to claim 3, characterized in that The determining whether the real-time motor speed of the assembly line is abnormal based on the real-time motor speed and the preset motor speed to obtain the real-time motor speed analysis result includes: comparing the real-time motor speed with a preset motor speed, and if the real-time motor speed is greater than or equal to the preset motor speed, determining that there is no abnormality in the real-time motor speed; If the real-time motor speed is less than the preset motor speed, it is determined that the real-time motor speed is abnormal.

5. The method according to claim 3, characterized in that: The determining whether the actual total amount of materials of the assembly line is insufficient based on the actual total amount of materials and the preset production material demand, and obtaining the actual total amount of materials analysis result, includes: Comparing the actual total amount of materials with the preset production material demand, if the preset production material demand is less than the actual total amount of materials, determining that the actual total amount of materials for the assembly line is sufficient; If the preset production material demand is greater than or equal to the actual total material quantity, it is determined that the actual total material quantity of the assembly line is insufficient.

6. The method according to claim 3, characterized in that The determining whether there is an abnormality in the production quality of the assembly line according to the real-time defective rate and the preset defective rate threshold, and obtaining the production quality analysis result, includes: Comparing the real-time defective rate with a preset defective rate threshold, if the real-time defective rate is less than the preset defective rate threshold, determining that there is no abnormality in the production quality of the assembly line; If the real-time defective rate is greater than or equal to a preset defective rate threshold, it is determined that there is an abnormality in the production quality of the assembly line.

7. The method according to claim 3, characterized in that The determining whether the staffing of the assembly line is insufficient based on the actual workstation output and the preset standard workstation output, and obtaining the staffing analysis result, includes: Calculate the actual deviation between the actual workstation output and the preset standard workstation output; Comparing the actual deviation value with the preset deviation value, if the actual deviation value is less than or equal to the preset deviation value, determining that the assembly line is adequately staffed; If the actual deviation value is greater than the preset deviation value, it is determined that the assembly line is understaffed.

8. The method according to claim 1, characterized in that The number of times the historical production data is collected within the first preset time period before the real-time production data is at least 5.

9. An assembly line yield analysis system, used to implement the assembly line yield analysis method according to any one of claims 1 to 8, characterized in that: include: A production analysis data group acquisition module is used to acquire the current production analysis data group of the assembly line in real time, wherein the production analysis data group includes the real-time production data of the assembly line and the historical production data within a first preset time period before the real-time production data, wherein the real-time production data and the historical production data are both acquired according to a preset sampling period; A first data analysis module is used to perform data change analysis processing on the current yield analysis data group to obtain a data change analysis result of the current yield analysis data group; A first judgment module is used to judge whether the data change analysis result of the current production analysis data group is less than the normal data fluctuation threshold; A data monitoring module, configured to monitor and obtain a production analysis data group within a second preset time period after the current production analysis data group when the data change analysis result of the current production analysis data group is less than a normal data fluctuation threshold; A second data analysis module is used to perform data change analysis on the production analysis data group within a second preset time period after the current production analysis data group, and obtain a data change analysis result of the production analysis data group within the second preset time period after the current production analysis data group; The second judgment module is used to judge whether the data change analysis results of the production analysis data group within a second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold; The production influencing factor data acquisition module is used to acquire the production influencing factor data of the assembly line in real time when the data change analysis results of the production analysis data group within the second preset time period after the current production analysis data group are all less than the normal data fluctuation threshold, and the production influencing factor data at least includes the real-time motor speed, the real-time material surplus, the real-time defective rate and the actual workstation output; The assembly line output abnormality analysis module is used to perform assembly line output abnormality analysis based on the output influencing factor data, obtain assembly line output abnormality analysis results, and issue an alarm based on the assembly line output abnormality analysis results.

10. A computer device, characterized in that: The computer device includes a processor and a memory, wherein the memory is used to store computer instructions, and the computer instructions are loaded and executed by the processor to implement the assembly line output analysis method according to any one of claims 1 to 8.

Citation Information

Patent Citations

  • Method and device for monitoring production equipment and analytical equipment

    CN108257248A

  • Battery parameter monitoring method, system and device and storage medium

    CN116413604A

  • Self-adaptive matching control system of flexible production line

    CN116661403A

  • Intelligent automatic monitoring system for centralized control operation of power plant

    CN117289659A

  • Internet of Things alarm system based on autoregressive comprehensive moving average model

    CN118487917A

Cited By

  • Electromechanical pipeline installation quality management system and method based on data analysis

    CN119761925A

  • Automatic production method and system based on physical or chemical foaming equipment

    CN121374963A

  • Kitchen garbage equipment operation monitoring method based on machine vision

    CN122505505A

  • A Machine Vision-Based Method for Monitoring the Operation of Food Waste Disposal Equipment

    CN122505505B