Material management system and method for component assembling workshop

By designing a material management system connected to the workshop MES system, the problem of poor material management during the assembly process of sending and receiving components is solved, the orderly management and accurate utilization of materials is achieved, the production costs are reduced and the material control capabilities of the component assembly workshop are improved. .

CN118886831APending Publication Date: 2024-11-01CHINA ELECTRONIC TECH GRP CORP NO 38 RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410941566.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

During the assembly process of sending and receiving components, the prior art cannot effectively manage materials, resulting in high production costs, difficult to analyze material losses, frequent interruptions in the production process, and heavy material management burden.

Method used

A material management system connected to the workshop MES system was designed, including the workshop material management module, on-site material registration module, material loss audit module, material classification summary module and material inventory analysis module. Through in-store management, out-of-store management, and loss Registration, classification review and early warning functions to achieve orderly management and accurate utilization of materials.

Benefits of technology

It effectively reduces production costs, reduces labor burden, improves material control capabilities, avoids production interruption, and meets the efficient management needs of radar equipment enterprises for component assembly workshops.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118886831A_ABST
    Figure CN118886831A_ABST
Patent Text Reader

Abstract

The invention provides a material management system and method for a component assembling workshop, and relates to the technical field of information. Aiming at the characteristics of complex assembly process, complicated material types and quantity, high value, uneven skill levels of operators, coexistence of multiple production modes and the like of the radar transceiver assembly, the system is connected with a workshop MES system, a production work order scheduling plan is firstly obtained, materials are issued in batches according to needs, and orderly management of the materials is guaranteed from the source; afterwards, the accurate utilization of the materials is ensured from the flow direction through the classified examination and processing of the material loss and repair material conditions. Meanwhile, on the basis of the utilization rule of the materials and the future production scheduling plan, early warning is carried out on the short board materials, the breakout phenomenon in the production process is effectively avoided, the labor burden is reduced, the material management and control capacity of the component assembly workshop is further improved, and the efficient management requirement of a radar complete machine equipment enterprise for the component assembly workshop is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of information technology, and in particular to a material management system and method for a component assembly workshop. Background Art

[0002] As an important electronic equipment, active phased array radar is widely involved in many fields such as meteorology, astronomy, surveying and mapping, and navigation. The transceiver component is the core component of the active phased array radar, and its cost accounts for 60-70% of the entire radar, which is directly related to the cost of radar equipment. Therefore, effective management of materials in the assembly process of the transceiver component to reduce production costs has become one of the key issues that technicians in this field need to consider.

[0003] At present, the assembly workshop of transceiver components mainly uses paper documents or electronic spreadsheets to manage materials. However, the above management method cannot grasp the material usage in time, and it is difficult to refine the reasons for material loss. The on-site operation material management is missing, the reasons for material loss are difficult to analyze, and the production cost is high; at the same time, there are many customized components in the transceiver components, and it is difficult to complete the production order materials. Usually, the front process is completed first and the rolling production method is adopted. Material management needs to match the production plan to maintain the continuity of the process production; in addition, the component assembly workshop belongs to the secondary production unit under the equipment manufacturing enterprise. The materials needed by the workshop need to be picked up in advance from the enterprise's first-level inventory, and can only be sent to the site after inventory. The burden of personnel management is heavy, and there is a lag in the collection and delivery of materials, which can easily lead to production interruptions.

[0004] In view of this, it is necessary to provide a material management system and method for a component assembly workshop. Summary of the invention

[0005] 1. Technical issues to be solved

[0006] In view of the deficiencies in the prior art, the present invention provides a material management system and method for a component assembly workshop, which solves the technical problem that materials cannot be effectively managed during the assembly process of sending and receiving components.

[0007] (II) Technical solution

[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0009] A material management system for a component assembly workshop, connected to a workshop MES system, comprising a workshop material management module, an on-site material registration module, a material loss audit module, a material classification summary module, and a material inventory analysis module;

[0010] The workshop material management module includes an inbound management module and an outbound management module; wherein the inbound management module is used to receive the material information entered by the material manager after the material manager picks up the component assembly materials from the enterprise inventory; the outbound management module is used to issue the materials determined by the material manager in batches to the corresponding operators according to the production schedule after obtaining the production schedule of the component production work order through the workshop MES system;

[0011] The on-site material registration module is used to receive the material loss information registered by the operator and transmit it to the material loss review module; wherein the material loss information includes material model specifications, loss quantity and loss reason;

[0012] The material loss review module is used to classify the material loss during use according to the loss reasons, generate a material loss approval process in combination with the information transmitted by the MES system, and send the material loss approval process to the production management personnel for review and processing;

[0013] The material classification and summary module is used to obtain material model specifications, material loss quantity and loss reasons after review through the material loss review module, and obtain material specifications, types and quantities used for normal product reporting and component repair through the workshop MES system, so as to classify and summarize material loss rules and pass them to the material inventory analysis module;

[0014] The material inventory analysis module is used to predict the material consumption in the production schedule according to the material loss law. If the workshop inventory cannot meet the plan, an alarm and / or warning is issued to remind the material management personnel and production management personnel.

[0015] Preferably, the loss causes include operating loss, equipment material discarding or incoming material problems.

[0016] Preferably, the material loss audit module is specifically used for:

[0017] S41. Classify the material loss during use according to the operation loss, equipment material discarding or incoming material problem, and obtain the loss classification result;

[0018] S42, approving the component repair process through the workshop MES system to obtain the material model, specification and quantity used for normal product reporting and component repair; and obtaining the equipment material discard rate in the component automated assembly through the workshop MES system;

[0019] S43. Based on the loss classification results, normal product reporting, material model specifications and quantity used for component repair, and equipment discard rate, generate the material loss approval process and send it to the production management personnel for review and processing.

[0020] Preferably, after the component repair process is approved by the workshop MES system, the workshop material management module is also used to:

[0021] Extract the material model specifications and quantity described in the component rework process, as well as the operator information of each process, to remind the material manager to prepare the rework materials in advance and remind the corresponding process operators to collect the rework materials in time.

[0022] Preferably, the specific process of classifying and summarizing the material loss law includes:

[0023] S51. Count the number of c types of materials from the workshop inventory of process M delivered to the site during the production scheduling time periods 1 to k:

[0024] S52. Calculate the loss of c types of materials at the site of process M during the production scheduling period from 1 to k: Operation loss and equipment throwing

[0025] S53. Calculate the average loss per unit time period of c types of materials at the site of process M during the production scheduling time period from 1 to k:

[0026] S54, calculate the number of c types of materials to be repaired in the production schedule period from 1 to k And calculate the total amount of returned materials used

[0027] S55. After calculating k production scheduling time periods, the remaining inventory quantity of c types of materials in the workshop is:

[0028]

[0029] Among them, M c The number of c types of materials already in process M before product production; The total quantity of c types of materials wasted due to incoming material problems during the production scheduling period from 1 to k; The total quantity of c types of materials that the workshop material manager successively collects from the enterprise inventory during the production scheduling period from 1 to k;

[0030] S56. Repeat S51 to S55 until all processes and all types of materials in the processes have been calculated, and the material loss pattern is obtained after classification and aggregation.

[0031] Preferably, the specific process of predicting the material consumption in the production scheduling plan includes:

[0032] S61. According to the production schedule, the total amount of c types of materials in process M is expected to be issued in the production time period from k+1 to k+N

[0033] S62. According to the production schedule, the total amount of material loss of c types in process M is expected to be in the production time period from k+1 to k+N And the total amount of repairs

[0034] Among them, a is the total production volume of components in the production scheduling time periods from 1 to k; b is the estimated total production volume of components in the production scheduling time periods from k+1 to k+N;

[0035] S63. It is estimated that the remaining inventory usage of material c in the workshop after the production scheduling period from k+1 to k+N is:

[0036]

[0037] S64, repeat S61 to S63 until all processes and all types of materials in the processes have been calculated, and finally the material consumption in the production schedule is predicted.

[0038] Preferably, if the workshop inventory cannot meet the plan, an alarm is issued; including:

[0039] If the quantity of c types of materials in process M is lower than the threshold value within the production scheduling time period from 1 to k, a material inventory alarm is issued.

[0040] Preferably, if the workshop inventory cannot meet the plan, an alarm is issued; including:

[0041] If, within the production scheduling time period 1 to k, the quantity of all materials in process M is less than the material requirement for all components transferred from the previous process to process M to complete processing within the previous J production scheduling times, a material consumption alarm is issued.

[0042] Preferably, if the workshop inventory cannot meet the plan, an early warning is issued; including

[0043] If in the future production scheduling time period from k+1 to k+N, the quantity of c types of materials in process M does not meet the material demand quantity of the total production components in N time periods, a material consumption warning is issued.

[0044] A method for a material management system for a component assembly workshop based on the above-mentioned method comprises:

[0045] S1. The workshop material manager collects the component assembly materials from the enterprise inventory and enters the material information into the workshop material management system in the warehousing management module; wherein the material information at least includes batch, wafer number and gear;

[0046] S2. The workshop material manager issues the production materials required in the production schedule to the corresponding operators in the outbound management module according to the production schedule information of the production work order;

[0047] S3. The operator checks and receives the material information, assembles the components according to the production schedule of the component production work order, and registers the loss of materials during use;

[0048] Among them, if there is a certain type of material information that does not match the actual object received, the material will be rejected in the on-site material registration module, otherwise it will be accepted;

[0049] S4. The material loss registered by the operator is classified according to the three loss reasons of operation loss, equipment material discarding and incoming material problem through the material classification summary module, and the material loss approval process is generated in combination with the information transmitted by the MES system, and the material loss approval process is sent to the production management personnel for review and processing;

[0050] S5. Analyze material usage based on production scheduling history and classify and summarize material loss patterns;

[0051] The production scheduling history at least includes the material specifications, types and quantities used for normal product reporting and component repair obtained through the workshop MES system;

[0052] S6. According to the material loss law, the material consumption in the production schedule is predicted through the material inventory analysis module. If the workshop inventory cannot meet the plan, an alarm and / or warning is issued to remind the material management personnel and production management personnel.

[0053] (III) Beneficial effects

[0054] The present invention provides a material management system and method for a component assembly workshop. Compared with the prior art, it has the following beneficial effects:

[0055] Compared with the current method of mainly using documents to manage materials, the present invention targets the complex assembly process of radar transceiver components, involving a variety of material types and quantities, high value, uneven operator skill levels, and the coexistence of multiple production modes. By connecting with the workshop MES system, the present invention first obtains the production order scheduling plan, and implements the distribution of materials in batches as needed, thereby ensuring the orderly management of materials from the source; then, by classifying, reviewing and processing the material loss and return materials, the accurate utilization of materials is guaranteed from the flow direction; at the same time, based on the material utilization rules and future production scheduling plans, by issuing early warnings for short-board materials, the phenomenon of running out of materials in the production process is effectively avoided, the labor burden is reduced, the material control capability of the component assembly workshop is further improved, and the demand for efficient management of component assembly workshops by radar complete equipment companies is met. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0057] Figure 1 A structural block diagram of a material management system for a component assembly workshop provided by an embodiment of the present invention;

[0058] Figure 2 A flow chart of material loss audit provided by an embodiment of the present invention;

[0059] Figure 3 A flow chart for classifying and summarizing material loss rules provided in an embodiment of the present invention;

[0060] Figure 4 A flowchart for predicting material consumption in a production schedule provided by an embodiment of the present invention;

[0061] Figure 5 A flow chart of a material management method for a component assembly workshop provided by an embodiment of the present invention;

[0062] Figure 6 A flow chart of another material management method for a component assembly workshop provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0063] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0064] The embodiment of the present application solves the technical problem that materials cannot be effectively managed during the assembly process of sending and receiving components by providing a material management system and method for a component assembly workshop.

[0065] The technical solution in the embodiment of the present application is to solve the above technical problems, and the overall idea is as follows:

[0066] The material management system and method for a component assembly workshop provided by the embodiment of the present invention, compared with the current method of mainly using documents to manage materials, is designed to address the complex assembly process of radar transceiver components, involving a variety of material types and quantities, high value, uneven operator skill levels, and the coexistence of multiple production modes. By connecting with the workshop MES system, the production work order scheduling plan is first obtained, and materials are issued in batches as needed, thereby ensuring orderly management of materials from the source; then, by classifying, reviewing and processing material losses and return materials, accurate utilization of materials is ensured from the flow direction; at the same time, based on the material utilization rules and future production scheduling plans, short-board materials are warned to effectively avoid the phenomenon of running out of materials in the production process, reduce the labor burden, further improve the material control capability of the component assembly workshop, and meet the needs of radar complete equipment companies for efficient management of component assembly workshops.

[0067] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0068] Embodiment 1:

[0069] like Figure 1 As shown, an embodiment of the present invention provides a material management system for a component assembly workshop, which is connected to the workshop MES system. The material management system includes a workshop material management module, an on-site material registration module, a material loss audit module, a material classification summary module and a material inventory analysis module.

[0070] The workshop material management module includes an inbound management module and an outbound management module; wherein the inbound management module is used to receive the material information entered by the material manager after the material manager picks up the component assembly materials from the enterprise inventory; the outbound management module is used to issue the materials determined by the material manager in batches to the corresponding operators according to the production schedule after obtaining the production schedule of the component production work order through the workshop MES system;

[0071] The on-site material registration module is used to receive the material loss information registered by the operator and transmit it to the material loss review module; wherein the material loss information includes material model specifications, loss quantity and loss reason;

[0072] The material loss review module is used to classify the material loss during use according to the loss reasons, generate a material loss approval process in combination with the information transmitted by the MES system, and send the material loss approval process to the production management personnel for review and processing;

[0073] The material classification and summary module is used to obtain material model specifications, material loss quantity and loss reasons after review through the material loss review module, and obtain material specifications, types and quantities used for normal product reporting and component repair through the workshop MES system, so as to classify and summarize material loss rules and pass them to the material inventory analysis module;

[0074] The material inventory analysis module is used to predict the material consumption in the production schedule according to the material loss law. If the workshop inventory cannot meet the plan, an alarm and / or warning is issued to remind the material management personnel and production management personnel.

[0075] Compared with the traditional use of paper documents or electronic spreadsheets to manage materials, the embodiments of the present invention achieve effective management of materials during the assembly process of the transceiver component.

[0076] It should be noted that the material management system provided in the embodiment of the present invention is connected to the workshop production execution system (Manufacturing Execution System, referred to as MES) system. This connection relationship is mainly for obtaining basic information such as component production work orders, production scheduling, operators, equipment and materials based on the workshop MES system. For details, please see below.

[0077] In an optional embodiment, the loss causes include operational loss, equipment material rejection or incoming material problems.

[0078] Correspondingly, such as Figure 2 As shown, at this time, the material loss audit module is specifically used for:

[0079] S41. Classify the material loss during use according to the operation loss, equipment material discarding or incoming material problem, and obtain the loss classification result;

[0080] S42, approving the component repair process through the workshop MES system to obtain the material model, specification and quantity used for normal product reporting and component repair; and obtaining the equipment material discard rate in the component automated assembly through the workshop MES system;

[0081] S43. Based on the loss classification results, normal product reporting, material model specifications and quantity used for component repair, and equipment discard rate, generate the material loss approval process and send it to the production management personnel for review and processing.

[0082] In an optional implementation, after the component repair process is approved by the workshop MES system, the workshop material management module is further used to:

[0083] Extract the material model specifications and quantity described in the component rework process, as well as the operator information of each process, to remind the material manager to prepare the rework materials in advance and remind the corresponding process operators to collect the rework materials in time.

[0084] In an optional embodiment, if Figure 3 As shown, the specific process of classifying and summarizing the material loss law includes (that is, the material classification and summary module is specifically used for):

[0085] S51. Count the number of c types of materials from the workshop inventory of process M delivered to the site during the production scheduling time periods 1 to k:

[0086] S52. Calculate the loss of c types of materials at the site of process M during the production scheduling period from 1 to k: Operation loss and equipment throwing

[0087] S53. Calculate the average loss per unit time period of c types of materials at the site of process M during the production scheduling time period from 1 to k:

[0088] S54, calculate the number of c types of materials to be repaired in the production schedule period from 1 to k And calculate the total amount of returned materials used

[0089] S55. After calculating k production scheduling time periods, the remaining inventory quantity of c types of materials in the workshop is:

[0090]

[0091] Among them, M c The number of c types of materials already in process M before product production; The total quantity of c types of materials wasted due to incoming material problems during the production scheduling period from 1 to k; The total quantity of c types of materials that the workshop material manager successively collects from the enterprise inventory during the production scheduling period from 1 to k;

[0092] S56. Repeat S51 to S55 until all processes and all types of materials in the processes have been calculated, and the material loss pattern is obtained after classification and aggregation.

[0093] In an optional embodiment, if Figure 4 As shown, the specific process of predicting the material consumption in the production scheduling plan includes (that is, the material inventory analysis module is specifically used for):

[0094] S61. According to the production schedule, the total amount of c types of materials in process M is expected to be issued in the production time period from k+1 to k+N

[0095] S62. According to the production schedule, the total amount of material loss of c types in process M is expected to be in the production time period from k+1 to k+N And the total amount of repairs

[0096] Among them, a is the total production volume of components in the production scheduling time periods from 1 to k; b is the estimated total production volume of components in the production scheduling time periods from k+1 to k+N;

[0097] S63. It is estimated that the remaining inventory usage of material c in the workshop after the production scheduling period from k+1 to k+N is:

[0098]

[0099] S64, repeat S61 to S63 until all processes and all types of materials in the processes have been calculated, and finally the material consumption in the production schedule is predicted.

[0100] In an optional implementation, if the workshop inventory cannot meet the plan, the material inventory analysis module issues an alarm; including:

[0101] If the quantity of c types of materials in process M is lower than the threshold within the production scheduling time period 1 to k, a material inventory alarm is issued;

[0102] And if within the production scheduling time period 1 to k, the quantity of all materials in process M is less than the material requirement for all components transferred from the previous process to process M to complete processing within the previous J production scheduling times, a material consumption alarm is issued.

[0103] In an optional implementation, if the workshop inventory cannot meet the plan, the material inventory analysis module issues an early warning; including

[0104] If in the future production scheduling time period from k+1 to k+N, the quantity of c types of materials in process M does not meet the material demand quantity of the total production components in N time periods, a material consumption warning is issued.

[0105] Embodiment 2:

[0106] like Figure 5 As shown, an embodiment of the present invention provides a method for a material management system for a component assembly workshop based on the method described in Embodiment 1, including:

[0107] S1. The workshop material manager collects the component assembly materials from the enterprise inventory and enters the material information into the workshop material management system in the warehousing management module; wherein the material information at least includes batch, wafer number and gear;

[0108] S2. The workshop material manager issues the production materials required in the production schedule to the corresponding operators in the outbound management module according to the production schedule information of the production work order;

[0109] S3. The operator checks and receives the material information, assembles the components according to the production schedule of the component production work order, and registers the loss of materials during use;

[0110] Among them, if there is a certain type of material information that does not match the actual object received, the material will be rejected in the on-site material registration module, otherwise it will be accepted;

[0111] S4. The material loss registered by the operator is classified according to the three loss reasons of operation loss, equipment material discarding and incoming material problem through the material classification summary module, and the material loss approval process is generated in combination with the information transmitted by the MES system, and the material loss approval process is sent to the production management personnel for review and processing;

[0112] S5. Analyze material usage based on production scheduling history and classify and summarize material loss patterns;

[0113] The production scheduling history at least includes the material specifications, types and quantities used for normal product reporting and component repair obtained through the workshop MES system;

[0114] S6. According to the material loss law, the material consumption in the production schedule is predicted through the material inventory analysis module. If the workshop inventory cannot meet the plan, an alarm and / or warning is issued to remind the material management personnel and production management personnel.

[0115] Compared with the traditional use of paper documents or electronic spreadsheets to manage materials, the embodiments of the present invention achieve effective management of materials during the assembly process of the transceiver component.

[0116] Correspondingly, such as Figure 2 As shown, the S4 includes:

[0117] S41. Classify the material loss during use according to the operation loss, equipment material discarding or incoming material problem, and obtain the loss classification result;

[0118] S42, approving the component repair process through the workshop MES system to obtain the material model, specification and quantity used for normal product reporting and component repair; and obtaining the equipment material discard rate in the component automated assembly through the workshop MES system;

[0119] S43. Based on the loss classification results, normal product reporting, material model specifications and quantity used for component repair, and equipment discard rate, generate the material loss approval process and send it to the production management personnel for review and processing.

[0120] In an optional implementation, after the component repair process is approved by the workshop MES system, the method further includes:

[0121] Extract the material model specifications and quantity described in the component rework process, as well as the operator information of each process, to remind the material manager to prepare the rework materials in advance and remind the corresponding process operators to collect the rework materials in time.

[0122] In an optional embodiment, if Figure 3 As shown, the S5 includes:

[0123] S51. Count the number of c types of materials from the workshop inventory of process M delivered to the site during the production scheduling time periods 1 to k:

[0124] S52. Calculate the loss of c types of materials at the site of process M during the production scheduling period from 1 to k: Operation loss and equipment throwing

[0125] S53. Calculate the average loss per unit time period of c types of materials at the site of process M during the production scheduling time period from 1 to k:

[0126] S54, calculate the number of c types of materials to be repaired in the production schedule period from 1 to k And calculate the total amount of returned materials used

[0127] S55. After calculating k production scheduling time periods, the remaining inventory quantity of c types of materials in the workshop is:

[0128]

[0129] Among them, M c The number of c types of materials already in process M before product production; The total quantity of c types of materials wasted due to incoming material problems during the production scheduling period from 1 to k; The total quantity of c types of materials that the workshop material manager successively collects from the enterprise inventory during the production scheduling period from 1 to k;

[0130] S56. Repeat S51 to S55 until all processes and all types of materials in the processes have been calculated, and the material loss pattern is obtained after classification and aggregation.

[0131] In an optional embodiment, if Figure 4 As shown, the S6 includes:

[0132] S61. According to the production schedule, the total amount of c types of materials in process M is expected to be issued in the production time period from k+1 to k+N

[0133] S62. According to the production schedule, the total amount of material loss of c types in process M is expected to be in the production time period from k+1 to k+N And the total amount of repairs

[0134] Among them, a is the total production volume of components in the production scheduling time periods from 1 to k; b is the estimated total production volume of components in the production scheduling time periods from k+1 to k+N;

[0135] S63. It is estimated that the remaining inventory usage of material c in the workshop after the production scheduling period from k+1 to k+N is:

[0136]

[0137] S64, repeat S61 to S63 until all processes and all types of materials in the processes have been calculated, and finally the material consumption in the production schedule is predicted.

[0138] In an optional implementation, if the workshop inventory cannot meet the plan, the S6 generates an alarm; including:

[0139] If the quantity of c types of materials in process M is lower than the threshold within the production scheduling time period 1 to k, a material inventory alarm is issued;

[0140] And if within the production scheduling time period 1 to k, the quantity of all materials in process M is less than the material requirement for all components transferred from the previous process to process M to complete processing within the previous J production scheduling times, a material consumption alarm is issued.

[0141] In an optional implementation, if the workshop inventory cannot meet the plan, an early warning is issued in S6; including

[0142] If in the future production scheduling time period from k+1 to k+N, the quantity of c types of materials in process M does not meet the material demand quantity of the total production components in N time periods, a material consumption warning is issued.

[0143] Embodiment 3:

[0144] Further, if Figure 6 As shown, the embodiment of the present invention also provides another method for a material management system for a component assembly workshop based on the embodiment 1, and sets the workshop to use a single day as the production scheduling time period, and the production planning manager formulates an X (day) + Y (day) rolling production scheduling plan, and the main implementation steps are as follows:

[0145] Step 1: The X (day) + Y (day) rolling production schedule is issued by the planning manager to the production manager;

[0146] Step 2: The production manager notifies the material manager to send the production materials to the welding process group;

[0147] Step 3: The welding process operator performs production and registers the material consumption in the system after the production is completed;

[0148] Step 4: The operator transfers the semi-finished components of the welding process to the next patch process;

[0149] Step 5: The system verifies and summarizes the material consumption of the welding process on the day;

[0150] Step 6: The system determines whether the amount of remaining material in the welding process is higher than the set threshold. If not, the system will alarm and notify relevant personnel;

[0151] Step 7: The system calculates that the total number of semi-finished components that can be transferred to the patch process in the next J (days) of the welding process is Z, and based on this, determines whether the minimum number of components that can be produced for all materials in the patch process is less than Z semi-finished components. If not, the system will alarm and notify relevant personnel;

[0152] Step 8: The system determines whether the production plan of X (days) has been completed. If not, it returns to step 3;

[0153] Step 9: Based on the material consumption of the previous X (days) of the welding process, the system summarizes the material usage rules and predicts the material consumption of the welding process in the future Y (days);

[0154] Step 10: Based on the existing materials in the workshop, the system analyzes whether the planned production quantity of components for the welding process in the next Y (days) can be supported. If so, it returns to step 2. If not, the system alarms and notifies relevant personnel.

[0155] In summary, compared with the prior art, the present invention has the following beneficial effects:

[0156] Compared with the current method of mainly using documents to manage materials, the embodiments of the present invention target the complex assembly process of radar transceiver components, involving a variety of material types and quantities, high value, uneven operator skill levels, and the coexistence of multiple production modes. By connecting with the workshop MES system, the production work order scheduling plan is first obtained, and materials are issued in batches as needed, thereby ensuring orderly management of materials from the source; then, by classifying, reviewing and processing material losses and return materials, accurate utilization of materials is guaranteed from the flow direction; at the same time, based on the material utilization rules and future production scheduling plans, short-board materials are warned to effectively avoid shortages in the production process, reduce the labor burden, further improve the material control capability of the component assembly workshop, and meet the needs of radar equipment companies for efficient management of component assembly workshops.

[0157] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0158] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A material management system for a component assembly workshop, characterized in that: Connected with the workshop MES system, the material management system includes a workshop material management module, an on-site material registration module, a material loss audit module, a material classification summary module and a material inventory analysis module; The workshop material management module includes a storage management module and a storage management module; The incoming warehouse management module is used to receive the material information entered by the material manager after he / she picks up the component assembly materials from the enterprise inventory; the outgoing warehouse management module is used to issue the materials determined by the material manager according to the production schedule to the corresponding operators in batches after obtaining the production schedule of the component production work order through the workshop MES system; The on-site material registration module is used to receive the material loss information registered by the operator and transmit it to the material loss review module; wherein the material loss information includes material model specifications, loss quantity and loss reason; The material loss review module is used to classify the material loss during use according to the loss reasons, generate a material loss approval process in combination with the information transmitted by the MES system, and send the material loss approval process to the production management personnel for review and processing; The material classification and summary module is used to obtain material model specifications, material loss quantity and loss reasons after review through the material loss review module, and obtain material specifications, types and quantities used for normal product reporting and component repair through the workshop MES system, so as to classify and summarize material loss rules and pass them to the material inventory analysis module; The material inventory analysis module is used to predict the material consumption in the production schedule according to the material loss law. If the workshop inventory cannot meet the plan, an alarm and / or warning is issued to remind the material management personnel and production management personnel.

2. The material management system according to claim 1, characterized in that: The reasons for the loss include operational loss, equipment material discard or incoming material problems.

3. The material management system according to claim 2, characterized in that: The material loss audit module is specifically used for: S41. Classify the material loss during use according to the operation loss, equipment material discarding or incoming material problem, and obtain the loss classification result; S42, reviewing the component repair process through the workshop MES system to obtain the normal product reporting and the material model, specification and quantity used for component repair; and obtaining the equipment material discard rate in the automated assembly of components through the workshop MES system; S43. Based on the loss classification results, normal product reporting, material model specifications and quantity used for component repair, and equipment discard rate, generate the material loss approval process and send it to the production management personnel for review and processing.

4. The material management system according to claim 3, characterized in that: After the component repair process is approved by the workshop MES system, the workshop material management module is also used to: Extract the material model specifications and quantity described in the component rework process, as well as the operator information of each process, to remind the material manager to prepare the rework materials in advance and remind the corresponding process operators to collect the rework materials in time.

5. The material management system according to claim 1, characterized in that: The specific process of classifying and summarizing the material loss rules; including: S51. Count the number of c types of materials from the workshop inventory of process M delivered to the site during the production scheduling time periods 1 to k: S52. Calculate the loss of c types of materials at the site of process M during the production scheduling period from 1 to k: Operation loss and equipment throwing S53. Calculate the average loss per unit time period of c types of materials at the site of process M during the production scheduling time period from 1 to k: S54, calculate the number of c types of materials to be repaired in the production schedule period from 1 to k And calculate the total amount of returned materials used S55. After calculating k production scheduling time periods, the remaining inventory quantity of c types of materials in the workshop is: Among them, M c The number of c types of materials already in process M before product production; The total quantity of c types of materials wasted due to incoming material problems during the production scheduling period from 1 to k; The total quantity of c types of materials that the workshop material manager successively collects from the enterprise inventory during the production scheduling period from 1 to k; S56. Repeat S51 to S55 until all processes and all types of materials in the processes have been calculated, and the material loss pattern is obtained after classification and aggregation.

6. The material management system according to claim 5, characterized in that: The specific process of predicting the material consumption in the production schedule includes: S61. According to the production schedule, the total amount of c types of materials in process M is expected to be issued in the production time period from k+1 to k+N S62. According to the production schedule, the total amount of material loss of c types in process M is expected to be in the production time period from k+1 to k+N And the total amount of repairs Among them, a is the total production volume of components in the production scheduling time periods from 1 to k; b is the estimated total production volume of components in the production scheduling time periods from k+1 to k+N; S63. It is estimated that the remaining inventory usage of material c in the workshop after the production scheduling period from k+1 to k+N is: S64, repeat S61 to S63 until all processes and all types of materials in the processes have been calculated, and finally the material consumption in the production schedule is predicted.

7. The material management system according to claim 6, characterized in that: If the workshop inventory cannot meet the plan, an alarm is issued; including: If the quantity of c types of materials in process M is lower than the threshold value within the production scheduling time period from 1 to k, a material inventory alarm is issued.

8. The material management system according to claim 6, characterized in that: If the workshop inventory cannot meet the plan, an alarm is issued; including: If, within the production scheduling time period 1 to k, the quantity of all materials in process M is less than the material requirement for all components transferred from the previous process to process M to complete processing within the previous J production scheduling times, a material consumption alarm is issued.

9. The material management system according to claim 6, characterized in that: If the workshop inventory cannot meet the plan, an early warning will be issued; include If in the future production scheduling time period from k+1 to k+N, the quantity of c types of materials in process M does not meet the material demand quantity of the total production components in N time periods, a material consumption warning is issued.

10. A method for a material management system for a component assembly workshop based on any one of claims 1 to 9, characterized in that: include: S1. The workshop material manager collects component assembly materials from the enterprise inventory and enters the material information into the workshop material management system in the warehouse management module; The material information at least includes batch, wafer number and gear; S2. The workshop material manager issues the production materials required in the production schedule to the corresponding operators in the outbound management module according to the production schedule information of the production work order; S3. The operator checks and receives the material information, assembles the components according to the production schedule of the component production work order, and registers the loss of materials during use; Among them, if the information of a certain type of material does not match the actual object received, the material will be rejected in the on-site material registration module, otherwise it will be accepted; S4. The material loss registered by the operator is classified according to the three loss reasons of operation loss, equipment material discarding and incoming material problem through the material classification summary module, and the material loss approval process is generated in combination with the information transmitted by the MES system, and the material loss approval process is sent to the production management personnel for review and processing; S5. Analyze material usage based on production scheduling history and classify and summarize material loss patterns; The production scheduling history at least includes the material specifications, types and quantities used for normal product reporting and component repair obtained through the workshop MES system; S6. According to the material loss law, the material consumption in the production schedule is predicted through the material inventory analysis module. If the workshop inventory cannot meet the plan, an alarm and / or warning is issued to remind the material management personnel and production management personnel.