BIM project management system
By adopting blockchain technology and hash computing in the BIM project management system, the problem of insufficient data acquisition and storage in BIM model resource management is solved, data immutability and traceability are realized, and management efficiency and security are improved ensures the comprehensive information management of construction projects.
Patent Information
- Application Number
- CN202410928705.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-01
AI Technical Summary
In the prior art, BIM model resource management has insufficient data acquisition, recording and storage, and lacks system implementations for fast query and real-time supervision.
设计一种BIM项目管理系统,结合区块链技术,通过编码方式对建筑项目的造价、质量和进度进行管理,利用数据库和区块链模块实现数据的不可篡改性和可追溯性,采用哈希计算和区块链网络确保数据的安全性和隐私性。
It realizes unified management of BIM resources, improves the collaborative work efficiency of all parties in the project, ensures data immutability and traceability, reduces storage and processing costs, and realizes comprehensive information management of construction projects.
Smart Images

Figure CN118886844A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data management and information system, and more specifically to a BIM project management system. Background Art
[0002] Building Information Modeling (BIM) is an information technology-based, data-driven and process-centric method mainly used for digital design, construction, operation, maintenance and management of buildings. Its main purpose is to transform construction projects into construction processes that can be analyzed intuitively and quantitatively. The digital construction process naturally involves different stakeholders. BIM brings together the main project participants during project design, focusing on the entire life cycle of the project. Using BIM technology for virtual design, construction, maintenance and management can bring greater economic benefits to all parties involved, significantly reduce project risks, reduce unknown factors in the project implementation process, and make management easier and more refined.
[0003] In recent years, the application of BIM technology in the engineering construction industry at home and abroad is in full swing. In the process of applying BIM technology in enterprises, a large number of BIM model resources have been established using BIM modeling software such as Revit, Catia, Bentley, Tekla, etc. These BIM model resources are an intangible knowledge productivity, but this undoubtedly poses a challenge to the management of a large number of BIM model resources. Blockchain is a distributed open classified transaction processing technology. It provides a way for information to be recorded, updated and shared by blocks to build classified transactions. This information may be process records, contracts, identities and other information described in digital form. Therefore, the application of blockchain has proposed new ideas for the management of BIM model resources. However, there are still some deficiencies in the use of blockchain technology in BIM technology for data acquisition, recording and storage. There is no relatively complete system to achieve rapid query and real-time supervision of BIM resources.
[0004] Therefore, how to realize BIM project management based on blockchain technology is an urgent problem that technical personnel in this field need to solve. Summary of the invention
[0005] In view of this, the present invention provides a BIM project management system, which combines blockchain and a building information model (BIM) project management platform, realizes the cost, quality and progress management of construction projects through coding and blockchain technology, and ensures the immutability and traceability of data.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] A BIM project management system, comprising a database, a project management module, a query module and a blockchain module;
[0008] Database, which collects and stores construction process images, coded element models and contracts, and uploads the collected data to the blockchain module;
[0009] The project management module identifies the element model of the construction process image, determines the corresponding coding element model, and generates the management code; generates the management log according to the management code, construction process image and contract, and uploads the management log to the blockchain module;
[0010] The query module receives the query code, performs query retrieval in the blockchain module according to the query code, and returns the project report.
[0011] Preferably, the coded element model includes an element model and a corresponding element code; the database is connected to the BIM platform to obtain the element model, and encodes each element model to obtain an element code, and embeds the element code into the corresponding element model to obtain the coded element model; the element code includes a material code, a position code and a progress code. The position code indicates the position of the component corresponding to the element model in the construction project; the material code indicates the material of the component corresponding to the element model in the construction project; the progress code indicates the position of the component corresponding to the element model in the progress of the construction project, that is, when the component will be installed in the construction project.
[0012] Preferably, the project management module includes a data detection unit and a log generation unit; the data detection unit matches and identifies the construction process image with the element model in the database to obtain the corresponding element code; the log generation unit generates a management code according to the element code, obtains the contract generation management constraints in the database, generates a management log according to the management code and the management constraints, and uploads it to the blockchain module.
[0013] Preferably, the data detection module matches and identifies the construction process images, detects changes in element models, records change information, and generates a new management log accordingly; element model change types include addition, deletion, and modification; change information includes change type, timestamp, and management code.
[0014] Preferably, the management code includes a quality management code, a progress management code and a cost management code, wherein the material code and the location code are combined to construct the quality management code, the material code and the progress code are combined to construct the cost management code, and the location code and the progress code are combined to construct the progress management code according to the recognition result of the construction process image; the management constraints include cost constraints, progress constraints and quality constraints; the management log includes the quality status generated according to the quality management code and quality constraints, the cost status generated according to the cost management code and cost constraints, and the progress status generated according to the progress management code and progress constraints.
[0015] Preferably, the blockchain module includes a hash calculation unit and a blockchain node; the hash calculation unit obtains the uploaded data and performs hash calculation to obtain a hash value, and transmits the hash value to the blockchain node and the database; the blockchain node stores the hash value to the blockchain network.
[0016] Preferably, when the management log of the project management module is uploaded to the chain, the management log is first hashed using SHA-256 or other data hashing algorithms suitable for blockchain, and then the hash value obtained by the hash calculation is published to the blockchain network; the blockchain network can be a private chain or a consortium chain, which can ensure the privacy and security of the data.
[0017] Preferably, the query module includes a retrieval unit and a visualization unit. The retrieval unit receives the query code, retrieves data from the blockchain network and the database according to the query code, and performs comparison and verification. The corresponding management logs, contracts and construction process images that have passed the verification generate a project report and send it to the visualization unit for display. The data on the chain is tracked and queried through blockchain technology, realizing comprehensive traceability of data in the project management process.
[0018] Preferably, during the verification process, the hash value stored in the retrieved blockchain network is compared with the hash value stored in the database to determine whether they are consistent. If they are consistent, the corresponding management log and image are returned; otherwise, no data is returned and an error is reported.
[0019] Preferably, the query code is a location code, a material code and / or a progress code.
[0020] Preferably, the project report is a report or a visual chart to facilitate user understanding and analysis.
[0021] Preferably, the visualization unit also generates project prompts based on the management log, including whether the progress is delayed, whether the quality is qualified, whether the cost is exceeded, etc.
[0022] Through the above technical solutions, it can be seen that compared with the prior art, the present invention discloses a BIM project management system, which assigns location codes, material codes and progress codes to components in the BIM model respectively, ensures the uniformity of data management, realizes data sharing and collaborative management through the blockchain network, and improves the collaborative work efficiency of all parties in the project; uses code to generate log files to record data changes, and only uploads the hash value of the log file to the chain, which ensures the immutability of the data while reducing the amount of data uploaded to the chain, and improves the storage and processing efficiency of the system; realizes comprehensive traceability of all data changes in the project management process through blockchain technology, ensures that each data change is traceable, and realizes comprehensive information management of the cost, quality and progress of the construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0024] Figure 1 A schematic diagram of the structure of the BIM project management system provided by the present invention;
[0025] Figure 2 This is a schematic diagram of the code construction provided by the present invention. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] The embodiment of the present invention discloses a BIM project management system, including a database, a project management module, a query module and a blockchain module;
[0028] Database, which collects and stores construction process images, coded element models and contracts, and uploads the collected data to the blockchain module;
[0029] The project management module identifies the element model of the construction process image, determines the corresponding coding element model, and generates the management code; generates the management log according to the management code, construction process image and contract, and uploads the management log to the blockchain module;
[0030] The query module receives the query code, performs query retrieval in the blockchain module according to the query code, and returns the project report.
[0031] Furthermore, the coded element model includes an element model and a corresponding element code; the database is connected to the BIM platform to obtain the element model, and encodes each element model to obtain an element code, and embeds the element code into the corresponding element model to obtain the coded element model; the element code includes a material code, a position code and a progress code. The position code indicates the position of the component corresponding to the element model in the construction project; the material code indicates the material of the component corresponding to the element model in the construction project; the progress code indicates the position of the component corresponding to the element model in the progress of the construction project, that is, when the component will be installed in the construction project.
[0032] Furthermore, the project management module includes a data detection unit and a log generation unit; the data detection unit matches and identifies the construction process image with the element model in the database to obtain the corresponding element code; the log generation unit generates a management code according to the element code, obtains the contract generation management constraints in the database, generates a management log according to the management code and management constraints, and uploads it to the blockchain module.
[0033] Furthermore, the data detection module matches and identifies the construction process images, detects changes in element models, records change information, and generates new management logs accordingly; element model change types include addition, deletion, and modification; change information includes change type, timestamp, and management code.
[0034] Furthermore, the management code includes a quality management code, a progress management code and a cost management code, wherein the material code and the location code are combined to construct the quality management code according to the recognition result of the construction process image, the material code and the progress code are combined to construct the cost management code, and the location code and the progress code are combined to construct the progress management code; the management constraints include cost constraints, progress constraints and quality constraints; the management log includes the quality status generated according to the quality management code and quality constraints, the cost status generated according to the cost management code and cost constraints, and the progress status generated according to the progress management code and progress constraints.
[0035] Furthermore, the blockchain module includes a hash calculation unit and a blockchain node; the hash calculation unit obtains the uploaded data and performs hash calculation to obtain a hash value, and transmits the hash value to the blockchain node and the database; the blockchain node stores the hash value to the blockchain network.
[0036] Furthermore, when the management log of the project management module is uploaded to the chain, the management log is first hashed using SHA-256 or other data hashing algorithms suitable for blockchain, and then the hash value obtained by the hash calculation is published to the blockchain network; the blockchain network can be a private chain or a consortium chain, which can ensure the privacy and security of the data.
[0037] Furthermore, the query module includes a retrieval unit and a visualization unit. The retrieval unit receives the query code, retrieves data from the blockchain network and the database according to the query code, and performs comparative verification. The project report generated by the corresponding management log, contract and construction process image that pass the verification is sent to the visualization unit for display.
[0038] Furthermore, during the verification process, the hash value stored in the retrieved blockchain network is compared with the hash value stored in the database to determine whether it has been tampered with. If it has not been tampered with, the corresponding management log and image are returned, otherwise no data is returned and an error is reported.
[0039] Furthermore, the query code is a location code, a material code and / or a progress code.
[0040] Furthermore, the project report is a report or a visual chart to facilitate user understanding and analysis.
[0041] Furthermore, the visualization unit also generates project prompts based on the management log, including whether the progress is delayed, whether the quality is qualified, whether the cost is exceeded, etc.
[0042] Example
[0043] In a specific embodiment, a construction project of a commercial building includes architectural design, structural frame, mechanical system, electrical and plumbing infrastructure, curtain wall configuration and interior layout, wherein the curtain wall is a type of construction of the commercial building, and a curtain wall model is constructed in the BIM platform. The system in this embodiment is linked to the BIM platform, and the curtain wall model is encoded according to material, location and installation schedule, and a material code, a location code and a progress code are obtained respectively; wherein the material code consists of two letters and three numbers, the first two letters represent the first two letters of the material name, providing a quick reference to its type, and the following three numbers correspond to a serial number consistent with the enterprise's internal classification table, which helps to effectively identify and classify materials during the organization's inventory and operation, for example, AL001; the location code is used to accurately Identifies the assembly point of parts within the construction site. It includes information about the direction (north, south, east, west), specific floor levels, and designated areas within that floor. For example, a code like "North_3F_A" means that the part will be assembled on the third floor of Area A facing north. The code provides the construction team with clear, concise, and easy-to-understand location instructions, simplifying the assembly process. The progress code is to indicate the specific start date when the panel needs to be assembled on the construction site, following a detailed format. For example, the code "12012024001" means: "1201" means January 12, "2024" means the year, and the last segment "001" means the panel is numbered 001, which effectively organizes the assembly schedule and ensures that each panel is accurately tracked and assembled on its designated date.
[0044] In the project management module of the system, the code corresponding to the curtain wall model is obtained. After identifying the real-time collected images of the construction site, the currently installed curtain wall information is identified and represented by a code. The quality management code, cost management code and progress management code are obtained by combining the material code, location code and progress code respectively; among them, the location code is combined with the progress code to effectively create the progress management code. The composite code will include the precise location on the construction site (such as a specific floor and area) and the exact date of assembly. For example, a combination code such as "North_3F_A_12012024001" will indicate that the panel should be assembled on the third floor on the north side of Area A on January 12, 2024, and is identified as panel number 001. This integrated coding method simplifies the entire process and ensures clarity and efficiency in the scheduling and placement of curtain wall panels; combining the material code with the progress code allows the cost management code to be strategically formulated, through its unique Codes are used to identify specific materials and associate them with specific timelines. For example, a cost management code such as "AL123_12012024001" will indicate an "AL" material with serial number "123" scheduled to be paid or delivered on January 12, 2024. As a "001" element, this combination code improves the accuracy and efficiency of tracking costs and managing the financial aspects of the construction process; quality management codes are designed by combining material codes and location codes. This combination code uniquely identifies each element based on its material type and specific location in the construction site. For example, "GL456_East_2F_B" means that the material coded as "GL456" is assembled on the second floor of Area B facing east. This combination code simplifies the process of tracking and maintaining quality standards, and can also quickly select appropriate substitutes to replace any defective or damaged elements, ensuring quality management in construction based on the assembly quality of the elements and the intrinsic quality of the materials. The above management code is used to record the images obtained by the inspection and generate a management log to record the real-time status of the construction project and save it synchronously to the blockchain network.
[0045] Enter the query code in the system's query module to query relevant management logs and images from the blockchain network, generate a project report, and display it in the form of a chart for easy query and analysis, so as to grasp the status of the construction project in real time and view real-life images.
[0046] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0047] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A BIM project management system, characterized in that: Including database, project management module, query module and blockchain module; The database collects and stores construction process images, coded element models and contracts, and uploads the collected data to the blockchain module; The project management module performs element model recognition on the construction process image, determines the corresponding coding element model, and generates a management code; Generate a management log according to the management code, the construction process image and the contract, and upload the management log to the blockchain module; The query module receives the query code, performs query retrieval in the blockchain module according to the query code, and returns a project report.
2. A BIM project management system according to claim 1, characterized in that: The coded element model includes an element model and a corresponding element code; the database is connected to the BIM platform to obtain the element model, and encodes each element model to obtain the element code, and embeds the element code into the corresponding element model to obtain the coded element model; the element code includes a material code, a location code and a progress code.
3. A BIM project management system according to claim 2, characterized in that: The project management module includes a data detection unit and a log generation unit; the data detection unit matches and identifies the construction process image with the element model in the database to obtain the corresponding element code; The log generation unit generates the management code according to the element code, obtains the contract generation management constraints in the database, generates the management log according to the management code and the management constraints, and uploads it to the blockchain module.
4. A BIM project management system according to claim 3, characterized in that: The data detection module matches and identifies the construction process image, detects changes in the element model, records change information, and generates a new management log accordingly; element model change types include addition, deletion and modification; change information includes change type, timestamp and management code.
5. A BIM project management system according to claim 3, characterized in that: The management code includes a quality management code, a progress management code and a cost management code, wherein the material code and the location code are combined to construct the quality management code, the material code and the progress code are combined to construct the cost management code, and the location code and the progress code are combined to construct the progress management code according to the recognition result of the construction process image; the management constraints include cost constraints, progress constraints and quality constraints; the management log includes the quality status generated according to the quality management code and the quality constraints, the cost status generated according to the cost management code and the cost constraints, and the progress status generated according to the progress management code and the progress constraints.
6. A BIM project management system according to claim 1, characterized in that: The blockchain module includes a hash calculation unit and a blockchain node; the hash calculation unit obtains the uploaded data and performs hash calculation to obtain a hash value, and transmits the hash value to the blockchain node and the database; The blockchain node stores the hash value in the blockchain network.
7. A BIM project management system according to claim 6, characterized in that: The query module includes a retrieval unit and a visualization unit. The retrieval unit receives the query code, retrieves data from the blockchain network and the database according to the query code, and performs comparative verification. The project report generated by the verified corresponding management log, the contract, and the construction process image is sent to the visualization unit for display.
8. A BIM project management system according to claim 2, characterized in that: The query code is a location code, a material code and / or a progress code.
9. A BIM project management system according to claim 1, characterized in that: The visualization unit also generates project prompts based on the management log, including whether the progress is delayed, whether the quality is qualified, and whether the cost is exceeded.
Citation Information
Cited By
Building intelligent actual measurement and quantity management method and system
CN120198255A
Construction whole process quality tracing method and system based on BIM and block chain
CN121981402A