Relay protection and phase control cooperation method and system for improving insufficient breaking capacity of circuit breaker
By installing phase control devices and relay protection devices in the substation, the circuit breaker is controlled to perform a delayed interruption before the zero crossing point, which solves the problem of insufficient circuit breaker breaking capacity and improves the reliability and safety of the power system.
Patent Information
- Application Number
- CN202410940855.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-01
AI Technical Summary
Insufficient breaking capacity of circuit breakers in power systems leads to excessive short-circuit current. Replacing circuit breakers with existing technology is costly and it is difficult to select the appropriate model. In extremely rare cases, this may cause equipment damage.
A method for coordinating relay protection and phase-controlled interruption to improve the insufficient breaking capacity of circuit breakers is adopted. By installing phase-controlled devices and relay protection devices in the substation, two circuit breakers in the same arcing section are coordinated to perform delayed interruption before the zero crossing point, ensuring that the short-circuit current is interrupted simultaneously.
It effectively reduces the probability of a single circuit breaker experiencing a full short-circuit current flow due to sequential circuit breaker interruption, thus avoiding equipment damage, reducing costs, and improving system reliability and safety.
Smart Images

Figure HDA0004944050740000011 
Figure HDA0004944050740000021 
Figure HDA0004944050740000022
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of short-circuit fault current interruption of high-voltage AC circuit breakers, and in particular to a relay protection and phase control coordination method and system for improving insufficient interrupting capacity of circuit breakers. Background Art
[0002] With the increasing expansion of the power grid, the short-circuit current level in the power system has increased dramatically. In addition, the further improvement of the main grid structure of some power grids and the access of new loads and power sources have also brought huge challenges to the protection of the power system. The circuit breaker interrupting capacity of some substations can no longer meet the system requirements. In order to ensure the safe and stable operation of the power system, how to avoid the harm caused by excessive short-circuit current has become an important issue that needs to be solved in the development of modern power systems.
[0003] Replacing the circuit breaker with insufficient interrupting capacity in the substation to solve the problem of excessive short-circuit current is a direct solution, but this will not only increase the construction cost, but also the workload is huge. Due to the limitations of the existing technical level, there may be no suitable circuit breakers to choose from. Conventional technical means to limit short-circuit current mainly include busbar segmented operation, installation of current limiting devices, installation of small reactors, system layering and partitioning, etc., but these methods are subject to certain limitations in terms of cost, technology, reliability, etc. However, under the grid structure of some substations, when a short-circuit fault occurs at the outgoing line, the four circuit breakers on the side and the opposite side that need to be disconnected will be disconnected in the same half-wave under a high probability. Due to the shunting effect of multiple circuits, even if the interrupting capacity of the circuit breaker is less than the maximum short-circuit current, it can withstand the short-circuit current after shunting, so it is not necessary to replace the circuit breaker with insufficient interrupting capacity.
[0004] However, considering the different opening and closing orders of the circuit breakers on this side and the opposite side, it may cause the short-circuit current to flow through the last circuit breaker to be opened. This extremely rare event may cause serious consequences if it occurs. Even if the four circuit breakers cannot be opened at the same time, as long as the circuit breakers on the same side can be opened at the same time, the short-circuit current flowing through the circuit breakers will not exceed their rated interrupting capacity. Therefore, a simple and low-cost method is urgently needed to avoid the occurrence of the above extremely rare events. Summary of the invention
[0005] In view of this, the present invention provides a method and system for improving the relay protection and phase control coordination of insufficient circuit breaker breaking capacity, so as to solve the problems of excessive short-circuit current in the system and insufficient circuit breaker breaking capacity, so that two circuit breakers on the same substation side can break the short-circuit current in the same arcing interval, further reducing the probability of the short-circuit current flowing through one of the circuit breakers due to the two circuit breakers breaking in succession, avoiding damage to equipment in the station, and eliminating the need to replace circuit breakers with insufficient breaking capacity, thereby reducing costs and increasing the reliability and safety of system operation.
[0006] In order to solve the above problems, the present invention provides a method for coordinating relay protection and phase-controlled breaking for improving the insufficient interrupting capacity of a substation circuit breaker. The technical solution is as follows: A relay protection and phase-controlled breaking coordination system for improving insufficient interrupting capacity of a circuit breaker is applicable to a substation adopting a 3 / 2 wiring mode. The substation comprises two busbars and M complete 3 / 2 wiring strings. Each wiring string comprises three circuit breakers between the two busbars and two outgoing lines between two adjacent circuit breakers. Each wiring string is equipped with a relay protection device, which is used to monitor outgoing line faults and control the breaking of each circuit breaker on the corresponding wiring string. The system comprises: a relay protection device, a phase-controlled device and a target circuit breaker, wherein: Definition Satisfies I CB kmax The circuit breaker with insufficient breaking capacity is the circuit breaker with insufficient breaking capacity, and the wiring string where the circuit breaker with insufficient breaking capacity is located is the target string, I CB is the interrupting capacity of the circuit breaker, I kmax is the maximum short-circuit current of the system, N is the number of target strings, the circuit breaker located on the target string is defined as the target circuit breaker, and each of the 3N target circuit breakers is configured to be connected to a phase-controlled device; the three phase-controlled devices of the three circuit breakers on the same target string are connected to the relay protection device corresponding to the target string; a connection signal connection relationship is established between the phase-controlled device corresponding to the circuit breaker with insufficient breaking capacity and the phase-controlled device corresponding to the adjacent circuit breaker.
[0007] Preferably, the relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the phase control device corresponding to the circuit breakers adjacent to the outgoing line where the fault point is located; The circuit breakers adjacent to the outgoing line at the fault point include side circuit breaker a and middle circuit breaker b, where: The phase control device k of the side circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Connected: If the phase control device kb The predicted zero-crossing time information t a Transmitted to the phase control device k b If the phase control device k b If there is no connection between them, then according to t a Calculate the delay time t da , and after receiving the delayed action signal, according to the delay time t da Sending a disconnection signal to the edge circuit breaker a and simultaneously sending a delayed action response signal to the relay protection device; The phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is first performed. The zero-crossing time information of the edge circuit breaker a is received within time t1. a After that, the predicted zero-crossing time information t b , is transmitted back to the phase control device k a , then according to max(t a ,t b ) Calculate the delay time t d-ba , and after receiving the delayed action signal, according to the delay time t d-ba Send a disconnection signal to the side circuit breaker b and send a delayed action response signal to the relay protection device at the same time, max(t a ,t b ) represents the latest zero-crossing time; if the phase control device k is not received within t1 time a The zero-crossing time information sent a , then according to t b Calculate the delay time t db , and after receiving the delayed action signal, according to the delay time t db Sending a disconnection signal to the side circuit breaker b and simultaneously sending a delayed action response signal to the relay protection device; The phase control device k of the edge circuit breaker a a , receiving the zero-crossing time information of the intermediate circuit breaker within t2 b After that, according to max(t a ,t b ) Calculate the delay time t d-ab , and after receiving the delayed action signal, according to the delay time t d-ab Send a disconnection signal to the edge circuit breaker a and send a delayed action response signal to the relay protection device; if the phase control device k is not received within t2, b The zero-crossing time information sent b , then according to t aCalculate the delay time t da , and after receiving the delayed action signal, when the delay time t is reached da Sending a disconnection signal to the side circuit breaker a and a delayed action response signal to the relay protection device at the same time; The relay protection device receives a signal from the phase control device k within t3 after the delayed action signal is sent. a and the phase control device k b After the response, detect whether the side circuit breaker a and the middle circuit breaker b are all successfully disconnected. If all are successfully disconnected, the relay protection device will no longer operate; if all are not successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action; The relay protection device does not receive a signal from the phase control device k within t3 after the delayed action signal is sent. a and the phase control device k b In response, the relay protection device performs a breaking action on the side circuit breaker a and the middle circuit breaker b.
[0008] Preferably, the delay time is calculated by subtracting the inherent opening time of the circuit breaker, the optimal arcing time and a margin, and the action time of the relay protection from the zero crossing point; the side circuit breaker a and the middle circuit breaker b will both interrupt the short-circuit current at the target zero crossing point after their respective inherent opening time and optimal arcing time.
[0009] Preferably, the method by which the relay protection device detects whether the side circuit breaker a and the middle circuit breaker b are successfully disconnected at the same time is to detect whether there is still a short-circuit current in the line. If there is still a short-circuit current, the circuit breaker a and the middle circuit breaker b are not successfully disconnected at the same time.
[0010] A method for improving relay protection and phase-controlled breaking coordination of circuit breaker with insufficient interrupting capacity, characterized in that the implementation subject is the aforementioned relay protection and phase-controlled breaking coordination system for improving insufficient interrupting capacity of circuit breaker, and the steps include: Step S1, determine the target string according to the substation topology structure, install a phase control device for each circuit breaker on the target string, and connect the three phase control devices of the three circuit breakers on the same target string to the relay protection device corresponding to the target string; establish a connection signal connection relationship between the phase control device corresponding to the circuit breaker with insufficient interrupting capacity and the phase control device corresponding to the adjacent circuit breaker; wherein, the definition satisfies I CB kmax The circuit breaker with insufficient breaking capacity is the circuit breaker with insufficient breaking capacity, and the wiring string where the circuit breaker with insufficient breaking capacity is located is the target string, I CB is the interrupting capacity of the circuit breaker, I kmax is the maximum short-circuit current of the system, and N is the number of target strings; Step S2, when an outgoing line fault occurs, the relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the circuit breakers adjacent to the outgoing line where the fault point is located; Step S3, when an outgoing line fault occurs, the two phase-controlled devices corresponding to the circuit breakers adjacent to each other on both sides of the outgoing line where the fault point is located both detect that an outgoing line fault occurs at their respective locations. If there is a signal connection relationship between the two phase-controlled devices, the two phase-controlled devices firstly perform zero-crossing prediction respectively, then transmit zero-crossing time information to each other, and then select the latest zero-crossing time as a parameter to calculate the delay time of the corresponding circuit breaker; if there is no signal connection relationship between the two phase-controlled devices, the delay time of the corresponding circuit breaker is calculated according to the respective zero-crossing time prediction information; Step S4, after the two phase-controlled devices receive the delayed action signal, when the delay time of the corresponding circuit breakers is reached, they send a disconnection signal to the corresponding circuit breaker and send a delayed action response signal to the relay protection device at the same time; Step S5, within the time t3 after the delayed action signal is sent, after the relay protection device receives the delayed action response signal from the two phase-controlled devices, it detects whether all the adjacent circuit breakers on both sides of the outgoing line where the fault point is located are successfully disconnected; if all are successfully disconnected, the relay protection device will no longer operate; if not all are successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action.
[0011] Preferably, the circuit breakers adjacent to the outgoing line at the fault point include a side circuit breaker a and a middle circuit breaker b. When there is a signal connection relationship between the two circuit breakers, step S3 includes: Step S31: the phase control device k of the edge circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Connected: If the phase control device k b The predicted zero-crossing time information t a Transmitted to the phase control device k b ; Step S32: the phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is first performed. The zero-crossing time information of the edge circuit breaker a is received within time t1. a After that, the predicted zero-crossing time information t b , is transmitted back to the phase control device k a, then according to max(t a ,t b ) Calculate the delay time t d-ba As the delay time of the intermediate circuit breaker b; Step S33: the phase control device k of the edge circuit breaker a a The zero-crossing time information t of the intermediate circuit breaker is received within t2 b After that, according to max(t a ,t b ) Calculate the delay time t d-ab As the delay time of the edge circuit breaker a; Step S34: the phase control device k of the edge circuit breaker a a , the phase control device k is not received within t2 b The zero-crossing time information sent b , then according to t a Calculate the delay time t da As the delay time of the edge circuit breaker a.
[0012] When there is no signal connection relationship between the two circuit breakers, the step S3 includes: Step S35, the phase control device k of the edge circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Connected: If the phase control device k b If there is no connection between them, then according to t a Calculate the delay time t da As the delay time of the edge circuit breaker a; Step S36, the phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is first performed. If the phase control device k is not received within t1 time a The zero-crossing time information sent a , then according to t b Calculate the delay time t db As the delay time of the intermediate circuit breaker b.
[0013] Preferably, after step S5, the method further includes: Step S6: the relay protection device does not receive any signal from the phase control device k within t3 after the delayed action signal is sent. a and the phase control device k b In response, the relay protection device performs a breaking action on the side circuit breaker a and the middle circuit breaker b.
[0014] Preferably, the delay time is calculated by subtracting the inherent opening time of the circuit breaker, the optimal arcing time and a margin, and the action time of the relay protection from the zero crossing point; the side circuit breaker a and the middle circuit breaker b will both interrupt the short-circuit current at the target zero crossing point after their respective inherent opening time and optimal arcing time.
[0015] Preferably, the method by which the relay protection device detects whether the side circuit breaker a and the middle circuit breaker b are successfully disconnected at the same time is to detect whether there is still a short-circuit current in the line. If there is still a short-circuit current, the circuit breaker a and the middle circuit breaker b are not successfully disconnected at the same time.
[0016] It can be seen from the above technical scheme that the relay protection and phase control coordination method and system for improving the insufficient interrupting capacity of the circuit breaker provided by the embodiment of the present invention first determine the target string according to the substation topology structure, and install a phase control device for each circuit breaker on the target string; establish a connection signal connection relationship between the phase control device corresponding to the circuit breaker with insufficient interrupting capacity and the phase control device corresponding to the adjacent circuit breaker; when an outgoing line fault occurs, the relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the two sides of the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the circuit breakers adjacent to the two sides of the outgoing line where the fault point is located; the two phase control devices corresponding to the circuit breakers adjacent to the two sides of the outgoing line where the fault point is located both detect that an outgoing line fault has occurred at their location, and if there is a signal between the two phase control devices connection relationship, the two phase-controlled devices first perform zero-crossing prediction respectively, then transmit zero-crossing time information to each other, and then select the latest zero-crossing time as a parameter to calculate the delay time of the corresponding circuit breaker; after the two phase-controlled devices receive the delayed action signal, when the delay time of the corresponding circuit breaker arrives, they send a disconnection signal to the corresponding circuit breaker and send a delayed action response signal to the relay protection device at the same time; within t3 time after the delayed action signal is sent, after the relay protection device receives the delayed action response signals from the two phase-controlled devices, it detects whether the adjacent circuit breakers on both sides of the outgoing line where the fault point is located are all successfully disconnected; if all are successfully disconnected, the relay protection device will no longer operate; if not all are successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action. The present invention can effectively improve the problem of insufficient interrupting capacity of the circuit breaker in the substation, so that two circuit breakers on the same substation side can interrupt the short-circuit current at the same time, further reducing the probability of the short-circuit current flowing through one of the circuit breakers due to the two circuit breakers being opened one after another, avoiding damage to the equipment in the station, and eliminating the need to replace the circuit breaker with insufficient interrupting capacity, thereby reducing costs and increasing the reliability, safety and flexibility of system operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0018] Figure 1 The present invention is a flow chart of the relay protection and phase control coordination method for improving the insufficient interrupting capacity of the circuit breaker.
[0019] Figure 2 It is a schematic diagram of the 3 / 2 wiring mode of the substation of the present invention.
[0020] Figure 3 It is a schematic diagram of the timing control of the coordination of relay protection and phase-controlled breaking of the present invention.
[0021] Figure 4 It is a schematic diagram of the breaking of a circuit breaker in a substation system according to a specific embodiment of the present invention.
[0022] Figure 5 It is a connection diagram of a relay protection device and a phase control device of a substation according to a specific embodiment of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] The technical scheme and technical effects of the present invention are further elaborated in detail below in conjunction with the accompanying drawings of the present invention.
[0025] The present invention provides a method and system for improving the insufficient interrupting capacity of a circuit breaker by using a relay protection and phase control coordination method. Based on the existing in-station equipment, the method uses relay protection and phase control breaking coordination to enable two circuit breakers on the same substation side to break short-circuit current in the same arcing interval, further reducing the probability of a short-circuit current flowing through one circuit breaker due to the successive breaking of two circuit breakers. Figure 2 and Figure 5The relay protection and phase-controlled breaking coordination system for improving the insufficient interrupting capacity of the circuit breaker provided by the present invention is applicable to a substation adopting a 3 / 2 wiring mode. The substation includes two busbars, M complete 3 / 2 wiring strings, each wiring string includes three circuit breakers between the two busbars and two outgoing lines between two adjacent circuit breakers, and each wiring string is equipped with a relay protection device, which is used to monitor outgoing line faults and control the breaking of each circuit breaker on the corresponding wiring string; the system includes: a relay protection device, a phase-controlled device and a target circuit breaker, wherein: Definition Satisfies I CB kmax The circuit breaker with insufficient breaking capacity is the circuit breaker with insufficient breaking capacity, and the wiring string where the circuit breaker with insufficient breaking capacity is located is the target string, I CB is the interrupting capacity of the circuit breaker, I kmax is the maximum short-circuit current of the system, N is the number of target strings, the circuit breaker located on the target string is defined as the target circuit breaker, and each of the 3N target circuit breakers is configured to be connected to a phase-controlled device; the three phase-controlled devices of the three circuit breakers on the same target string are connected to the relay protection device corresponding to the target string; a connection signal connection relationship is established between the phase-controlled device corresponding to the circuit breaker with insufficient breaking capacity and the phase-controlled device corresponding to the adjacent circuit breaker.
[0026] The relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the phase control device corresponding to the circuit breakers adjacent to the outgoing line where the fault point is located; The circuit breakers adjacent to the outgoing line at the fault point include side circuit breaker a and middle circuit breaker b, where: Phase control device k of side circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Phase connection: If the phase control device k b The predicted zero-crossing time information t a Transmit to the phase control device k b ; If the phase control device k b If there is no connection between them, then according to t a Calculate the delay time t da , and after receiving the delayed action signal, according to the delay time t da Send a disconnection signal to the side circuit breaker a and send a delayed action response signal to the relay protection device at the same time; Phase control device k of intermediate circuit breaker b b , a line fault is detected at the location, and the zero-crossing point prediction is performed first. The zero-crossing point information of the edge circuit breaker a is received within time t1.a After that, the predicted zero-crossing time information t b , is transmitted back to the phase control device k a , then according to max(t a ,t b ) Calculate the delay time t d-ba , and after receiving the delayed action signal, according to the delay time t d-ba Send a disconnection signal to the side circuit breaker b and send a delayed action response signal to the relay protection device at the same time, max(t a ,t b ) represents the latest zero-crossing time; if the phase control device k is not received within t1 time a The zero-crossing time information sent a , then according to t b Calculate the delay time t db , and after receiving the delayed action signal, according to the delay time t db Send a disconnection signal to the side circuit breaker b and send a delayed action response signal to the relay protection device at the same time; Phase control device k of side circuit breaker a a , receiving the zero-crossing time information of the intermediate circuit breaker within t2 b After that, according to max(t a ,t b ) Calculate the delay time t d-ab , and after receiving the delayed action signal, according to the delay time t d-ab Send a disconnect signal to the side circuit breaker a and send a delayed action response signal to the relay protection device at the same time; if no signal is received from the phase control device k within t2 b The zero-crossing time information sent b , then according to t a Calculate the delay time t da , and after receiving the delayed action signal, when the delay time t is reached da At the same time, it sends a disconnection signal to the side circuit breaker a and a delayed action response signal to the relay protection device; The relay protection device receives the signal from the phase control device k within t3 after the delayed action signal is sent. a and phase control device k b After the response, it is detected whether the side circuit breaker a and the middle circuit breaker b are all successfully disconnected. If all are successfully disconnected, the relay protection device will no longer operate; if not all are successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action; The relay protection device does not receive the signal from the phase control device k within t3 after the delayed action signal is sent. a and phase control device k bIf the relay protection device responds, it will perform the breaking action on the side circuit breaker a and the middle circuit breaker b.
[0027] The delay time is calculated by subtracting the inherent opening time of the circuit breaker, the optimal arcing time and a margin, as well as the action time of the relay protection from the zero crossing point; both the side circuit breaker a and the middle circuit breaker b will interrupt the short-circuit current at the target zero crossing point after their respective inherent opening time and optimal arcing time.
[0028] The method by which the relay protection device detects whether the side circuit breaker a and the middle circuit breaker b are successfully disconnected at the same time is to detect whether there is still a short-circuit current in the line. If there is still a short-circuit current, the circuit breaker cannot be disconnected successfully at the same time.
[0029] refer to Figure 1 The present invention provides a method for improving the relay protection and phase-controlled breaking coordination of the circuit breaker with insufficient interrupting capacity. The implementation subject is the aforementioned relay protection and phase-controlled breaking coordination system for improving the circuit breaker with insufficient interrupting capacity. The steps include: Step S1, determine the target string according to the substation topology structure, install a phase control device for each circuit breaker on the target string, and connect the three phase control devices of the three circuit breakers on the same target string to the relay protection device corresponding to the target string; establish a connection signal connection relationship between the phase control device corresponding to the circuit breaker with insufficient interrupting capacity and the phase control device corresponding to the adjacent circuit breaker; wherein, the definition satisfies I CB kmax The circuit breaker with insufficient breaking capacity is the circuit breaker with insufficient breaking capacity, and the wiring string where the circuit breaker with insufficient breaking capacity is located is the target string, I CB is the interrupting capacity of the circuit breaker, I kmax is the maximum short-circuit current of the system, and N is the number of target strings; At the same time, the action characteristic information of the substation protection device and all circuit breakers on the target string is also determined, including: substation protection device model; protection device action time; all circuit breaker models on the target string; inherent opening time of all circuit breakers on the target string; Step S2, when an outgoing line fault occurs, the relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the circuit breakers adjacent to the outgoing line where the fault point is located; Step S3, when an outgoing line fault occurs, the two phase-controlled devices corresponding to the circuit breakers adjacent to each other on both sides of the outgoing line where the fault point is located both detect that an outgoing line fault occurs at their respective locations. If there is a signal connection relationship between the two phase-controlled devices, the two phase-controlled devices firstly perform zero-crossing prediction respectively, then transmit zero-crossing time information to each other, and then select the latest zero-crossing time as a parameter to calculate the delay time of the corresponding circuit breaker; if there is no signal connection relationship between the two phase-controlled devices, the delay time of the corresponding circuit breaker is calculated according to the respective zero-crossing time prediction information; Step S4, after the two phase-controlled devices receive the delayed action signal, when the delay time of the corresponding circuit breaker is reached, they send a disconnection signal to the corresponding circuit breaker and send a delayed action response signal to the relay protection device at the same time; Step S5, within the time t3 after the delayed action signal is sent, after the relay protection device receives the delayed action response signals from the two phase-controlled devices, it detects whether all the adjacent circuit breakers on both sides of the outgoing line where the fault point is located have been successfully disconnected; if all have been successfully disconnected, the relay protection device will no longer operate; if not all have been successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action.
[0030] As an optional implementation manner, the circuit breakers adjacent to the outgoing line at the fault point include a side circuit breaker a and a middle circuit breaker b. When there is a signal connection relationship between the two circuit breakers, step S3 includes: Step S31: the phase control device k of the side circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Phase connection: If the phase control device k b The predicted zero-crossing time information t a Transmit to the phase control device k b ; Step S32: the phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and the zero-crossing point prediction is performed first. The zero-crossing point information of the edge circuit breaker a is received within time t1. a After that, the predicted zero-crossing time information t b , is transmitted back to the phase control device k a , then according to max(t a ,t b ) Calculate the delay time t d-ba As the delay time of the middle circuit breaker b; Step S33: the phase control device k of the side circuit breaker a a Receive the zero-crossing time information of the intermediate circuit breaker within t2 bAfter that, according to max(t a ,t b ) Calculate the delay time t d-ab As the delay time of edge circuit breaker a; Step S34: the phase control device k of the side circuit breaker a a , the phase control device k is not received within t2 b The zero-crossing time information sent b , then according to t a Calculate the delay time t da As the delay time of edge circuit breaker a.
[0031] When there is no signal connection relationship between the two circuit breakers, step S3 includes: Step S35, the phase control device k of the side circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Phase connection: If the phase control device k b If there is no connection between them, then according to t a Calculate the delay time t da As the delay time of edge circuit breaker a; Step S36, the phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is performed first. If the phase control device k is not received within t1 time a The zero-crossing time information sent a , then according to t b Calculate the delay time t db As the delay time of the intermediate circuit breaker b.
[0032] Preferably, after step S5, the method further includes: Step S6: The relay protection device does not receive a signal from the phase control device k within t3 after the delayed action signal is sent. a and phase control device k b If the relay protection device responds, it will perform the breaking action on the side circuit breaker a and the middle circuit breaker b.
[0033] Preferably, the delay time is calculated by subtracting the inherent opening time of the circuit breaker, the optimal arcing time and a margin, and the action time of the relay protection from the zero crossing point; the side circuit breaker a and the middle circuit breaker b will both interrupt the short-circuit current at the target zero crossing point after their respective inherent opening time and optimal arcing time.
[0034] Preferably, the method for the relay protection device to detect whether the side circuit breaker a and the middle circuit breaker b are successfully disconnected at the same time is to detect whether there is still a short-circuit current in the line. If there is still a short-circuit current, the circuit breaker a and the middle circuit breaker b are not successfully disconnected at the same time.
[0035] A specific implementation is given below. Figure 2 The following is a schematic diagram of the 3 / 2 wiring method of the substation. Figure 2 As shown in Figure 1, the substation has two busbars, M1 and M2, and n complete 3 / 2 wiring strings. The side circuit breaker close to busbar M1 on the i-th wiring string is denoted as CB i1 , the adjacent outgoing line of the circuit breaker is marked as L i1 ; The side circuit breaker close to busbar M2 is denoted as CB i3 , the adjacent outgoing line of the circuit breaker is marked as L i2 , the middle circuit breaker of the string is denoted as CB i2 (i=1, 2, ..., n), thereby determining the wiring method and topological structure of the system.
[0036] Determine the target string according to the system wiring method and topology; and install a phase control device. Figure 5 The figure is a connection diagram of the relay protection device and the phase control device of the substation according to the specific embodiment of the present invention. When a short circuit fault occurs in the outgoing line of a target string of the substation, the coordination strategy of the relay protection and the phase control disconnection is executed.
[0037] Specifically, Figure 4 For example, Figure 4 There are three target strings in CB 11 CB 12 CB 23 CB 31 CB 32 CB 33 All circuit breakers have insufficient breaking capacity, which satisfies I CB kmax .
[0038] When the output line L 11 When a short circuit occurs, the circuit breaker to be opened is the CB of the substation on this side. 11 CB 12 As well as the two circuit breakers in the opposite substation, it is highly likely that the four circuit breakers will be disconnected in the same half-wave. Due to the shunting effect of multiple circuits, the current flowing through the side circuit breaker CB 11 The short-circuit current is 1 / 3 of the short-circuit current level at the short-circuit point; however, if the two circuit breakers on the opposite side are opened first, the circuit breakers on this side are opened later and the side circuit breaker CB 11 Finally, the short-circuit current will flow through the side circuit breaker CB. 11 , this extremely rare probability situation will cause serious consequences once it occurs; even if the four circuit breakers cannot be opened at the same time, as long as the circuit breakers on the same side are opened at the same time, the current flowing through the side circuit breaker CB 11 The short-circuit current will not exceed 1 / 2 of the short-circuit current level at the short-circuit point. Therefore, the phase control device and the relay protection device are coordinated to control the simultaneous disconnection of the circuit breaker. The timing control diagram of the coordination of relay protection and phase control disconnection is shown in the figure below. Figure 3 shown.
[0039] When the output line L 11 When a short circuit occurs at time t0, the relay protection device A1 detects the fault and sends a short circuit to the circuit breaker CB. 11 and CB 12 Phase control device K 11 and K 12 Send a delayed action signal. After receiving the delayed action signal, the phase control device immediately performs zero-crossing point prediction and determines the target zero-crossing point t a and t b , and then transmit the zero-crossing time information to each other, and compare t a and t b The size of t a =t b , then the target zero point does not change; if t a <t b , then let t a =t b If t a >t b , then let t b =t a ; Then the two phase-controlled devices calculate their respective delay times t d1 and t d2 .
[0040] Phase control device K 11 and K 12 After receiving the delayed action signal, after the respective delay time t d1 and t d2 Then give the corresponding circuit breaker CB 11 and CB 12 Send an action signal, t open1 For CB 11 The inherent opening time of arc1 For CB 11 The optimal arcing time; t open2 For CB 12 The inherent opening time of arc2 For CB 12 The optimal arcing time; CB 11 After the inherent opening time topen1 After that, the contacts separate at time t5, and the arc passes through the optimal arcing time t arc1 The current then turns off at the zero crossing point t6; CB 12 After the inherent opening time t open2 After that, the contacts separate at time t4, and the arc passes through the optimal arcing time t arc2 The current then turns off at the zero crossing point t6, CB 11 CB 12 The two circuit breakers interrupt the short-circuit current at the same time. The zero-crossing point t6 is t a and t b The zero-crossing moment value, at this time t a and t b same.
[0041] When a short circuit occurs in a certain outgoing line, the circuit breaker to be opened is the CB of the substation on this side. 11 CB 12 As well as the two adjacent circuit breakers in the opposite substation, it is highly likely that the four circuit breakers will be disconnected in the same half-wave. Due to the shunting effect of multiple circuits, the current will flow through the side circuit breaker CB with insufficient interrupting capacity. 11 The short-circuit current is 1 / 3 of the short-circuit current level at the short-circuit point, and the current becomes smaller, so even a circuit breaker with insufficient interrupting capacity can interrupt the short-circuit current; but if the two circuit breakers on the opposite side are opened first, the circuit breaker on this side is opened later and the side circuit breaker CB 11 Finally, the short-circuit current will flow through the side circuit breaker CB. 11 , this extremely rare probability situation will cause serious consequences once it occurs; even if the four circuit breakers cannot be opened at the same time, as long as the circuit breakers on the same side are opened at the same time, the current flowing through the side circuit breaker CB 11 The short-circuit current will not exceed 1 / 2 of the short-circuit current level at the short-circuit point. Therefore, the two circuit breakers on this side can be controlled to break at the same time by coordinating the phase control device with the relay protection device, without replacing the circuit breaker with insufficient breaking capacity, thus saving costs.
[0042] What is disclosed above is only a preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. A person skilled in the art can understand that all or part of the processes of the above embodiments and equivalent changes made according to the claims of the present invention still fall within the scope of the invention.
Claims
1. A relay protection and phase-controlled breaking coordination system for improving the insufficient interrupting capacity of a circuit breaker, characterized in that: Applicable to a substation adopting a 3 / 2 wiring mode, the substation includes two busbars, M complete 3 / 2 wiring strings, each of the wiring strings includes three circuit breakers between the two busbars and two outgoing lines between two adjacent circuit breakers, each wiring string is equipped with a relay protection device, the relay protection device is used to monitor outgoing line faults and control the opening and closing of each circuit breaker on the corresponding wiring string; the system includes: a relay protection device, a phase control device and a target circuit breaker, wherein: Definition Satisfies I CB kmax The circuit breaker with insufficient breaking capacity is the circuit breaker with insufficient breaking capacity, and the wiring string where the circuit breaker with insufficient breaking capacity is located is the target string, I CB is the interrupting capacity of the circuit breaker, I kmax is the maximum short-circuit current of the system, N is the number of target strings, the circuit breaker located on the target string is defined as the target circuit breaker, and each of the 3N target circuit breakers is configured to be connected to a phase-controlled device; the three phase-controlled devices of the three circuit breakers on the same target string are connected to the relay protection device corresponding to the target string; a connection signal connection relationship is established between the phase-controlled device corresponding to the circuit breaker with insufficient breaking capacity and the phase-controlled device corresponding to the adjacent circuit breaker. 2. The relay protection and phase-controlled breaking coordination system for improving the insufficient interrupting capacity of the circuit breaker according to claim 1, characterized in that: The relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the phase control device corresponding to the circuit breakers adjacent to the outgoing line where the fault point is located; The circuit breakers adjacent to the outgoing line at the fault point include side circuit breaker a and middle circuit breaker b, where: The phase control device k of the edge circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Connected: If the phase control device k b The predicted zero-crossing time information t a Transmitted to the phase control device k b If the phase control device k b If there is no connection between them, then according to t a Calculate the delay time t da , and after receiving the delayed action signal, according to the delay time t da Sending a disconnection signal to the edge circuit breaker a and simultaneously sending a delayed action response signal to the relay protection device; The phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is first performed. The zero-crossing time information of the edge circuit breaker a is received within time t1. a After that, the predicted zero-crossing time information t b , is transmitted back to the phase control device k a , then according to max(t a ,t b ) Calculate the delay time t d-ba , and after receiving the delayed action signal, according to the delay time t d-ba Send a disconnection signal to the side circuit breaker b and send a delayed action response signal to the relay protection device at the same time, max(t a ,t b ) represents the latest zero-crossing time; if the phase control device k is not received within t1 time a The zero-crossing time information sent a , then according to t b Calculate the delay time t db , and after receiving the delayed action signal, according to the delay time t db Sending a disconnection signal to the side circuit breaker b and simultaneously sending a delayed action response signal to the relay protection device; The phase control device k of the edge circuit breaker a a , receiving the zero-crossing time information of the intermediate circuit breaker within t2 b After that, according to max(t a ,t b ) Calculate the delay time t d-ab , and after receiving the delayed action signal, according to the delay time t d-ab Send a disconnection signal to the edge circuit breaker a and send a delayed action response signal to the relay protection device; if the phase control device k is not received within t2, b The zero-crossing time information sent b , then according to t a Calculate the delay time t da , and after receiving the delayed action signal, when the delay time t is reached da Sending a disconnection signal to the side circuit breaker a and a delayed action response signal to the relay protection device at the same time; The relay protection device receives a signal from the phase control device k within t3 after the delayed action signal is sent. a and the phase control device k b After the response, detect whether the side circuit breaker a and the middle circuit breaker b are all successfully disconnected. If all are successfully disconnected, the relay protection device will no longer operate; if all are not successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action; The relay protection device does not receive a signal from the phase control device k within t3 after the delayed action signal is sent. a and the phase control device k b In response, the relay protection device performs a breaking action on the side circuit breaker a and the middle circuit breaker b.
3. The relay protection and phase-controlled breaking coordination system for improving the insufficient interrupting capacity of the circuit breaker according to claim 2, characterized in that: The delay time is calculated by subtracting the inherent opening time of the circuit breaker, the optimal arcing time and a margin, as well as the action time of the relay protection from the zero crossing point; the side circuit breaker a and the middle circuit breaker b will both interrupt the short-circuit current at the target zero crossing point after their respective inherent opening time and optimal arcing time.
4. The relay protection and phase-controlled breaking coordination system for improving the insufficient interrupting capacity of the circuit breaker according to claim 3, characterized in that: The method by which the relay protection device detects whether the side circuit breaker a and the middle circuit breaker b are successfully disconnected at the same time is to detect whether there is still a short-circuit current in the line. If there is still a short-circuit current, the circuit breaker a and the middle circuit breaker b cannot be disconnected successfully at the same time.
5. A method for improving the relay protection and phase-controlled breaking coordination of circuit breaker with insufficient interrupting capacity, characterized in that: The implementation subject is the relay protection and phase-controlled breaking coordination system for improving insufficient interrupting capacity of a circuit breaker as described in any one of claims 1 to 4, and the steps include: Step S1, determine the target string according to the substation topology structure, install a phase control device for each circuit breaker on the target string, and connect the three phase control devices of the three circuit breakers on the same target string to the relay protection device corresponding to the target string; establish a connection signal connection relationship between the phase control device corresponding to the circuit breaker with insufficient interrupting capacity and the phase control device corresponding to the adjacent circuit breaker; wherein, the definition satisfies I CB kmax The circuit breaker with insufficient breaking capacity is the circuit breaker with insufficient breaking capacity, and the wiring string where the circuit breaker with insufficient breaking capacity is located is the target string, I CB is the interrupting capacity of the circuit breaker, I kmax is the maximum short-circuit current of the system, and N is the number of target strings; Step S2, when an outgoing line fault occurs, the relay protection device detects the location of the outgoing line fault and determines whether the circuit breakers adjacent to the outgoing line where the fault point is located are located on the target string; if they are located on the target string, a delayed action signal is sent to the circuit breakers adjacent to the outgoing line where the fault point is located; Step S3, when an outgoing line fault occurs, the two phase-controlled devices corresponding to the circuit breakers adjacent to each other on both sides of the outgoing line where the fault point is located both detect that an outgoing line fault occurs at their respective locations. If there is a signal connection relationship between the two phase-controlled devices, the two phase-controlled devices firstly perform zero-crossing prediction respectively, then transmit zero-crossing time information to each other, and then select the latest zero-crossing time as a parameter to calculate the delay time of the corresponding circuit breaker; if there is no signal connection relationship between the two phase-controlled devices, the delay time of the corresponding circuit breaker is calculated according to the respective zero-crossing time prediction information; Step S4, after the two phase-controlled devices receive the delayed action signal, when the delay time of the corresponding circuit breakers is reached, they send a disconnection signal to the corresponding circuit breaker and send a delayed action response signal to the relay protection device at the same time; Step S5, within the time t3 after the delayed action signal is sent, after the relay protection device receives the delayed action response signal from the two phase-controlled devices, it detects whether all the adjacent circuit breakers on both sides of the outgoing line where the fault point is located are successfully disconnected; if all are successfully disconnected, the relay protection device will no longer operate; if not all are successfully disconnected, the relay protection device controls the circuit breakers that have not been successfully disconnected to perform the disconnection action.
6. The method for improving the relay protection and phase-controlled breaking coordination of the circuit breaker with insufficient interrupting capacity according to claim 5, characterized in that: The circuit breakers adjacent to the outgoing line at the fault point include a side circuit breaker a and a middle circuit breaker b. When there is a signal connection relationship between the two circuit breakers, step S3 includes: Step S31: the phase control device k of the edge circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Connected: If the phase control device k b The predicted zero-crossing time information t a Transmitted to the phase control device k b ; Step S32: the phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is first performed. The zero-crossing time information of the edge circuit breaker a is received within time t1. a After that, the predicted zero-crossing time information t b , is transmitted back to the phase control device k a , then according to max(t a ,t b ) Calculate the delay time t d-ba As the delay time of the intermediate circuit breaker b; Step S33: the phase control device k of the edge circuit breaker a a The zero-crossing time information t of the intermediate circuit breaker is received within t2 b After that, according to max(t a ,t b ) Calculate the delay time t d-ab As the delay time of the edge circuit breaker a; Step S34: the phase control device k of the edge circuit breaker a a , the phase control device k is not received within t2 b The zero-crossing time information sent b , then according to t a Calculate the delay time t da As the delay time of the edge circuit breaker a; When there is no signal connection relationship between the two circuit breakers, the step S3 includes: Step S35, the phase control device k of the edge circuit breaker a a , detects the outgoing line fault at the location, first performs zero-crossing prediction, and detects whether it is connected to the phase control device k of the intermediate circuit breaker b. b Connected: If the phase control device k b If there is no connection between them, then according to t a Calculate the delay time t da As the delay time of the edge circuit breaker a; Step S36, the phase control device k of the intermediate circuit breaker b b , a line fault is detected at the location, and a zero-crossing prediction is first performed. If the phase control device k is not received within t1 time a The zero-crossing time information sent a , then according to t b Calculate the delay time t db As the delay time of the intermediate circuit breaker b.
7. The method for improving the relay protection and phase-controlled breaking coordination of the circuit breaker with insufficient interrupting capacity according to claim 6, characterized in that: After step S5, the method further includes: Step S6: the relay protection device does not receive a signal from the phase control device k within t3 after the delayed action signal is sent. a and the phase control device k b In response, the relay protection device performs a breaking action on the side circuit breaker a and the middle circuit breaker b.
8. The method for improving the relay protection and phase-controlled breaking coordination of the circuit breaker with insufficient interrupting capacity according to claim 7, characterized in that: The calculation method of the delay time is to subtract the inherent opening time of the circuit breaker, the optimal arcing time and a margin, and the action time of the relay protection from the zero crossing point; the side circuit breaker a and the middle circuit breaker b will both interrupt the short-circuit current at the target zero crossing point after their respective inherent opening time and optimal arcing time.
9. The method for improving the relay protection and phase-controlled breaking coordination of the circuit breaker with insufficient interrupting capacity as claimed in claim 8, characterized in that: The method by which the relay protection device detects whether the side circuit breaker a and the middle circuit breaker b are successfully disconnected at the same time is to detect whether there is still a short-circuit current in the line. If there is still a short-circuit current, the circuit breaker a and the middle circuit breaker b cannot be disconnected successfully at the same time.