Alternating current and direct current interconnected power grid dispatching method considering direct current tie line discrete operation mode

By using the MINLP linear relaxation algorithm with multivariable Lipschitz continuous nonlinearity in AC-DC interconnection power grid, considering the discrete operation mode and transmission loss of DC connection lines, the problem of neglecting DC connection lines in AC-DC interconnection power grid scheduling is solved, and the power grid is improved Operational efficiency and reliability of scheduling results.

CN118889394APending Publication Date: 2024-11-01GUANGZHOU UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410945094.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The prior art ignores DC connection line losses in AC-DC interconnection grid scheduling, resulting in a decrease in grid operation economy and a decrease in transmission efficiency. The existing solutions are complex and cumbersome or difficult to ensure the reliability and accuracy of the solution results.

Method used

The MINLP linear relaxation algorithm with multivariable Lipschitz continuous nonlinearity is adopted to convert the AC-DC interconnection grid scheduling model into alternately solving mixed integer linear main problems and nonlinear sub-problems. Considering the discrete operation mode of DC connection lines and transmission loss, reducing the complexity of model solution and improve the reliability of the results.

Benefits of technology

It improves the overall efficiency of the power grid, prevents line overload, ensures voltage stability, and ensures power transmission on demand by accurately considering DC connection line losses, reduces transmission losses, and improves the reliability and accuracy of scheduling results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889394A_ABST
    Figure CN118889394A_ABST
Patent Text Reader

Abstract

The invention discloses an AC / DC interconnected power grid dispatching method considering a DC tie line discrete operation mode, and the method comprises the steps: firstly building an AC / DC interconnected power grid economic dispatching model considering the DC tie line discrete operation mode and transmission loss, and enabling the built AC / DC interconnected power grid dispatching model to consider the DC tie line loss; therefore, the overall efficiency of the power grid is improved, the power transmission efficiency can be improved, line overload is prevented, and the voltage stability is ensured. And then, solving is carried out based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity, and a complex AC / DC interconnected power grid economic dispatching mixed integer nonlinear problem is converted into alternate solving of a mixed integer linear main problem and a nonlinear sub-problem, so that the solving complexity of an original model is greatly reduced, and the economic dispatching efficiency of the AC / DC interconnected power grid is improved. And meanwhile, the reliability and the accuracy of a solving result are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a power grid dispatching technology, and in particular to an AC / DC interconnected power grid dispatching method taking into account a discrete operation mode of a DC tie line. Background Art

[0002] With the rapid development of renewable energy, AC / DC interconnected power grids have attracted much attention as a flexible and effective way of power transmission. Independent power grids in various regions are interconnected through DC interconnection lines to form multi-regional AC / DC interconnected power grids. According to the power generation and consumption of each region, the transmission power of DC interconnection lines at different times within 24 hours a day is adjusted, which can well promote the cross-regional consumption of power resources and reduce the cost of power generation. When the flexible operation mode of DC interconnection lines is considered in detail in the scheduling problem of AC / DC interconnected power grids, a large number of discrete variables will be introduced, making the scheduling problem of AC / DC interconnected power grids a mixed integer programming problem.

[0003] DC interconnection lines will generate energy loss during the power transmission process. If the DC interconnection line loss is ignored in the dispatching of AC / DC interconnected power grids, the economic efficiency of the entire power grid operation will be reduced. If the loss is too large, it may also lead to problems such as reduced transmission efficiency, line overload or voltage stability. Accurately estimating and considering the loss of DC interconnection lines in dispatching can not only help plan more efficient power transmission paths, minimize losses and ensure that power is transmitted to the destination on demand, thereby improving the overall efficiency of the power grid, but also ensure that all participants share the cost of transmission losses fairly, avoid unfair competition or waste of resources, and promote the healthy development of the power market. Therefore, the loss problem of DC interconnection lines in AC / DC interconnected power grids has attracted more and more attention. In AC / DC interconnected power grids, the transmission loss of DC interconnection lines between various regions has a nonlinear relationship with the transmission flow. With the increase of flow, the transmission loss does not increase linearly, but increases in a nonlinear function relationship of a quadratic function. When the flow increases, its line loss will increase significantly. When the transmission loss problem of DC interconnection lines is considered, the dispatching problem of AC / DC interconnected power grids mentioned above will be transformed into a complex mixed integer nonlinear programming problem. Due to the huge scale of modern power systems, how to efficiently solve the above large-scale mixed integer nonlinear programming problems has become a research focus in this field.

[0004] Some scholars focus on dealing with the uncertainty of wind power, distributed algorithms and other research in the dispatch of AC and DC power grids, and do not consider the loss problem of DC interconnection lines in their models; for scholars who have considered the loss of DC interconnection lines, some of the existing research focuses on the linearization of the model, using linear functions to replace nonlinear functions, and simplifying the original problem into a mixed integer linear problem, but the current linearization processing method is relatively complicated and cumbersome, and does not directly address the nonlinear problem. Another part of the researchers focuses on the field of intelligent algorithms, using intelligent algorithms such as moth-to-flame, particle swarm, and gray wolf algorithm for solution, but intelligent algorithms are prone to fall into local optimality, and the solution process is invisible, making it difficult to ensure the reliability and accuracy of the solution results. Summary of the invention

[0005] The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art and provide an AC / DC interconnected power grid dispatching method taking into account the discrete operation mode of the DC tie line

[0006] To achieve the above object, the technical solution of the present invention is:

[0007] In a first aspect, the present invention provides an AC / DC interconnected power grid dispatching method considering a discrete operation mode of a DC tie line, comprising:

[0008] Establish an AC / DC interconnected power grid dispatching model that takes into account the discrete operation mode and transmission loss of DC tie lines;

[0009] The AC / DC interconnected power grid dispatching model is solved based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity, and the complex AC / DC interconnected power grid dispatching mixed integer nonlinear problem is transformed into an alternating solution of a mixed integer linear main problem and a nonlinear sub-problem to obtain a dispatching scheme.

[0010] In a second aspect, the present invention provides an AC / DC interconnected power grid dispatching terminal that takes into account the discrete operation mode of DC interconnection lines, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method described above when executing the computer program.

[0011] In a third aspect, the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method described above are implemented.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] The present invention firstly establishes an AC / DC interconnected power grid economic dispatch model that takes into account the discrete operation mode and transmission loss of DC interconnection lines. The established AC / DC interconnected power grid dispatch model takes into account the DC interconnection line loss, ensures that power is transmitted to the destination on demand, thereby improving the overall efficiency of the power grid, and can also improve the transmission efficiency, prevent line overload, and ensure voltage stability; then, based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity, a complex AC / DC interconnected power grid economic dispatch mixed integer nonlinear problem is converted into an alternate solution of a mixed integer linear main problem and a nonlinear sub-problem, which greatly reduces the complexity of the original model solution and ensures the reliability and accuracy of the solution result. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A flow chart of an AC / DC interconnected power grid dispatching method considering a discrete operation mode of a DC tie line provided in an embodiment of the present invention;

[0015] Figure 2 is a nonlinear function f i :R li → Visualization of the R subproblem S(k) (left) and the feasible domain of the next iteration main problem M(k) (right);

[0016] Figure 3 It is a dual-zone 12-node AC / DC interconnected system;

[0017] Figure 4 It is a 24h load curve of a certain place;

[0018] Figure 5 It is the 24h DC tie line transmission plan diagram (solved by SCIP solver);

[0019] Figure 6 It is the 24h DC interconnection line transmission plan diagram (solved by Lipschitz nonlinear optimization algorithm);

[0020] Figure 7 It is a dual-area 114-node AC / DC interconnected system;

[0021] Figure 8 It is the 24h DC tie line transmission plan diagram (solved by SCIP solver);

[0022] Fig. 9 This is the 24h DC interconnection line transmission plan diagram (solved by Lipschitz nonlinear optimization algorithm).

[0023] Fig.10 A schematic diagram of the composition of an AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of DC tie lines provided in Example 2 of the present invention. DETAILED DESCRIPTION

[0024] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0025] Embodiment 1:

[0026] See also Figure 1 As shown, the AC / DC interconnected power grid dispatching method considering the discrete operation mode of the DC tie line provided in this embodiment mainly includes the following steps:

[0027] 101. Establish an AC / DC interconnected power grid dispatching model that takes into account the discrete operation mode and transmission loss of DC tie lines;

[0028] In this step, the established AC / DC interconnected grid dispatching model takes into account the DC interconnection line losses to ensure that electricity is transmitted to the destination on demand, thereby improving the overall efficiency of the grid. At the same time, it can improve transmission efficiency, prevent line overload, and ensure voltage stability.

[0029] 102. Solve the AC / DC interconnected power grid dispatch model based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity to obtain a dispatch plan.

[0030] It can be seen that the present invention first establishes an AC / DC interconnected power grid economic dispatch model that takes into account the discrete operation mode and transmission loss of the DC interconnection line. The established AC / DC interconnected power grid dispatch model takes into account the DC interconnection line loss to ensure that electricity is transmitted to the destination on demand, thereby improving the overall efficiency of the power grid. At the same time, it can improve the transmission efficiency, prevent line overload, and ensure voltage stability; then, based on the linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity, the complex AC / DC interconnected power grid economic dispatch mixed integer nonlinear problem is converted into an alternate solution of a mixed integer linear main problem and a nonlinear sub-problem, which greatly reduces the complexity of the original model solution and ensures the reliability and accuracy of the solution result.

[0031] In a specific embodiment, the objective function of the AC / DC interconnected power grid dispatching model considering the discrete operation mode and transmission loss of the DC tie line is:

[0032]

[0033] Where T is the time period index set within the full-day scheduling cycle, ΔT is the scheduling time interval, with 1 hour as a time period; a and A are the regional index and regional index set respectively; Ga is the generator index set of region a; P g,t is the active output of generator g in period t, are the positive and negative spinning reserves of generator g in period t; c g is the electricity price of generator g, are the positive and negative spinning reserve cost coefficients of generator g respectively.

[0034] The constraints of the AC / DC interconnected power grid dispatching model considering the discrete operation mode and transmission loss of the DC tie line include regional operation constraints, which include:

[0035] Node power balance equation constraints:

[0036]

[0037] in, are the equivalent power of the nodes on the rectifier and inverter sides of the DC tie line mn in time period t, D i,t is the load forecast value of node i in period t, is the index set of generators located at node i, is the index set of the rectifier-side node / inverter-side node of the DC tie line located at the node, Ψ a is the set of provincial network a nodes, Ω i is the set of nodes connected to node i;

[0038] Transmission capacity constraints of AC lines:

[0039]

[0040] in, is the upper limit of the transmission capacity of the AC line (i, j), θ i,t ,θ j,t is the voltage phase angle of the nodes at the beginning and end of the AC line;

[0041] Upper and lower limit constraints of the generator set:

[0042]

[0043] in, are the upper and lower limits of the active output of generator g respectively;

[0044] Generator climbing and sliding constraints:

[0045] -RD g ΔT≤P g,t -P g,t-1 ≤RU g ΔT,g∈G a , (5)

[0046] RU g , RD g are the climbing rate and sliding rate of generator g respectively;

[0047] Positive spinning reserve capacity constraint:

[0048]

[0049] Negative spinning reserve capacity constraint:

[0050]

[0051] Global positive and negative rotation constraints:

[0052]

[0053] in, They are the total positive and negative spinning reserves of region a in period t, respectively.

[0054] The constraints of the AC / DC interconnected power grid dispatching model considering the discrete operation mode and transmission loss of the DC tie line also include the operation constraints of the DC tie line. Taking the DC tie line equivalent generator mn as an example, the constraints are:

[0055] DC tie line transmission limit:

[0056]

[0057] Among them, P mn , They are the upper and lower limits of DC tie line mn output respectively;

[0058] Constraints on the output adjustment direction of adjacent phases: Due to the protection restrictions of the DC converter, the power of the DC interconnection line cannot be adjusted in different directions in adjacent periods

[0059]

[0060] in, The variables of 0 and 1 respectively indicate whether the equivalent generator mn of the DC tie line is climbing or sliding in the period t;

[0061] Constraints on continuity of output adjustment in adjacent phases: Due to the protection limitations of the DC converter, the power of the DC interconnection line cannot be adjusted continuously in adjacent periods

[0062]

[0063] Among them, M + 、M - is a constant large enough to make the equation valid;

[0064] Output adjustment frequency constraints: DC interconnection lines cannot be adjusted frequently within a day

[0065]

[0066] Among them, S is the maximum number of adjustments allowed for the DC tie line within one day;

[0067] Output adjustment rate constraint: The minimum adjustment amount of the equivalent generator mn of the DC tie line cannot be lower than a certain fixed value

[0068]

[0069] in, are the minimum and maximum adjustment amounts of the DC tie line power respectively;

[0070] Output step constraint: After a ramp or landslide, the equivalent generator mn of the DC interconnection line must operate stably for at least one period of time to keep the power change of the DC interconnection line in a step state.

[0071]

[0072] in, The variables of 0 and 1 respectively indicate whether the equivalent generator mn starts to adjust or ends the adjustment in period t;

[0073] Constraints on total power transmission of DC interconnection lines: The power transmission plan of DC interconnection lines is determined by advance agreement or market transactions.

[0074]

[0075] Among them, Qm n Plan to transmit power for DC interconnection line mn;

[0076] The relationship between the equivalent power on the rectifier and inverter sides of the DC interconnection line: Consider the transmission loss of the DC interconnection line to ensure the economy, stability and reliability of the power system in each region

[0077]

[0078] Among them, V DC,mn 、rm n 、pm n They are respectively the rated voltage of the DC interconnection line mn, the line single-pole resistance and the number of operating poles.

[0079] In a specific embodiment, solving the AC / DC interconnected power grid dispatching model based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity includes:

[0080] The AC / DC interconnected power grid dispatching model is written in the following compact form

[0081]

[0082] Among them, c∈Rn+m,A∈Rq×(n+m ) and b∈Rq are given known quantities, x∈Rn×Zm and are the upper and lower bounds, [p]:={1,...,p} is the nonlinear constraint index, equation (17a) is the linear objective function equation (1), equation (17b) is the mixed integer linear constraint equation (2)-(15), the nonlinear constraint equation (16) is defined as equation (17c), the number of fi variables li=|Ii|, the index set For all i∈[p], ri∈[n] but Right now

[0083] By relaxing constraint (17c), the original problem is relaxed to the following ε form:

[0084]

[0085] Where ε>0 is the specified error, the feasible solution of problem (18) is the ε feasible point of problem (17); the global optimal solution of problem (18) is called the approximate global optimal solution of (17).

[0086] The following will introduce an iterative algorithm to solve problem (18). The algorithm decomposes the mixed integer nonlinear problem (MINLP) into a mixed integer linear master problem (MILP) and a nonlinear subproblem (NLP). The approximate global optimal solution of the original problem is solved by alternating the master problem and the subproblem. The main idea is to use the Lipschitz continuity of the nonlinear function to relax all nonlinear factors. In each iteration, we need to solve the relaxed problem (master problem) to the global optimal, and then solve the corresponding subproblem to strengthen the relaxation for the next master problem. Then repeat this process until a "feasible solution" is found or the original problem is proved to be infeasible. The algorithm flow is shown in Table 1.

[0087] The main problem for the kth iteration is defined as follows

[0088]

[0089] in is a nonlinear function f i The relaxation of the graph can be expressed in terms of mixed integer linear constraints. i The Lipschitz continuity of a function is f i The domain is divided into a series of indexes box, and in each box Linear relaxation on the region f i Graphics.

[0090] Feasible domain of the main problem The construction process is as follows:

[0091] First define the box in d is an arbitrary dimension. For each i∈[p], we assume that Vector Make all Do not intersect each other and can cover The boundary of

[0092]

[0093] Assume that L i Yes i exist The Lipschitz constant on the box The center of indicates that, therefore

[0094]

[0095] Based on f i The Lipschitz continuity property of f i satisfy

[0096]

[0097] because In the box The maximum value is obtained on the boundary of Alternative After replacing f i satisfy

[0098]

[0099] Therefore, for We can put the box area It is defined as follows

[0100]

[0101] All boxes The sum of is the nonlinear function f i Relaxation graph, satisfying That is, used in the algorithm Replace nonlinear constraints In order to relax the original problem, we define As A collection of indexes.

[0102] After solving the main problem, we can get the solution x kThe main purpose of solving the subproblem is to find the solution x. k The subproblem is to find a suitable split point in the box. The subproblem is to determine a point for each nonlinear graph and minimize the distance from the solution of the previous main problem. Therefore, the subproblem is defined as follows

[0103]

[0104] in Indicates that x is included after solving the main problem k Solution Box The index of yes The sub-regions are selected as follows

[0105]

[0106]

[0107] in is to solve the main problem and include x k Solution box Upper and lower bounds, λ∈(0,1 / 2], so that the solution to the subproblem (S(k)) does not get arbitrarily close to the edge of the used box.

[0108] Area of ​​sub-problems and Region (left) and the feasible region of the main problem at the beginning of the next iteration and (Right) Figure 2 shown.

[0109] Table 1 Linear relaxation algorithm for MINLP with multivariate Lipschitz continuous nonlinearity

[0110]

[0111] In an AC / DC interconnected power grid, the transmission loss of the DC interconnection lines between various regions is nonlinearly related to the transmission power flow. As the power flow increases, the transmission loss does not increase linearly, but increases as a nonlinear function of a quadratic function. When the power flow increases, the line loss will increase significantly. When considering the transmission loss problem of the DC interconnection lines, the scheduling problem of the AC / DC interconnected power grid will be transformed into a complex mixed integer nonlinear programming problem.

[0112] Due to the huge scale of modern power systems, how to efficiently solve the above large-scale mixed-integer nonlinear programming problems has become a research focus in this field. Existing research mainly focuses on the linearization of the model, using linear functions to replace nonlinear functions and simplifying the original problem into a mixed-integer linear problem. However, the current linearization processing method is relatively complicated and cumbersome, and does not directly address nonlinear problems. Another group of researchers focuses on the field of intelligent algorithms, using intelligent algorithms such as moth-to-flame, particle swarm, and gray wolf algorithm for solution, but intelligent algorithms are prone to fall into local optimality, and the solution process is invisible, making it difficult to ensure the reliability and accuracy of the solution results.

[0113] Therefore, based on the linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity proposed above, the present invention proposes an AC / DC interconnected power grid scheduling method considering the discrete operation mode and transmission loss of DC tie lines. The algorithm transforms the complex AC / DC interconnected power grid scheduling mixed integer nonlinear problem into alternating solution of mixed integer linear main problem and nonlinear sub-problems.

[0114] First, the nonlinear constraint of the transmission loss of the DC tie line is written as follows:

[0115]

[0116] Therefore, the nonlinear function Indexing of nonlinear functions That is That is, the first dimension index of the box is The second dimension index is

[0117] Box relaxation feasible region constructed for tie line transmission loss constraints

[0118]

[0119] For each box, we introduce Binary variable to determine whether the solution to the original problem is in the box If Description Solution is located in this box If This indicates that the optimal solution to the original problem is not in this box. Each solution will only select one of the boxes in the relaxed feasible region.

[0120] According to the box relaxation feasible domain of the DC tie line transmission loss constraint constructed above and the original problem of AC / DC interconnected power grid scheduling, the main problem of AC / DC interconnected power grid scheduling based on the linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity can be obtained as follows:

[0121]

[0122] -RD g ΔT≤P g,t -P g,t-1 ≤RU g ΔT,g∈G a , (33)

[0123]

[0124]

[0125] The sub-problem of AC / DC interconnected power grid scheduling is to tighten the box relaxation feasible domain constructed in the main problem for the transmission loss constraint of the tie line. On the one hand, the solution of the sub-problem should be as close as possible to the optimal solution of the main problem, but it cannot be arbitrarily close to the boundary of the box feasible domain constructed by the main problem. On the other hand, it must also meet the transmission loss constraint of the tie line. Therefore, the feasible domain of the sub-problem of AC / DC interconnected power grid scheduling is defined as follows

[0126]

[0127] in, The index of the feasible region of the box selected after optimizing and solving the main problem.

[0128] According to the feasible domain of the sub-problem of DC tie line transmission loss constraint constructed above and the original problem of AC / DC interconnected power grid scheduling, the AC / DC interconnected power grid scheduling sub-problem based on the linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity can be obtained as follows:

[0129]

[0130]

[0131] The main problem of the AC / DC interconnected power grid scheduling constructed above is a mixed integer linear problem (MILP), and the subproblem is a nonlinear problem (NLP). Based on the alternating iteration of the main problem and subproblems of the AC / DC interconnected power grid scheduling constructed above, the approximate global optimal solution of the original highly complex mixed integer nonlinear problem (MINLP) of the AC / DC interconnected power grid scheduling can be solved.

[0132] Define the convergence criterion of the algorithm

[0133]

[0134] Where ε is the convergence threshold.

[0135] The detailed calculation steps of the algorithm are as follows

[0136] 1) Construct the main problem of AC / DC interconnected power grid scheduling, initialize the main problem model variables and solve the error ε.

[0137] 2) Solve the main problem of AC / DC interconnected power grid scheduling. If the main problem has a solution, retain the optimal solution and its box index. If the optimal solution meets the convergence criterion, the optimal solution of the main problem is the approximate global optimal solution of the original problem, and exit the iteration, otherwise enter step 3); if the main problem has no solution, it is prompted that the original problem may not be feasible and exit the iteration.

[0138] 3) Construct the sub-problem of AC / DC interconnected power grid scheduling, initialize the sub-problem model variables, solve the sub-problem and save the optimal solution of the sub-problem.

[0139] 4) According to the optimal solution obtained from the sub-problem, the feasible domain of the box selected for solving the main problem is cut, the feasible domain of the main problem is reduced, the feasible domain of the main problem is reconstructed, and return to step 1).

[0140] The present invention is further verified and explained below in conjunction with an application scenario example:

[0141] In order to further verify the effectiveness and superiority of the proposed algorithm, a modified 2-area IEEE 6-node standard test system and a 2-area IEEE 57-node standard test system were selected for simulation tests. The test environment CPU is Intel(R) Core(TM) i5-9300H CPU@2.40GHz. The programming environment is Julia, MINLP is solved by SCIP solver, MILP is solved by GUROBI solver, and NLP is solved by Julia's built-in solver Ipopt.

[0142] 1) Dual-zone 12-node AC / DC interconnection system

[0143] In the simulation test of the dual-zone 12-node AC / DC interconnected system, Figure 3As shown in the figure, two modified IEEE 6-node standard systems are used to simulate two regional power grids, A and B, respectively. The two regional power grids are interconnected through a DC interconnection line to form a dual-area 12-node AC / DC interconnection system. The DC converter station in area A is located at node 5, and the DC converter station in area B is located at node 5. In order to ensure that the power direction of the DC interconnection line flows from area A to area B, the load in area B is increased to 1.5 times the original value. The rated voltage of the DC interconnection line is 57KV, the line single-pole resistance is 10Ω, and the number of operating poles is 2. It is assumed that within 24 hours a day, the transmission upper and lower limits of the DC interconnection line are [50,150]MW, the daily planned transaction power is 1700MWh and there is no transmission power error. The power adjustment rate of the DC interconnection line is [15,45]MW, and the minimum modulation interval period N of the DC interconnection line is T =2, the upper limit of output adjustment times is 10 times; the loads of regions A and B are constructed based on the load curve of a certain place within 24 hours of a day. The load curve is as follows Figure 4 shown.

[0144] In order to verify the effectiveness and correctness of the Lipschitz nonlinear optimization algorithm in solving the AC / DC interconnected power grid scheduling problem, the scheduling results of directly using the SCIP solver and the scheduling results of using the Lipschitz nonlinear optimization algorithm were compared in a dual-area 12-node AC / DC interconnected power grid area.

[0145] First, the SCIP solver is used to directly formulate an economic optimization dispatch strategy for the dual-area 12-node AC / DC interconnected power grid area. The total active output of the generators in the area is optimized to be 9028 kW, and the dispatch plan cost is $152,770. The power change of the DC interconnection line transmission plan between area A and area B within 24 hours in one day is as follows: Figure 5 As shown in the figure, since the load level in area A is relatively low during the 22-24h and 1-12h periods, there is more power redundancy at this time. Therefore, the power generated in area A during this period is mainly transported to area B through the DC interconnection line. In the 12-22h period, the load level in area A is relatively high. The power generated in area A first meets the load demand in this area, and the excess power is transported to area B through the DC interconnection line. Therefore, the power transmission of the DC interconnection line during this period is relatively small.

[0146] In the example of using the Lipschitz nonlinear optimization algorithm to solve the regional dispatch problem of a dual-zone 12-node AC / DC interconnected power grid, the convergence criterion of the Lipschitz nonlinear optimization algorithm is set to ε = 10. -3, the sub-problem reduces the feasible domain containing the optimal solution of the main problem by a factor of λ = 0.5. We use the Lipschitz nonlinear optimization algorithm to make scheduling optimization decisions for the dual-area 12-node AC / DC interconnected power grid area. The constructed MILP main problem is solved by the solver Gurobi11.0, and the NLP sub-problem is solved by the solver Ipopt. Under the optimization decision of this algorithm, the total active output of the generators in the area is optimized to be 9021kw, and the cost of the scheduling plan is $152,665. The power changes of the DC interconnection line transmission plan between area A and area B within 24 hours in 1 day are as follows: Figure 6 As shown in the figure, it can be seen that the optimization scheduling results of the 12-node AC / DC interconnected power grid in the 1-21h period are basically the same as the optimization scheduling results directly using the solver SCIP under the optimization solution of the Lipschitz nonlinear optimization algorithm. The optimization scheduling results in the 22-24h period are slightly different, but they also conform to the actual load demand situation between the two regions.

[0147] For the comparison of the total active output and optimization cost of the generators in the area under the two optimization conditions, if the solution result of SCIP is used as the benchmark, the error of the total active output of the generators in the area of ​​the optimization result using the Lipschitz nonlinear optimization algorithm is 0.07%, and the cost error of the optimization strategy is 0.07%. Therefore, within the allowable error range, the two can be considered equal, and the error is under the convergence criterion of ε=10 -3 If the convergence criterion is further reduced, the resulting cost error and the total active output error of the generator will be further reduced.

[0148] In summary, from the comparison of the scheduling results of the dual-zone 12-node AC / DC interconnected power grid area directly using the SCIP solver and the scheduling results solved by the Lipschitz nonlinear optimization algorithm, it can be seen that the scheduling strategy of the AC / DC interconnected power grid area based on the Lipschitz nonlinear optimization algorithm is correct and effective.

[0149] 2) Dual-area 114-node AC / DC interconnection system

[0150] In the above, the effectiveness of the scheduling method for AC / DC interconnected power grid areas based on the Lipschitz nonlinear optimization algorithm was verified, and the superiority of this algorithm will be verified in a dual-area 114-node AC / DC interconnected system.

[0151] In the simulation test of the AC / DC interconnection system of 114 nodes in the dual zones, Figure 7As shown in the figure, two modified IEEE 57-node standard systems are used to simulate two regional power grids, A and B, respectively. The two regional power grids are interconnected through a DC interconnection line to form a dual-area 114-node AC / DC interconnection system. The DC converter stations are located at 8 nodes in area A and 8 nodes in area B respectively. In order to ensure that the power direction of the DC interconnection line flows from area A to area B, the load of area B is increased to 1.5 times the original. The rated voltage of the DC interconnection line is 57KV, the line single-pole resistance is 10Ω, and the number of operating poles is 2. It is assumed that within 24 hours a day, the transmission upper and lower limits of the DC interconnection line are [50,150]MW, the daily planned transaction power is 1700MWh and there is no transmission power error. The power adjustment rate of the DC interconnection line is [15,75]MW, and the minimum modulation interval period N of the DC interconnection line T =2, the upper limit of output adjustment times is 10 times; the load structure of areas A and B of the dual-area 114-node AC / DC interconnected system is the same as that of the dual-area 12-node AC / DC interconnected system.

[0152] First, the SCIP solver is used to directly formulate an economic optimization dispatch strategy for the 114-node AC / DC interconnected power grid area in the dual-area. The total active output of the generators in the area is optimized to be 62,877 kW, and the dispatch plan cost is $1,273,414. The power change of the DC interconnection line transmission plan between area A and area B within 24 hours in one day is as follows: Figure 8 shown.

[0153] Subsequently, the Lipschitz nonlinear optimization algorithm is used to solve the scheduling problem of the dual-area 114-node AC / DC interconnected power grid, and the convergence criterion of the Lipschitz nonlinear optimization algorithm is set to ε = 10. -4 , the sub-problem reduces the feasible domain containing the optimal solution of the main problem by a factor of λ = 0.5. Under the optimization decision of this algorithm, a dispatching scheme for the 114-node AC / DC interconnected power grid in the two regions was successfully formulated. The total active output of the generators in the region was optimized to be 62897kw, and the dispatching scheme cost was $177850. The power change of the DC interconnection line transmission plan between region A and region B within 24 hours in one day is as follows Fig. 9 shown.

[0154] In summary, from the comparison of the scheduling results of directly using the SCIP solver and the scheduling results of optimizing the solution using the Lipschitz nonlinear optimization algorithm for the scheduling problem of the dual-zone 114-node AC / DC interconnected power grid area, it can be seen that the strategy cost formulated by the Lipschitz nonlinear optimization algorithm for scheduling is much smaller than the strategy cost formulated by the SCIP solver, and the 24h DC interconnection line transmission plan formulated by it is also more reasonable, that is, the Lipschitz nonlinear optimization algorithm performs better than the MINLP solver in solving larger-scale AC / DC interconnected power grid scheduling problems.

[0155] Embodiment 2:

[0156] See also Fig.10 As shown, the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line provided in this embodiment includes a processor, a memory, and a computer program stored in the memory and executable on the processor, such as an AC / DC interconnected power grid dispatching program considering the discrete operation mode of the DC tie line. When the processor executes the computer program, the steps of the above embodiment 1 are implemented, such as Figure 1 Steps shown.

[0157] Exemplarily, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to complete the present invention. The one or more modules / units may be a series of computer program instruction segments capable of completing specific functions, which are used to describe the execution process of the computer program in the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line.

[0158] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0159] The memory may be an internal storage unit of the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line, such as a hard disk or memory of the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line. The memory may also be an external storage device of the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line, such as a plug-in hard disk, a smart memory card (SmartMedia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line. Further, the memory may also include both the internal storage unit of the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line and an external storage device. The memory is used to store the computer program and other programs and data required by the AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of the DC tie line. The memory may also be used to temporarily store data that has been output or is to be output.

[0160] Embodiment 3:

[0161] This embodiment provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps of the method described in Embodiment 1 are implemented.

[0162] The computer-readable medium shown can be any device that can contain, store, communicate, propagate or transmit a program for use with an instruction execution system, device or apparatus or in conjunction with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection portion with one or more wirings (electronic devices), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and editable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium can even be paper or other suitable media on which the program can be printed, such as by optically scanning the paper or other medium, then editing, interpreting or processing in other suitable ways as necessary to obtain the program electronically, and then storing it in a computer memory.

[0163] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable ordinary technicians in the field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made based on the essence of the content of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for dispatching an AC / DC interconnected power grid considering the discrete operation mode of DC tie lines, characterized in that: include: Establish an AC / DC interconnected power grid dispatching model that takes into account the discrete operation mode and transmission loss of DC tie lines; The AC / DC interconnected power grid dispatching model is solved based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity to obtain a dispatching scheme.

2. The AC / DC interconnected power grid dispatching method considering the discrete operation mode of DC tie lines according to claim 1, characterized in that: The objective function of the AC / DC interconnected power grid dispatching model considering the discrete operation mode and transmission loss of the DC tie line is: Where T is the time period index set within the full-day scheduling cycle, ΔT is the scheduling time interval, with 1 hour as a time period; a and A are the regional index and regional index set respectively; Ga is the generator index set of region a; P g,t is the active output of generator g in period t, are the positive and negative spinning reserves of generator g in period t; c g is the electricity price of generator g, are the positive and negative spinning reserve cost coefficients of generator g respectively.

3. The AC / DC interconnected power grid dispatching method considering the discrete operation mode of DC tie lines according to claim 2, characterized in that: The constraint conditions of the AC / DC interconnected power grid dispatching model considering the discrete operation mode and transmission loss of the DC tie line include regional operation constraints, and the regional operation constraints include: Node power balance equation constraints: in, are the equivalent power of the nodes on the rectifier and inverter sides of the DC tie line mn in time period t, D i,t is the load forecast value of node i in period t, is the index set of generators located at node i, is the index set of the rectifier-side node / inverter-side node of the DC tie line located at the node, Ψ a is the set of provincial network a nodes, Ω i is the set of nodes connected to node i; Transmission capacity constraints of AC lines: in, is the upper limit of the transmission capacity of the AC line (i, j), θ i,t ,θ j,t is the voltage phase angle of the nodes at the beginning and end of the AC line; Upper and lower limit constraints of the generator set: in, are the upper and lower limits of the active output of generator g respectively; Generator climbing and sliding constraints: -RD g ΔT≤P g,t -P g,t-1 ≤RU g ΔT,g∈G a , (5) where RU g , RD g are the climbing rate and sliding rate of generator g respectively; Positive spinning reserve capacity constraint: Negative spinning reserve capacity constraint: Global positive and negative rotation constraints: in, They are the total positive and negative spinning reserves of region a in period t, respectively.

4. The AC / DC interconnected power grid dispatching method considering the discrete operation mode of DC tie lines according to claim 3, characterized in that: The constraints of the AC / DC interconnected power grid dispatching model considering the discrete operation mode and transmission loss of the DC tie line also include the DC tie line operation constraints. Taking the DC tie line equivalent generator mn as an example, the constraints are: DC tie line transmission limit: Among them, P mn , They are the upper and lower transmission limits of the DC tie line mn respectively; Constraints on the output adjustment direction in adjacent phases: Due to the protection restrictions of the DC converter, the power of the DC interconnection line cannot be adjusted in different directions in adjacent periods; in, The variables of 0 and 1 respectively indicate whether the equivalent generator mn of the DC tie line is climbing or sliding in the period t; Constraints on continuity of output adjustment in adjacent phases: Due to the protection limitations of the DC converter, the power of the DC tie line cannot be adjusted continuously in adjacent periods; Among them, M + 、M - is a constant large enough to make the equation valid; Output adjustment frequency constraints: DC interconnection lines cannot be adjusted frequently within a day: Among them, S is the maximum number of adjustments allowed for the DC tie line within one day; Output adjustment rate constraint: The minimum adjustment amount of the equivalent generator mn of the DC tie line cannot be lower than a certain fixed value: in, are the minimum and maximum adjustment amounts of the DC tie line power respectively; Step constraint of output: After a ramp or landslide, the equivalent generator mn of the DC interconnection line needs to operate stably for at least one period of time to keep the power change of the DC interconnection line in a step state; in, The variables of 0 and 1 respectively indicate whether the DC tie line equivalent generator mn starts to adjust or ends the adjustment in period t; Constraints on total power transmission of DC interconnection lines: The power transmission plan of DC interconnection lines is determined by advance agreement or market transactions; Among them, Q mn Plan to transmit power for DC interconnection line mn; The relationship between the equivalent power on the rectifier and inverter sides of the DC interconnection line: Consider the transmission loss of the DC interconnection line to ensure the economy, stability and reliability of the power system in each region; Among them, V DC,mn 、r mn 、p mn They are respectively the rated voltage of the DC interconnection line mn, the line single-pole resistance and the number of operating poles.

5. The AC / DC interconnected power grid dispatching method considering the discrete operation mode of DC tie lines according to claim 4, characterized in that: The AC / DC interconnected power grid dispatching model is solved based on a linear relaxation algorithm of MINLP with multivariable Lipschitz continuous nonlinearity, including: The AC / DC interconnected power grid dispatching model is written in the following compact form: Where c∈R n+m ,A∈R q×(n+m) and b∈R q is a given known quantity, x∈R n ×Z m and are the upper and lower boundary quantities, [p]:={1,...,p} is the nonlinear constraint index, equation (17a) is the linear objective function equation (1), equation (17b) is the mixed integer linear constraint equation (2)-(15), the nonlinear constraint equation (16) is defined as equation (17c), f i The number of variables i =|I i |, Index set For all i∈[p], r i ∈[n] but Right now By relaxing constraint (17c), the original problem is relaxed to the following ε form: Where ε>0 is the specified error, the solution of problem (18) is the ε feasible point of problem (17), and the global optimal solution of problem (18) is called the approximate global optimal solution of problem (17).

6. The AC / DC interconnected power grid dispatching method considering the discrete operation mode of DC tie lines according to claim 5, characterized in that: The solution to problem (18) is: The main problem for the kth iteration is defined as follows: in is a nonlinear function f i The relaxation of the graph can be expressed in terms of mixed integer linear constraints; based on f i The Lipschitz continuity of a function is f i The domain is divided into a series of indexes box, and in each box Linear relaxation on the region f i Graphics; Feasible domain of the main problem The construction process is as follows: First define the box in d is an arbitrary dimension; for each i∈[p], assuming that Vector Make all Do not intersect each other and can cover The boundary of , at this time: Assume that L i Yes i exist The Lipschitz constant on the box The center of It means that, therefore: Based on f i The Lipschitz continuity property of f i satisfy: because In the box The maximum value is obtained on the boundary of Alternative After replacing f i satisfy: for The box area It is defined as follows: All boxes The sum of is the nonlinear function f i Relaxation graph, satisfying That is, used in the algorithm Replace nonlinear constraints Relax the original problem and define As The index collection of After solving the main problem, we get the solution x k box and split it into smaller boxes in the sub-problems; The sub-problems are defined as follows: in Indicates that x is included after solving the main problem k Solution Box The index of yes The sub-regions are selected as follows: in is to solve the main problem and include x k Solution box Upper and lower boundaries, λ∈(0,1 / 2]; Area of ​​sub-problems and Region (left) and the feasible region of the main problem at the beginning of the next iteration and 7. The AC / DC interconnected power grid dispatching method considering the discrete operation mode of DC tie lines according to claim 6, characterized in that: The iterative method to approximately solve problem (17) is:

8. An AC / DC interconnected power grid dispatching terminal considering the discrete operation mode of DC tie lines, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.