Optical storage charging station optimal configuration method based on master-slave game pricing strategy

By adopting the optimized configuration method of photo-storage charging stations based on the master-slave game pricing strategy in rural areas, the problems of insufficient charging facilities and photovoltaic absorption pressure are solved, the popularization of rural new energy vehicles and the efficiency of power grid operation are improved, and the charging and storage are realized The economic benefits and environmental friendliness of the power station.

CN118889412APending Publication Date: 2024-11-01STATE GRID SHANDONG ELECTRIC POWER CO LIAOCHENG POWER SUPPLY CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411146313.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The insufficient charging facilities in rural areas have led to the restriction of the development of new energy vehicles, and the rural network has a pressure to absorb in high-proportion photovoltaic access areas, affecting the operation of the power grid.

Method used

Adoption of the optical storage charging station optimization configuration method based on the master-slave game pricing strategy, by constructing a rural distribution network structure, establishing the upper-level decision-maker model and the lower-level follower model, and using the KKT condition and dual principle to convert the double-layer model into a hybrid integer linearity Planning the model and optimizing the configuration strategy of the charging and storage station.

Benefits of technology

It effectively solved the problem of insufficient charging facilities in rural areas, improved the photovoltaic consumption rate, increased the income of charging and storage station investors, reduced the charging costs of electric vehicles, and promoted the popularization of new energy vehicles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889412A_ABST
    Figure CN118889412A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of power station optimal configuration, and particularly relates to an optical storage charging station optimal configuration method based on a master-slave game pricing strategy, and the method comprises the steps: constructing a to-be-planned rural power distribution network structure containing a charging and storage power station; taking a charging and storage power station investor as an upper decision maker, and establishing an upper decision maker model based on the power grid operation constraint and the charging and storage power station constraint; based on the upper layer decision maker model, establishing a lower layer follower model by taking the minimum charging cost as a target; converting the lower-layer follower model into additional constraints of an upper-layer decision maker model by using a KKT condition; based on a duality principle, replacing a nonlinear term in an upper decision maker model with a linear term, and converting the charging and storage power station optimization configuration model into a single-layer mixed integer linear programming model; and solving the mixed integer linear programming model to obtain an optimal configuration strategy of the optical storage charging station. The problem that charging facilities in rural areas are insufficient can be effectively solved, and popularization of new energy automobiles in the rural areas can be promoted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power station optimization configuration, and specifically relates to a method for optimizing configuration of a photovoltaic storage charging station based on a master-slave game pricing strategy. Background Art

[0002] At present, the uneven layout and insufficient number of charging facilities have become "bottlenecks" and "pain points" that restrict the development of new energy vehicles in rural areas. According to statistics, only 5% of public charging piles are located in rural areas of towns and villages, which cannot meet the requirements of advanced charging facilities in rural areas.

[0003] From the perspective of the current status of power grid development, there are two significant differences between rural regional power grids and urban regional power grids: First, the power grid infrastructure is weak, with large power supply radius, small equipment capacity, and severe wear and aging. Electric vehicle charging stations have the characteristics of strong uncertainty and high impact of charging load, which brings new challenges to the operation of rural power grids. Therefore, the operation constraints such as rural power grid current and voltage should be considered when selecting the site for charging stations. Second, a large number of distributed photovoltaics in various forms such as rooftop photovoltaics and water photovoltaics are connected. Some rural power grids have a return current at noon due to the large amount of photovoltaic output, and the pressure on photovoltaic absorption is increasing. Therefore, the integrated photovoltaic storage and charging power station is not suitable for large-scale development in rural power grid areas with a high proportion of photovoltaic access, and the charging and storage power station composed of energy storage equipment and charging stations is more compatible with the rural power grid.

[0004] From the perspective of charging and storage power station builders, rural road construction is imperfect, the number of electric vehicles is small, and the demand for charging is small. Charging and storage power station construction projects have problems such as low profits and small returns. How to improve the rate of return on charging and storage power station construction projects has become the key to attracting operators to invest in the construction of charging and storage power stations and increase the coverage rate of rural power grid charging and storage power stations. A reasonable pricing strategy can fully consider the interests of the network-station-vehicle, increase the operating profit of charging and storage power stations, and reduce the charging costs of electric vehicles. Therefore, in the optimization configuration model of charging and storage power stations in rural power grid areas, it is necessary to take into account the impact of pricing strategies on the interests of all parties. Summary of the invention

[0005] In view of the above deficiencies in the prior art, the present invention provides a method for optimizing the configuration of photovoltaic storage charging stations based on a master-slave game pricing strategy, which can effectively solve the problem of insufficient charging facilities in rural areas and promote the popularization of new energy vehicles in rural areas.

[0006] To achieve the above objectives, the technical solution adopted by the present invention is a method for optimizing the configuration of a photovoltaic storage charging station based on a master-slave game pricing strategy, comprising the following steps: S1. Construct a planned rural distribution network structure including a charging and storage power station. The planned rural distribution network structure includes a photovoltaic array and a charging and storage power station. The charging and storage power station obtains electricity from the distribution network and supplies the charging load of electric vehicles through charging piles. At the same time, it can temporarily store electricity in energy storage equipment, and the photovoltaic array transmits electricity to the distribution network; S2. Taking the investors of charging and storage power stations as the upper-level decision makers, an upper-level decision maker model is established based on the constraints of power grid operation and charging and storage power stations; S3. Based on the upper decision-maker model, with the goal of minimizing the charging cost, a lower follower model is established, and the charging constraints of electric vehicles are set. The upper decision-maker model and the lower follower model together constitute an optimal configuration model of charging and storage power stations based on the master-slave game principle; S4. Use KKT conditions to convert the lower-layer follower model into an additional constraint of the upper-layer decision-maker model, thereby realizing the transformation of the two-layer model into a single-layer model. S5. Based on the duality principle, linear terms are used to replace nonlinear terms in the upper decision-maker model, and the large M method is used to achieve complementary relaxation of nonlinear terms, so as to transform the optimal configuration model of charging and storage power stations into a single-layer mixed integer linear programming model; S6. Solve the mixed integer linear programming model to obtain the optimal configuration strategy of the charging and storage power station.

[0007] As a preferred embodiment of the present invention, in the S1, a plurality of charging and storage power stations are provided in the rural distribution network structure to be planned.

[0008] As a preferred embodiment of the present invention, in said S2, it is defined as , , , ; is a universal quantifier, , , are the sets of rural power grid nodes, rural power grid lines, and typical time sequence numbers; is the set of nodes connected to the rural grid node i; i and j are the serial numbers of the rural grid nodes; t is the serial number of the typical time, the rural grid is the rural distribution network structure to be planned, the rural grid node is the network node connected to the load and power supply in the rural distribution network structure to be planned, referred to as the node, the typical time is referred to as the time, and the rural grid line is referred to as the line; the grid operation constraints include power flow constraints, power balance constraints, equipment capacity constraints, node voltage constraints and load power factor constraints, which are respectively expressed as: Power flow constraints: (1); In the formula, , are the squares of the voltages at nodes i and j at time t respectively; , are respectively the active and reactive power of line ij at time t; , are the resistance and reactance of line ij respectively; Power balance constraints: (2); (3); (4); In the formula, , are respectively the active and reactive power of the transformer at node i at time t; is the actual photovoltaic output of node i at time t; , are the active and reactive loads of node i at time t respectively; is the power of the charging and storage station on node i interacting with the distribution network at time t; is the amount of electricity purchased by the charging and storage station at node i in the day-ahead market at time t; , They are the amount of electricity purchased and sold by the charging and storage power station at node i in the real-time market at time t; Equipment capacity constraints: (5); (6); In the formula, is the photovoltaic capacity of node i; is the unit capacity photovoltaic output of node i at time t; is the capacity of line ij; Node voltage constraints: (7); In the formula, , are the lower and upper limits of the voltage at node i respectively; Load power factor constraint: In the formula, (8); In the formula, is the load power factor angle.

[0009] As a preferred embodiment of the present invention, in said S2, it is defined as ; A collection of candidate rural grid nodes for building charging and storage power stations. include (That is, if node i satisfies , then it can be used as an alternative rural grid node for access to the charging and storage power station); m is the serial number of the electric vehicle being charged; the constraints of the charging and storage power station include charging price constraints, power balance constraints of the charging and storage power station, energy storage equipment operation constraints, and logical constraints of the charging and storage power station construction, which are expressed as follows: Charging price constraints: (9); (10); In the formula, , , are the lower limit, charging price, and upper limit of charging price of node i at time t respectively; N T is the number of typical moments; is the average electricity price; Power balance constraints of charging and storage power stations: (11); In the formula, is the charging power of electric vehicle m at time t when charging at node i; , are the charging and discharging powers of the charging and storage station on node i (here refers to the corresponding charging and storage station when there is a charging and storage station on node i, the same below) at time t; Energy storage equipment operation constraints: (12); (13); (14); In the formula, , are the charging and discharging efficiencies of the energy storage device, respectively; , are the electric energy stored by the energy storage device on node i at time t and time t+1 respectively; It is the ratio of the maximum charging power of the energy storage device to the device capacity; is the capacity of the energy storage equipment to be built on node i; Logical constraints on the construction of charging and storage power stations: (15); (16); (17); In the formula, is the upper limit of the capacity of energy storage equipment allowed to be built on node i; is a Boolean variable representing the construction status of the charging and storage power station at node i; M is the coefficient in the big M method (usually a very large constant).

[0010] As a preferred solution of the present invention, in S2, the objective function of the upper decision maker model is to maximize the investment benefits of the charging and storage power station, which is expressed as: (18); (19); Where N is the number of times a typical moment occurs in a year; , are the real-time market electricity purchase and sales prices at time t; is the construction cost of energy storage equipment per unit capacity; is the electricity purchase price at time t in the market the day before; is the annuity present value coefficient; r is the annual interest rate; T is the planning period.

[0011] As a preferred solution of the present invention, in S3, the objective function of the lower follower model is expressed as: (20); The electric vehicle charging constraints are: (twenty one); (twenty two); (twenty three); In the formula, A set of typical time sequence numbers for charging; is the capacity of the battery of electric vehicle m at node i; The power of electric vehicle m at node i before charging; is the maximum charging power of electric vehicle m at node i.

[0012] As a preferred solution of the present invention, in the S4, in the lower follower model, is a constant, so the lower model is a linear programming problem. KKT conditions are used to transform equations (20) to (23) into constraint conditions, which can be expressed as: (twenty four); (25); (26); (27); (28); (29); In the formula, , , , is the dual variable; The big M method is used to achieve complementary relaxation of nonlinear terms, which can be expressed as: (30); (31); (32); (33); (34); In the formula, , is an auxiliary variable.

[0013] Here, the dual variable and the auxiliary variable are variables that appear in the pure mathematical transformation process, and the subscripts of the dual variable and the auxiliary variable indicate that the variable corresponds to the node i, the electric vehicle m, and the time t.

[0014] As a preferred solution of the present invention, in said S5, in the upper decision maker model, is the decision quantity. According to the duality theorem, the nonlinear term in the objective function of the lower follower model is replaced by a linear term. , and then obtain the linearized objective function f of the upper decision maker model after transformation, expressed as: (35); (36).

[0015] As a preferred embodiment of the present invention, in S5, the single-layer mixed integer linear programming model is expressed as: (37).

[0016] As a preferred solution of the present invention, in S6, the commercial solver GUROBI is used for solving.

[0017] The algorithm involved in the present invention can be executed by an electronic device, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor. The algorithm is implemented by executing software through the processor.

[0018] The beneficial effects of the present invention are: The present invention effectively solves the problem of insufficient charging facilities in rural areas by establishing an optimization model that comprehensively considers the operation constraints of the power grid, the construction and operation conditions of the charging and storage power stations, and the charging behavior of electric vehicles. The model uses the KKT condition (Karush Kuhn Tucker) and the duality principle to transform the complex two-level game problem into a mixed integer linear programming problem that is easier to solve, thereby improving the practicality and operability of the model.

[0019] Through empirical analysis of typical examples of IEEE33 nodes, this paper verifies the effectiveness of the proposed model in improving the photovoltaic absorption rate, alleviating the pressure of photovoltaic absorption in rural power grids, increasing the returns of charging and storage power station investors, and reducing the charging costs of electric vehicles. This not only reflects the economic benefits and environmental friendliness of the model, but also demonstrates its potential in practical applications. Through this optimized configuration, the popularization of new energy vehicles in rural areas can be promoted, and a win-win situation can be brought to power grid operators and electric vehicle owners. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the process of the present invention; Figure 2 is a schematic diagram of a rural distribution network structure to be planned in an embodiment of the present invention; Figure 3 It is a schematic diagram of the IEEE33 node power grid during the verification process of the present invention; Figure 4 It is a schematic diagram of the day-ahead electricity price parameters at a typical time during the verification process of the present invention; Figure 5 It is a schematic diagram of node load parameters at a typical moment during the verification process of the present invention; Figure 6 It is a schematic diagram of photovoltaic output parameters at typical moments during the verification process of the present invention; Figure 7 It is a schematic diagram of the charging period of an electric vehicle during the verification process of the present invention; Figure 8 It is a schematic diagram of Case 1 electricity price optimization results during the verification process of the present invention; Fig. 9 It is a schematic diagram of energy balance of Case 1 charging and storage power station during the verification process of the present invention; Fig.10 It is a schematic diagram of the correspondence between the charging power and the charging electricity price of Case 1 electric vehicle in the verification process of the present invention; Fig.11 It is a schematic diagram of the energy balance situation on the grid side of Case 1 and Case 4 during the verification process of the present invention; Fig.12 It is a schematic diagram comparing the charging costs of electric vehicles in Case 1 and Case 3 during the verification process of the present invention. DETAILED DESCRIPTION

[0021] The embodiments of the present invention are further described below in conjunction with the accompanying drawings: like Figure 1 As shown, a method for optimizing configuration of a photovoltaic storage charging station based on a master-slave game pricing strategy includes the following steps: S1. Construct a planned rural distribution network structure including a charging and storage power station. The planned rural distribution network structure includes a photovoltaic array and a charging and storage power station. The charging and storage power station obtains electricity from the distribution network and supplies the charging load of electric vehicles through charging piles. At the same time, it can temporarily store electricity in energy storage equipment, and the photovoltaic array transmits electricity to the distribution network; S2. Taking the investors of charging and storage power stations as the upper-level decision makers, an upper-level decision maker model is established based on the constraints of power grid operation and charging and storage power stations; S3. Based on the upper decision-maker model, with the goal of minimizing the charging cost, a lower follower model is established, and the charging constraints of electric vehicles are set. The upper decision-maker model and the lower follower model together constitute an optimal configuration model of charging and storage power stations based on the master-slave game principle; S4. Use KKT conditions to convert the lower-layer follower model into an additional constraint of the upper-layer decision-maker model, thereby realizing the transformation of the two-layer model into a single-layer model. S5. Based on the duality principle, linear terms are used to replace nonlinear terms in the upper decision-maker model, and the large M method is used to achieve complementary relaxation of nonlinear terms, so as to transform the optimal configuration model of charging and storage power stations into a single-layer mixed integer linear programming model; S6. Solve the mixed integer linear programming model to obtain the optimal configuration strategy of the charging and storage power station.

[0022] In S1, the reference structure of the rural distribution network to be planned is as follows: Figure 2 As shown, there are two charging and storage power stations in the reference figure.

[0023] In S2, define , , , ; is a universal quantifier, , , are the sets of rural power grid nodes, rural power grid lines, and typical time sequence numbers; is the set of nodes connected to the rural grid node i; i and j are the serial numbers of the rural grid nodes; t is the serial number of the typical time, the rural grid is the rural distribution network structure to be planned, the rural grid node is the network node connected to the load and power supply in the rural distribution network structure to be planned, referred to as the node, the typical time is referred to as the time, and the rural grid line is referred to as the line; the grid operation constraints include power flow constraints, power balance constraints, equipment capacity constraints, node voltage constraints and load power factor constraints, which are respectively expressed as: Power flow constraints: (1); In the formula, , are the squares of the voltages at nodes i and j at time t respectively; , are respectively the active and reactive power of line ij at time t; , are the resistance and reactance of line ij respectively; Power balance constraints: (2); (3); (4); In the formula, , are respectively the active and reactive power of the transformer at node i at time t; is the actual photovoltaic output of node i at time t; , are the active and reactive loads of node i at time t respectively; is the power of the charging and storage station on node i interacting with the distribution network at time t; is the amount of electricity purchased by the charging and storage station at node i in the day-ahead market at time t; , They are the amount of electricity purchased and sold by the charging and storage power station at node i in the real-time market at time t; Equipment capacity constraints: (5); (6); In the formula, is the photovoltaic capacity of node i; is the unit capacity photovoltaic output of node i at time t; is the capacity of line ij; Node voltage constraints: (7); In the formula, , are the lower and upper limits of the voltage at node i respectively; Load power factor constraint: In the formula, (8); In the formula, is the load power factor angle.

[0024] In S2, define ; A collection of candidate rural grid nodes for building charging and storage power stations. include ; m is the serial number of the electric vehicle being charged; the constraints of the charging and storage power station include the charging price constraint, the power balance constraint of the charging and storage power station, the operation constraint of the energy storage equipment, and the logical constraint of the construction of the charging and storage power station, which are respectively expressed as: Charging price constraints: (9); (10); In the formula, , , are the lower limit, charging price, and upper limit of charging price of node i at time t respectively; N T is the number of typical moments; is the average electricity price; Power balance constraints of charging and storage power stations: (11); In the formula, is the charging power of electric vehicle m at time t when charging at node i; , are the charging and discharging power of the charging and storage station at node i at time t; Energy storage equipment operation constraints: (12); (13); (14); In the formula, , are the charging and discharging efficiencies of the energy storage device, respectively; , are the electric energy stored by the energy storage device on node i at time t and time t+1 respectively; It is the ratio of the maximum charging power of the energy storage device to the device capacity; is the capacity of the energy storage equipment to be built on node i; Logical constraints on the construction of charging and storage power stations: (15); (16); (17); In the formula, is the upper limit of the capacity of energy storage equipment allowed to be built on node i; is a Boolean variable representing the construction status of the charging and storage power station at node i; M is the coefficient in the big M method.

[0025] In S2, the objective function of the upper decision-maker model is to maximize the investment benefits of the charging and storage power station, which can be expressed as: (18); (19); Where N is the number of times a typical moment occurs in a year; , are the real-time market electricity purchase and sales prices at time t; is the construction cost of energy storage equipment per unit capacity; is the electricity purchase price at time t in the market the day before; is the annuity present value coefficient; r is the annual interest rate; T is the planning period.

[0026] In S3, the objective function of the lower follower model is expressed as: (20); The electric vehicle charging constraints are: (twenty one); (twenty two); (twenty three); In the formula, A set of typical time sequence numbers for charging; is the capacity of the battery of electric vehicle m at node i; The power of electric vehicle m at node i before charging; is the maximum charging power of electric vehicle m at node i.

[0027] In S4, in the lower follower model, is a constant, so the lower model is a linear programming problem. KKT conditions are used to transform equations (20) to (23) into constraint conditions, which can be expressed as: (twenty four); (25); (26); (27); (28); (29); In the formula, , , , is the dual variable; The big M method is used to achieve complementary relaxation of nonlinear terms, which can be expressed as: (30); (31); (32); (33); (34); In the formula, , is an auxiliary variable.

[0028] In S5, in the upper decision maker model, is the decision quantity. According to the duality theorem, the nonlinear term in the objective function of the lower follower model is replaced by a linear term. , and then obtain the linearized objective function f of the upper decision maker model after transformation, expressed as: (35); (36).

[0029] In S5, the single-layer mixed integer linear programming model is expressed as: (37).

[0030] In S6, the commercial solver GUROBI is used for solving.

[0031] The verification process is: The verification is based on the improved IEEE33-node power grid. Figure 3 As shown, the grid nodes in each figure are the rural grid nodes in the invention. Nodes 2, 19, 23, and 26 in area 1 are connected to distributed photovoltaics, and nodes 2, 21, 23, and 30 are candidate charging and storage power station construction nodes; nodes 7 and 14 in area 2 are connected to distributed photovoltaics, and nodes 6, 10, 13, and 16 are candidate charging and storage power station construction nodes. Other grid parameters are set based on known technologies, such as the reference document "Optimal Operation of Photovoltaic Charging Station Energy Storage System Based on Deep Reinforcement Learning".

[0032] In order to ensure the adaptability of the configuration scheme, four typical days in spring, summer, autumn and winter are selected for operation scenario simulation. Each typical day contains 24 typical moments, totaling 4×24=96 typical moments. The day-ahead electricity price, node load and photovoltaic output parameters at typical moments are as follows: Figure 4-Figure 6 shown.

[0033] To characterize the differences in electric vehicle charging behavior, electric vehicles are divided into three groups: the first group charges only during the day, representing night shift workers; the second group charges at night and at noon, representing people with normal work and rest schedules; the third group charges only at night, representing people who leave early and return late. Figure 7 As shown in Figure 1, the number of electric vehicles in the three groups in area 1 is 25, 15, and 10 respectively, and the number of electric vehicles in the three groups in area 2 is 10, 20, and 20 respectively.

[0034] The parameters of energy storage equipment in the charging and storage station are shown in Table 1. The parameters of electric vehicles are as follows: Battery capacity =24kW·h, power before charging =9.6kW·h, maximum charging power =3kW. The electricity price parameters are as follows: =1.2 , =1.2 , =1.2 , =0.8 , = 0.55 yuan / kW·h. Other parameters in the planning process are set as follows: r = 5%; T = 15 years.

[0035] Table 1 Energy storage equipment parameters

[0036] Set up four sets of comparison examples: Case 1: Configuration of charging and storage power stations based on master-slave game pricing.

[0037] Case 2: Configuration of charging and storage power stations based on day-ahead market pricing.

[0038] Case 3: Charging and storage power station configuration based on real-time market pricing.

[0039] Case 4: Charging station configuration based on master-slave game pricing, without coordinated configuration of energy storage equipment.

[0040] Optimization results: The revenue and expenditure of the charging and storage power station construction plan in Case 1 are shown in Table 2. The investors of the charging and storage power stations in Region 1 and Region 2 respectively made a profit of 18.88×10 4 Yuan, 18.03×10 4 Yuan, with a total profit of 36.91×10 4 Yuan.

[0041] Table 2 Benefit and cost table of Case 1

[0042] Case 1 electricity price optimization results are as follows Figure 8 As shown in the figure, the charging and storage power station investors determine the optimal electricity price strategy between the upper and lower limits of electricity prices through a game process with electric vehicle owners and pass it on to electric vehicle owners, ensuring the interests of both parties while making electric vehicle charging behavior more orderly.

[0043] Case 1 Energy balance of charging and storage power station Fig. 9 As shown in the figure, the investors of charging and storage power stations provide charging services for electric vehicle owners by optimizing the power purchase and sales strategy and the energy storage equipment charging and discharging strategy.

[0044] Case 1 The correspondence between electric vehicle charging power and charging electricity price is as follows Fig.10 As shown in the figure, rational electric car owners will tend to choose to charge during the period of low electricity prices within their own charging period to reduce their own charging costs.

[0045] Network side comparison: Fig.11 The energy balance of the grid side of Case 1 and Case 4 is shown. Compared with the traditional charging station in Case 4, the charging and storage station in Case 1 can take advantage of the energy storage equipment to absorb excess power during the period of high distributed photovoltaic output at noon, increase the photovoltaic absorption rate in the area with a high proportion of photovoltaic access to the rural grid, and alleviate the pressure of photovoltaic absorption in the rural grid.

[0046] Station side comparison: The configuration schemes of the charging and storage power stations in each case are shown in Table 3. In Case 1, charging and storage power stations are built at nodes 6 and 30, and 4531kW·h and 4203kW·h energy storage equipment are built respectively.

[0047] Table 3 Comparison of charging and storage power station configuration schemes

[0048] The total revenue comparison of each example configuration scheme is shown in Table 4. Compared with Case 2 and Case 3, which are priced according to the day-ahead market and the real-time market, the total revenue of Case 1 based on master-slave game pricing increased by 14.45% and 8.14% respectively. Compared with Case 4 without energy storage, the total revenue of Case 1 increased by 36.06×10 4 That is, compared with the traditional configuration model, the model proposed in the present invention can increase the income of the charging and storage power station investors.

[0049] Table 4 Comparison of total benefits of configuration schemes

[0050] Car side comparison: For electric car owners, they can directly obtain electricity from the real-time market. In this case, the charging cost should be the same as that of Case 3, which is priced according to the real-time market. Fig.12 As shown in Figure 1, the charging cost of Case 1 is 16.2% lower than that of Case 3, which means that compared with purchasing electricity directly from the real-time market, charging through a charging and storage station is more in line with the interests of electric vehicle owners.

[0051] After verification, the present invention proposes an optimal configuration model of charging and storage power stations based on the master-slave game pricing strategy for rural grid areas with a high proportion of photovoltaic access, and plans the location of photovoltaic storage power stations in rural areas and the capacity of supporting energy storage equipment. The example comparison shows that: from the perspective of the power grid, the optimal configuration scheme of the charging and storage power station can improve the photovoltaic absorption rate in rural grid areas with a high proportion of photovoltaic access, and alleviate the pressure of photovoltaic absorption in rural grids; from the perspective of the charging and storage power station, the configuration model of the charging and storage power station based on the master-slave game pricing strategy can improve the income of the charging and storage power station investors; from the perspective of electric vehicles, the pricing strategy based on the master-slave game can reduce the charging cost of electric vehicles, which is more in line with the interests of electric vehicle owners.

Claims

1. A method for optimizing the configuration of photovoltaic charging stations based on a master-slave game pricing strategy, characterized in that The following steps are involved: S1. Construct a planned rural distribution network structure including a charging and storage power station. The planned rural distribution network structure includes a photovoltaic array and a charging and storage power station. The charging and storage power station obtains electricity from the distribution network and supplies the charging load of electric vehicles through charging piles. At the same time, it can temporarily store electricity in energy storage equipment, and the photovoltaic array transmits electricity to the distribution network; S2. Taking the investors of charging and storage power stations as the upper-level decision makers, an upper-level decision maker model is established based on the constraints of power grid operation and charging and storage power stations; S3. Based on the upper decision-maker model, with the goal of minimizing the charging cost, a lower follower model is established, and the charging constraints of electric vehicles are set. The upper decision-maker model and the lower follower model together constitute an optimal configuration model of charging and storage power stations based on the master-slave game principle; S4. Use KKT conditions to convert the lower-layer follower model into an additional constraint of the upper-layer decision-maker model, thereby realizing the transformation of the two-layer model into a single-layer model. S5. Based on the duality principle, linear terms are used to replace nonlinear terms in the upper decision-maker model, and the large M method is used to achieve complementary relaxation of nonlinear terms, so as to transform the optimal configuration model of charging and storage power stations into a single-layer mixed integer linear programming model; S6. Solve the mixed integer linear programming model to obtain the optimal configuration strategy of the charging and storage power station.

2. According to claim 1, a method for optimizing configuration of photovoltaic storage charging stations based on a master-slave game pricing strategy is characterized by: In the above-mentioned S1, a plurality of charging and storage power stations are provided in the rural distribution network structure to be planned.

3. The method for optimizing configuration of photovoltaic charging stations based on master-slave game pricing strategy according to claim 1 is characterized in that: In S2, it is defined , , , ; is a universal quantifier, , , are the sets of rural power grid nodes, rural power grid lines, and typical time sequence numbers; is the set of nodes connected to the rural grid node i; i and j are the serial numbers of the rural grid nodes; t is the serial number of the typical time, the rural grid is the rural distribution network structure to be planned, the rural grid node is the network node connected to the load and power supply in the rural distribution network structure to be planned, referred to as the node, the typical time is referred to as the time, and the rural grid line is referred to as the line; the grid operation constraints include power flow constraints, power balance constraints, equipment capacity constraints, node voltage constraints and load power factor constraints, which are respectively expressed as: Power flow constraints: (1); In the formula, , are the squares of the voltages at nodes i and j at time t respectively; , are respectively the active and reactive power of line ij at time t; , are the resistance and reactance of line ij respectively; Power balance constraints: (2); (3); (4); In the formula, , are respectively the active and reactive power of the transformer at node i at time t; is the actual photovoltaic output of node i at time t; , are the active and reactive loads of node i at time t respectively; is the power of the charging and storage station on node i interacting with the distribution network at time t; is the amount of electricity purchased by the charging and storage station at node i in the day-ahead market at time t; , They are the amount of electricity purchased and sold by the charging and storage station at node i in the real-time market at time t; Equipment capacity constraints: (5); (6); In the formula, is the photovoltaic capacity of node i; is the unit capacity photovoltaic output of node i at time t; is the capacity of line ij; Node voltage constraints: (7); In the formula, , are the lower and upper limits of the voltage at node i respectively; Load power factor constraint: In the formula, (8); In the formula, is the load power factor angle.

4. The method for optimizing configuration of photovoltaic charging stations based on a master-slave game pricing strategy according to claim 3 is characterized in that: In S2, it is defined ; A collection of candidate rural grid nodes for building charging and storage power stations. include ; m is the serial number of the electric vehicle being charged; the constraints of the charging and storage power station include the charging price constraint, the power balance constraint of the charging and storage power station, the operation constraint of the energy storage equipment, and the logical constraint of the construction of the charging and storage power station, which are respectively expressed as: Charging price constraints: (9); (10); In the formula, , , are the lower limit, charging price, and upper limit of charging price of node i at time t respectively; N T is the number of typical moments; is the average electricity price; Power balance constraints of charging and storage power stations: (11); In the formula, is the charging power of electric vehicle m at time t when charging at node i; , are the charging and discharging power of the charging and storage station at node i at time t; Energy storage equipment operation constraints: (12); (13); (14); In the formula, , are the charging and discharging efficiencies of the energy storage device, respectively; , are the electric energy stored by the energy storage device on node i at time t and time t+1 respectively; It is the ratio of the maximum charging power of the energy storage device to the device capacity; is the capacity of the energy storage equipment to be built on node i; Logical constraints on the construction of charging and storage power stations: (15); (16); (17); In the formula, is the upper limit of the capacity of energy storage equipment allowed to be built on node i; is a Boolean variable representing the construction status of the charging and storage power station at node i; M is the coefficient in the big M method.

5. The method for optimizing configuration of photovoltaic charging stations based on master-slave game pricing strategy according to claim 4 is characterized in that: In S2, the objective function of the upper decision-maker model is to maximize the investment benefits of the charging and storage power station, which is expressed as: (18); (19); Where N is the number of times a typical moment occurs in a year; , are the real-time market electricity purchase and sales prices at time t; is the construction cost of energy storage equipment per unit capacity; is the electricity purchase price in the market at time t the day before; is the annuity present value coefficient; r is the annual interest rate; T is the planning period.

6. The method for optimizing configuration of photovoltaic charging stations based on a master-slave game pricing strategy according to claim 5 is characterized in that: In S3, the objective function of the lower follower model is expressed as: (20); The electric vehicle charging constraints are: (21); (22); (23); In the formula, A set of typical time sequence numbers for charging; is the capacity of the battery of electric vehicle m at node i; The power of electric vehicle m at node i before charging; is the maximum charging power of electric vehicle m at node i.

7. The method for optimizing configuration of photovoltaic charging stations based on master-slave game pricing strategy according to claim 6 is characterized in that: In the above S4, in the lower follower model, is a constant, so the lower model is a linear programming problem. KKT conditions are used to transform equations (20) to (23) into constraint conditions, which can be expressed as: (24); (25); (26); (27); (28); (29); In the formula, , , , is the dual variable; The big M method is used to achieve complementary relaxation of nonlinear terms, which can be expressed as: (30); (31); (32); (33); (34); In the formula, , is an auxiliary variable.

8. The method for optimizing configuration of photovoltaic charging stations based on master-slave game pricing strategy according to claim 7 is characterized in that: In S5, in the upper decision maker model, is the decision quantity. According to the duality theorem, the nonlinear term in the objective function of the lower follower model is replaced by a linear term. , and then obtain the linearized objective function f of the upper decision maker model after transformation, expressed as: (35); (36)。 9. The method for optimizing configuration of photovoltaic storage charging stations based on master-slave game pricing strategy according to claim 8 is characterized in that: In S5, the single-layer mixed integer linear programming model is expressed as: (37)。 10. The method for optimizing configuration of photovoltaic energy storage charging stations based on master-slave game pricing strategy according to claim 1, characterized in that: In the above-mentioned S6, the commercial solver GUROBI is used for solving.