Primary distribution micro integrated layered time sequence production simulation method based on partition aggregation

Through partition aggregation and double-layer optimization models, the power balance and stability problems of traditional main-equipped microgrids under the demand for new energy and complex loads are solved, and more efficient new energy consumption and grid stability are achieved.

CN118889425AActive Publication Date: 2024-11-01STATE GRID JIANGSU ELECTRIC POWER CO LTD +1

Patent Information

Application Number
CN202411002761.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-01
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

When traditional main distribution microgrids face the growth of new energy proportion and complex load demand, it is difficult to maintain power balance and stability. The existing production simulation methods cannot accurately reflect the characteristics of power flow, and traditional scheduling methods are difficult to cope with the volatility of new energy and The complexity of distributed power supplies.

Method used

Using the main and micro-integrated layered timing production simulation method based on partition aggregation, the power balance is optimized through the double-layer optimization model, and the new energy consumption and system power supply reliability are optimized, including defining aggregate partitions, establishing upper and lower layer timing production models, Set technical and economic constraints to optimize start-stop and energy storage scheduling of conventional units.

Benefits of technology

The power balance analysis capability and new energy consumption capacity of the main microgrid are improved, the power supply shortage and operating costs are reduced, and the stability and power supply reliability of the power grid are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889425A_ABST
    Figure CN118889425A_ABST
Patent Text Reader

Abstract

The invention relates to a partition aggregation-based main distribution micro-grid integrated layered time sequence production simulation method. The method comprises the following steps of S1, defining an aggregation partition of a main distribution micro-grid; s2, establishing an upper-layer time sequence production model; s3, establishing a lower-layer time sequence production model; s4, setting constraint conditions; and S5, based on the steps S2-S4, solving by using Cplex to obtain a time sequence production simulation process. On the basis of optimizing the electric quantity balance of the main distribution micro-grid, the power supply reliability and the new energy utilization rate of the main distribution micro-grid are improved, and safe and efficient operation of the main distribution micro-grid is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of main distribution microgrids, and in particular to a main distribution microgrid hierarchical sequential production simulation method based on partition aggregation. Background Art

[0002] Traditional main and distribution microgrids face severe challenges in the face of the growing proportion of renewable energy and complex load demands. With the rapid development of renewable energy such as wind power and solar energy and the widespread popularity of new loads such as electric vehicles and electric heat, the grid structure has become increasingly complex, and traditional production simulation and power dispatching methods are difficult to adapt to this dynamic, fluctuating and decentralized energy structure. Existing production simulation methods have limitations in the dispatch optimization of large-scale power systems and cannot accurately reflect the power balance and power flow characteristics of various regions in the main and distribution microgrids.

[0003] On the one hand, new energy sources have characteristics such as volatility, intermittency and reverse peak regulation, which makes it difficult to maintain the balance of supply and demand in the power grid. New energy sources bring great challenges to the stability of the main distribution microgrid. On the other hand, traditional main distribution microgrids mainly rely on large centralized power plants, but a high proportion of distributed power sources are distributed in various places, which brings more complexity to power dispatching. The technical constraints of the main distribution microgrid (such as power loss, voltage support, line congestion and unit start and stop, etc.) are coupled with the characteristics of new energy grid connection, further exacerbating the impact on traditional dispatching methods.

[0004] In the prior art, for example, the application number "202310820841.6" proposed a two-layer optimization scheduling method for active distribution networks containing multiple microgrids, which optimizes system operating costs and improves grid efficiency through the interaction of top-level and bottom-level models. However, for the uncertainty modeling of wind and solar power generation, the heuristic moment matching method used is difficult to accurately capture the high randomness and volatility of wind and solar energy, which limits the accuracy and reliability of the model in actual grid operations.

[0005] The application number is "201510208209.1". A method for simulating the output time series of photovoltaic power plants based on the clear sky index is proposed. By obtaining geographic information and parameters related to the clear sky index, direct irradiation is calculated, and the tracking mode of the photovoltaic array is considered, a time-space correlation normal distribution sequence of the clear sky index is generated, and these data are used to calculate the actual output of the photovoltaic power plant to improve the accuracy of the output prediction. Although this method can simulate the theoretical maximum output of the photovoltaic power plant, it is not enough to deal with the volatility and uncertainty of photovoltaic output, especially the impact on the stability and reliability of the power grid in a multi-energy integrated system. Summary of the invention

[0006] In order to overcome the shortcomings of the prior art, the present invention provides a main-distribution-microintegrated hierarchical timing production simulation method based on partition aggregation, which improves the power balance analysis capability of the main-distribution-microgrid by establishing a two-layer optimization model, optimizes the consumption of new energy and the power supply reliability of the system.

[0007] The technical solution adopted by the present invention is:

[0008] The main-distribution-micro-integrated hierarchical sequential production simulation method based on partition aggregation includes the following steps:

[0009] Step S1: define the aggregation partition of the main distribution microgrid;

[0010] Step S2: Establish an upper-level sequential production model, mainly to optimize the start-stop status and output curve of conventional units in each zone, promote the consumption of new energy and reduce power supply shortages;

[0011] Step S3: On the basis of the upper-level sequential production model, a lower-level sequential production model is constructed, mainly to optimize the economic dispatch of conventional units in each aggregation zone to minimize the operating cost of the system;

[0012] Step S4: Set the technical and economic constraints of the upper and lower layer sequential production models, including regional load balance, section interconnection line transmission power, conventional unit start-up and shutdown, and energy storage scheduling.

[0013] In step S1, the aggregation partition of the main distribution microgrid is defined, and the main distribution microgrid is divided into multiple grid structure areas, and the partitions are aggregated according to the actual geographical characteristics and structural complexity of the grid. In each aggregation partition, the detailed grid topology and flow distribution are ignored, and each partition processes its internal power supply and load.

[0014] In step S2, an upper-level sequential production model is established, which mainly optimizes the start-stop status and output curve of conventional units in each zone, promotes the consumption of new energy and reduces power supply shortages. The objective function of the upper-level sequential production model is:

[0015]

[0016] Where: N is the total number of aggregate partitions contained in the system; n represents a certain aggregate partition; T represents the total simulation time (unit: h); α is the load shedding weight coefficient ratio; t is the simulation time step; is the amount of renewable energy cut-off in aggregated partition n in time period t; is the power shortage of aggregated partition n in time period t.

[0017] In step S3, a lower-level sequential production model is established. On the basis of the upper-level sequential production model, a lower-level sequential production model is constructed. The lower-level sequential production model optimizes the operating cost of conventional units in each partition, and performs independent optimization and solution on each partition, for the aggregated partition n. The objective function of the lower-level sequential production model is:

[0018]

[0019] Where: D represents the total simulation time (unit: day); J(n) is the total number of conventional units contained in the system aggregation partition n; is the output of conventional unit j contained in the system aggregation partition n; d(t) represents the number of days corresponding to time period t; Y n,j (d) and Z n,j (d) are binary variables, representing the start and stop actions of the unit, respectively. n,j (d) takes 1 to indicate that unit j is started from shutdown state to running state on day d, otherwise it takes 0; Z n,j (d) is 1 when it indicates that unit j changes from operating state to shutdown state on day d, otherwise it is 0; is the daily unit power generation cost of each conventional unit; and It is the start-up and shutdown costs of each conventional unit.

[0020] In step S4, set constraints, set technical and economic constraints of the upper and lower time-series production models, including regional load balance, section tie line transmission power, conventional unit start and stop, and energy storage scheduling. Upper-level time-series production model constraints:

[0021] (1) Regional load balance constraints:

[0022]

[0023] Where: is the power load of the aggregated partition n in the tth period; is the total power of all conventional units in the aggregation partition n in the tth period; L k,n (t) is the transmission power from aggregation partition k to aggregation partition n. If there is no connecting transmission line between aggregation partitions k and n, then L k,n (t) takes 0; is the external power of the aggregated partition n in the tth period; is the energy storage charging power of the aggregated partition n in the tth period; is the energy storage discharge power of the aggregated partition n in the tth period. is the total renewable energy output of the aggregated partition n during period t.

[0024] (2) Transmission power constraints of cross-section tie lines:

[0025]

[0026] L k,n (t)=-L n,k (t) (5)

[0027] Where: is the upper limit of the transmission power from aggregation partition k to aggregation partition n; the current reference direction is set as: flowing into aggregation partition n is the positive direction, and flowing out of aggregation partition n is the negative direction.

[0028] (3) Total output constraints of conventional units:

[0029]

[0030] Where: is the maximum output power of conventional unit j; is the minimum output power of conventional unit j; X n,j (d) is a binary variable, which indicates the operating status of unit j in aggregate partition n on day d. It takes 0 to indicate that the unit has been shut down, and takes 1 to indicate that the unit is running.

[0031] (4) Constraints on new energy output:

[0032]

[0033]

[0034]

[0035]

[0036] In the formula, and They are the total theoretical maximum output of wind power and the total theoretical maximum output of photovoltaic power in the aggregation zone n period t respectively; and They are the total wind power output and total photovoltaic output in the aggregated partition n during period t.

[0037] (5) System backup constraints:

[0038]

[0039]

[0040] Where: R up is positive spinning reserve; R down Negative spinning reserve.

[0041] (6) Minimum start and stop time constraints for units:

[0042]

[0043] Where: T on and T off They are the minimum continuous operating time and minimum continuous shutdown time of the unit respectively.

[0044] (7) Energy storage constraints:

[0045]

[0046]

[0047]

[0048]

[0049]

[0050]

[0051]

[0052] Where: and are binary variables, representing the operating status of the aggregated energy storage in the aggregated partition n at time period t. The value is 1 if the aggregated energy storage is in the charging state, otherwise it is 0; 1 means the aggregated energy storage is in the discharge state, otherwise it is 0; η ch and η dis Respectively represent the charging efficiency and discharging efficiency of aggregate energy storage; SOC n (t) represents the charge state of the aggregated energy storage in the aggregated partition n at time period t; and Respectively represent the upper and lower limits of the state of charge.

[0053] The constraints of the lower-level sequential production model are:

[0054] (1) Output constraints of conventional units:

[0055]

[0056]

[0057] (2) Constraints on unit utilization hours:

[0058]

[0059] Where: and They represent the upper and lower limits of the utilization hours of unit j in aggregation zone n respectively.

[0060] Compared with the prior art, the present invention has the following beneficial effects:

[0061] 1. The two-layer model of the present invention optimizes the power production and dispatching of each region by means of zoning aggregation, so that the start-stop plan of conventional units is more coordinated with the output of new energy. The upper-layer timing optimization model promotes the maximum consumption of new energy and reduces the power supply shortage; the lower-layer timing production model optimizes the economic dispatching of conventional units while reducing operating costs, and improves the power supply reliability of the main distribution microgrid.

[0062] 2. The two-layer optimization strategy adopted in the present invention not only takes into account technical constraints such as power loss, voltage support and line congestion, but also reduces the additional operating costs caused by grid overload or uneven resource allocation through partition aggregation and precise timing scheduling optimization. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 It is a schematic flow chart of the method of the present invention;

[0064] Figure 2 It is a schematic diagram of the grid aggregation structure of the present invention;

[0065] Figure 3 It is a double-layer model framework of the present invention;

[0066] Figure 4 It is the load shedding condition of each partition of the present invention;

[0067] Figure 5 It is the new energy cutting condition of each partition of the present invention;

[0068] Figure 6 is the total thermal power output curve of the southern region of the present invention;

[0069] Figure 7 It is the energy storage charge and discharge (discharge direction) curve of the present invention;

[0070] Figure 8 It is the power transmission curve of the central-southern region section (southward transmission) of the present invention. DETAILED DESCRIPTION

[0071] The technical solution of the present invention will be more clearly and completely explained below through description of preferred embodiments of the present invention in combination with the accompanying drawings.

[0072] like Figure 1-3 As shown, the present invention is:

[0073] Step S1: define the aggregation partition of the main distribution microgrid;

[0074] Step S2: Establish an upper-level sequential production model, mainly to optimize the start-stop status and output curve of conventional units in each zone, promote the consumption of new energy and reduce power supply shortages;

[0075] By optimizing the start and stop and output of conventional units, we can better integrate renewable energy generation and ensure the continuity and reliability of power grid supply. This model relies on the partition aggregation framework defined in step S1 and adjusts the supply and demand balance of each aggregation partition through time series analysis.

[0076] Step S3: On the basis of the upper-level sequential production model, a lower-level sequential production model is constructed, mainly to optimize the economic dispatch of conventional units in each aggregation zone to minimize the operating cost of the system;

[0077] Based on the results of the upper-level sequential production model, the economic dispatch of conventional units in each aggregation zone is further optimized. This step aims to minimize the operating cost and optimize each aggregation zone independently. By fine-tuning the operation of the units, costs can be reduced while ensuring the stability and economy of the power grid.

[0078] Step S4: Set the technical and economic constraints of the upper and lower layer sequential production models, including regional load balance, section interconnection line transmission power, conventional unit start-up and shutdown, and energy storage scheduling.

[0079] The upper and lower time-series production models form a two-layer model;

[0080] Set constraints to ensure the practical applicability and feasibility of the model.

[0081] Step S5: Based on steps S2-S4, Cplex is used to solve and obtain a sequential production simulation process.

[0082] The present invention simplifies grid management by aggregating partitions in dealing with large-scale and geographically dispersed power grids, and introduces time-series production simulation so that the method can more accurately predict and adjust the power system to cope with highly fluctuating loads and production patterns. The present invention can significantly improve the adaptability of the power grid to new energy and the stability of the overall power system.

[0083] The "zonal aggregation" in the present invention is a method of dividing a power grid into several areas or zones, wherein each zone contains a group of power sources and loads, and the zones are relatively independent but connected to each other.

[0084] The details are as follows:

[0085] The present invention defines the aggregation partition of the main distribution microgrid, divides the main distribution microgrid into multiple grid structure areas, and performs partition aggregation according to the actual geographical characteristics and structural complexity of the grid. In each aggregation partition, the detailed grid topology and flow distribution are ignored, and each partition processes its internal power supply and load.

[0086] Each aggregation zone is a subsystem of the grid, with its own power sources, loads, and possibly energy storage. Within an aggregation zone, grid operators can centrally manage resources and loads in this area to optimize production and consumption. This approach allows for more efficient resource allocation and risk management, as each zone can be independently regulated according to its specific needs and conditions.

[0087] The present invention simplifies the complexity and allows specific grid structure details to be ignored during simulation, while focusing on processing power sources and loads within a partition, thereby reducing calculation costs while retaining key information that affects overall grid operation.

[0088] Grid structure: 1. Geographical location: The grid is divided into different regions based on geographical location, such as the northern, central and southern regions; 2. Power source and load distribution: The grid is divided according to the distribution of power sources (such as power stations) and loads (electricity demand) in the region, so that the power supply and demand in each zone is as balanced as possible.

[0089] In applications, it can also be divided according to functional requirements, including: 1. Power supply reliability: divided according to the power supply reliability requirements of different regions, for example, some key industrial areas require higher power supply reliability; 2. New energy consumption: divided according to the distribution and absorption capacity of new energy (such as wind power, photovoltaic), so that each zone can absorb new energy to the maximum extent; 3. Economic efficiency: considering the economy of power production and transmission, such as reducing transmission losses, reducing operating costs, etc.; 4. Load characteristics: divided according to the time characteristics of the load (such as peak load, valley load) and type (such as residential load, industrial load).

[0090] like Figure 2 As shown, the present invention establishes a partitioned aggregation structure of a main distribution microgrid, divides the provincial power grid into several main grid and distribution microgrid aggregation partitions according to the grid structure and functional partitions, and retains the power transmission constraints of key sections between each partition.

[0091] The present invention establishes an upper-level sequential production model, mainly optimizing the start-stop status and output curve of conventional units in each zone, promoting the consumption of new energy and reducing power supply shortages.

[0092] It emphasizes the maximum absorption of new energy and the reduction of power supply shortages. Such a design takes into account the volatility and uncertainty of new energy such as wind power and solar power, directly responds to this challenge through the optimization of the upper-level time-series production model, enhances the system's ability to absorb new energy, and reduces power shortages caused by new energy fluctuations.

[0093] The objective function of the upper-level sequential production model is:

[0094]

[0095] Where: N is the total number of aggregate partitions contained in the system; n represents a certain aggregate partition; T represents the total simulation time (unit: h); α is the load shedding weight coefficient ratio; t is the simulation time step; is the amount of renewable energy cut-off in aggregated partition n in time period t; is the power shortage of aggregated partition n in time period t.

[0096] The present invention establishes a lower-level sequential production model. On the basis of the upper-level sequential production model, the lower-level sequential production model is constructed. The lower-level sequential production model optimizes the operating cost of conventional units in each partition, and independently optimizes and solves each partition for the aggregated partition n.

[0097] This layer of optimization helps the system maximize cost-effectiveness while ensuring power supply.

[0098] The objective function of the lower-level sequential production model is:

[0099]

[0100] Where: D represents the total simulation time (unit: day); J(n) is the total number of conventional units contained in the system aggregation partition n; is the output of conventional unit j contained in the system aggregation partition n; d(t) represents the number of days corresponding to time period t; Y n,j (d) and Z n,j (d) are binary variables, representing the start and stop actions of the unit, respectively. n,j (d) takes 1 to indicate that unit j is started from shutdown state to running state on day d, otherwise it takes 0; Z n,j (d) is 1 when it indicates that unit j changes from operating state to shutdown state on day d, otherwise it is 0; is the daily unit power generation cost of each conventional unit; and It is the start-up and shutdown costs of each conventional unit.

[0101] The present invention sets constraints, and sets technical and economic constraints of the upper and lower time-series production models, including regional load balance, section tie line transmission power, conventional unit start-stop and energy storage scheduling, etc. Upper-level time-series production model constraints:

[0102] (1) Regional load balance constraints:

[0103]

[0104] Where: is the power load of the aggregated partition n in the tth period; is the total power of all conventional units in the aggregation partition n in the tth period; L k,n (t) is the transmission power from aggregation partition k to aggregation partition n. If there is no connecting transmission line between aggregation partitions k and n, then L k,n (t) takes 0; is the external power of the aggregated partition n in the tth period; is the energy storage charging power of the aggregated partition n in the tth period; is the energy storage discharge power of the aggregated partition n in the tth period. is the total renewable energy output of the aggregated partition n during period t.

[0105] (2) Transmission power constraints of cross-section tie lines:

[0106]

[0107] L k,n (t)=-L n,k (t) (5)

[0108] Where: is the upper limit of the transmission power from aggregation partition k to aggregation partition n; the current reference direction is set as: flowing into aggregation partition n is the positive direction, and flowing out of aggregation partition n is the negative direction.

[0109] (3) Total output constraints of conventional units:

[0110]

[0111] Where: is the maximum output power of conventional unit j; is the minimum output power of conventional unit j; X n,j (d) is a binary variable, which indicates the operating status of unit j in aggregate partition n on day d. It takes 0 to indicate that the unit has been shut down, and takes 1 to indicate that the unit is running.

[0112] (4) Constraints on new energy output:

[0113]

[0114]

[0115]

[0116]

[0117] In the formula, and They are the total theoretical maximum output of wind power and the total theoretical maximum output of photovoltaic power in the aggregation zone n period t respectively; and They are the total wind power output and total photovoltaic output in the aggregated partition n during period t.

[0118] (5) System backup constraints:

[0119]

[0120]

[0121] Where: R up is positive spinning reserve; R down Negative spinning reserve.

[0122] (6) Minimum start and stop time constraints for units:

[0123]

[0124] Where: T on and T off are the minimum continuous operation time and minimum continuous shutdown time of the unit respectively, and i is the number of days.

[0125] (7) Energy storage constraints:

[0126]

[0127]

[0128]

[0129]

[0130]

[0131]

[0132]

[0133] Where: and are binary variables, representing the operating status of the aggregated energy storage in the aggregated partition n at time period t. The value is 1 if the aggregated energy storage is in the charging state, otherwise it is 0; 1 means the aggregated energy storage is in the discharge state, otherwise it is 0; η ch and η dis Respectively represent the charging efficiency and discharging efficiency of aggregate energy storage; SOC n (t) represents the charge state of the aggregated energy storage in the aggregated partition n at time period t; and Respectively represent the upper and lower limits of the state of charge.

[0134] The constraints of the lower-level sequential production model are:

[0135] (1) Output constraints of conventional units:

[0136]

[0137]

[0138] (2) Constraints on unit utilization hours:

[0139]

[0140] Where: and They represent the upper and lower limits of the utilization hours of unit j in aggregation zone n respectively.

[0141] The present invention simulates the annual time series production based on the actual power grid structure and installed capacity of a province in 2023, models it in MATLAB, and calls the optimization software Cplex to solve it. Based on MATLAB 2016a programming, CplexV12.63 is called for solution. According to the set model parameters and conditions, the annual time series production simulation is performed. The simulation process includes power dispatch at each time step and the consumption of new energy.

[0142] The present invention considers the actual geographical characteristics, grid structure and distribution of key tidal sections of the province, and divides the provincial grid into three aggregation zones: the northern region, the central region and the southern region. The tie lines between the three regions are equivalent to power transmission sections. In 2023, the north-sending power limit of the tie line between the northern and central regions of the province is 2500MW; the south-sending power limit is 2200MW; the north-sending power limit of the tie line between the central and southern regions is 3700MW; the south-sending power limit is 6100MW. The parameter settings of the thermal power units are shown in Table 1. Due to the different minimum technical outputs of the thermal power units in the province, the value range is given in Table 1.

[0143] Table 1 Thermal power unit parameters

[0144]

[0145] First, based on the principle of supply priority, the weight coefficient ratio α of the load shedding and renewable energy shedding is set to 10. Based on the results of sequential production simulation optimization, the load shedding is 323.05MWh, and the renewable energy shedding is 1282.30MWh. The time distribution of load shedding and renewable energy shedding in each partition is as follows: Figure 4 and Figure 5 shown.

[0146] Figures 6 to 8The total thermal power output curve of the southern region of the province, the energy storage charging and discharging curve (with discharge as positive) and the power transmission curve of the central-southern region section (southward transmission direction) are given respectively.

[0147] In terms of new energy consumption, Figure 5-7 It can be seen that during the low load period in the second quarter, due to the limited energy storage capacity, even if the energy storage is in a charging state, it still cannot provide sufficient space for the absorption of new energy; on the other hand, affected by the minimum start and stop time constraints, it is impossible to always deploy high peak-shaving capacity thermal power units to start operation, and the higher minimum technical output level of thermal power has squeezed the absorption space of new energy to a certain extent. The above factors have jointly led to the phenomenon of new energy cutting.

[0148] In terms of load supply, Figure 6 It can be seen that in the third quarter, the thermal power units in the southern region were in the maximum power output state for most of the time (due to the setting of the hot standby coefficient, they were not fully generated); Figure 8 It can be seen that during the peak period in summer, the load shortage period in the southern region of the province has reached the power limit. Therefore, the capacity limitation of thermal power units in the southern region and the power constraint of the section between the aggregation partitions jointly lead to the power shortage in the southern region during the peak load period in summer.

[0149] In operation, the present invention reasonably divides the power grid into zones, constructs upper and lower layer sequential production models, and sets relevant technical and economic constraints to accurately simulate the production and dispatching process of the main and distribution microgrids, optimize the power transmission and load balance relationship between regions, and improve the overall power supply reliability and new energy absorption capacity of the system.

[0150] The technical means disclosed in the scheme of the present invention are not limited to the technical means disclosed in the above-mentioned implementation mode, but also include technical schemes composed of any combination of the above-mentioned technical features. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications are also regarded as the protection scope of the present invention.

Claims

1. A method for simulating hierarchical sequential production of main, distribution and micro-integration based on partition aggregation. Features: It includes the following steps: Step S1: define the aggregation partition of the main distribution microgrid; Step S2: On the basis of aggregation partitioning, establish an upper-level time series production model; Step S3: On the basis of the upper-layer sequential production model, a lower-layer sequential production model is established; Step S4: setting constraints of the upper and lower layer sequential production models; Step S5: Based on steps S2-S4, Cplex is used to solve and obtain a sequential production simulation process.

2. According to the method for simulating the hierarchical sequential production of main, distribution and micro-integration based on partition aggregation according to claim 1, Features: In step S1, The main distribution microgrid is divided into multiple aggregation partitions according to the grid structure.

3. According to the method for simulating the hierarchical sequential production of main, distribution and micro-integration based on partition aggregation in claim 1, Features: In step S2, The objective function of the upper-level sequential production model is: Where: N is the total number of aggregate partitions contained in the system; n represents a certain aggregate partition; T represents the total simulation time; α is the load shedding weight coefficient ratio; t is the simulation time step; is the amount of renewable energy cut-off in aggregated partition n in time period t; is the power shortage of aggregated partition n in time period t.

4. The main-distribution-micro-integrated hierarchical sequential production simulation method based on partition aggregation according to claim 1, Features: In step S3, The objective function of the lower-level sequential production model is: Where: D represents the total simulation time; J(n) is the total number of conventional units contained in the system aggregation partition n; is the output of conventional unit j contained in the system aggregation partition n; d(t) represents the number of days corresponding to time period t; Y n,j (d) and Z n,j (d) are binary variables, representing the start and stop actions of the unit, respectively. n,j (d) takes 1 to indicate that unit j is started from shutdown state to running state on day d, otherwise it takes 0; Z n,j (d) is 1 when it indicates that unit j changes from operating state to shutdown state on day d, otherwise it is 0; is the daily unit power generation cost of each conventional unit; and It is the start-up and shutdown costs of each conventional unit.

5. The main-distribution-micro-integrated hierarchical sequential production simulation method based on partition aggregation according to claim 1, Features: In step S4, The constraints of the upper-level sequential production model include regional load balance constraints, section interconnection line transmission power constraints, conventional unit total output constraints, new energy output constraints, system backup constraints, unit minimum start and shutdown time constraints, and energy storage constraints.

6. The main-distribution-micro-integrated hierarchical sequential production simulation method based on partition aggregation according to claim 5, Features: The constraints of the upper-level sequential production model are specifically: (1) Regional load balance constraints: Where: is the power load of the aggregated partition n in the tth period; is the total power of all conventional units in the aggregation partition n in the tth period; L k,n (t) is the transmission power from aggregation partition k to aggregation partition n. If there is no connecting transmission line between aggregation partitions k and n, then L k,n (t) takes 0; is the external power of the aggregated partition n in the tth period; is the energy storage charging power of the aggregated partition n in the tth period; is the energy storage discharge power in the aggregation partition n at the tth period; is the total renewable energy output of the aggregated partition n during period t; (2) Transmission power constraints of cross-section tie lines: L k,n (t)=-L n,k (t) (5) Where: is the upper limit of transmission power from aggregation partition k to aggregation partition n; (3) Total output constraints of conventional units: Where: is the maximum output power of conventional unit j; is the minimum output power of conventional unit j; X n,j (d) is a binary variable, indicating the operating status of unit j in aggregate partition n on day d. It takes 0 to indicate that the unit has been shut down, and takes 1 to indicate that the unit is running; (4) Constraints on new energy output: Where: and They are the total theoretical maximum output of wind power and the total theoretical maximum output of photovoltaic power in the aggregation zone n period t respectively; and are the total wind power output and total photovoltaic output in the aggregated partition n period t, respectively; (5) System backup constraints: Where: R up is positive spinning reserve; R down It is negative spinning reserve; (6) Minimum start and stop time constraints for units: Where: T on and T off They are the minimum continuous operation time and minimum continuous shutdown time of the unit respectively; (7) Energy storage constraints: Where: and are binary variables, representing the operating status of the aggregated energy storage in the aggregated partition n at time period t. The value is 1 if the aggregated energy storage is in the charging state, otherwise it is 0; 1 means the aggregated energy storage is in the discharge state, otherwise it is 0; η ch and η dis Respectively represent the charging efficiency and discharging efficiency of aggregate energy storage; SOC n (t) represents the charge state of the aggregated energy storage in the aggregated partition n at time period t; and Respectively represent the upper and lower limits of the state of charge.

7. The main-distribution-micro-integrated hierarchical sequential production simulation method based on partition aggregation according to claim 5, Features: The constraints of the lower-level sequential production model include conventional unit output constraints and unit utilization hour constraints.

8. The main-distribution-micro-integrated hierarchical sequential production simulation method based on partition aggregation according to claim 7, Features: The constraints of the lower-level sequential production model are specifically: (1) Output constraints of conventional units: (2) Constraints on unit utilization hours: Where: and They represent the upper and lower limits of the utilization hours of unit j in aggregation zone n respectively.

Citation Information

Patent Citations

  • Virtual power plant partition construction model and construction method based on voltage regulation and control

    CN112271724A

  • Method for improving restoring force of power transmission and distribution coupling system containing renewable energy sources

    CN113078633A

  • Shared energy storage capacity optimization method based on neural network prediction

    CN115496256A

  • Distributed energy declaration strategy regulation and control system and method based on cloud edge collaborative architecture

    CN116544941A

  • Three-layer planning method for distributed photovoltaic power supply of power distribution network

    CN118263875A

Cited By

  • Multi-regional power grid reserve planning method and device adopting three-stage decomposition coordination acceleration time sequence production simulation

    CN121097671A

  • A multi-area power grid reserve planning method and device using three-stage decomposition coordination accelerated time sequence production simulation

    CN121097671B

  • Double-layer time sequence provincial power system time sequence production simulation method and device based on carbon emission flow tracking and spatial polymerization and medium

    CN122620629A