Grid-connected protection method, device and equipment for high-temperature gas cooled reactor nuclear power unit

By calculating the maximum and minimum grid-connected load value when the turbine simulated total power value and the polarity of the current transformer is reversed, the grid-connected operation of the high-temperature gas-cooled reactor nuclear power unit is controlled, and the polarity of the current transformer is reversed during the grid-connected process is solved. The tripping problem caused improves operational safety and stability.

CN118889529APending Publication Date: 2024-11-01HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410998037.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

During the grid connection process of the high-temperature gas-cooled reactor nuclear power unit, the steam turbine generator may trip due to the reverse polarity of the main transformer, causing the grid connection to fail, threatening the operation safety of the nuclear power plant, and fluctuations in the second circuit parameters affect the first circuit. stability.

Method used

By obtaining the outlet power values ​​of the first and second reactors, calculating the total power value of the turbine simulation, and determining the maximum and minimum grid-connected load values ​​of the unit according to the reverse polarity of the current transformer, controlling grid-connected operation to prevent excessive load or Protective action caused by too little.

Benefits of technology

Automatic calculation of the grid connection load of the steam turbine generator set is realized, which improves the safety and stability of operation, reduces the working intensity of the operation personnel, and reduces the cost of equipment maintenance and procurement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889529A_ABST
    Figure CN118889529A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of nuclear power, and discloses a high-temperature gas cooled reactor nuclear power unit grid-connected protection method, device and equipment, and the method comprises the steps: respectively obtaining the outlet power values of a first reactor and a second reactor, and taking the sum of the outlet power values of the first reactor and the second reactor as a steam turbine simulation total power value; obtaining a corresponding unit maximum grid-connected load value when the polarity of a group of current transformers on the generator end side is reversely connected; obtaining the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine; and when the simulated total power value of the steam turbine is between the minimum grid-connected load value of the unit and the maximum grid-connected load value of the unit, grid connection of the units of the first reactor and the second reactor is allowed, and otherwise, grid-connected operation is locked. According to the method, the grid-connected load of the high-temperature gas cooled reactor steam turbine generator unit can be automatically calculated, the accuracy is high, the result is reliable, the grid-connected failure caused by wrong tripping of the steam turbine due to overlarge load of the unit can be effectively prevented, and the safety and stability of the operation of the nuclear power unit are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of nuclear power technology, and in particular to a method, device and equipment for grid-connected protection of a high-temperature gas-cooled reactor nuclear power unit. Background Art

[0002] The high-temperature gas-cooled reactor demonstration project adopts the operation mode of two reactors driving one steam turbine, with a single reactor rated capacity of 250MW and a steam turbine generator rated power of 211MW. The steam turbine generator is connected to the main transformer through the outlet circuit breaker, and the main transformer high-voltage side circuit breaker is connected to the 220kV switch station. The two outgoing lines of the switch station are connected to the power grid.

[0003] Before the unit is connected to the grid for the first time, the current transformers used for differential protection on both sides of the high-voltage and low-voltage sides of the main transformer are not actually loaded for polarity verification, so there may be a situation where the polarity of a set of current transformers used for the main transformer differential protection is reversed. However, according to the grid operation requirements, when the unit is connected to the grid, the unit's main transformer differential protection must be put into use. In this case, if the unit is connected to the grid under high load, the differential current may be too large to trigger the main transformer differential protection, causing the steam turbine generator unit to trip, grid connection failure, and even reactor shutdown, threatening the safe operation of the nuclear power plant.

[0004] The high-temperature gas-cooled reactor nuclear power unit uses a high secondary circuit operating parameter, the coordination control process between the reactor and the secondary circuit is complex, the primary circuit tracking process is slow, and the initial load is too large during the grid connection of the steam turbine generator set, which may cause the bypass valve to open and close too much, causing the secondary circuit parameters to fluctuate greatly, affecting the stability of the primary circuit operation. If the grid connection load is too low, it will affect the turbine blades, causing the blades to overheat and affecting the safety of the steam turbine generator set. Summary of the invention

[0005] In view of this, the present invention provides a method, device and equipment for grid-connected protection of a high-temperature gas-cooled reactor nuclear power unit to solve the problem of how to protect the operation safety and stability of the unit when the steam turbine generator unit is connected to the grid.

[0006] In a first aspect, the present invention provides a method for grid-connected protection of a high temperature gas-cooled reactor nuclear power unit, the method comprising:

[0007] The export power values ​​of the first reactor and the second reactor are respectively obtained, and the sum of the export power values ​​of the first reactor and the second reactor is used as the total simulated power value of the steam turbine;

[0008] Obtain the maximum grid-connected load value of the corresponding unit when the polarity of a group of current transformers on the generator side is reversed;

[0009] Obtain the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine;

[0010] When the simulated total power value of the steam turbine is between the minimum grid-connected load value of the unit and the maximum grid-connected load value of the unit, the grid-connected operation of the first reactor and the second reactor is allowed, otherwise the grid-connected operation is blocked.

[0011] The grid-connected protection method for high-temperature gas-cooled reactor nuclear power units provided in this embodiment can realize the automatic calculation of the grid-connected load of the steam turbine generator set, with high accuracy and reliable results. It can effectively prevent the turbine from erroneous tripping due to excessive unit load, and can effectively reduce the workload of operating personnel, thereby ensuring the safe and stable operation of the nuclear power unit. It only requires modification of the unit logic, with simple configuration and low equipment maintenance and procurement costs.

[0012] In an optional implementation manner, respectively obtaining the outlet power values ​​of the first reactor and the second reactor includes:

[0013] Respectively obtaining the measured primary circuit thermal power, outlet flow rate, and steam enthalpy value of the first reactor and the second reactor, and respectively calculating the outlet power values ​​of the first reactor and the second reactor based on the measured outlet flow rate and steam enthalpy value;

[0014] The measured primary circuit thermal power is corrected based on the calculated outlet power values ​​of the first reactor and the second reactor to obtain corrected outlet power values ​​of the first reactor and the second reactor.

[0015] The embodiment of the present invention ensures the accuracy of power measurement by correcting the measured primary circuit thermal power.

[0016] In an optional implementation manner, the maximum grid-connected load value of the unit is obtained by the following power calculation formula:

[0017]

[0018] Wherein, U represents the generator outlet terminal voltage, which is obtained by measurement; It indicates the power factor at the time of grid connection, which is obtained through measurement; I indicates the current flowing through the current transformer when the polarity of a group of current transformers at the generator output end is reversed.

[0019] The present invention prevents a group of current transformers at the generator outlet end from being connected in reverse polarity, and uses the current flowing through the current transformer when the group of current transformers at the generator outlet end is connected in reverse polarity as an extreme condition to calculate the maximum grid-connected load value of the unit, as a maximum grid-connected load value limit condition.

[0020] In an optional implementation, the current flowing through the current transformer when the polarity of a group of current transformers at the generator end side is reversed is calculated based on the main transformer differential protection equation under the braking boundary condition.

[0021] The embodiment of the present invention prevents the occurrence of a group of current transformers being connected in reverse polarity, the grid-connected load being too large causing the main transformer differential protection to be actuated, resulting in the tripping of the steam turbine generator and the failure of grid connection. Based on the main transformer differential protection equation under the braking boundary condition, the current flowing through the current transformer when the polarity of a group of current transformers on the generator end side is connected in reverse is calculated.

[0022] In a second aspect, the present invention provides a grid-connected protection device for a high-temperature gas-cooled reactor nuclear power unit, the device comprising:

[0023] A steam turbine simulated total power value acquisition module is used to respectively acquire the export power values ​​of the first reactor and the second reactor, and take the sum of the export power values ​​of the first reactor and the second reactor as the steam turbine simulated total power value;

[0024] The maximum grid-connected load value acquisition module is used to obtain the corresponding maximum grid-connected load value of the unit when the polarity of a group of current transformers at the generator end side is reversed;

[0025] A minimum grid-connected load value acquisition module is used to obtain the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine;

[0026] The grid-connected protection module allows the first reactor and the second reactor to be connected to the grid when the simulated total power value of the steam turbine is between the minimum grid-connected load value of the unit and the maximum grid-connected load value of the unit, otherwise the grid-connected operation is blocked.

[0027] In an optional implementation, the steam turbine simulated total power value acquisition module includes:

[0028] A reactor data acquisition unit, used to respectively acquire the measured primary circuit thermal power, outlet flow rate, and steam enthalpy value of the first reactor and the second reactor;

[0029] An outlet power value calculation unit, used to calculate the outlet power values ​​of the first reactor and the second reactor respectively based on the measured outlet flow rate and steam enthalpy value;

[0030] The outlet power value correction unit is used to correct the measured primary circuit thermal power based on the calculated outlet power values ​​of the first reactor and the second reactor to obtain the corrected outlet power values ​​of the first reactor and the second reactor.

[0031] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to execute the grid-connected protection method for a high-temperature gas-cooled reactor nuclear power unit according to the first aspect or any corresponding embodiment thereof.

[0032] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the grid-connected protection method for a high-temperature gas-cooled reactor nuclear power unit according to the first aspect or any corresponding embodiment thereof.

[0033] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the method for grid-connected protection of a high-temperature gas-cooled reactor nuclear power unit according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 is a schematic flow chart of a method for grid-connected protection of a high-temperature gas-cooled reactor nuclear power unit according to an embodiment of the present invention;

[0036] Figure 2 is a logic flow chart of the grid-connected load limit of a unit according to an embodiment of the present invention;

[0037] Figure 3 is a schematic diagram of connection between a generator, a main transformer and a high-voltage power plant side of a demonstration project according to an embodiment of the present invention;

[0038] Figure 4 is a schematic diagram of a differential protection action characteristic curve according to an embodiment of the present invention;

[0039] Figure 5 is a structural block diagram of a grid-connected protection device for a high-temperature gas-cooled reactor nuclear power unit according to an embodiment of the present invention;

[0040] Figure 6 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0042] According to an embodiment of the present invention, a grid-connected protection method embodiment of a high-temperature gas-cooled reactor nuclear power unit is provided, which can prevent the occurrence of a group of current transformers being connected in reverse polarity, excessive grid-connected load resulting in the main transformer differential protection being activated during the unit's entire startup and grid-connected test, causing the steam turbine generator to trip and the grid-connected failure.

[0043] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer device such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0044] In this embodiment, a high temperature gas-cooled reactor nuclear power unit grid-connected protection method is provided, which can be used for the above-mentioned computer equipment. Figure 1 is a flow chart of a method for grid-connected protection of a high temperature gas-cooled reactor nuclear power unit according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0045] Step S101, respectively obtaining the export power values ​​of the first reactor and the second reactor, and taking the sum of the export power values ​​of the first reactor and the second reactor as the total simulated power value of the steam turbine.

[0046] Specifically, Figure 2 The logic flow chart of the grid-connected load limit of the unit shown in the figure first reads the primary circuit thermal power (3) of the unit 1# reactor and the primary circuit thermal power (6) of the unit 2# reactor, the outlet flow rate (1) and steam enthalpy value (2) of the steam generator of the unit 1# reactor, the outlet flow rate (4) and steam enthalpy value (5) of the steam generator of the unit 2# reactor, and respectively calculates the outlet power values ​​of the two reactors by using the outlet flow rate (1) and steam enthalpy value (2) of the steam generator of the unit 1# reactor, and the outlet flow rate (4) and steam enthalpy value (5) of the steam generator of the unit 2# reactor, and corrects by using the primary circuit thermal power (3) of the unit 1# reactor and the primary circuit thermal power (6) of the unit 2# reactor to ensure the accuracy of the power measurement. By calculating the sum of the outlet powers of the two reactors, the simulated total power value of the steam turbine is obtained (7).

[0047] Step S102, obtaining the corresponding maximum grid-connected load value of the unit when the polarity of a group of current transformers at the generator end side is reversed.

[0048] Specifically, the current flowing through the current transformer when the polarity of a group of current transformers on the generator end side is reversed is calculated (11), and combined with the measured generator outlet terminal voltage (8) and power factor (9), the corresponding maximum grid-connected load value of the unit is obtained using a power calculation formula (10).

[0049] Step S103, obtaining the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine.

[0050] Specifically, the corresponding minimum grid-connected load value (12) is found through the steam turbine characteristic parameters according to the factory instructions, which serves as the minimum grid-connected protection of the steam turbine unit.

[0051] Step S104: when the simulated total power value of the steam turbine is between the minimum grid-connected load value of the unit and the maximum grid-connected load value of the unit, the grid-connected operation of the first reactor and the second reactor is allowed, otherwise the grid-connected operation is blocked.

[0052] Specifically, Figure 2 As shown, the simulated total power value (7) of the steam turbine is compared with the maximum grid-connected load (10) of the unit and the minimum grid-connected load (12) of the unit in the comparator (13). When the minimum grid-connected load value (12) < the simulated total power value (7) of the steam turbine < the maximum grid-connected load value (10) of the unit, the grid-connected condition of the unit is met and the grid-connected unit is allowed. Otherwise, the grid-connected operation is blocked.

[0053] like Figure 3 As shown, the differential protection of the main transformer of the demonstration project takes the current flowing through the current transformer T2 on the high-voltage side of the main transformer as I2, the current flowing through the current transformer T1 on the generator side on the low-voltage side of the main transformer as I1, and the current flowing through the current transformer T3 on the high-voltage side of the high-voltage plant transformer on the low-voltage side of the main transformer as I3. The primary current and secondary current of the current transformer are fixed (the default form of the equipment manufacturer): the primary current flows into the current transformer from the interface P1, the secondary current of the current transformer flows out from the interface S1, and the secondary current of the current transformer is connected to the protection device. If the interface S1 is connected to the polarity end of the protection device, the current phasor of the protection device is positive; conversely, if the interface S2 is connected to the polarity end of the protection device at this time, the current phasor of the protection device is negative. During normal operation, the generator of the demonstration project generates electricity to supply the power grid and the plant load. The primary current flows from the generator to the high-voltage plant transformer and to the main transformer, so the current vectors of the three current transformers T1 are substituted into the main transformer differential protection equation to calculate the main transformer differential protection.

[0054] The differential protection of the main transformer in the demonstration project is taken from the variable slope equation, such as Figure 4 , K in the figure bl1 is the initial ratio differential slope, K bl2 is the maximum ratio differential slope, I cdqd It is the differential current starting setting.

[0055] In one embodiment, K bl1 =0.1; K bl2 =0.7; n=5, n represents the braking current multiple at the maximum slope; I cdqd =0.4Ie, Ie is the secondary rated current of the main transformer.

[0056] Main transformer parameters of the demonstration project: rated current of the high main transformer is 572.6A, and rated current of the low main transformer is 7698A.

[0057] Braking current in differential protection of main transformer in demonstration project

[0058] Differential current in differential protection of main transformer in demonstration project

[0059] When the unit is operating normally, The differential current is I d =0, braking current I r =I1.

[0060] Differential current starting setting I cdqd =0.4Ie=0.4×0.6415=0.2566A (Ie is the secondary rated current of the main transformer low voltage side. Since the primary rated current of the main transformer low voltage side is 7698A and the current transformer ratio K is 12000 / 1, the secondary current of the main transformer low voltage side is 0.6415A)

[0061] According to the main transformer differential protection equation:

[0062]

[0063] in I r When <n, I d >K bl ×I r +I cdqd ,

[0064] Take the nearby point:

[0065]

[0066] Assume that the polarity of the current transformer T1 on the generator side of the main transformer low voltage side is reversed.

[0067] Then the differential current is I d =2I1, braking current I r =I1, and substituting it into formula (1), we get the quadratic equation of I1, which is as follows:

[0068]

[0069] After finishing, it is as follows:

[0070] Solve I1=0.134A, corresponding to the primary current generated by the generator:

[0071] I=K×0.134=12000×0.134=1608A;

[0072] Then, the total power of the symmetrical three-phase load is calculated by the power calculation formula as the maximum grid-connected load value of the unit:

[0073]

[0074] Therefore, at the moment of grid connection of the demonstration project, assuming that the polarity of the current transformer T1 on the generator side of the low-voltage side of the main transformer is reversed, and the initial power of the unit is less than 42.6MW, the main transformer differential protection will not operate, ensuring the successful grid connection of the unit. Because the current I1 flowing through the current transformer T1 is the sum of the absolute values ​​of the current I2 flowing through the current transformer T2 and the current I3 flowing through the current transformer T3, that is, the value of I1 is the largest, so the reverse polarity of the current transformer T1 is the worst case, and it is the case where the unit is allowed to carry the minimum initial load. At the same time, the embodiment of the present invention can be based on the unit power factor at the moment of grid connection. The maximum grid-connected load value of the unit is calculated for different values ​​of the terminal voltage.

[0075] In this embodiment, a high temperature gas-cooled reactor nuclear power unit grid-connected protection device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0076] This embodiment provides a high temperature gas-cooled reactor nuclear power unit grid-connected protection device, such as Figure 5 As shown, including:

[0077] The steam turbine simulated total power value acquisition module 501 is used to respectively acquire the export power values ​​of the first reactor and the second reactor, and take the sum of the export power values ​​of the first reactor and the second reactor as the steam turbine simulated total power value;

[0078] The maximum grid-connected load value acquisition module 502 is used to obtain the corresponding maximum grid-connected load value of the unit when the polarity of a group of current transformers at the generator end side is reversed;

[0079] The minimum grid-connected load value acquisition module 503 is used to acquire the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine;

[0080] The grid connection protection module 504 allows the first reactor and the second reactor to be connected to the grid when the simulated total power value of the steam turbine is between the minimum grid connection load value and the maximum grid connection load value of the unit, otherwise the grid connection operation is blocked.

[0081] In some optional implementations, the steam turbine simulated total power value acquisition module 501 includes:

[0082] A reactor data acquisition unit, used to respectively acquire the measured primary circuit thermal power, outlet flow rate, and steam enthalpy value of the first reactor and the second reactor;

[0083] An outlet power value calculation unit, used to calculate the outlet power values ​​of the first reactor and the second reactor respectively based on the measured outlet flow rate and steam enthalpy value;

[0084] The outlet power value correction unit is used to correct the measured primary circuit thermal power based on the calculated outlet power values ​​of the first reactor and the second reactor to obtain the corrected outlet power values ​​of the first reactor and the second reactor.

[0085] In some optional embodiments, the maximum grid-connected load value acquisition module 502 calculates the current flowing through a group of current transformers on the generator end side when the polarity is reversed, and combines the measured generator outlet terminal voltage and power factor to obtain the corresponding maximum grid-connected load value of the unit using a power calculation formula.

[0086] In some optional implementations, the maximum grid-connected load value of the unit is obtained by the following power calculation formula:

[0087]

[0088] Wherein, U represents the generator outlet terminal voltage, which is obtained by measurement; It indicates the power factor at the time of grid connection, which is obtained through measurement; I indicates the current flowing through the current transformer when the polarity of a group of current transformers at the generator output end is reversed.

[0089] In some optional implementations, the current flowing through the current transformers when the polarity of a group of current transformers at the generator end side is reversed is calculated based on a main transformer differential protection equation under a braking boundary condition.

[0090] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0091] The high-temperature gas-cooled reactor nuclear power unit grid-connected protection device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0092] The embodiment of the present invention also provides a computer device having the above Figure 5 The grid-connected protection device of the high temperature gas-cooled reactor nuclear power unit shown.

[0093] See also Figure 6 , Figure 6 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 6 As shown, the computer device includes: one or more processors 61, memory 62, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides part of the necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 61 is taken as an example.

[0094] The processor 61 may be a central processing unit, a network processor or a combination thereof. The processor 61 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0095] The memory 62 stores instructions executable by at least one processor 61 so as to enable at least one processor 61 to implement the method shown in the above embodiment.

[0096] The memory 62 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required by at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 62 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 62 may optionally include a memory remotely arranged relative to the processor 61, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0097] The memory 62 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 62 may also include a combination of the above types of memory.

[0098] The computer device also includes a communication interface 63 for the computer device to communicate with other devices or a communication network.

[0099] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0100] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0101] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for grid-connected protection of a high temperature gas-cooled reactor nuclear power unit, characterized in that: The method comprises: The export power values ​​of the first reactor and the second reactor are respectively obtained, and the sum of the export power values ​​of the first reactor and the second reactor is used as the total simulated power value of the steam turbine; Obtain the maximum grid-connected load value of the corresponding unit when the polarity of a group of current transformers on the generator side is reversed; Obtain the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine; When the simulated total power value of the steam turbine is between the minimum grid-connected load value of the unit and the maximum grid-connected load value of the unit, the grid-connected operation of the first reactor and the second reactor is allowed, otherwise the grid-connected operation is blocked.

2. The method according to claim 1, characterized in that The step of respectively obtaining the export power values ​​of the first reactor and the second reactor comprises: respectively obtaining the measured primary circuit thermal power, outlet flow rate, and steam enthalpy value of the first reactor and the second reactor; Calculating the outlet power values ​​of the first reactor and the second reactor respectively based on the measured outlet flow rate and steam enthalpy value; The measured primary circuit thermal power is corrected based on the calculated outlet power values ​​of the first reactor and the second reactor to obtain corrected outlet power values ​​of the first reactor and the second reactor.

3. The method according to claim 1, characterized in that The obtaining of the corresponding maximum grid-connected load value of the unit when the polarity of a group of current transformers at the generator terminal side is reversed includes: Calculate the current flowing through the current transformer when the polarity of a group of current transformers on the generator side is reversed, and combine the measured generator outlet terminal voltage and power factor to obtain the corresponding unit maximum grid-connected load value using the power calculation formula.

4. The method according to claim 3, characterized in that The maximum grid-connected load value of the unit is obtained by the following power calculation formula: Wherein, U represents the generator outlet terminal voltage, which is obtained by measurement; It indicates the power factor at the time of grid connection, which is obtained through measurement; I indicates the current flowing through the current transformer when the polarity of a group of current transformers at the generator output end is reversed.

5. The method according to claim 4, characterized in that The current flowing through the current transformer when the polarity of a group of current transformers at the generator end side is reversed is calculated based on the main transformer differential protection equation under the braking boundary condition.

6. A grid-connected protection device for a high-temperature gas-cooled reactor nuclear power unit, characterized in that: The device comprises: A steam turbine simulated total power value acquisition module is used to respectively acquire the export power values ​​of the first reactor and the second reactor, and take the sum of the export power values ​​of the first reactor and the second reactor as the steam turbine simulated total power value; The maximum grid-connected load value acquisition module is used to obtain the corresponding maximum grid-connected load value of the unit when the polarity of a group of current transformers at the generator end side is reversed; A minimum grid-connected load value acquisition module is used to obtain the minimum grid-connected load value of the unit according to the characteristic parameters of the steam turbine; The grid-connected protection module allows the first reactor and the second reactor to be connected to the grid when the simulated total power value of the steam turbine is between the minimum grid-connected load value of the unit and the maximum grid-connected load value of the unit, otherwise the grid-connected operation is blocked.

7. The grid-connected protection device for a high temperature gas-cooled reactor nuclear power unit according to claim 6, characterized in that: The steam turbine simulated total power value acquisition module includes: A reactor data acquisition unit, used to respectively acquire the measured primary circuit thermal power, outlet flow rate, and steam enthalpy value of the first reactor and the second reactor; An outlet power value calculation unit, used to calculate the outlet power values ​​of the first reactor and the second reactor respectively based on the measured outlet flow rate and steam enthalpy value; The outlet power value correction unit is used to correct the measured primary circuit thermal power based on the calculated outlet power values ​​of the first reactor and the second reactor to obtain the corrected outlet power values ​​of the first reactor and the second reactor.

8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the grid-connected protection method for a high-temperature gas-cooled reactor nuclear power unit according to any one of claims 1 to 5 by executing the computer instructions.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the grid-connected protection method for a high-temperature gas-cooled reactor nuclear power unit according to any one of claims 1 to 5.

10. A computer program product, characterized in that The method comprises computer instructions for causing a computer to execute the grid-connected protection method for a high-temperature gas-cooled reactor nuclear power unit according to any one of claims 1 to 5.