Control method and device of power supply system and power supply system

By obtaining the phase mapping relationship between the inverter and the power metering device and performing adaptive control, the wiring complexity and phase matching problems of the parallel inverter are solved, and the correct closed-loop control and operation reliability of the power supply system are achieved.

CN118889535APending Publication Date: 2024-11-01SHANGHAI SIGEYUAN INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411022781.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-06-13
Filing Date
2024-07-26
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

With the increase in the number of parallel inverters, the wiring complexity has increased exponentially. The existing technology has failed to effectively solve the phase matching problem between multiple inverters, resulting in the failure of closed-loop control of the power supply system and affecting operating reliability.

Method used

By obtaining the phase mapping relationship between the power supply device and the power metering device, adaptive control is performed to ensure that the AC current output by the inverter corresponds one by one to the phase at the connection point, forming correct closed-loop control to avoid line reversal processing.

Benefits of technology

The correct phase matching between multiple inverters is achieved, the closed-loop control of the power supply system is ensured, operational reliability is improved, and wiring complexity is simplified.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889535A_ABST
    Figure CN118889535A_ABST
Patent Text Reader

Abstract

The invention discloses a control method and device of a power supply system and the power supply system, and belongs to the technical field of power supply. The power supply system comprises a plurality of power supply devices and a power metering device, the plurality of power supply devices are connected in parallel to a grid-connected point, the power metering device is arranged at the grid-connected point, and the method comprises the following steps: in the case of phase sequence misconnection between the power supply devices and the power metering device, the power supply devices are connected in parallel with the grid-connected point; obtaining a phase mapping relation between the power supply equipment and the power metering equipment; and controlling the power output of the power supply equipment based on the phase mapping relation between the power supply equipment and the power metering equipment. Even if the phase sequence between the power supply equipment and the power metering equipment is misconnected, rerouting processing is not needed, each phase of the power supply equipment can output correct power, one-to-one correspondence of alternating current outputs of a plurality of power supply equipment can be ensured, one-to-one correspondence with phases of the power metering equipment at a grid-connected point can be ensured, and correct closed-loop control of the power supply system is formed.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Citation of Related Applications

[0002] This application claims priority. The application number of the prior application is: 2024107659210, and the title is: Control method of power supply system Technical Field

[0003] The present application belongs to the field of power supply technology, and in particular, relates to a control method and device for a power supply system, and a power supply system. Background Art

[0004] In the solar energy storage system, the inverter can output higher power by adopting parallel technology, and meet the demand of larger load through the joint output of multiple inverters. In this process, the AC output of multiple inverters that need to be paralleled must correspond one by one, and the phase of the power metering equipment at the grid connection point must correspond one by one to form a correct closed-loop control.

[0005] However, as the number of parallel inverters increases, the complexity of wiring increases exponentially. There is currently no effective solution to this problem. Summary of the invention

[0006] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a control method, device and power supply system of a power supply system, which can ensure that the AC outputs of multiple power supply devices correspond one to one, and correspond one to one with the phases of the power metering devices at the grid connection point, so as to form a correct closed-loop control of the power supply system.

[0007] In a first aspect, the present application provides a control method for a power supply system, wherein the power supply system comprises a plurality of power supply devices and a power metering device, wherein the plurality of power supply devices are connected in parallel to a grid connection point, and the power metering device is arranged at the grid connection point, and the method comprises:

[0008] In the case where the phase sequence between the power supply device and the power metering device is wrongly connected, obtaining a phase mapping relationship between the power supply device and the power metering device;

[0009] Based on the phase mapping relationship between the power supply device and the power metering device, the power output of the power supply device is controlled.

[0010] According to the control method of the power supply system of the present application, when the phase sequence between the power supply device and the power metering device is misconnected, the phase mapping relationship between the power supply device and the power metering device is determined, and the power output of the power supply device is adaptively controlled according to the phase mapping relationship. Even if the phase sequence between the power supply device and the power metering device is misconnected, there is no need to change the line, and each phase of the power supply device can output the correct power. It can ensure that the AC outputs of multiple power supply devices correspond one to one, and correspond one to one with the phase of the power metering device at the grid connection point, forming a correct closed-loop control of the power supply system.

[0011] According to an embodiment of the present application, the multiple power supply devices are divided into a master and a slave, and the acquiring the phase mapping relationship between the power supply device and the power metering device includes:

[0012] The host controls the multiple power supply devices to perform wiring detection respectively, and each of the power supply devices obtains a phase mapping relationship between itself and the power metering device respectively.

[0013] According to an embodiment of the present application, the acquiring the phase mapping relationship between the power supply device and the power metering device includes:

[0014] The plurality of power supply devices in the power supply system are controlled to perform wiring detection in sequence, and each of the power supply devices respectively obtains a phase mapping relationship between itself and the power metering device.

[0015] According to an embodiment of the present application, the phase sequence misconnection between the power supply device and the power metering device is determined by the following steps:

[0016] Based on the power control instruction corresponding to the grid connection point, each of the power supply devices is controlled to output power in sequence, and the current sampled power value of the power metering device is obtained;

[0017] Based on the current sampled power value and the power value output by each of the power supply devices, each of the power supply devices determines in turn the phase matching of its own wiring with the power metering device, and the phase matching of the wiring between the power supply device and the power metering device includes the wrong phase sequence connection between the power supply device and the power metering device.

[0018] According to an embodiment of the present application, the acquiring the phase mapping relationship between the power supply device and the power metering device includes:

[0019] Control the power supply device to output power, and obtain the current voltage sampling value corresponding to each phase voltage sampling line of the power metering device and the current current sampling value corresponding to each phase current sampling line;

[0020] Determine the current sampled power values ​​corresponding to the power metering devices based on the current voltage sampled value and the current current sampled value;

[0021] Based on the current sampled power value and the power value of the power output by the power supply device, a phase mapping relationship between the power supply device and the power metering device is determined.

[0022] According to an embodiment of the present application, controlling the power supply device to output power includes:

[0023] According to the power disturbance value, controlling the power supply device to output power;

[0024] The determining, based on the current sampled power value and the power value of the power output of the power supply device, a phase mapping relationship between the power supply device and the power metering device comprises:

[0025] A phase mapping relationship between the power supply device and the power metering device is determined based on the power difference value of the current sampled power value and the power disturbance value.

[0026] According to one embodiment of the present application, the current sampled power value includes at least one of a current sampled active power value and a current sampled reactive power value.

[0027] In a second aspect, the present application provides a control device for a power supply system, the power supply system comprising a plurality of power supply devices and a power metering device, the plurality of power supply devices being connected in parallel to a grid connection point, the power metering device being arranged at the grid connection point, the control device comprising:

[0028] an acquisition module, configured to acquire a phase mapping relationship between the power supply device and the power metering device when a phase sequence between the power supply device and the power metering device is misconnected;

[0029] A control module is used to control the power output of the power supply device based on the phase mapping relationship between the power supply device and the power metering device.

[0030] According to the control device of the power supply system of the present application, when the phase sequence is misconnected between the power supply equipment and the power metering equipment, the phase mapping relationship between the power supply equipment and the power metering equipment is determined, and the power output of the power supply equipment is adaptively controlled according to the phase mapping relationship. Even if the phase sequence between the power supply equipment and the power metering equipment is misconnected, there is no need to change the line, and each phase of the power supply equipment can output the correct power. It can ensure that the AC outputs of multiple power supply equipment correspond one-to-one, and correspond one-to-one with the phases of the power metering equipment at the grid connection point, forming a correct closed-loop control of the power supply system.

[0031] In a third aspect, the present application provides a power supply system, including:

[0032] A plurality of power supply devices and a power metering device, wherein the plurality of power supply devices are connected in parallel to a grid connection point, and the power metering device is arranged at the grid connection point;

[0033] As in the control device of the power supply system described in the second aspect above, the control device is connected to the power supply device and the power metering device.

[0034] According to the power supply system of the present application, when the phase sequence between the power supply equipment and the power metering equipment is misconnected, the phase mapping relationship between the power supply equipment and the power metering equipment is determined, and the power output of the power supply equipment is adaptively controlled according to the phase mapping relationship. Even if the phase sequence between the power supply equipment and the power metering equipment is misconnected, there is no need to change the line, and each phase of the power supply equipment can output the correct power. It can ensure that the AC outputs of multiple power supply equipment correspond one-to-one, and correspond one-to-one with the phase of the power metering equipment at the grid connection point, forming a correct closed-loop control of the power supply system.

[0035] In a fourth aspect, the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the control method of the power supply system as described in the first aspect above is implemented.

[0036] In a fifth aspect, the present application provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the control method of the power supply system as described in the first aspect above is implemented.

[0037] In a sixth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the control method of the power supply system as described in the first aspect above.

[0038] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0040] Figure 1 It is one of the flow charts of the control method of the power supply system provided in the embodiment of the present application;

[0041] Figure 2 It is one of the structural schematic diagrams of the power supply system provided in the embodiment of the present application;

[0042] Figure 3 This is the second structural diagram of the power supply system provided in the embodiment of the present application;

[0043] Figure 4 This is the third structural diagram of the power supply system provided in the embodiment of the present application;

[0044] Figure 5 This is the fourth structural diagram of the power supply system provided in the embodiment of the present application;

[0045] Figure 6 This is the fifth structural diagram of the power supply system provided in the embodiment of the present application;

[0046] Figure 7 This is the sixth structural diagram of the power supply system provided in the embodiment of the present application;

[0047] Figure 8 This is the seventh structural diagram of the power supply system provided in the embodiment of the present application;

[0048] Fig. 9 This is a second flow chart of a control method for a power supply system provided in an embodiment of the present application;

[0049] Fig.10 This is a third flow chart of the control method of the power supply system provided in the embodiment of the present application;

[0050] Fig.11 This is the eighth structural diagram of the power supply system provided in the embodiment of the present application;

[0051] Fig.12 This is the ninth structural diagram of the power supply system provided in the embodiment of the present application;

[0052] Fig.13 This is a fourth flow chart of the control method of the power supply system provided in the embodiment of the present application;

[0053] Fig.14 is a schematic diagram of the structure of a control device for a power supply system provided in an embodiment of the present application;

[0054] Fig.15 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application.

[0055] Reference numerals:

[0056] Power supply device 210 , power metering device 230 , load 310 , power grid 320 . DETAILED DESCRIPTION

[0057] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.

[0058] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0059] In the following, in combination with the accompanying drawings, the control method of the power supply system, the control device of the power supply system, the power supply system, the electronic device and the readable storage medium provided in the embodiments of the present application are described in detail through specific embodiments and their application scenarios.

[0060] The control method of the power supply system may be applied to a terminal, and may be specifically executed by hardware or software in the terminal.

[0061] The terminal includes, but is not limited to, a portable communication device such as a mobile phone or tablet computer with a touch-sensitive surface (e.g., a touch screen display and / or a touch pad). It should also be understood that in some embodiments, the terminal may not be a portable communication device, but a desktop computer with a touch-sensitive surface (e.g., a touch screen display and / or a touch pad).

[0062] In the following various embodiments, a terminal including a display and a touch-sensitive surface is described. However, it should be understood that the terminal may include one or more other physical user interface devices such as a physical keyboard, a mouse and a joystick.

[0063] The control method of the power supply system provided in the embodiment of the present application can be executed by an electronic device or a functional module or functional entity in the electronic device that can implement the control method of the power supply system. The electronic devices mentioned in the embodiment of the present application include but are not limited to mobile phones, tablet computers, computers, cameras and wearable devices. The control method of the power supply system provided in the embodiment of the present application is described below using the electronic device as an example of the execution subject.

[0064] It should be noted that the power supply device 210 of the embodiment of the present application can be an inverter, a photovoltaic energy storage integrated machine, etc. The power supply device 210 can output AC power to supply the load 310 or the power grid 320.

[0065] An embodiment of the present application provides a control method for a power supply system, wherein the power supply system includes multiple power supply devices 210 and a convergence device, wherein the AC output end of the power supply device 210 is connected to the AC input end of the convergence device, and the AC output end of the convergence device is used to connect to a power grid 320.

[0066] The power supply equipment 210 of the power supply system is connected to a grid connection point, and a power metering device 230 is provided at the grid connection point.

[0067] The power supply system has input and output power limit requirements at the grid connection point. The power supply system will execute the corresponding scheduling strategy according to the grid connection point power. Therefore, the power metering device 230 is often connected to the grid connection point to measure the real-time power information between the power supply system and the power grid 320.

[0068] The power metering device 230 may be a device for measuring power, such as an electric meter.

[0069] For a three-phase grid-connected system, the access power metering device 230 has three current sensors (Current Transformer, CT) and three-phase voltage sampling points, which are connected to the power grid 320 through current sampling lines and voltage sampling lines respectively.

[0070] Since the power metering device 230 performs sampling at the grid connection point, when the connection between the power metering device 230 and the grid connection point is completely correct, but the AC outputs of different power supply devices 210 in the power supply system do not correspond one to one, it will cause an incorrect phase matching relationship between the power supply device 210 and the power metering device 230. This incorrect phase matching relationship will eventually cause the scheduling strategy of the power supply system to fail, the power of the grid connection point cannot be effectively limited, and the reliability of the power supply system operation will be affected.

[0071] To address the problem of detecting the connection between the power metering device 230 and each power supply device 210 in the power supply system (i.e., detecting the phase matching relationship between the power metering device 230 and each power supply device 210), an embodiment of the present application provides a control method for the power supply system.

[0072] A schematic diagram showing a completely correct connection between the grid connection point and the power metering device 230 is shown in FIG. Figure 2 As shown, the three CTs respectively sample the three-phase currents of the grid connection point, the four voltage sampling lines L respectively sample the three-phase voltages of the grid connection point, and the phase voltage sampling of the power metering device 230 is the voltage between L1, L2 and L3 and LN respectively.

[0073] CT1 and L1 are connected to phase A, CT2 and L2 are connected to phase B, CT3 and L3 are connected to phase C, no CT is connected to phase N, and LN is connected to phase N.

[0074] The control method of the power supply system of the embodiment of the present application is used to detect the connection problem between the power metering device 230 and each power supply device 210 in the power supply system under the premise that the voltage sampling and the corresponding current sampling of the power metering device 230 are connected to the same phase of the grid connection point.

[0075] like Figure 1 As shown, the control method of the power supply system includes: steps 110 to 150.

[0076] Step 110 : Obtain the current voltage sampling value corresponding to each phase voltage sampling line of the power metering device 230 .

[0077] The current voltage sampling value is the voltage value collected by the voltage sampling line at the current moment.

[0078] In this embodiment, each phase voltage sampling line of the power metering device 230 performs voltage acquisition in real time to obtain a corresponding current voltage sampling value.

[0079] Step 120: Based on the current voltage sampling value and the current grid-side voltage values ​​corresponding to the grid-connected points, determine the reliable connection status of the voltage sampling lines of each phase of the power metering device 230 and the grid-connected point wiring.

[0080] The current grid-side voltage value is the rated voltage value corresponding to each grid connection point at the current moment.

[0081] In this embodiment, according to the current voltage sampling values ​​corresponding to the phase voltage sampling lines of the power metering device 230 and the current grid-side voltage values ​​corresponding to the grid-connected points, the reliable connection status of L1, L2, L3 and LN in the power metering device 230 and the grid-connected points A, B, C and N phase connections can be determined.

[0082] By comparing the current grid-side voltage value with the current voltage sampling value, the reliable connection status of the voltage sampling lines of each phase of the power metering device 230 and the grid connection point wiring can be determined.

[0083] In this step, the reliable connection between the phase voltage sampling lines of the power metering device 230 and the grid connection point includes missing connection between the phase voltage sampling lines of the power metering device 230 and the grid connection point, and N-phase wrong connection between the phase voltage sampling lines of the power metering device 230 and the grid connection point.

[0084] For example, Figure 3 As shown, the L1 voltage sampling line of the power metering device 230 is disconnected from the grid connection point, such as Figure 4As shown, the N phases between the voltage sampling lines of each phase of the power metering device 230 and the grid connection point are connected incorrectly, the L1 voltage sampling line of the power metering device 230 is connected incorrectly to the N line of the grid connection point, and the LN voltage sampling line of the power metering device 230 is connected to the A line of the grid connection point.

[0085] It is understandable that when there is a missing connection between the phase voltage sampling lines of the power metering device 230 and the grid connection point, or when N phases are misconnected between the phase voltage sampling lines of the power metering device 230 and the grid connection point, a prompt message can be output to prompt the user to change the connection.

[0086] Step 130: When the voltage sampling lines of each phase of the power metering device 230 are reliably connected to the grid connection point, control the power supply device 210 to output power, and obtain the current voltage sampling values ​​corresponding to the voltage sampling lines of each phase of the power metering device 230 and the current current sampling values ​​corresponding to the current sampling lines of each phase.

[0087] In this embodiment, there is no missing connection or N-line misconnection between the voltage sampling lines of each phase of the power metering device 230 and the grid connection point, which is a reliable connection situation.

[0088] like Figure 2 As shown, four voltage sampling lines L respectively sample the three-phase voltage of the grid connection point, and the phase voltage sampling of the power metering device 230 is the voltage between L1, L2 and L3 and LN respectively. The phase voltage sampling lines of the power metering device 230 are reliably connected to the grid connection point.

[0089] In this embodiment, the current sampling value is the current value collected by the current sampling line at the current moment.

[0090] In this embodiment, the power supply device 210 is started, the power supply device 210 outputs power, current flows through each phase of the grid connection point, each phase current sampling line collects the corresponding current current sampling value, and each phase voltage sampling line collects the corresponding current voltage sampling value.

[0091] Step 140 : Determine the current sampled power values ​​corresponding to the power metering devices 230 based on the current voltage sampled value and the current current sampled value.

[0092] The current sampled power value is the power value of each phase of the grid connection point obtained by sampling and calculating by the power metering device 230 at the current moment.

[0093] In this step, the current voltage sampling value and the current current sampling value of the corresponding phase may be multiplied to obtain the current sampling power value.

[0094] Step 150: Based on the current sampled power value and the power value output by the power supply device 210, determine the reliable connection between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point.

[0095] The power value output by the power supply device 210 is the real power value output by the power supply device 210 .

[0096] In this step, the reliable connection between each phase voltage sampling line and current sampling line and the grid connection point can be determined by comparing the current sampled power value with the real power value output by the power supply device 210 .

[0097] It should be noted that when determining the reliable connection between each phase voltage sampling line and the grid connection point, the reliable connection between the current sampling line and the grid connection point can be determined by comparing the current current sampling value of each phase with the corresponding real current value of the grid connection point at the current moment.

[0098] According to the control method of the power supply system provided in the embodiment of the present application, when the reliable connection between the voltage sampling lines of each phase of the power metering device 230 and the grid connection point is determined through the current voltage sampling values ​​of each phase and the current grid-side voltage values ​​of each phase, the power supply device 210 is controlled to output power, and the current sampled power value is determined according to the current voltage sampling values ​​of each phase and the current current sampling values ​​of each phase, and compared with the power value of the power output of the power supply device 210, to judge the reliable connection between the voltage sampling lines and current sampling lines of each phase of the power metering device 230 and the grid connection point, to prevent the voltage sampling lines and current sampling lines from not being connected to the corresponding grid phase lines, to ensure the accuracy of the metering data of the power metering device 230, and to help improve the reliability of the operation of the power supply system.

[0099] In some embodiments, controlling the power supply device 210 to output power includes:

[0100] According to the power disturbance value, control the power supply device 210 to output power;

[0101] Based on the current sampled power value and the power value of the power supply device 210 outputting power, the reliable connection between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point is determined, including:

[0102] Based on the power difference of the current sampled power value and the power disturbance reference value, the reliable connection between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point is determined.

[0103] The power disturbance reference value is a disturbance value that can control the output power of the power supply device 210 .

[0104] The power difference of the current sampled power value is the difference between the current sampled power value before the power disturbance reference value controls the output power of the power supply device 210 and the current sampled power value after the power disturbance value controls the output power of the power supply device 210.

[0105] In this embodiment, the power supply device 210 is controlled to output power, the current voltage sampling value and the current current sampling value of the power metering device 230 are collected, and the corresponding current sampling power values ​​of the power metering device 230 are calculated and recorded. According to the disturbance power value of the power output of the power supply device 210 and the difference corresponding to the current sampling power value of the power metering device 230, the reliable connection between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point wiring is determined.

[0106] Take the power supply device 210 as a three-phase inverter as an example.

[0107] Set the control mode of the three-phase inverter to three-phase independent control, and control the output reactive power reference Q of phase A. ref,1 , record the reactive power data of the power metering device 230 at this time, where the reactive power recorded at the S1 port of the power metering device 230 is Q S1,1 , the reactive power recorded by the power metering device 230S2 port is Q S2,1 , the reactive power recorded by the power metering device 230S3 port is Q S3,1 .

[0108] According to the preset power disturbance value, continue to control the output reactive power reference Q of phase A ref,2 , record the reactive power data of the power metering device 230 at this time, where the reactive power recorded at the S1 port of the power metering device 230 is Q S1,2 , the reactive power recorded by the power metering device 230S2 port is Q S2,2 , the reactive power recorded by the power metering device 230S3 port is Q S3,2 .

[0109] The reactive power record difference (i.e., the power difference of the current sampled power value) and the reactive power reference value difference (i.e., the power disturbance reference value) of the power metering device 230 can be expressed as:

[0110]

[0111] By comparing the recorded difference of the three-phase reactive power sampled by the three CTs of the power metering device 230 with the reactive power reference value difference, the wiring conditions shown in Table 1 below may appear.

[0112] Table 1

[0113]

[0114] The above detection steps can also be applied to the other two phases. When all three phases are detected, adaptive control can be performed within the power supply system based on the detection results.

[0115] For example, when it is detected that the power metering device 230CT1 is reversely connected, the correct grid connection point power can be obtained through data processing; when it is detected that the power metering device 230CT1 is connected to the correct position, corresponding to the grid connection point B, the power metering device 230CT2 is connected to the correct position, corresponding to the grid connection point C, and the power metering device 230CT3 is connected to the correct position, corresponding to the grid connection point A, the three-phase reactive power measured by the power metering device 230 can be mapped to the reactive power of the corresponding phase of the grid connection point through mapping processing, thereby realizing power limitation on the grid connection point.

[0116] If the detection result cannot meet the adaptive requirements, such as the CT and N lines are connected incorrectly or missed, a prompt message can be output to guide the wiring personnel to change the CT access position.

[0117] In some embodiments, the current sampled power value includes at least one of a current sampled active power value and a current sampled reactive power value.

[0118] Correspondingly, the power disturbance value includes an active power disturbance value and a reactive power disturbance value. The active power disturbance value is used to disturb the active power outputted by the power supply device 210 , and the reactive power disturbance value is used to disturb the reactive power outputted by the power supply device 210 .

[0119] In this embodiment, the current sampled power value may also include a current sampled apparent power value.

[0120] Assuming that the three-phase power grid is an ideal power grid, the current sampled active power value P x (x=a,b,c) and the current sampled reactive power value Q x (x=a,b,c) are respectively expressed as

[0121]

[0122] Among them, U x 、E x and I x (x=a, b, c) respectively represent the current voltage sampling value, the current grid-side voltage value and the current current sampling value of the power metering device 230. The current voltage sampling value and the current current sampling value of the power metering device 230 determine the current sampled active power value and the current sampled reactive power value calculated by it.

[0123] In some embodiments, after determining the phase matching between the voltage sampling lines and current sampling lines of each phase of the power metering device 230 and the grid connection point, the control method of the power supply system further includes:

[0124] In the case where the phase sequence between the power metering device 230 and the grid connection point is misconnected, and the voltage sampling line and the current sampling line of the same phase in the power metering device 230 are connected to the same phase of the grid connection point, the phase mapping relationship of the connection between the power metering device 230 and the grid connection point is determined based on the current sampled power value and the power value of the power output of the power supply device 210;

[0125] Based on the phase mapping relationship of the connection between the power metering device 230 and the grid connection point, the sampled output information of the power metering device 230 is adjusted.

[0126] The phase mapping relationship represents the correct matching relationship between the current sampling line and the voltage sampling line and the grid connection point wiring.

[0127] The sampled output information represents the current, voltage, power, etc. output by the power metering device 230 in each phase.

[0128] In actual implementation, it is ensured that the current sampling line and the voltage sampling line are stably connected to the A, B, and C phases of the grid connection point. Even if the connection position is incorrect, the installer does not need to change the wiring position. The phase mapping relationship between the current sampling line of each phase of the power metering device 230 and the voltage sampling line and the grid connection point wiring is determined through voltage, power and other information. The voltage or current sampling of the power metering device 230 is mapped, and the correct power data can be obtained by adapting the processing in the power calculation, power calculation and other links.

[0129] In this embodiment, each phase of the power supply device 210 is controlled to output reference power data (current, voltage, power, etc.), and the current sampled power value of the power metering device 230 is recorded. According to the reference power data and the current sampled power value, the phase mapping relationship between the current sampling line and the voltage sampling line of each phase of the power metering device 230 and the grid connection point is determined.

[0130] For example, the power supply device 210 is an inverter.

[0131] Set the inverter control mode to three-phase independent control, and control the reference current of phase A output to -I ref , the three-phase current sampled by the power metering device 230 is I x,1 (x=a,b,c), the reference current for controlling the inverter output is I ref , the three-phase current sampled by the power metering device 230 is I x,2 (x=a,b,c).

[0132] The reference current and the difference between the two current samples can be expressed as:

[0133]

[0134] The current difference sampled by the power metering device 230 is compared with the reference current difference. x The absolute value of the reference current difference is the same, indicating that the x-phase current of the power metering device 230 corresponds to A, and this mapping relationship is recorded.

[0135] The apparent power reference value difference of inverter A phase output is ΔS ref , the three-phase voltages of the power metering device 230 are multiplied by the above x-phase current differences, and the apparent power can be obtained as follows:

[0136]

[0137] The above three apparent powers S a、b、c The difference between the apparent power reference value and the apparent power reference value ΔS ref In contrast, there is S y (y=a,b,c) and ΔS ref The absolute values ​​of are the same, indicating that the x-phase current of the power metering device 230 and the y-phase voltage of the power metering device 230 are sampled on the same phase, which is phase A of the power grid 320 here.

[0138] In this embodiment, if the absolute values ​​are the same but opposite, it means that the CT access direction of the x phase is reversed, and this mapping relationship is recorded, and the detection of the A phase is completed.

[0139] Similarly, the detection method of phases B and C is the same as above, and the corresponding mapping relationship can also be obtained.

[0140] After the phase mapping relationship is obtained, the sampling output information of the power metering device 230 is adjusted based on the phase mapping relationship.

[0141] like Figure 6 As shown, the CT1 and CT2 of the power metering device 230 are connected incorrectly, and the phase mapping relationship between the grid connection point and the power metering device 230 is A-CT2-L1, B-CT1-L2, and C-CT3-L3. When the power of each phase of the grid connection point can be controlled according to the phase mapping relationship, the current sampling line of the power metering device 230 can be used as a reference.

[0142] For example, the active power output of the phase corresponding to the control power metering device 230CT1 is P ref , the three-phase power reference value P of the power supply device 210 at the grid connection point can be obtained by using the above mapping relationship x,ref And power feedback value P x,fdb They are:

[0143]

[0144] Among them, U x represents the x-phase voltage sampled by the power metering device 230, I y It represents the current sampled by the power metering device 230CTy. At this time, the power reference value and feedback value of the power supply device 210 are both data of the phase to be controlled at the grid-connected point, so that closed-loop power control of each phase of the grid-connected point can be realized.

[0145] In actual implementation, after the detection of the voltage sampling lines of each phase of the power metering device 230 and the grid connection point wiring, ensure that the phases of the voltage sampling lines of each phase of the power metering device 230 and the grid connection point wiring are matched (that is, there is no missing wiring or N line misconnection), and then detect the current sampling lines of each phase of the power metering device 230 and the grid connection point wiring.

[0146] like Figure 2 As shown, it is determined that the voltage sampling lines and current sampling lines of each phase of the power metering device 230 are completely matched with the grid connection point wiring. Assuming that the current output by the power supply system contains only reactive components and the three-phase currents are symmetrical, the reactive power Q of the power metering device 230 x (x=a,b,c) can be expressed as:

[0147]

[0148] Among them, U x 、E x and I x (x=a, b, c) represent the current voltage sampling, grid-side voltage and three-phase current of the power metering device 230 respectively. The reactive power of the power metering device 230 is related to the voltage and current sampling.

[0149] like Figure 3 As shown, L1 voltage sampling is missed. At this time, the current voltage sampling and reactive power of the power metering device 230 can be expressed as:

[0150]

[0151] When a phase voltage sampling of the power metering device 230 is missed, the reactive power of the phase will also be 0. By extending this abnormal situation to three phases, it can be seen that when the effective value of the x-phase voltage sampling of the power metering device 230 is close to 0, it is determined that the x-phase voltage sampling of the meter is missed.

[0152] like Figure 4 As shown, the N line is connected incorrectly, the L1 voltage sampling of the power metering device 230 is connected to the N line of the grid connection point, and the LN voltage sampling of the power metering device 230 is connected to the A line of the grid connection point. At this time, the current voltage sampling and reactive power of the power metering device 230 can be expressed as:

[0153]

[0154] When the LN and L1 voltage sampling of the power metering device 230 are connected incorrectly, the reactive power calculated by the power metering device 230 will be abnormal. By extending this abnormal situation to three phases, it can be seen that by comparing the current voltage sampling of the power metering device 230 with the grid voltage value, if there are two phase voltage sampling values ​​close to each other, The effective value of the voltage sampled on the other phase Y is close to U N , it is determined that the LN voltage sampling of the power metering device 230 is connected incorrectly, and the object to which the LN voltage sampling is connected incorrectly is the Y-phase voltage sampling.

[0155] like Figure 5 As shown, the phase sequence of L1 and L2 is wrongly connected, the L1 voltage sampling of the power metering device 230 is connected to the grid-connected point B, and the L2 voltage sampling of the power metering device 230 is connected to the grid-connected point A. At this time, the current voltage sampling and reactive power of the power metering device 230 can be expressed as:

[0156]

[0157] When the phase sequence of L1 and L2 is wrongly connected, resulting in abnormal reactive power calculated by the power metering device 230, the wiring of the power metering device 230 can be restored to normal by replacing the positions of the voltage sampling of L1 and L2.

[0158] It should be noted that if the current samples corresponding to L1 and L2 are exchanged, the reactive power value measured by the power metering device 230 can also return to normal. At this time, the reactive power measured by the power metering device 230A phase is actually the reactive power of the grid-connected point B phase, and the reactive power measured by the power metering device 230B phase is actually the reactive power of the grid-connected point A phase, as follows:

[0159]

[0160] When the power supply system obtains the power data of the power metering device 230, if the reactive power of phase A and phase B sampled by the power metering device 230 is exchanged, the closed-loop control of the grid connection point power can be achieved. At this time, the reactive power Q' of the grid connection point obtained by the power supply system is x (x=a,b,c) is:

[0161]

[0162] like Figure 7 As shown, CT1 and CT2 of the power metering device 230 are connected incorrectly and L1 and L2 are connected incorrectly. CT1 is sampled and connected to the grid point B, CT2 of the power metering device 230 is sampled and connected to the grid point A, and the wiring position of CT3 is correct.

[0163] The L1 voltage sampling is connected to B of the grid-connected point, the L2 voltage sampling is connected to A of the grid-connected point, and the other voltage sampling lines are connected in the correct positions.

[0164] At this time, the three-phase voltage real sampling and reactive power of the power metering device 230 can be expressed as

[0165]

[0166] When CT1 and CT2 of the metering device are connected incorrectly and the L1 and L2 voltage sampling are connected incorrectly, the reactive power of phase A calculated by the power metering device 230 will be the reactive power of phase B of the power grid, while the reactive power of phase B calculated by the metering device will be the reactive power of phase A of the power grid. At this time, when the inverter independently controls the power of each phase of the grid connection point, the feedback amount and the reference amount are not of the same phase, which will cause power control disorder.

[0167] L1 and CT1 are connected in the same phase, and L2 and CT2 are connected in the same phase, so that self-adaptation can be achieved.

[0168] Through adaptation, when the phase sequence of the voltage sampling line of the power metering device 230 is wrongly connected, it can be corrected by exchanging the data of the current sampling line, which greatly simplifies the operation complexity of the wiring personnel.

[0169] It should be noted that the adaptation is performed when the phases of the current sampling line and the voltage sampling line of the power metering device 230 are the same, but the phases of the current sampling line and the voltage sampling line are inconsistent with the phases of the power supply system.

[0170] When the phase sequence of the voltage sampling line of the power metering device 230 is connected incorrectly, and the corresponding current sampling line is also connected incorrectly, and the phases of the current sampling line and the voltage sampling line are the same, the data of the voltage and current sampling lines can be exchanged at the same time. At this time, the wiring personnel do not need to make any changes. The system can ensure the power limit of the grid connection point through the internal adaptive method.

[0171] In this embodiment, when the phase sequence of the voltage sampling line and the current sampling line of the power metering device 230 is wrongly connected, and the phases of the current sampling line and the voltage sampling line are the same, the wiring personnel do not need to make any changes. Based on the phase mapping relationship between the power metering device 230 (including the voltage sampling line and the current sampling line) and the grid connection point, the sampling output information of the power metering device 230 is adaptively mapped and adjusted, which is beneficial to the system's accurate control of the power of the grid connection point.

[0172] In some embodiments, the phase matching between the voltage sampling lines of each phase of the power metering device 230 and the grid connection point means that there is no missing connection or wrong connection of N line between the voltage sampling lines of each phase of the power metering device 230 and the grid connection point.

[0173] In this embodiment, when there is no missing connection or N-line misconnection between the phase voltage sampling lines of the power metering device 230 and the grid connection point, it can be determined that the phase of the phase voltage sampling lines of the power metering device 230 and the grid connection point is matched, the power supply device 210 can be controlled to output power, and the current voltage sampling value and the current current sampling value can be obtained.

[0174] In this embodiment, when there is no voltage sampling line missing or N line wrong connection, the data output of the power metering device 230 can be corrected and the grid-connected point power can be limited by correcting the position of the current sampling line, and the phase matching of the voltage sampling line and the current sampling line connection can be detected by power disturbance.

[0175] In this embodiment, the phase matching conditions of the phase sequence misconnection between the phase voltage sampling lines of the power metering device 230 and the grid connection point and the phase sequence matching connection between the phase voltage sampling lines of the power metering device 230 and the grid connection point can be detected according to the power data.

[0176] In some embodiments, the phase matching conditions between the current sampling lines of each phase of the power metering device 230 and the grid connection point include missing connections between the current sampling lines of each phase of the power metering device 230 and the grid connection point, wrong phase sequence connections between the current sampling lines of each phase of the power metering device 230 and the grid connection point, and phase sequence matching connections between the current sampling lines of each phase of the power metering device 230 and the grid connection point.

[0177] It is understandable that when the phase sequence between the current sampling lines of each phase of the power metering device 230 and the grid connection point is wrongly connected, the personnel can be prompted to change the line, or adaptive control can be performed according to the connection status of the voltage sampling line.

[0178] In the case where there is a missing connection between the current sampling lines of each phase of the power metering device 230 and the grid connection point, personnel can be prompted to change the line.

[0179] like Figure 8 As shown, the current sampling line CT1 of the power metering device 230 is missing, and the connection positions of the current sampling lines CT2 and CT3 of the power metering device 230 are correct. At this time, the three-phase voltage real sampling and reactive power of the power metering device 230 can be expressed as

[0180]

[0181] When CT1 of the power metering device 230 is disconnected, the reactive power of the phase will be zero.

[0182] In some embodiments, controlling the power supply device 210 to output power includes:

[0183] Controlling the power supply device 210 to output power at least twice;

[0184] Based on the current sampled power value and the power value of the power supply device 210 outputting power, the phase matching between the voltage sampling line and the current sampling line of each phase of the power metering device 230 and the grid connection point is determined, including:

[0185] Based on at least two power values ​​corresponding to at least two power outputs of the power supply device 210 and at least two currently sampled power values, the phase matching between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point is determined.

[0186] In this embodiment, each power output of the power supply device 210 corresponds to a power value.

[0187] The power supply device 210 performs power output at least twice, and compares the power values ​​corresponding to each power output to determine whether the acquired power value is reliable. If the power value is reliable, the phase matching condition can be determined based on the power value and the corresponding current sampled power value.

[0188] In some embodiments, based on at least two power values ​​corresponding to at least two power outputs of the power supply device 210 and at least two currently sampled power values, determining the phase matching between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point wiring includes:

[0189] The power value corresponding to each power output of the power supply device 210 and the current sampled power value are used as a set of detection power data;

[0190] Obtaining data similarity between at least two sets of detection power data;

[0191] When the data similarity is greater than the first similarity threshold, the phase matching between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point is determined based on at least two sets of detected power data.

[0192] The detection power data is data that can calculate the phase matching between the voltage sampling line and the current sampling line and the grid connection point. If the detection power data is reliable, the phase matching is determined by the detection power data.

[0193] The data similarity represents the similarity between the power values ​​in the two sets of detection power data and the similarity between the current sampled power values.

[0194] The first similarity threshold is a preset value used to determine whether the detection power data is reliable.

[0195] In this embodiment, when the data similarity is greater than the first similarity threshold, the power output fluctuation of the power supply device is small, the detected power data is reliable, and the phase matching of the voltage sampling line and the current sampling line with the grid connection point can be determined by detecting the power data.

[0196] In some embodiments, based on at least two power values ​​corresponding to at least two power outputs of the power supply device 210 and at least two currently sampled power values, determining the phase matching between the voltage sampling lines and the current sampling lines of each phase of the power metering device 230 and the grid connection point wiring includes:

[0197] The power value corresponding to each power output of the power supply device 210 and the current sampled power value are used as a set of detection power data;

[0198] Obtaining data similarity between at least two sets of detection power data;

[0199] When the data similarity is less than or equal to the first similarity threshold, a prompt message is output to prompt re-detection.

[0200] In this embodiment, when the data similarity is less than or equal to the first similarity threshold, the power output of the power supply device fluctuates greatly, the detected power data is unreliable, and a prompt message for re-detection is output to the user.

[0201] A specific embodiment of the wiring detection of the power metering device 230 is introduced below.

[0202] First, the phase matching between each phase voltage sampling line of the power metering device 230 and the grid connection point is checked.

[0203] The three-phase real voltage sampling of the power metering device 230 is recorded as the current voltage sampling value U x (x=a,b,c), if there exists U x If the value is ≈0, it means that the x-phase voltage sampling line of the metering equipment is missed. At this time, the detection is stopped and an abnormal alarm is reported to guide the user to check whether the x-phase voltage sampling line is stably connected.

[0204] When the N-phase voltage sampling line and the x-phase voltage sampling line are connected incorrectly, the three-phase voltage sampling of the power metering device 230 can be expressed as

[0205]

[0206] Where E rms Indicates the effective value of the current grid-side voltage. If the effective value of the current voltage sampling value appears to be approximately equal to the effective value of the current grid-side voltage, and the effective values ​​of the current grid-side voltage values ​​of the other two phases are approximately equal to the effective values ​​of the current grid-side voltage times, it means that the N-phase voltage sampling line and the x-phase voltage sampling line of the power metering device 230 are connected incorrectly. At this time, the detection is stopped and an abnormal alarm is reported, guiding the user to swap the x-phase voltage sampling line harness with the N-line voltage sampling line harness.

[0207] If the voltage sampling connection of the power metering device 230 does not have the above situation, the CT access position of the power metering device 230 is detected.

[0208] Taking the power supply device 210 as a three-phase inverter as an example, the CT access position is detected by controlling the inverter to output reactive power.

[0209] Set the control mode of the three-phase inverter to three-phase independent control, and control the output reactive power reference Q of phase A. ref,1 , record the reactive power data of the power metering device 230 at this time, where the reactive power recorded by the S1 port of the power metering device 230 is Q S1,1 , the reactive power recorded by the S2 port of the power metering device 230 is Q S2,1 , the reactive power recorded by the S3 port of the power metering device 230 is Q S3,1 .

[0210] Continue to control the output reactive power reference Q of phase A ref,2 , record the reactive power data of the power metering device 230 at this time, where the reactive power recorded by the S1 port of the power metering device 230 is Q S1,2 , the reactive power recorded by the S2 port of the power metering device 230 is Q S2,2 , the reactive power recorded by the S3 port of the power metering device 230 is Q S3,2 , then the reactive power recorded difference and the reactive power reference value difference of the power metering device 230 can be expressed as:

[0211]

[0212] After the output of phase A is controlled, phases B and C of the inverter are controlled in turn to output reactive power and obtain corresponding data in the above manner.

[0213] After the three-phase detection is completed, there are a total of 9 data, which can be expressed as:

[0214] ΔQ1=[ΔQ S1,a ,ΔQ S2,a ,ΔQ S3,a ,ΔQ S1,b ,...,ΔQ S3,c ]

[0215] The above detection action is performed again, and the detection data obtained after the second detection is completed can be expressed as:

[0216] ΔQ2=[ΔQ S ' 1,a ,ΔQ S ' 2,a ,ΔQ S ' 3,a ,ΔQ S ' 1,b ,...,ΔQ S ' 3,c ]

[0217] The superscript ' represents the data of the second test, which is distinguished from the data of the first test.

[0218] The correlation between the two sets of data is defined as:

[0219]

[0220] Where a and b represent two sets of data respectively. If the correlation is less than the threshold value 1, the user is informed through an alarm or other means that the current inverter output power fluctuates greatly and needs to be retested.

[0221] Otherwise, the detection data is considered reliable and the CT position is determined using the detection power data.

[0222] First, determine whether the CT is connected, and add the reactive power difference recorded by the power metering device 230 for each phase to obtain

[0223]

[0224] Comparison of ΔQ Sy,sum (y=1,2,3) and the preset reactive power threshold (Q thres =0.01*ΔQ ref ), if ΔQ Sy,sum thres , indicating that CTy is not connected.

[0225] Secondly, determine the access location of the CT. The following situations may occur:

[0226] ①ΔQ Sy,x ≈ΔQ ref , CTy of the power metering device 230 and the voltage sampling line Ly are simultaneously connected to the x phase of the inverter, and the connection direction of CTy is forward;

[0227] ②ΔQ Sy,x ≈-ΔQ ref , indicating that CTy of the power metering device 230 and the voltage sampling line Ly are simultaneously connected to the x-phase of the inverter, and the connection direction of CTy is reverse;

[0228] ③ΔQ Sy,x ≈±0.5ΔQ​ref , indicating that CTy and the voltage sampling line Ly are connected to different phases.

[0229] If the above situation ③ appears in the results of two phases, it means that the two CTs and the corresponding voltage sampling lines are not connected to the same phase. It may be that the two voltage sampling lines are connected incorrectly or the two CTs are connected incorrectly. At this time, an alarm of abnormal CT access position is reported, prompting the installer to swap the access positions of the two CTs and re-test;

[0230] If the three-phase results show the phenomenon of situation ③ above, it means that the three CTs and the corresponding voltage sampling lines are not connected to the same phase. At this time, an alarm of abnormal CT access position is reported, prompting the installer to exchange two CTs at random and re-test.

[0231] If the three-phase results are all one of the cases ① and ②, the mapping relationship between the metering equipment and the inverter can be determined. Case ② indicates that the CT access direction is reversed. At this time, the sampling of the CT needs to be processed in the opposite number, and the mapping relationship and CT access direction information are stored in the inverter. This process is called adaptation.

[0232] Another specific embodiment of wiring detection of the power metering device 230 is described below.

[0233] Take the power metering device 230 as a three-phase electric meter as an example. Fig. 9 As shown, the current voltage sampling value corresponding to each phase voltage sampling line of the three-phase meter is obtained, and the x-phase (x=a, b, c) voltage sampling of the three-phase meter is judged to be less than the threshold value 1 to determine whether the x-phase voltage sampling is not connected (missed).

[0234] It is determined that only the x-phase voltage of the three-phase electric meter is normal and the voltage samples of the other two phases are greater than the threshold 2, so as to determine that the voltage sampling of the N line is incorrectly connected to the x-phase.

[0235] After the voltage wiring detection is completed and it is ensured that there is no missing connection or wrong connection of N phase, the A phase reactive power disturbance 1 of the power supply equipment 210 is controlled, and the reactive power measurement value 1 of the three-phase meter is recorded, and the A phase reactive power disturbance 2 is recorded, and the reactive power measurement value 2 of the three-phase meter is recorded.

[0236] Is the reactive power difference Qx measured twice by the meter for phase x equal to the expected reactive power difference Q ref , determine that the x-phase CT access direction is reverse and the x-phase CT position is wrong.

[0237] The x-phase CT access position is correct, and the next phase disturbance is carried out. After all three phases are detected, the wiring detection results are displayed, and internal adaptation is performed according to the phase mapping relationship between the three-phase meter and the grid connection point.

[0238] After obtaining the three-phase detection structure, whether the three-phase adaptive results conflict is detected. If the three-phase adaptive results do not conflict, the adaptive results are saved and the wiring is normal.

[0239] It should be noted that in the power supply system, the use of parallel technology can output higher power to meet the needs of a larger load 310. In this process, the AC outputs of multiple power supply devices 210 that need to be connected in parallel correspond one-to-one, and correspond one-to-one with the phases of the power metering equipment 230 at the grid connection point to form a correct closed-loop control.

[0240] With respect to the connection detection between a plurality of power supply devices 210 and a power metering device 230 connected in parallel, the present application provides a control method for a power supply system.

[0241] like Fig.11 As shown, the power supply system includes a plurality of power supply devices 210 and a power metering device 230. The plurality of power supply devices 210 are connected in parallel to a grid connection point, and the power metering device 230 is arranged at the grid connection point.

[0242] like Fig.10 As shown, the control method of the power supply system includes: step 1010 and step 1020.

[0243] Step 1010 : When the phase sequence between the power supply device 210 and the power metering device 230 is wrongly connected, obtain a phase mapping relationship between the power supply device 210 and the power metering device 230 .

[0244] It should be noted that, under the premise that the voltage and current sampling of the power metering device 230 are in the same phase of the grid connection point, when the phase sequence between the power supply device 210 and the power metering device 230 is misconnected, the phase mapping relationship between the power supply device 210 and the power metering device 230 is obtained.

[0245] In this embodiment, the phase matching conditions of the wiring between the power supply device 210 and the power metering device 230 include missing wiring between the power supply device 210 and the power metering device 230, N-phase misconnection between the power supply device 210 and the power metering device 230, wrong phase sequence connection between the power supply device 210 and the power metering device 230, and phase sequence matching connection between the power supply device 210 and the power metering device 230.

[0246] Among them, the missing connection between the power supply device 210 and the power metering device 230 may be that a phase is not firmly connected, the N-phase misconnection between the power supply device 210 and the power metering device 230 may be that the N line is mistakenly connected to the phase (A, B, C) with normal voltage, the phase sequence misconnection between the power supply device 210 and the power metering device 230 may be that the N line is correctly connected but the phases (A, B, C) with normal voltage are connected in the wrong order, and the phase sequence matching connection between the power supply device 210 and the power metering device 230 may be that A, B, C, and N are all connected correctly.

[0247] It can be understood that the phase sequence misconnection between the power supply device 210 and the power metering device 230 is a situation where the phases between the power supply device 210 and the power metering device 230 do not match.

[0248] In this embodiment, the phase mapping relationship represents the correct matching relationship between each phase of the power supply device 210 and the power metering device 230 .

[0249] In this step, the phase mapping relationship between the power supply device 210 and the power metering device 230 can be obtained by detecting the phase mapping relationship between the power metering device 230 and the grid connection point as described above.

[0250] Step 1020: Control the power output of the power supply device based on the phase mapping relationship between the power supply device and the power metering device.

[0251] In this embodiment, when the phase sequence of the wiring between the power supply device 210 and the power metering device 230 is misconnected, the phase mapping relationship between the power supply device 210 and the power metering device 230 can be obtained according to the above-mentioned method of detecting the phase mapping relationship between the power metering device 230 and the grid connection point, and the power output of the power supply device 210 can be adaptively controlled according to the phase mapping relationship between the power supply device 210 and the power metering device 230.

[0252] According to the control method of the power supply system provided in the embodiment of the present application, when the phase sequence is misconnected between the power supply device 210 and the power metering device 230, the phase mapping relationship between the power supply device 210 and the power metering device 230 is determined, and the power output of the power supply device 210 is adaptively controlled according to the phase mapping relationship. Even if the phase sequence between the power supply device 210 and the power metering device 230 is misconnected, there is no need to change the line, and each phase of the power supply device 210 can output the correct power, which can ensure that the AC outputs of multiple power supply devices 210 correspond one-to-one, and correspond one-to-one with the phases of the power metering device 230 at the grid connection point, so as to form a correct closed-loop control of the power supply system.

[0253] In some embodiments, the plurality of power supply devices 210 are divided into a master and a slave, and obtaining a phase mapping relationship between the power supply device 210 and the power metering device 230 includes:

[0254] The host controls the multiple power supply devices 210 to perform wiring detection respectively, and each power supply device 210 obtains a phase mapping relationship between itself and the power metering device 230 respectively.

[0255] In this embodiment, the host controls itself and the slave to execute the detection method in sequence, and respectively obtains the phase mapping relationship between itself and the power metering device.

[0256] Taking the power supply device 210 as an inverter, the power supply system includes inverter 1 and inverter 2, the master in the power supply system is inverter 1, and the slave is inverter 2 as an example, the power disturbance takes reactive power disturbance as an example.

[0257] For example, Fig.12 As shown, the host controls the inverter 1 to perform wiring detection of the power metering device 230 to determine the phase mapping relationship between the AC output of the inverter 1 of the power supply device 210 and the power metering device 230 .

[0258] First, all inverters in the host-controlled power supply system operate in three-phase independent control mode, and the three-phase power output of the host control itself and the slaves is 0.

[0259] The host controls its own A phase output reactive power reference Q ref,1 , record the reactive power data of the power metering device 230 at this time, where the reactive power recorded at the S1 port of the power metering device 230 is Q S1,1 , the reactive power recorded by the power metering device 230S2 port is Q S2,1 , the reactive power recorded by the power metering device 230S3 port is Q S3,1 .

[0260] According to the preset power disturbance reference value, continue to control the A phase output reactive power reference Q ref,2 , record the reactive power data of the power metering device 230 at this time, where the reactive power recorded at the S1 port of the power metering device 230 is Q S1,2 , the reactive power recorded by the power metering device 230S2 port is Q S2,2 , the reactive power recorded by the power metering device 230S3 port is Q S3,2 .

[0261] The reactive power record difference (i.e., the power difference of the current sampled power value) and the reactive power reference value difference (i.e., the power disturbance reference value) of the power metering device 230 can be expressed as:

[0262]

[0263] Compare the reactive power recorded difference of the power metering device 230 with the reactive power reference value difference. If ΔQ is satisfied, ref ≈±ΔQ Sx , it means that the CTx of the power metering device matches the A of the host AC output.

[0264] The negative sign indicates that the CTx access direction is reversed. These phase mapping relationships are recorded, and when the host obtains the sampling information (current, voltage, power, etc.) of the power metering device 230, corresponding adjustments can be made according to the above mapping relationships.

[0265] exist Fig.12 In the embodiment, the phases between the host and the power metering device 230 are matched, that is, the AC outputs A, B, C of the host correspond one to one with the silk screens S1, S2, S3 (A, B, C) of the power metering device 230.

[0266] After the host obtains the phase mapping relationship between itself and the power metering device 230, the host controls the slave to perform the above-mentioned power metering device 230 connection detection. ref ≈±ΔQ Sx The phase mapping relationship between the power metering device 230 and the slave is obtained and recorded under the conditions. When the slave obtains the sampling information (current, voltage, power, etc.) of the power metering device 230, corresponding adjustments can be made according to the above mapping relationship.

[0267] exist Fig.12 In the example, the AC output of the slave does not match the phase of the power metering device 230 , and the AC outputs A, B, and C of the slave correspond one to one with the silk screens S2 , S1 , and S3 (B, A, and C) of the power metering device 230 .

[0268] Through the above detection process, both the master and the slave obtain the phase mapping relationship between their own AC output and the power metering device 230 .

[0269] In this embodiment, all power supply devices in the power supply system adjust corresponding sampling information and power instruction information based on the mapping relationship between themselves and the power metering device.

[0270] by Fig.12 As an example, when the power supply system independently controls the reactive power output of phase A at the grid connection point, the reactive power reference value is Q ref , the reference value is sent to each inverter through the host.

[0271] like Fig.13 As shown, inverter 1 and inverter 2 output corresponding power according to the mapping relationship between their own AC output and the power metering device 230 .

[0272] At this time, the power sampling value Q of the power metering device 230 X (X=A,B,C) is

[0273]

[0274] Among them, the first 0.5Q ref Indicates the reactive power output of phase A of inverter 1. The second 0.5Q ref It represents the reactive power output by phase B of inverter 2. It can be found that even if the internal wiring of the power supply system is wrong, the power supply system can correctly control the phase A power of the grid connection point. By applying the mapping relationship to the three phases, the power supply system can realize independent control of each phase of the grid connection point.

[0275] In this embodiment, all power supply devices in the power supply system respond to the dispatching control of the host respectively to ensure the stable operation of the wiring detection.

[0276] In some embodiments, obtaining a phase mapping relationship between the power supply device 210 and the power metering device 230 includes:

[0277] The multiple power supply devices 210 in the power supply system are controlled to perform wiring detection in sequence, and each power supply device 210 obtains a phase mapping relationship between itself and the power metering device 230 .

[0278] In this embodiment, when there is no host in the power supply system, wiring detection can be performed in sequence according to the order of all power supply devices 210 in the power supply system to obtain phase mapping information between each power supply device 210 and the power metering device 230 .

[0279] In this embodiment, after the phase mapping information of each power supply device 210 and the power metering device 230 is obtained, even if the phase connections between the power supply devices 210 are not completely corresponding, each phase of the grid connection point can be independently controlled.

[0280] In some embodiments, the phase sequence misconnection between the power supply device 210 and the power metering device 230 is determined by the following steps:

[0281] Based on the power control instruction corresponding to the grid connection point, each power supply device 210 is controlled to output power in sequence, and the current sampled power value of the power metering device 230 is obtained;

[0282] Based on the current sampled power value and the power value output by each power supply device 210, each power supply device 210 determines the phase matching of its own connection with the power metering device 230 in turn. The phase matching of the connection between the power supply device 210 and the power metering device 230 includes the wrong phase sequence connection between the power supply device 210 and the power metering device 230.

[0283] It is understandable that the power supply system can control the power output of each phase at the grid connection point.

[0284] In this embodiment, one power supply device 210 is detected at the same time, and after the detection of the current power supply device 210 is completed, the next power supply device 210 is detected.

[0285] In this embodiment, the power control instruction corresponding to the grid connection point is an instruction for controlling the power output of each phase of the grid connection point (for example, an instruction for controlling the output target power of phase A of the grid connection point). According to the power control instruction, each power supply device 210 is controlled to output power, and the current sampled power value of the power metering device 230 is obtained.

[0286] It is understandable that the power metering device 230 can collect the current sampled power value corresponding to the power output of each power supply device 210 .

[0287] In this embodiment, based on the current sampled power value of each power supply device 210 collected by the power metering device 230 and the power value of the power output of each power supply device 210 under the control of the power control instruction, the two power values ​​are compared to determine the phase matching of the connection between each power supply device 210 and the power metering device 230.

[0288] It is understandable that the wiring phases of the power supply device 210 and the power metering device 230 may be completely matched, and the wiring phases of the power supply device 210 and the power metering device 230 may also be wrong.

[0289] When the wiring of each power supply device 210 and the power metering device 230 is completely matched, as shown in FIG. Fig.11 As shown, the power supply system includes multiple power supply devices 210, the voltage sampling line and the current sampling line of the power metering device 230 are connected at the correct position, and the A, B, C, and N of the multiple power supply devices 210 are also connected correctly.

[0290] For example, the power supply device 210 is an inverter, and the power supply system includes inverter 1 and inverter 2.

[0291] When the phase sequence of the connection between the power supply device 210 and the power metering device 230 is wrong, for example, Fig.12 As shown, the A-phase output of inverter 2 is connected to the B-phase output of inverter 1, the B-phase output of inverter 2 is connected to the A-phase output of inverter 1, and the C-phase output of inverter 2 is connected to the C-phase output of inverter 1.

[0292] like Fig.13 As shown in the figure, when the system independently controls the reactive power output of phase A of the grid connection point, the reactive power reference value is Qref The reference value sends a power control command to each inverter through the host. Inverters 1 and 2 will control phase A to output the corresponding reactive power. At this time, the reactive power sampling value Q of the three-phase meter is X (X=A,B,C) is:

[0293]

[0294] It can be found from the above formula that when the internal wiring of the power supply system is wrong, the power supply system cannot correctly control the power of the grid connection point. The control method of the power supply system of the embodiment of the present application can detect the wiring error between the power supply devices 210 inside the power supply system, and use the wiring of the power metering device 230 as a reference to identify the phase matching of the wiring of each power supply device 210 and the power metering device 230.

[0295] It should be noted that the phase matching between the power supply device 210 and the power metering device 230 can be detected by the above-mentioned method of detecting the phase matching between the power metering device 230 and the grid connection point, and the point where the power supply system and the power metering device 230 are connected can be regarded as the grid connection point.

[0296] In some embodiments, obtaining a phase mapping relationship between the power supply device 210 and the power metering device 230 includes:

[0297] Control the power supply device 210 to output power, and obtain the current voltage sampling value corresponding to each phase voltage sampling line and the current current sampling value corresponding to each phase current sampling line of the power metering device 230;

[0298] Determine the current sampled power value corresponding to each power metering device 230 based on the current voltage sampled value and the current current sampled value;

[0299] Based on the current sampled power value and the power value of the power output by the power supply device 210 , a phase mapping relationship between the power supply device 210 and the power metering device 230 is determined.

[0300] In this embodiment, the power supply device 210 is started and controlled to output power. Current flows through each phase of the grid-connected point. Each phase current sampling line collects the corresponding current sampling value, and each phase voltage sampling line collects the corresponding current sampling value.

[0301] In this embodiment, the current voltage sampling value and the current current sampling value of the corresponding phase may be multiplied to obtain the current sampling power value.

[0302] In this embodiment, the phase mapping relationship between the power supply device 210 and the power metering device 230 can be determined based on the current sampled power value and the power value of the power output of the power supply device 210 by detecting the phase mapping relationship between the power metering device 230 and the grid connection point.

[0303] In some embodiments, controlling the power supply device 210 to output power includes:

[0304] According to the power disturbance reference value, control the power supply device 210 to output power;

[0305] Based on the current sampled power value and the power value of the power output of the power supply device 210, a phase mapping relationship between the power supply device 210 and the power metering device 230 is determined, including:

[0306] Based on the power difference value of the current sampled power value and the power disturbance reference value, a phase mapping relationship between the power supply device 210 and the power metering device 230 is determined.

[0307] The power disturbance reference value is a disturbance value that can control the output power of the power supply device 210 .

[0308] The power difference of the current sampled power value is the difference between the current sampled power value before the power disturbance reference value controls the output power of the power supply device 210 and the current sampled power value after the power disturbance reference value controls the output power of the power supply device 210.

[0309] In this embodiment, the power supply device 210 is controlled to output power, the current voltage sampling value and the current current sampling value of the power metering device 230 are collected, and the corresponding current sampling power values ​​of the power metering device 230 are calculated and recorded. According to the disturbance power value of the power output of the power supply device 210 and the difference corresponding to the current sampling power value of the power metering device 230, the phase mapping relationship between the power supply device 210 and the power metering device 230 is determined.

[0310] In some embodiments, the current sampled power value includes at least one of a current sampled active power value and a current sampled reactive power value.

[0311] Correspondingly, the power disturbance value includes an active power disturbance value and a reactive power disturbance value. The active power disturbance value is used to disturb the active power outputted by the power supply device 210 , and the reactive power disturbance value is used to disturb the reactive power outputted by the power supply device 210 .

[0312] In this embodiment, the current sampled power value may also include a current sampled apparent power value.

[0313] A specific embodiment of a control method for a power supply system is given below.

[0314] Step 1: On the premise that the voltage sampling lines of each phase of the power metering device 230 and the corresponding current sampling lines are connected to the same phase of the grid connection point, a power supply device 210 is selected as the master in the power supply system, and the remaining machines are selected as slaves.

[0315] Step 2: The host controls itself to output power, and obtains the current voltage sampling value corresponding to each phase voltage sampling line of the power metering device 230 and the current current sampling value corresponding to each phase current sampling line.

[0316] In this embodiment, each phase voltage sampling line of the power metering device 230 collects voltage in real time to obtain a corresponding current voltage sampling value, and the current current sampling value is the current value collected by the current sampling line at the current moment.

[0317] In this embodiment, the power supply device 210 is controlled to output power, current flows through each phase of the grid connection point, each phase current sampling line collects the corresponding current sampling value, and each phase voltage sampling line collects the corresponding current sampling value.

[0318] Step 3: Based on the current voltage sampling value and the current current sampling value, determine the current sampling power value corresponding to each power metering device 230 and record and save it.

[0319] The current sampled power value is the power value of each phase of the grid connection point obtained by sampling and calculating by the power metering device 230 at the current moment.

[0320] Step 4: Based on the current sampled power value and the power value of the power output of the power supply device 210, determine the phase mapping relationship of the connection between the power metering device 230 and the power supply device 210, and record the phase mapping relationship.

[0321] In this embodiment, the phase matching conditions of the connection between the power supply device 210 and the power metering device 230 include a wrong phase sequence connection between the power supply device 210 and the power metering device 230 and a matched phase sequence connection between the power supply device 210 and the power metering device 230 .

[0322] Among them, the phase sequence misconnection between the power supply device 210 and the power metering device 230 can be that the N line is connected correctly but the phases (A, B, C) with normal voltage are connected in the wrong order, and the phase sequence matching connection between the power supply device 210 and the power metering device 230 can be that A, B, C, N are all connected correctly.

[0323] In this embodiment, the phase mapping relationship represents the correct matching relationship between each phase of the power supply device 210 and the power metering device 230 .

[0324] In this step, the phase mapping relationship between the power supply device 210 and the power metering device 230 can be obtained by detecting the phase mapping relationship between the power metering device 230 and the grid connection point as described above.

[0325] Step 5: After the host successfully obtains the phase mapping relationship between itself and the power metering device 230 , the host controls the slaves to sequentially execute the above detection method, and each slave obtains the phase mapping relationship between itself and the power metering device 230 in turn.

[0326] Step 6: Based on the phase mapping relationship between each power supply device 210 and the power metering device 230 , control the power output of the power supply device.

[0327] In this embodiment, when the phase sequence of the wiring between the power supply device 210 and the power metering device 230 is misconnected, the phase mapping relationship between the power supply device 210 and the power metering device 230 can be obtained according to the above-mentioned method of detecting the phase mapping relationship between the power metering device 230 and the grid connection point, and the power output of the power supply device 210 can be adaptively controlled according to the phase mapping relationship between the power supply device 210 and the power metering device 230.

[0328] The control method of the power supply system provided in the embodiment of the present application can be executed by a control device of the power supply system.

[0329] In the embodiment of the present application, the control device of the power supply system executing the control method of the power supply system is taken as an example to illustrate the control device of the power supply system provided in the embodiment of the present application.

[0330] An embodiment of the present application also provides a control device for a power supply system.

[0331] The power supply system includes a plurality of power supply devices and a power metering device. The plurality of power supply devices are connected in parallel to a grid connection point, and the power metering device is arranged at the grid connection point.

[0332] like Fig.14 As shown, the control device of the power supply system includes:

[0333] The acquisition module 1410 is used to acquire the phase mapping relationship between the power supply device 210 and the power metering device 230 when the phase sequence between the power supply device 210 and the power metering device 230 is wrongly connected;

[0334] The control module 1420 is configured to control the power output of the power supply device 210 based on the phase mapping relationship between the power supply device 210 and the power metering device 230 .

[0335] According to the control device of the power supply system provided in the embodiment of the present application, when the phase sequence is misconnected between the power supply device 210 and the power metering device 230, the phase mapping relationship between the power supply device 210 and the power metering device 230 is determined, and the power output of the power supply device 210 is adaptively controlled according to the phase mapping relationship. Even if the phase sequence between the power supply device 210 and the power metering device 230 is misconnected, there is no need to change the line, and each phase of the power supply device 210 can output the correct power, which can ensure that the AC outputs of multiple power supply devices 210 correspond one-to-one, and correspond one-to-one with the phase of the power metering device 230 at the grid connection point, so as to form a correct closed-loop control of the power supply system.

[0336] In some embodiments, the multiple power supply devices 210 are divided into a host and a slave, and the acquisition module 1410 is used by the host to control the multiple power supply devices 210 to perform wiring detection and obtain the phase mapping relationship between each power supply device 210 and the power metering device 230.

[0337] In some embodiments, the acquisition module 1410 is used to control multiple power supply devices 210 in the power supply system to perform wiring detection in sequence, and acquire the phase mapping relationship between each power supply device 210 and the power metering device 230 .

[0338] In some embodiments, the phase sequence misconnection between the power supply device 210 and the power metering device 230 is determined by the following steps:

[0339] Based on the power control instruction corresponding to the grid connection point, each power supply device 210 is controlled to output power, and the current sampled power value of the power metering device 230 is obtained;

[0340] Based on the current sampled power value and the power value output by each power supply device 210 , the phase matching of the connection between each power supply device 210 and the power metering device 230 is determined. The phase matching of the connection between the power supply device 210 and the power metering device 230 includes the wrong phase sequence connection between the power supply device 210 and the power metering device 230 .

[0341] In some embodiments, the acquisition module 1410 is used to control the power supply device 210 to output power, and obtain the current voltage sampling value corresponding to each phase voltage sampling line of the power metering device 230 and the current current sampling value corresponding to each phase current sampling line;

[0342] Determine the current sampled power value corresponding to each power metering device 230 based on the current voltage sampled value and the current current sampled value;

[0343] Based on the current sampled power value and the power value of the power output by the power supply device 210 , a phase mapping relationship between the power supply device 210 and the power metering device 230 is determined.

[0344] In some embodiments, the acquisition module 1410 is used to control the power supply device 210 to output power according to the power disturbance value;

[0345] Based on the current sampled power value and the power value of the power output of the power supply device 210, a phase mapping relationship between the power supply device 210 and the power metering device 230 is determined, including:

[0346] Based on the power difference value and the power disturbance value of the current sampled power value, a phase mapping relationship between the power supply device 210 and the power metering device 230 is determined.

[0347] In some embodiments, the current sampled power value includes at least one of a current sampled active power value and a current sampled reactive power value.

[0348] The control device of the power supply system in the embodiment of the present application can be an electronic device, or a component in the electronic device, such as an integrated circuit or a chip. The electronic device can be a terminal, or it can be other devices other than a terminal. Exemplarily, the electronic device can be a mobile phone, a tablet computer, a laptop computer, a PDA, a vehicle-mounted electronic device, a mobile Internet device (Mobile Internet Device, MID), an augmented reality (augmented reality, AR) / virtual reality (virtual reality, VR) device, a robot, a wearable device, an ultra-mobile personal computer (ultra-mobile personal computer, UMPC), a netbook or a personal digital assistant (personal digital assistant, PDA), etc., and can also be a server, a network attached storage (Network Attached Storage, NAS), a personal computer (personal computer, PC), a television (television, TV), a teller machine or a self-service machine, etc., which is not specifically limited in the embodiment of the present application.

[0349] The control device of the power supply system in the embodiment of the present application may be a device having an operating system. The operating system may be an Android operating system, an IOS operating system, or other possible operating systems, which are not specifically limited in the embodiment of the present application.

[0350] The control device of the power supply system provided in the embodiment of the present application can achieve Fig.10 , Fig.13 To avoid repetition, the various processes implemented by the method embodiment are not described here.

[0351] The embodiment of the present application also provides a power supply system.

[0352] like Fig.11 As shown, the power supply system includes multiple power supply devices 210, a power metering device 230 and a control device of the power supply system as described above. The multiple power supply devices 210 are connected in parallel to the grid connection point, and the power metering device 230 is arranged at the grid connection point.

[0353] In this embodiment, the control device is connected to the power supply device 210 and the power metering device 230 .

[0354] According to the power supply system provided by the embodiment of the present application, when the phase sequence is misconnected between the power supply device 210 and the power metering device 230, the phase mapping relationship between the power supply device 210 and the power metering device 230 is determined, and the power output of the power supply device 210 is adaptively controlled according to the phase mapping relationship. Even if the phase sequence between the power supply device 210 and the power metering device 230 is misconnected, there is no need to change the line, and each phase of the power supply device 210 can output the correct power, which can ensure that the AC outputs of multiple power supply devices 210 correspond one-to-one, and correspond one-to-one with the phase of the power metering device 230 at the grid connection point, so as to form a correct closed-loop control of the power supply system.

[0355] In some embodiments, Fig.15 As shown, an embodiment of the present application also provides an electronic device 1500, including a processor 1501, a memory 1502, and a computer program stored in the memory 1502 and executable on the processor 1501. When the program is executed by the processor 1501, each process of the control method embodiment of the above-mentioned power supply system is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0356] It should be noted that the electronic devices in the embodiments of the present application include the mobile electronic devices and non-mobile electronic devices mentioned above.

[0357] An embodiment of the present application also provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the various processes of the control method embodiment of the above-mentioned power supply system are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0358] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0359] An embodiment of the present application also provides a computer program product, including a computer program, which implements the control method of the power supply system when executed by a processor.

[0360] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0361] An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the control method embodiment of the above-mentioned power supply system, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0362] It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.

[0363] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.

[0364] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a computer software product, which is stored in a storage medium (such as ROM / RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0365] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

[0366] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0367] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A control method for a power supply system, It is characterized in that The power supply system comprises a plurality of power supply devices and a power metering device, the plurality of power supply devices are connected in parallel to a grid connection point, the power metering device is arranged at the grid connection point, and the method comprises: In the case where the phase sequence between the power supply device and the power metering device is wrongly connected, obtaining a phase mapping relationship between the power supply device and the power metering device; Based on the phase mapping relationship between the power supply device and the power metering device, the power output of the power supply device is controlled.

2. The control method of the power supply system according to claim 1, It is characterized in that The multiple power supply devices are divided into a master and a slave, and the acquiring of a phase mapping relationship between the power supply device and the power metering device includes: The host controls the multiple power supply devices to perform wiring detection respectively, and each of the power supply devices obtains a phase mapping relationship between itself and the power metering device respectively.

3. The control method of the power supply system according to claim 1, It is characterized in that The acquiring the phase mapping relationship between the power supply device and the power metering device includes: The plurality of power supply devices in the power supply system are controlled to perform wiring detection in sequence, and each of the power supply devices respectively obtains a phase mapping relationship between itself and the power metering device.

4. The control method of the power supply system according to claim 1, It is characterized in that The phase sequence misconnection between the power supply device and the power metering device is determined by the following steps: Based on the power control instruction corresponding to the grid connection point, each of the power supply devices is controlled to output power in sequence, and the current sampled power value of the power metering device is obtained; Based on the current sampled power value and the power value output by each of the power supply devices, each of the power supply devices determines in turn the phase matching of its own wiring with the power metering device, and the phase matching of the wiring between the power supply device and the power metering device includes the wrong phase sequence connection between the power supply device and the power metering device.

5. The control method of the power supply system according to any one of claims 1 to 4, It is characterized in that The acquiring the phase mapping relationship between the power supply device and the power metering device includes: Control the power supply device to output power, and obtain the current voltage sampling value corresponding to each phase voltage sampling line of the power metering device and the current current sampling value corresponding to each phase current sampling line; Determine the current sampled power values ​​corresponding to the power metering devices based on the current voltage sampled value and the current current sampled value; Based on the current sampled power value and the power value of the power output by the power supply device, a phase mapping relationship between the power supply device and the power metering device is determined.

6. The control method of the power supply system according to claim 5, It is characterized in that The controlling the power supply device to output power includes: According to the power disturbance value, controlling the power supply device to output power; The determining, based on the current sampled power value and the power value of the power output of the power supply device, a phase mapping relationship between the power supply device and the power metering device comprises: A phase mapping relationship between the power supply device and the power metering device is determined based on the power difference value of the current sampled power value and the power disturbance value.

7. The control method of the power supply system according to claim 6, It is characterized in that The current sampled power value includes at least one of a current sampled active power value and a current sampled reactive power value.

8. A control device for a power supply system, It is characterized in that The power supply system includes a plurality of power supply devices and a power metering device, wherein the plurality of power supply devices are connected in parallel to a grid connection point, the power metering device is arranged at the grid connection point, and the control device includes: an acquisition module, configured to acquire a phase mapping relationship between the power supply device and the power metering device when a phase sequence between the power supply device and the power metering device is misconnected; A control module is used to control the power output of the power supply device based on the phase mapping relationship between the power supply device and the power metering device.

9. A power supply system, It is characterized in that include: A plurality of power supply devices and a power metering device, wherein the plurality of power supply devices are connected in parallel to a grid connection point, and the power metering device is arranged at the grid connection point; The control device of the power supply system according to claim 8, wherein the control device is connected to the power supply device and the power metering device.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the program, the control method of the power supply system according to any one of claims 1 to 7 is implemented.

11. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the control method of the power supply system as described in any one of claims 1 to 7 is implemented.

12. A computer program product comprising a computer program, It is characterized in that When the computer program is executed by a processor, the control method of the power supply system according to any one of claims 1 to 7 is implemented.