Substation AC power supply management system and method based on digital platform
The substation AC power management system, through a digital platform, solves the problems of information silos and data fragmentation in traditional design, enabling precise equipment selection and verification, and improving the design efficiency and reliability of the substation AC power system.
Patent Information
- Application Number
- CN202410951740.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-01
AI Technical Summary
Traditional substation AC power system design relies on manual calculations and experience, resulting in inaccurate and unreliable design results. It also makes it difficult to effectively integrate power system equipment and data, leading to information silos and data fragmentation.
The substation AC power management system adopts a digital platform, including a system construction module, a station service transformer capacity selection module, a circuit load current calculation module, an AC cable circuit breaker selection module, and a verification module. It uses big data analysis and intelligent algorithms to perform accurate selection and verification.
It has achieved comprehensive integration of power equipment and data, improved design accuracy and efficiency, ensured system safety and reliability, optimized resource allocation, and reduced human error and failures.
Smart Images

Figure CN118889685A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transmission and transformation engineering, and in particular to a substation AC power supply management system and method based on a digital platform. Background Art
[0002] With the development of digitalization and intelligence of power systems, digital platforms play an increasingly important role in power system design and operation and maintenance. By integrating various power system equipment and data, digital platforms achieve high integration and sharing of information, providing strong technical support for the design, simulation, monitoring and management of power systems. In the design process of AC power systems, digital platforms can significantly improve design efficiency and accuracy, reduce human errors, and improve the overall reliability of the system.
[0003] The AC power supply system is a key component of substations and other power facilities. It is responsible for supplying power to equipment within the station. The design of the AC power supply system needs to consider many factors such as equipment capacity, power supply reliability, fault protection, and short-circuit current calculation. Through the digital platform, a complete AC power supply system structure and database can be established to integrate the parameters, operating data, and historical records of various types of equipment, providing complete data support for system design and analysis.
[0004] In AC system power calculation, the station transformer is one of the core equipment of the AC power system. The selection of its capacity is directly related to the reliability and economy of the power supply system. The selection of station transformer capacity needs to comprehensively consider factors such as load demand, grid conditions, and redundancy requirements. The traditional station transformer capacity selection method often relies on the experience and manual calculation of designers, which easily leads to inaccurate and unreliable design results. The digital platform can optimize the station transformer capacity selection process and improve design accuracy and efficiency through big data analysis and intelligent algorithms.
[0005] AC system calculations also include the selection calculation of AC circuit breakers, which are important equipment for protecting AC power systems. Their selection needs to comprehensively consider factors such as the system's operating conditions, fault currents, and rated parameters of circuit breakers. The digital platform can integrate various parameters and selection criteria of AC circuit breakers, and achieve fast and accurate circuit breaker selection through intelligent algorithms to ensure the safety and reliability of the system. In addition, short-circuit current calculation is a key link in the design of AC power systems, involving system fault analysis and the selection of protection equipment. Accurate short-circuit current calculations can help designers reasonably configure protection equipment to avoid equipment damage and system failures.
[0006] By integrating the power system model and fault analysis algorithm, the digital platform can achieve fast and accurate short-circuit current calculation and optimize the system protection configuration. Finally, cable selection is also an important part of AC power system design, involving multiple factors such as cable length, voltage drop, current carrying capacity and loop constraints. Traditional cable selection methods often require tedious manual calculations, which are prone to calculation errors and unreasonable designs.
[0007] Currently, no effective solution has been proposed for the problems in the related technologies. Summary of the invention
[0008] In view of the problems in the related art, the present invention proposes a substation AC power management system and method based on a digital platform to overcome the above-mentioned technical problems existing in the existing related technology.
[0009] To this end, the specific technical solution adopted by the present invention is as follows:
[0010] According to one aspect of the present invention, there is provided a substation AC power management system based on a digital platform, the substation AC power management system based on a digital platform comprises a system building module, a station variable capacity selection module, a loop load current calculation module, an AC cable circuit breaker selection module and a verification module;
[0011] Among them, the system building module is used to build the substation AC power supply system and database, and establish a communication interaction connection between the substation AC power supply system and the database;
[0012] The station transformer capacity selection module is used to calculate the total load capacity of the substation and select the station transformer capacity based on the total load capacity of the substation;
[0013] The loop load current calculation module is used to calculate the substation loop load current and select the circuit breaker model based on the substation loop load current;
[0014] AC cable circuit breaker selection module, used to calculate the short-circuit current under different cable lengths and select cable models based on the short-circuit current;
[0015] The verification module is used to perform cable selection voltage drop verification, current carrying capacity and loop constraint verification and sensitivity verification in sequence and output the verification results.
[0016] Preferably, the station transformer capacity selection module includes: when calculating the total load capacity of the substation and selecting the station transformer capacity based on the total load capacity of the substation:
[0017] Extracting substation load data from a database, the substation load data including power load data, heating load data and lighting load data;
[0018] Inputting the substation load data and the pre-set power load conversion coefficient into the station-use variable capacity calculation model to calculate the total substation load capacity;
[0019] Select the capacity in the station transformer capacity sequence that is one level larger than the total load capacity of the substation as the station transformer capacity and formulate a load statistics table.
[0020] Preferably, the loop load current calculation module includes:
[0021] Extract substation circuit data from the database, the substation circuit data including circuit name, circuit load power, load type, rated current of lower-level circuit breaker and maximum allowable cross-section of cable access;
[0022] Inputting substation loop data into a loop load current calculation model to calculate the substation loop load current;
[0023] According to the substation circuit load current and preset selection rules, determine the rated current and setting multiple of the circuit breaker and prepare a circuit statistics table.
[0024] Preferably, the AC cable circuit breaker selection module includes a short-circuit current calculation module and a cable selection module;
[0025] Among them, the short-circuit current calculation module is used to calculate the total impedance of the station transformer outlet side, and calculate the short-circuit current under different cable lengths based on the total impedance of the station transformer outlet side;
[0026] The cable selection module is used to select cable models based on the short-circuit current at different cable lengths.
[0027] Preferably, the short-circuit current calculation module includes: when calculating the total impedance of the station transformer outlet side and calculating the short-circuit current under different cable lengths according to the total impedance of the station transformer outlet side:
[0028] Extract station transformer impedance data from the database and input it into the station transformer impedance calculation model to calculate the total impedance at the station transformer outlet side;
[0029] Extracting cable characteristic data from a database, and calculating the total impedance of the feeder based on the cable characteristic data;
[0030] Combined with the total impedance of the station transformer outlet and the total impedance of the feeder, the short-circuit current under different cable lengths is calculated and a short-circuit current table is developed;
[0031] Among them, the short-circuit currents under different cable lengths include single-phase short-circuit current, three-phase short-circuit current and short-circuit current at the station transformer outlet.
[0032] Preferably, the cable selection module includes:
[0033] Use cable laying software to load substation loop data into the cable inventory to calculate cable length, thereby updating cable length data;
[0034] According to the preset cable verification rules, the cable models that match the cable verification rules are screened out and output.
[0035] Preferably, the verification module includes a cable verification module, a current carrying capacity and loop constraint verification module, a sensitivity verification module and a verification result output module;
[0036] Among them, the cable verification module is used to verify whether the screened cable model meets the voltage drop requirements;
[0037] Current carrying capacity and loop constraint verification module, used to ensure that the current carrying capacity and thermal stability of the cable meet the requirements, and to precisely control the level difference and action time;
[0038] Sensitivity verification module, used to determine the sensitivity of protection components when a fault occurs in the AC power system of the substation;
[0039] The verification result output module is used to output the verification results generated by the cable verification module, the current carrying capacity and loop constraint verification module and the sensitivity verification module.
[0040] Preferably, the current carrying capacity and loop constraint verification module includes a cable current carrying capacity constraint module, a thermal stability constraint module, an action characteristic constraint module and an upper and lower level difference constraint module;
[0041] Among them, the current carrying capacity constraint module is used to calculate and verify the long-term allowable current carrying capacity of the cable to ensure that the actual current carrying capacity of the cable remains within the long-term allowable current carrying capacity of the cable;
[0042] Thermal stability constraint module, used to evaluate the thermal stability of the cable under short-circuit conditions based on the effective value of the short-circuit current;
[0043] Action characteristic constraint module, used to ensure that the action characteristics of low-voltage circuit overload protection electrical appliances meet preset standards;
[0044] The upper and lower level difference constraint module is used to configure the circuit difference coordination according to the current level and action time to ensure that the protection device closest to the fault point takes priority when a fault occurs.
[0045] Preferably, the calculation formulas for the three short-circuit currents are:
[0046]
[0047] in:
[0048] R k =R s +RT +R m +R L
[0049] X k =X s +X T +X m +X L
[0050] U n represents the nominal voltage of the network; c represents the voltage coefficient; Z k , R k , X k Both represent the short-circuit capacity on the system side; R s Indicates the resistance of the high voltage side system of the transformer; X s Represents the reactance of the transformer high voltage side system; R T Represents the resistance of the transformer; X T Represents the reactance of the transformer; R m Indicates the resistance of the busbar section on the low-voltage side of the transformer; X m Represents the reactance of the busbar section on the low-voltage side of the transformer; R L Indicates the resistance of the distribution line; X L Indicates the reactance of the distribution line.
[0051] According to another aspect of the present invention, a method for managing AC power supply of a substation based on a digital platform is also provided. The method for managing AC power supply of a substation based on a digital platform comprises the following steps:
[0052] S1. Build the substation AC power supply system and database, and establish a communication interaction connection between the substation AC power supply system and the database;
[0053] S2. Calculate the total load capacity of the substation and select the substation capacity based on the total load capacity of the substation;
[0054] S3, calculating the load current of the substation circuit, and selecting the circuit breaker model based on the load current of the substation circuit;
[0055] S4. Calculate the short-circuit current under different cable lengths and select the cable model based on the short-circuit current;
[0056] S5. Perform cable selection voltage drop verification, current carrying capacity and loop constraint verification, and sensitivity verification in sequence and output the verification results.
[0057] The beneficial effects of the present invention are:
[0058] 1. The present invention realizes the comprehensive integration and information sharing of various power equipment and data by constructing a complete AC system structure and database, solves the problems of information islands and data fragmentation in traditional systems, provides a unified data source and information platform, and significantly improves the integrity and coordination of the system.
[0059] 2. Through the big data analysis and intelligent algorithms of the digital platform, the present invention can comprehensively consider the load demand, grid conditions and redundancy requirements, and make accurate station transformer capacity selection, thereby not only improving the accuracy and rationality of station transformer selection, but also optimizing resource allocation and improving the economy and reliability of the system.
[0060] 3. The present invention adopts the intelligent algorithm of the digital platform, which can quickly and accurately select AC circuit breakers to ensure the safety and reliability of the system, thereby reducing the subjectivity and errors of human selection and improving the design efficiency and the rationality of equipment configuration.
[0061] 4. The short-circuit current calculation function of the present invention is based on a digital platform. By integrating the power system model and the fault analysis algorithm, it realizes fast and accurate short-circuit current calculation, thereby ensuring the reasonable configuration of the protection equipment, enhancing the system's fault detection and isolation capabilities, and improving the stability and safety of the system.
[0062] 5. The digital platform in the present invention can perform automated and optimized cable selection based on factors such as cable length and load current, and ensure the scientificity and rationality of cable configuration through various verification methods such as voltage drop verification, current carrying capacity and loop constraint verification, sensitivity verification, etc., thereby improving the accuracy and reliability of cable selection and avoiding system failures and performance degradation caused by improper cable selection. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0064] Figure 1 It is a principle block diagram of a substation AC power management system based on a digital platform according to an embodiment of the present invention;
[0065] Figure 2 is a flow chart of a method for managing AC power supply of a substation based on a digital platform according to an embodiment of the present invention;
[0066] Figure 3This is a diagram of the architecture of a substation AC power supply system in a substation AC power supply management system based on a digital platform according to an embodiment of the present invention;
[0067] Figure 4 It is a flow chart of selecting a transformer for a substation in a substation AC power management system based on a digital platform according to an embodiment of the present invention;
[0068] Figure 5 It is a flow chart of circuit breaker selection in a substation AC power management system based on a digital platform according to an embodiment of the present invention;
[0069] Figure 6 It is a flow chart of short-circuit current calculation in a substation AC power management system based on a digital platform according to an embodiment of the present invention;
[0070] Figure 7 It is a flow chart of cable selection in a substation AC power management system based on a digital platform according to an embodiment of the present invention;
[0071] Figure 8 A circuit breaker protection constraint diagram of a substation AC power management system based on a digital platform according to an embodiment of the present invention;
[0072] Fig. 9 The present invention is an action characteristic constraint diagram in a substation AC power management system based on a digital platform according to an embodiment of the present invention.
[0073] In the figure:
[0074] 1. System construction module; 2. Station variable capacity selection module; 3. Loop load current calculation module; 4. AC cable circuit breaker selection module; 5. Verification module. DETAILED DESCRIPTION
[0075] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments. They can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in this field should be able to understand other possible implementation methods and advantages of the present invention.
[0076] According to an embodiment of the present invention, a substation AC power management system and method based on a digital platform are provided.
[0077] The present invention is further described with reference to the accompanying drawings and specific embodiments. Figure 1As shown, according to the embodiment of the present invention, the substation AC power management system based on the digital platform includes a system building module 1, a station variable capacity selection module 2, a loop load current calculation module 3, an AC cable circuit breaker selection module 4 and a verification module 5;
[0078] Among them, the system building module 1 is used to build the substation AC power supply system and database, and establish a communication interaction connection between the substation AC power supply system and the database.
[0079] It should be noted that if Figure 3 As shown in Table 1, the substation AC power system is implemented using a C / S architecture. The database uses MySql5.7 version, which is deployed on a Windows Server server. The developed WCF server application is deployed on the application server through IIS. In the early stage, it is considered that the data server and the application server will be shared. If a single server cannot bear the load due to a surge in the number of users in the future, more application servers can be added. The client is developed based on .NetFramework4.5.2SDK, adopts MVVM architecture design, and the front end is developed using WPF.
[0080] It should be noted that C / S stands for server-client, that is, Client-Server (C / S) structure; the C / S structure usually adopts a two-tier structure, with the server responsible for data management and the client responsible for completing the interaction tasks with the user.
[0081] MySQL stands for relational database management system.
[0082] Windows Server refers to the server operating system of Windows.
[0083] Internet Information Services (IIS) refers to the basic Internet services based on Microsoft Windows.
[0084] Windows Communication Foundation (WCF) is a series of application frameworks that support data communication.
[0085] .NET Framework represents the managed execution environment of Windows, which provides various services to the applications that run on it.
[0086] A software development kit (SDK) is a collection of development tools that software engineers use to build application software for a specific software package, software framework, hardware platform, operating system, etc.
[0087] MVVM (Model-View-ViewModel) is essentially an improved version of MVC. The MVVM pattern helps to clearly separate the business and presentation logic of an application from the user interface (UI).
[0088] WPF (Windows Presentation Foundation) represents a Windows-based user interface framework.
[0089] Table 1: Architecture selection table
[0090]
[0091] The station transformer capacity selection module 2 is used to calculate the total load capacity of the substation and select the station transformer capacity based on the total load capacity of the substation.
[0092] The station transformer capacity selection module includes the following steps when calculating the total load capacity of the substation and selecting the station transformer capacity based on the total load capacity of the substation:
[0093] Extracting substation load data from a database, the substation load data including power load data, heating load data and lighting load data;
[0094] Inputting the substation load data and the pre-set power load conversion coefficient into the station-use variable capacity calculation model to calculate the total substation load capacity;
[0095] Select the capacity in the station transformer capacity sequence that is one level larger than the total load capacity of the substation as the station transformer capacity and formulate a load statistics table.
[0096] It should be noted that if Figure 4 As shown, through the user's input of various power loads, heating loads and lighting loads, the capacity of the station transformer is selected according to the station transformer capacity calculation model, and a "Load Statistics Table" is generated.
[0097] The calculation formula for the total load capacity is: 1.05 (0.85 power load + heating load + lighting load), and the capacity that is one level greater than the total capacity in the station variable capacity sequence is selected according to the total capacity.
[0098] The loop load current calculation module 3 is used to calculate the substation loop load current and select the circuit breaker model based on the substation loop load current.
[0099] The loop load current calculation module includes:
[0100] Extract substation circuit data from the database, the substation circuit data including circuit name, circuit load power, load type, rated current of lower-level circuit breaker and maximum allowable cross-section of cable access;
[0101] Inputting substation loop data into a loop load current calculation model to calculate the substation loop load current;
[0102] According to the substation circuit load current and preset selection rules, determine the rated current and setting multiple of the circuit breaker and prepare a circuit statistics table.
[0103] It should be noted that if Figure 5 As shown, by inputting (including circuit name, circuit load power, load type, rated current of lower-level circuit breaker, and maximum allowable cross-section of cable access), the load current is calculated according to the circuit load current calculation model, and the rated current and setting multiple of the circuit breaker are automatically determined according to the selection rules of the circuit breaker rated current, and a "Circuit Statistics Table" is generated.
[0104] The circuit load current is calculated according to the load type and the preset selection rules are used to automatically determine the rated current and setting multiple of the circuit breaker. The preset selection rules are: [max (circuit load current, rated current of the lower circuit breaker) & (≥2 level difference with the rated current of the lower circuit breaker)].
[0105] It should be noted that the conditions for selecting the rated current of the circuit breaker are:
[0106] (1) Greater than the maximum value of the circuit load current and the rated current of the lower circuit breaker;
[0107] (2) There are at least two extreme differences between the rated current of the selected circuit breaker and the rated current of the lower-level circuit breaker.
[0108] It should be noted that the range means that there are only a few types of rated currents for each type of circuit breaker. For example, for one type of circuit breaker, the rated current options range from small to large, namely 4A, 6A, 10A, 25A, 32A, etc. The ones that have two extreme differences from 4A are 10A and above.
[0109] The AC cable circuit breaker selection module 4 is used to calculate the short-circuit current under different cable lengths and select the cable model based on the short-circuit current.
[0110] Among them, the AC cable circuit breaker selection module includes a short-circuit current calculation module and a cable selection module;
[0111] Among them, the short-circuit current calculation module is used to calculate the total impedance on the station transformer outlet side, and calculate the short-circuit current under different cable lengths based on the total impedance on the station transformer outlet side.
[0112] like Figure 6 As shown, the short-circuit current calculation module includes:
[0113] Extract the station transformer impedance data from the database and input it into the station transformer impedance calculation model to calculate the total impedance on the station transformer outlet side. According to the impedance calculation, the impedance network diagram of the station power system can be obtained, and the short-circuit current calculation of the system can be performed.
[0114] Extract cable characteristic data (cable length data) from the database, and calculate the total impedance of the feeder (including phase resistance, phase reactance, phase protection resistance, and phase protection reactance) based on the cable characteristic data;
[0115] Combined with the total impedance of the station transformer outlet and the total impedance of the feeder, the short-circuit current under different cable lengths is calculated and a short-circuit current table is developed.
[0116] Among them, the short-circuit currents under different cable lengths include single-phase short-circuit current, three-phase short-circuit current and short-circuit current at the station transformer outlet.
[0117] The calculation formula for the AC component value of the three-phase initial short-circuit current of the low-voltage network is:
[0118]
[0119] in:
[0120] R k =R s +R T +R m +R L
[0121] X k =X s +X T +X m +X L
[0122] Where U n represents the nominal voltage of the network; c represents the voltage coefficient; Z k , R k , X k All represent system side impedance (where Z represents impedance, R represents resistance, and X represents reactance); R s Indicates the resistance of the high voltage side system of the transformer; X s Represents the reactance of the transformer high voltage side system; R T Represents the resistance of the transformer; XT Represents the reactance of the transformer; R m Indicates the resistance of the busbar section on the low-voltage side of the transformer; X m Represents the reactance of the busbar section on the low-voltage side of the transformer; R L Indicates the resistance of the distribution line; X L Indicates the reactance of the distribution line.
[0123] The calculation formula for single-phase ground short-circuit fault current is:
[0124]
[0125] in:
[0126]
[0127] Where U n Network nominal voltage (line voltage), V, 380V for 220 / 380 network; c represents voltage coefficient, which is 1 when calculating single-phase ground fault current; R (1) , R (2) , R (0) Respectively represent the positive sequence, negative sequence and zero sequence resistance of the short circuit; X (1) , X (2) , X (0) Respectively represent the positive sequence, negative sequence and zero sequence reactance of the short circuit; R phps , R phpT , X phps , X phpT Respectively represent the resistance and reactance of the system, the resistance and reactance of the transformer, which can be obtained by impedance calculation; R phpL , X phpL , Z phpL Respectively represent the phase line-protection line phase protection resistance, phase protection reactance, and phase protection impedance of the short-circuit circuit; R phpm , X phpm , Z phpm They respectively represent the resistance and reactance of the bus section on the low-voltage side of the transformer.
[0128] Calculation of the initial value of single-phase and neutral short-circuit current: The calculation method is similar to the calculation of single-phase ground fault current, except that the box resistance R of the distribution line is phpL , phase protection reactance X phpL Use the resistance and reactance of the phase-neutral loop instead.
[0129] The cable selection module is used to select cable models based on the short-circuit current at different cable lengths.
[0130] Among them, the cable selection module includes:
[0131] Use cable laying software to load substation loop data into the cable inventory to calculate cable length, thereby updating cable length data;
[0132] According to the preset cable verification rules, the cable models that match the cable verification rules are screened out and output.
[0133] It should be noted that if Figure 7 As shown in the figure, the cable models screened according to the short-circuit current at different cable lengths include:
[0134] 1) Export all loops as a cable list without cable length information, import the list through the cable laying software and calculate the cable length, and import the calculated cable list through the cable laying software to realize the entry of cable length information.
[0135] 2) Verify that the short-circuit current at the single-phase end of the cable meets the minimum value requirement based on the loop load current in the "Loop Statistics Table"; select a cable model that meets the requirements based on the "Short-circuit Current Table"; verify that the selected cable meets the three-phase end short-circuit current requirements based on the "Short-circuit Current Table".
[0136] 3) Check whether the rated current carrying capacity of this type of cable meets the load current requirements under standard laying conditions.
[0137] 4) If both conditions are met, the cable model is output; if not, a cable with a cross-sectional model of the previous level is selected. If the current carrying capacity of the largest cross-sectional cable in the existing library or the maximum cross-sectional area allowed for cable access does not meet the requirements, a double-cable is used, and steps 1 and 2 are repeated until both conditions are met and the cable model is output.
[0138] 5) If the above conditions are still not met, manually modify the control parameters and repeat the calculation verification until they are met.
[0139] The verification module 5 is used to sequentially perform the cable selection voltage drop verification, the current carrying capacity and the loop constraint verification and the sensitivity verification and output the verification results.
[0140] Among them, the verification module includes a cable verification module, a current carrying capacity and loop constraint verification module, a sensitivity verification module and a verification result output module;
[0141] The cable verification module is used to verify whether the screened cable model meets the voltage drop requirements.
[0142] It should be noted that the cable selection needs to verify that the voltage drop meets the requirements.
[0143] The calculation formula for single-phase circuit voltage drop is:
[0144]
[0145] The calculation formula for the three-phase circuit voltage drop is:
[0146]
[0147] In the formula, L represents the line length (m); R represents the line resistance per unit length (Ω / m); X represents the line reactance per unit length (Ω / m); Indicates the power factor.
[0148] The cable selection is determined, and the cable impedance can be obtained by looking up the table and calculating. In order to ensure reliable operation of the line, the loop voltage drop does not exceed 10%. The voltage drop requirement can also be manually input through requirements. When the voltage drop does not meet the requirements, it is necessary to increase the cable cross-section to meet the voltage drop requirements.
[0149] The current-carrying capacity and loop constraint verification module is used to ensure that the cable current-carrying capacity and thermal stability meet the requirements, and to precisely control the level difference and action time.
[0150] It should be noted that the time characteristics of circuit breakers from the same manufacturer are similar. The differential coordination must take into account the coordination with the cables and the coordination of the action characteristics, as well as the coordination differential of the rated currents of the upper and lower circuits and the constraints of sensitivity. For renovation and expansion projects, the time and interface characteristics must also be considered on the basis of new construction projects.
[0151] Among them, the current carrying capacity and loop constraint verification module includes a cable current carrying capacity constraint module, a thermal stability constraint module, an action characteristic constraint module and an upper and lower level difference constraint module;
[0152] The current-carrying capacity constraint module is used to calculate and verify the long-term allowable current-carrying capacity of the cable to ensure that the actual current-carrying capacity of the cable remains within the long-term allowable current-carrying capacity of the cable.
[0153] The expression for the current carrying capacity constraint is:
[0154]
[0155] Where, Izd1 represents the setting current of the long-time delay release of the circuit breaker; I2 represents the long-term allowable current-carrying capacity of the wire or cable (the correction factor should be multiplied due to changes in ambient temperature and laying and operating conditions).
[0156] The thermal stability constraint module is used to evaluate the thermal stability of the cable under short-circuit conditions based on the effective value of the short-circuit current.
[0157] The expression of thermal stability constraint is:
[0158]
[0159] In the formula, S represents the cable cross section; I zd1It represents the effective value of the three-phase short-circuit current; K represents the calculation coefficient related to the conductor material; t represents the calculation coefficient related to the conductor material;
[0160] Meet the circuit breaker protection constraints such as Figure 8 As shown in the figure, if the loop protection constraints are not met, the cable cross-section needs to be adjusted and the cable calibration needs to be re-performed.
[0161] The action characteristic constraint module is used to ensure that the action characteristics of the low-voltage circuit overload protection device meet the preset standards.
[0162] The action characteristics of the low-voltage circuit overload protection device must meet the preset standards. The specific expression is:
[0163] I B ≤I n ≤I Z
[0164] I2≤1.45I Z
[0165] Where: I B Indicates the calculated current of the circuit (A); I n Indicates the rated current of the fuse element or the rated current or setting current of the circuit breaker (A); I Z It indicates the allowable continuous current-carrying capacity of the conductor (kW); I2 indicates the current (A) required to ensure the reliable operation of the protective device. When the protective device is a circuit breaker, I2 is the agreed operating current within the agreed time; when it is a fuse, I2 is the agreed fusing current within the agreed time.
[0166] It should be noted that if Fig. 9 As shown in the figure, the extreme difference coordination of the circuit is mainly reflected in the two dimensions of the circuit breaker rated current and the action time. From the perspective of rated current, the rated current of the incoming circuit breaker must be greater than the rated current of the branch circuit breaker, and the rated current of the branch circuit breaker must be greater than the rated current of the lower circuit breaker; from the perspective of action time, the load side circuit breaker protection is instantaneous, and the power side protection should be delayed Action; the main power protection should be Action delay: Considering the differential coordination from the dimensions of current and time can ensure accurate and reliable operation of the switch and avoid the risk of over-tripping.
[0167] The upper and lower level difference constraint module is used to configure the circuit difference coordination according to the current level and action time to ensure that the protection device closest to the fault point takes priority when a fault occurs.
[0168] It should be noted that the selectivity differential can be complete or partial. If a fault occurs at any point in the device, the upstream protection device close to the faulty part will segment and isolate the fault, and other protection devices will not be affected, thus achieving complete selectivity.
[0169] The differential coordination of the circuit can be achieved through current level selection, step delay selection and comprehensive methods. Since the delay situation is relatively complicated, this section mainly considers the differential selection through current level, that is, it is achieved by setting the tripping threshold from the downstream load to the power supply in steps. For circuits where the upper and lower levels do not meet the differential constraints, it is achieved by adjusting the size of the upper level circuit breaker.
[0170] The sensitivity verification module is used to determine the sensitivity of the protection element when a fault occurs in the AC power system of the substation.
[0171] It should be noted that the sensitivity is used to determine whether the protection element will refuse to operate when a fault occurs in the system. Generally, the end of the cable connecting the protection element is used as the standard criterion. When a fault occurs in the AC system, the protection element closest to the fault location should be disconnected to ensure that the fault is separated from the circuit. At the same time, the corresponding upper protection element should not operate to ensure that the fault range is reduced to the minimum range and the reliability of the selection is guaranteed. At the same time, it is necessary to determine the sensitivity of the upper and lower protection elements.
[0172] The sensitivity of the short-circuit protection can be obtained by the ratio of the single-phase short-circuit current to the instantaneous current setting value of the circuit breaker. When the protective device is a circuit breaker, the short-circuit current at the end of the protected line should not be less than 1.5 times the setting current of the instantaneous or delayed overcurrent release of the circuit breaker (including phase-to-zero short circuit and phase-to-phase short circuit). If K = I k / I set ≥1.5, it means that the sensitivity requirement is met; if K=I k / I set ≤1.5, it means that the requirements are not met. When the sensitivity does not meet the requirements, it can be solved by replacing electronic circuit breakers, replacing circuit breakers with smaller rated currents, replacing circuit breakers with different tripping characteristics, and replacing cables with larger cross-sections. If cables with larger connections are replaced, the corresponding sensitivity also needs to be recalculated and verified.
[0173] The following protections should be installed for low-voltage power plant motors: a protection circuit consisting of a circuit breaker or a circuit breaker and an operating device. The short-circuit release of the circuit breaker itself can be used as phase-to-phase short-circuit protection. The protection range can extend into the motor. When the motor output terminal is short-circuited, the protection sensitivity coefficient should not be less than 1.5. If the protection sensitivity does not meet the requirements, a relay protection should be installed. The protection should act instantly when the circuit breaker trips.
[0174] The verification result output module is used to output the verification results generated by the cable verification module, the current carrying capacity and loop constraint verification module and the sensitivity verification module.
[0175] It should be noted that the present invention greatly improves the efficiency of power system design through automation and intelligent tools. Designers can complete complex calculations and selection work in a shorter time, reducing the time for manual calculations and verification, thereby speeding up project progress.
[0176] The present invention ensures that each link of the AC power supply system can meet the design requirements and operating conditions through accurate equipment selection and comprehensive verification methods, improves the reliability and safety of the system, and reduces the probability of failure.
[0177] The present invention optimizes the station transformer capacity and cable selection through intelligent algorithms and big data analysis, avoids waste and over-configuration of resources, and improves the economy of the system. At the same time, the optimized resource configuration also reduces operation and maintenance costs and improves the overall benefits of the system.
[0178] The present invention improves the system's ability to detect and respond to faults through accurate short-circuit current calculation and sensitivity verification, ensures that the system can quickly and accurately isolate faults, reduces the impact of faults on system operation, and improves system stability and reliability.
[0179] The digital platform in the present invention provides comprehensive information integration and data sharing, and realizes intelligent management of the AC power system. Through real-time monitoring and data analysis, system problems can be discovered and handled in a timely manner, operation strategies can be optimized, and the management level and operation efficiency of the system can be improved.
[0180] In summary, the present invention has achieved a dual improvement in design efficiency and system reliability through comprehensive integration, precise selection, optimized verification and intelligent management, significantly optimized resource allocation, enhanced the system's fault handling capability, and provided solid technical support and broad application prospects for the digital transformation and intelligent development of the power system.
[0181] According to another embodiment of the present invention, a method for managing AC power supply of a substation based on a digital platform is also provided. The method for managing AC power supply of a substation based on a digital platform comprises the following steps:
[0182] S1. Build the substation AC power supply system and database, and establish a communication interaction connection between the substation AC power supply system and the database;
[0183] S2. Calculate the total load capacity of the substation and select the substation capacity based on the total load capacity of the substation;
[0184] S3, calculating the load current of the substation circuit, and selecting the circuit breaker model based on the load current of the substation circuit;
[0185] S4. Calculate the short-circuit current under different cable lengths and select the cable model based on the short-circuit current;
[0186] S5. Perform cable selection voltage drop verification, current carrying capacity and loop constraint verification, and sensitivity verification in sequence and output the verification results.
[0187] In summary, with the help of the above technical solutions of the present invention, the present invention realizes the comprehensive integration and information sharing of various types of power equipment and data by constructing a complete AC system structure and database, solves the problems of information islands and data fragmentation in traditional systems, provides a unified data source and information platform, and significantly improves the integrity and coordination of the system. Through the big data analysis and intelligent algorithm of the digital platform, the present invention can comprehensively consider the load demand, power grid conditions and redundancy requirements, and make accurate station variable capacity selection, thereby not only improving the accuracy and rationality of station transformer selection, but also optimizing resource allocation and improving the economy and reliability of the system. The present invention adopts the intelligent algorithm of the digital platform, which can quickly and accurately select AC circuit breakers to ensure the safety and reliability of the system, thereby reducing the subjectivity and errors of human selection, and improving the design efficiency and the rationality of equipment configuration. Based on the short-circuit current calculation function of the digital platform, the present invention realizes fast and accurate short-circuit current calculation by integrating the power system model and the fault analysis algorithm, thereby ensuring the reasonable configuration of the protection equipment, enhancing the fault detection and isolation capabilities of the system, and improving the stability and safety of the system. The digital platform in the present invention can perform automated and optimized cable selection based on factors such as cable length and load current, and ensure the scientificity and rationality of cable configuration through various verification methods such as voltage drop verification, current carrying capacity and loop constraint verification, and sensitivity verification, thereby improving the accuracy and reliability of cable selection and avoiding system failures and performance degradation caused by improper cable selection.
[0188] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A substation AC power management system and method based on a digital platform, characterized in that: The substation AC power management system based on the digital platform includes a system building module, a station transformer capacity selection module, a loop load current calculation module, an AC cable circuit breaker selection module and a verification module; The system building module is used to build the substation AC power supply system and database, and to establish a communication interaction connection between the substation AC power supply system and the database; The station transformer capacity selection module is used to calculate the total load capacity of the substation and select the station transformer capacity based on the total load capacity of the substation; The loop load current calculation module is used to calculate the substation loop load current and screen the circuit breaker model based on the substation loop load current; The AC cable circuit breaker selection module is used to calculate the short-circuit current under different cable lengths and select the cable model based on the short-circuit current; The verification module is used to sequentially perform cable selection voltage drop verification, current carrying capacity and loop constraint verification, and sensitivity verification and output verification results.
2. According to the digital platform-based substation AC power management system of claim 1, it is characterized in that: The station transformer capacity selection module calculates the total load capacity of the substation and selects the station transformer capacity based on the total load capacity of the substation, including: Extracting substation load data from a database, wherein the substation load data includes power load data, heating load data and lighting load data; Inputting the substation load data and the pre-set power load conversion coefficient into the station-use variable capacity calculation model to calculate the total substation load capacity; Select the capacity in the station transformer capacity sequence that is one level larger than the total load capacity of the substation as the station transformer capacity and formulate a load statistics table.
3. The substation AC power management system based on a digital platform according to claim 2 is characterized in that: The loop load current calculation module calculates the substation loop load current and selects the circuit breaker model based on the substation loop load current, including: Extracting substation circuit data from a database, the substation circuit data including circuit name, circuit load power, load type, rated current of lower-level circuit breaker and maximum allowable cross-section of cable access; Inputting substation loop data into a loop load current calculation model to calculate the substation loop load current; According to the substation circuit load current and preset selection rules, determine the rated current and setting multiple of the circuit breaker and prepare a circuit statistics table.
4. The substation AC power management system based on a digital platform according to claim 3 is characterized in that: The AC cable circuit breaker selection module includes a short-circuit current calculation module and a cable selection module; The short-circuit current calculation module is used to calculate the total impedance of the station transformer outlet side, and calculate the short-circuit current under different cable lengths according to the total impedance of the station transformer outlet side; The cable selection module is used to select cable models according to short-circuit currents at different cable lengths.
5. The substation AC power management system based on a digital platform according to claim 4 is characterized in that: The short-circuit current calculation module calculates the total impedance of the station transformer outlet side, and calculates the short-circuit current under different cable lengths according to the total impedance of the station transformer outlet side, including: Extract station transformer impedance data from the database and input it into the station transformer impedance calculation model to calculate the total impedance at the station transformer outlet side; Extracting cable characteristic data from a database, and calculating the total impedance of the feeder based on the cable characteristic data; Combined with the total impedance of the station transformer outlet and the total impedance of the feeder, the short-circuit current under different cable lengths is calculated and a short-circuit current table is developed; Among them, the short-circuit currents under different cable lengths include single-phase short-circuit current, three-phase short-circuit current and short-circuit current at the station transformer outlet side.
6. The substation AC power management system based on a digital platform according to claim 5, characterized in that: The cable selection module includes: Use cable laying software to load substation loop data into the cable inventory to calculate cable length, thereby updating cable length data; According to the preset cable verification rules, the cable models that match the cable verification rules are screened out and output.
7. The substation AC power management system based on a digital platform according to claim 6, characterized in that: The verification module includes a cable verification module, a current carrying capacity and loop constraint verification module, a sensitivity verification module and a verification result output module; Wherein, the cable verification module is used to verify whether the screened cable model meets the voltage drop requirement; The current carrying capacity and loop constraint verification module is used to ensure that the current carrying capacity and thermal stability of the cable meet the requirements, and to accurately control the level difference and action time; The sensitivity verification module is used to determine the sensitivity of the protection element when a fault occurs in the AC power supply system of the substation; The verification result output module is used to output the verification results generated by the cable verification module, the current carrying capacity and loop constraint verification module and the sensitivity verification module.
8. The substation AC power management system based on a digital platform according to claim 7, characterized in that: The current carrying capacity and loop constraint verification module includes a cable current carrying capacity constraint module, a thermal stability constraint module, an action characteristic constraint module and an upper and lower level difference constraint module; The current carrying capacity constraint module is used to calculate and verify the long-term allowable current carrying capacity of the cable to ensure that the actual current carrying capacity of the cable remains within the long-term allowable current carrying capacity of the cable; The thermal stability constraint module is used to evaluate the thermal stability of the cable under short-circuit conditions according to the effective value of the short-circuit current; The action characteristic constraint module is used to ensure that the action characteristics of the low-voltage circuit overload protection device meet the preset standards; The upper and lower level difference constraint module is used to configure the circuit difference coordination according to the current level and the action time, so as to ensure that the protection device closest to the fault point takes priority when a fault occurs.
9. The substation AC power management system based on a digital platform according to claim 8, characterized in that: The calculation formulas for the three short-circuit currents are: in: R k =R s +R T +R m +R L X k =X s +X T +X m +X L U n represents the nominal voltage of the network; c represents the voltage coefficient; Z k , R k , X k Both represent the short-circuit capacity on the system side; R s Indicates the resistance of the high voltage side system of the transformer; X s Represents the reactance of the transformer high-voltage side system; R T Represents the resistance of the transformer; X T Represents the reactance of the transformer; R m Indicates the resistance of the busbar section on the low-voltage side of the transformer; X m Represents the reactance of the busbar section on the low-voltage side of the transformer; R L Indicates the resistance of the distribution line; X L Indicates the reactance of the distribution line.
10. A method for managing AC power supply in a substation based on a digital platform, characterized in that: A substation AC power management system based on a digital platform for implementing any one of claims 1-9, the substation AC power management method based on a digital platform comprises the following steps: S1. Build the substation AC power supply system and database, and establish a communication interaction connection between the substation AC power supply system and the database; S2. Calculate the total load capacity of the substation and select the substation capacity based on the total load capacity of the substation; S3, calculating the load current of the substation circuit, and selecting the circuit breaker model based on the load current of the substation circuit; S4. Calculate the short-circuit current under different cable lengths and select the cable model based on the short-circuit current; S5. Perform cable selection voltage drop verification, current carrying capacity and loop constraint verification, and sensitivity verification in sequence and output the verification results.