Wave energy power supply system of offshore buoy equipment and control method of wave energy power supply system

Through the integrated buoy with fully enclosed oscillating wave power generation and Thevenin model prediction controller, the problem of insufficient power supply for marine buoys is solved, and the continuous power supply and normal working state of the buoys are achieved, reducing the dormant time.

CN118896042AActive Publication Date: 2024-11-05TSINGHUA UNIVERSITY
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410924118.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-11-05
Estimated Expiration
2044-07-10

AI Technical Summary

Technical Problem

Due to the limitation of power supply, marine buoys are difficult to maintain a long-term and continuous working state, especially in severe weather conditions, which affects the quality of real-time monitoring and data collection. In addition, traditional wave power generation devices require major modifications to the buoys, destroying concealment.

Method used

The integrated float is adopted with fully enclosed oscillating wave power generation. The linear motor power generation component generates power when the waves are impacted, and power is supplied to the monitoring component and rechargeable battery component. Thevenin model prediction controller optimizes the charging and operating status to ensure that the float is continuously powered.

Benefits of technology

There is no need to undergo major renovation of the float, which realizes continuous power supply of the float, reduces the dormant time caused by insufficient power, and ensures the normal working state and concealment of the float.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896042A_ABST
    Figure CN118896042A_ABST
Patent Text Reader

Abstract

The invention discloses a wave energy power supply system of an offshore buoy device and a control method thereof, the offshore buoy device comprises a buoy shell and a monitoring assembly arranged on the outer surface of the buoy shell, and the wave energy power supply system comprises a rechargeable battery assembly, a power generation assembly and a control assembly; the buoy shell is of a totally-closed structure. The power generation assembly is arranged in the buoy shell and is of an oscillation body type wave power generation structure based on a linear motor. When the buoy shell is impacted by waves, the power generation assembly is driven to generate power and supply power to the monitoring assembly and the rechargeable battery assembly. The control assembly obtains the real-time power generation power of the power generation assembly and the real-time SOC state information of the rechargeable battery assembly, controls the rechargeable battery assembly to charge and discharge, and controls the operation state of the monitoring assembly. By adopting the wave energy power supply system, the buoy does not need to be greatly changed, so that the buoy is kept in a normal working state to the greatest extent, and the dormancy duration caused by insufficient electric energy is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the marine field, and in particular to a wave energy power supply system for marine buoy equipment and a control method thereof. Background Art

[0002] Ocean buoys are automatic observation stations for ocean hydrology, water quality and meteorology, which are mainly composed of observation buoys anchored at sea. They can collect the required ocean hydrology, water quality and meteorology data for ocean science research, offshore oil (gas) development, port construction and national defense construction in a long-term and continuous manner according to the requirements, especially the data on bad weather and sea conditions that are difficult to collect by survey ships.

[0003] In addition, buoys are widely used in the military as carriers of monitoring equipment, and undertake anti-submarine, anti-torpedo and other detection tasks, which requires buoys to work for a long time and continuously. However, due to the limitation of power supply, in order to reduce power consumption, the conventional choice is to use low-voltage and low-power equipment; otherwise, the equipment needs to work in intermittent working mode, in which the equipment works and sleeps periodically. Traditional buoys usually use rechargeable batteries to power the equipment, or a combination of solar panels and rechargeable batteries. Although the above implementation method reduces the sleep interval, it is difficult to keep the equipment working normally due to weather factors, and the above shortcomings are crucial to the impact on real-time monitoring / data collection. In addition, other forms of wave power generation devices such as double-floating type require major modifications to the buoy itself, which destroys its own concealment. Summary of the invention

[0004] The purpose of an embodiment of the present invention is to provide a wave energy power supply system for an offshore buoy device and a control method thereof. By adopting an integrated buoy for fully enclosed oscillating wave power generation, there is no need to make major changes to the buoy, and the buoy device can be continuously powered, so that the buoy can maintain a normal working state to the greatest extent, reducing the sleep time caused by insufficient power.

[0005] In order to solve the above technical problems, a first aspect of an embodiment of the present invention provides a wave energy power supply system for an offshore buoy device, wherein the offshore buoy device comprises: a buoy shell and a monitoring component arranged on the outer surface of the buoy shell, and the wave energy power supply system comprises: a rechargeable battery component, a power generation component and a control component;

[0006] The buoy housing is a fully enclosed structure;

[0007] The power generation component is arranged inside the buoy shell, and adopts an oscillating body wave power generation structure based on a linear motor;

[0008] When the buoy shell is impacted by waves, it drives the power generation component to generate electricity and supply power to the monitoring component and the rechargeable battery component;

[0009] The control component obtains the real-time power generation of the power generation component and the real-time SOC status information of the rechargeable battery component, controls the charging and discharging of the rechargeable battery component, and controls the operating status of the monitoring component.

[0010] Furthermore, the monitoring component is arranged on the top upper surface of the buoy housing;

[0011] The rechargeable battery assembly is arranged at the bottom of the buoy housing;

[0012] The power generation assembly is arranged between the top of the buoy shell and the rechargeable battery assembly.

[0013] Further, the power generation assembly includes: a linear motor stator, a linear motor mover, a first spring and a second spring;

[0014] The two ends of the linear motor stator are respectively connected to the top wall of the buoy shell and the top of the rechargeable battery. The first spring, the linear motor mover and the second spring are sequentially mounted on the linear motor stator. The two ends of the first spring are respectively connected to the top wall of the buoy shell and one side of the linear motor mover. The two ends of the second spring are respectively connected to the top of the rechargeable battery and the other side of the linear motor mover.

[0015] Further, when the SOC of the rechargeable battery assembly is less than a first preset power threshold, the control component controls the power generation component to only supply power to the rechargeable battery assembly and puts the monitoring component into a dormant state;

[0016] When the SOC of the rechargeable battery component is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component controls the monitoring component to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation component;

[0017] When the SOC of the rechargeable battery assembly is greater than or equal to the second preset power threshold, the control assembly controls the monitoring assembly to be in a continuous operation state.

[0018] Furthermore, when the SOC of the rechargeable battery assembly is greater than or equal to the first preset power threshold and less than the second preset power threshold,

[0019] If the real-time power generation of the power generation component is less than the load power threshold, the control component controls the monitoring component to be in an interval operation state;

[0020] If the real-time power generation of the power generation component is greater than or equal to the load power threshold required for the continuous operation of the monitoring component, the control component controls the monitoring component to be in a continuous operation state.

[0021] Further, the control component includes: a model predictive controller based on the Thevenin model;

[0022] The Thevenin model includes: an equivalent power supply, a first resistor, a parallel resistor, and a parallel capacitor, wherein the positive electrode of the equivalent power supply is connected to the first resistor, the parallel resistor, and the positive electrode of the load in sequence, the negative electrode of the equivalent power supply is connected to the negative electrode of the load, and the parallel capacitor and the parallel resistor are connected in parallel;

[0023] When the monitoring component is in an interval operation state, the model predictive controller obtains the working time of the monitoring component in each buoy working cycle based on its state equation, objective function and constraint conditions;

[0024] The objective function takes maximizing the buoy working time within the prediction period and minimizing the battery energy loss as the control goal.

[0025] Furthermore, the state equation of the model predictive controller is:

[0026]

[0027] Among them, x(k+1) and x(k) are the state variables at time k+1 and time k, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, and the control variable u(k) at time k adopts the corresponding buoy working period T float Working time of internal monitoring components T load The disturbance variable r(k) at time k adopts the real-time power generation power P of the power generation component WEC , Δt is the sampling time interval, P float (k) is the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) is the output voltage of the rechargeable battery assembly at time k, η and Q N Represents the charge and discharge efficiency coefficient and capacity of the rechargeable battery assembly, R c1 is the parallel resistance value, C1 is the parallel capacitance value, T float is the working cycle length of the buoy, R1 is the first resistor;

[0028] The objective function J of the model predictive controller is:

[0029]

[0030] Among them, w1 and w2 represent positive weight coefficients, N is the maximum prediction period, i is the number of moments recursively predicted from the current moment, and T load is the buoy working period T float The working time of the internal monitoring component, I b is the output current value of the rechargeable battery assembly, R0 is the first resistance value, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, P float (k) represents the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) represents the output voltage of the rechargeable battery assembly at time k;

[0031] The constraints of the model predictive controller include: SOC constraints, rechargeable battery assembly output current constraints and control constraints;

[0032] The SOC constraint condition is:

[0033] SOC min <SOC(k+i|k)<SOC max ,i=1,2,…,N;

[0034] Among them, SOC min is the first preset power threshold, SOC max is the second preset power threshold, N is the maximum prediction period, and i is the number of moments recursively deduced from the current moment;

[0035] The output current constraint condition of the rechargeable battery assembly is:

[0036]

[0037] Among them, P float (k) is the power required for the buoy to operate continuously under the sea condition at time k, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future, r(k+i|k) is the wave power generation value at the i-th moment in the future, T float is the buoy working period, U b (k) represents the output voltage of the rechargeable battery assembly at time k, I b max is the maximum output current of the battery, I b min The maximum absorption current of the battery;

[0038] The control constraints are:

[0039] 0≤T load (k+i|k)≤T float ,i=0,1,…,N-1;

[0040] Among them, Tload (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future.

[0041] Furthermore, the objective function J of the model predictive controller is:

[0042]

[0043] Among them, U(k) is the control sequence starting from the current time k, r(k|k) is the wave power value at the current time k, and r(k+N-1|k) is the wave power value at the N-1th time after the current time k.

[0044] Accordingly, a second aspect of an embodiment of the present invention provides a method for controlling a wave energy power supply system of an offshore buoy device, which is used to control the wave energy power supply system of the offshore buoy device, and comprises the following steps:

[0045] Acquire the SOC of the rechargeable battery component based on the control component;

[0046] When the SOC of the rechargeable battery assembly is less than a first preset power threshold, the control component controls the power generation component to only supply power to the rechargeable battery assembly and puts the monitoring component into a dormant state;

[0047] When the SOC of the rechargeable battery component is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component controls the monitoring component to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation component;

[0048] When the SOC of the rechargeable battery assembly is greater than or equal to the second preset power threshold, the control assembly controls the monitoring assembly to be in a continuous operation state.

[0049] Furthermore, when the SOC of the rechargeable battery component is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component controls the monitoring component to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation component, including:

[0050] If the real-time power generation of the power generation component is less than the load power threshold, the control component controls the monitoring component to be in an interval operation state;

[0051] If the real-time power generation of the power generation component is greater than or equal to the load power threshold required for the continuous operation of the monitoring component, the control component controls the monitoring component to be in a continuous operation state.

[0052] Further, the control component includes: a model predictive controller based on the Thevenin model, the Thevenin model includes: an equivalent power supply, a first resistor, a parallel resistor, and a parallel capacitor, the positive electrode of the equivalent power supply is connected to the first resistor, the parallel resistor, and the positive electrode of the load in sequence, the negative electrode of the equivalent power supply is connected to the negative electrode of the load, and the parallel capacitor and the parallel resistor are connected in parallel;

[0053] If the real-time power generation of the power generation component is less than the load power threshold, the control component controls the monitoring component to be in an interval operation state, including:

[0054] When the monitoring component is in an interval operation state, the model predictive controller obtains the working time of the monitoring component in each buoy working cycle based on its state equation, objective function and constraint conditions;

[0055] The objective function takes maximizing the buoy working time within the prediction period and minimizing the battery energy loss as the control goal.

[0056] Furthermore, the state equation of the model predictive controller is:

[0057]

[0058] Among them, x(k+1) and x(k) are the state variables at time k+1 and time k, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, and the control variable u(k) at time k adopts the corresponding buoy working period T float Working time of internal monitoring components T load The disturbance variable r(k) at time k adopts the real-time power generation power P of the power generation component WEC , Δt is the sampling time interval, P float (k) is the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) is the output voltage of the rechargeable battery assembly at time k, η and Q N Represents the charge and discharge efficiency coefficient and capacity of the rechargeable battery assembly, R c1 is the parallel resistance value, C1 is the parallel capacitance value, T float is the working cycle length of the buoy, R1 is the first resistor;

[0059] The objective function J of the model predictive controller is:

[0060]

[0061] Among them, w1 and w2 represent positive weight coefficients, N is the maximum prediction period, i is the number of moments recursively predicted from the current moment, and T loadis the buoy working period T float The working time of the internal monitoring component, I b is the output current value of the rechargeable battery assembly, R0 is the first resistance value, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, P float (k) represents the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) represents the output voltage of the rechargeable battery assembly at time k;

[0062] The constraints of the model predictive controller include: SOC constraints, rechargeable battery assembly output current constraints and control constraints;

[0063] The SOC constraint condition is:

[0064] SOC min <SOC(k+i|k)<SOC max ,i=1,2,…,N;

[0065] Among them, SOC min is the first preset power threshold, SOC max is the second preset power threshold, N is the maximum prediction period, and i is the number of moments recursively deduced from the current moment;

[0066] The output current constraint condition of the rechargeable battery assembly is:

[0067]

[0068] Among them, P float (k) is the power required for the buoy to operate continuously under the sea condition at time k, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future, r(k+i|k) is the wave power generation value at the i-th moment in the future, T float is the buoy working period, U b (k) represents the output voltage of the rechargeable battery assembly at time k, I b max is the maximum output current of the battery, I b min The maximum absorption current of the battery;

[0069] The control constraints are:

[0070] 0≤T load (k+i|k)≤T float ,i=0,1,…,N-1;

[0071] Among them, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future.

[0072] The above technical solution of the embodiment of the present invention has the following beneficial technical effects:

[0073] By adopting an integrated buoy with fully enclosed oscillating wave power generation, there is no need to make major changes to the buoy, and the buoy equipment can be continuously powered, so that the buoy can maintain normal working conditions to the greatest extent, reducing the dormancy time caused by insufficient power. BRIEF DESCRIPTION OF THE DRAWINGS

[0074] Figure 1 This is a schematic diagram of the principle of a wave energy power supply system for an offshore buoy device provided by an embodiment of the present invention;

[0075] Figure 2 is a schematic diagram of the Thevenin model circuit structure provided by an embodiment of the present invention;

[0076] Figure 3 It is a schematic diagram of the control principle of the model predictive controller provided by an embodiment of the present invention;

[0077] Figure 4 It is a flow chart of a wave energy power supply system control method for an offshore buoy device provided by an embodiment of the present invention.

[0078] Reference numerals:

[0079] 1. Monitoring component, 2. First spring, 3. Directional rod, 4. Linear motor stator, 5. Linear motor mover, 6. Control component, 7. Rechargeable battery component. DETAILED DESCRIPTION

[0080] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0081] Please refer to Figure 1A first aspect of an embodiment of the present invention provides a wave energy power supply system for an offshore buoy device, the offshore buoy device comprising: a buoy shell and a monitoring component 1 arranged on the outer surface of the buoy shell, the wave energy power supply system comprising: a rechargeable battery component 7, a power generation component and a control component 6; the buoy shell is a fully enclosed structure; the power generation component is arranged inside the buoy shell, and adopts an oscillating body wave power generation structure based on a linear motor; when the buoy shell is impacted by waves, the power generation component drives the power generation component to generate electricity and supply power to the monitoring component 1 and the rechargeable battery component 7; the control component 6 obtains the real-time power generation power of the power generation component and the real-time SOC status information of the rechargeable battery component 7, controls the charging and discharging of the rechargeable battery component 7, and controls the operating status of the monitoring component 1.

[0082] The offshore buoy device (hereinafter referred to as the buoy) includes: a buoy shell, a monitoring component 1, a spring, a linear motor, a limiter and a controller. The buoy serves as a carrier of the monitoring device and the wave power generation device, and moves up and down with the waves. When the buoy moves up and down with the waves, the spring deforms and drives the linear motor mover 5 to move. At this time, the linear motor mover 5 and the stator move relative to each other, thereby continuously supplying power to the buoy device.

[0083] Optionally, the monitoring component 1 is arranged on the top upper surface of the buoy shell; the rechargeable battery component 7 is arranged on the bottom of the buoy shell; and the power generation component is arranged between the top of the buoy shell and the rechargeable battery component 7.

[0084] Specifically, the power generation assembly includes: a linear motor stator 4, a linear motor mover 5, a first spring 2 and a second spring; the two ends of the linear motor stator 4 are respectively connected to the top wall of the buoy shell and the top of the rechargeable battery, the first spring 2, the linear motor mover 5 and the second spring are sequentially mounted on the linear motor stator 4, the two ends of the first spring 2 are respectively connected to the top wall of the buoy shell and one side of the linear motor mover 5, and the two ends of the second spring are respectively connected to the top of the rechargeable battery and the other side of the linear motor mover 5.

[0085] The power generation assembly is located inside the buoy and is integrated with the buoy shell. The power generation assembly mainly includes a linear motor mover 5, a linear motor stator 4, a first spring 2, and a second spring. Since the power generation assembly is located inside the buoy, there is no need to make obvious changes to the appearance of the buoy shell. The power generation assembly can be installed inside the buoy shell through a flange fixing device. The linear motor stator 4 is mainly composed of permanent magnets, magnetic silicon steel sheets and stainless steel sleeves. The permanent magnets are axially magnetized. The linear motor mover 5 is composed of a three-phase armature winding, a winding skeleton and a shell. The winding skeleton adopts a hollow pancake coil form, which is directly wound in the winding skeleton slot. It has a high slot fill rate, no ends, high copper material utilization, low copper loss, and better motor energy saving effect.

[0086] Further, when the SOC of the charging battery assembly 7 is less than a first preset power threshold, the control component 6 controls the power generation component to only supply power to the charging battery assembly 7 and puts the monitoring component 1 into a sleep state; when the SOC of the charging battery assembly 7 is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component 6 controls the monitoring component 1 to be in a continuous operation state or an intermittent operation state according to the power generation power value of the power generation component; when the SOC of the charging battery assembly 7 is greater than or equal to the second preset power threshold, the control component 6 controls the monitoring component 1 to be in a continuous operation state.

[0087] Optionally, the rechargeable battery assembly 7 is located at the bottom of the floating body shell.

[0088] When the battery SOC is less than the first preset power threshold, the SOC <SOC min At this time, all the wave power is supplied to the battery to charge, so that it can return to the safe SOC range as soon as possible, that is, [SOC min ,SOC max ]. Among them, SOC min and SOC max are preset constants, such as 20% and 80%.

[0089] When the battery SOC is greater than or equal to the second preset power threshold, that is, SOC ≥ SOC max , it plays the role of energy storage and peak-shaving compensation to ensure that the buoy is in continuous working mode. The specific principle is: when the wave conditions are good, the generated power is higher than the power load required for the continuous work of the buoy, and the battery absorbs the remaining power after deducting the load from the generated power; when the wave conditions are average, the generated power is lower than the power required for the continuous work of the buoy, and the battery releases the remaining power after deducting the generated power from the load to provide power for the buoy.

[0090] When the battery SOC is greater than or equal to the first preset power threshold and less than the second preset power threshold, the SOC min ≤SOC <SOC max , the buoy is in intermittent working mode, and its sleep interval is determined by the real-time rolling optimized model predictive control MPC, which aims to maximize the buoy working time and battery life.

[0091] Further, when the SOC of the rechargeable battery assembly 7 is greater than or equal to a first preset power threshold and less than a second preset power threshold, if the real-time power generation power of the power generation assembly is less than the load power threshold, the control assembly 6 controls the monitoring assembly 1 to be in an intermittent operation state; if the real-time power generation power of the power generation assembly is greater than or equal to the load power threshold required for the continuous operation of the monitoring assembly 1, the control assembly 6 controls the monitoring assembly 1 to be in a continuous operation state.

[0092] Please refer to Figure 2The control component 6 includes: a model predictive controller based on the Thevenin model; the Thevenin model includes: an equivalent power supply, a first resistor, a parallel resistor, and a parallel capacitor. The positive electrode of the equivalent power supply is connected to the first resistor, the parallel resistor, and the positive electrode of the load in sequence, the negative electrode of the equivalent power supply is connected to the negative electrode of the load, and the parallel capacitor and the parallel resistor are connected in parallel; when the monitoring component 1 is in an interval operation state, the model predictive controller obtains the working time of the monitoring component 1 in each buoy working cycle based on its state equation, objective function and constraint conditions. The buoy working cycle can be a wave cycle; the objective function takes maximizing the buoy working time within the prediction cycle and minimizing the battery energy loss as control targets.

[0093] Please refer to Figure 3 Specifically, take x = [U1, SOC] T is the state variable, U1 represents the voltage of the RC parallel circuit inside the battery module; take each buoy working cycle T float Working hours within T load is the control variable, that is, u=T load , where the buoy working period T float =Equal to 0.1 to 0.2 wave peak period can be obtained through actual ocean observation; Take the output power P of the wave power generation device WEC is the disturbance variable, that is, r = P WEC The state variable, control variable, and disturbance variable at time k are denoted as x(k), u(k), and r(k), respectively, and the discretized state equation is obtained using the forward Euler method.

[0094] The optimal working time of the monitoring components within the buoy working cycle at each moment is solved in real time through the model predictive controller; among them, the model predictive controller solves the quadratic programming problem through the interior point method to obtain the optimal working time of the monitoring components within the buoy working cycle.

[0095] The state equation of the model predictive controller is:

[0096]

[0097] Among them, x(k+1) and x(k) are the state variables at time k+1 and time k, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, and the control variable u(k) at time k adopts the corresponding buoy working period T float Working time of internal monitoring components T load The disturbance variable r(k) at time k uses the real-time power generation power P of the power generation component WEC , Δt is the sampling time interval, P float (k) is the power required for the buoy in continuous operation mode under sea conditions at time k, U b(k) is the output voltage of the rechargeable battery assembly 7 at time k, η and Q N represents the charge and discharge efficiency coefficient and capacity of the rechargeable battery assembly 7, R c1 is the parallel resistance value, C1 is the parallel capacitance value, T float is the working period of the buoy, and R1 is the first resistor.

[0098] The control objectives of the model predictive controller are: ① maximizing the buoy working time within the prediction period N; ② minimizing the positive correlation between battery energy loss and battery life loss. The objective function J of the model predictive controller is:

[0099]

[0100] Among them, w1 and w2 represent positive weight coefficients, N is the maximum prediction period, i is the number of moments recursively predicted from the current moment, and T load is the buoy working period T float The working time of the internal monitoring component, I b is the output current value of the rechargeable battery assembly 7, R0 is the first resistance value, u(k) is the control variable at time k, r(k) is the disturbance variable at time k (i.e., the wave power value, generated by the power generation assembly), P float (k) represents the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) represents the output voltage of the rechargeable battery pack 7 at time k.

[0101] Furthermore, considering the objective function It is only related to the disturbance variable and can be ignored. At the same time, define U(k) as follows: And the objective function is minimized to minimize the model.

[0102] The above formula can be expressed as:

[0103]

[0104] To obtain the standard quadratic programming model shown in the above formula, the present invention adopts two approximation processes: ① In the control-oriented model, only the energy loss on the resistor R0 is considered, which is a reasonable approximation based on the fact that "the energy loss of the resistor R0 is dominant in the battery model"; ② Assuming that B1(k+i|k) and B2(k+i|k) are only related to P at the current moment float (k) and U b (k) related, i.e. B 1,2 (k+i|k)=B 1,2(k|k), which is a reasonable approximation based on the fact that "the wave conditions are basically stable in a short period of time and the battery voltage can be approximately considered unchanged". In the rolling optimization process with a very limited prediction time domain, the error caused by the above approximate processing can be ignored, which greatly reduces the complexity of the calculation process.

[0105] In addition, the vector f is related to the disturbance variable at the future moment, so the present invention adopts the AR model to predict the disturbance variable at the next N moments, that is, r(k+i|k). The interior point method is used to solve the following quadratic programming problem, and the control sequence U(k) is obtained: * ,Right now:

[0106]

[0107] After each rolling optimization, only the first item is used for real-time control; the solution process of the quadratic programming problem is as follows:

[0108]

[0109] Specifically, the constraints of the model predictive controller include: SOC constraints, output current constraints of the rechargeable battery assembly 7 and control constraints;

[0110] The SOC constraints are:

[0111] SOC min <SOC(k+i|k)<SOC max ,i=1,2,…,N;

[0112] Among them, SOC min is the minimum SOC value of the battery (the first preset power threshold), SOC max is the maximum value of the battery SOC (the second preset power threshold), N is the maximum prediction period, and i is the number of moments recursively calculated from the current moment;

[0113] The output current constraint condition of the rechargeable battery assembly 7 is:

[0114]

[0115] Among them, P float (k) is the power required for the buoy to operate continuously under the sea condition at time k, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future, r(k+i|k) is the wave power generation value at the i-th moment in the future, T float is the buoy working period, U b (k) represents the output voltage of the rechargeable battery assembly 7 at time k, I b max is the maximum output current of the battery, I b minis the maximum absorption current of the battery (with the output direction as positive, I b min is a negative value);

[0116] The control constraints are:

[0117] 0≤T load (k+i|k)≤T float ,i=0,1,…,N-1;

[0118] Among them, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future.

[0119] Furthermore, the objective function J of the model predictive controller is:

[0120]

[0121] Among them, U(k) is the control sequence starting from the current time k, r(k|k) is the wave power value at the current time k, and r(k+N-1|k) is the wave power value at the N-1th time after the current time k.

[0122] Accordingly, please refer to Figure 4 A second aspect of an embodiment of the present invention provides a method for controlling a wave energy power supply system of an offshore buoy device, which is used to control the wave energy power supply system of the offshore buoy device, and comprises the following steps:

[0123] Step S100 , obtaining the SOC of the rechargeable battery assembly 7 based on the control assembly 6 .

[0124] Step S200, when the SOC of the rechargeable battery assembly 7 is less than the first preset power threshold, the control component 6 controls the power generation component to only supply power to the rechargeable battery assembly 7, and puts the monitoring component 1 into a dormant state.

[0125] Step S300, when the SOC of the rechargeable battery assembly 7 is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control assembly 6 controls the monitoring assembly 1 to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation assembly.

[0126] Step S400, when the SOC of the rechargeable battery assembly 7 is greater than or equal to the second preset power threshold, the control assembly 6 controls the monitoring assembly 1 to be in a continuous operation state.

[0127] Specifically, in step S300, when the SOC of the rechargeable battery assembly 7 is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control assembly 6 controls the monitoring assembly 1 to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation assembly, including:

[0128] Step S310: If the real-time power generation of the power generation component is less than the load power threshold, the control component 6 controls the monitoring component 1 to be in an interval operation state.

[0129] Step S320: If the real-time power generation of the power generation component is greater than or equal to the load power threshold required for the continuous operation of the monitoring component 1, the control component 6 controls the monitoring component 1 to be in a continuous operation state.

[0130] Furthermore, the control component 6 includes: a model predictive controller based on the Thevenin model, the Thevenin model includes: an equivalent power supply, a first resistor, a parallel resistor, and a parallel capacitor, the positive electrode of the equivalent power supply is connected to the first resistor, the parallel resistor, and the positive electrode of the load in sequence, the negative electrode of the equivalent power supply is connected to the negative electrode of the load, and the parallel capacitor and the parallel resistor are connected in parallel.

[0131] Specifically, when the aforementioned Thevenin model is adopted, in step S310, if the real-time power generation of the power generation component is less than the load power threshold, the control component 6 controls the monitoring component 1 to be in an interval operation state, including:

[0132] When the monitoring component 1 is in the interval operation state, the model predictive controller obtains the working time of the monitoring component 1 in each buoy working cycle based on its state equation, objective function and constraint conditions.

[0133] Among them, the objective function takes maximizing the buoy working time within the prediction period and minimizing the battery energy loss as the control goal.

[0134] In a specific implementation of the embodiment of the present invention, the state equation of the model predictive controller is:

[0135]

[0136] Among them, x(k+1) and x(k) are the state variables at time k+1 and time k, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, and the control variable u(k) at time k adopts the corresponding buoy working period T float Working time of internal monitoring components T load The disturbance variable r(k) at time k uses the real-time power generation power P of the power generation component WEC , Δt is the sampling time interval, P float (k) is the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) is the output voltage of the rechargeable battery assembly 7 at time k, η and Q N represents the charge and discharge efficiency coefficient and capacity of the rechargeable battery assembly 7, R c1 is the parallel resistance value, C1 is the parallel capacitance value, Tfloat is the working cycle length of the buoy, R1 is the first resistor;

[0137] The objective function J of the model predictive controller is:

[0138]

[0139] Among them, w1 and w2 represent positive weight coefficients, N is the maximum prediction period, i is the number of moments recursively predicted from the current moment, and T load is the buoy working period T float The working time of the internal monitoring component, I b is the output current value of the rechargeable battery assembly 7, R0 is the first resistance value, u(k) is the control variable at time k, r(k) is the disturbance variable at time k (i.e., the wave power value, generated by the power generation assembly), P float (k) represents the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) represents the output voltage of the rechargeable battery pack 7 at time k.

[0140] The constraints of the model predictive controller include: SOC constraints, output current constraints of the rechargeable battery assembly 7 and control constraints.

[0141] The SOC constraints are:

[0142] SOC min <SOC(k+i|k)<SOC max ,i=1,2,…,N;

[0143] Among them, SOC min is the minimum SOC value of the battery (the first preset power threshold), SOC max is the maximum value of the battery SOC (the second preset power threshold), N is the maximum prediction period, and i is the number of moments recursively calculated from the current moment;

[0144] The output current constraint condition of the rechargeable battery assembly 7 is:

[0145]

[0146] Among them, P float (k) is the power required for the buoy to operate continuously under the sea condition at time k, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future, r(k+i|k) is the wave power generation value at the i-th moment in the future, T float is the buoy working period, U b (k) represents the output voltage of the rechargeable battery assembly 7 at time k, I b max is the maximum output current of the battery, Ib min is the maximum absorption current of the battery (with the output direction as positive, I b min is a negative value);

[0147] The control constraints are:

[0148] 0≤T load (k+i|k)≤T float ,i=0,1,…,N-1;

[0149] Among them, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future.

[0150] The embodiment of the present invention aims to protect a wave energy power supply system and control method of an offshore buoy device. The offshore buoy device includes: a buoy shell and a monitoring component arranged on the outer surface of the buoy shell. The wave energy power supply system includes: a rechargeable battery component, a power generation component and a control component. The buoy shell is a fully enclosed structure. The power generation component is arranged inside the buoy shell. When the buoy shell is impacted by waves, it drives the power generation component to generate electricity and supply power to the monitoring component and the rechargeable battery component. The control component obtains the real-time power generation power of the power generation component and the real-time SOC status information of the rechargeable battery component, controls the charging and discharging of the rechargeable battery component, and controls the operating status of the monitoring component. The above technical solution has the following effects:

[0151] By adopting a wave energy power supply system, there is no need to make major changes to the existing buoy structure. The buoy equipment can be continuously powered, allowing the buoy to maintain normal working conditions to the greatest extent and reducing the dormancy time caused by insufficient power.

[0152] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. A wave energy power supply system for offshore buoy equipment, characterized in that: The offshore buoy device comprises: a buoy shell and a monitoring component (1) arranged on the outer surface of the buoy shell, and the wave energy power supply system comprises: a rechargeable battery component (7), a power generation component and a control component (6); The buoy housing is a fully enclosed structure; The power generation component is arranged inside the buoy shell, and adopts an oscillating body wave power generation structure based on a linear motor; When the buoy shell is impacted by waves, it drives the power generation component to generate electricity, thereby supplying power to the monitoring component (1) and the rechargeable battery component (7); The control component (6) obtains the real-time power generation of the power generation component and the real-time SOC status information of the rechargeable battery component (7), controls the charging and discharging of the rechargeable battery component (7), and controls the operating status of the monitoring component (1).

2. The wave energy power supply system for offshore buoy equipment according to claim 1, characterized in that: The monitoring component (1) is arranged on the top upper surface of the buoy housing; The rechargeable battery assembly (7) is arranged at the bottom of the buoy housing; The power generation assembly is arranged between the top of the buoy housing and the rechargeable battery assembly (7).

3. The wave energy power supply system for offshore buoy equipment according to claim 2, characterized in that: The power generation assembly comprises: a linear motor stator (4), a linear motor mover (5), a first spring (2) and a second spring; The two ends of the linear motor stator (4) are respectively connected to the top wall of the buoy housing and the top of the rechargeable battery; the first spring (2), the linear motor mover (5) and the second spring are sequentially mounted on the linear motor stator (4); the two ends of the first spring (2) are respectively connected to the top wall of the buoy housing and one side of the linear motor mover (5); the two ends of the second spring are respectively connected to the top of the rechargeable battery and the other side of the linear motor mover (5).

4. The wave energy power supply system for offshore buoy equipment according to claim 1, characterized in that: When the SOC of the rechargeable battery assembly (7) is less than a first preset power threshold, the control assembly (6) controls the power generation assembly to supply power only to the rechargeable battery assembly (7) and puts the monitoring assembly (1) into a dormant state; When the SOC of the rechargeable battery component (7) is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component (6) controls the monitoring component (1) to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation component; When the SOC of the rechargeable battery component (7) is greater than or equal to the second preset power threshold, the control component (6) controls the monitoring component (1) to be in a continuous operation state.

5. The wave energy power supply system for offshore buoy equipment according to claim 4, characterized in that: When the SOC of the rechargeable battery assembly (7) is greater than or equal to the first preset power threshold and less than the second preset power threshold, If the real-time power generation of the power generation component is less than the load power threshold, the control component (6) controls the monitoring component (1) to be in an interval operation state; If the real-time power generation of the power generation component is greater than or equal to the load power threshold required for the continuous operation of the monitoring component (1), the control component (6) controls the monitoring component (1) to be in a continuous operation state.

6. The wave energy power supply system for offshore buoy equipment according to claim 5, characterized in that: The control component (6) includes: a model predictive controller based on the Thevenin model; The Thevenin model includes: an equivalent power supply, a first resistor, a parallel resistor, and a parallel capacitor, wherein the positive electrode of the equivalent power supply is connected to the first resistor, the parallel resistor, and the positive electrode of the load in sequence, the negative electrode of the equivalent power supply is connected to the negative electrode of the load, and the parallel capacitor and the parallel resistor are connected in parallel; When the monitoring component (1) is in an interval operation state, the model predictive controller obtains the working time of the monitoring component (1) in each buoy working cycle based on its state equation, objective function and constraint conditions; The objective function takes maximizing the buoy working time within the prediction period and minimizing the battery energy loss as the control goal.

7. The wave energy power supply system for offshore buoy equipment according to claim 6, characterized in that: The state equation of the model predictive controller is: x(k+1)=Ax(k)+B1(k)u(k)+B2(k)r(k) Among them, x(k+1) and x(k) are the state variables at time k+1 and time k, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, and the control variable u(k) at time k adopts the corresponding buoy working period T float Working time of internal monitoring components T load The disturbance variable r(k) at time k adopts the real-time power generation power P of the power generation component WEC , Δt is the sampling time interval, P float (k) is the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) is the output voltage of the rechargeable battery assembly (7) at time k, η and Q N represents the charge and discharge efficiency coefficient and capacity of the rechargeable battery assembly (7), R c1 is the parallel resistance value, C1 is the parallel capacitance value, T float is the working cycle length of the buoy, R1 is the first resistor; The objective function J of the model predictive controller is: Among them, w1 and w2 represent positive weight coefficients, N is the maximum prediction period, i is the number of moments recursively predicted from the current moment, and T load is the buoy working period T float The working time of the internal monitoring component, I b is the output current value of the rechargeable battery assembly (7), R0 is the first resistance value, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, P float (k) represents the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) represents the output voltage of the rechargeable battery assembly (7) at time k; The constraints of the model predictive controller include: SOC constraints, output current constraints of the rechargeable battery assembly (7) and control constraints; The SOC constraint condition is: SOC min <SOC(k+i|k)<SOC max ,i=1,2,...,N; Among them, SOC min is the first preset power threshold, SOC max is the second preset power threshold, N is the maximum prediction period, and i is the number of moments recursively deduced from the current moment; The output current constraint condition of the rechargeable battery assembly (7) is: Among them, P float (k) is the power required for the buoy to operate continuously under the sea condition at time k, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future, r(k+i|k) is the wave power generation value at the i-th moment in the future, T float is the buoy working period, U b (k) represents the output voltage of the rechargeable battery assembly (7) at time k, I bmax is the maximum output current of the battery, I bmin The maximum absorption current of the battery; The control constraints are: 0≤T load (k+i|k)≤T float ,i=0,1,...,N-1; Among them, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future.

8. The wave energy power supply system for offshore buoy equipment according to claim 7, characterized in that: The objective function J of the model predictive controller is: Among them, U(k) is the control sequence starting from the current time k, r(k|k) is the wave power value at the current time k, and r(k+N-1|k) is the wave power value at the N-1th time after the current time k.

9. A method for controlling a wave energy power supply system of an offshore buoy device, characterized in that: A wave energy power supply system for controlling an offshore buoy device as claimed in any one of claims 1 to 8, comprising the following steps: Acquiring the SOC of the rechargeable battery component (7) based on the control component (6); When the SOC of the rechargeable battery assembly (7) is less than a first preset power threshold, the control assembly (6) controls the power generation assembly to supply power only to the rechargeable battery assembly (7) and puts the monitoring assembly (1) into a dormant state; When the SOC of the rechargeable battery component (7) is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component (6) controls the monitoring component (1) to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation component; When the SOC of the rechargeable battery component (7) is greater than or equal to the second preset power threshold, the control component (6) controls the monitoring component (1) to be in a continuous operation state.

10. The wave energy power supply system control method for offshore buoy equipment according to claim 9, characterized in that: When the SOC of the rechargeable battery component (7) is greater than or equal to the first preset power threshold and less than the second preset power threshold, the control component (6) controls the monitoring component (1) to be in a continuous operation state or an intermittent operation state according to the power generation value of the power generation component, including: If the real-time power generation of the power generation component is less than the load power threshold, the control component (6) controls the monitoring component (1) to be in an interval operation state; If the real-time power generation of the power generation component is greater than or equal to the load power threshold required for the continuous operation of the monitoring component (1), the control component (6) controls the monitoring component (1) to be in a continuous operation state.

11. The wave energy power supply system control method for offshore buoy equipment according to claim 10, characterized in that: The control component (6) comprises: a model predictive controller based on a Thevenin model, wherein the Thevenin model comprises: an equivalent power source, a first resistor, a parallel resistor, and a parallel capacitor, wherein the positive electrode of the equivalent power source is connected to the first resistor, the parallel resistor, and the positive electrode of the load in sequence, the negative electrode of the equivalent power source is connected to the negative electrode of the load, and the parallel capacitor and the parallel resistor are connected in parallel; If the real-time power generation of the power generation component is less than the load power threshold, the control component (6) controls the monitoring component (1) to be in an interval operation state, including: When the monitoring component (1) is in an interval operation state, the model predictive controller obtains the working time of the monitoring component (1) in each buoy working cycle based on its state equation, objective function and constraint conditions; The objective function takes maximizing the buoy working time within the prediction period and minimizing the battery energy loss as the control goal.

12. The wave energy power supply system control method for offshore buoy equipment according to claim 11, characterized in that: The state equation of the model predictive controller is: x(k+1)=Ax(k)+B1(k)u(k)+B2(k)r(k) Among them, x(k+1) and x(k) are the state variables at time k+1 and time k, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, and the control variable u(k) at time k adopts the corresponding buoy working period T float Working time of internal monitoring components T load The disturbance variable r(k) at time k adopts the real-time power generation power P of the power generation component WEC , Δt is the sampling time interval, P float (k) is the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) is the output voltage of the rechargeable battery assembly (7) at time k, η and Q N represents the charge and discharge efficiency coefficient and capacity of the rechargeable battery assembly (7), R c1 is the parallel resistance value, C1 is the parallel capacitance value, T float is the working cycle length of the buoy, R1 is the first resistor; The objective function J of the model predictive controller is: Among them, w1 and w2 represent positive weight coefficients, N is the maximum prediction period, i is the number of moments recursively predicted from the current moment, and T load is the buoy working period T float The working time of the internal monitoring component, I b is the output current value of the rechargeable battery assembly (7), R0 is the first resistance value, u(k) is the control variable at time k, r(k) is the disturbance variable at time k, P float (k) represents the power required for the buoy in continuous operation mode under sea conditions at time k, U b (k) represents the output voltage of the rechargeable battery assembly (7) at time k; The constraints of the model predictive controller include: SOC constraints, output current constraints of the rechargeable battery assembly (7) and control constraints; The SOC constraint condition is: SOC min <SOC(k+i|k)<SOC max ,i=1,2,…,N; Among them, SOC min is the first preset power threshold, SOC max is the second preset power threshold, N is the maximum prediction period, and i is the number of moments recursively deduced from the current moment; The output current constraint condition of the rechargeable battery assembly (7) is: Among them, P float (k) is the power required for the buoy to operate continuously under the sea condition at time k, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future, r(k+i|k) is the wave power generation value at the i-th moment in the future, T float is the buoy working period, U b (k) represents the output voltage of the rechargeable battery assembly (7) at time k, I bmax is the maximum output current of the battery, I bmin The maximum absorption current of the battery; The control constraints are: 0≤T load (k+i|k)≤T float ,i=0,1,...,N-1; Among them, T load (k+i|k) is the working time of the monitoring component in each working cycle of the buoy at the i-th moment in the future.

Citation Information

Patent Citations

  • ARGO buoy based on wave energy

    CN109823479A

  • Tidal wave monitoring buoy capable of generating power and power generation method

    CN114837877A

  • Energy supply control system of ocean detection buoy device based on wave power generation

    CN117728550A

  • Hydrogen leakage monitoring method, system and equipment and readable storage medium

    CN118124388A

  • ARGO buoy based on wave energy

    CN209126926U