Marine transportation binding method for ship lift platform

By calculating the stability and equilibrium state of the barge, combined with the layout of the hoist lugs and steel piers, the problem of overturning of the lifting platform during sea transportation is solved, and the stability and pre-arch protection of the platform are achieved.

CN118907309APending Publication Date: 2024-11-08SINOHYDRO BUREAU 5
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411101700.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art lacks the binding method for the lifting platform with large working loads, large sizes and weights during sea transportation, resulting in the possibility of overturning and overturning during transportation.

Method used

By calculating the horizontal stability and longitudinal equilibrium status of the barge, the loading point of the lifting platform is determined, and the lifting lugs and steel piers are welded on the barge deck, and tied with lanyards to ensure the stability and pre-arch of the platform. Spend.

Benefits of technology

It effectively avoids the risk of overturning of the ship lift platform during transportation, ensures the stability of large-weight and large-size platforms and the protection of pre-arches, and reduces the impact of bumps during transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907309A_ABST
    Figure CN118907309A_ABST
Patent Text Reader

Abstract

The invention discloses a marine transportation binding method for a ship lift platform. The marine transportation binding method comprises the following steps that S1, the loading point location of the ship lift platform is determined according to the transverse stability; s2, the longitudinal balance state is judged according to the head and tail draft variation of the barge; s3, selecting a ship lift platform placement position; s4, determining the number of fastening channels and approving the fastening strength of a single root cable; s5, deck lifting lugs are welded to the barge deck; s6, steel buttresses are arranged, and the top elevation of the steel buttresses is adjusted; and S7, after a platform lifting lug of the ship lift platform is connected to a deck lifting lug through a tying rope with a hand-cranking guide chain, the tying rope is tightened, and ship lift platform binding is completed. According to the method, the pre-camber of the main beam of the ship lift platform can be effectively protected, the pre-camber change of the main beam of the ship lift platform caused by jolting in the transportation process is avoided, the influence of a barge deck on the pre-camber of the ship lift platform is reduced, and meanwhile, the stability of the large-weight and large-size ship lift platform in the transportation process is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of installation of ship maintenance equipment, and in particular to a marine transportation lashing method for a ship lift platform. Background Art

[0002] Traditional shipyards often choose to produce and overhaul ships in docks. However, due to the long time span of shipbuilding and overhaul, the fixed size of the dock, and the low turnover rate of the dock and slipway, the shipyard often faces an embarrassing situation where there are orders but no slipway and production is impossible. As an important tool for shipbuilding in modern shipyards, the ship lift is mainly responsible for the lifting and transfer of ships to be transferred, and plays an important role in improving the slipway turnover rate and reducing costs.

[0003] Its working principle is: when the ship needs to be repaired, the ship lift platform (hereinafter referred to as the platform) is immersed in water, the ship enters the top of the ship lift platform, the ship lift lifts the ship to be repaired out of the water, and then transfers it to the dry berth by the transfer system for repair. When the ship is repaired or manufactured, the transfer system transfers the ship from the dry berth and lowers the ship lift platform to complete the ship's launching.

[0004] Ordinary ship lift platforms are often transported by land due to their small size and easy operation, and do not involve the issue of sea transfer and lashing. In ocean transportation of platforms, the platform and the deck of the transport ship are generally welded together. For some special ship lift platforms with large working loads, large sizes and weights, the above method is not applicable for still water transfer work, especially during the platform lashing process before transportation, it is necessary to determine the installation position and lash the ship lift platform to avoid the ship lift platform from tipping over during transportation.

[0005] Therefore, a marine transportation lashing method for a ship lift platform is proposed to solve the above technical problems. Summary of the invention

[0006] The technical problem solved by the present invention is that in the prior art, there is no method specifically designed for tying up a ship lift platform with a large working load, size and weight during marine transportation in closed waters, thereby avoiding the problem of rollover and capsizing of the ship lift platform during transportation.

[0007] In order to solve the above technical problems, the technical solutions adopted by the present invention are as follows:

[0008] A method for lashing a ship lift platform for marine transportation comprises the following steps:

[0009] Step S1, calculating the lateral stability height of the barge after the ship lift platform is loaded, and determining the loading point of the ship lift platform at which the barge is in a stable equilibrium state after the ship lift platform is loaded according to the lateral stability height;

[0010] Step S2, according to the loading point of the ship lift platform determined in step S1, calculating the change in the fore and stern draft of the barge when loaded at different points, and judging the longitudinal balance state of the barge after loading according to the change in the fore and stern draft of the barge before and after loading;

[0011] Step S3, according to the calculation result of step S2, selecting the loading point with the smallest change in the fore and stern draft as the placement position of the ship lift platform on the barge;

[0012] Step S4, determining the number of lashing lines and verifying the lashing strength of a single lashing line;

[0013] Step S5, welding deck lugs on the barge deck according to the number of mooring tracks and the placement position of the ship lift platform in step S3;

[0014] Step S6, according to the placement position of the ship lift platform determined in step S3, a number of steel buttresses are evenly arranged within the projection range of the placement position of the ship lift platform on the barge deck, and the elevation of the top of the steel buttresses is adjusted to adapt to the pre-camber of the platform; the ship lift platform is hoisted to the steel buttresses, the position of the steel buttresses is adjusted, and the steel buttresses are welded and fixed;

[0015] Step S7, after connecting the platform lifting lug of the ship lift platform to the deck lifting lug through the lanyard with a hand-cranked guide chain, tighten the lanyard to complete the lashing of the ship lift platform.

[0016] In particular, in step S1, the lateral stability is calculated according to formula (1);

[0017]

[0018] In the formula, For high lateral stability, M R is the restoring moment, △ is the displacement volume of the barge, is the barge inclination angle;

[0019] The basis for judging the lateral equilibrium state is: the restoring moment M R The relationship between the heel direction and the center of gravity G can be used to determine the relative position of the center of gravity G below the center of gravity M. is a positive value, the restoring moment M R If it is a positive value, the restoring torque is opposite to the tilt direction, and it can return to the original equilibrium position after the external force disappears, then the original state is a stable equilibrium.

[0020] In particular, in step S2, the draft change is calculated according to formula (2) and formula (3):

[0021]

[0022]

[0023] In the formula, δd F is the change in bow draft after the ship lift platform (41) moves from point A to point B, δd A is the change in stern draft after the ship lift platform (41) moves from point A to point B, L is the length of the ship, x F is the longitudinal coordinate of the drift center, p is the loading mass, x1 and x2 are the longitudinal coordinates at A and B respectively; High longitudinal stability;

[0024] The change in draft at the bow and stern of the barge (11) is calculated according to formula (2) and formula (3). The smaller the change in draft, the better the longitudinal balance state.

[0025] In particular, in step S5, the specific welding method of the deck lifting lug is: with the platform lifting lug point when the ship lift platform is in the placement position as the center of the circle and the mooring length as the radius, the deck lifting lug is welded on the barge deck; the number of deck lifting lugs is the same as the number of mooring tracks, and the deck lifting lugs around each platform lifting lug are evenly arranged.

[0026] Furthermore, the ship lift platform has an even number of platform lifting ears, which are respectively arranged on the left and right sides of the main beam of the ship lift platform; the deck lifting ears are welded with the platform lifting ears on one side as the center of the circle, and the deck lifting ears on the platform lifting ears on the other side are arranged in a symmetrical manner.

[0027] In particular, in step S6, the method for adjusting the pre-arch of the steel piers is specifically as follows: a steel pad is laid on each steel pier and initially fixed so that the overall direction of the top of the steel pad above the steel pier is consistent with the pre-arch of the ship lift platform; after hoisting the ship lift platform onto the steel piers, the position of the steel piers and the number of steel pads are adjusted so that the ship lift platform is in close contact with the steel pads, and then the steel piers are welded and fixed.

[0028] Furthermore, a rubber pad is provided between the steel pad and the ship lift platform.

[0029] In particular, in step S7, the method of tightening the fastening force of the belay rope is: tightening the belay rope using the hand-cranked guide chain to ensure that the links of the hand-cranked guide chain are tight and without any looseness.

[0030] In particular, in step S4, the number of fastening tracks is calculated by formula (4);

[0031] N = 9.87 × P × 1.5 / CS (5)

[0032] Wherein, N is the minimum number of mooring tracks, P is the weight of the ship lift platform (41), in tons, and CS is the actual mooring strength value, in KN.

[0033] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0034] The present invention can effectively ensure the stability of a heavy-weight and large-sized ship lift platform during the marine transportation of a barge, and effectively avoid the problem of the transport barge tipping over during the transfer of the ship lift platform.

[0035] The present invention can effectively protect the pre-camber of the main beam of the ship lift platform, avoid the change of the pre-camber of the main beam of the ship lift platform caused by bumps during transportation, and reduce the influence of the barge deck on the pre-camber of the ship lift platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 Schematic diagram of the side view of the structure after loading the ship lift platform onto the barge.

[0037] Figure 2 Schematic diagram of the main structure after the barge is loaded with the ship lift platform.

[0038] Figure 3 Schematic diagram of the structure after loading the barge with the ship lift platform from above.

[0039] Figure 4 Schematic diagram of the ship lift platform and the steel pier structure at the bottom.

[0040] The meanings of the numbers in the figure are: barge—11, deck eye—21; mooring rope—31; ship lift platform—41; steel pier—51; rubber pad—61; steel pad—71. DETAILED DESCRIPTION

[0041] The technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention, so as to have a further understanding of the concept of the present invention, the technical problems solved, the technical features constituting the technical scheme and the technical effects brought about.

[0042] like Figure 1 to Figure 4 As shown, a method for lashing a ship lift platform for offshore transportation comprises the following steps:

[0043] Step S1, calculating the lateral stability height of the barge 11 after the ship lift platform 41 is loaded, and determining the loading point of the ship lift platform 41 at which the barge 11 is in a stable equilibrium state after the ship lift platform 41 is loaded according to the lateral stability height;

[0044] Step S2, according to the loading position of the ship lift platform 41 determined in step S1, calculating the change in the fore and stern draft of the barge 11 when loaded at different positions, and judging the longitudinal balance state of the barge 11 after loading according to the change in the fore and stern draft of the barge 11 before and after loading;

[0045] Step S3, according to the calculation result of step S2, selecting the loading point with the smallest change in the fore and stern draft as the placement position of the ship lift platform 41 on the barge 11;

[0046] Step S4, determining the number of lashing paths and verifying the lashing strength of a single lashing line 31;

[0047] Step S5, welding the deck lugs 21 on the deck of the barge 11 according to the number of mooring tracks and the placement position of the ship lift platform 41 in step S3;

[0048] Step S6, according to the placement position of the ship lift platform 41 determined in step S3, a number of steel buttresses 51 are evenly arranged within the projection range of the placement position of the ship lift platform 41 on the deck of the barge 11, and the top elevation of the steel buttresses 51 is adjusted to adapt to the pre-camber of the platform; the ship lift platform 41 is hoisted to the steel buttresses 51, the position of the steel buttresses 51 is adjusted, and the steel buttresses 51 are welded and fixed;

[0049] Step S7, after connecting the platform lifting lug of the ship lift platform 41 to the deck lifting lug 21 through the lashing rope 31 with a hand-cranked guide chain, tighten the lashing rope 31 to complete the lashing of the ship lift platform 41.

[0050] The purpose of the present invention is to provide a lashing method for the marine transportation of a ship lift platform 41, which improves the stress of the platform, enhances the transportation stability of the platform, and improves the transportation safety. Specifically, all longitudinal stability problems belong to the category of small inclination angles, because the longitudinal stability moment is greater than the lateral stability moment, so it is impossible to capsize due to insufficient longitudinal stability.

[0051] Therefore, the lateral stability is judged only by calculating the high lateral stability, which is the main indicator for measuring the initial stability of the ship. The larger the restoring torque M R The larger the initial stability, the stronger the ability to resist the tilting moment. A ship with a high initial stability that is too large has a short swing period and will sway violently when encountering wind and waves at sea. On the contrary, a ship with a small transverse stability has a poor ability to resist tilting, but has a long swing period and a gentle swing.

[0052] As a preferred embodiment, in step S1, the lateral stability is calculated according to formula (1);

[0053]

[0054] In the formula, For high lateral stability, M R is the restoring moment, △ is the displacement volume of the barge 11, The barge has an inclination angle of 11.

[0055] The basis for judging the lateral equilibrium state is: the restoring moment M RThe relationship between the heel direction and the center of gravity G can be determined from the relative position of the center of gravity M and the center of gravity G. Specifically, the center of gravity G is below the center of gravity M. is a positive value, the restoring moment M R If it is a positive value, the restoring torque is opposite to the tilt direction, and it can return to the original equilibrium position after the external force disappears, then the original state is a stable equilibrium.

[0056] In the formula (1) of this embodiment, the restoring moment M R The stability of the ship's balance can be determined from the relationship between the heel direction and the relative position of the metacenter M and the center of gravity G.

[0057] 1) The center of gravity G is below the metacenter M, and the lateral stability is high is a positive value, the restoring moment M R is a positive value, which is opposite to the tilt direction. After the external force disappears, it can return to the original equilibrium position, and the original equilibrium state is a stable equilibrium;

[0058] 2) The center of gravity G is above the metacenter M, and the lateral stability is high is a negative value, the restoring moment M R is a negative value, which is consistent with the tilt direction. After the external force disappears, the ship is at M R It continues to tilt under the action, and the original equilibrium state becomes an unstable equilibrium;

[0059] 3) The center of gravity G coincides with the metacenter M, resulting in high lateral stability is zero, the restoring moment M R When the external force disappears and the ship does not move, the original equilibrium state is neutral equilibrium or random equilibrium.

[0060] As a preferred embodiment, in step S2, the change in draft is calculated according to formula (2) and formula (3):

[0061]

[0062]

[0063] In the formula, δd F is the change in bow draft after the ship lift platform 41 moves from point A to point B, δd A is the change in stern draft after the ship lift platform 41 moves from point A to point B, L is the length of the ship, x F is the longitudinal coordinate of the drift center, p is the loading mass, x1 and x2 are the longitudinal coordinates at A and B respectively; It has high longitudinal stability.

[0064] The change in the draft at the bow and stern of the barge 11 is calculated according to formula (2) and formula (3). The smaller the change in the draft, the better the longitudinal balance state.

[0065] For the longitudinal equilibrium state of the barge 11 after loading the ship lift platform 41, the longitudinal shift of the weight causes the longitudinal inclination tangent of the barge 11:

[0066]

[0067] Changes in bow draft caused by weight shift:

[0068]

[0069] Changes in stern draft caused by weight shift:

[0070]

[0071] Therefore, the drafts fore and aft after the weight shift are:

[0072]

[0073]

[0074] At the same time, when considering the optimal position of the platform, that is, parallel to the optimal position of the middle station surface, according to the above calculation results, through the difference in the change of the tail draft, the smaller the difference, the better the stability and the better the longitudinal balance.

[0075] As a preferred embodiment, in step S5, the specific welding method of the deck lifting lug 21 is: with the platform lifting lug point when the ship lift platform 41 is in the placement position as the center of the circle and the length of the mooring rope 31 as the radius, the deck lifting lug 21 is welded on the deck of the barge 11; the number of deck lifting lugs 21 is the same as the number of mooring tracks, and the deck lifting lugs 21 around each platform lifting lug are evenly distributed.

[0076] In this embodiment, deck ears 21 are arranged on the barge deck around the platform ears of the ship lift platform, and the deck ears 21 are cooperated with the lashing ropes 31 to firmly connect the platform ears with the deck ears 21, so that the platform ears of the ship lift platform receive the fastening force of the lashing ropes 31 in all directions, thereby providing a stable tying force for the ship lift platform 41.

[0077] As a further embodiment, the number of platform lifting ears of the ship lift platform 41 is an even number, which are respectively arranged on the left and right sides of the main beam of the ship lift platform 41; the deck lifting ears 21 are welded with the platform lifting ears on one side as the center of the circle, and the deck lifting ears 21 are arranged symmetrically on the platform lifting ears on the other side.

[0078] In this embodiment, when the number of platform lifting eyes of the ship lift platform 41 is an even number, the platform lifting eyes are arranged on the ship lift platform in a symmetrical manner on both sides. At this time, the position of the deck lifting eyes 21 needs to be adjusted according to the arrangement position of the platform lifting eyes, so that the deck lifting eyes 21 are symmetrically arranged on the other side with the platform lifting eyes on one side as the center of the circle, so as to balance the fastening force on both sides of the ship lift platform.

[0079] As a preferred embodiment, in step S6, the method for adjusting the pre-arch of the steel piers 51 is specifically as follows: a steel pad 71 is laid on each steel pier 51 and initially fixed so that the overall direction of the top of the steel pad 71 above the steel pier 51 is consistent with the pre-arch of the ship lift platform 41; after hoisting the ship lift platform 41 onto the steel piers 51, the position of the steel piers 51 and the number of steel pads 71 ​​are adjusted so that the ship lift platform 41 is in close contact with the steel pad 71, and then the steel piers 51 are welded and fixed.

[0080] In this embodiment, the purpose of adding the steel pad 7 to the steel pier 51 is to actually splice an upwardly arched curved surface so that after the ship lift platform 41 sits on the pier, it is subjected to surface contact rather than point force, so as to improve the platform force conditions. If it is subjected to pure point force, that is, the simple support mode is adopted, the ship lift platform 41 has been pre-arched, and during transportation, due to the lateral and longitudinal rolling of the hull, the pre-arch curve will collapse, thereby affecting the later platform installation and product installation quality.

[0081] At the same time, the number of steel piers 51 also needs to be determined after considering the load of the steel piers 51 and the size of a single steel pier 51. Taking the maximum platform weight of 550t in a certain embodiment as an example, the size of each steel pier 51 is 12m*1m*1m, and a total of 15 steel piers 51 are arranged. The reason for considering 15 steel piers 51 is that, on the one hand, the overall size of the platform is relatively long, reaching 45m, and the width varies from 9 to 11m. Second, the steel piers 51 must be coordinated with the pre-arch curve of the main beam of the upper platform. Arranging as many piers as possible can reduce the concentrated load. Since the deck bearing capacity of the deck ship is 20t / m2, the total contact area between the steel pier 51 and the deck is: 12*15=180m2. According to the maximum bearing capacity of the deck, the maximum weight that the ship can withstand is 180*20=3600t, which is much greater than the deadweight of the 550t platform.

[0082] As a preferred embodiment, a rubber pad 61 is further provided between the steel pad 71 and the ship lift platform 41 .

[0083] In this embodiment, a rubber pad 61 is also provided between the steel pad 71 and the ship lift platform 41, and its function is to protect the coating of the main beam of the ship lift platform 41 from being damaged during hoisting and fixing. The platform is hoisted from the dock by a floating crane or other lifting equipment and placed on the arranged steel pier 51. Check the gap between the platform main beam and the rubber pad 6, and adjust the thickness of the pad and the position of the pier appropriately to make the two in close contact.

[0084] As a preferred embodiment, in step S7, the method of tightening the fastening force of the belay 31 is: tightening the belay 31 by using a hand-cranked guide chain to ensure that the links of the hand-cranked guide chain are tight and without any looseness.

[0085] In this embodiment, the mooring rope is tightened by tightening the hand-cranked guide chain, thereby increasing the force between the clamping plate lifting ears 21 at both ends of the mooring rope 31 and the platform lifting ears, thereby ensuring that the overall fastening strength of the ship lift platform meets the regulatory requirements.

[0086] As a preferred embodiment, in step S4, the number of fastening tracks is calculated by formula (4);

[0087] N = 9.81 × P / CS × 1.5 (4)

[0088] Wherein, N is the minimum number of mooring tracks, P is the weight of the ship lift platform 41, in tons, and CS is the actual mooring strength value, in KN.

[0089] In this embodiment, according to the provisions of the Ship Securing Manual, the effectiveness of the securing devices for semi-standard cargo and non-standard cargo is evaluated and the securing force is calculated as follows:

[0090] N=9.81P / MSL

[0091] The maximum securing load MSL of the mooring rope 31 refers to the allowable load of the ship's securing equipment, just like the safe working load of the lifting equipment. When it can provide equal or higher strength, the safe working load (SWL) can replace the MSL. The maximum securing load (MSL) of various securing equipment is determined by its breaking strength. When multiple securing accessories are used in series, the maximum securing load (MSL) takes the minimum value. The MSL value determined by the breaking strength can be directly queried according to the table in the ship's securing manual, so it will not be repeated here. Taking into account the uneven force between the various securing devices and the reduction in strength due to improper assembly, the calculated strength value of the securing equipment should be determined on the basis of the MSL taking into account the safety factor, that is:

[0092] CS=MSL / 1.5

[0093] a. When the main force of longitudinal sliding is Fx <Longitudinal sliding restraint force F x ', the goods will not move longitudinally;

[0094] b. When the main force of sliding is F y ,<lateral sliding restraint force F y ', the goods will not move horizontally;

[0095] c. When the main force of vertical jump is F z ,<vertical jump constraint F z ', the cargo will not move vertically;

[0096] d. When the active rollover moment M y <Rollover restraint moment M y ', the cargo will not overturn laterally.

[0097] When a, b and d are met at the same time, the securing scheme meets the requirements.

[0098] As a preferred embodiment, adjacent lashing ropes 31 are cross-tied.

[0099] In this embodiment, adjacent lashing ropes 31 are cross-tied to obtain better lashing stress conditions and avoid uneven lashing caused by excessive stress on a single lashing rope or part of the lashing ropes 31.

[0100] The terms “connection” and “fixation” mentioned in the description of the present invention may refer to fixed connection, processing and forming, welding or mechanical connection. The specific meanings of the above terms in the present invention shall be understood according to the specific circumstances.

[0101] In the description of the present invention, the terms "center", "upper", "lower", "horizontal", "inside", "outside", etc., which indicate the orientation or position relationship, are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying a specific orientation that the device or element referred to must have, and therefore cannot be understood as a limitation on the present invention.

[0102] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some or all of the technical features therein can be replaced by equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for lashing a ship lift platform for offshore transportation, characterized in that: The following steps are involved: Step S1, calculating the lateral stability height of the barge (11) after the ship lift platform (41) is loaded, and determining the loading point of the ship lift platform (41) at which the barge (11) is in a stable equilibrium state after the ship lift platform (41) is loaded according to the lateral stability height; Step S2, according to the loading point of the ship lift platform (41) determined in step S1, calculating the change in the fore and stern draft of the barge (11) when loaded at different points, and judging the longitudinal balance state of the barge (11) after loading according to the change in the fore and stern draft of the barge (11) before and after loading; Step S3, based on the calculation result of step S2, selecting the loading point with the smallest change in the fore and stern draft as the placement position of the ship lift platform (41) on the barge (11); Step S4, determining the number of securing paths and verifying the securing strength of a single lashing line (31); Step S5, welding the deck lugs (21) on the deck of the barge (11) according to the number of mooring tracks and the placement position of the ship lift platform (41) in step S3; Step S6, according to the placement position of the ship lift platform (41) determined in step S3, a plurality of steel buttresses (51) are evenly arranged within the projection range of the placement position of the ship lift platform (41) on the deck of the barge (11), and the top elevation of the steel buttresses (51) is adjusted to adapt to the pre-camber of the platform; the ship lift platform (41) is hoisted to the steel buttresses (51), the position of the steel buttresses (51) is adjusted, and the steel buttresses (51) are welded and fixed; Step S7, after connecting the platform lifting lug of the ship lift platform (41) to the deck lifting lug (21) through the lashing rope (31) with a hand-cranked guide chain, tighten the lashing rope (31) to complete the lashing of the ship lift platform (41).

2. A method for lashing a ship lift platform for marine transportation as claimed in claim 1, characterized in that: In step S1, the lateral stability is calculated according to formula (1); In the formula, For high lateral stability, M R is the restoring moment, △ is the displacement volume of the barge, is the barge inclination angle; The basis for judging the lateral equilibrium state is: the restoring moment M R The relationship between the heel direction and the center of gravity G can be used to determine the relative position of the center of gravity G below the center of gravity M. is a positive value, the restoring moment M R If it is a positive value, the restoring torque is opposite to the tilt direction, and it can return to the original equilibrium position after the external force disappears, then the original state is a stable equilibrium.

3. The marine transportation lashing method for a ship lift platform according to claim 1, characterized in that: In step S2, the draft change is calculated according to formula (2) and formula (3): Where δdF is the change in bow draft after the ship lift platform (41) moves from point A to point B, δd A is the change in stern draft after the ship lift platform (41) moves from point A to point B, L is the length of the ship, x F is the longitudinal coordinate of the drift center, p is the loading mass, x1 and x2 are the longitudinal coordinates at A and B respectively; High longitudinal stability; The change in draft at the bow and stern of the barge (11) is calculated according to formula (2) and formula (3). The smaller the change in draft, the better the longitudinal balance state.

4. The marine transportation lashing method for a ship lift platform according to claim 1, characterized in that: In step S5, the specific welding method of the deck lifting lug (21) is as follows: with the platform lifting lug point when the ship lift platform (41) is in the placement position as the center of the circle and the length of the mooring rope (31) as the radius, the deck lifting lug (21) is welded on the deck of the barge (11); the number of the deck lifting lug (21) is the same as the number of the mooring tracks, and the deck lifting lugs (21) around each platform lifting lug are evenly arranged.

5. A method for lashing a ship lift platform for marine transportation as claimed in claim 4, characterized in that: The ship lift platform (41) has an even number of platform lifting ears, which are respectively arranged on the left and right sides of the main beam of the ship lift platform (41); the deck lifting ears (21) are welded with the platform lifting ears on one side as the center of the circle, and the deck lifting ears (21) are arranged symmetrically on the platform lifting ears on the other side.

6. The marine transportation lashing method for a ship lift platform according to claim 1, characterized in that: In step S6, the method for adjusting the pre-arch of the steel buttress (51) is specifically as follows: a steel pad (71) is laid on each steel buttress (51) and initially fixed so that the overall direction of the top of the steel pad (71) above the steel buttress (51) is consistent with the pre-arch of the ship lift platform (41); after hoisting the ship lift platform (41) onto the steel buttress (51), the position of the steel buttress (51) and the number of the steel pads (71) are adjusted so that the ship lift platform (41) is in close contact with the steel pads (71), and then the steel buttress (51) is welded and fixed.

7. A method for lashing a ship lift platform for marine transportation as claimed in claim 6, characterized in that: A rubber pad (61) is also provided between the steel pad (71) and the ship lift platform (41).

8. The marine transportation lashing method for a ship lift platform according to claim 1, characterized in that: In step S7, the fastening force of the belay (31) is tightened by using a hand-cranked guide chain to tighten the belay (31) and ensure that the links of the hand-cranked guide chain are tight and without any looseness.

9. The marine transportation lashing method for a ship lift platform according to claim 1, characterized in that: In step S4, the number of fastening tracks is calculated by formula (4); N = 9.81 × P / CS × 1.5 (4) Wherein, N is the minimum number of mooring tracks, P is the weight of the ship lift platform (41), in tons, and CS is the actual mooring strength value, in KN.