Construction method for additionally arranging inspection well through steel open caisson under condition of water supply and drainage pipe without water interruption
By using steel riding caisson shells and high-pressure rotary pile spraying technology in the water supply and drainage pipelines, the disadvantages of traditional water cut-off construction are solved and efficient Safe construction results.
Patent Information
- Application Number
- CN202411049349.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-08
AI Technical Summary
The traditional water-breaking construction method affects the normal operation of the pipeline, long construction cycle, high cost, environmental pollution and safety hazards in the maintenance and reconstruction of the water supply and drainage pipeline system. It is difficult to continuously water. Effective construction under conditions.
The steel riding caisson shell is constructed by non-drainage, combined with high-pressure rotary spray piles and MJS technology to seal the soil voids, and use the base plate and pipeline pads of the prefabricated assembly structure for rapid installation to ensure pipeline stability and sealing , and reduce the impact on the pipeline through high-strength steel cable suspension protection.
The addition of pipeline inspection wells under constant water conditions has been achieved, reducing the impact of construction on pipelines and environment, improving construction efficiency and safety, shortening construction time, reducing costs, and ensuring the stability and sealing of pipelines sex.
Smart Images

Figure CN118911201A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of inspection well construction, and in particular to a construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are kept dry. Background Art
[0002] With the continuous acceleration of urbanization, urban infrastructure construction is facing more and more challenges, especially in the reconstruction and maintenance of water supply and drainage pipeline systems. As an important part of urban underground infrastructure, the operation status of super-large-diameter water supply and drainage pipelines is directly related to the drainage capacity and flood control capacity of the city. However, in actual projects, the addition and maintenance of water supply and drainage pipeline inspection wells are often limited by the construction environment and technical conditions.
[0003] The traditional method of adding inspection wells usually requires cutting off or stopping the water supply to the pipeline, which not only affects the normal operation of the pipeline, but may also cause water supply and drainage interruptions in the surrounding areas, causing inconvenience to urban life and production.
[0004] Although water outage construction is common in the construction and maintenance of water supply and drainage pipeline systems, it also has many disadvantages, such as affecting the normal operation of pipelines; long construction period; the use of temporary pumping stations, pipeline modifications, and temporary water supply facilities will increase construction costs; water pollution, soil erosion and other problems may occur during the drainage process, which will affect the surrounding environment; the rupture of temporary water supply pipelines, flooding of construction sites, etc., all of which may pose a threat to the safety of construction workers and surrounding residents; during the water outage construction period, users may face problems such as water supply interruption or reduced water pressure, which will bring inconvenience to residents' lives and commercial operations, and may even cause user complaints and social conflicts; during the water outage construction period, the emergency response capacity of the pipeline system will be reduced. If an emergency occurs during this period (such as heavy rain, sudden pipeline failure, etc.), the response capacity will be limited.
[0005] To sum up, although water cut-off construction is a traditional construction method, its disadvantages are obvious.
[0006] In addition, when dealing with ultra-large diameter pipes, traditional construction methods have problems such as great construction difficulty, long construction period, and high cost, and are likely to affect the pipeline structure and surrounding environment during the construction process.
[0007] Therefore, how to carry out pipeline construction under the condition of continuous water supply has become a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0008] In view of the above-mentioned defects of the prior art, the present invention provides a construction method for adding an inspection well through a steel caisson under the condition of continuous water flow in the drainage pipe, so as to enable construction to be carried out under the normal operation of the pipeline, reduce the impact on the operation of the pipeline, improve construction efficiency, reduce construction costs, and ensure the safety and reliability of the construction process.
[0009] To achieve the above purpose, the present invention discloses a construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are not cut off; it is used to set an inspection well in an existing water supply and drainage pipe under the condition that water supply and drainage pipes are not cut off, and comprises the following steps:
[0010] Step 1: sinking the inspection well at the location where the water supply and drainage pipe needs to be set up without drainage, and pressing into the steel riding-type caisson shell;
[0011] The outer shell of the steel riding caisson is a tubular structure, and two grooves with semicircular bottoms are provided from the lower end to the middle at the side wall positions corresponding to the water supply and drainage pipes, and a plurality of pairs of rope fixings are provided on the inner sides of the two side walls on both sides of the two grooves, corresponding to the positions of the lower outer walls of the water supply and drainage pipes, along the length direction of the water supply and drainage pipes;
[0012] Step 2, after the steel riding caisson shell is sunk to the designed depth, the soil inside the steel riding caisson shell is excavated to a depth that exposes the lower outer wall of the water supply and drainage pipe, and then steel cables are passed through each pair of the rope fixings to form multiple suspension protections arranged along the length direction of the water supply and drainage pipe on the lower outer wall of the water supply and drainage pipe;
[0013] Step 3, continue to excavate the soil to the bottom position of the steel riding caisson shell, use concrete to seal the bottom of the steel riding caisson shell, and pour a cushion layer to the bottom surface height of the bottom plate of the inspection well;
[0014] Step 4: Use the bottom plate and pipeline pad of the inspection well of the prefabricated assembly structure to construct the bottom plate and pipeline pad of the inspection well on the cushion layer;
[0015] Step 5, construct the remaining structure of the inspection well from the bottom plate upwards, and connect the inspection well with the water supply and drainage pipe;
[0016] Step 6: After completing the entire construction of the inspection well, remove all the suspension protection and pipe pads, and break the water supply and drainage pipes.
[0017] In practical applications, the diameter of water supply and drainage pipes is between 2000 and 3000 mm, the inner diameter of the steel caisson shell is usually 4500 mm, and the wall thickness is usually 50 mm.
[0018] Preferably, before executing step 1, more than two circles of overlapping and seamless high-pressure jet grouting piles are arranged below the position where the inspection well is required to be set in the water supply and drainage pipe, starting from the center of the inspection well and extending outward to seal the gap between the water supply and drainage pipe and the soil below the inspection well.
[0019] Preferably, the inner cavity size of each of the grooves is larger than the outer diameter of the water supply and drainage pipe at the corresponding position, and there is a construction gap between the inner cavity and the outer wall of the water supply and drainage pipe at the corresponding position.
[0020] Preferably, in step 2, each of the steel cables of the suspension protection is tensioned and fixed by an anchoring and tensioning device arranged on the inner wall of the steel riding-type caisson shell.
[0021] Preferably, the base plate of the prefabricated assembly structure comprises a plurality of prefabricated base plate blocks arranged in a rectangular array;
[0022] Each of the prefabricated bottom plate blocks is fastened to another adjacent prefabricated bottom plate block by double-headed arc-shaped segment bolts.
[0023] More preferably, a nitrile cork rubber sheet is provided between every two adjacent prefabricated bottom plate blocks for sealing.
[0024] Preferably, the pipeline cushion block of the prefabricated assembly structure includes two cushion block sections symmetrically arranged below the water supply and drainage pipe;
[0025] The side of each of the pad blocks facing the water supply and drainage pipe is an inwardly concave arc that matches the corresponding position of the water supply and drainage pipe, and the side facing the base plate is provided with a tenon structure extending along the length direction of the water supply and drainage pipe. The fixation to the base plate is achieved by clamping the corresponding tenon structure into the corresponding groove on the base plate.
[0026] Preferably, the bottom plate is partially hollowed out and connected via a secondary structure.
[0027] Preferably, a plurality of steel bar connectors are provided around the base plate of the prefabricated assembly structure, and the base plate is connected to the steel bars of the remaining structure through the steel bar connectors.
[0028] Preferably, the remaining structure is a cast-in-place structure or a prefabricated assembled structure.
[0029] Beneficial effects of the present invention:
[0030] The high-strength steel riding-type caisson shell of the present invention adopts a press-in high-strength steel riding-type caisson shell above the pipeline, and steel rope fixings are reserved on the inner wall to ensure the stability of the pipeline during construction and avoid damage to the pipeline.
[0031] The present invention adopts high-pressure jet grouting piles and MJS technology to seal the gap between the steel caisson and the bottom of the pipeline to form a closed water stop ring, while enhancing the stability of the overall structure.
[0032] The present invention adopts an integrated prefabricated assembly type base plate and pipeline pad structure design. The base plate and pipeline pad are composed of a plurality of prefabricated modules. Through on-site assembly and fixation, the on-site construction time is reduced and the construction efficiency is improved.
[0033] The inspection well of the present invention adopts a prefabricated component design, which can be quickly installed and fixed, further reducing on-site construction time.
[0034] The pipeline suspension protection of the present invention has strong safety. During the construction process, high-strength steel cables and suspension devices are used to suspend and protect the water supply and drainage pipelines, ensuring that the pipelines remain stable and are not damaged during the construction process.
[0035] The present invention can realize non-drainage construction, and the steel caisson is sunk in a non-drainage manner for construction, thereby reducing the impact on the surrounding environment and improving the safety of construction.
[0036] The present invention can realize segmented and sectioned lifting. The base plate and the pipeline cushion block are implemented by segmented and sectioned lifting, which is convenient for lifting operation and can adapt to the needs of different construction sites.
[0037] The bottom plate of the present invention is partially designed to be hollowed out and connected through a secondary structure, thereby ensuring the integrity of the bottom plate and adapting to the construction difficulty below the super-large diameter pipeline.
[0038] The pipeline of the present invention only needs to be cut and connected in one to two days after the construction of the inspection well is completed, and there is no need to cut off water supply for a long time during construction.
[0039] The present invention significantly improves construction efficiency and safety, while ensuring the stability and sealing of the pipeline. The use of prefabricated components and flexible design schemes enable the technology to adapt to different construction environments and needs, and has broad application prospects.
[0040] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 A schematic plan view of a steel riding caisson shell when it is sunk in one embodiment of the present invention is shown.
[0042] Figure 2 Showing the present invention Figure 1 Schematic diagram of the AA section.
[0043] Figure 3A schematic diagram showing the suspension of water supply and drainage pipes by multiple suspension protections in one embodiment of the present invention.
[0044] Figure 4 A schematic diagram showing the construction of a bottom plate and a pipeline pad for a manhole in one embodiment of the present invention.
[0045] Figure 5 Showing the present invention Figure 4 Schematic diagram of the cross section along the BB direction.
[0046] Figure 6 A schematic diagram of the structure of a rope fixing member in one embodiment of the present invention is shown.
[0047] Figure 7 A schematic cross-sectional view taken along the EE direction in the present invention 6 is shown.
[0048] Figure 8 A schematic diagram of the connection structure between two adjacent prefabricated bottom plate blocks in one embodiment of the present invention is shown.
[0049] Fig. 9 A schematic structural diagram of the prefabricated bottom plate blocks in one embodiment of the present invention is shown.
[0050] Fig.10 Showing the present invention Fig. 9 Schematic diagram of the CC section.
[0051] Fig.11 A schematic structural diagram of the cushion block division in one embodiment of the present invention is shown.
[0052] Fig.12 Showing the present invention Fig.11 Schematic diagram of the DD section. DETAILED DESCRIPTION
[0053] Example
[0054] like Figures 1 to 7 As shown, the construction method of adding an inspection well through a steel caisson under the condition that the water supply and drainage pipe is not cut off; it is used to set an inspection well in the existing water supply and drainage pipe 3 under the condition that the water supply and drainage pipe is not cut off, and includes the following steps:
[0055] Step 1: sink the water pipe 3 where the inspection well needs to be set up in a non-draining way and press in the steel riding caisson shell 1;
[0056] The steel riding caisson shell 1 is a tubular structure. From the lower end to the middle, two grooves with semicircular bottoms are provided at the side wall positions corresponding to the water supply and drainage pipes 3. On the inner sides of the two side walls on both sides of the two grooves, corresponding to the positions of the lower outer walls of the water supply and drainage pipes 3, a plurality of pairs of rope fixing members 4 are provided along the length direction of the water supply and drainage pipes 3.
[0057] Step 2: After the steel riding caisson shell 1 sinks to the designed depth, the soil inside the steel riding caisson shell 1 is excavated to a depth that exposes the lower outer wall of the water supply and drainage pipe 3, and then a steel cable 5 is passed through each pair of rope fixings 4 to form multiple suspension protections arranged along the length direction of the water supply and drainage pipe 3 on the lower outer wall of the water supply and drainage pipe 3;
[0058] In actual application, high-strength steel cables 5 and several pairs of rope fixings 4 located on the inner wall of the steel riding-type caisson shell 1 are used to form multiple suspension protections at a certain interval, and the water supply and drainage pipes 3 are suspended for protection to ensure that the water supply and drainage pipes 3 remain stable and are not damaged during the construction process.
[0059] Step 3, continue to excavate the soil to the bottom of the steel riding caisson shell 1, use concrete to seal the bottom of the steel riding caisson shell 1, and pour the cushion layer to the bottom surface height of the bottom plate of the inspection well;
[0060] Step 4: Use the bottom plate and pipe pads of the inspection well with prefabricated assembled structures to construct the bottom plate and pipe pads of the inspection well on the cushion layer;
[0061] Step 5: construct the remaining structure 8 of the inspection well from the bottom plate upwards, and connect the inspection well to the water supply and drainage pipe 3;
[0062] Step 6: After completing the entire construction of the inspection well, remove all pipe suspension protection and pipe pads, and break the water supply and drainage pipe 3.
[0063] By setting multiple suspension protections at the position of the lower outer wall of the water supply and drainage pipe 3 corresponding to the steel riding-type caisson shell 1, the construction of additional inspection wells for the water supply and drainage pipe 3 is realized under the condition of continuous water supply, which has important practical application value and broad market prospects.
[0064] Although the construction technology of steel riding caisson shell 1 has made significant progress in the prior art, there are still many challenges in complex projects such as adding inspection wells to super-large diameter water supply and drainage pipes 3 of 2000 to 3000 mm. For example, how to carry out construction without water interruption and how to ensure the stability and safety of the pipeline during construction are all urgent problems to be solved.
[0065] The innovative technologies and construction methods of the present invention, such as the development and application of the water-free suspension of steel casing and the assembled base plate construction system, for the above-mentioned problems have important practical significance and broad application prospects.
[0066] In practical applications, the diameter of the water supply and drainage pipe 3 is 2000 to 3000 mm, the inner diameter of the steel riding caisson shell 1 is usually 4500 mm, and the wall thickness is usually 50 mm.
[0067] like Figure 1 and Figure 2 As shown, in certain embodiments, before executing step 1, more than two circles of overlapping and seamless high-pressure jet grouting piles 2 are arranged from the center of the corresponding inspection well below the position where the inspection well is required to be set up in the water supply and drainage pipe 3 to seal the gap between the water supply and drainage pipe 3 and the soil below the inspection well.
[0068] In practical applications, the reinforcement body formed by the steel riding caisson shell 1 and the high-pressure rotary jet piles 2 can form an effective enclosure and water-stopping structure, so that the subsequent construction process can be carried out in a non-drainage sinking construction under the effective enclosure and water-stopping structure.
[0069] Since the diameter of the water supply and drainage pipe 3 is between 2000 and 3000 mm, a high-pressure rotary jet pile 2 with a diameter of 2600 mm and a depth of 2000 mm is selected, that is, MJS can ensure that during the construction process of the bevel angle, the gap between the steel riding-type caisson shell 1 and the water supply and drainage pipe 3 can be fully filled, thereby forming a closed water stop ring.
[0070] Moreover, since an open groove is provided at the lower end of the steel riding-type caisson shell 1, its side wall bearing capacity is relatively weak. The MJS can also serve as a reinforcement body to jointly participate in the force during the excavation of the lower part of the water supply and drainage pipe 3, thereby enhancing the stability of the overall structure of the steel riding-type caisson shell 1 suspending the water supply and drainage pipe 3.
[0071] In some embodiments, the inner cavity size of each groove is larger than the outer diameter of the water supply and drainage pipe 3 at the corresponding position, and there is a construction gap between the inner cavity and the outer wall of the water supply and drainage pipe 3 at the corresponding position.
[0072] In practical applications, there is a construction gap between each groove corresponding to the water supply and drainage pipe 3 at the lower end of the steel riding caisson shell 1 and the outer wall of the water supply and drainage pipe 3 at the corresponding position, which can avoid damage to the water supply and drainage pipe 3 during the construction process.
[0073] like Figures 8 to 10 As shown, in certain embodiments, in step 2, each suspended protective steel cable 5 is tensioned and fixed by an anchoring and tensioning device arranged on the inner wall of the steel riding-type caisson shell 1.
[0074] In practical applications, each suspended protective steel cable 5 is tensioned and fixed by an anchoring and tensioning device arranged on the inner wall of the steel riding-type caisson shell 1, which can ensure the suspension stability of the water supply and drainage pipe 3 during construction.
[0075] As shown in some embodiments, the base plate of the prefabricated assembly structure includes a plurality of prefabricated base plate blocks 6 arranged in a rectangular array;
[0076] Each prefabricated bottom plate block 6 is fastened to another adjacent prefabricated bottom plate block 6 by double-headed arc-shaped segment bolts.
[0077] In some embodiments, a nitrile cork rubber sheet 10 is provided between every two adjacent prefabricated bottom plate blocks 6 for sealing.
[0078] In practical applications, the thickness of the nitrile cork rubber sheet 10 is generally 6 mm.
[0079] like Fig.11 and Fig.12 As shown, in some embodiments, the pipeline spacer of the prefabricated assembly structure includes two spacer blocks 7 symmetrically arranged below the water supply and drainage pipe 3;
[0080] The side of each pad block 7 facing the water supply and drainage pipe 3 is an inwardly concave arc that matches the corresponding position of the water supply and drainage pipe 3, and the side facing the bottom plate is provided with a tenon structure 71 extending along the length direction of the water supply and drainage pipe 3. The fixation with the bottom plate is achieved by clamping the corresponding tenon structure 71 into the corresponding groove 61 on the bottom plate.
[0081] In practical applications, a plurality of prefabricated bottom plate blocks 6 and cushion block blocks 7 arranged in a rectangular array of an integrated prefabricated assembly structure are used to form the bottom plate and pipe cushion blocks of the inspection well, and the lifting can be carried out in sections and pipe sections, which is more convenient.
[0082] The bottom plate and pipe pads are composed of multiple prefabricated modules, which are assembled and fixed on site to form a complete inspection well bottom structure.
[0083] The remaining structure 8 of the inspection well is connected to the original water supply and drainage pipe 3 by post-casting, and a circle of water-swelling waterstop strips is set at the interface between the new and old concrete structures to ensure the sealing and stability of the connection.
[0084] In some embodiments, the bottom plate is partially hollowed out and connected via a secondary structure.
[0085] Since the extra-large diameter of the water supply and drainage pipe 3 of 2000 to 3000 mm limits the construction space below, and the long-term suspension of the water supply and drainage pipe 3 and the long-term exposure of the steel riding-type caisson shell 1 will affect the surrounding safety, in order to ensure the integrity of the bottom plate, the bottom plate is partially designed to be hollowed out and connected through a secondary structure.
[0086] In some embodiments, a plurality of steel bar connectors are provided around the base plate of the prefabricated assembly structure, and are connected to the steel bars of the remaining structure 8 through the steel bar connectors.
[0087] In some embodiments, the remaining structure 8 is a cast-in-place structure or a prefabricated assembled structure.
[0088] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.
Claims
1. A construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are not cut off; used to set up an inspection well in an existing water supply and drainage pipe (3) under the condition that water supply and drainage pipes are not cut off; characterized in that: The steps include: Step 1: sinking the inspection well at the location where the water supply and drainage pipe (3) needs to be set up in a non-draining manner, and pressing in a steel riding-type caisson shell (1); The steel riding caisson shell (1) is a tubular structure, and two grooves with semicircular bottoms are provided from the lower end to the middle at the side wall positions corresponding to the water supply and drainage pipe (3), and a plurality of pairs of rope fixing members (4) are provided along the length direction of the water supply and drainage pipe (3) on the inner sides of the two side walls on both sides of the two grooves, corresponding to the positions of the lower outer walls of the water supply and drainage pipe (3); Step 2, after the steel riding caisson shell (1) sinks to the designed depth, the soil inside the steel riding caisson shell (1) is excavated to a depth that exposes the lower outer wall of the water supply and drainage pipe (3), and then a steel cable (5) is passed through each pair of the rope fixing members (4), so as to form a plurality of suspension protections arranged along the length direction of the water supply and drainage pipe (3) on the lower outer wall of the water supply and drainage pipe (3); Step 3, continue to excavate the soil to the bottom position of the steel riding type caisson shell (1), use concrete to carry out bottom sealing construction at the bottom of the steel riding type caisson shell (1), and pour the cushion layer to the bottom surface height of the bottom plate of the inspection well; Step 4: Use the bottom plate and pipeline pad of the inspection well of the prefabricated assembly structure to construct the bottom plate and pipeline pad of the inspection well on the cushion layer; Step 5, constructing the remaining structure (8) of the inspection well from the bottom plate upwards, and connecting the inspection well with the water supply and drainage pipe (3); Step 6: After completing all the construction of the inspection well, remove all the suspension protection and pipe pads, and break the water supply and drainage pipes (3). In practical applications, the diameter of the water supply and drainage pipe (3) is between 2000 and 3000 mm, the inner diameter of the steel riding caisson shell (1) is usually 4500 mm, and the wall thickness is usually 50 mm.
2. The construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are not cut off according to claim 1, characterized in that: Before executing step 1, two or more circles of overlapping and seamless high-pressure jet grouting piles (2) are arranged below the position where the inspection well is to be set in the water supply and drainage pipe (3), starting from the center of the inspection well and extending outward to seal the gap between the water supply and drainage pipe (3) and the soil below the inspection well.
3. The construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are not cut off according to claim 1, characterized in that: The inner cavity size of each groove is larger than the outer diameter of the water supply and drainage pipe (3) at the corresponding position, and there is a construction gap between the inner cavity and the outer wall of the water supply and drainage pipe (3) at the corresponding position.
4. The construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are not cut off according to claim 1, characterized in that: In step 2, each of the steel cables (5) for suspension protection is tensioned and fixed by an anchoring and tensioning device arranged on the inner wall of the steel riding-type caisson shell (1).
5. The construction method for adding an inspection well through a steel caisson under the condition of water supply and drainage pipes not being cut off according to claim 1 is characterized in that: The base plate of the prefabricated assembly structure comprises a plurality of prefabricated base plate blocks (6) arranged in a rectangular array; Each of the prefabricated bottom plate blocks (6) is fastened to another adjacent prefabricated bottom plate block (6) by means of double-headed arc-shaped segment bolts.
6. The construction method for adding an inspection well through a steel caisson under the condition that water supply and drainage pipes are not cut off according to claim 5, characterized in that: A nitrile cork rubber sheet (10) is provided between each two adjacent prefabricated bottom plate blocks (6) for sealing.
7. The construction method for adding an inspection well through a steel caisson under the condition of water supply and drainage pipes not being cut off according to claim 1 is characterized in that: The pipeline cushion block of the prefabricated assembly structure comprises two cushion block segments (7) symmetrically arranged below the water supply and drainage pipe (3); The side of each of the cushion block segments (7) facing the water supply and drainage pipe (3) is an inwardly concave arc that matches the corresponding position of the water supply and drainage pipe (3), and the side facing the base plate is provided with a tenon structure (71) extending along the length direction of the water supply and drainage pipe (3), and the corresponding tenon structure (71) is clamped into the corresponding groove (61) on the base plate to achieve fixation with the base plate.
8. The construction method for adding an inspection well through a steel caisson under the condition of water supply and drainage pipes not being cut off according to claim 1 is characterized in that: The bottom plate is partially hollowed out and connected via a secondary structure.
9. The construction method for adding an inspection well through a steel caisson under the condition of water supply and drainage pipes not being cut off according to claim 1 is characterized in that: A plurality of steel bar connectors are arranged around the base plate of the prefabricated assembly structure, and are connected to the steel bars of the remaining structure (8) through the steel bar connectors.
10. The construction method for adding an inspection well through a steel caisson under the condition of water supply and drainage pipes not being cut off according to claim 1 is characterized in that: The remaining structure (8) is a cast-in-place structure or a prefabricated assembled structure.