Construction method for adjusting lifting height of construction hoist for variable-cross-section variable-floor-height building

By setting adjustment brackets and embedded steel plates in variable-section buildings and adjusting the height of the steel frame, the problem of difficulty in lifting traditional construction elevators in variable-section buildings is solved, efficient and low-cost mechanical vertical transportation is achieved, and complex building structures are met construction requirements.

CN118911433APending Publication Date: 2024-11-08THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410899837.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-05
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Traditional construction elevators can only be used in conventional cross-section high-rise buildings, with limited lifting heights and difficult to adapt to variable cross-sectional variable-rise buildings, resulting in low construction efficiency and high cost, and cannot meet the requirements of green construction and quality and safety.

Method used

A construction method was designed, by setting adjustment brackets and embedded steel plates at variable cross-sectional positions, adjusting the height of the steel frame, installing main legs, secondary legs and support legs, ensuring the stable lift of the construction elevator to the highest building elevation, which is suitable for in various floor structures.

Benefits of technology

It realizes efficient use of construction elevators in variable-section buildings, reduces the number of tower cranes, reduces labor costs, expands the height of construction elevators, and meets the mechanical vertical transportation needs of complex building structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911433A_ABST
    Figure CN118911433A_ABST
Patent Text Reader

Abstract

The invention provides a construction method for adjusting the lifting height of a construction elevator for a variable-section variable-floor-height building. The construction method comprises the steps that the arrangement positions of the construction elevator and an adjusting support are determined; determining the height of an adjusting support steel frame; the mounting positions of the main supporting leg embedded steel plate and the auxiliary supporting leg track embedded steel plate are determined and fixed through chemical bolts; the main supporting leg is hinged to the embedded steel plate, and the auxiliary supporting leg is installed on the auxiliary supporting leg track; assembling a left supporting leg and a right supporting leg between the main supporting leg and the auxiliary supporting leg; according to the application condition that the construction elevator needs to be lifted to the top face of the main body structure, supporting legs are additionally arranged in the stand columns to enhance the earthquake resistance of the structure. The purpose that the use height of the construction elevator is increased to the highest elevation of a building is achieved, the construction elevator can be suitable for various floor structural forms by adjusting the structural form of the frame, mechanical vertical transportation full coverage of people, machines and materials is achieved, the hoisting times of a tower crane and the labor cost are reduced, and the construction efficiency is improved. The problem of lifting of the lifter under the variable cross-section condition in a complex building structure is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method for adjusting the lifting height of a construction elevator for a building with variable cross-section and variable floor height. Background Art

[0002] With the development of construction technology, as the mainstream and symbolic type of super high-rise buildings in the city, the number of architectural structures with different design styles is increasing, and the number of buildings with variable cross-sections and varied exterior wall shapes is increasing. The mechanical equipment originally used for construction needs to adapt to more diversified application scenarios. Under the premise of increasing use requirements, it is very important to reduce the use cost and achieve the use effect, and meet the current requirements of green construction, quality and safety, recyclability, simple installation, easy operation, and safety. As an important means of vertical transportation for people, machines, and materials, construction elevators are indispensable in engineering projects; traditional construction elevators can only be used in conventional cross-section high-rise buildings, and the lifting height is limited, which limits their application. During construction, they need to cooperate with tower cranes for multiple lifting constructions, and the construction efficiency is not high. In order to solve the above technical problems, the present invention designs a construction method for adjusting the lifting height of a construction elevator for buildings with variable cross-sections and variable floor heights. Summary of the invention

[0003] In view of the shortcomings in the prior art, the present invention provides a construction method for adjusting the lifting height of a construction elevator for buildings with variable cross-sections and variable storey heights, which solves the problem of elevator lifting under variable cross-section conditions in complex building structures.

[0004] The present invention achieves the above technical objectives through the following technical means.

[0005] A construction method for adjusting the lifting height of a construction elevator for a building with a variable cross-section and variable floor height, comprising the following steps: Step 1: Determine the layout of the construction elevator and the location of the adjustment bracket according to the design drawing; Step 2: Design and calculate a reasonable steel structure base layout for the adjustment bracket, and determine the height of the steel frame of the adjustment bracket according to the height of the construction elevator; Step 3: Find the position where the span width matches the floor beam at the floor cross-section variable position, determine the installation position of the main leg embedded steel plate and the auxiliary leg track embedded steel plate, and fix them with chemical bolts; Step 4: hinge the processed main leg with the embedded steel plate, and install the processed auxiliary leg on the auxiliary leg track; Step 5: Assemble the left leg and the right leg between the main leg and the auxiliary leg; Step 6: For applications where the construction elevator needs to be raised to the top of the main building structure, additional support legs are added between the secondary legs to enhance the seismic resistance of the structure.

[0006] Furthermore, in the step 1, the floor interval of the variable cross-section structure is first determined according to the on-site drawings; when the upper floor slab retreats and the construction elevator wall support parts can no longer meet the wall support requirements, the adjustment brackets are arranged starting from the next floor where the floor slab retreats according to the usage requirements and intervals. If the retreat floor is more than one floor, the support legs are pre-embedded and connected to the floor edge ring beam. If the upper floor protrudes and the construction elevator wall support parts can no longer meet the wall support requirements, the device is installed in reverse at the bottom of the protruding floor, and the construction elevator is installed in the same way.

[0007] Furthermore, in step 3, three embedded steel plates are set on the auxiliary leg track, and one embedded steel plate is set on the main leg. The floor structure is matched according to the preset position, and the steel plates are embedded at the strong stress points of the structure; after the embedded steel plates of the auxiliary leg track are set, the auxiliary leg track is welded and fixed to the embedded steel plates.

[0008] Furthermore, in step 6, first determine whether it is necessary to install the support leg based on the force calculation; if it is necessary to install the support leg, select different types of support legs according to the spacing of the auxiliary legs; then fix the connection node between the auxiliary leg and the support leg through the upper fixing device of the auxiliary leg.

[0009] The present invention has the following beneficial effects: The present invention expands the application of construction elevators at floors with variable cross-sections and floors with excessive heights, thereby achieving the goal of raising the use height of the construction elevator to the highest elevation of the building. The invention can be adapted to a variety of floor structures by adjusting the frame structure, and achieves full coverage of mechanical vertical transportation of people, machines and materials through convenient disassembly and assembly of mechanical components, thereby reducing the number of tower crane hoists and labor costs, solving the problem of elevator lifting under variable cross-section conditions in complex building structures, and achieving the goal of raising the maximum lifting height of the construction elevator to the highest floor of the structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 This is a schematic diagram of the auxiliary leg track; Figure 2 Schematic diagram of the main outrigger; Figure 3 This is a schematic diagram of the left leg; Figure 4 It is a schematic diagram of the auxiliary outrigger; Figure 5 Schematic diagram of the supporting legs; Figure 6 Schematic diagram of the minimum opening and closing angle; Figure 7 Schematic diagram of maximum opening and closing angle; In the figure: 1-support leg; 2-auxiliary leg track; 3-main leg; 4-auxiliary leg; 5-left leg; 6-right leg; DETAILED DESCRIPTION

[0011] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.

[0012] Reference Figures 1 to 7 The construction method for adjusting the lifting height of a construction elevator for a building with a variable cross-section and variable floor height according to the present invention comprises the following steps: Step 1: Determine the approximate location of the construction elevator according to the design drawing and identify the location for setting the adjustment bracket; First, determine the floor interval of the variable-section structure according to the on-site drawings; when the upper floor slab retreats and the construction elevator wall support parts can no longer meet the wall support requirements, arrange the adjustment brackets starting from the next floor where the floor slab retreats according to usage requirements and intervals. If the retreat floor is more than one floor, the support leg 1 can be pre-embedded and connected with the floor edge ring beam. If the upper floor protrudes and the construction elevator wall support parts can no longer meet the wall support requirements, the device can be installed in reverse at the bottom of the protruding floor and the construction elevator can be installed in the same way.

[0013] Step 2: Calculate the reasonable steel structure base layout through design, and determine the steel frame height according to the construction elevator height; When setting up embedded points on floors, in-depth design force calculations are required to determine the specific embedded points; in order to meet standardization requirements for installation, uniform chemical bolt specifications must be determined; the specifications and quantity of embedded bolts must be determined based on the total height of the floor in use.

[0014] Step 3: According to the position determined in step 2, find the position where the span width matches the floor beam at the floor cross-section variable position, determine the installation position of the embedded steel plate of the main leg 3 and the embedded steel plate of the auxiliary leg track 2, and fix them with chemical bolts; Among them, three embedded steel plates are set on the auxiliary leg track 2, and one embedded steel plate is set on the main leg 3. The floor structure is matched according to the preset position, and the steel plates are embedded at the strong stress points of the structure as much as possible; after the embedded steel plates are set, the auxiliary leg track 2 is welded and fixed to the embedded steel plates.

[0015] Step 4: Hinged the processed vertical support (main support leg 3) with the embedded steel plate, installed the processed vertical support (auxiliary support leg 4) on the auxiliary support leg track 2, and adjusted the upper position of the auxiliary support leg 4 according to the size of the construction elevator car used.

[0016] Step 5: Assemble the upper connecting beam (left leg 5, right leg 6), fix the left leg 5 and the right leg 6 through the upper fixing devices of the main leg 3 and the auxiliary leg 4, and connect the main leg 3 with the auxiliary leg 4 through the left leg 5 and the right leg 6.

[0017] Step 6: For applications where the construction elevator needs to be raised to the top surface of the main structure, a connecting beam (support leg 1) can be added to the column to enhance the seismic resistance of the structure; First, according to the force calculation, determine whether it is necessary to install the support leg 1; If it is necessary to install the support legs 1, different models of support legs 1 are selected according to the spacing of the auxiliary legs 4; Then, the connection node between the auxiliary leg 4 and the supporting leg 1 is fixed by the upper fixing device of the auxiliary leg 4 .

[0018] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.

Claims

1. A construction method for adjusting the lifting height of a construction elevator for a building with a variable cross-section and variable floor height, It is characterized in that The process includes the following: Step 1: Determine the layout of the construction elevator and the location of the adjustment bracket according to the design drawing; Step 2: Design and calculate a reasonable steel structure base layout for the adjustment bracket, and determine the height of the steel frame of the adjustment bracket according to the height of the construction elevator; Step 3: Find the position where the span width matches the floor beam at the floor cross-section variable position, determine the installation position of the embedded steel plate of the main leg (3) and the embedded steel plate of the auxiliary leg track (2), and fix them with chemical bolts; Step 4: hinge the processed main support leg (3) with the embedded steel plate, and install the processed auxiliary support leg (4) on the auxiliary support leg track (2); Step 5: Assemble the left supporting leg (5) and the right supporting leg (6) between the main supporting leg (3) and the auxiliary supporting leg (4); Step 6: For applications where the construction elevator needs to be raised to the top surface of the main structure of the building, additional support legs (1) are provided between the auxiliary legs (4) to enhance the seismic resistance of the structure.

2. The construction method for adjusting the lifting height of a construction elevator for a building with a variable cross-section and variable height according to claim 1, It is characterized in that In the step 1, first determine the floor interval of the variable cross-section structure according to the on-site drawings; when the upper floor slab retreats and the construction elevator wall support parts can no longer meet the wall support requirements, arrange the adjustment brackets starting from the next floor where the floor slab retreats according to the use requirements and intervals. If the retreat floor is more than one floor, the support legs are pre-embedded and connected to the floor edge ring beam. If the upper floor protrudes and the construction elevator wall support parts can no longer meet the wall support requirements, the device is installed in reverse at the bottom of the protruding floor, and the construction elevator is installed in the same way.

3. The construction method for adjusting the lifting height of a construction elevator for a building with a variable cross-section and variable height according to claim 1, It is characterized in that In step 3, three embedded steel plates are provided on the auxiliary leg track (2), and one embedded steel plate is provided on the main leg (3). The floor structure is matched according to the preset position, and the steel plates are embedded at the strong stress points of the structure. After the embedded steel plates of the auxiliary leg track (2) are provided, the auxiliary leg track (2) is welded and fixed to the embedded steel plates.

4. The construction method for adjusting the lifting height of a construction elevator for a building with a variable cross-section and variable height according to claim 1, It is characterized in that In step 6, firstly, based on the force calculation, it is determined whether the support leg (1) needs to be installed; if the support leg (1) needs to be installed, different types of support legs (1) are selected based on the spacing of the auxiliary legs (4); and then, the connection node between the auxiliary legs (4) and the support leg (1) is fixed by the upper fixing device of the auxiliary legs (4).