Extracting type construction ventilation system for extra-long high-gas tunnel

Through the combined structure of anchor rods and fixed components, the ventilation duct of special-length high-gas tunnel is easily installed and lengthened, solving the problem of low construction efficiency during the lengthening of ventilation ducts, and improving construction efficiency and safety.

CN118911763APending Publication Date: 2024-11-08CHENGDU CONSTR ENG GROUP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411006981.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the construction of extra-length high-gas tunnels, ventilation ducts need to be frequently lengthened, resulting in low construction efficiency. The existing technology needs to be installed through equipment such as tripods, which affects efficiency.

Method used

The combined structure of anchor rod, fixing rod, fixing sleeve, fixing assembly and connecting assembly is adopted. The anchor rod is preset on the top of the tunnel, and the fixing assembly and connecting assembly are used to facilitate installation and lengthening of the ventilation duct, without the need for tools such as a tripod.

Benefits of technology

It realizes convenient installation and lengthening of ventilation ducts, improves construction efficiency, simplifies the construction process, and improves construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911763A_ABST
    Figure CN118911763A_ABST
Patent Text Reader

Abstract

The invention relates to an extra-long high-gas tunnel extraction type construction ventilation system, and belongs to the technical field of tunnel construction. The device comprises an axial flow fan and a ventilation pipe arranged on the axial flow fan, and further comprises an anchor rod, a fixing rod, a fixing sleeve, a fixing assembly and a connecting assembly, the anchor rod is pre-arranged at the top of a tunnel, an inserting groove allowing the fixing rod to be inserted is formed in the tail end of the anchor rod, and the fixing assembly is arranged on the anchor rod; the fixing assembly is used for fixing the fixing rod inserted into the inserting groove to an anchor rod, the fixing sleeve is arranged at the other end of the fixing rod, the ventilating pipes are sleeved with the fixing sleeve, the two ends of each ventilating pipe are each provided with a step face, the adjacent ventilating pipes are connected in an inserted mode through the step faces, and the connecting assembly is arranged on the ventilating pipes. The connecting assemblies are used for fixing the adjacent ventilation pipes. The construction method has the effect of improving the construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of tunnel construction technology, and in particular to an extraction-type construction ventilation system for an extra-long high-gas tunnel. Background Art

[0002] The extra-long high-gas tunnel is a type of tunnel with special engineering geological conditions and high risks. Its geological conditions are complex, the construction process needs to pass through multiple strata, and there are dangerous gases such as gas in the tunnel. Strict gas monitoring and ventilation measures are required to ensure construction safety.

[0003] When excavating extra-long tunnels with high gas content, commonly used ventilation methods generally include forced ventilation, tunnel ventilation, mixed ventilation and exhaust ventilation. Exhaust ventilation usually involves installing a high-power axial flow fan in the tunnel, and extracting the air in the tunnel through the layout of ventilation ducts, thereby discharging gas and harmful gases out of the tunnel, and forming a negative pressure in the tunnel, allowing fresh air from the outside to enter the tunnel.

[0004] As the tunnel is excavated, the ventilation ducts need to be gradually lengthened. However, the ventilation ducts are generally installed at the top of the tunnel, and they need to be frequently lengthened and installed using equipment such as tripods, which affects construction efficiency. Summary of the invention

[0005] In order to improve construction efficiency, the present application provides an extra-long high-gas tunnel extraction-type construction ventilation system.

[0006] The present application provides an extra-long high-gas tunnel extraction type construction ventilation system adopts the following technical solution: A special-length high-gas tunnel extraction-type construction ventilation system, comprising an axial flow fan and a ventilation pipe arranged on the axial flow fan, and also comprising an anchor rod, a fixing rod, a fixing sleeve, a fixing assembly and a connecting assembly, wherein the anchor rod is preset at the top of the tunnel, and a slot for inserting the fixing rod is provided at the end of the anchor rod, and the fixing assembly is provided on the anchor rod, and the fixing assembly is used to fix the fixing rod inserted into the slot to the anchor rod, and the fixing sleeve is provided at the other end of the fixing rod, and the fixing sleeve is sleeved on the ventilation pipe, and step surfaces are provided at both ends of the ventilation pipe, and adjacent ventilation pipes are connected through the step surfaces, and the connecting assembly is provided on the ventilation pipe, and the connecting assembly is used to fix adjacent ventilation pipes.

[0007] Optionally, the fixing component includes steel balls, and a fixing groove with an inclined bottom wall is opened around the inner wall of the slot, and the fixing groove is deep at one end close to the top wall of the tunnel. A plurality of steel balls are arranged in the fixing groove, and when the fixing rod is inserted into the slot, one side of the steel ball conflicts with the fixing rod and the other side conflicts with the fixing rod.

[0008] Optionally, a retaining frame is provided on the anchor rod and located in the fixing groove. The retaining frame is an annular plate body, and the outer wall of the retaining frame is parallel to the bottom wall of the fixing groove, and the inner wall of the retaining frame is flush with the inner wall of the slot. The retaining frame is provided with a plurality of trumpet holes for accommodating steel balls.

[0009] Optionally, a first spring is arranged in the anchor rod and in the fixing groove, one end of the first spring is connected to the anchor rod, and the other end is connected to the retaining frame, and the first spring makes the retaining frame always have a tendency to move away from the top wall of the tunnel.

[0010] Optionally, the step surface includes an outer step surface and an inner step surface, the inner step surface and the outer step surface are respectively located at two ends of the ventilation duct, the inner diameter of the outer step surface is adapted to the outer diameter of the inner step surface, the connecting component is arranged on the outer step surface, and the connecting component is used to fix the inner step surface inserted into the outer step surface.

[0011] Optionally, the connecting assembly includes a limit block and a second spring. A limit groove with an inclined bottom wall is formed on the inner wall of the outer step surface. The limit groove is shallow toward one end of the ventilation pipe body. The limit block is a wedge-shaped block, and the limit block is slidably arranged in the limit groove. The second spring is arranged in the limit groove and connected to the wedge-shaped block. The second spring makes the limit block always have a tendency to move away from the ventilation pipe body.

[0012] Optionally, a plurality of the limiting grooves are arranged around the inner wall of the outer step surface, and a limiting block and a second spring are arranged in each of the plurality of limiting grooves.

[0013] Optionally, a rubber ring gasket is provided at the end of the inner step surface.

[0014] In summary, the present application includes at least one of the following beneficial technical effects: 1. The anchor rod is preset at the top of the tunnel during tunnel construction. As the tunnel is excavated, when the ventilation pipe needs to be lengthened, the fixing sleeve is put on the ventilation pipe to be installed, and the ventilation pipe and the fixing sleeve are lifted so that the fixing rod is inserted into the slot of the anchor rod. At this time, the fixing assembly fixes the fixing rod inserted into the anchor rod, thereby fixing the ventilation pipe. Then, the ventilation pipe to be installed is slidably plugged into the original ventilation pipe through tools, and the connecting assembly fixes the ventilation pipe to be installed to the original ventilation pipe, thereby installing and fixing the ventilation pipe; making the installation and lengthening of the ventilation pipe convenient, there is no need to install the ventilation pipe through tools such as tripods, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application.

[0016] Figure 2It is a cross-sectional view used to show the ventilation pipe structure in the embodiment of the present application.

[0017] Figure 3 yes Figure 2 Enlarged view of part A in the middle.

[0018] Figure 4 yes Figure 2 Enlarged view of part B in the middle.

[0019] Description of reference numerals: 1. Axial flow fan; 2. Ventilation duct; 21. Outer step surface; 22. Inner step surface; 23. Limiting groove; 3. Anchor rod; 31. Slot; 32. Fixing groove; 4. Fixing rod; 5. Fixing sleeve; 6. Fixing group; 61. Steel ball; 62. Retaining frame; 621. Horn hole; 63. First spring; 7. Connecting assembly; 71. Limiting block; 72. Second spring. DETAILED DESCRIPTION

[0020] The following is combined with Figure 1-4 This application is described in further detail.

[0021] The present application embodiment discloses an extra-long high-gas tunnel extraction type construction ventilation system, referring to Figure 1 and Figure 2 The extra-long high-gas tunnel extraction-type construction ventilation system includes an axial flow fan 1 and a ventilation pipe 2. The axial flow fan 1 is arranged outside the tunnel. According to the design requirements of the tunnel construction, an adapted high-power axial flow fan 1 is used. The ventilation pipe 2 is arranged on the axial flow fan 1 and extends to the inside of the tunnel. The extra-long high-gas tunnel extraction-type construction ventilation system also includes an anchor rod 3, a fixing rod 4, a fixing sleeve 5, a fixing group 6 and a connecting assembly 7. The anchor rod 3 is a metal rod body. The anchor rod 3 is preset at the top of the tunnel during the tunnel construction process, and the end of the anchor rod 3 extends vertically downward. A slot 31 for inserting the fixing rod 4 is opened at the end of the anchor rod 3. The cross section of the slot 31 is circular and is coaxially arranged with the anchor rod 3. The fixing group 6 is arranged on the anchor rod 3. When the fixing rod 4 is inserted into the anchor rod 3 through the slot 31, the fixing group 6 is used to fix the fixing rod 4 to the anchor rod 3. The fixing sleeve 5 is an annular plate body, the inner diameter of the fixing sleeve 5 is adapted to the outer diameter of the ventilation pipe 2 and is sleeved outside the ventilation pipe 2, and the fixing sleeve 5 is fixedly arranged at the other end of the fixing rod 4. Both ends of the ventilation pipe 2 are provided with step surfaces, and adjacent ventilation pipes 2 are plugged through the step surfaces. The connecting assembly 7 is arranged on the ventilation pipe 2, and the connecting assembly 7 is used to fix the adjacent ventilation pipes 2.

[0022] The anchor rod 3 is preset at the top of the tunnel during tunnel construction. As the tunnel is excavated, when it is necessary to lengthen the ventilation pipe 2, the fixing sleeve 5 is put on the ventilation pipe 2 to be installed, and the ventilation pipe 2 and the fixing sleeve 5 are lifted, so that the fixing rod 4 is inserted into the slot 31 of the anchor rod 3. At this time, the fixing assembly 6 fixes the fixing rod 4 inserted into the anchor rod 3, thereby fixing the ventilation pipe 2, and then the ventilation pipe 2 to be installed is slidably plugged into the original ventilation pipe 2 through tools, and the connecting assembly 7 fixes the ventilation pipe 2 to be installed to the original ventilation pipe 2, thereby installing and fixing the ventilation pipe 2; making the installation and lengthening operation of the ventilation pipe 2 convenient, there is no need to install the ventilation pipe 2 through tools such as a tripod, thereby improving construction efficiency.

[0023] Reference Figure 2 and Figure 3 The fixing assembly 6 includes a steel ball 61. A fixing groove 32 with an inclined bottom wall is provided around the inner wall of the slot 31. The fixing groove 32 has a deep depth at one end close to the tunnel top wall and a shallow depth at the end away from the tunnel top wall. A plurality of steel balls 61 are provided around the fixing groove 32. When the fixing rod 4 is inserted into the slot 31, the steel ball 61 always keeps one side in contact with the fixing rod 4 and the other side in contact with the fixing rod 4 under the action of gravity. Furthermore, a retainer 62 is provided on the anchor rod 3 and located in the fixing groove 32. The retainer 62 is an annular plate body, and the outer wall of the retainer 62 is parallel to the bottom wall of the fixing groove 32, and the inner wall of the retainer 62 is flush with the inner wall of the slot 31. A plurality of trumpet holes 621 for accommodating the steel balls 61 are provided on the retaining frame 62. The trumpet holes 621 have a large aperture at one end away from the axis of the retaining frame 62, and a small aperture at one end close to the axis of the retaining frame 62. The retaining frame 62 limits the plurality of steel balls 61 in the fixing groove 32. Furthermore, a first spring 63 is provided in the anchor rod 3 and in the fixing groove 32. One end of the first spring 63 is connected to the anchor rod 3, and the other end of the first spring 63 is connected to the retaining frame 62. The first spring 63 is sleeved outside the inserted fixing rod 4. The first spring 63 makes the retaining frame 62 always have a tendency to move away from the top wall of the tunnel.

[0024] When the fixing rod 4 is inserted into the slot 31, the fixing rod 4 has a tendency to drive the steel ball 61 and the retaining frame 62 to move upward along the fixing slot 32. Since the upper end of the fixing slot 32 is deep, the gap between the fixing rod 4 and the steel ball 61 tends to increase, so that the fixing rod 4 can be smoothly inserted into the slot 31; and under the action of gravity and the elastic force of the first spring 63, the steel ball 61 always keeps one side in contact with the fixing rod 4 and the other side in contact with the bottom wall of the fixing slot 32, so that when the fixing rod 4 has a tendency to move downward away from the anchor rod 3, the plurality of steel balls 61 clamp the fixing rod 4 in the anchor rod 3, thereby fixing the fixing rod 4. And the fixing rod 4 can be automatically self-locked and fixed after being inserted into the anchor rod 3, so as to facilitate the installation of the ventilation pipe 2.

[0025] Reference Figure 2 and Figure 4 The step surface includes an outer step surface 21 and an inner step surface 22. The inner step surface 22 and the outer step surface 21 are respectively located at the two ends of the ventilation pipe 2. The inner diameter of the outer step surface 21 matches the outer diameter of the inner step surface 22. The inner step surface 22 of the ventilation pipe 2 can be inserted into the outer step surface 21 of the adjacent ventilation pipe 2. The connecting component 7 is arranged on the outer step surface 21. The connecting component 7 is used to fix the inner step surface 22 inserted into the outer step surface 21. The connecting component 7 includes a stopper 71 and a second spring 72. A stopper groove 23 with an inclined bottom wall is provided on the inner wall of the outer step surface 21. The stopper groove 23 has a shallow depth at one end facing the ventilation pipe 2 body and a deep depth at the end away from the ventilation pipe 2 body. The stopper block 71 is a wedge-shaped block. The stopper block 71 is slidably arranged in the stopper groove 23. One side of the stopper block 71 is parallel to the bottom wall of the stopper groove 23, and the other side of the stopper block 71 is flush with the inner wall of the outer step surface 21. The second spring 72 is arranged in the limiting groove 23 and connected to the wedge block, and the second spring 72 makes the limiting block 71 always have a tendency to move away from the main body of the ventilation pipe 2. Further, guide blocks are arranged on both sides of the limiting block 71, and guide grooves are opened on the two side walls of the limiting groove 23, and the guide grooves are parallel to the bottom wall of the limiting groove 23, and the guide blocks are slidably arranged in the guide grooves.

[0026] When the inner step surface 22 is inserted into the outer step surface 21, the inner step surface 22 pushes the limit block 71 to move toward the deeper end of the limit groove 23. When the inner step surface 22 has a tendency to move away from the outer step surface 21, the limit block 71 clamps the inner step surface 22 in the outer step surface 21. Therefore, when installing the ventilation pipe 2, the ventilation pipe 2 to be installed is inserted into the existing ventilation pipe 2, which can be automatically fixed, facilitating the installation of the branch pipe.

[0027] Furthermore, in order to improve the fixing effect of the ventilation pipe 2, a plurality of limiting grooves 23 are arranged around the inner wall of the outer step surface 21, and a limiting block 71 and a second spring 72 are arranged in each of the plurality of limiting grooves 23. At the same time, a rubber gasket is arranged at the end of the inner step surface 22. When the inner step surface 22 is installed in place, the rubber gasket contacts the step of the outer step surface 21, and the rubber gasket seals the ventilation pipe 2, thereby improving the sealing performance of the ventilation pipe 2.

[0028] The implementation principle of the extra-long high-gas tunnel extraction-type construction ventilation system** of the embodiment of the present application is as follows: the anchor rod 3 is preset at the top of the tunnel during tunnel construction. As the tunnel is excavated, when it is necessary to lengthen the ventilation pipe 2, the fixing sleeve 5 is put on the ventilation pipe 2 to be installed, and the ventilation pipe 2 and the fixing sleeve 5 are lifted, so that the fixing rod 4 is inserted into the slot 31 of the anchor rod 3. At this time, the fixing assembly 6 fixes the fixing rod 4 inserted into the anchor rod 3, thereby fixing the ventilation pipe 2, and then the ventilation pipe 2 to be installed is slidably plugged into the original ventilation pipe 2 through a tool, and the connecting assembly 7 fixes the ventilation pipe 2 to be installed to the original ventilation pipe 2, thereby installing and fixing the ventilation pipe 2; the installation and lengthening operation of the ventilation pipe 2 is convenient, and there is no need to install the ventilation pipe 2 through tools such as a tripod, thereby improving construction efficiency.

[0029] Finally, it should be noted that in the description of this application, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on this application.

[0030] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An exhaust-type construction ventilation system for an extra-long high-gas tunnel, comprising an axial flow fan (1) and a ventilation pipe (2) arranged on the axial flow fan (1), characterized in that: The invention also comprises an anchor rod (3), a fixing rod (4), a fixing sleeve (5), a fixing assembly (6) and a connecting assembly (7); the anchor rod (3) is preset at the top of the tunnel; a slot (31) for inserting the fixing rod (4) is provided at the end of the anchor rod (3); the fixing assembly (6) is arranged on the anchor rod (3); the fixing assembly (6) is used to fix the fixing rod (4) inserted into the slot (31) to the anchor rod (3); the fixing sleeve (5) is arranged at the other end of the fixing rod (4); the fixing sleeve (5) is sleeved on the ventilation pipe (2); both ends of the ventilation pipe (2) are provided with step surfaces; adjacent ventilation pipes (2) are connected via the step surfaces; the connecting assembly (7) is arranged on the ventilation pipe (2); the connecting assembly (7) is used to fix adjacent ventilation pipes (2).

2. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 1 is characterized by: The fixing assembly (6) comprises a steel ball (61). A fixing groove (32) with an inclined bottom wall is formed around the inner wall of the slot (31). The fixing groove (32) has a deeper depth at one end close to the tunnel top wall. A plurality of steel balls (61) are arranged in the fixing groove (32). When the fixing rod (4) is inserted into the slot (31), one side of the steel ball (61) contacts the fixing rod (4) and the other side contacts the fixing rod (4).

3. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 2 is characterized in that: A retaining frame (62) is also provided on the anchor rod (3) and located in the fixing groove (32); the retaining frame (62) is an annular plate body; the outer wall of the retaining frame (62) is parallel to the bottom wall of the fixing groove (32); the inner wall of the retaining frame (62) is flush with the inner wall of the slot (31); and a plurality of horn holes (621) for accommodating the steel balls (61) are provided on the retaining frame (62).

4. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 3 is characterized in that: A first spring (63) is arranged inside the anchor rod (3) and located in the fixing groove (32); one end of the first spring (63) is connected to the anchor rod (3) and the other end is connected to the retaining frame (62); the first spring (63) enables the retaining frame (62) to always have a tendency to move away from the top wall of the tunnel.

5. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 1 is characterized in that: The step surface comprises an outer step surface (21) and an inner step surface (22); the inner step surface (22) and the outer step surface (21) are respectively located at two ends of the ventilation pipe (2); the inner diameter of the outer step surface (21) is matched with the outer diameter of the inner step surface (22); the connecting component (7) is arranged on the outer step surface (21); and the connecting component (7) is used to fix the inner step surface (22) inserted into the outer step surface (21).

6. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 5 is characterized in that: The connecting assembly (7) comprises a limit block (71) and a second spring (72); a limit groove (23) with a bottom wall inclined thereon is provided on the inner wall of the outer step surface (21); the limit groove (23) is shallow at one end facing the ventilation pipe (2) body; the limit block (71) is a wedge-shaped block, and the limit block (71) is slidably arranged in the limit groove (23); the second spring (72) is arranged in the limit groove (23) and connected to the wedge-shaped block; the second spring (72) enables the limit block (71) to always have a tendency to move away from the ventilation pipe (2) body.

7. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 6 is characterized by: A plurality of the limiting grooves (23) are arranged around the inner wall of the outer step surface (21), and a limiting block (71) and a second spring (72) are arranged in each of the plurality of limiting grooves (23).

8. The extraction type construction ventilation system for an extra-long high-gas tunnel according to claim 5 is characterized by: A rubber ring gasket is provided at the end of the inner step surface (22).