Weighing method for powder conveying system

By generating correction coefficients and material leakage prediction models in the powder conveying system, the powder weighing accuracy problem under the influence of electronic belt scale factors is solved, and higher powder weighing accuracy and system stability are achieved.

CN118913420APending Publication Date: 2024-11-08BEIXIN BUILDING MATERIALS (JINGGANGSHAN) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410833430.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the existing powder weighing methods, the electronic belt scale is affected by factors such as the deviation of the conveyor belt and the surface adhesive of the transmission belt, resulting in a decrease in the powder weighing accuracy and the weight of the semi-water calcium sulfate powder cannot be accurately weighed.

Method used

By generating correction coefficients in the powder conveying system, correcting the powder quantity value, and constructing a material leakage prediction model, calculating the powder weighing evaluation value, compensating the influencing factors of the electronic belt scale, and improving the powder weighing accuracy.

Benefits of technology

It improves the accuracy of powder weighing in the powder conveying system, reduces leakage and overflow, and enhances weighing accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118913420A_ABST
    Figure CN118913420A_ABST
Patent Text Reader

Abstract

The invention discloses a weighing method for a powder conveying system. The weighing method comprises the steps that the powder conveying system is started according to conveying parameters; when the powder is conveyed to the weighing module, a powder weighing signal and a speed measurement signal are generated, and a powder quantity value is generated according to the powder weighing signal and the speed measurement signal; weighing influence factors are determined, a correction coefficient is generated, the powder quantity value is corrected according to the correction coefficient, and a corrected powder quantity value and a first powder accumulation value are obtained; constructing a powder leakage prediction model, generating a leakage prediction value based on the powder leakage prediction model, and obtaining a second powder accumulation value according to the leakage prediction value and the first powder accumulation value; when the second powder cumulant value is in the discharging amount threshold value interval, the material conveying system is stopped, the powder weighing evaluation value is calculated, the weighing method compensates for the influence of various weighing influence factors on the electronic belt scale, and the powder weighing accuracy in the powder conveying coefficient is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of powder weighing, and in particular to a weighing method for a powder conveying system. Background Art

[0002] In the gypsum board production process, it is necessary to accurately weigh the weight of calcium sulfate hemihydrate powder. Since the weighed material is a powder, the powder has a certain fluidity and the powder will overflow through some gaps, resulting in inaccurate weighing.

[0003] In the prior art, most powder weighing methods are based on electronic belt scales. However, electronic belt scales are greatly affected by factors such as conveyor belt deviation and material sticking to the belt surface, which greatly reduces the weighing accuracy during powder transportation. Summary of the invention

[0004] In order to solve the above technical problems, the present application provides a weighing method for a powder conveying system, which starts the powder conveying system according to the conveying parameters, obtains the powder quantity value when passing through the weighing module, and generates a correction coefficient according to the weighing influencing factors in the powder conveying system, and corrects the corresponding powder quantity value according to the correction coefficient to obtain the corrected powder quantity value and the first powder cumulative quantity value, and obtains the second powder cumulative quantity value according to the first powder cumulative quantity value and the leakage prediction value on the baffle, and when the second powder cumulative quantity value reaches the set value of the discharge module, the powder weighing evaluation value is calculated. The above weighing method compensates for the influence of various weighing influencing factors on the electronic belt scale, and improves the powder weighing accuracy in the powder conveying coefficient.

[0005] In some embodiments of the present application, a weighing method for a powder conveying system is provided, comprising:

[0006] Setting the conveying parameters of the powder conveying system, and starting the powder conveying system according to the conveying parameters, wherein the powder conveying system includes a frame, a conveyor belt, a feeding module, a weighing module, a discharging module and a baffle;

[0007] When the powder material is transported to the weighing module, a powder material weighing signal and a speed measurement signal are generated, and a powder material amount value is generated according to the powder material weighing signal and the speed measurement signal;

[0008] Determine the weighing influencing factors, analyze the weighing influencing factors and generate correction coefficients, correct the corresponding powder amount value according to the correction coefficients, and obtain the corrected powder amount value and the first powder cumulative amount value;

[0009] Constructing a powder leakage prediction model, generating a leakage prediction value based on the first powder accumulation value and the powder leakage prediction model, and obtaining a second powder accumulation value according to the leakage prediction value and the first powder accumulation value;

[0010] When the second powder accumulation value is within the discharge amount threshold interval, the feeding and conveying system is stopped and the powder weighing evaluation value is calculated, and whether to generate a correction instruction is determined according to the powder weighing evaluation value.

[0011] In some embodiments of the present application, starting the powder material conveying system and setting the conveying parameters of the powder material conveying system include:

[0012] Acquire historical conveying parameters, wherein the historical conveying parameters include historical conveying speed, historical one-time conveying powder amount, historical powder amount value and historical conveying time interval;

[0013] Generate a historical powder material cumulative value according to a plurality of historical powder material values, compare the historical powder material cumulative value with the historical actual total amount of delivery, and generate a historical evaluation value according to the comparison result;

[0014] The historical evaluation values ​​are mapped one by one with the historical conveying speed, the historical amount of powder conveyed at one time, and the historical conveying time interval to generate a historical conveying parameter-historical evaluation value mapping table;

[0015] Sort multiple historical evaluation values, select the maximum historical evaluation value, and determine the historical transportation parameter corresponding to the maximum historical evaluation value according to the historical transportation parameter-historical evaluation mapping table;

[0016] The conveying parameters of the powder conveying system are set according to the historical conveying parameters corresponding to the maximum historical evaluation value, wherein the conveying parameters include a conveying speed, a powder conveying amount at one time, and a conveying time interval.

[0017] In some embodiments of the present application, generating a powder amount value according to a powder weighing signal and a speed measurement signal includes:

[0018] When the powder is transported to the weighing module, a powder weighing signal and a speed measurement signal are generated, and an instantaneous powder flow rate is generated according to the powder weighing signal and the speed measurement signal, and the instantaneous powder flow rate is set as the powder amount value;

[0019] The arrangement order of the powder values ​​is set according to the generation time of the powder weighing signal and the speed measurement signal, and a powder value sequence M, M (m1, m2..., mn) is constructed, where mi is the i-th powder value and n is the total number of powder values.

[0020] In some embodiments of the present application, determining the weighing influencing factors includes:

[0021] Acquire a historical first change parameter and a historical second change parameter in the powder conveying system;

[0022] Calculating a first correlation coefficient between a historical powder amount value and a historical first change parameter, and setting a historical first change parameter whose first correlation coefficient is greater than a first preset correlation coefficient threshold as a first influencing factor;

[0023] Calculating a second correlation coefficient between the historical powder amount value and the historical second change parameter, and setting the historical second change parameter whose second correlation coefficient is greater than a second preset correlation coefficient threshold as a second influencing factor;

[0024] The first influencing factor and the second influencing factor are set as weighing influencing factors.

[0025] In some embodiments of the present application, the weighing influencing factors are analyzed and a correction coefficient is generated, including:

[0026] According to the generation time node of each powder quantity value in the powder quantity value sequence, a real-time first change parameter and a real-time second change parameter in the weighing influencing factor corresponding to the powder quantity value are collected;

[0027] Compare each real-time first change parameter in the first influencing factor with the corresponding first preset parameter interval, and perform amplitude calculation according to the comparison result to obtain a first reference coefficient of each real-time first change parameter in the first influencing factor;

[0028] Compare each real-time second change parameter in the second influencing factor with the corresponding second preset parameter interval, and perform amplitude calculation according to the comparison result to obtain a second reference coefficient for each real-time second change parameter in the second influencing factor;

[0029] Generate a correction coefficient corresponding to the powder amount value according to a plurality of first reference coefficients and a plurality of second reference coefficients;

[0030]

[0031] Among them, ki is the correction coefficient of the i-th powder quantity value, e1 is the weight coefficient corresponding to the first reference coefficient, e2 is the weight coefficient corresponding to the second reference coefficient, and e1+e2=1, Ai,s is the first reference coefficient of the s-th first change parameter of the i-th powder quantity value, qs is the important coefficient of the s-th first change parameter, w is the total number of the first change parameters of the i-th powder parameter, Bi,r is the second reference coefficient of the r-th second change parameter of the i-th powder quantity value, cr is the important coefficient of the r-th second change parameter, and d is the total number of the second change parameters of the i-th powder parameter.

[0032] In some embodiments of the present application, the corresponding powder amount value is corrected according to the correction coefficient to obtain the corrected powder amount value and the first powder cumulative amount value, including:

[0033] Sort multiple correction coefficients according to the generation time nodes to generate a correction coefficient sequence K, K (k1, k2, ..., kn), where ki is the i-th correction coefficient and n is the total number of correction coefficients;

[0034] Map the correction coefficient sequence with the powder quantity sequence to obtain a correction coefficient-powder quantity mapping table, generate corresponding corrected powder quantities according to the correction coefficient-powder quantity mapping table, and construct a corrected powder quantity sequence MK according to multiple corrected powder quantities, MK(m1k1, m2k2, …, mnkn), where miki is the i-th corrected powder quantity value;

[0035] The first powder cumulative amount H1 is:

[0036] In some embodiments of the present application, a powder leakage prediction model is constructed, including:

[0037] Obtain the historical powder accumulation value, the historical conveying speed of the conveyor belt, and the historical powder leakage value on the baffle;

[0038] The historical powder accumulation values, the historical conveying speed of the conveyor belt, and the historical powder leakage values ​​on the baffle are used to construct training data sets and test data sets;

[0039] An initial powder leakage prediction model is constructed based on the training test set, and the credibility of the initial powder leakage prediction model is generated based on the test data set;

[0040] If the credibility is greater than the preset credibility threshold, the initial powder leakage prediction model is set as the powder leakage prediction model;

[0041] If the credibility is less than the preset credibility threshold, the training set data is iteratively trained and the initial powder leakage prediction model is rebuilt.

[0042] In some embodiments of the present application, the first powder accumulation amount and the conveying speed of the conveyor belt are input into the powder leakage prediction model to obtain a leakage prediction value;

[0043] Obtain a second powder material accumulation value according to the leakage prediction value and the first powder material accumulation value;

[0044] The second powder cumulative amount is:

[0045] H2=H1+Y;

[0046] Wherein, H2 is the second powder accumulation value, and Y is the leakage prediction value.

[0047] In some embodiments of the present application, calculating the powder weighing evaluation value includes:

[0048] Arrange multiple corrected powder quantity values ​​in chronological order and draw a powder quantity value change curve;

[0049] Obtaining the fluctuation amplitude of the powder amount value change curve, and generating a first evaluation value according to the fluctuation amplitude;

[0050] Generate an actual total powder amount value according to the powder amount delivered once and the delivery time interval, subtract the actual total powder amount value from the second powder cumulative amount value to obtain a powder cumulative amount difference value, and generate a second evaluation value according to the powder cumulative amount difference value;

[0051] generating a powder material weighing evaluation value according to the first evaluation value and the second evaluation value;

[0052] The powder weighing evaluation value is:

[0053] Z = X1 * v1 + X2 * v2;

[0054] Among them, Z is the powder weighing evaluation value, X1 is the first evaluation value, v1 is the first weight coefficient, X2 is the second evaluation value, v2 is the second weight coefficient, and v1+v2=1.

[0055] In some embodiments of the present application, judging whether to generate a correction instruction according to the powder weighing evaluation value includes:

[0056] Pre-set the powder weighing evaluation value threshold;

[0057] If the powder material weighing evaluation value is less than the powder material weighing evaluation value threshold, a correction instruction is generated and the abnormal correction powder material value is screened out, and the abnormal correction powder material value is corrected twice according to the powder material weighing evaluation value difference;

[0058] If the powder material weighing evaluation value is greater than the powder material weighing evaluation value threshold, no correction instruction is generated.

[0059] Compared with the prior art, the weighing method for a powder conveying system in the embodiment of the present application has the following beneficial effects:

[0060] The powder conveying system is started according to the conveying parameters, and the powder quantity value is obtained when passing through the weighing module, and a correction coefficient is generated according to the weighing influencing factors in the powder conveying system. The corresponding powder quantity value is corrected according to the correction coefficient to obtain the corrected powder quantity value and the first powder cumulative quantity value, and the second powder cumulative quantity value is obtained according to the first powder cumulative quantity value and the leakage prediction value on the baffle. When the second powder cumulative quantity value reaches the set value of the discharge module, the powder weighing evaluation value is calculated. The above weighing method compensates for the influence of various weighing influencing factors on the electronic belt scale, and improves the powder weighing accuracy in the powder conveying coefficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a schematic diagram of a weighing method for a powder conveying system in a preferred embodiment of the present application. DETAILED DESCRIPTION

[0062] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0063] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0064] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0065] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0066] like Figure 1 As shown, a weighing method for a powder conveying system according to a preferred embodiment of the present application includes:

[0067] Step S101: setting the conveying parameters of the powder conveying system, and starting the powder conveying system according to the conveying parameters, wherein the powder conveying system includes a frame, a conveyor belt, a feeding module, a weighing module, a discharging module and a baffle;

[0068] Step S102: when the powder material is transported to the weighing module, a powder material weighing signal and a speed measurement signal are generated, and a powder material amount value is generated according to the powder material weighing signal and the speed measurement signal;

[0069] Step S103: determining weighing influencing factors, analyzing the weighing influencing factors and generating correction coefficients, and correcting the corresponding powder amount value according to the correction coefficients to obtain the corrected powder amount value and the first powder cumulative amount value;

[0070] Step S104: constructing a powder leakage prediction model, generating a leakage prediction value based on the first powder accumulation value and the powder leakage prediction model, and obtaining a second powder accumulation value according to the leakage prediction value and the first powder accumulation value;

[0071] Step S105: when the second powder accumulation value is within the discharge amount threshold range, the feeding and conveying system is stopped and the powder weighing evaluation value is calculated, and whether a correction instruction is generated is determined according to the powder weighing evaluation value.

[0072] In this embodiment, the feeding module, the weighing module and the discharging module are arranged on the frame in sequence. The weighing module includes an electronic belt scale and a weighing sensor. The electronic belt scale weighing bridge is installed on the frame. When the powder passes through, the metering roller detects the weight of the powder on the conveyor belt and acts on the weighing sensor through a lever to generate a voltage signal proportional to the belt load. There is a weighing sensor installed on the weighing bridge on the belt scale. When working, the weight of the powder on the belt is detected and sent to the weighing instrument. At the same time, the speed sensor also sends the speed signal of the conveyor belt to the weighing instrument. The instrument integrates the powder weighing signal and the speed signal, and obtains an instantaneous powder flow rate (i.e., the powder amount value) through integration operation, and accumulates multiple powder amount values ​​to obtain a first powder cumulative amount value.

[0073] In this embodiment, baffles are arranged on both sides of the conveyor belt. The baffles are used to collect the leakage of powder during the powder conveying process. During the operation of the powder conveying system, the powder will overflow and most of the powder will be collected by the baffles.

[0074] In some embodiments of the present application, starting the powder material conveying system and setting the conveying parameters of the powder material conveying system include:

[0075] Acquire historical conveying parameters, wherein the historical conveying parameters include historical conveying speed, historical one-time conveying powder amount, historical powder amount value and historical conveying time interval;

[0076] Generate a historical powder material cumulative value according to a plurality of historical powder material values, compare the historical powder material cumulative value with the historical actual total amount of delivery, and generate a historical evaluation value according to the comparison result;

[0077] The historical evaluation values ​​are mapped one by one with the historical conveying speed, the historical amount of powder conveyed at one time, and the historical conveying time interval to generate a historical conveying parameter-historical evaluation value mapping table;

[0078] Sort multiple historical evaluation values, select the maximum historical evaluation value, and determine the historical transportation parameter corresponding to the maximum historical evaluation value according to the historical transportation parameter-historical evaluation mapping table;

[0079] The conveying parameters of the powder conveying system are set according to the historical conveying parameters corresponding to the maximum historical evaluation value, wherein the conveying parameters include a conveying speed, a powder conveying amount at one time, and a conveying time interval.

[0080] In this embodiment, the historical evaluation value refers to the discharge efficiency of the historical accumulated powder amount. The smaller the difference between the historical accumulated powder amount and the historical actual total conveying amount, the larger the historical evaluation value. Conversely, the smaller the historical evaluation value, the higher the discharge efficiency of the historical accumulated powder amount. This indicates that under the current historical conveying parameters, there is less powder leakage, the weighing data is more accurate, and it is relatively simple for on-site sanitation management, thereby improving the conveying efficiency.

[0081] In this embodiment, real-time conveying parameters are set according to historical conveying parameters and conveying results, so as to reduce leakage and overflow of the powder conveying system, thereby making it easier to manage on-site hygiene and improving the powder conveying efficiency.

[0082] In some embodiments of the present application, generating a powder amount value according to a powder weighing signal and a speed measurement signal includes:

[0083] When the powder is transported to the weighing module, a powder weighing signal and a speed measurement signal are generated, and an instantaneous powder flow rate is generated according to the powder weighing signal and the speed measurement signal, and the instantaneous powder flow rate is set as the powder amount value;

[0084] The arrangement order of the powder values ​​is set according to the generation time of the powder weighing signal and the speed measurement signal, and a powder value sequence M, M (m1, m2..., mn) is constructed, where mi is the i-th powder value and n is the total number of powder values.

[0085] In some embodiments of the present application, determining the weighing influencing factors includes:

[0086] Acquire a historical first change parameter and a historical second change parameter in the powder conveying system;

[0087] Calculating a first correlation coefficient between a historical powder amount value and a historical first change parameter, and setting a historical first change parameter whose first correlation coefficient is greater than a first preset correlation coefficient threshold as a first influencing factor;

[0088] Calculating a second correlation coefficient between the historical powder amount value and the historical second change parameter, and setting the historical second change parameter whose second correlation coefficient is greater than a second preset correlation coefficient threshold as a second influencing factor;

[0089] The first influencing factor and the second influencing factor are set as weighing influencing factors.

[0090] In this embodiment, the historical first change parameter and the historical second change parameter are divided into categories, and the categories include the conveyor belt state and the powder itself. The historical first change parameter is judged according to the historical operating state of the conveyor belt, and the historical first change parameter includes the conveyor belt tension, the degree of conveyor belt deviation, etc. The historical second change parameter is judged according to the influence of ambient temperature and humidity on the powder, and the historical second change parameter includes the belt surface sticky area, the powder viscosity, etc.

[0091] In some embodiments of the present application, the weighing influencing factors are analyzed and a correction coefficient is generated, including:

[0092] According to the generation time node of each powder quantity value in the powder quantity value sequence, a real-time first change parameter and a real-time second change parameter in the weighing influencing factor corresponding to the powder quantity value are collected;

[0093] Compare each real-time first change parameter in the first influencing factor with the corresponding first preset parameter interval, and perform amplitude calculation according to the comparison result to obtain a first reference coefficient of each real-time first change parameter in the first influencing factor;

[0094] Compare each real-time second change parameter in the second influencing factor with the corresponding second preset parameter interval, and perform amplitude calculation according to the comparison result to obtain a second reference coefficient for each real-time second change parameter in the second influencing factor;

[0095] Generate a correction coefficient corresponding to the powder amount value according to a plurality of first reference coefficients and a plurality of second reference coefficients;

[0096]

[0097] Among them, ki is the correction coefficient of the i-th powder quantity value, e1 is the weight coefficient corresponding to the first reference coefficient, e2 is the weight coefficient corresponding to the second reference coefficient, and e1+e2=1, Ai,s is the first reference coefficient of the s-th first change parameter of the i-th powder quantity value, qs is the important coefficient of the s-th first change parameter, w is the total number of the first change parameters of the i-th powder parameter, Bi,r is the second reference coefficient of the r-th second change parameter of the i-th powder quantity value, cr is the important coefficient of the r-th second change parameter, and d is the total number of the second change parameters of the i-th powder parameter.

[0098] In this embodiment, the first preset parameter interval is set according to the historical parameter interval of each first change parameter, and the real-time first change parameter is compared with the first preset parameter interval. If the first preset parameter interval in which the real-time first change parameter is located affects the historical powder quantity value, causing the historical powder quantity value to be too large or too small, the amplitude is calculated and the first reference coefficient is set according to the degree of large or small, thereby compensating for the impact of the change in the operating state of the conveyor belt on the reduced accuracy of the belt scale.

[0099] In this embodiment, the second preset parameter interval is set according to the historical parameter interval of each second change parameter, and the real-time second change parameter is compared with the second preset parameter interval. If the second preset parameter interval in which the real-time second change parameter is located affects the historical powder quantity value, causing the historical powder quantity value to be too large or too small, the amplitude is calculated and the second reference coefficient is set according to the degree of large or small, thereby compensating for the impact of the reduced accuracy of the belt scale caused by the sticky material on the surface of the belt conveyor.

[0100] In this embodiment, the correlation coefficient is calculated according to the degree to which the powder quantity is influenced by the historical first change parameter and the historical second change parameter. If the influence degree is greater, the correlation coefficient is greater, and vice versa, the correlation coefficient is smaller, thereby obtaining the first influencing factor and the second influencing factor, that is, the weighing influencing factor. A comprehensive analysis is performed based on the weighing influencing factors, the correction coefficient is determined, and the powder quantity is corrected. The accuracy of the corrected powder quantity is greatly improved, which compensates for the influence of the conveyor belt operation state and the environment on the fluidity of the powder, and improves the weighing accuracy of the belt electronic scale.

[0101] In some embodiments of the present application, the corresponding powder amount value is corrected according to the correction coefficient to obtain the corrected powder amount value and the first powder cumulative amount value, including:

[0102] Sort multiple correction coefficients according to the generation time nodes to generate a correction coefficient sequence K, K (k1, k2, ..., kn), where ki is the i-th correction coefficient and n is the total number of correction coefficients;

[0103] Map the correction coefficient sequence with the powder quantity sequence to obtain a correction coefficient-powder quantity mapping table, generate corresponding corrected powder quantities according to the correction coefficient-powder quantity mapping table, and construct a corrected powder quantity sequence MK according to multiple corrected powder quantities, MK(m1k1, m2k2, …, mnkn), where miki is the i-th corrected powder quantity value;

[0104] The first powder cumulative amount H1 is:

[0105] In some embodiments of the present application, a powder leakage prediction model is constructed, including:

[0106] Obtain the historical powder accumulation value, the historical conveying speed of the conveyor belt, and the historical powder leakage value on the baffle;

[0107] The historical powder accumulation values, the historical conveying speed of the conveyor belt, and the historical powder leakage values ​​on the baffle are used to construct training data sets and test data sets;

[0108] An initial powder leakage prediction model is constructed based on the training test set, and the credibility of the initial powder leakage prediction model is generated based on the test data set;

[0109] If the credibility is greater than the preset credibility threshold, the initial powder leakage prediction model is set as the powder leakage prediction model;

[0110] If the credibility is less than the preset credibility threshold, the training set data is iteratively trained and the initial powder leakage prediction model is rebuilt.

[0111] In this embodiment, a powder leakage prediction model is constructed based on the historical accumulated powder amount values, the historical conveying speed of the conveyor belt, and the historical powder leakage values ​​on the baffle. The historical accumulated powder amount values ​​and the historical conveying speed of the conveyor belt are used as input items, and the historical powder leakage values ​​on the baffle are used as output items. The historical powder leakage values ​​that can be collected on the baffle under the corresponding historical accumulated powder amount values ​​and conveying speeds can be obtained.

[0112] In this embodiment, the real-time conveying speed and the first powder cumulative amount value are input into the powder leakage prediction model to obtain the powder leakage prediction value, which provides a basis for judging whether the powder weighing is accurate and lays a data foundation for the subsequent generation of powder weighing evaluation values.

[0113] In some embodiments of the present application, the first powder accumulation amount and the conveying speed of the conveyor belt are input into the powder leakage prediction model to obtain a leakage prediction value;

[0114] Obtain a second powder material accumulation value according to the leakage prediction value and the first powder material accumulation value;

[0115] The second powder cumulative amount is:

[0116] H2=H1+Y;

[0117] Wherein, H2 is the second powder accumulation value, and Y is the leakage prediction value.

[0118] In some embodiments of the present application, calculating the powder weighing evaluation value includes:

[0119] Arrange multiple corrected powder quantity values ​​in chronological order and draw a powder quantity value change curve;

[0120] Obtaining the fluctuation amplitude of the powder amount value change curve, and generating a first evaluation value according to the fluctuation amplitude;

[0121] Generate an actual total powder amount value according to the powder amount delivered once and the delivery time interval, subtract the actual total powder amount value from the second powder cumulative amount value to obtain a powder cumulative amount difference value, and generate a second evaluation value according to the powder cumulative amount difference value;

[0122] generating a powder material weighing evaluation value according to the first evaluation value and the second evaluation value;

[0123] The powder weighing evaluation value is:

[0124] Z = X1 * v1 + X2 * v2;

[0125] Among them, Z is the powder weighing evaluation value, X1 is the first evaluation value, v1 is the first weight coefficient, X2 is the second evaluation value, v2 is the second weight coefficient, and v1+v2=1.

[0126] In this embodiment, the fluctuation amplitude refers to the stability of multiple corrected powder values ​​in the powder value change curve. If the amount of powder conveyed at one time is the same and the difference between the corrected powder values ​​generated is large, it means that the weighing accuracy is low and the first evaluation value is small. If the amount of powder conveyed at one time is the same and the difference between the corrected powder values ​​generated is small, it means that the weighing accuracy is high and the first evaluation value is large.

[0127] In this embodiment, the actual total powder amount value and the second powder cumulative amount value are subtracted to obtain the powder cumulative amount difference. If the powder cumulative amount difference is smaller, the weighing is more accurate and the second evaluation value is larger. If the powder cumulative amount difference is larger, the weighing accuracy is lower and the second evaluation value is smaller.

[0128] In this embodiment, the powder weighing is evaluated based on the stability of a plurality of corrected powder amount values ​​and the difference in the accumulated amount of powder, thereby improving the accuracy of the powder weighing evaluation.

[0129] In some embodiments of the present application, judging whether to generate a correction instruction according to the powder weighing evaluation value includes:

[0130] Pre-set the powder weighing evaluation value threshold;

[0131] If the powder material weighing evaluation value is less than the powder material weighing evaluation value threshold, a correction instruction is generated and the abnormal correction powder material value is screened out, and the abnormal correction powder material value is corrected twice according to the powder material weighing evaluation value difference;

[0132] If the powder material weighing evaluation value is greater than the powder material weighing evaluation value threshold, no correction instruction is generated.

[0133] In this embodiment, the powder weighing evaluation value threshold is set based on multiple historical powder quantities and historical powder cumulative quantity differences under critical normal weighing conditions. If the powder weighing evaluation value is less than the powder weighing evaluation value threshold, indicating that the weighing accuracy is relatively large, the abnormal corrected powder quantity value is subjected to secondary correction. The abnormal corrected powder quantity value is a corrected powder quantity value whose difference with the average value of the corrected powder quantity value is greater than the preset difference.

[0134] In this embodiment, the accuracy of weighing is determined according to the relationship between the powder weighing evaluation value and the powder weighing evaluation value threshold, and a corresponding correction instruction is generated to improve the weighing accuracy of the powder conveying system.

[0135] In summary, the present invention discloses a weighing method for a powder conveying system, the powder conveying system is started according to the conveying parameters, the powder amount value is obtained when passing through the weighing module, and a correction coefficient is generated according to the weighing influencing factors in the powder conveying system, the corresponding powder amount value is corrected according to the correction coefficient to obtain the corrected powder amount value and the first powder cumulative amount value, the second powder cumulative amount value is obtained according to the first powder cumulative amount value and the leakage prediction value on the baffle, when the second powder cumulative amount value reaches the set value of the discharge module, the powder weighing evaluation value is calculated, the above weighing method compensates for the influence of various weighing influencing factors on the electronic belt scale, and improves the powder weighing accuracy in the powder conveying coefficient.

[0136] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A weighing method for a powder delivery system, characterized in that: include: Setting the conveying parameters of the powder conveying system, and starting the powder conveying system according to the conveying parameters, wherein the powder conveying system includes a frame, a conveyor belt, a feeding module, a weighing module, a discharging module and a baffle; When the powder material is transported to the weighing module, a powder material weighing signal and a speed measurement signal are generated, and a powder material amount value is generated according to the powder material weighing signal and the speed measurement signal; Determine the weighing influencing factors, analyze the weighing influencing factors and generate correction coefficients, correct the corresponding powder amount value according to the correction coefficients, and obtain the corrected powder amount value and the first powder cumulative amount value; Constructing a powder leakage prediction model, generating a leakage prediction value based on the first powder accumulation value and the powder leakage prediction model, and obtaining a second powder accumulation value according to the leakage prediction value and the first powder accumulation value; When the second powder accumulation value is within the discharge amount threshold interval, the feeding and conveying system is stopped and the powder weighing evaluation value is calculated, and whether to generate a correction instruction is determined according to the powder weighing evaluation value.

2. The weighing method for a powder conveying system according to claim 1, characterized in that: Start the powder conveying system and set the conveying parameters of the powder conveying system, including: Acquire historical conveying parameters, wherein the historical conveying parameters include historical conveying speed, historical one-time conveying powder amount, historical powder amount value and historical conveying time interval; Generate a historical powder material cumulative value according to a plurality of historical powder material values, compare the historical powder material cumulative value with the historical actual total amount of delivery, and generate a historical evaluation value according to the comparison result; The historical evaluation values ​​are mapped one by one with the historical conveying speed, the historical amount of powder conveyed at one time, and the historical conveying time interval to generate a historical conveying parameter-historical evaluation value mapping table; Sort multiple historical evaluation values, select the maximum historical evaluation value, and determine the historical transportation parameter corresponding to the maximum historical evaluation value according to the historical transportation parameter-historical evaluation mapping table; The conveying parameters of the powder conveying system are set according to the historical conveying parameters corresponding to the maximum historical evaluation value, wherein the conveying parameters include a conveying speed, a powder conveying amount at one time, and a conveying time interval.

3. The weighing method for a powder conveying system according to claim 2, characterized in that: Generate powder quantity value based on powder weighing signal and speed measurement signal, including: When the powder is transported to the weighing module, a powder weighing signal and a speed measurement signal are generated, and an instantaneous powder flow rate is generated according to the powder weighing signal and the speed measurement signal, and the instantaneous powder flow rate is set as the powder amount value; The arrangement order of the powder values ​​is set according to the generation time of the powder weighing signal and the speed measurement signal, and a powder value sequence M, M (m1, m2..., mn) is constructed, where mi is the i-th powder value and n is the total number of powder values.

4. The weighing method for a powder conveying system according to claim 3, characterized in that: Identify factors affecting weighing, including: Acquire a historical first change parameter and a historical second change parameter in the powder conveying system; Calculating a first correlation coefficient between a historical powder amount value and a historical first change parameter, and setting a historical first change parameter whose first correlation coefficient is greater than a first preset correlation coefficient threshold as a first influencing factor; Calculating a second correlation coefficient between the historical powder amount value and the historical second change parameter, and setting the historical second change parameter whose second correlation coefficient is greater than a second preset correlation coefficient threshold as a second influencing factor; The first influencing factor and the second influencing factor are set as weighing influencing factors.

5. The weighing method for a powder conveying system according to claim 4, characterized in that: Analyze the factors affecting weighing and generate correction factors, including: According to the generation time node of each powder quantity value in the powder quantity value sequence, a real-time first change parameter and a real-time second change parameter in the weighing influencing factor corresponding to the powder quantity value are collected; Compare each real-time first change parameter in the first influencing factor with the corresponding first preset parameter interval, and perform amplitude calculation according to the comparison result to obtain a first reference coefficient of each real-time first change parameter in the first influencing factor; Compare each real-time second change parameter in the second influencing factor with the corresponding second preset parameter interval, and perform amplitude calculation according to the comparison result to obtain a second reference coefficient for each real-time second change parameter in the second influencing factor; Generate a correction coefficient corresponding to the powder amount value according to a plurality of first reference coefficients and a plurality of second reference coefficients; Among them, ki is the correction coefficient of the i-th powder quantity value, e1 is the weight coefficient corresponding to the first reference coefficient, e2 is the weight coefficient corresponding to the second reference coefficient, and e1+e2=1, Ai,s is the first reference coefficient of the s-th first change parameter of the i-th powder quantity value, qs is the important coefficient of the s-th first change parameter, w is the total number of the first change parameters of the i-th powder parameter, Bi,r is the second reference coefficient of the r-th second change parameter of the i-th powder quantity value, cr is the important coefficient of the r-th second change parameter, and d is the total number of the second change parameters of the i-th powder parameter.

6. The weighing method for a powder conveying system according to claim 5, characterized in that: Correcting the corresponding powder amount value according to the correction coefficient to obtain the corrected powder amount value and the first powder cumulative amount value includes: Sort multiple correction coefficients according to the generation time nodes to generate a correction coefficient sequence K, K (k1, k2, ..., kn), where ki is the i-th correction coefficient and n is the total number of correction coefficients; Map the correction coefficient sequence with the powder quantity sequence to obtain a correction coefficient-powder quantity mapping table, generate corresponding corrected powder quantities according to the correction coefficient-powder quantity mapping table, and construct a corrected powder quantity sequence MK according to multiple corrected powder quantities, MK(m1k1, m2k2, …, mnkn), where miki is the i-th corrected powder quantity value; The first powder cumulative amount H1 is:

7. The weighing method for a powder conveying system according to claim 6, characterized in that: Construct a powder leakage prediction model, including: Obtain the historical powder accumulation value, the historical conveying speed of the conveyor belt, and the historical powder leakage value on the baffle; The historical powder accumulation values, the historical conveying speed of the conveyor belt, and the historical powder leakage values ​​on the baffle are used to construct training data sets and test data sets; An initial powder leakage prediction model is constructed based on the training test set, and the credibility of the initial powder leakage prediction model is generated based on the test data set; If the credibility is greater than the preset credibility threshold, the initial powder leakage prediction model is set as the powder leakage prediction model; If the credibility is less than the preset credibility threshold, the training set data is iteratively trained and the initial powder leakage prediction model is rebuilt.

8. The weighing method for a powder conveying system according to claim 7, characterized in that: Inputting the first powder accumulation amount and the conveying speed of the conveyor belt into the powder leakage prediction model to obtain a leakage prediction value; Obtain a second powder material accumulation value according to the leakage prediction value and the first powder material accumulation value; The second powder cumulative amount is: H2=H1+Y; Wherein, H2 is the second powder accumulation value, and Y is the leakage prediction value.

9. The weighing method for a powder delivery system according to claim 8, characterized in that: Calculate the powder weighing evaluation value, including: Arrange multiple corrected powder quantity values ​​in chronological order and draw a powder quantity value change curve; Obtaining the fluctuation amplitude of the powder quantity value change curve, and generating a first evaluation value according to the fluctuation amplitude; Generate an actual total powder amount value according to the powder amount delivered once and the delivery time interval, subtract the actual total powder amount value from the second powder cumulative amount value to obtain a powder cumulative amount difference value, and generate a second evaluation value according to the powder cumulative amount difference value; generating a powder material weighing evaluation value according to the first evaluation value and the second evaluation value; The powder weighing evaluation value is: Z = X1 * v1 + X2 * v2; Among them, Z is the powder weighing evaluation value, X1 is the first evaluation value, v1 is the first weight coefficient, X2 is the second evaluation value, v2 is the second weight coefficient, and v1+v2=1.

10. The weighing method for a powder delivery system according to claim 9, characterized in that: Determine whether to generate a correction instruction based on the powder weighing evaluation value, including: Pre-set the powder weighing evaluation value threshold; If the powder material weighing evaluation value is less than the powder material weighing evaluation value threshold, a correction instruction is generated and the abnormal correction powder material value is screened out, and the abnormal correction powder material value is corrected twice according to the powder material weighing evaluation value difference; If the powder material weighing evaluation value is greater than the powder material weighing evaluation value threshold, no correction instruction is generated.