Calculation power scheduling method and device, equipment and storage medium
By obtaining and analyzing the performance parameters of the computing power center node and selecting the appropriate node for scheduling, the problems of low computing power scheduling efficiency and low resource utilization in the existing technology are solved, and more efficient resource utilization is achieved.
Patent Information
- Application Number
- CN202410972757.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
The existing computing power scheduling is inefficient and resource utilization is low, especially in heterogeneous resource management and scheduling.
By obtaining the performance parameters of the candidate computing center node, determining the allocation parameters, and selecting the matching computing center node according to the priority of the target demand task, and computing power is performed based on the allocation parameters of the candidate computing center node and the priority of the target demand task. Scheduling.
It improves computing power scheduling efficiency, improves resource utilization, ensures that high-performance nodes undertake important tasks and avoids waste of resources.
Smart Images

Figure CN118916162A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of computing power network technology, and in particular to a computing power scheduling method, device, equipment and storage medium. Background Art
[0002] The intelligent computing power network measurement system is based on new network technology, which connects geographically distributed computing power center nodes, dynamically and in real time perceives the status of computing power resources, and then coordinates and dispatches computing tasks, transmits data, and forms a network that perceives, allocates, and dispatches computing power on a global scale. On this basis, computing power, data, and application resources are gathered and shared.
[0003] Among the existing technical solutions, one method starts from the three aspects of the underlying computing power infrastructure, the middle computing power orchestration management layer, and the upper computing power operation service layer, and explains the seven major capabilities of computing power network intention acceptance, trusted transactions, unified management, unified measurement, capability encapsulation, orchestration scheduling, and computing square perception, as well as multiple landing scenarios. Another implementation method is computing power scheduling, which realizes global scheduling of north-south center / edge and east-west hub / edge, and hybrid deployment of multiple applications to meet the requirements of intelligent elasticity and peak shaving; making cross-cloud agile deployment and collaboration of business a reality, while greatly improving resource utilization.
[0004] At present, the management and scheduling of heterogeneous resources is relatively difficult for different application scenarios, the computing power scheduling efficiency is low, and the resource utilization rate is low. Summary of the invention
[0005] The present disclosure provides a computing power scheduling method, device, equipment and storage medium to at least solve the problems of low efficiency and low resource utilization of existing computing power scheduling.
[0006] The technical solution of the present disclosure is as follows:
[0007] The present disclosure provides a computing power scheduling method, including:
[0008] Obtain the performance parameters of candidate computing center nodes;
[0009] Determine the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node;
[0010] According to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the candidate computing power center nodes, wherein the priority of the target demand task reflects the request time of the target demand task.
[0011] Optionally, obtaining the performance parameters of the candidate computing power center node includes:
[0012] Collect computing power configuration parameters of the candidate computing power center nodes in the computing power network;
[0013] The computing power configuration parameters are input into the computing power resource processing model to obtain the performance parameters of the candidate computing power center node.
[0014] Optionally, the performance parameters include: CPU usage, memory usage, disk usage, network bandwidth usage and task completion time, and determining the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node includes:
[0015] The deployment parameters of the candidate computing power center node are calculated according to the CPU utilization rate, the memory utilization rate, the disk utilization rate, the network bandwidth utilization rate and the task completion time.
[0016] Optionally, selecting a target computing center node matching the target demand task from the candidate computing center nodes according to the deployment parameters of the candidate computing center nodes and the priority of the target demand task includes:
[0017] According to the priority of the target demand task, the target computing center node with the smallest allocation parameter is selected from the candidate computing center nodes.
[0018] Optionally, selecting a target computing power center node matching the target demand task from the computing power center nodes according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task includes:
[0019] Calculate the load factor of the candidate computing power center according to the performance parameters of the candidate computing power center node;
[0020] Calculate the dispatchability coefficient of the candidate computing power center according to the deployment parameters and the load factor of the candidate computing power center node;
[0021] According to the schedulable coefficient and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the computing power center nodes.
[0022] Optionally, selecting a target computing power center node matching the target demand task from the computing power center nodes according to the schedulable coefficient and the priority of the target demand task includes:
[0023] According to the priority of the target demand task, the target computing center node with the largest schedulable coefficient is selected from the candidate computing center nodes.
[0024] The present disclosure also provides a computing power scheduling device, including:
[0025] An acquisition module is used to obtain the performance parameters of candidate computing power center nodes;
[0026] A determination module, used to determine the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node;
[0027] A selection module is used to select a target computing power center node that matches the target demand task from the candidate computing power center nodes according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, wherein the priority of the target demand task reflects the request time of the target demand task.
[0028] The present disclosure also provides an electronic device, including:
[0029] processor;
[0030] a memory for storing processor-executable instructions;
[0031] The processor is configured to execute instructions to implement each step in the above method.
[0032] The embodiment of the present disclosure further provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, each step in the above method is implemented.
[0033] The embodiment of the present disclosure further provides a computer program product, including a computer program / instruction, which implements each step of the above method when executed by a processor.
[0034] The technical solution provided by the embodiments of the present disclosure brings at least the following beneficial effects:
[0035] In some embodiments of the present disclosure, performance parameters of candidate computing power center nodes are obtained; allocation parameters of candidate computing power center nodes are determined based on the performance parameters of candidate computing power center nodes; based on the allocation parameters of candidate computing power center nodes and the priority of target demand tasks, a target computing power center node that matches the target demand task is selected from the candidate computing power center nodes, wherein the priority of the target demand task reflects the request time of the target demand task; the present disclosure performs computing power scheduling based on the allocation parameters of candidate computing power center nodes and the priority of target demand tasks, combined with demand tasks and parameters of computing power center nodes, to improve computing power scheduling efficiency and improve resource utilization.
[0036] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The drawings herein are incorporated into and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the description are used to explain the principles of the present disclosure, and do not constitute improper limitations on the present disclosure.
[0038] Figure 1 A flowchart of a computing power scheduling method provided for an exemplary embodiment of the present disclosure;
[0039] Figure 2 A schematic diagram of the structure of a computing power scheduling device provided for an exemplary embodiment of the present disclosure;
[0040] Figure 3 A schematic structural diagram of an electronic device provided by an exemplary embodiment of the present disclosure. DETAILED DESCRIPTION
[0041] In order to enable ordinary persons in the art to better understand the technical solutions of the present disclosure, the technical solutions in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the accompanying drawings.
[0042] It should be noted that the terms "first", "second", etc. in the specification and claims of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. Instead, they are merely examples of devices and methods consistent with some aspects of the present disclosure.
[0043] It should be noted that the user information involved in this disclosure includes but is not limited to: user device information and user personal information; the collection, storage, use, processing, transmission, provision and disclosure of user information in this disclosure comply with the relevant laws and regulations and do not violate public order and good morals.
[0044] The intelligent computing power network measurement system is based on new network technology, which connects geographically distributed computing power center nodes, dynamically and in real time perceives the status of computing power resources, and then coordinates and dispatches computing tasks, transmits data, and forms a network that perceives, allocates, and dispatches computing power on a global scale. On this basis, computing power, data, and application resources are gathered and shared.
[0045] Among the existing technical solutions, one method starts from the three aspects of the underlying computing power infrastructure, the middle computing power orchestration management layer, and the upper computing power operation service layer, and explains the seven major capabilities of computing power network intention acceptance, trusted transactions, unified management, unified measurement, capability encapsulation, orchestration scheduling, and computing square perception, as well as multiple landing scenarios. Another implementation method is computing power scheduling, which realizes global scheduling of north-south center / edge and east-west hub / edge, and hybrid deployment of multiple applications to meet the requirements of intelligent elasticity and peak shaving; making cross-cloud agile deployment and collaboration of business a reality, while greatly improving resource utilization.
[0046] At present, the management and scheduling of heterogeneous resources is relatively difficult for different application scenarios, the computing power scheduling efficiency is low, and the resource utilization rate is low.
[0047] In response to the above technical problems, in some embodiments of the present disclosure, the performance parameters of the candidate computing power center nodes are obtained; the deployment parameters of the candidate computing power center nodes are determined according to the performance parameters of the candidate computing power center nodes; according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, a target computing power center node that matches the target demand task is selected from the candidate computing power center nodes, wherein the priority of the target demand task reflects the request time of the target demand task; the present disclosure performs computing power scheduling based on the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, combined with the demand tasks and the parameters of the computing power center nodes, to improve the computing power scheduling efficiency and improve resource utilization.
[0048] The technical solutions provided by various embodiments of the present disclosure are described in detail below in conjunction with the accompanying drawings.
[0049] Figure 1 A flowchart of a computing power scheduling method provided by an exemplary embodiment of the present disclosure. Figure 1 As shown, the method includes:
[0050] S101: Obtain performance parameters of candidate computing power center nodes;
[0051] S102: Determine the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node;
[0052] S103: According to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the candidate computing power center nodes, wherein the priority of the target demand task reflects the request time of the target demand task.
[0053] In this embodiment, the execution subject of the above method is a terminal device or a server.
[0054] Among them, the terminal device includes but is not limited to a mobile station (MS), a mobile terminal, a mobile phone, a handset and a portable equipment, etc. The terminal device can communicate with one or more core networks via a radio access network (RAN). For example, the terminal device can be a mobile phone (or a "cellular" phone), a computer with a wireless communication function, etc. The terminal device can also be a computer with a wireless transceiver function, a virtual reality (VR) terminal device, an AR terminal device, a wireless terminal in industrial control, a wireless terminal in self driving, a wireless terminal in remote medical, a wireless terminal in a smart grid, a wireless terminal in transportation safety, a wireless terminal in a smart city, a wireless terminal in a smart home, etc., and the operating system installed on the terminal device includes but is not limited to: IOS, Android, windows, linux, Mac OS and other operating systems. In different networks, the terminal may be called different names, such as user equipment, mobile station, subscriber unit, station, cellular phone, personal digital assistant, wireless modem, wireless communication device, handheld device, laptop computer, cordless phone, wireless local loop station, television, etc. For the convenience of description, it is referred to as terminal equipment in this embodiment.
[0055] In this embodiment, the implementation form of the server is not limited. For example, the server can be a conventional server, a cloud server, a cloud host, a virtual center, or other server devices. The server mainly includes a processor, a hard disk, a memory, a system bus, etc., and a general computer architecture type.
[0056] In this embodiment, the performance parameters of the candidate computing power center nodes are obtained; the deployment parameters of the candidate computing power center nodes are determined according to the performance parameters of the candidate computing power center nodes; according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, a target computing power center node that matches the target demand task is selected from the candidate computing power center nodes, wherein the priority of the target demand task reflects the request time of the target demand task; the present invention performs computing power scheduling based on the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, combined with the demand tasks and the parameters of the computing power center nodes, so as to improve the computing power scheduling efficiency and improve the resource utilization.
[0057] In some embodiments of the present disclosure, the performance parameters of the candidate computing power center node are obtained. One achievable method is to collect the computing power configuration parameters of the candidate computing power center node in the computing power network; input the computing power configuration parameters into the computing power resource processing model to obtain the performance parameters of the candidate computing power center node. It should be noted that the computing power configuration parameters include but are not limited to: the CPU, disk, memory and network bandwidth configuration of the device. The performance parameters of the computing power center node include but are not limited to: CPU utilization, memory utilization, disk utilization, network bandwidth utilization and task completion time.
[0058] It should be noted that the computing power center nodes include: cloud computing centers and edge devices such as terminal devices.
[0059] In some embodiments of the present disclosure, the computing power configuration parameters are input into the computing power resource processing model to obtain the performance parameters of the candidate computing power center node. The computing power configuration parameters corresponding to each computing power center node are imported into the pre-trained computing power resource processing model, and the performance parameters of each computing power center node are obtained through the specified tasks preset in the computing power resource processing model.
[0060] For example, the computing resource processing model corresponds to a simulated computing center, and each simulated computing center corresponds to a computing center node; the computing resource processing model obtains the computing power configuration of the computing center node, and then adjusts the computing power configuration of the simulated computing center to be consistent with it according to its computing power configuration. Then, the preset specified task is executed through the simulated computing center, and then the CPU usage, memory usage, disk usage, network bandwidth usage and task completion time corresponding to the corresponding computing power configuration when executing the specified task are obtained.
[0061] The adjustment method of the computing power configuration of the simulated computing center is as follows:
[0062] 1. The CPU computing power configuration adjustment method is: by adjusting the CPU clock frequency of the simulated computing power center to change the CPU's operating speed and processing power; if the CPU computing power configuration is reduced, the CPU clock frequency is lowered through the BIOS to reduce the CPU's operating speed and processing power; if the CPU computing power configuration is increased, the custom debugging method is used: overclocking, adjusting the CPU system value to increase the CPU's operating frequency to improve the CPU's operating speed and processing power; because excessive overclocking may cause hardware overheating or damage, no overclocking operation is performed, and the simulation computing power center uses a CPU with a configuration higher than the CPU configuration in each computing power center node, and the CPU's operating speed and processing power are adjusted by lowering the CPU clock frequency.
[0063] 2. The method for adjusting the spatial configuration of the disk and memory is: use the disk memory partitioning technology in the existing technology to partition the computing power configuration of the simulated computing power center, and enable a disk and memory partition of the disk and memory configuration corresponding to the computing power center node, and disable other partitions.
[0064] 3. The network bandwidth adjustment method is to simulate the computing power configuration of the computing center by changing the hardware settings corresponding to the network bandwidth.
[0065] In some embodiments of the present disclosure, the deployment parameters of the candidate computing center node are determined according to the performance parameters of the candidate computing center node. One achievable method is to calculate the deployment parameters of the candidate computing center node according to the CPU usage, the memory usage, the disk usage, the network bandwidth usage and the task completion time.
[0066] Specifically, the CPU usage, memory usage, disk usage, network bandwidth usage, and task completion time corresponding to each computing center node are marked as G i 、N i , C i , W i , R i , where i = 1, 2, ... m, m represents the number of all computing center nodes; the deployment parameter ZB of each computing center node i The calculation formula is as follows:
[0067]
[0068] Among them, β1, β2, and β3 are all preset proportion coefficients, which are used to control the ratio among CPU utilization, memory utilization, disk utilization, network bandwidth utilization and task completion time when calculating the allocation parameters. α is the correction factor, and the value can be 0.12265.
[0069] In some embodiments of the present disclosure, the computing power configuration parameters and performance parameters of each candidate computing power center node are stored in a computing power resource cloud pool.
[0070] In some embodiments of the present disclosure, a target demand task and a priority of the target demand task are obtained. The priority of the demand task is determined according to the request time of the demand task, wherein the earlier the request time of the corresponding demand task is, the higher its priority is.
[0071] In some embodiments of the present disclosure, according to the deployment parameters of the candidate computing center nodes and the priority of the target demand task, a target computing center node matching the target demand task is selected from the candidate computing center nodes. Including but not limited to the following selection methods:
[0072] Selection method 1: According to the priority of the target demand task, the target computing center node with the smallest allocation parameter is selected from the candidate computing center nodes. The smaller the value of the allocation parameter, the stronger the computing power of the corresponding computing center node, and vice versa.
[0073] Selection method two: Calculate the load factor of the candidate computing power center based on the performance parameters of the candidate computing power center node; Calculate the dispatchable coefficient of the candidate computing power center based on the deployment parameters and the load factor of the candidate computing power center node; Select the target computing power center node that matches the target demand task from the computing power center nodes based on the dispatchable coefficient and the priority of the target demand task.
[0074] In the above selection method 1, the required tasks are allocated to the corresponding computing power center nodes in order from small to large according to the allocation parameters.
[0075] In the above-mentioned second selection method, the performance parameters of each computing center node and the load factor of each computing center node are obtained. Among them, the performance indicator data of the computing center node is collected in the current task executed by each computing center node through SNMP protocol, log file, API interface, etc.
[0076] The calculation formula of the load factor is as follows:
[0077]
[0078] Among them, the load factor FT i The larger the value, the greater the remaining processing capacity of the corresponding computing center node, and the higher the load it can bear at the current moment; λ1, λ2, λ3, and λ4 are all preset proportional coefficients used to calculate the load factor FT iWhen controlling the ratio of CPU usage, memory usage, disk usage, and network bandwidth usage, G y 、N y , C y , W y is a corresponding preset determination threshold. In this embodiment, if the corresponding usage rate is less than the corresponding determination threshold, it means that the corresponding usage rate can be ignored when calculating the load factor.
[0079] According to the deployment parameters and the load factor of the candidate computing power center node, the dispatchable coefficient of the candidate computing power center is calculated. Wherein, dispatchable coefficient = load factor * deployment parameter. According to the order of priority from high to low in the demand tasks, the corresponding demand tasks are dispatched and allocated to the corresponding computing power center nodes in turn.
[0080] In some embodiments of the present disclosure, after each computing power center node is assigned a required task, each computing power center node is controlled to execute the required task assigned to each computing power center node.
[0081] Take a specific application scenario as an example. In this application scenario, it is assumed that a large cloud computing center needs to manage and schedule various computing resources within it. These computing resources include servers and storage devices with different configurations, and their CPU, memory, disk and network bandwidth configurations are different. In order to effectively utilize these resources and improve the overall operating efficiency, the above computing power scheduling method can be used for resource scheduling.
[0082] First, the configuration collection unit will collect the computing power configuration information of each computing power center node, including CPU, disk, memory and network bandwidth configuration. Then, the resource processing unit imports this data into the pre-trained computing power resource processing model, and obtains the performance indicator data of each node by executing the preset tasks, such as CPU utilization, memory utilization, disk utilization, network bandwidth utilization and task completion time. The data analysis unit will calculate and analyze the collected performance parameters to obtain the allocation parameters of each computing power center node. The allocation parameters reflect the comprehensive performance of the node and are used for subsequent resource scheduling decisions. During the resource scheduling process, the task acquisition unit will obtain the required tasks and their priorities. The priority is determined according to the request time of the task, and the earlier the task is requested, the higher the priority. The resource scheduling unit will calculate the schedulable coefficient based on the node's allocation parameters and load coefficient, and assign the tasks to the corresponding computing power center nodes in the order of the priority of the required tasks from high to low, so as to ensure that high-performance nodes undertake more important tasks while avoiding resource waste. Finally, the task execution unit will control each computing power center node to execute the assigned tasks to achieve efficient operation of the entire system. The present disclosure can monitor and manage various computing resources of the cloud computing center in real time, and perform intelligent scheduling according to task requirements and node performance, thereby improving resource utilization and overall system performance.
[0083] Figure 2 FIG. 2 is a schematic diagram of a computing power scheduling device 20 provided in an exemplary embodiment of the present disclosure. Figure 2 As shown, the computing power scheduling device 20 includes: an acquisition module 21, a determination module 22 and a selection module 23.
[0084] The acquisition module 21 is used to obtain the performance parameters of the candidate computing power center node;
[0085] A determination module 22, configured to determine the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node;
[0086] The selection module 23 is used to select a target computing center node that matches the target demand task from the candidate computing center nodes according to the deployment parameters of the candidate computing center nodes and the priority of the target demand task, wherein the priority of the target demand task reflects the request time of the target demand task.
[0087] Optionally, when acquiring the performance parameters of the candidate computing power center node, the acquisition module 21 is used to:
[0088] Collect computing power configuration parameters of the candidate computing power center nodes in the computing power network;
[0089] The computing power configuration parameters are input into the computing power resource processing model to obtain the performance parameters of the candidate computing power center node.
[0090] Optionally, the performance parameters include: CPU usage, memory usage, disk usage, network bandwidth usage and task completion time. When the determination module 22 determines the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node, it is used to:
[0091] The deployment parameters of the candidate computing power center node are calculated according to the CPU utilization rate, the memory utilization rate, the disk utilization rate, the network bandwidth utilization rate and the task completion time.
[0092] Optionally, when the selection module 23 selects a target computing center node matching the target demand task from the candidate computing center nodes according to the deployment parameters of the candidate computing center nodes and the priority of the target demand task, it is used to:
[0093] According to the priority of the target demand task, the target computing center node with the smallest allocation parameter is selected from the candidate computing center nodes.
[0094] Optionally, when the selection module 23 selects a target computing power center node matching the target demand task from the computing power center nodes according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, it is used to:
[0095] Calculate the load factor of the candidate computing power center according to the performance parameters of the candidate computing power center node;
[0096] Calculate the dispatchability coefficient of the candidate computing power center according to the deployment parameters and the load factor of the candidate computing power center node;
[0097] According to the schedulable coefficient and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the computing power center nodes.
[0098] Optionally, when the selection module 23 selects a target computing power center node matching the target demand task from the computing power center nodes according to the schedulable coefficient and the priority of the target demand task, it is configured to:
[0099] According to the priority of the target demand task, the target computing center node with the largest schedulable coefficient is selected from the candidate computing center nodes.
[0100] Regarding the device in the above embodiment, the specific manner in which each module performs operations has been described in detail in the embodiment of the method, and will not be elaborated here.
[0101] Figure 3 FIG. 1 is a schematic diagram of a structure of an electronic device provided by an exemplary embodiment of the present disclosure. Figure 3 As shown, the electronic device includes: a memory 31 and a processor 32. In addition, the electronic device also includes a power supply component 33 and a communication component 34.
[0102] The memory 31 is used to store computer programs and can be configured to store various other data to support operations on the electronic device. Examples of such data include instructions for any application program or method operating on the electronic device.
[0103] The memory 31 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0104] The communication component 34 is used for data transmission with other devices.
[0105] The processor 32 can execute computer instructions stored in the memory 31 to: obtain performance parameters of the candidate computing power center node; determine the allocation parameters of the candidate computing power center node based on the performance parameters of the candidate computing power center node; select a target computing power center node that matches the target demand task from the candidate computing power center nodes based on the allocation parameters of the candidate computing power center node and the priority of the target demand task, wherein the priority of the target demand task reflects the request time of the target demand task.
[0106] Optionally, when acquiring the performance parameters of the candidate computing power center node, the processor 32 is used to:
[0107] Collect computing power configuration parameters of the candidate computing power center nodes in the computing power network;
[0108] The computing power configuration parameters are input into the computing power resource processing model to obtain the performance parameters of the candidate computing power center node.
[0109] Optionally, the performance parameters include: CPU usage, memory usage, disk usage, network bandwidth usage and task completion time. When the processor 32 determines the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node, it is used to:
[0110] The deployment parameters of the candidate computing power center node are calculated according to the CPU utilization rate, the memory utilization rate, the disk utilization rate, the network bandwidth utilization rate and the task completion time.
[0111] Optionally, when the processor 32 selects a target computing power center node matching the target demand task from the candidate computing power center nodes according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, it is configured to:
[0112] According to the priority of the target demand task, the target computing center node with the smallest allocation parameter is selected from the candidate computing center nodes.
[0113] Optionally, when the processor 32 selects a target computing power center node matching the target demand task from the computing power center nodes according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, it is configured to:
[0114] Calculate the load factor of the candidate computing power center according to the performance parameters of the candidate computing power center node;
[0115] Calculate the dispatchability coefficient of the candidate computing power center according to the deployment parameters and the load factor of the candidate computing power center node;
[0116] According to the schedulable coefficient and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the computing power center nodes.
[0117] Optionally, when the processor 32 selects a target computing power center node matching the target demand task from the computing power center nodes according to the schedulable coefficient and the priority of the target demand task, it is configured to:
[0118] According to the priority of the target demand task, the target computing center node with the largest schedulable coefficient is selected from the candidate computing center nodes.
[0119] Accordingly, the present disclosure also provides a computer-readable storage medium storing a computer program. When the computer-readable storage medium stores the computer program and the computer program is executed by one or more processors, the one or more processors execute Figure 1 Each step in the method embodiment.
[0120] Accordingly, the present disclosure also provides a computer program product, the computer program product includes a computer program / instruction, the computer program / instruction is executed by a processor Figure 1 Each step in the method embodiment.
[0121] Above Figure 3 The communication component in is configured to facilitate wired or wireless communication between the device where the communication component is located and other devices. The device where the communication component is located can access a wireless network based on a communication standard, such as WiFi, 2G, 3G, 4G / LTE, 5G and other mobile communication networks, or a combination thereof. In an exemplary embodiment, the communication component receives a broadcast signal or broadcast-related information from an external broadcast management system via a broadcast channel. In an exemplary embodiment, the communication component also includes a near field communication (NFC) module to facilitate short-range communication. For example, the NFC module can be implemented based on radio frequency identification (RFID) technology, infrared data association (IrDA) technology, ultra-wideband (UWB) technology, Bluetooth (BT) technology and other technologies.
[0122] Above Figure 3 The power supply component in the device provides power to various components of the device where the power supply component is located. The power supply component may include a power management system, one or more power supplies, and other components associated with generating, managing, and distributing power to the device where the power supply component is located.
[0123] The electronic device also includes a display screen and an audio component.
[0124] The display screen includes a screen, and the screen may include a liquid crystal display (LCD) and a touch panel (TP). If the screen includes a touch panel, the screen may be implemented as a touch screen to receive input signals from a user. The touch panel includes one or more touch sensors to sense touch, slide, and gestures on the touch panel. The touch sensor may not only sense the boundary of a touch or slide action, but also detect the duration and pressure associated with the touch or slide operation.
[0125] The audio component may be configured to output and / or input audio signals. For example, the audio component includes a microphone (MIC), and when the device where the audio component is located is in an operating mode, such as a call mode, a recording mode, and a speech recognition mode, the microphone is configured to receive an external audio signal. The received audio signal may be further stored in a memory or sent via a communication component. In some embodiments, the audio component also includes a speaker for outputting an audio signal.
[0126] Those skilled in the art will appreciate that the embodiments of the present disclosure may be provided as methods, systems, or computer program products. Therefore, the present disclosure may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present disclosure may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0127] The present disclosure is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present disclosure. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0128] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0129] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0130] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0131] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0132] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0133] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0134] The above are only specific embodiments of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to these embodiments herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A computing power scheduling method, characterized in that: include: Obtain the performance parameters of candidate computing center nodes; Determine the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node; According to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the candidate computing power center nodes, wherein the priority of the target demand task reflects the request time of the target demand task.
2. The method according to claim 1, characterized in that The obtaining of the performance parameters of the candidate computing power center node includes: Collect computing power configuration parameters of the candidate computing power center nodes in the computing power network; The computing power configuration parameters are input into the computing power resource processing model to obtain the performance parameters of the candidate computing power center node.
3. The method according to claim 1, characterized in that The performance parameters include: CPU usage, memory usage, disk usage, network bandwidth usage and task completion time. The allocation parameters of the candidate computing power center node are determined according to the performance parameters of the candidate computing power center node, including: The deployment parameters of the candidate computing power center node are calculated according to the CPU utilization rate, the memory utilization rate, the disk utilization rate, the network bandwidth utilization rate and the task completion time.
4. The method according to claim 1, characterized in that: The step of selecting a target computing center node that matches the target demand task from the candidate computing center nodes according to the deployment parameters of the candidate computing center nodes and the priority of the target demand task includes: According to the priority of the target demand task, the target computing center node with the smallest allocation parameter is selected from the candidate computing center nodes.
5. The method according to claim 1, characterized in that The step of selecting a target computing center node that matches the target demand task from the computing center nodes according to the deployment parameters of the candidate computing center nodes and the priority of the target demand task includes: Calculate the load factor of the candidate computing power center according to the performance parameters of the candidate computing power center node; Calculate the dispatchability coefficient of the candidate computing power center according to the deployment parameters and the load factor of the candidate computing power center node; According to the schedulable coefficient and the priority of the target demand task, a target computing power center node matching the target demand task is selected from the computing power center nodes.
6. The method according to claim 5, characterized in that The selecting, according to the schedulable coefficient and the priority of the target demand task, a target computing power center node matching the target demand task from the computing power center nodes comprises: According to the priority of the target demand task, the target computing center node with the largest schedulable coefficient is selected from the candidate computing center nodes.
7. A computing power scheduling device, characterized in that: include: An acquisition module is used to obtain the performance parameters of candidate computing power center nodes; A determination module, used to determine the deployment parameters of the candidate computing power center node according to the performance parameters of the candidate computing power center node; A selection module is used to select a target computing power center node that matches the target demand task from the candidate computing power center nodes according to the deployment parameters of the candidate computing power center nodes and the priority of the target demand task, wherein the priority of the target demand task reflects the request time of the target demand task.
8. An electronic device, characterized in that: include: processor; a memory for storing processor-executable instructions; The processor is configured to execute instructions to implement each step in the method according to any one of claims 1 to 6.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, each step of the method according to any one of claims 1 to 6 is implemented.
10. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the steps in the method according to any one of claims 1 to 6 are implemented.
Citation Information
Cited By
Computing power scheduling management method, baseband processing unit and communication system
CN119814877A
Resource affinity-based computing power scheduling method, apparatus and device, and medium
CN120892207A
Resource affinity computing power scheduling method and device, equipment and medium
CN120892207B