Method for calculating dosage of liquid diverting agent

By obtaining reservoir and engineering parameters, combining software calculation and on-site monitoring, the dosage of liquid steering agents is scientifically calculated, and the problem of inaccurate design of liquid steering agents in low-permeability dense reservoirs is solved, achieving accurate dosage and high efficiency oil and gas fields increase production.

CN118917133AActive Publication Date: 2024-11-08SOUTHWEST PETROLEUM UNIV
View PDF 15 Cites 0 Cited by

Patent Information

Application Number
CN202410947301.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

The prior art has inaccurate design of the dosage of liquid steering agents in low-permeability dense reservoirs, resulting in low breakthrough pressure of temporary plugging layer, and solid steering agents are limited by the sandproof screen and crack size, making it difficult to effectively move and control.

Method used

By obtaining reservoir and engineering parameters, using FracMan or Kinetix software to calculate the morphology of the reservoir fracturing before temporary blockage, combining microseismic monitoring and downhole fiber monitoring to determine the temporary blockage pressure, and select liquid steering agents that meet the temporary blockage length and pressure. The filtration loss and mixed phase volumes were calculated using numerical calculations and the finite volumes, and the dosage of liquid steering agents was scientifically calculated.

Benefits of technology

The accurate calculation of the dosage of liquid steering agents is achieved, which avoids waste, improves the pressure bearing capacity and migration control of temporary blocking layers, and improves the production efficiency of oil and gas fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917133A_ABST
    Figure CN118917133A_ABST
Patent Text Reader

Abstract

The invention discloses a method for calculating the dosage of a liquid diverting agent. The method specifically comprises the following steps: (1) acquiring basic data; (2) calculating the shape and size parameters of the reservoir fracturing fracture before temporary plugging; (3) optimizing the optimal temporary plugging position in the seam by taking the productivity as the target; (4) determining temporary plugging pressure required by diversion fracturing by two means of temporary plugging diversion fracturing mine field test and numerical theoretical calculation; (5) preferably selecting several liquid diverting agents meeting conditions; (6) calculating the total filtrate loss volume of the liquid diverting agent in the process of moving from the well bottom to the optimal temporary plugging position; (7) calculating the total mixed-phase volume of the diverting agent in the process of moving from the wellhead to the optimal temporary plugging position; and (8) determining the final diverting agent and dosage by taking the minimum total price and the minimum reservoir damage as targets. According to the method, theoretical calculation and on-site fracturing data are combined, on the basis of characteristics of the diverting agent, the temporary plugging position and crack parameters, filtration loss and miscible phase in the injection process are considered, and the using amount of the diverting agent is scientifically calculated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an oil and gas field fracturing production increasing technology, in particular to a method for calculating the dosage of a liquid diverting agent, and belongs to the field of oil and gas field production increasing transformation. Background Art

[0002] For low-permeability tight reservoirs with small brittleness index, large geostress difference, high approach angle between natural fractures and hydraulic fractures, and undeveloped natural fractures, conventional hydraulic fracturing or acid fracturing can only obtain simple fractures, with a small transformation volume, small improvement in single well production capacity, and a fast production decline rate. Therefore, many scholars have proposed temporary plugging and diverting fracturing technology and carried out experiments on oil field sites, achieving certain results, but the overall success rate needs to be improved. One of the main reasons is that the dosage design of the diverting agent (also known as temporary plugging agent) is inaccurate, resulting in the breakthrough pressure of the temporary plugging layer formed by the diverting agent being lower than the temporary plugging pressure, and the temporary plugging layer is broken through. Solid diverting agents are limited by their inherent size, and it is difficult for them to pass through the sand screen. They need to match the size of the fracture. The migration process from the wellhead to the deep part of the fracture is difficult to control, and they need to be carried by fluid. Therefore, liquid diverting agents have significant advantages. They are not limited by sand control completion tools and fracture sizes, do not require fluid to carry, can be pumped independently, and are controlled by temperature, pH, time or ion concentration to change from low-viscosity liquid to high-viscosity liquid or solid. The bearing pressure of the temporary plugging layer is adjustable, but there is also the problem of inaccurate dosage design. Summary of the invention

[0003] The purpose of the present invention is to solve the above-mentioned problems and propose a method for calculating the amount of liquid diverting agent. The specific technical scheme is as follows: Figure 1 shown.

[0004] Step S1: Obtain reservoir and engineering parameters. Reservoir parameters include wellbore trajectory, logging data, geostress, stress difference coefficient, rock mechanics, natural fractures, bedding, brittleness, physical properties, etc. Engineering parameters include perforation data, injection fluid properties, injection fluid volume and displacement, etc.

[0005] Step S2: Considering the influence of natural fractures, bedding, brittleness, stress difference coefficient, multi-layer and other factors, the FracMan or Kinetix fracturing software is used to calculate the reservoir fracturing fracture morphology and size parameters before temporary plugging, and the fracture is divided into M units using rectangular units with length a and width b based on the boundary element method.

[0006] Step S3: Assuming that the temporary plugging layer formed by the diverting agent will not be broken, temporary plugging is performed at different positions in the fracture of step S2. The FracMan fracturing software is used to calculate the reservoir fracturing fracture morphology and size parameters after temporary plugging at different positions. The obtained fracture parameters are imported into the CMG oil and gas reservoir simulation software to simulate the production capacity obtained at different temporary plugging positions. The temporary plugging position corresponding to the case with the highest production capacity is the optimal temporary plugging position L. best .

[0007] Step S4: Collect the field test data of temporary plugging and diverting fracturing in the block, and analyze the fracturing construction pumping curve in combination with microseismic monitoring, downhole optical fiber monitoring, downhole television monitoring, etc., so as to determine the temporary plugging pressure P actually required for temporary plugging and diverting fracturing in the block. tem1 Based on the elastic-plastic mechanics theory, the temporary plugging pressure P required for temporary plugging and diversion fracturing is numerically calculated. tem2 Temporary plugging pressure P tem Take the larger value of the two, that is:

[0008] P tem =max(P tem1 ,P tem2 ) (1)

[0009] Where: P tem ——temporary plugging pressure, Pa; P tem1 ——temporary plugging pressure obtained from field test, Pa; P tem2 ——Temporary plugging pressure obtained by theoretical calculation, Pa.

[0010] Step S5: Preliminary selection of multiple (W) liquid diverting agents, and indoor experiments to obtain the breakthrough pressure gradients P of various liquid diverting agents bre-k , calculate the temporary plugging length L of various liquid diverters tem-k , determine the maximum temporary blocking length L according to the optimal temporary blocking position obtained in step S3 tem-max , choose to satisfy L tem-k <L tem-max Liquid diverter with different conditions. Temporary plugging length L of different liquid diverters tem-k for:

[0011]

[0012] Step S6: Calculate the total loss volume of the liquid diverter during its migration from the bottom of the well to the optimal temporary plugging position. During the migration process, the properties of the liquid diverter are constantly changing. The classic Cater loss model cannot accurately calculate the loss. The total injection time T of the liquid diverter is divided into N time steps, and the length of a single time step is Δt. In the i-th Δt, the liquid diverter has flowed to R i Fracture unit, referring to the Darcy flow concept, the loss volume of liquid diverter in the i-th Δt is:

[0013]

[0014] Where: K m-j ——matrix permeability near the wall of the jth fracture unit, m 2 ;μ j ——Liquid diversion agent viscosity at the jth fracture unit, Pa·s; Pf-j ——pressure of liquid diverter at the jth fracture unit, Pa; P m-j ——matrix pore pressure near the wall of the jth fracture unit, Pa; l m-j ——filtration loss depth near the j-th fracture unit, m.

[0015] Then, the total filtration volume of the liquid diverter during the migration from the bottom of the well to the optimal temporary plugging position is:

[0016]

[0017] The NS equations characterize the fluid flow in the fracture, and the finite volume method is used to solve the fluid pressure in the fracture. The equivalent permeability tensor method takes into account the natural fractures in the matrix, and the Darcy equation represented by the full permeability tensor characterizes the matrix fluid flow, and the 19-point finite difference method is used to solve the matrix pore pressure near the fracture.

[0018] Step S7: Calculate the total miscible volume of the liquid diverter during its migration from the wellhead to the optimal temporary plugging position. Considering the viscous fingering phenomenon, the lattice-Boltzmann method is used to calculate the miscible zone length with other fluids during the migration of the liquid diverter:

[0019]

[0020] in:

[0021]

[0022] Where: C * ——dimensionless concentration of liquid diverter; t * ——dimensionless time; u * ——dimensionless flow velocity; Pe——Peclet number, which characterizes the diffusion strength of liquid diverting agents.

[0023] Then, the total mixed phase volume is:

[0024]

[0025] In the formula: L is the length of the seam, m; h is the height of the seam, m; w is the width of the seam, m.

[0026] Step S8: Calculate the dosage V of the different liquid diverting agents selected in step S5 tem-k The final liquid diverter and its dosage V are preferably determined with the lowest total price of the liquid diverter and the least damage to the reservoir as the goal. tem . The amount of liquid diverter V tem for:

[0027]

[0028] The inventors found that the existing patents "CN106194145B A multi-stage temporary plugging depth network acid fracturing method", "CN113935093B A design method for the dosage of temporary plugging agents for diverting fracturing based on shale geology-engineering parameters", "CN110685657B A method for calculating the dosage of temporary plugging particles for diverting fracturing", and "CN111980652B A method for determining the type, size combination and dosage of temporary plugging agents in fractures" all describe methods for calculating the dosage of temporary plugging agents (also known as diverting agents), but they are for solid temporary plugging agents (such as particles, fibers, powders, etc.). Solid temporary plugging agents need to be carried by fluids and pumped, and the temporary plugging mechanism is filter cakes or filter screens (large particles or long fiber bridges, small particles or short fibers). The breakthrough pressure is mainly determined by the toughness of the filter cake or filter screen; CN106194145B and CN110685657B need to calculate the amount of bridge particles and filling particles respectively; CN111980652B and CN113935093B use the API standard diversion chamber device to simulate the temporary plugging process. The temporary plugging length is short, with a maximum of 15.85 cm, and it is believed that the amount of diverter required for on-site fracturing is simply the amount used in the indoor experiment multiplied by the ratio of the height and width of the reservoir fracture to the experimental height and width. The indoor experimental results are affected by factors such as the size of the rock plate and the type of carrying fluid. The temporary plugging process simulated by the device is relatively simple, which is quite different from the complex temporary plugging and diverting process of actual on-site construction. The existing patent "CN115898324A A method for optimizing the amount of temporary plugging and diverting agent" uses multivariate regression analysis to analyze the apparent correlation between the reservoir characteristic data, designed fracture characteristic data, diverting agent carrying fluid characteristic data, and diverting agent characteristic data of wells with better temporary plugging and diverting fracturing effects and the actual amount of temporary plugging agent used in fracturing, thereby predicting the amount of diverting agent used in future wells to be fractured. The existing patent "CN109267985B A method for controlling the amount of temporary plugging and diverting agent used in temporary plugging and diverting fracturing" believes that the diverting agent will fill the area from the temporary plugging position to the tip of the fracture. When the fracture mouth is temporarily plugged, the amount of diverting agent used is the entire fracture volume. When the 1 / 3 of the fracture end is temporarily plugged, the amount of diverting agent used is the volume from 1 / 3 of the fracture end to the fracture tip. Obviously, the amount of diverting agent obtained by this calculation method is obviously too large, and the actual amount of diverting agent required is not really calculated, which is a certain waste. The existing patent "CN113468831A A method for designing the amount of temporary plugging material in a fracture" calculates the support force P acting on the plugging layer in step S3. plug The formula is P plug =(P fmouse w plug_mouse -P ftip w plug_tip ) / [2a(1-φ)tanδ3], and step S5 determines whether the friction instability strength criterion of the seam plugging layer is met. If not, steps S3 to S5 are repeated, but the friction instability strength criterion of the seam plugging layer in step S5 is hP fmouse w plug_mouse-hP ftip w plug_tip ≤hP plug 2a(1-φ)tanδ3, the left and right sides of the formula are divided by h, and the final result is P plug ≥(P fmouse w plug_mouse -P ftip w plug_tip ) / [2a(1-φ)tanδ3], obviously, after executing step S3, the condition of step S5 will be automatically satisfied. In addition, it does not take into account the loss of diverting agent during injection and the mixing of diverting agent with other fluids caused by viscous fingering. The existing patents "CN114592823A Method for determining the amount of temporary plugging diverting material and its application" and "CN114592840A Temporary plugging fracturing method and its application" have the same invention content. Both patents believe that the amount of diverting agent is proportional to the square of the length and width of the fracture, the density of the diverting agent and the permeability of the temporary plugging layer formed by it, and inversely proportional to the viscosity and displacement of the carrying fluid. The theoretical basis is insufficient. The permeability of the temporary plugging layer formed by the liquid diverting agent is almost 0, and the amount cannot be calculated. Therefore, it is only applicable to solid diverting agents.

[0029] Compared with the existing patents, the main differences of the present invention are: (1) different applicable objects, different temporary plugging mechanisms, and different dosage design ideas: the existing patents are mainly aimed at solid diverting agents, which need to rely on fluid to carry and pump, and the temporary plugging mechanism is filter cake or filter screen (large particles or long fiber bridge, small particles or short fiber filling). The breakthrough pressure is mainly determined by the toughness of the filter cake or filter screen, and the dosage of large particles or long fibers of the bridge and small particles or short fibers of the filling need to be calculated separately; the present invention is aimed at liquid diverting agents, which can be pumped independently, and the temporary plugging mechanism is volume temporary plugging. The breakthrough pressure is mainly determined by the temporary plugging length, and only one liquid diverting agent dosage needs to be calculated; (2) Different dosage calculation methods: most of the existing patents obtain diverting agents through indoor experiments. The amount of diverter is calculated and then magnified to the amount required in the mine through a simple similarity principle. The temporary plugging length of the indoor experiment is relatively short, and the experimental results are affected by many experimental factors. Alternatively, the apparent correlation between the reservoir, fracture, diverter characteristics and the amount of diverter is obtained through a simple multiple regression analysis of the field fracturing test data, thereby predicting the amount of diverter required for fracturing of other wells, and the actual amount of diverter required is not analyzed from a mechanism perspective. The present invention comprehensively determines the temporary plugging pressure by combining numerical theoretical calculations with field fracturing test data, and then combines the liquid diverter characteristics, temporary plugging position, and fracture parameters, considers the filtration loss and miscibility during the injection of the liquid diverter, and scientifically calculates the amount of diverter. The calculated amount of diverter is accurate and reasonable, without waste.

[0030] The benefits of the present invention are as follows: for liquid diverting agents, the present invention combines theoretical calculations with field fracturing data, and then based on the characteristics of the liquid diverting agent, temporary plugging position, fracture parameters, and considering the filtration loss and miscibility during the injection process, the amount of diverting agent is scientifically calculated, and the result is reasonable without waste. Other advantages, objectives and features of the present invention will be partially reflected in the following description, and partly will be understood by those skilled in the art through research and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a flow chart for calculating the dosage of liquid diverting agents.

[0032] Figure 2 This is the wellbore trajectory diagram of Well S.

[0033] Figure 3 This is the distribution diagram of the geostress in Well S.

[0034] Figure 4 This is the grid division diagram of the fractures before temporary plugging in Well S.

[0035] Figure 5 It is the production capacity increase ratio corresponding to temporary plugging at different positions in the S well fracture. DETAILED DESCRIPTION

[0036] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0037] Step S1: Taking the WSQ block as an example, the wellbore trajectory of Well S is as follows: Figure 2 The distribution of ground stress calculated based on the logging data is shown in Figure 3 As shown, the horizontal stress difference coefficient is 0.11-0.216, Young's modulus is 16.2 GPa, Poisson's ratio is 0.22, the natural fracture line density is 0.2 lines / m, the angle with the maximum horizontal ground stress direction is about 75°, the natural fracture cohesion is 10 MPa, the natural fracture friction coefficient is 0.6, the rock tensile strength is 3 MPa, there is no stratification, the brittleness index is 40.4%, the porosity is 8.9%, and the permeability is 5.23×10 -3 μm 2 The perforation density is 16 holes / m, the aperture is 10 mm, the phase angle is 60°, and the perforation pattern is spiral. The viscosity of the injected fluid is 26 mPa·s and the density is 1050 kg / m 3 , displacement 6m 3 / min, the injection volume before temporary blockage is 100m 3 , after temporary plugging, the injection volume is 80m 3 .

[0038] Step S2: Use FracMan software to calculate the fracture morphology and size parameters of the reservoir before temporary plugging. Since the approach angle between natural fractures and hydraulic fractures is as high as 75°, the hydraulic fractures directly pass through the natural fractures. The fractures are divided into 195 units using rectangular units with a length of a = 6m and a width of b = 3m, as shown in Figure 4 shown.

[0039] Step S3: Use FracMan software to calculate reservoir fracturing parameters after temporary plugging at 5, 15, 35, 55, and 75 m in the fracture length direction. Import the obtained fracture parameters into CMG oil and gas reservoir simulation software to simulate the production capacity obtained at different temporary plugging positions, such as Figure 5 As shown, the best temporary blocking position L best It is 55m inside the crack.

[0040] Step S4: Based on the field test results of temporary plugging and diverting fracturing wells in the same layer around Well S, the temporary plugging pressure P actually required for temporary plugging and diverting fracturing in Well S is determined. tem1 is 15.8MPa; Based on the elastic-plastic mechanics theory, the temporary plugging pressure P required for temporary plugging and diverting fracturing is numerically calculated. tem2 is 17.2MPa; temporary plugging pressure P tem Take the larger value of the two, i.e. 17.2MPa.

[0041] Step S5: Five liquid diverting agents (DA-1, DA-2, DA-3, DA-4, and DA-5) were preliminarily selected, and the breakthrough pressure gradients P of various liquid diverting agents were obtained by indoor experiments. bre-k They are 0.51, 0.87, 0.62, 1.53, and 1.32 MPa / m, respectively, corresponding to the temporary plugging length L of various liquid diverting agents tem-k The maximum temporary blocking length L is determined based on the best temporary blocking position obtained in step S3. tem-max is 27m, select tem-k <L tem-max The liquid diverting agents used in the above conditions are DA-2, DA-4 and DA-5 liquid diverting agents.

[0042] Step S6: The total filtration volume of DA-2, DA-4 and DA-5 liquid diverting agents during migration from the bottom of the well to the optimal temporary plugging position was 12.1, 8.3 and 9.7 m3, respectively. 3 .

[0043] Step S7: The total mixed phase volumes of DA-2, DA-4, and DA-5 liquid diverting agents during migration from the wellhead to the optimal temporary plugging position are 3.8, 2.4, and 2.9 m3, respectively. 3 .

[0044] Step S8: Amount of DA-2, DA-4, DA-5 liquid diverting agents V tem-k 20.6, 13.4 and 15.7m respectively 3 With the lowest total price of liquid diverter and the least damage to the reservoir as the goal, the final diverter is preferably determined to be DA-4 liquid diverter, with a dosage of 13.4m 3 .

[0045] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A method for calculating the amount of liquid diverting agent, characterized in that: The following steps are involved: S1: Obtain reservoir and engineering parameters; reservoir parameters include wellbore trajectory, logging data, geostress, stress difference coefficient, rock mechanics, natural fractures, bedding, brittleness, physical properties, etc.; engineering parameters include perforation data, injected fluid properties, injected fluid volume and displacement, etc.; S2: Considering the influence of natural fractures, bedding, brittleness, stress difference coefficient, multi-layer and other factors, the FracMan or Kinetix fracturing software is used to calculate the reservoir fracturing fracture morphology and size parameters before temporary plugging, and the fracture is divided into M units using rectangular units with length a and width b based on the boundary element method; S3: Assuming that the temporary plugging layer formed by the diverting agent will not be broken, temporary plugging is performed at different positions in the fractures of step S2. The FracMan fracturing software is used to calculate the reservoir fracturing fracture morphology and size parameters after temporary plugging at different positions. The obtained fracture parameters are imported into the CMG oil and gas reservoir simulation software to simulate the production capacity obtained at different temporary plugging positions. The temporary plugging position corresponding to the case with the highest production capacity is the optimal temporary plugging position L best ; S4: Collect the field test data of temporary plugging and diverting fracturing in the block, and analyze the pumping curve of fracturing construction by combining microseismic monitoring, downhole optical fiber monitoring, downhole television monitoring, etc., so as to determine the temporary plugging pressure P actually required for temporary plugging and diverting fracturing in the block. tem1 Based on the elastic-plastic mechanics theory, the temporary plugging pressure P required for temporary plugging and diversion fracturing is numerically calculated. tem2 Temporary plugging pressure P tem Take the larger value of the two; S5: Preliminary selection of multiple (W) liquid diverting agents, indoor experiments to obtain the breakthrough pressure gradient P of various liquid diverting agents bre-k , calculate the temporary plugging length L of various liquid diverters tem-k , determine the maximum temporary blocking length L according to the optimal temporary blocking position obtained in step S3 tem-max , choose to satisfy L tem-k <L tem-max Liquid diverter under certain conditions; Temporary plugging length L of different liquid diverters tem-k for: S6: Calculate the total filtration volume of the liquid diverter during the migration from the bottom of the well to the optimal temporary plugging position; S7: Calculate the total miscible volume during the process of liquid diverting agent migrating from the wellhead to the optimal temporary plugging position; S8: Calculate the amount V of the different liquid diverting agents selected in step S5 tem-k The final liquid diverter and its dosage V are preferably determined with the lowest total price of the liquid diverter and the least damage to the reservoir as the goal. tem .

2. A method for calculating the amount of a liquid diverting agent as claimed in claim 1, characterized in that: In step S6, the total injection time T of the liquid diverter is divided into N time steps, and the length of a single time step is Δt; within the i-th Δt, the liquid diverter has flowed to R i The loss volume of liquid diverter in the i-th Δt fracture unit is: Where: K m-j ——matrix permeability near the wall of the jth fracture unit, m 2 ;μ j ——Liquid diversion agent viscosity at the jth fracture unit, Pa·s; P f-j ——pressure of liquid diverter at the jth fracture unit, Pa; P m-j ——matrix pore pressure near the wall of the jth fracture unit, Pa; l m-j ——filtration depth near the jth fracture unit, m; The total filtration volume of the liquid diverter during its migration from the bottom of the well to the optimal temporary plugging position is: The NS equations characterize the fluid flow in the fracture, and the finite volume method is used to solve the fluid pressure in the fracture. The equivalent permeability tensor method takes into account the natural fractures in the matrix, and the Darcy equation represented by the full permeability tensor characterizes the matrix fluid flow, and the 19-point finite difference method is used to solve the matrix pore pressure near the fracture.

3. A method for calculating the amount of liquid diverting agent as claimed in claim 1, characterized in that: In step S7, the viscous fingering phenomenon is considered and the lattice-Boltzmann method is used to calculate the length of the miscible zone with other fluids during the migration of the liquid diverting agent: in: Where: C * ——dimensionless concentration of liquid diverter; t * ——dimensionless time; u * ——dimensionless flow velocity; Pe——Peclet number, which characterizes the diffusion strength of liquid diverting agents; Then, the total miscible volume is: In the formula: L is the length of the seam, m; h is the height of the seam, m; w is the width of the seam, m.

4. A method for calculating the amount of a liquid diverting agent as claimed in claim 1, characterized in that: In step S8, the amount of liquid diverting agent V tem for: Where: V tem ——Liquid diverter dosage m 3 .

Citation Information

Patent Citations

  • A multi-stage temporary plugging depth network acid fracturing method

    CN106194145B

  • A method for controlling the dosage of temporary plugging agent in directional fracturing.

    CN109267985B

  • A method for calculating the amount of temporary plugging particles used in diverting fracturing.

    CN110685657B

  • Methods for determining the type, size combination, and dosage of temporary sealant for joints

    CN111980652B

  • Method for designing amount of temporary plugging materials in fracturing crack

    CN113468831A