Air conditioner upgrading method, server and computer readable storage medium
By obtaining the load-loading length ratio parameters of the air conditioner, confirming and generating an upgrade program, and adjusting the temperature adjustment capability of the air conditioner, the problem of mismatch between the air conditioner's temperature adjustment logic and the working condition is solved, and the temperature adjustment capability and user experience are improved.
Patent Information
- Application Number
- CN202310647194.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-01
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2043-06-01
AI Technical Summary
The temperature regulation logic of the air conditioner cannot be updated in real time according to changes in working conditions, resulting in the temperature regulation capability not being able to fully meet user needs and affecting the user's cooling and cooling experience.
By obtaining the load-loading length ratio parameters of the air conditioner in the preset acquisition cycle, confirm whether the temperature adjustment logic needs to be upgraded, and generate an upgrade program based on the parameters to adjust the temperature adjustment capability of the air conditioner, including calculating the load-loading length ratio parameters and judging its The relationship between preset standard intervals is generated to generate an upgrade program designed to improve or reduce the temperature regulation capability.
The air conditioner temperature regulation logic matches the current working conditions, improves the temperature regulation capability, meets user needs, and improves the efficiency and user experience of the air conditioner.
Smart Images

Figure CN119063184A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of air conditioning, and in particular to an air conditioning upgrading method, a server and a computer-readable storage medium. Background Art
[0002] The main function of air conditioning is to adjust the indoor temperature. For heat pump air conditioners, it has both cooling and heating functions.
[0003] When the air conditioner is in cooling and heating operation, its temperature regulation ability (cooling capacity and heating capacity) directly affects the user's heating and cooling experience. The temperature regulation ability is not only related to the hardware structure of the air conditioner, but also closely related to the operating conditions and control logic. However, the control logic of the air conditioner has been determined at the factory and cannot be updated in real time according to changes in operating conditions, which affects the performance of the air conditioner and the user's heating and cooling experience. Summary of the invention
[0004] An object of the present invention is to provide an air conditioner upgrading method, a server and a computer-readable storage medium that can overcome the above problems or at least partially solve the above problems.
[0005] The purpose of the present invention is to make the temperature adjustment logic of the air conditioner more compatible with the current working conditions so that the temperature adjustment capability of the air conditioner can fully meet the needs of users.
[0006] In one aspect, the present invention provides a method for upgrading an air conditioner, comprising:
[0007] Obtain the load duration ratio parameters of the air conditioner in the preset collection cycle and the current temperature adjustment logic;
[0008] Determining whether the current temperature adjustment logic needs to be upgraded according to the load duration ratio parameter, so as to adjust the temperature adjustment capability of the air conditioner;
[0009] If yes, generating an upgrade program of the temperature regulation logic according to the load duration ratio parameter and the current temperature regulation logic;
[0010] The air conditioner is controlled to upgrade the temperature adjustment logic based on the upgrade program.
[0011] Optionally, each of the collection cycles is a preset time period before a corresponding data collection moment.
[0012] Optionally, obtaining the load duration ratio parameter of the air conditioner in the collection period includes:
[0013] Obtaining the load duration of the compressor running at a frequency higher than a preset frequency and / or the number of self-stops of the compressor during the collection period of the air conditioner, as well as the total duration of intervals between all adjacent on / off events based on user operations;
[0014] The load duration ratio parameter is calculated based on the load duration and / or the number of self-shutdowns, and the total duration.
[0015] Optionally, obtaining the load duration ratio parameter of the air conditioner in the collection period includes:
[0016] The load duration ratio parameter is calculated according to the following formula: C=a(T / T0)-b(N / T0);
[0017] In the formula, C is the load duration ratio parameter, T is the load duration, T0 is the total duration, N is the number of automatic shutdowns, and a and b are preset coefficients.
[0018] Optionally, confirming whether the temperature adjustment logic needs to be upgraded according to the load duration ratio parameter includes:
[0019] Determine the relationship between the load duration ratio parameter and a preset duration parameter standard interval;
[0020] If the load duration ratio parameter falls within the duration parameter standard range, it is confirmed that there is no need to upgrade the temperature adjustment logic;
[0021] If the load duration ratio parameter does not fall within the duration parameter standard range, it is confirmed that the temperature adjustment logic needs to be upgraded.
[0022] Optionally, generating an upgrade program for the temperature adjustment logic according to the load duration ratio parameter and the current temperature adjustment logic includes:
[0023] Determine the relationship between the load duration ratio parameter and a preset duration parameter standard interval;
[0024] If the load duration ratio parameter falls to the right of the duration parameter standard interval, an upgrade program for temperature regulation logic is generated to improve the temperature regulation capability of the air conditioner;
[0025] If the load duration ratio parameter falls to the left of the duration parameter standard interval, an upgrade program for the temperature regulation logic is generated to reduce the temperature regulation capability of the air conditioner.
[0026] Optionally, in the upgrade program, the adjustment range of the temperature adjustment capability of the air conditioner is proportional to the distance of the load duration ratio parameter from the standard interval of the duration parameter.
[0027] Optionally, during the collection period, the operation mode of the air conditioner is a cooling mode or a heating mode;
[0028] The temperature regulation capacity is cooling capacity or heating capacity.
[0029] On the other hand, the present invention further provides a server, comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, it is used to implement the control method according to any one of the above items.
[0030] In yet another aspect, the present invention further provides a computer-readable storage medium storing a computer program, wherein the computer program implements any of the above-mentioned upgrading methods when executed by a processor.
[0031] In the upgrade method of the air conditioner of the present invention, the load time ratio parameter of the air conditioner in the previous acquisition cycle is obtained. The load time ratio parameter can reflect the effective operation time of the compressor in the acquisition cycle (it is best to deduct the compressor running at an extremely low frequency such as 1Hz to keep it from stopping), that is, it reflects the temperature regulation ability and temperature regulation difficulty of the air conditioner in the cycle. Specifically, if the load time ratio parameter is large, it indicates that the cooling capacity / heating capacity of the current temperature regulation logic is insufficient, and the compressor needs to run for a long time, with little chance of stopping or running at an extremely low frequency, and the temperature regulation difficulty is relatively large. On the contrary, if the load time ratio parameter is small, it indicates that the cooling capacity / heating capacity of the existing temperature regulation logic is excessive, so that the compressor runs too little in the cycle, the shutdown or extremely low frequency time is long, and the temperature regulation difficulty is low. The first case above makes the user feel that the cooling / heating is too slow and the effect is not good, and the second case makes the air conditioner cooling / heating efficiency low. Therefore, when the above situation occurs, an upgrade program can be generated according to the load duration ratio parameter and the current temperature adjustment logic to adjust the temperature adjustment capability of the air conditioner to a reasonable range, which not only meets user needs but also makes it more efficient. In addition, the remote upgrade process can be realized through OTA to improve the user experience.
[0032] Furthermore, in the air conditioner upgrading method of the present invention, the load time ratio parameter is comprehensively calculated based on the load time of the compressor running at a frequency higher than the preset frequency and the number of self-stops of the compressor during the collection period, so that the result of the load time ratio parameter is more reasonable and effective, and interference factors are eliminated.
[0033] Based on the following detailed description of specific embodiments of the present invention in conjunction with the accompanying drawings, those skilled in the art will become more aware of the above and other objects, advantages and features of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Hereinafter, some specific embodiments of the present invention will be described in detail in an exemplary and non-limiting manner with reference to the accompanying drawings. The same reference numerals in the accompanying drawings indicate the same or similar components or parts. It should be understood by those skilled in the art that these drawings are not necessarily drawn to scale. In the accompanying drawings:
[0035] Figure 1is a schematic diagram of an air conditioner upgrading method according to an embodiment of the present invention;
[0036] Figure 2 is a flow chart of an air conditioner upgrade method according to an embodiment of the present invention;
[0037] Figure 3 is a schematic block diagram of a server according to an embodiment of the present invention;
[0038] Figure 4 is a schematic block diagram of a computer-readable storage medium according to an embodiment of the present invention. DETAILED DESCRIPTION
[0039] Refer to the following Figures 1 to 4 The air conditioner upgrade method, server, and computer-readable storage medium according to the embodiments of the present invention are described.
[0040] It should be noted that the logic and / or steps represented in the flowchart or described in other ways herein, for example, can be considered as a sequenced list of executable instructions for implementing logical functions, and can be specifically implemented in any computer-readable medium for use by an instruction execution system, device or equipment (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or equipment and execute instructions), or used in combination with these instruction execution systems, devices or equipment.
[0041] The flow chart and block diagram in the accompanying drawings show the possible architecture, function and operation of the system, method and computer program product according to multiple embodiments of the present invention. In this regard, each square box in the flow chart or block diagram can represent a part of a module, program segment or instruction, and a part of the module, program segment or instruction includes one or more executable instructions for realizing the specified logical function. In some alternative implementations, the function marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two continuous square boxes can actually be executed substantially in parallel, and they can sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs the specified function or action, or can be implemented with a combination of special hardware and computer instructions.
[0042] On the one hand, the present invention provides an upgrade method for an air conditioner. The air conditioner is used to regulate indoor air, including regulating the temperature, humidity, and air quality of the air, humidifying and dehumidifying the indoor air, introducing fresh air, and the like. The air conditioner is composed of an evaporator, a condensing device, a compressor, a throttling device, and other components to form a vapor compression refrigeration cycle system. The upgrade method for the air conditioner is used to upgrade the control program of the air conditioner. Specifically, the OTA method can be adopted, that is, the latest software upgrade package is downloaded from a remote server through the mobile communication interface of the air conditioner, and the control program itself is upgraded, so as to realize remote management of the air conditioner by the air conditioner manufacturer.
[0043] It should be understood that the upgrade methods in the embodiments of the present invention are all described from the server side, that is, the server executes the relevant steps.
[0044] The inventor of the present invention realizes that when the air conditioner is cooling or heating, the temperature regulation ability is not only related to the hardware structure of the air conditioner (mainly the size of the refrigeration system), but also closely related to the operating conditions and control logic of the air conditioner. However, in reality, the design of the control logic often only takes into account conventional operating conditions, but not special operating conditions. Therefore, the control logic often does not match the operating conditions, making it difficult for the air conditioner to operate at optimal efficiency and meet the user's heating and cooling needs.
[0045] Based on this understanding, the present invention particularly designs the following optimization scheme. Figure 1 is a schematic diagram of an air conditioner upgrading method according to an embodiment of the present invention.
[0046] like Figure 1 As shown, the air conditioner upgrade method of the embodiment of the present invention may generally include the following steps:
[0047] Step S102: Obtain the load duration ratio parameter of the air conditioner in a preset collection cycle and the current temperature adjustment logic.
[0048] Step S104: confirming whether the temperature adjustment logic needs to be upgraded according to the load duration ratio parameter, so as to adjust the temperature adjustment capability of the air conditioner;
[0049] Step S106: If yes, generate an upgrade program for the temperature control logic according to the load duration ratio parameter and the current temperature control logic;
[0050] Step S108: Control the air conditioner to upgrade the temperature adjustment logic based on the upgrade program.
[0051] In the upgrade method of the embodiment of the present invention, the server collects the operating parameters of the air conditioner by remote communication. In the above collection cycle, the operating mode of the air conditioner is the cooling mode or the heating mode, and the temperature adjustment capacity of the air conditioner is the cooling capacity or the heating capacity, for example, specifically the cooling capacity or the heating capacity.
[0052] Each collection cycle is a preset time period before the corresponding data collection time. For example, you can set time A every day as the data collection time, collect relevant data within X time between time AX and time A on the same day, and the time period between AX and A constitutes the "collection cycle" of the collection time. The server can obtain the relevant operation data of the air conditioner in real time, and filter, summarize and calculate it at the collection time. Alternatively, the controller of the air conditioner can record the relevant operation data in real time and provide it to the server at the collection time.
[0053] The load duration refers to the effective operation time of the compressor. It is best to deduct the time when the compressor runs at an extremely low frequency such as 2Hz or 1Hz, because the most important purpose of this extremely low frequency operation is to ensure that the compressor does not stop and reduce start-stop losses. The main purpose is not cooling / heating. The load duration ratio parameter is related to the load duration and is used to reflect the load level of the compressor during the collection cycle, that is, it reflects the temperature regulation capability and temperature regulation difficulty of the air conditioner during the cycle.
[0054] Specifically, if the load duration ratio parameter is large, it indicates that under the working conditions of the collection period, the air conditioner is controlled by the current temperature adjustment logic, and the air conditioner cooling capacity / heating capacity is insufficient, so that the compressor needs to run for a long time in the collection period, the downtime or extremely low frequency operation time is very short, and the temperature adjustment is very difficult. On the contrary, if the load duration ratio parameter is small, it indicates that the air conditioner cooling capacity / heating capacity of the current temperature adjustment logic is excessive, so that the compressor operation time in the collection period is too short, the downtime or extremely low frequency operation is too long, and the temperature adjustment difficulty is too low. The first situation above makes the user feel that the cooling / heating is too slow and the effect is not good, and the second situation makes the cooling / heating efficiency low. Therefore, in the above situation, an upgrade program can be generated according to the load duration ratio parameter and the current temperature adjustment logic to adjust the temperature adjustment capacity of the air conditioner to a reasonable range, which not only meets user needs but also makes it more efficient.
[0055] Specifically, remote upgrade can be achieved through OTA. For example, automatic upgrade or manual upgrade can be used. Automatic upgrade means that the server sends the upgrade program to the air conditioner, and it automatically upgrades in a reasonable time period (for example, when the air conditioner is shut down at night). After the upgrade is completed, you can choose to report the prompt information to the customer. Manual upgrade means that the server reports the upgrade prompt information to the customer, which can be specifically achieved through the terminal app, remote control, and air conditioner base control panel light. The user chooses to upgrade or not. When the user chooses to upgrade, the server sends the upgrade program to the air conditioner, and the air conditioner executes the upgrade process after receiving it.
[0056] In step S104, if it is determined that the temperature adjustment logic does not need to be upgraded, the process ends.
[0057] During the entire service life of the air conditioner, the above upgrade method can be run only once or multiple times. For example, the server can collect air conditioner parameters regularly or irregularly. If the collection is regular, the collection frequency can be reasonably set, such as once a day or every three days. After each collection, when it is determined that an upgrade is needed, the temperature adjustment logic is upgraded in time. As for irregular collection, the manufacturer can determine the collection time based on climate and other working conditions to cope with the adverse effects of drastic changes in climate and other working conditions on the air conditioner.
[0058] In some embodiments, in the aforementioned step S102, obtaining the load duration ratio parameter of the air conditioner in the collection cycle includes: obtaining the load duration T of the compressor of the air conditioner running at a frequency higher than the preset frequency and / or the number of self-stops N of the compressor in the collection cycle, as well as the total duration T0 of all adjacent on / off event intervals based on user operations; and calculating the load duration ratio parameter C according to the load duration T and / or the number of self-stops N, and the total duration T0. It can be seen that the larger the load duration T and the smaller the number of self-stops N, the greater the load of the compressor in the collection cycle and the higher the difficulty of temperature regulation. The smaller the load duration T and the greater the number of self-stops N, the smaller the load of the compressor in the collection cycle and the lower the difficulty of temperature regulation.
[0059] The preset frequency can be reasonably set according to the original compressor control method of the air conditioner. For example, if in the original compressor control method, when the indoor temperature reaches near the set temperature, the compressor is controlled to stop, and when the indoor temperature deviates from the set temperature to reach the preset temperature difference, the compressor is restarted, it means that the entire running time of the compressor is for cooling / heating, and the aforementioned "preset frequency" can be set to 0. If in the original compressor control method, when the indoor temperature reaches near the set temperature, the compressor is controlled to run at an extremely low frequency, such as 2Hz, 1Hz, 0.5Hz, etc., the most important purpose of extremely low frequency operation is to ensure that the compressor does not stop and reduce start-stop losses, and it is not mainly used for cooling / heating. Therefore, the aforementioned "preset frequency" can be set to 2Hz, 1Hz, 0.5Hz, etc., so as to exclude the time of extremely low frequency operation and not include it in the load time T of the compressor.
[0060] In this step, the number of compressor self-stops N refers to the number of times the air conditioner controls the compressor to automatically stop when the indoor temperature reaches near the set temperature. In each collection cycle, the user may use the air conditioner once or more, and each time the air conditioner is turned on and off by operating the remote control, terminal app, and control panel. There is an interval between each power-on event and shutdown event, and the sum of the intervals of all power-on and power-off times in the collection cycle constitutes the total duration T0. For example, in a certain "collection cycle", the user uses the air conditioner twice. The first time it was turned on at time t and turned off at time v, with an interval of T1 hours, during which the compressor automatically stopped N1 times. The second time it was turned on at time c and turned off at time d, with an interval of T2 hours, during which the compressor automatically stopped N2 times. Then the total duration T0 = T1 + T2, and the number of self-stops N = N1 + N2.
[0061] Furthermore, in the aforementioned step S102, obtaining the load duration ratio parameter of the air conditioner during the collection period includes: calculating the load duration ratio parameter according to the following formula: C=a(T / T0)-b(N / T0). In the formula, C is the load duration ratio parameter, T is the load duration, T0 is the total duration, N is the number of self-stops, and a and b are preset coefficients. This calculation method comprehensively considers the load duration, the number of self-stops and the total duration of the compressor, so that the load duration ratio parameter can better reflect the load degree of the compressor during the collection period. The technician can judge the degree of reflection of T and N on the load degree of the compressor according to the specific model of the air conditioner and the existing control logic, so as to reasonably determine the size of a and b. It can be understood that a and b are both positive values or one is 0 and the other is positive.
[0062] In some embodiments, the aforementioned step S104, i.e., confirming whether the temperature adjustment logic needs to be upgraded according to the load duration ratio parameter C, includes:
[0063] Determine the relationship between the load duration ratio parameter C and the preset duration parameter standard range; if the load duration ratio parameter C falls within the duration parameter standard range, confirm that there is no need to upgrade the temperature control logic; if the load duration ratio parameter C does not fall within the duration parameter standard range, confirm that the temperature control logic needs to be upgraded.
[0064] Specifically, the standard interval of the duration parameter represents the reasonable range of the load duration ratio parameter C, or the ideal range. When C falls into the standard interval of the duration parameter, it indicates that the load level of the compressor is within the normal range and there is no need to change the temperature control logic. The left endpoint of the standard interval of the duration parameter is C1, and the right endpoint is C2. It can be an open interval, a closed interval, a left-open and right-closed interval, or a left-closed and right-open interval. Technicians can reasonably determine the range of the standard interval of the duration parameter based on the specific model of the air conditioner and the existing control logic.
[0065] Further, the aforementioned step S106, i.e., generating an upgrade program of the temperature regulation logic according to the load duration ratio parameter C and the current temperature regulation logic, includes: determining the relationship between the load duration ratio parameter C and the preset duration parameter standard interval; if the load duration ratio parameter C falls to the right side of the duration parameter standard interval, generating an upgrade program of the temperature regulation logic for improving the temperature regulation capability of the air conditioner; if the load duration ratio parameter C falls to the left side of the duration parameter standard interval, generating an upgrade program of the temperature regulation logic for reducing the temperature regulation capability of the air conditioner. For example, the duration parameter standard interval is a closed interval [C1, C2], and when C1≤C≤C2, it indicates that C falls to the right side of the interval. When C>C2, it indicates that C falls to the right side of the interval, indicating that the C value is too large, and the compressor is under a large load in the acquisition cycle, so it is necessary to improve the temperature regulation capability, that is, to improve the cooling capability / heating capability. When C<C1, it indicates that C falls to the left side of the interval, and the compressor is under a small load in the acquisition cycle, so it is necessary to reduce the temperature regulation capability, that is, to reduce the cooling capability / heating capability.
[0066] Specifically, the temperature regulation logic can be adjusted by adjusting multiple control parameters to increase / decrease the temperature regulation ability of the air conditioner. For example, if other parameters remain unchanged, increasing / decreasing the compressor frequency can increase / decrease the temperature regulation ability, that is, increase / decrease the cooling capacity / heating capacity. If other parameters remain unchanged, increasing / decreasing the speed of the heat exchange fan can increase / decrease the temperature regulation ability. If other parameters remain unchanged, increasing / decreasing the opening of the electronic expansion valve can increase / decrease the temperature regulation ability. These control methods can be used alone or in combination. The above methods of increasing / decreasing the temperature regulation ability of the air conditioner are well known to those skilled in the art and will not be repeated here.
[0067] Furthermore, in the upgrade procedure, the adjustment range of the temperature adjustment capability of the air conditioner is proportional to the distance of the load duration ratio parameter C from the standard interval of the duration parameter. The calculation method of the distance between the point value and the interval is clear to those skilled in the art. Specifically, when C falls to the right side of the interval, the distance is C-C2, and when C falls to the left side of the interval, the distance is C1-C. This embodiment makes the adjustment range proportional to the distance, so that the adjustment range can better meet the actual needs of the air conditioner.
[0068] For example, taking improving the temperature regulation capability as an example, the compressor frequency increment ΔF=m(C-C2), the heat exchange fan speed increment Δn=k(C-C2), and the electronic expansion valve opening ΔB=r(C-C2), where m, k, and r are all positive coefficients.
[0069] In some optional embodiments, higher technical effects can be achieved by further optimizing and configuring the above steps. The upgrade method of this embodiment is described in detail below in combination with the introduction of an optional execution process of this embodiment. This embodiment is only an example of the execution process. During the specific implementation, the execution order and operating conditions of some steps can be modified according to the specific implementation requirements.
[0070] Figure 2 4 is a flow chart of an air conditioner upgrading method according to an embodiment of the present invention.
[0071] like Figure 2 As shown, the upgrading method of a preferred embodiment of the present invention sequentially performs the following steps:
[0072] Step S202: Obtain the load duration ratio parameter of the air conditioner in the collection cycle and the current temperature adjustment logic.
[0073] Step S204: Determine whether the load duration ratio parameter falls within the preset duration parameter standard range. If yes, execute step S206: Confirm that there is no need to upgrade the temperature control logic. If not, execute step S208:
[0074] Step S208: confirming that the temperature adjustment logic needs to be upgraded.
[0075] Step S210: Determine whether the load duration ratio parameter falls on the right side of the duration parameter standard interval. If so, execute step S212; if not, it indicates that the load duration ratio parameter falls on the left side of the duration parameter standard interval, execute step S214.
[0076] Step S212: Generate an upgrade program for the temperature adjustment logic to improve the temperature adjustment capability of the air conditioner.
[0077] Step S214: Generate an upgrade program for the temperature adjustment logic to reduce the temperature adjustment capability of the air conditioner.
[0078] Step S216: Control the air conditioner to upgrade the temperature adjustment logic based on the upgrade program.
[0079] The present invention also provides a server, Figure 3 is a schematic block diagram of a server according to an embodiment of the present invention.
[0080] like Figure 3 As shown, the server of the embodiment of the present invention may generally include a processor 810 and a memory 820, wherein the memory 820 stores a computer program 821, and when the computer program 821 is executed by the processor 810, it is used to implement the method of any embodiment of the present invention.
[0081] The processor 810 may be a central processing unit (CPU), or a digital processing unit, etc. The processor 810 sends and receives data via a communication interface. The memory 820 is used to store the program executed by the processor 810. The memory 820 is any medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, and may also be a combination of multiple memories. The above-mentioned computer program 821 can be downloaded from a computer-readable storage medium to a corresponding computing / processing device or downloaded and installed to a server via a network (e.g., the Internet, a local area network, a wide area network, and / or a wireless network).
[0082] The present invention also provides a computer storage medium, Figure 4 is a schematic block diagram of a computer-readable storage medium according to an embodiment of the present invention.
[0083] like Figure 4 As shown, the computer storage medium 700 stores a computer program 821, and when the computer program 821 is executed, the device where the computer storage medium 700 is located executes the refrigerator control method of any of the above embodiments.
[0084] The computer storage medium 700 of this embodiment can be an electronic memory such as a flash memory, an EEPROM (electrically erasable programmable read-only memory), an EPROM, a hard disk or a ROM. The computer storage medium 700 has a storage space for a computer program 821 for executing any method step of the above method. These computer programs 821 can be read from or written into one or more computer program products. These computer program products include program code carriers such as a hard disk, a compact disk (CD), a memory card or a floppy disk. When the device where the computer storage medium 700 is located runs the above computer program 821, each step in the method described above can be executed.
[0085] At this point, those skilled in the art should recognize that, although multiple exemplary embodiments of the present invention have been shown and described in detail herein, many other variations or modifications that conform to the principles of the present invention can still be directly determined or derived based on the content disclosed in the present invention without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention should be understood and recognized as covering all these other variations or modifications.
Claims
1. A method for upgrading an air conditioner, comprising: Obtain the load duration ratio parameters of the air conditioner in the preset collection cycle and the current temperature adjustment logic; Determining whether the current temperature adjustment logic needs to be upgraded according to the load duration ratio parameter, so as to adjust the temperature adjustment capability of the air conditioner; If yes, generating an upgrade program of the temperature regulation logic according to the load duration ratio parameter and the current temperature regulation logic; The air conditioner is controlled to upgrade the temperature adjustment logic based on the upgrade program.
2. The method for upgrading an air conditioner according to claim 1, wherein Each of the collection cycles is a preset time period before the corresponding data collection moment.
3. The method for upgrading an air conditioner according to claim 2, wherein: The parameters for obtaining the load duration ratio of the air conditioner during the collection period include: Obtaining the load duration of the compressor of the air conditioner running at a frequency higher than a preset frequency and / or the number of self-stops of the compressor during the collection period of the air conditioner, as well as the total duration of intervals between all adjacent on / off events based on user operations; The load duration ratio parameter is calculated based on the load duration and / or the number of self-shutdowns, and the total duration.
4. The method for upgrading an air conditioner according to claim 3, wherein: The parameters for obtaining the load duration ratio of the air conditioner during the collection period include: The load duration ratio parameter is calculated according to the following formula: C=a(T / T0)-b(N / T0); In the formula, C is the load duration ratio parameter, T is the load duration, T0 is the total duration, N is the number of automatic shutdowns, and a and b are preset coefficients.
5. The method for upgrading an air conditioner according to claim 1, wherein: Confirming whether the temperature adjustment logic needs to be upgraded according to the load duration ratio parameter includes: Determine the relationship between the load duration ratio parameter and a preset duration parameter standard interval; If the load duration ratio parameter falls within the duration parameter standard range, it is confirmed that there is no need to upgrade the temperature adjustment logic; If the load duration ratio parameter does not fall within the duration parameter standard range, it is confirmed that the temperature adjustment logic needs to be upgraded.
6. The method for upgrading an air conditioner according to claim 5, wherein: Generating an upgrade program of the temperature regulation logic according to the load duration ratio parameter and the current temperature regulation logic includes: Determine the relationship between the load duration ratio parameter and a preset duration parameter standard interval; If the load duration ratio parameter falls to the right of the duration parameter standard interval, an upgrade program for temperature regulation logic is generated to improve the temperature regulation capability of the air conditioner; If the load duration ratio parameter falls to the left of the duration parameter standard interval, an upgrade program for the temperature regulation logic is generated to reduce the temperature regulation capability of the air conditioner.
7. The method for upgrading an air conditioner according to claim 6, wherein In the upgrade program, the adjustment range of the temperature adjustment capability of the air conditioner is proportional to the distance of the load duration ratio parameter from the standard interval of the duration parameter.
8. The method for upgrading an air conditioner according to claim 1, wherein During the collection period, the operation mode of the air conditioner is a cooling mode or a heating mode; The temperature regulation capacity is cooling capacity or heating capacity.
9. A server, comprising a memory and a processor, wherein the memory stores a computer program, and when the computer program is executed by the processor, it is used to implement the control method according to any one of claims 1 to 7.
10. A computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor, implements the upgrading method according to any one of claims 1 to 7.
Citation Information
Patent Citations
Cold machine system control method and device and cold machine system
CN113803813A
System and method for establishing local control of a space conditioning load during a direct load control event
US20120053745A1