Digital dynamic management system and method for special equipment
By combining digital twin models and C4.5 decision tree models, an intelligent management system for special equipment is constructed, which solves the problems of dynamic management and safety monitoring of special equipment, realizes comprehensive digital management and real-time data updates, and improves safety and production efficiency.
Patent Information
- Application Number
- CN202411005796.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-25
AI Technical Summary
Existing special equipment management systems are unable to achieve dynamic management, suffer from severe data silos, frequent safety accidents, and have low levels of digitalization, failing to meet the real-time monitoring and operation optimization needs of large-scale special equipment.
Intelligent analysis is performed using digital twin models and C4.5 decision tree models. Combined with 3D spatial sensors and video sensors to monitor equipment trajectories, optimized operation strategies are constructed. The feasibility of actual operations is verified through simulation operations. Potential dangers are monitored and warned in real time, achieving comprehensive digital management.
It has enabled comprehensive digital management of special equipment, improved safety performance and management efficiency, optimized operational decisions, solved the problem of data silos, and ensured real-time updates of equipment models and parameters.
Smart Images

Figure CN118917196A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of special equipment operation management, and more specifically, relates to a digital dynamic management system and method for special equipment. Background Art
[0002] By the end of 2023, the total number of special equipment in my country will reach 21.2891 million. The variety and quantity of special equipment have brought great difficulties to the safety management of special equipment. At present, the traditional management of special equipment mainly relies on manual management, which has problems such as scattered data, untimely information update, and low work efficiency. At the same time, the safety awareness of special equipment users is not strong, and there are phenomena such as illegal purchase, use, and modification of special equipment, which leads to frequent safety accidents. Once they occur, they will bring significant losses and threats to personal safety and property.
[0003] At present, the special equipment field in my country is not closely integrated with digital technology, and the level of digitization is still low. Although some achievements have been made in intelligent monitoring, damage identification, risk warning, accident prediction, etc. in recent years, and multiple risk monitoring platforms have been developed, the phenomenon of data islands is still serious. In addition, most digital management systems for special equipment only consider the collection of data resources, and lack sufficient consideration of the utilization of resources after collection. There are still few systems that truly realize the dynamic operation management, risk control and data conversion and application of special equipment. Therefore, in order to solve the above problems, it is urgent to build a set of digital and dynamic special equipment management systems to truly realize the dynamic management of basic information of special equipment, real-time update of supervision information, real-time warning of safety hazards, and real-time analysis and statistics of data, so as to improve the safety performance and production efficiency of special equipment.
[0004] Prior art document 1 (CN104656459B) discloses a crane monitoring management simulation system, which is divided into crane monitoring management and crane simulation. Crane monitoring management consists of a local monitoring management system and a remote monitoring management system, which realizes functions such as crane status monitoring, video monitoring of the operating area, crane fault detection and crane management.
[0005] The shortcoming of the prior art document 1 is that the crane monitoring and management simulation system in the prior art mainly obtains the safe action parameter range through pre-action simulation, and then controls the actual operation process of the crane. It is difficult to exert the timeliness and dynamic management characteristics when a large number of special equipment are operated at the same time, the task volume is large, and the construction period is tight. Summary of the invention
[0006] In order to solve the deficiencies in the prior art, the present invention provides a digital dynamic management system and method for special equipment.
[0007] The present invention adopts the following technical solution.
[0008] A first aspect of the present invention provides a method for digital dynamic management of special equipment, comprising the following steps:
[0009] Collect and process various data of special equipment, generate digital twin models, and use C4.5 decision tree model for intelligent analysis and decision-making to optimize operation strategies;
[0010] Use the optimized digital twin model to perform simulation operations, verify the feasibility of actual operations, and provide simulation data for operation management reference;
[0011] Monitor the operation of special equipment in real time, analyze and make decisions based on real-time and simulation data; issue early warnings for potential dangerous situations, and record and verify all operating data;
[0012] Store all operating data, exchange information with third-party platforms, update equipment models and operating parameters, and conduct all-round digital dynamic management of special equipment.
[0013] Preferably, building a digital twin model specifically includes the following steps:
[0014] Install three-dimensional space sensors and video sensors to monitor the movement trajectory and operation behavior of the equipment;
[0015] Verify the accuracy of monitoring data and calculate deviation values through video sensors;
[0016] Check whether the deviation is within a reasonable range and generate a digital twin model.
[0017] Preferably, constructing a C4.5 decision tree model specifically includes the following steps:
[0018] According to the stratified sampling strategy, the operation data set of special equipment is divided into training set and validation set to build and evaluate the performance of decision tree model;
[0019] Calculate the information gain ratio, select the optimal partitioning attribute, and recursively construct the C4.5 decision tree until all leaf nodes contain samples of the same category;
[0020] Starting from the leaf nodes, each non-leaf node is post-pruned from the bottom up to make the performance of the model on the new data consistent with the performance on the training data;
[0021] Continue to traverse other non-leaf nodes of the decision tree upwards, repeat the post-pruning processing operation until the root node, and obtain the pruned decision tree model to judge the operating status of the special equipment, including start-up, emergency stop, safety and danger.
[0022] Preferably, the formula for calculating the information gain ratio and information entropy is as follows:
[0023]
[0024] Where:
[0025] p i is the proportion of samples of the i-th category in the data set, and n is the number of categories in the data set;
[0026] The formula for information gain is as follows:
[0027]
[0028] Where:
[0029] value s(A) represents all possible values of attribute A, D v represents the sample subset whose attribute A takes the value v, |D v | represents the size of the sample subset, |D| represents the total number of samples in the data set D;
[0030] The formula for the intrinsic value of attribute A is as follows:
[0031]
[0032] The information gain ratio formula of attribute A is as follows:
[0033]
[0034] Where:
[0035] Gain(A) represents the information gain of attribute A; IV(A) represents the intrinsic value of attribute A;
[0036] Select the feature with the largest information gain ratio as the partition feature of the current node.
[0037] Preferably, the post-pruning process specifically comprises the following steps:
[0038] Temporary pruning: Change the current non-leaf node to a leaf node, keep the node category label unchanged, and prune all its child nodes;
[0039] Evaluation on the validation set: Use the validation set to evaluate the performance of the temporarily pruned decision tree and calculate the accuracy;
[0040] Determine whether to prune: Compare the accuracy before and after temporary pruning. If the accuracy does not change significantly, perform pruning; otherwise, keep the node without pruning.
[0041] Preferably, the simulation operation using the optimized digital twin model specifically includes the following steps:
[0042] Confirm the special equipment model and the motion equation of each measuring point;
[0043] Simulate special equipment operations, including forward, backward, turning, rotating, lifting, retracting, retracting and releasing, and load bearing simulation, and trigger the simulation effect through the front button;
[0044] Prioritize the operation of special equipment, check whether there is motion interference between two special equipment, and determine the range of motion when working together;
[0045] According to the boom height and working range, set the high-voltage line warning special effects and the circular ring warning special effects, and check whether the special equipment simulation process interferes with the warning line.
[0046] Preferably, the operation of special equipment is monitored in real time, and analysis and decision making are performed in combination with real-time data and simulation data, specifically including the following steps:
[0047] Combined with the working range of special equipment obtained by the simulation module, by setting more than 0 and less than or equal to 2 three-dimensional space sensors at each key measuring point of the special equipment, work according to the preset action instructions;
[0048] Compare the analysis data of the real measurement points and the special equipment simulation module, and record the change values and change trends of each key point;
[0049] The measured values of each key point are substituted into the C4.5 decision tree model to judge the operating status of the special equipment and make action decisions.
[0050] Preferably, the system provides early warning for potential dangerous situations, and records and verifies all operating data, including alarm prompts for emergency stops, provides dangerous measurement points in the BIM model, and outputs and reports identification information.
[0051] Preferably, the system stores all operating data, exchanges information with a third-party platform, updates equipment models and operating parameters, and performs all-round digital dynamic management of special equipment, including saving each special equipment operation information as incremental information, connecting to a third-party platform for adding special equipment model information, and adding corresponding mechanical equations and motion equations.
[0052] The second aspect of the present invention provides a digital dynamic management system for special equipment, comprising: a digital modeling module, a special equipment simulation module, an operation management module, a safety warning module and an information storage module;
[0053] The digital modeling module is used to collect and process data, generate digital twin models, and use the C4.5 decision tree model to optimize operation strategies through intelligent analysis and decision-making;
[0054] The special equipment simulation module is used to simulate the operation of the optimized digital twin model, verify the actual operation, and provide simulation data to the operation management module;
[0055] The operation management module is used to monitor the operation of special equipment in real time, and to analyze and make decisions based on real-time data and simulation data;
[0056] The safety warning module warns of potential dangerous situations and records and verifies all operating data;
[0057] The information storage module is used to save all operating data, exchange information with third-party platforms, update equipment models and operating parameters, and conduct all-round digital dynamic management of special equipment.
[0058] Compared with the prior art, the beneficial effects of the present invention include at least:
[0059] (1) Achieve all-round digital management: Through digital modeling and information storage, ensure data centralization and real-time updating, improve management efficiency, realize digital simulation of the construction boundary conditions of the substation project site, and twin the objective environment of the construction operation at the digital information level;
[0060] (2) Improve safety performance: Use safety warnings to warn of potential dangers in real time and record and verify all operating data to reduce the occurrence of safety accidents. Perform three-dimensional dynamic modeling and full-process construction simulation on commonly used special construction machinery, and complete safety verification and validation of construction operation plans.
[0061] (3) Optimize operational decisions: Through intelligent analysis and decision optimization, combined with real-time data of special equipment, rapid analysis and decision-making of special equipment actions can be achieved, and the operation strategy of special equipment can be optimized to improve production efficiency;
[0062] (4) Improve management efficiency: Through real-time monitoring of operation management and simulation operation verification of special equipment, efficient use of data can be achieved and the problem of data silos can be solved;
[0063] (5) Real-time data exchange and update: Through information storage and information exchange with third-party platforms, ensure the real-time update of equipment models and operating parameters, and realize dynamic management of basic information and real-time update of regulatory information. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] Figure 1 It is a flow chart of digital dynamic management of special equipment provided in accordance with an embodiment of the present invention;
[0065] Figure 2 It is an architecture diagram of a digital dynamic management system for special equipment provided in accordance with an embodiment of the present invention. DETAILED DESCRIPTION
[0066] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only part of the embodiments of the present invention, not all of them. Based on the spirit of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the scope of protection of the present invention.
[0067] Taking two types of truck cranes (50T and 130T) at the construction site of the substation renovation project as an example, the specific implementation method of the special equipment digital management system is as follows:
[0068] like Figure 1 As shown, embodiment 1 of the present invention provides a digital dynamic management method for special equipment, comprising the following steps:
[0069] Collect and process various data of special equipment, generate digital twin models, and use C4.5 decision tree model for intelligent analysis and decision-making to optimize operation strategies;
[0070] Building a digital twin model includes the following steps:
[0071] High-precision three-dimensional space sensors are installed on the crane's mechanical arms and motion nodes to remotely collect, store, proofread and optimize the crane's position and movement data. The special machinery operation process is mapped to the digital twin virtual operation site through artificial intelligence algorithms to achieve all-round recording of the construction process:
[0072] S11 uses high-precision three-dimensional spatial sensors to monitor the movement trajectory and operation behavior of the equipment. The chassis includes the frame, outriggers, axles, tires, cab and other factors; the upper part includes the control room, boom, hook, rope, slewing mechanism, lifting mechanism, luffing mechanism and other factors;
[0073] S12 verifies the accuracy of monitoring data and calculates deviation values through video sensors;
[0074] S13 checks whether the deviation is within a reasonable range and generates a digital twin model.
[0075] Construct a C4.5 decision tree model for real-time analysis and decision-making of equipment working data:
[0076] S21 is divided into training set and validation set:
[0077] According to the stratified sampling strategy, the historical operation dataset of the crane is divided into a training set and a validation set, which are used to build and evaluate the performance of the decision tree model.
[0078] S22 selects the optimal partition attribute:
[0079] The calculation formula of information entropy is:
[0080]
[0081] Among them, pi is the proportion of samples of the i-th category (chassis, vehicle) in the data set, and n is the number of categories in the data set.
[0082] The calculation formula of information gain is:
[0083]
[0084] Among them, values(A) represents all possible values of attribute A, such as the full range of the swing and extension of the boom, D v represents the sample subset whose attribute A takes the value v, |D v | represents the size of the sample subset, and |D| represents the total number of samples in data set D.
[0085] The formula for calculating the intrinsic value of attribute A is:
[0086]
[0087] The information gain ratio formula of attribute A is:
[0088]
[0089] Select the feature with the largest information gain ratio as the partition feature of the current node.
[0090] The C4.5 decision tree is constructed recursively until all leaf nodes contain samples of the same category.
[0091] S23 post-pruning processing:
[0092] Starting from the leaf nodes, prune each non-leaf node from the bottom up. For each non-leaf node, perform pruning operations according to the following steps a, b, and c.
[0093] a. Temporary pruning: Change the current non-leaf node to a leaf node, but keep the node category label unchanged, that is, prune all its child nodes.
[0094] b. Evaluate on the validation set: Use the validation set to evaluate the performance of the temporarily pruned decision tree and calculate the accuracy.
[0095] c. Determine whether to prune: Compare the accuracy before and after temporary pruning. If the accuracy drops slightly or does not change significantly, perform pruning. Otherwise, keep the node without pruning.
[0096] Continue to traverse other non-leaf nodes of the decision tree upward, repeating steps a, b, and c until the root node is reached.
[0097] Get the pruned decision tree model.
[0098] Use the optimized digital twin model to perform simulation operations, verify the feasibility of actual operations, and provide simulation data for operation management reference;
[0099] Preferably, the simulation operation using the optimized digital twin model specifically includes the following steps:
[0100] Select the digital twin model of the crane to restore the crane's motion trajectory, working radius, work efficiency, and mechanical impact on the object being constructed, and conduct construction safety analysis under different boundary conditions:
[0101] S31 confirms the crane model (50T, 130T) and the motion equation of each measuring point;
[0102] S32 simulates the two cranes moving forward, backward, turning, rotating, lifting, telescoping, retracting and extending, and bearing loads. The model movement is triggered by the front button:
[0103] (1) Forward / backward / turn simulation, which can be directly input, modified by addition and subtraction, and the "crane move" button and the plus and minus buttons trigger the simulation effect;
[0104] (2) Boom rotation simulation, which can be directly input, added or subtracted. The "Boom rotation" button and the plus or minus buttons trigger the simulation effect. The parameters are as follows: 50t: 0-360°, 1.6r / min; 130t: 0-360°, 1.5r / min;
[0105] (3) Boom lifting simulation, which can be directly input, added or subtracted. The "boom elevation angle" button and the plus or minus button trigger the simulation effect. The "boom lift / drop back" button triggers the boom lifting to the maximum value / dropping back effect. The parameters are as follows: 50t: -1°~80°, 45s; 130t: -0.5°~81.5°, 55s;
[0106] (4) Boom extension and retraction simulation, which can be directly input, added or subtracted. The "boom length" button and the "add or subtract" button trigger the simulation effect. The "boom extension / retraction" button triggers the effect of the boom extending to the maximum value / retracting. The parameters are as follows: 50t: 5-section boom, basic boom 11.6m, full extension boom 45.5m, each boom is about 8.5m long, 105s; 130t: 7-section boom, basic boom 13.6m, full extension boom 73m, each boom is about 9.9m long, 660s;
[0107] (5) Hook retraction simulation, which can be directly input, added or subtracted. The "hook retraction" button and the "add or subtract" button trigger the simulation effect. The "hook down / up" button triggers the effect of the hook being lowered to the ground / up. The parameters are as follows: The rising / falling range of the hook / rope refers to the maximum lifting height of each boom; 50t: maximum lifting height 45m; 130t: maximum lifting height 75m;
[0108] (6) The “Lift Steel Structure” button and the “Release Steel Structure” button simulate the lifting / releasing of components, and the lifting performance is derived from the corresponding technical documents.
[0109] S33 prioritizes each movement link of the cranes, checks whether there is movement interference between the two cranes, and determines the range of motion of each node when the two cranes work together;
[0110] S34 sets the high-voltage line warning special effects and the circular warning special effects to check whether the special equipment simulation process interferes with the warning line. According to the boom height, set the high-voltage line warning special effects (for example, the 220kV Dongda 2585 line #34~#34-1, 2586 line #32~#32-1 high-voltage lines, set the height limit rope protection line along the north-south line on the west side of the high-voltage line, 15m outward and west of the vertical projection of the high-voltage line, the line height is 20m, and the construction ensures the safety of the high-voltage line operation); the boom height is calculated as follows: refer to the maximum lifting height of each section of the boom: 50t: maximum lifting height 45m; 130t: maximum lifting height 75m; according to the working range, set the circular warning special effects, the parameters are as follows: 50t: 3~38m; 130t: 3~62m.
[0111] Monitor the operation of special equipment in real time, analyze and make decisions based on real-time and simulation data; issue early warnings for potential dangerous situations, and record and verify all operating data;
[0112] Preferably, the operation of special equipment is monitored in real time, and analysis and decision making are performed in combination with real-time data and simulation data, specifically including the following steps:
[0113] Combined with the working range of special equipment obtained by the simulation module, 1-2 high-precision three-dimensional space sensors are set at each key measuring point of the crane, and work is performed according to preset action instructions. The analysis data in the real measuring points and the special equipment simulation module are compared to timely discover the change values and change trends of each key point.
[0114] The measured values of each key node are substituted into the C4.5 decision tree model to judge the start-up, emergency stop, safety and dangerous situations of the crane and make autonomous action decisions.
[0115] Preferably, the system provides early warning for potential dangerous situations, and records and verifies all operating data, including alarm prompts for emergency stops, provides dangerous measurement points in the BIM model, and outputs and reports identification information.
[0116] Store all operating data, exchange information with third-party platforms, update equipment models and operating parameters, and conduct all-round digital dynamic management of special equipment.
[0117] Preferably, the system stores all operating data, exchanges information with a third-party platform, updates equipment models and operating parameters, and performs all-round digital dynamic management of special equipment, including saving each special equipment operation information as incremental information, connecting to a third-party platform for adding special equipment model information, and adding corresponding mechanical equations and motion equations.
[0118] like Figure 2 As shown, embodiment 1 of the present invention provides a digital dynamic management system for special equipment:
[0119] Includes: digital modeling module, special equipment simulation module, operation management module, safety warning module and information storage module;
[0120] The digital modeling module is used to collect and process data, generate digital twin models, and use the C4.5 decision tree model to optimize operation strategies through intelligent analysis and decision-making;
[0121] The special equipment simulation module is used to simulate the operation of the optimized digital twin model, verify the actual operation, and provide simulation data to the operation management module;
[0122] The operation management module is used to monitor the operation of special equipment in real time, and to analyze and make decisions based on real-time data and simulation data;
[0123] The safety warning module warns of potential dangerous situations and records and verifies all operating data;
[0124] The information storage module is used to save all operating data, exchange information with third-party platforms, update equipment models and operating parameters, and conduct all-round digital dynamic management of special equipment.
[0125] The beneficial effects of the present invention include at least:
[0126] (1) Achieve all-round digital management: Through digital modeling and information storage, ensure data centralization and real-time updating, improve management efficiency, realize digital simulation of the construction boundary conditions of the substation project site, and twin the objective environment of the construction operation at the digital information level;
[0127] (2) Improve safety performance: Use safety warnings to warn of potential dangers in real time and record and verify all operating data to reduce the occurrence of safety accidents. Perform three-dimensional dynamic modeling and full-process construction simulation on commonly used special construction machinery, and complete safety verification and validation of construction operation plans.
[0128] (3) Optimize operational decisions: Through intelligent analysis and decision optimization, combined with real-time data of special equipment, rapid analysis and decision-making of special equipment actions can be achieved, and the operation strategy of special equipment can be optimized to improve production efficiency;
[0129] (4) Improve management efficiency: Through real-time monitoring of operation management and simulation operation verification of special equipment, efficient use of data can be achieved and the problem of data silos can be solved;
[0130] (5) Real-time data exchange and update: Through information storage and information exchange with third-party platforms, ensure the real-time update of equipment models and operating parameters, and realize dynamic management of basic information and real-time update of regulatory information.
[0131] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0132] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A digital dynamic management method for special equipment, It is characterized in that The following steps are involved: Collect and process various data of special equipment, generate digital twin models, and use C4.5 decision tree model for intelligent analysis and decision-making to optimize operation strategies; Use the optimized digital twin model to perform simulation operations, verify the feasibility of actual operations, and provide simulation data for operation management reference; Monitor the operation of special equipment in real time, and analyze and make decisions based on real-time and simulation data; Provide early warning of potential dangerous situations and record and verify all operating data; Store all operating data, exchange information with third-party platforms, update equipment models and operating parameters, and conduct all-round digital dynamic management of special equipment.
2. A digital dynamic management method for special equipment according to claim 1, Features: Building a digital twin model includes the following steps: Install three-dimensional space sensors and video sensors to monitor the movement trajectory and operation behavior of the equipment; Verify the accuracy of monitoring data and calculate deviation values through video sensors; Check whether the deviation is within a reasonable range and generate a digital twin model.
3. According to claim 1, a digital dynamic management method for special equipment, Features: Building a C4.5 decision tree model specifically includes the following steps: According to the stratified sampling strategy, the operation data set of special equipment is divided into training set and validation set to build and evaluate the performance of decision tree model; Calculate the information gain ratio, select the optimal partitioning attribute, and construct the C4.5 decision tree recursively until all leaf nodes contain samples of the same category; Starting from the leaf nodes, each non-leaf node is post-pruned from the bottom up to make the performance of the model on the new data consistent with the performance on the training data; Continue to traverse other non-leaf nodes of the decision tree upwards, repeat the post-pruning processing operation until the root node, and obtain the pruned decision tree model to judge the operating status of the special equipment, including start-up, emergency stop, safety and danger.
4. A digital dynamic management method for special equipment according to claim 3, Features: The formula for calculating the information gain ratio and information entropy is as follows: Where: p i is the proportion of samples of the i-th category in the data set, and n is the number of categories in the data set; The formula for information gain is as follows: Where: value s(A) represents all possible values of attribute A, D v represents the sample subset whose attribute A takes value v, |D v | represents the size of the sample subset, |D| represents the total number of samples in the data set D; The formula for the intrinsic value of attribute A is as follows: The information gain ratio formula of attribute A is as follows: Where: Gain(A) represents the information gain of attribute A; IV(A) represents the intrinsic value of attribute A; Select the feature with the largest information gain ratio as the partition feature of the current node.
5. A digital dynamic management method for special equipment according to claim 3, Features: The post-pruning process specifically includes the following steps: Temporary pruning: Change the current non-leaf node to a leaf node, keep the node category label unchanged, and prune all its child nodes; Evaluation on the validation set: Use the validation set to evaluate the performance of the temporarily pruned decision tree and calculate the accuracy; Determine whether to prune: Compare the accuracy before and after temporary pruning. If the accuracy does not change significantly, perform pruning; otherwise, keep the node without pruning.
6. A digital dynamic management method for special equipment according to claim 1, Features: The simulation operation using the optimized digital twin model specifically includes the following steps: Confirm the special equipment model and the motion equation of each measuring point; Simulate special equipment operations, including forward, backward, turning, rotating, lifting, retracting, retracting and releasing, and load bearing simulation, and trigger the simulation effect through the front button; Prioritize the operation of special equipment, check whether there is motion interference between two special equipment, and determine the range of motion when working together; According to the boom height and working range, set the high-voltage line warning special effects and the circular ring warning special effects, and check whether the special equipment simulation process interferes with the warning line.
7. A digital dynamic management method for special equipment according to claim 1, Features: Real-time monitoring of the operation of special equipment, combined with real-time data and simulation data for analysis and decision-making, specifically including the following steps: Combined with the working range of special equipment obtained by the simulation module, by setting more than 0 and less than or equal to 2 three-dimensional space sensors at each key measuring point of the special equipment, work according to the preset action instructions; Compare the analysis data of the real measurement points and the special equipment simulation module, and record the change values and change trends of each key point; The measured values of each key point are substituted into the C4.5 decision tree model to judge the operating status of the special equipment and make action decisions.
8. A digital dynamic management method for special equipment according to claim 1, Features: The system will provide early warning for potential dangerous situations, record and verify all operating data, including alarm prompts for emergency stops, provide dangerous measurement points in the BIM model, and output and report identification information.
9. A digital dynamic management method for special equipment according to claim 1, Features: The system stores all operating data, exchanges information with a third-party platform, updates equipment models and operating parameters, and conducts all-round digital dynamic management of special equipment, including saving each special equipment operation information as incremental information, connecting to a third-party platform for adding special equipment model information, and adding corresponding mechanical equations and motion equations.
10. A digital dynamic management system for special equipment, Features: include: Digital modeling module, special equipment simulation module, operation management module, safety warning module and information storage module; The digital modeling module is used to collect and process data, generate digital twin models, and use the C4.5 decision tree model to optimize operation strategies through intelligent analysis and decision-making; The special equipment simulation module is used to simulate the operation of the optimized digital twin model, verify the actual operation, and provide simulation data to the operation management module; The operation management module is used to monitor the operation of special equipment in real time, and to analyze and make decisions based on real-time data and simulation data; The safety warning module warns of potential dangerous situations and records and verifies all operating data; The information storage module is used to save all operating data, exchange information with third-party platforms, update equipment models and operating parameters, and conduct all-round digital dynamic management of special equipment.
Citation Information
Patent Citations
A large crane monitoring, management and simulation system
CN104656459B
Petrochemical unattended loading and unloading line digital twinning intelligent monitoring system and method
CN112731887A
Complex equipment system model verification method and system based on digital twinning
CN113221338A
Modeling method of digital twin data driving model in autonomous spading process of loading machine