Project management software based on mobile terminal positioning and photographing and application method thereof
By using project management software based on mobile positioning and photography in construction projects, the problems of worker attendance and construction environment monitoring are solved, the accuracy of worker attendance and real-time monitoring of construction environment are achieved, and the occurrence of safety accidents is avoided.
Patent Information
- Application Number
- CN202410970023.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-08
AI Technical Summary
In construction projects, it is difficult for the existing technology to effectively manage workers' attendance, construction environment monitoring and safety risks, resulting in labor disputes and safety accidents.
Design a project management software based on mobile terminal positioning and photography, including personnel management unit, environmental management unit and AI identification unit. Through personnel information management, environmental monitoring, electronic access control, electronic fence, intelligent health monitoring and AI identification functions, it realizes Workers’ attendance management, real-time monitoring of construction environment and safety risk identification.
It improves the accuracy and efficiency of workers' attendance management, promptly grasps workers' attendance and construction environment, avoids accidents, and ensures the safety and compliance of the construction environment.
Smart Images

Figure CN118917793A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the field of engineering management informationization, and in particular to a project management software and method based on mobile terminal positioning and photography. Background Art
[0002] With the continuous expansion of the production and operation scale of my country's construction enterprises, the total output value of the construction industry continues to grow. The overall development of the construction engineering industry shows a stable upward trend. Under the influence of the market environment, governments and enterprises across the country have actively explored the establishment of a wage supervision platform based on the real-name platform data to reduce data asymmetry between enterprises, subcontractors, and workers, thereby reducing labor disputes. Summary of the invention
[0003] In view of the above technical problems in the related art, the present disclosure proposes a project management software based on mobile terminal positioning and photo taking, which can overcome the above deficiencies in the prior art.
[0004] To achieve the above technical objectives, the technical solution of the present disclosure is implemented as follows: The first object of the present disclosure is to provide a project management software based on mobile terminal positioning and photography, which includes a personnel management unit, an environment management unit, a visualization platform unit and an AI recognition unit which are respectively connected to the control terminal in communication; Personnel management unit: including personnel information management module, personnel attendance management module and personnel health monitoring module; among them, the personnel information management module is used to configure project personnel information; the personnel attendance management module is used to set the punch-in range and attendance rules for project personnel, so as to confirm the accuracy and authenticity of project personnel attendance and record the work status of project personnel; the personnel health monitoring module is used to monitor the physical health status of project personnel in real time; Environmental management unit: including environmental monitoring module, electronic access control module, and electronic fence module, which can be used to monitor the project construction environment and send environmental monitoring information of the project construction environment to the control end for processing; Visualization platform unit: can receive and display the processed environmental monitoring information from the control end, so as to monitor the project construction environment in real time; AI recognition unit: located on the mobile phone of the project personnel, used to interact with the control end data and perform functions such as identification, warning and alarm of the risk conditions of the project construction environment.
[0005] Preferably, for a specific project, the personnel information management module sets the corresponding project location, project personnel and the employee unit price of the project personnel, thereby realizing the personnel information configuration operation for the project personnel.
[0006] Preferably, the personnel attendance management module sets corresponding punch-in ranges and attendance rules according to the project location and the project personnel; wherein the punch-in range is the specific working area of the project personnel.
[0007] Preferably, the attendance rules may be as follows: project personnel must personally enter the clock-in range before they can clock in via their mobile phones; clocking in via mobile phones can only be done by taking instant photos with the mobile phone camera and album photos are prohibited; camera watermarks must be used in photos; the clock-in location of the project personnel's mobile phone is obtained through GPS positioning, and the clock-in location of the mobile phone is compared with the clock-in range to determine whether the team members are actually on duty, thereby achieving that only project personnel who personally clock in within the clock-in range can count as work attendance.
[0008] Preferably, the control end determines the attendance of employees by having them clock in at designated construction sites and upload photos according to the personnel information configuration, attendance rules, clock-in range, attendance management, employee unit price and other functions of the personnel management unit, and calculates the accumulated amount of employees' work bills through unit price and attendance, which is convenient for later settlement. During implementation, because workers must work at the construction site when they go to work, it can be assumed that employees must enter the clock-in range before they can work. At this time, GPS positioning is used to confirm that the clock-in mobile phone is in the attendance position, and the attendance employee can only be checked by taking a selfie with the watermark camera. The person who clocks in can only take photos with the mobile phone and cannot use album photos, which ensures that the person who clocks in is himself.
[0009] Preferably, the personnel health monitoring module detects the physical health status of the project personnel through an intelligent monitoring device worn by the project personnel; the intelligent monitoring device is provided with an integrated intelligent chip, a sensor group and a feedback component, the sensor component includes an optical heart rate sensor, a bioelectrical impedance sensor, a galvanic skin response sensor, and an acceleration sensor, the sensor component collects the data of the project personnel during operation at a regular interval and transmits it to the intelligent chip for comparison and analysis with the preset value, when the data deviates from the preset value, it is fed back to the control end through the feedback component, and the control end records and processes the physical health status data of the project personnel.
[0010] Preferably, in the environmental management unit, the environmental monitoring module is used to obtain environmental monitoring information of the project construction environment, the electronic access control module is used to manage room access authorization, and the electronic fence module is used to prevent personnel from crossing the boundary and to issue an alarm.
[0011] Preferably, the environmental management unit transmits the environmental monitoring information to the control end, which then processes and transmits it to the visualization platform unit for display, and sends it to the mobile phones of the team members, so as to facilitate real-time monitoring of the project construction environment. Electronic access control adds access authorization management to the room. Backstage managers can also monitor the construction environment in real time through the control end or visualization platform unit, and deal with unexpected situations in a timely manner.
[0012] Preferably, the detection equipment used by the environmental monitoring module includes data collectors such as temperature, humidity, temperature sensor, smoke sensor, data simulator, surveillance camera and other equipment; the environmental monitoring module collects and obtains various data of the project construction environment.
[0013] Preferably, the AI recognition unit obtains and analyzes the environmental monitoring information of the project construction environment from the control end, and identifies the following information through algorithms: whether employees wear safety helmets, work clothes, leave their posts without permission, fall accidentally, whether there are problems such as smoke and flames in the construction environment, whether the electronic fence restricted area is intruded, etc., and after confirmation, alerts the management personnel to handle it in time.
[0014] Preferably, the AI recognition unit automatically alerts through a number set by the control terminal after the alarm continues for 15 minutes without being resolved.
[0015] The second object of the present disclosure is to provide an application method of the project management software according to any one of claims 1 to 8, which comprises the following steps: S1: The personnel information management module configures and authenticates the project personnel who have registered through the mobile terminal, and divides the project personnel into specific managers, team leaders, and workers; S2: The team leader creates his own team through the personnel information management module and adds specific workers to one of his construction teams; S3: For specific project tasks, the team leader sets the punch-in range and attendance rules of the project work location through the personnel attendance management module, completes the project personnel information and attendance configuration, and completes the binding of workers and project tasks. At this time, the workers are regarded as entering the project task work and accepting attendance; S4: After the worker enters the punch-in range, he punches in through his mobile phone. The personnel attendance management module obtains the punch-in data of the worker's mobile phone and its GPS location, and then transmits it to the control end. The control end determines whether the punch-in data meets the attendance rules according to the attendance rules, and compares whether the mobile phone GPS location is within the punch-in range; if the punch-in data meets the attendance rules and the GPS location is within the open range, it is recorded as valid attendance, otherwise it is recorded as invalid attendance and a reminder is given; finally, the punch-in data is transmitted to the team leader for attendance statistics; S5: After the workers start working, the environmental safety monitoring module monitors the project construction environment and feeds back the environmental monitoring information of the project construction environment to the control end for processing. The control end transmits the processed environmental monitoring information to the visualization platform unit for display; S6: The AI recognition unit continuously obtains environmental monitoring data from the control end and analyzes and identifies it, and promptly alerts management personnel to handle any abnormal situations to avoid malicious incidents.
[0016] Preferably, in S2, after a worker is added to a construction team by the team leader, the control terminal prohibits the worker from being added to other teams to ensure that the worker can only be in one team.
[0017] The beneficial effects of the present invention are: the accuracy and efficiency of worker attendance management are improved, and it is convenient for management personnel to timely grasp the worker attendance and construction environment conditions. Accidents can be handled in a timely manner to avoid malicious incidents.
[0018] The present invention configures the project or team personnel information and sets specific attendance rules and punch-in ranges. The attendance rules can set the watermark camera to punch in and take photos in real time, GPS to verify the open location, and disable the album to achieve personnel attendance management, so as to determine the employee's attendance by letting the employee punch in and upload photos at the designated construction site, and calculate the employee's accumulated amount through the unit price and attendance status, so as to facilitate the later settlement.
[0019] This disclosure will obtain personnel health information through the personnel health monitoring module, and the environmental monitoring module will synchronize the acquired environmental monitoring information to the employee's mobile phone in real time, and the AI recognition module will monitor it in real time. When an alarm message appears, a warning will be issued to remind employees of illegal behavior or safety alarms in the construction environment. In addition, back-end managers can also monitor the construction environment in real time through the visualization platform, and deal with unexpected situations in a timely manner. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a system functional module architecture diagram of the present invention.
[0022] Figure 2 It is a relationship diagram between the team leaders and workers of the system of the present invention. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, rather than all the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present disclosure.
[0024] like Figure 1-2 As shown, in order to facilitate the understanding of the above technical solutions of the present disclosure, the above technical solutions of the present disclosure are described in detail below through specific usage methods.
[0025] The first object of the present disclosure is to provide a project management software based on mobile terminal positioning and photography, which includes a personnel management unit, an environment management unit, a visualization platform unit and an AI recognition unit which are respectively connected to the control terminal in communication; Personnel management unit: including personnel information management module, personnel attendance management module and personnel health monitoring module; among them, the personnel information management module is used to configure project personnel information; the personnel attendance management module is used to set the punch-in range and attendance rules for project personnel, so as to confirm the accuracy and authenticity of project personnel attendance and record the work status of project personnel; the personnel health monitoring module is used to monitor the physical health status of project personnel in real time; Environmental management unit: including environmental monitoring module, electronic access control module, and electronic fence module, which can be used to monitor the project construction environment and send environmental monitoring information of the project construction environment to the control end for processing; Visualization platform unit: can receive and display the processed environmental monitoring information from the control end, so as to monitor the project construction environment in real time; AI recognition unit: located on the mobile phone of the project personnel, used to interact with the control end data and perform functions such as identification, warning and alarm of the risk conditions of the project construction environment.
[0026] In a certain embodiment, for a specific project, the personnel information management module sets the corresponding project location, project personnel, and the employee unit price of the project personnel, thereby implementing personnel information configuration operations for the project personnel.
[0027] In a certain embodiment, the personnel attendance management module sets the corresponding punch-in range and attendance rules according to the project location and the project personnel; wherein the punch-in range is the specific working area of the project personnel.
[0028] In a certain embodiment, the attendance rules may be as follows: project personnel must personally enter the clock-in range before they can clock in via their mobile phones; clocking in via mobile phones can only be done by taking instant photos with the mobile phone camera and album photos are prohibited; camera watermarks must be used in photos; the clock-in location of the project personnel's mobile phone is obtained through GPS positioning, and the clock-in location of the mobile phone is compared with the clock-in range to determine whether the team members are actually on duty, thereby achieving that only project personnel who personally clock in within the clock-in range can count towards work attendance.
[0029] In one embodiment, the control end determines the attendance of employees by having them clock in at a designated construction site and upload photos based on the personnel information configuration, attendance rules, clock-in range, attendance management, employee unit price and other functions of the personnel management unit, and calculates the accumulated amount of employees' work bills through unit price and attendance, which is convenient for later settlement. During implementation, because workers must work at the construction site when they go to work, it can be considered that employees must enter the clock-in range before they can work. At this time, GPS positioning is used to confirm that the clock-in mobile phone is in the attendance position, and the attendance employee can only be checked by taking a selfie with the watermark camera. The person who clocks in can only take photos with the mobile phone and cannot use album photos, which ensures that the person who clocks in is himself.
[0030] In a certain embodiment, the personnel health monitoring module detects the physical health status of the project personnel through an intelligent monitoring device worn by the project personnel; the intelligent monitoring device is provided with an integrated intelligent chip, a sensor group and a feedback component, and the sensor component includes an optical heart rate sensor, a bioelectrical impedance sensor, a galvanic skin response sensor, and an acceleration sensor. The sensor component collects the data of the project personnel during operation at a regular interval and transmits it to the intelligent chip for comparison and analysis with the preset value. When the data deviates from the preset value, it is fed back to the control end through the feedback component, and the control end records and processes the physical health status data of the project personnel.
[0031] In one embodiment, in the environmental management unit, the environmental monitoring module is used to obtain environmental monitoring information of the project construction environment, the electronic access control module is used to manage room access authorization, and the electronic fence module is used to prevent personnel from crossing the boundary and to issue an alarm.
[0032] In one embodiment, the environmental management unit transmits the environmental monitoring information to the control end, which then processes and transmits it to the visualization platform unit for display, and sends it to the mobile phones of the team members, so as to facilitate real-time monitoring of the project construction environment. Electronic access control adds access authorization management to the room. Backstage managers can also monitor the construction environment in real time through the control end or visualization platform unit, and deal with unexpected situations in a timely manner.
[0033] In a certain embodiment, the detection equipment used by the environmental monitoring module includes data collectors such as temperature, humidity, temperature sensor, smoke sensor, data simulator, surveillance camera and other equipment; the environmental monitoring module collects and obtains various data of the project construction environment.
[0034] In a certain embodiment, the AI recognition unit obtains and analyzes the environmental monitoring information of the project construction environment from the control end, and identifies the following information through an algorithm: whether the employee wears a safety helmet, whether he wears work clothes, whether he leaves his post without authorization, whether he falls accidentally, whether there is smoke, flame or other problems in the construction environment, whether the electronic fence restricted area is intruded, etc., and after confirmation, an alarm is issued to notify the management personnel to deal with it in time.
[0035] In one embodiment, the AI recognition unit automatically sends an alarm through a number set by the control terminal after the alarm continues for 15 minutes without being resolved.
[0036] The second object of the present disclosure is to provide an application method of the project management software according to any one of claims 1 to 8, which comprises the following steps: S1: The personnel information management module configures and authenticates the project personnel who have registered through the mobile terminal, and divides the project personnel into specific managers, team leaders, and workers; S2: The team leader creates his own team through the personnel information management module and adds specific workers to one of his construction teams; S3: For specific project tasks, the team leader sets the punch-in range and attendance rules of the project work location through the personnel attendance management module, completes the project personnel information and attendance configuration, and completes the binding of workers and project tasks. At this time, the workers are regarded as entering the project task work and accepting attendance; S4: After the worker enters the punch-in range, he punches in through his mobile phone. The personnel attendance management module obtains the punch-in data of the worker's mobile phone and its GPS location, and then transmits it to the control end. The control end determines whether the punch-in data meets the attendance rules according to the attendance rules, and compares whether the mobile phone GPS location is within the punch-in range; if the punch-in data meets the attendance rules and the GPS location is within the open range, it is recorded as valid attendance, otherwise it is recorded as invalid attendance and a reminder is given; finally, the punch-in data is transmitted to the team leader for attendance statistics; S5: After the workers start working, the environmental safety monitoring module monitors the project construction environment and feeds back the environmental monitoring information of the project construction environment to the control end for processing. The control end transmits the processed environmental monitoring information to the visualization platform unit for display; S6: The AI recognition unit continuously obtains environmental monitoring data from the control end and analyzes and identifies it, and promptly alerts management personnel to handle any abnormal situations to avoid malicious incidents.
[0037] In one embodiment, in S2, after a worker is added to a construction team by the team leader, the control end prohibits the worker from being added to other teams to ensure that the worker can only be in one team.
[0038] Specific working principle: The unit modules in this disclosure, among which the personnel management module, manage personnel information, personnel health and personnel attendance; the environmental management module implements monitoring of the construction environment; the visualization platform can monitor the construction environment in real time; the AI recognition module is a function to identify and warn the risk of the construction environment. The software configures personnel information, sets attendance rules, sets clock-in ranges, uses watermark cameras to clock in and take photos, manages attendance, manages employee unit prices, and other functions. By allowing employees to clock in at designated construction sites and upload photos, the software determines the employee's attendance and calculates the employee's accumulated amount through unit prices and attendance, which is convenient for later settlement. At the same time, the system will obtain personnel health information through the equipment, and the environmental monitoring information will be synchronized to the employee's mobile phone in real time, and will be monitored in real time by the AI recognition module. When an alarm message appears, a warning will be issued to remind employees of violations or safety alarms in the construction environment. In addition, backstage managers can also monitor the construction environment in real time through the visualization platform, and can deal with unexpected situations in a timely manner.
[0039] Through this disclosure, the project leader (team leader, etc.) configures the personnel information (workers), sets the project location and the workers' clock-in location, and selects appropriate personnel from the team to enter the project and prepare for construction. When the workers go to work, they will enter the clock-in range. At this time, the mobile phone GPS positioning is used to confirm that the clock-in range is within the specified range. At the same time, when clocking in, the workers need to upload a selfie photo. The photo can only be taken with the mobile phone camera, and a watermark will be added to the photo to ensure that the mobile phone currently entering the clock-in range is used by the worker himself. After that, the authenticity of the employee's attendance is determined by comparing the photo and the portrait. The clock-in data of the workers every day will be transmitted to the team through the system. The team leader can see the attendance and unit price of each person, and can see the expenses incurred by the worker based on the attendance, and the team leader can settle the expenses with the employees through this data.
[0040] In summary, the unique design of the present invention improves the accuracy and efficiency of worker attendance management, and facilitates management personnel to timely grasp the attendance of workers and the conditions of the construction environment. Unexpected situations can be handled in a timely manner to avoid malicious incidents. The present invention configures project or team personnel information, sets specific attendance rules and punch-in ranges, and the attendance rules can set watermark cameras to punch in and take photos in real time, GPS verification to open the location, and disable the album to achieve personnel attendance management, thereby allowing employees to punch in and upload photos at designated construction sites to determine employee attendance, and calculate the employee's accumulated amount through unit price and attendance, and the attendance rules facilitate later settlement.
[0041] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present disclosure should be included in the protection scope of the present disclosure.
Claims
1. A project management software based on mobile terminal positioning and photography, characterized in that: It includes a personnel management unit, an environment management unit, a visualization platform unit and an AI recognition unit which are respectively connected to the control end in communication; Personnel management unit: including personnel information management module, personnel attendance management module and personnel health monitoring module; among them, the personnel information management module is used to configure project personnel information; the personnel attendance management module is used to set the punch-in range and attendance rules for project personnel, so as to confirm the accuracy and authenticity of project personnel attendance and record the work status of project personnel; the personnel health monitoring module is used to monitor the physical health status of project personnel in real time; Environmental management unit: including environmental monitoring module, electronic access control module, and electronic fence module, used to monitor the project construction environment and send environmental monitoring information of the project construction environment to the control end for processing; Visualization platform unit: receives and displays the processed environmental monitoring information from the control end, thereby monitoring the project construction environment in real time; AI recognition unit: located on the mobile phone of the project personnel, used to interact with the control end data and identify, warn and alarm the risk conditions of the project construction environment.
2. The project management software according to claim 1, characterized in that: For a specific project, the personnel information management module sets the corresponding project location, project personnel, and the employee unit price of the project personnel, thereby implementing personnel information configuration operations for the project personnel.
3. The project management software according to claim 2, characterized in that: The personnel attendance management module sets the corresponding punch-in range and attendance rules according to the project location and the project personnel; the punch-in range is the specific working area of the project personnel, and the attendance rules are as follows: the project personnel must enter the punch-in range in person to punch in via the mobile phone, and mobile phone punch-in can only be done by taking photos instantly with the mobile phone camera and album photos are prohibited, and camera watermarks must be used in photos; the mobile phone punch-in position of the project personnel is obtained through GPS positioning, and the mobile phone punch-in position is compared with the punch-in range to determine whether the team members are actually on duty, so that only project personnel who personally punch in within the punch-in range can be counted into the work attendance.
4. The project management software according to claim 3, characterized in that: The control end determines the attendance of employees by asking them to punch in at designated construction sites and upload photos based on the personnel information configuration, attendance rules, punch-in range, attendance management, and employee unit price functions of the personnel management unit, and calculates the accumulated amount of employees' billing based on the unit price and attendance status, which is convenient for later settlement.
5. The project management software according to claim 4, characterized in that: The personnel health monitoring module detects the physical health status of the project personnel through the intelligent monitoring equipment worn by the project personnel; the intelligent monitoring equipment is provided with an integrated intelligent chip, a sensor group and a feedback component, the sensor component includes an optical heart rate sensor, a bioelectrical impedance sensor, a galvanic skin response sensor, and an acceleration sensor. The sensor component collects the data of the project personnel during operation at a regular interval and transmits it to the intelligent chip for comparison and analysis with the preset value. When the data deviates from the preset value, it is fed back to the control end through the feedback component, and the control end records and processes the physical health status data of the project personnel.
6. The project management software according to claim 5, characterized in that: In the environmental management unit, the environmental monitoring module is used to obtain environmental monitoring information of the project construction environment, the electronic access control module is used to manage room access authorization, and the electronic fence module is used to prevent personnel from crossing the boundary and alarm reminder; The environmental management unit transmits the environmental monitoring information to the control end, which processes and transmits it to the visualization platform unit for display, and sends it to the mobile phones of the team members, so as to facilitate real-time monitoring of the project construction environment.
7. The project management software according to claim 1, characterized in that: The AI recognition unit obtains and analyzes the environmental monitoring information of the project construction environment from the control end, and identifies the following information through algorithms: whether employees wear safety helmets, work clothes, leave their posts without permission, or fall accidentally, whether there is smoke or flame in the construction environment, whether the electronic fence restricted area has been intruded, and after confirmation, it alerts the management personnel to handle it in time.
8. The project management software according to claim 7, characterized in that: If the AI recognition unit continues to alarm for 15 minutes without being resolved, it will automatically alarm through the number set by the control terminal.
9. The method for applying the project management software according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: The personnel information management module configures and authenticates the project personnel who have registered through the mobile terminal, and divides the project personnel into specific managers, team leaders, and workers; S2: The team leader creates his own team through the personnel information management module and adds specific workers to one of his construction teams; S3: For specific project tasks, the team leader sets the punch-in range and attendance rules of the project work location through the personnel attendance management module, completes the project personnel information and attendance configuration, and completes the binding of workers and project tasks. At this time, the workers are regarded as entering the project task work and accepting attendance; S4: After the worker enters the punch-in range, he punches in through his mobile phone. The personnel attendance management module obtains the punch-in data of the worker's mobile phone and its GPS location, and then transmits it to the control end. The control end determines whether the punch-in data meets the attendance rules according to the attendance rules, and compares whether the mobile phone GPS location is within the punch-in range; if the punch-in data meets the attendance rules and the GPS location is within the open range, it is recorded as valid attendance, otherwise it is recorded as invalid attendance and a reminder is given; finally, the punch-in data is transmitted to the team leader for attendance statistics; S5: After the workers start working, the environmental safety monitoring module monitors the project construction environment and feeds back the environmental monitoring information of the project construction environment to the control end for processing. The control end transmits the processed environmental monitoring information to the visualization platform unit for display; S6: The AI recognition unit continuously obtains environmental monitoring data from the control end and analyzes and identifies it, and promptly alerts management personnel to handle any abnormal situations to avoid malicious incidents.
10. The application method according to claim 9, characterized in that: In S2, after a worker is added to a construction team by the team leader, the control end prohibits the worker from being added to other teams to ensure that the worker can only be in one team.
