Cascade hydropower station in-plant economic operation optimization method and system

By establishing hydraulic and dynamic models, combining particle swarm optimization methods, optimizing the turbine efficiency model, the problem of low economic operation efficiency of the basin cascade hydropower stations is solved, and more efficient active power distribution and economic operation are achieved.

CN118917966AActive Publication Date: 2024-11-08POWERCHINA HUADONG ENG CORP LTD +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411015340.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-08
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

The economic operation model in the basin cascade hydropower station is not refined at a high degree of refinement, and the efficiency characteristics of the entire working conditions of the unit are not considered, resulting in low overall economic benefits.

Method used

Establish a hydraulic relationship model and dynamic characteristic model of the basin cascade hydropower station, determine the objective function by means of water-to-energy or electricity-to-energy-to-energy-to-water operation, and optimize the BP neural network through particle swarm optimization method to build a refined efficiency model of the turbine. Optimize active power distribution.

Benefits of technology

The prediction accuracy is improved, the optimal allocation of loads of each unit is achieved, and the economic operation benefits of the basin cascade hydropower station are maximized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917966A_ABST
    Figure CN118917966A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of hydroelectric power generation, and discloses a cascade hydropower station in-plant economic operation optimization method and system, and the method comprises the following steps: building a hydraulic relation model of a drainage basin cascade hydropower station and a dynamic characteristic model of the drainage basin cascade hydropower station according to the hydraulic topological relation of each hydropower station in the drainage basin; according to the hydraulic relation model and the dynamic characteristic model of the drainage basin cascade hydropower station, determining an objective function of the drainage basin cascade hydropower station by adopting an operation mode of determining electricity by water or determining water by electricity; performing optimization solution on the target function of the drainage basin cascade hydropower station determined by the operation mode of water-based electricity or the target function of the drainage basin cascade hydropower station determined by the operation mode of electricity-based water, and obtaining the target function value of the drainage basin cascade hydropower station, namely obtaining the optimal economic operation efficiency of the drainage basin cascade hydropower station; the method has the characteristics of high model precision and good optimization effect, and the load of the unit of each hydropower station in the cascade hydropower stations can be optimally distributed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hydropower generation, and in particular to a method and system for optimizing the economic operation of a cascade hydropower station. Background Art

[0002] The economic operation of a hydropower plant refers to the active power that each unit should provide when the physical constraints within the system are met and the power generation efficiency of the entire plant is the highest under the external requirements of a certain amount of water or electricity. The economic operation of a hydropower plant can ensure that the units operate at a higher efficiency, thereby generating more electricity with a limited amount of water or generating the same amount of electricity with the minimum amount of water, thereby improving the economic benefits of the operation of the hydropower plant. A cascade hydropower station in a river basin includes multiple hydropower stations, and there are complex hydraulic and electrical connections between the stations. Therefore, the in-plant economic operation of a cascade hydropower station in a river basin is more complex than that of a single hydropower station, which is reflected in the higher degree of nonlinearity and coupling of the system, and the greater difficulty in solving the problem.

[0003] At present, the mathematical model for the economic operation of cascade hydropower stations in a river basin mainly considers the conventional hydraulic equations and the head-active power relationship curve of the whole plant. The result of model optimization is the active power of the whole plant. Its limitation is that the head-active power characteristic curve of the whole plant cannot reflect the efficiency characteristics of each unit in the plant under all operating conditions. The active power of the whole plant usually distributes the whole plant load to each unit with a simple strategy (such as the averaging method), which reduces the accuracy of the optimization results and leads to low economic benefits of the operation of cascade hydropower plants. Summary of the invention

[0004] In view of the above-mentioned deficiencies in the prior art, the present invention provides a method and system for optimizing the economic operation of cascade hydropower stations. By providing an economic operation model and an optimization system for cascade hydropower stations in a river basin, the present invention is used to solve the problems of low refinement of the current economic operation models in cascade hydropower stations, lack of consideration of the efficiency characteristics of the units under all operating conditions, and simple load distribution methods, resulting in low overall economic benefits for all cascade hydropower stations in the river basin.

[0005] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is:

[0006] A method for optimizing the economic operation of a cascade hydropower station comprises the following steps:

[0007] S1. According to the hydraulic topological relationship of each hydropower station in the basin, a hydraulic relationship model of cascade hydropower stations in the basin is established;

[0008] S2. According to the active power and water head of each hydropower station in the basin, a dynamic characteristic model of cascade hydropower stations in the basin is established;

[0009] S3, according to the hydraulic relationship model of the cascade hydropower station in the river basin established in step S1 and the dynamic characteristic model of the cascade hydropower station in the river basin established in step S2, the objective function of the cascade hydropower station in the river basin is determined by adopting the operation mode of determining electricity by water or determining water by electricity;

[0010] Among them, the maximum power generation of the hydropower station is determined based on the water inflow and the reservoir water level planning curve;

[0011] Determine the minimum water consumption of the hydropower station based on the load planning curve based on the electricity-to-water ratio;

[0012] The objective function of the cascade hydropower stations in a river basin aims to maximize the power generation or minimize the water consumption of all hydropower stations in the river basin;

[0013] S4. Optimize and solve the objective function of the cascade hydropower stations in the river basin determined by the operation mode of determining electricity with water or the objective function of the cascade hydropower stations in the river basin determined by the operation mode of determining water with electricity, and obtain the objective function value of the cascade hydropower stations in the river basin, that is, obtain the optimal economic operation efficiency of the cascade hydropower stations in the river basin.

[0014] An in-plant economic operation optimization system for a cascade hydropower station, comprising:

[0015] The system objective function value determination unit is used to determine the active power or flow rate of the unit required in the objective function calculation of the cascade hydropower station in the river basin. When the operation mode of determining electricity by water is adopted, the flow rate of the unit is calculated according to the active power of the unit. When the operation mode of determining water by electricity is adopted, the active power of the unit is calculated according to the flow rate of the unit.

[0016] The system initial state determination unit is used to obtain the storage capacity of the reservoir and the active power of the unit in the initial period according to the measured signal of the hydropower station monitoring system, obtain the water level of the reservoir according to the storage capacity of the reservoir, and calculate the flow and water head of the unit;

[0017] The system operation mode optimization unit is used to determine the flow and active power of the unit calculated by the unit according to the system objective function value, optimize and solve the objective function of the cascade hydropower stations in the basin determined by the operation mode of water determining electricity or the objective function of the cascade hydropower stations in the basin determined by the operation mode of electricity determining water, and obtain the objective function value of the cascade hydropower stations in the basin, that is, obtain the optimal economic operation efficiency of the cascade hydropower stations in the basin.

[0018] The present invention has the following beneficial effects:

[0019] 1. The present invention optimizes the initial parameters of the BP neural network by using a particle swarm optimization method, thereby constructing a refined efficiency model of a water turbine, which is used to predict the efficiency of the units in a hydropower station and improves the prediction accuracy;

[0020] 2. The hydraulic relationship model of the basin cascade hydropower station, the dynamic characteristic model of the basin cascade hydropower station, and the objective function of the basin cascade hydropower station determined by the operation mode of determining electricity by water or determining water by electricity are part of the economic operation model of the basin cascade hydropower station, that is, the hydraulic relationship model is used to reflect the hydraulic relationship between hydraulic structures, the dynamic characteristic model is used to reflect the characteristics of the unit, the objective function is used to evaluate the economic efficiency of the active power distribution result of the unit, and the objective function is optimized and solved, so as to obtain the objective function value of the basin cascade hydropower station, that is, to obtain the optimal economic operation efficiency of the basin cascade hydropower station;

[0021] 3. Compared with traditional methods, the present invention has the characteristics of high model accuracy and good optimization effect. The various modules of the system proposed by the present invention can optimally distribute the loads of the units of each hydropower station in the cascade hydropower station, thereby maximizing the economic operation benefits of the cascade hydropower stations in the basin. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A schematic diagram of a flow chart of an in-plant economic operation optimization method of a cascade hydropower station proposed by the present invention;

[0023] Figure 2 It is a schematic diagram of the hydraulic topology of the cascade hydropower station group in the experimental basin in the embodiment;

[0024] Figure 3 is the turbine efficiency model of the hydropower station S1 in the embodiment;

[0025] Figure 4 Schematic diagram of error comparison of the turbine efficiency model of the hydropower station S1 obtained by the method proposed by the present invention and the traditional method in the embodiment;

[0026] Figure 5 A schematic diagram showing a comparison of daily active power variation curves of two generating units of the hydropower station S1 obtained by the method of the present invention and the traditional method;

[0027] Figure 6 A schematic diagram showing a comparison of daily active power variation curves of two generating units of the hydropower station S2 obtained by the method of the present invention and the traditional method;

[0028] Figure 7 Schematic diagram comparing daily water level changes of reservoir R1 obtained by the method of the present invention and the traditional method. DETAILED DESCRIPTION

[0029] The specific implementation modes of the present invention are described below so that those skilled in the art can understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.

[0030] like Figure 1 As shown, a method for optimizing the economic operation of a cascade hydropower station comprises the following steps S1-S4:

[0031] S1. According to the hydraulic topological relationship of each hydropower station in the basin, a hydraulic relationship model of cascade hydropower stations in the basin is established.

[0032] In this embodiment, the hydraulic relationship model of the cascade hydropower stations in the river basin is established to reflect the hydraulic relationship between the hydraulic structures.

[0033] Specifically, step S1 includes S11-S16:

[0034] S11. The change in the reservoir capacity during a set time period is equal to the difference in the volume of water flowing into and out of the reservoir during the set time period, and the reservoir capacity of the current period is obtained. At the same time, the thin plate spline method is used to fit the historical data of the reservoir capacity and water level, and a mathematical model of the reservoir capacity and water level is constructed. When the reservoir capacity of the current period is input, the water level of the reservoir in the current period is obtained, that is:

[0035]

[0036] in, represents the storage capacity of reservoir R1 in period t, represents the storage capacity of reservoir R1 in the t-1 period, in represents inflow, out represents outflow, represents the inflow of reservoir R1 in period t, represents the outflow of reservoir R1 in the t period, Δt represents the set time interval, represents the water level of reservoir R1 at time period t, Represents the fitting relationship function between the reservoir capacity and water level.

[0037] In this embodiment, reservoir R1 is an upstream reservoir.

[0038] S12. According to the minimum and maximum water levels of the reservoir, a water level restriction model of the reservoir is constructed, namely:

[0039]

[0040] in, represents the minimum water level of reservoir R1, Indicates the maximum water level of reservoir R1.

[0041] S13, according to the flow of the hydropower station in the current period is equal to the sum of the total flow of all units of the hydropower station in the current period and the abandoned water, the flow of the hydropower station in the current period is obtained, and at the same time, the thin plate spline method is used to fit the historical data of the flow and water level of the hydropower station to construct a mathematical model of the flow and water level of the hydropower station. When the flow of the hydropower station in the current period is input, the water level of the hydropower station in the current period is obtained, that is:

[0042]

[0043] in, represents the flow of hydropower station S1 in period t, represents the number of units in the hydropower station S1, i represents the corresponding unit, represents the flow rate of the i-th unit of the hydropower station S1 in the t-th period, a represents the abandoned water, represents the amount of water abandoned by hydropower station S1 in period t, represents the water level of hydropower station S1 in period t, Represents the fitting relationship function between the flow and water level of the hydropower station.

[0044] S14. According to the lowest tailwater level and the highest tailwater level of the hydropower station, a water level restriction model of the hydropower station is constructed, namely:

[0045]

[0046] in, represents the lowest tailwater level of hydropower station S1, Indicates the highest tailwater level of hydropower station S1.

[0047] S15. According to the direction of water flow in space, the water level of the upstream hydropower station is not lower than the water level of the downstream reservoir. At the same time, in the interval direction, the inflow of the downstream reservoir is equal to the sum of the flow of the upstream hydropower station and the interval inflow. The relationship model between the water level and flow of the upstream hydropower station and the downstream reservoir is constructed, that is:

[0048]

[0049] in, represents the water level of the upstream hydropower station S1 at time period t, represents the water level of the downstream reservoir R2 at time period t, represents the inflow of the downstream reservoir R2 in the t period, li represents the interval inflow, It represents the interval inflow flow between the upstream hydropower station and the downstream reservoir in the tth period.

[0050] S16. A hydraulic relationship model of cascade hydropower stations in the basin is established based on the mathematical model of reservoir capacity and water level, the water level restriction model of the reservoir, the mathematical model of the flow and water level of the hydropower station, the water level restriction model of the hydropower station, and the relationship model between the water level and flow of the upstream hydropower station and the downstream reservoir.

[0051] S2. According to the active power and water head of each hydropower station in the basin, a dynamic characteristic model of cascade hydropower stations in the basin is established.

[0052] In this embodiment, the dynamic characteristic model of the cascade hydropower station in the river basin established reflects the characteristics of the units in the hydropower station.

[0053] Specifically, step S2 specifically includes S21-S26:

[0054] S21. Based on the fact that the sum of the active power of all units in the hydropower station is equal to the load of the hydropower station, the power balance equation model of the hydropower station is constructed, namely:

[0055]

[0056] in, represents the active power of the i-th unit of the hydropower station S1 in the t-th period, L1 represents the load, Represents the load carried by the hydropower station in the tth period.

[0057] S22. According to the minimum active power and maximum active power allowed for each unit in the hydropower station, a power limitation model for the units in the hydropower station is constructed, namely:

[0058]

[0059] in, represents the minimum active power allowed for the i-th unit in the hydropower station S1, It represents the maximum active power allowed for the i-th unit in the hydropower station S1.

[0060] S23. Construct a water head calculation model for the units in the hydropower station, namely:

[0061]

[0062] in, represents the water head of the i-th unit in the hydropower station S1, K f Represents the head loss coefficient of the hydropower station.

[0063] S24. According to the maximum and minimum heads allowed for each unit in the hydropower station, a head limitation model for the units in the hydropower station is constructed, namely:

[0064]

[0065] in, represents the minimum allowable water head of the i-th unit in the hydropower station S1, It represents the maximum allowable water head of the i-th unit in the hydropower station S1.

[0066] S25. The head of the unit in the hydropower station and the active power of the unit in the hydropower station are taken as the original data, and the efficiency of the unit in the hydropower station is taken as the label data. The original data with the label data is input into the BP neural network for training. At the same time, the particle swarm optimization method is used to optimize the initial parameters of the BP neural network during training, and a refined efficiency model of the turbine is constructed to predict the efficiency of the unit in the hydropower station.

[0067] In this embodiment, the particle swarm optimization method is used to optimize the initial parameters of the BP neural network, so as to construct a refined efficiency model of the water turbine, thereby improving the prediction accuracy of the refined efficiency model of the water turbine.

[0068] Specifically, step S25 specifically includes S251-S259:

[0069] S251, setting includes population size N, inertia weight w, first learning rate c1 and second learning rate c2, and maximum number of iterations T max The initial parameters of .

[0070] S252. Randomly generate positions of the first generation of N particles in the feasible domain according to the set initial parameters.

[0071] S253. The positions of the first-generation N particles are used as the initial weights and thresholds of the BP neural network. At the same time, the water head of the unit in the hydropower station and the active power of the unit in the hydropower station are used as the original data, and the efficiency of the unit in the hydropower station is used as the label data. The original data with the label data is input into the BP neural network for training to obtain N trained BP neural networks. The objective function of the N trained BP neural networks is used to calculate the current fitness of each particle of the first generation.

[0072] In this embodiment, the objective function of the BP neural network refers to the prediction error of the BP neural network.

[0073] S254, taking the current fitness of each particle of the first generation as the historical optimal value of the individual particle, and recording the position and speed of the individual particle historical optimal value, and taking the optimal value of the current fitness of each particle of the first generation as the historical optimal value of the population, recording the position and fitness of the population at the historical optimal value of the population, and adding 1 to the number of iterations.

[0074] S255. Determine whether the N trained BP neural networks have reached the maximum number of iterations or the prediction accuracy meets the set requirements. If so, stop the iteration and output the trained optimal BP neural network as a turbine refined efficiency model for predicting the efficiency of the units in the hydropower station. Otherwise, execute step S256.

[0075] S256. According to the recorded historical optimal position and speed of the individual particle and the recorded historical optimal position and fitness of the population, the speed and position update formula of the particle is used to calculate the position of the contemporary particle.

[0076] S257. The position of the contemporary particle is used as the initial weight and threshold of the BP neural network, and the BP neural network is trained to obtain N trained BP neural networks. At the same time, the objective function of the N trained BP neural networks is used to calculate the fitness of each contemporary particle.

[0077] S258. Determine whether the fitness of each particle in the current period is better than the individual historical optimal value of the particle. If so, take the fitness of the particle in the current period as the individual historical optimal value of the particle. Otherwise, keep the individual historical optimal value of the particle unchanged.

[0078] At the same time, the optimal value of the fitness of each contemporary particle is taken as the optimal value of the contemporary population, and it is judged whether the optimal value of the contemporary population is better than the historical optimal value of the population. If so, the optimal value of the contemporary population is taken as the historical optimal value of the population, otherwise the historical optimal value of the population remains unchanged.

[0079] S259. Increase the number of iterations by 1 and return to step S255.

[0080] S26. A dynamic characteristic model of cascade hydropower stations in a river basin is established based on the power balance equation model of the hydropower station, the power limitation model of the units in the hydropower station, the head calculation model of the units in the hydropower station, the head limitation model of the units in the hydropower station and the refined efficiency model of the turbine.

[0081] S3. According to the hydraulic relationship model of the cascade hydropower stations in the river basin established in step S1 and the dynamic characteristic model of the cascade hydropower stations in the river basin established in step S2, the objective function of the cascade hydropower stations in the river basin is determined by adopting the operation mode of determining electricity by water or determining water by electricity.

[0082] Among them, the maximum power generation of the hydropower station is determined according to the inflow and reservoir water level planning curve based on water; the minimum water consumption of the hydropower station is determined according to the load planning curve based on electricity; the objective function of the cascade hydropower stations in the basin is to maximize the power generation or minimize the water consumption of all hydropower stations in the basin.

[0083] In this embodiment, the purpose of using different operation modes to determine the objective function of the cascade hydropower station in the basin is to evaluate the economic efficiency of the active power distribution results of all units in the hydropower station.

[0084] Specifically, step S3 specifically includes S31-S33:

[0085] S31, solving the hydraulic relationship model of the cascade hydropower stations in the river basin established in step S1 and the dynamic characteristic model of the cascade hydropower stations in the river basin established in step S2 to obtain the active power and flow of the units of all hydropower stations.

[0086] S32, according to the active power and flow of all the hydropower stations obtained in step S31, the objective function of the cascade hydropower stations in the basin is determined by adopting the operation mode of determining power by water, that is:

[0087]

[0088] Among them, F1 represents the objective function of the cascade hydropower stations in the basin determined by the operation mode of water-to-electricity, max represents the maximum value, and m represents the total number of cascade hydropower stations in the basin. represents the jth hydropower station S j The number of units, T represents the number of optimized time periods, represents the jth hydropower station S in the tth period j The active power of the i-th unit, represents the jth hydropower station S in the tth period j The flow rate of the i-th unit.

[0089] S33, according to the active power and flow of all the hydropower stations obtained in step S31, the objective function of the cascade hydropower stations in the basin is determined by the operation mode of determining water by electricity, that is:

[0090]

[0091] Among them, F2 represents the objective function of the cascade hydropower stations in the basin determined by the operation mode of electricity-determined water.

[0092] In this embodiment, the hydraulic relationship model of the river basin cascade hydropower station, the dynamic characteristic model of the river basin cascade hydropower station, and the objective function of the river basin cascade hydropower station determined by the operation mode of determining electricity by water or determining water by electricity are part of the economic operation model within the river basin cascade hydropower station plant, among which the hydraulic relationship model of the river basin cascade hydropower station is used to reflect the hydraulic relationship between hydraulic structures, the dynamic characteristic model of the river basin cascade hydropower station is used to reflect the characteristics of the units in the hydropower station, and the objective function of the river basin cascade hydropower station is determined to evaluate the economy of the active power distribution results of the units.

[0093] S4. Optimize and solve the objective function of the cascade hydropower stations in the river basin determined by the operation mode of determining electricity with water or the objective function of the cascade hydropower stations in the river basin determined by the operation mode of determining water with electricity, and obtain the objective function value of the cascade hydropower stations in the river basin, that is, obtain the optimal economic operation efficiency of the cascade hydropower stations in the river basin.

[0094] An in-plant economic operation optimization system for a cascade hydropower station, comprising:

[0095] The system objective function value determination unit is used to determine the active power or flow of the unit required in the objective function calculation of the cascade hydropower station in the basin. When the operation mode of determining electricity by water is adopted, the flow of the unit is calculated based on the active power of the unit. When the operation mode of determining water by electricity is adopted, the active power of the unit is calculated based on the flow of the unit.

[0096] The system initial state determination unit is used to obtain the reservoir capacity and the active power of the unit in the initial period according to the measured signal of the hydropower station monitoring system, obtain the water level of the reservoir according to the reservoir capacity, and calculate the flow and head of the unit.

[0097] The system operation mode optimization unit is used to determine the flow and active power of the unit calculated by the unit according to the system objective function value, optimize and solve the objective function of the cascade hydropower stations in the basin determined by the operation mode of water determining electricity or the objective function of the cascade hydropower stations in the basin determined by the operation mode of electricity determining water, and obtain the objective function value of the cascade hydropower stations in the basin, that is, obtain the optimal economic operation efficiency of the cascade hydropower stations in the basin.

[0098] In this embodiment, the system objective function value determination unit, the system initial state determination unit and the system operation mode optimization unit are used to calculate and optimize various variables in the process of economic operation optimization in the cascade hydropower station.

[0099] Specifically, the system objective function value determination unit includes a module for inferring unit active power from unit flow, a module for inferring unit flow from unit active power, and a penalty module.

[0100] The module for calculating the active power of the unit by the unit flow is used to calculate the active power and efficiency of the unit by an iterative method when the flow and water head of the unit are given. The specific process is as follows:

[0101] In the efficiency interval [0,η max ] randomly generates the efficiency η of the i-th unit i , where η max Indicates the maximum efficiency of the unit.

[0102] According to the efficiency η of the i-th unit i , calculate the active power of the i-th unit, that is:

[0103] Pi =γQ i H i η i

[0104] Among them, P i represents the active power of the i-th unit, γ represents a constant, Q i represents the flow rate of the i-th unit, H i represents the water head of the i-th unit.

[0105] In this embodiment, γ is 9.81.

[0106] The water head H of the i-th unit i and the active power P of the i-th unit i Input the refined efficiency model of the turbine to obtain the actual efficiency under the head and active power of the i-th unit.

[0107] Determine the efficiency η of the generated i-th unit i The actual efficiency under the head and active power of the i-th unit Whether the relative error reaches the first preset value, if so, stop the iteration and output the efficiency η of the i-th unit i and the active power P of the i-th unit i , otherwise, let η i ′ represents the regenerated efficiency of the i-th unit, the active power of the i-th unit is calculated again and the next iteration is performed, where α represents a constant value.

[0108] In this embodiment, α is 0.5.

[0109] The module for calculating the flow rate of the unit based on the unit active power is used to calculate the flow rate and water head of the unit using an iterative method when the active power of the unit and the water level of the reservoir are given. The specific process is as follows:

[0110] Assume that the water head H of the i-th unit i Equal to the rated water head H of the i-th unit i ′ , then the water head H of the i-th unit i and the active power P of the i-th unit i Input the refined efficiency model of the turbine to obtain the efficiency η of the i-th unit i .

[0111] According to the efficiency η of the i-th unit i , calculate the flow rate of the i-th unit, that is:

[0112]

[0113] And sum up the flow of all units to get the total flow of all units in the hydropower station.

[0114] According to the total flow of all units of the hydropower station, the water level of the hydropower station is calculated using the dynamic characteristic model of the cascade hydropower stations in the basin.

[0115] Calculate the actual water head of the i-th unit using the water head calculation model of the unit in the hydropower station

[0116] Determine the actual water head of the i-th unit and the water head H of the i-th unit i Whether the relative error reaches the second preset value, if so, stop the iteration and output the efficiency η of the i-th unit i and the flow rate Q of the i-th unit i , otherwise, let H″ i represents the water head of the i-th unit in the next iteration, and the efficiency of the i-th unit is calculated again and the next iteration is performed, where β represents a constant value.

[0117] In this embodiment, β is 0.5.

[0118] The penalty module is used to determine whether the system state of the cascade hydropower station in the basin satisfies the inequality conditions in the hydraulic relationship model and the dynamic characteristic model of the cascade hydropower station in the basin. If so, the objective function value is calculated according to the objective function of the cascade hydropower station in the basin; otherwise, the objective function value of the cascade hydropower station in the basin is taken as the set value; wherein the system state is the water level of the hydropower station, the active power and the head of the unit.

[0119] In this embodiment, the module for inferring unit active power from unit flow, the module for inferring unit flow from unit active power, and the penalty module are used for accurate calculation of the objective function to accurately evaluate the performance of the candidate solutions.

[0120] Specifically, the system initial state determination unit is used to obtain the storage capacity of the reservoir and the active power of the unit in the initial period according to the measured signal of the hydropower station monitoring system, obtain the water level of the reservoir according to the storage capacity of the reservoir, and calculate the flow and head of the unit. The specific process is as follows:

[0121] The reservoir capacity and active power of the unit in the initial period are obtained from the measured signals of the hydropower station monitoring system.

[0122] The storage capacity of the reservoir in the initial period is input into the mathematical model of the storage capacity and water level of the reservoir to obtain the water level of the reservoir in the initial period.

[0123] The water level of the reservoir in the initial period and the active power of the unit are input into the unit active power deduction unit flow module to obtain the unit flow and water head.

[0124] In this embodiment, the system initial state determination unit is used to determine the initial state of the system, so as to provide boundary conditions for the optimization of the economic operation within the hydropower station in subsequent time periods.

[0125] Specifically, the system operation mode optimization unit is used to determine the flow and active power of the unit calculated by the unit according to the system objective function value, optimize and solve the objective function of the basin cascade hydropower station determined by the operation mode of determining electricity with water or the objective function of the basin cascade hydropower station determined by the operation mode of determining water with electricity, and obtain the objective function value of the basin cascade hydropower station, that is, obtain the optimal economic operation efficiency of the basin cascade hydropower station. The specific process is:

[0126] Step 1: Use the initial state of the system to determine the flow and head of the unit computer group, and use the flow or active power of the unit as the optimization variable, while recording the current period number as 0.

[0127] Step 2: Determine whether the economic operation of the cascade hydropower stations in the last period is optimized. If so, output the optimal solution for each period, otherwise go to Step 3; the optimal solution is the optimal active power or optimal flow of each unit.

[0128] Step 3: Randomly generate an initial population. Within the feasible domain of the given optimization variables, randomly generate an initial population of a certain size. Each individual in the population contains all the information of the candidate solution, that is, the active power or flow of each unit.

[0129] Step 4: Determine the objective function according to the operation mode of the cascade hydropower stations in the basin, and determine the unit according to all the information of the candidate solutions contained in each individual in the population and the system objective function value, and calculate the fitness of each individual in the population, that is, the objective function value.

[0130] Step 5: Record the individual information of each individual in the population when its fitness is the highest, including its corresponding optimal solution and objective function value.

[0131] Step 6: Check whether the maximum number of iterations has been reached. If so, stop the calculation, output the optimal solution and go to Step 11, otherwise go to Step 7.

[0132] Step 7: Generate a new population based on the evolutionary mechanism of the gravitational search method and the previous generation population.

[0133] Step 8: Calculate the fitness of the new population, and use the system objective function value to determine the unit to calculate the fitness of each individual in the new population, that is, the optimal active power or optimal flow of each unit in the current period.

[0134] Step 9: Update the information of the individual with the highest fitness in the current population. If the best individual in the new population is better than the best individual in the previous population in terms of fitness, the best individual in the new population will be used as the historical best individual, otherwise the historical best individual will remain unchanged.

[0135] Step 10: Increase the number of iterations by 1 and return to Step 6.

[0136] Step 11: Calculate the initial state of the next period of the cascade hydropower station in the basin. The initial state of the next moment of the cascade hydropower station in the basin is calculated based on the output optimal solution, the hydraulic relationship model and the dynamic characteristic model of the cascade hydropower station in the basin. At the same time, add 1 to the current period number and enter Step 2 for iteration.

[0137] In this embodiment, the system operation mode optimization unit is used to determine the best mode of economic operation within the cascade hydropower station, that is, to achieve the optimal distribution of active power of each unit in each hydropower station, thereby compensating for the shortcomings of traditional load distribution methods in the economic operation of the hydropower station.

[0138] In this embodiment, the cascade hydropower station group in the experimental basin is used as the implementation object of the economic operation optimization method and system of the cascade hydropower station proposed in the present invention, so as to verify the effectiveness of the economic operation optimization method and system of the cascade hydropower station proposed in the present invention. Figure 2 As shown, Figure 2 This is a schematic diagram of the hydraulic topology of the cascade hydropower stations in the experimental basin. Figure 2 The experimental basin contains two hydropower stations, denoted by S1 and S2, where S1 is the upstream power station of S2. Hydropower station S1 is equipped with two units with a rated capacity of 8MW, and hydropower station S2 is equipped with two units with a rated capacity of 2MW. There is an upstream reservoir in front of hydropower station S1, denoted by R1. The water level of the upstream reservoir in time period t is expressed as There is a downstream reservoir in front of the hydropower station S2, represented by R2. The water level of the downstream reservoir in time period t is expressed as The water level of hydropower station S1, i.e. the downstream tailwater level, is expressed as The water level of hydropower station S2 is expressed as The main parameters of the units of each hydropower station in the cascade hydropower station group in the basin are shown in Table 1, and the detailed parameters of the constraints of the hydraulic structures of the cascade hydropower station group in the basin are shown in Table 2:

[0139] Table 1 Main parameters of the units of each hydropower station in the cascade hydropower station group in the basin

[0140]

[0141] Table 2 Detailed parameter table of hydraulic structure constraints of cascade hydropower station group

[0142]

[0143]

[0144] like Figure 3 As shown, Figure 3 is the turbine efficiency model of hydropower station S1, Figure 3 The horizontal axis represents the unit head, the vertical axis represents the unit active power, and the vertical axis represents the efficiency; Figure 3 The middle surface is generated by the turbine efficiency model of the hydropower station S1 obtained by the method for optimizing the economic operation of the cascade hydropower station proposed by the present invention. The points near the surface are the sample points of the turbine efficiency characteristics of the unit's head, active power and efficiency. It can be seen that most of the sample points of the turbine efficiency characteristics are located on the surface generated by the turbine efficiency model of the hydropower station S1 obtained by the method proposed by the present invention. In addition, the turbine efficiency model of the hydropower station S2 can also be obtained by the method proposed by the present invention.

[0145] like Figure 4 As shown, Figure 4 Schematic diagram of error comparison between the turbine efficiency model of hydropower station S1 obtained by the method of the present invention and the traditional method; Figure 4 The horizontal axis is the number of samples, the vertical axis is the absolute error of the samples, the solid line represents the traditional method, and the dotted line represents the method of the present invention; the traditional method directly uses the turbine efficiency characteristic samples, i.e., the head and active power of the unit to train the BP neural network, and does not use the particle swarm optimization method to optimize the initial weights and thresholds of the network, while the method of the present invention uses the particle swarm optimization method to optimize the initial weights and thresholds of the network; Figure 4 It can be found that the absolute error of the turbine efficiency model obtained by the method of the present invention on most samples is smaller than that of the traditional method, which shows that the accuracy of the method of the present invention in fitting the turbine efficiency characteristics is better than that of the traditional method.

[0146] Therefore, when using Figure 2 When the cascade hydropower station shown in the figure uses the operation mode of determining water by electricity, the objective function of the cascade hydropower station in the basin is to minimize the sum of the flow of all units of all hydropower stations in the entire basin within a certain period of time, that is: According to the main parameters of the units of each hydropower station in the cascade hydropower station group in the basin and the detailed parameters of the hydraulic structure constraints of the cascade hydropower station group given in Table 1 and Table 2, as well as the hydraulic relationship model of the cascade hydropower station in the basin and the dynamic characteristic model of the cascade hydropower station in the basin established by the method of the present invention, under the conditions of the total load of the hydropower station S1 and the hydropower station S2 respectively given, the system operation mode optimization unit proposed in the present invention is used to optimize the load distribution of a total of 4 units of the hydropower station S1 and the hydropower station S2, and the daily active power change curve of each unit and the daily water level change curve of the reservoir are obtained.

[0147] like Figure 5 As shown, Figure 5 Schematic diagram showing the comparison of daily active power variation curves of two units of hydropower station S1 obtained by the method of the present invention and the traditional method; Figure 5 It can be seen that the traditional method distributes the total load of the power station to the two units according to the principle of average distribution, while the active power of the two units optimized by the method of the present invention is not the same in each hour, but the total active power of the two methods in each hour is the same.

[0148] like Figure 6 As shown, Figure 6 Schematic diagram showing the comparison of daily active power variation curves of two units of the hydropower station S2 obtained by the method of the present invention and the traditional method; Figure 6 It can be seen that the traditional method distributes the total load of the power station to the two units according to the principle of average distribution, while the active power of the two units optimized by the method of the present invention is not the same in each hour, but the total active power of the two methods in each hour is the same.

[0149] like Figure 7 As shown, Figure 7 Schematic diagram comparing the daily water level changes of reservoir R1 obtained by the method of the present invention and the traditional method; Figure 7 It can be seen that under the condition of the same total active power, the load distribution results of the two power stations with a total of four units obtained by the method of the present invention can consume less reservoir capacity or flow, making the operation of the cascade power stations in the basin more economical.

[0150] In summary, according to Figure 5-Figure 7 The comparison results show that the method of the present invention is used to establish the hydraulic relationship model and the dynamic characteristic model of the cascade hydropower station in the basin, and the objective function of the cascade hydropower station in the basin is determined by adopting the operation mode of determining electricity by water or determining water by electricity. By solving the objective function, it is able to overcome the limitations of the traditional method that lacks consideration of the full-condition efficiency characteristics of the turbine and the simple load distribution strategy determined, and can be applied to any nonlinear system with complex hydraulic and electrical coupling relationships, and has high calculation accuracy.

[0151] The present invention uses specific embodiments to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

[0152] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the principles of the present invention, and should be understood that the protection scope of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.

Claims

1. A method for optimizing the economic operation of a cascade hydropower station, characterized in that: The following steps are involved: S1. According to the hydraulic topological relationship of each hydropower station in the basin, a hydraulic relationship model of cascade hydropower stations in the basin is established; S2. According to the active power and water head of each hydropower station in the basin, a dynamic characteristic model of cascade hydropower stations in the basin is established; S3, according to the hydraulic relationship model of the cascade hydropower station in the river basin established in step S1 and the dynamic characteristic model of the cascade hydropower station in the river basin established in step S2, the objective function of the cascade hydropower station in the river basin is determined by adopting the operation mode of determining electricity by water or determining water by electricity; Among them, the maximum power generation of the hydropower station is determined based on the water inflow and the reservoir water level planning curve; Determine the minimum water consumption of the hydropower station based on the load planning curve based on the electricity-to-water ratio; The objective function of the cascade hydropower stations in a river basin aims to maximize the power generation or minimize the water consumption of all hydropower stations in the river basin; S4. Optimize and solve the objective function of the cascade hydropower stations in the river basin determined by the operation mode of determining electricity with water or the objective function of the cascade hydropower stations in the river basin determined by the operation mode of determining water with electricity, and obtain the objective function value of the cascade hydropower stations in the river basin, that is, obtain the optimal economic operation efficiency of the cascade hydropower stations in the river basin.

2. The method for optimizing the economic operation of a cascade hydropower station according to claim 1, characterized in that: Step S1 specifically includes: S11. The change in the reservoir capacity during a set time period is equal to the difference in the volume of water flowing into and out of the reservoir during the set time period, and the reservoir capacity of the current period is obtained. At the same time, the thin plate spline method is used to fit the historical data of the reservoir capacity and water level, and a mathematical model of the reservoir capacity and water level is constructed. When the reservoir capacity of the current period is input, the water level of the reservoir in the current period is obtained, that is: in, represents the storage capacity of reservoir R1 in period t, represents the storage capacity of reservoir R1 in the t-1 period, in represents inflow, out represents outflow, represents the inflow of reservoir R1 in period t, represents the outflow of reservoir R1 in the t period, Δt represents the set time interval, represents the water level of reservoir R1 at time period t, Represents the fitting relationship function between the reservoir capacity and water level; S12. According to the minimum and maximum water levels of the reservoir, a water level restriction model of the reservoir is constructed, namely: in, represents the minimum water level of reservoir R1, represents the maximum water level of reservoir R1; S13, according to the flow of the hydropower station in the current period is equal to the sum of the total flow of all units of the hydropower station in the current period and the abandoned water, the flow of the hydropower station in the current period is obtained, and at the same time, the thin plate spline method is used to fit the historical data of the flow and water level of the hydropower station to construct a mathematical model of the flow and water level of the hydropower station. When the flow of the hydropower station in the current period is input, the water level of the hydropower station in the current period is obtained, that is: in, represents the flow of hydropower station S1 in period t, represents the number of units in the hydropower station S1, i represents the corresponding unit, represents the flow rate of the i-th unit of the hydropower station S1 in the t-th period, a represents the abandoned water, represents the amount of water abandoned by hydropower station S1 in period t, represents the water level of hydropower station S1 in period t, Represents the fitting relationship function between the flow and water level of the hydropower station; S14. According to the lowest tailwater level and the highest tailwater level of the hydropower station, a water level restriction model of the hydropower station is constructed, namely: in, represents the lowest tailwater level of hydropower station S1, Indicates the highest tailwater level of hydropower station S1; S15. According to the direction of water flow in space, the water level of the upstream hydropower station is not lower than the water level of the downstream reservoir. At the same time, in the interval direction, the inflow of the downstream reservoir is equal to the sum of the flow of the upstream hydropower station and the interval inflow. The relationship model between the water level and flow of the upstream hydropower station and the downstream reservoir is constructed, that is: in, represents the water level of the upstream hydropower station S1 at time period t, represents the water level of the downstream reservoir R2 at time period t, represents the inflow of the downstream reservoir R2 in the t period, li represents the interval inflow, represents the interval inflow between the upstream hydropower station and the downstream reservoir at time period t; S16. A hydraulic relationship model of cascade hydropower stations in the basin is established based on the mathematical model of reservoir capacity and water level, the water level restriction model of the reservoir, the mathematical model of the flow and water level of the hydropower station, the water level restriction model of the hydropower station, and the relationship model between the water level and flow of the upstream hydropower station and the downstream reservoir.

3. The method for optimizing the economic operation of a cascade hydropower station according to claim 2, characterized in that: Step S2 specifically includes: S21. Based on the fact that the sum of the active power of all units in the hydropower station is equal to the load of the hydropower station, the power balance equation model of the hydropower station is constructed, namely: in, represents the active power of the i-th unit of the hydropower station S1 in the t-th period, L1 represents the load, represents the load carried by the hydropower station in period t; S22. According to the minimum active power and maximum active power allowed for each unit in the hydropower station, a power limitation model for the units in the hydropower station is constructed, namely: in, represents the minimum active power allowed for the i-th unit in the hydropower station S1, represents the maximum active power allowed by the i-th unit in the hydropower station S1; S23. Construct a water head calculation model for the units in the hydropower station, namely: in, represents the water head of the i-th unit in the hydropower station s1, K f It represents the head loss coefficient of the hydropower station; S24. According to the maximum and minimum heads allowed for each unit in the hydropower station, a head limitation model for the units in the hydropower station is constructed, namely: in, represents the minimum allowable head of the i-th unit in the hydropower station s1, represents the maximum head allowed for the i-th unit in the hydropower station s1; S25, taking the head of the unit in the hydropower station and the active power of the unit in the hydropower station as the original data, taking the efficiency of the unit in the hydropower station as the label data, inputting the original data with the label data into the BP neural network for training, and simultaneously using the particle swarm optimization method to optimize the initial parameters of the BP neural network during the training, and constructing a refined efficiency model of the turbine for predicting the efficiency of the unit in the hydropower station; S26. A dynamic characteristic model of cascade hydropower stations in a river basin is established based on the power balance equation model of the hydropower station, the power limitation model of the units in the hydropower station, the head calculation model of the units in the hydropower station, the head limitation model of the units in the hydropower station and the refined efficiency model of the turbine.

4. The method for optimizing the economic operation of a cascade hydropower station according to claim 3, characterized in that: Step S25 specifically includes: S251, setting includes population size N, inertia weight w, first learning rate c1 and second learning rate c2, and maximum number of iterations T max The initial parameters of S252, randomly generating positions of the first generation N particles in the feasible domain according to the set initial parameters; S253, using the positions of the first-generation N particles as the initial weights and thresholds of the BP neural network, and using the water head of the unit in the hydropower station and the active power of the unit in the hydropower station as the original data, and using the efficiency of the unit in the hydropower station as the label data, inputting the original data with the label data into the BP neural network for training, and obtaining N trained BP neural networks, and using the objective function of the N trained BP neural networks to calculate the current fitness of each particle in the first generation; S254, taking the current fitness of each particle of the first generation as the historical optimal value of the individual particle, and recording the position and speed of the individual particle historical optimal value, and taking the optimal value of the current fitness of each particle of the first generation as the historical optimal value of the population, recording the position and fitness of the population at the historical optimal value of the population, and adding 1 to the number of iterations; S255, judging whether the N trained BP neural networks have reached the maximum number of iterations or the prediction accuracy meets the set requirements, if so, stopping the iteration and outputting the trained optimal BP neural network as a turbine refined efficiency model for predicting the efficiency of the units in the hydropower station, otherwise executing step S256; S256, according to the recorded position and speed of the individual particle's historical optimal value and the recorded position and fitness of the population at the historical optimal value of the population, using the particle's speed and position update formula, calculate the position of the contemporary particle; S257, using the position of the contemporary particle as the initial weight and threshold of the BP neural network, training the BP neural network to obtain N trained BP neural networks, and using the objective function of the N trained BP neural networks to calculate the fitness of each contemporary particle; S258, judging whether the fitness of each particle in the present time is better than the individual historical optimal value of the particle, if so, taking the fitness of the particle in the present time as the individual historical optimal value of the particle, otherwise, keeping the individual historical optimal value of the particle unchanged; At the same time, the optimal value of the fitness of each particle in the contemporary period is taken as the optimal value of the contemporary population, and it is judged whether the optimal value of the contemporary population is better than the optimal value of the population history. If so, the optimal value of the contemporary population is taken as the optimal value of the population history, otherwise the optimal value of the population history remains unchanged; S259. Increase the number of iterations by 1 and return to step S255.

5. The method for optimizing the economic operation of a cascade hydropower station according to claim 4, characterized in that: Step S3 specifically includes: S31, solving the hydraulic relationship model of the cascade hydropower stations in the river basin established in step S1 and the dynamic characteristic model of the cascade hydropower stations in the river basin established in step S2 to obtain the active power and flow of the units of all hydropower stations; S32, according to the active power and flow of all the hydropower stations obtained in step S31, the objective function of the cascade hydropower stations in the basin is determined by adopting the operation mode of determining power by water, that is: Among them, F1 represents the objective function of the cascade hydropower stations in the basin determined by the operation mode of water-to-electricity, max represents the maximum value, and m represents the total number of cascade hydropower stations in the basin. represents the jth hydropower station S j The number of units, T represents the number of optimized time periods, represents the jth hydropower station S in the tth period j The active power of the i-th unit, represents the jth hydropower station S in the tth period j The flow rate of the i-th unit; S33, according to the active power and flow of all the hydropower stations obtained in step S31, the objective function of the cascade hydropower stations in the basin is determined by the operation mode of determining water by electricity, that is: Among them, F2 represents the objective function of the cascade hydropower stations in the basin determined by the operation mode of electricity-determined water.

6. An in-plant economic operation optimization system for cascade hydropower stations, characterized in that: include: The system objective function value determination unit is used to determine the active power or flow rate of the unit required in the objective function calculation of the cascade hydropower station in the river basin. When the operation mode of determining electricity by water is adopted, the flow rate of the unit is calculated according to the active power of the unit. When the operation mode of determining water by electricity is adopted, the active power of the unit is calculated according to the flow rate of the unit. The system initial state determination unit is used to obtain the storage capacity of the reservoir and the active power of the unit in the initial period according to the measured signal of the hydropower station monitoring system, obtain the water level of the reservoir according to the storage capacity of the reservoir, and calculate the flow and water head of the unit; The system operation mode optimization unit is used to determine the flow and active power of the unit calculated by the unit according to the system objective function value, optimize and solve the objective function of the cascade hydropower stations in the basin determined by the operation mode of water determining electricity or the objective function of the cascade hydropower stations in the basin determined by the operation mode of electricity determining water, and obtain the objective function value of the cascade hydropower stations in the basin, that is, obtain the optimal economic operation efficiency of the cascade hydropower stations in the basin.

7. The method for optimizing the economic operation of a cascade hydropower station according to claim 6, characterized in that: The system objective function value determination unit includes a module for calculating the unit active power from the unit flow rate, a module for calculating the unit flow rate from the unit active power, and a penalty module; The module for calculating the active power of the unit by the unit flow is used to calculate the active power and efficiency of the unit by an iterative method when the flow and water head of the unit are given. The specific process is as follows: In the efficiency interval [0,η max ] randomly generates the efficiency η of the i-th unit i , where η max Indicates the maximum efficiency of the unit; According to the efficiency η of the i-th unit i , calculate the active power of the i-th unit, that is: P i =γQ i H i η i Among them, P i represents the active power of the i-th unit, γ represents a constant, Q i represents the flow rate of the i-th unit, H i represents the water head of the i-th unit; The water head H of the i-th unit i and the active power P of the i-th unit i Input the refined efficiency model of the turbine to obtain the actual efficiency under the head and active power of the i-th unit. Determine the efficiency η of the generated i-th unit i The actual efficiency under the head and active power of the i-th unit Whether the relative error reaches the first preset value, if so, stop the iteration and output the efficiency η of the i-th unit i and the active power P of the i-th unit i , otherwise, let η i ′ represents the regenerated efficiency of the i-th unit, and the active power of the i-th unit is calculated again and the next iteration is performed, where α represents a constant value; The module for calculating the flow rate of the unit based on the unit active power is used to calculate the flow rate and water head of the unit using an iterative method when the active power of the unit and the water level of the reservoir are given. The specific process is as follows: Assume that the water head H of the i-th unit i Equal to the rated water head H of the i-th unit i ′ , then the water head H of the i-th unit i and the active power P of the i-th unit i Input the refined efficiency model of the turbine to obtain the efficiency η of the i-th unit i ; According to the efficiency η of the i-th unit i , calculate the flow rate of the i-th unit, that is: And sum up the flow of all units to get the total flow of all units in the hydropower station; According to the total flow of all units of the hydropower station, the water level of the hydropower station is calculated using the dynamic characteristic model of the cascade hydropower stations in the basin; Calculate the actual water head of the i-th unit using the water head calculation model of the unit in the hydropower station Determine the actual water head of the i-th unit and the water head H of the i-th unit i Whether the relative error reaches the second preset value, if so, stop the iteration and output the efficiency η of the i-th unit i and the flow rate Q of the i-th unit i , otherwise, let H″ i represents the water head of the i-th unit in the next iteration, and the efficiency of the i-th unit is calculated again and the next iteration is performed, where β represents a constant value; The penalty module is used to determine whether the system state of the cascade hydropower station in the basin satisfies the inequality conditions in the hydraulic relationship model and the dynamic characteristic model of the cascade hydropower station in the basin. If so, the objective function value is calculated according to the objective function of the cascade hydropower station in the basin. Otherwise, the objective function value of the cascade hydropower station in the basin is set to a set value. Among them, the system status includes the water level of the hydropower station, the active power and the head of the unit.

8. The method for optimizing the economic operation of a cascade hydropower station according to claim 7, characterized in that: The system initial state determination unit is used to obtain the reservoir capacity and the active power of the unit in the initial period according to the measured signal of the hydropower station monitoring system, obtain the water level of the reservoir according to the reservoir capacity, and calculate the flow and head of the unit. The specific process is as follows: Obtain the reservoir capacity and active power of the unit in the initial period from the measured signals of the hydropower station monitoring system; Input the storage capacity of the reservoir in the initial period into the mathematical model of the storage capacity and water level of the reservoir to obtain the water level of the reservoir in the initial period; The water level of the reservoir in the initial period and the active power of the unit are input into the unit active power deduction unit flow module to obtain the unit flow and water head.

9. The method for optimizing the economic operation of a cascade hydropower station according to claim 8, characterized in that: The system operation mode optimization unit is used to determine the flow and active power of the unit calculated by the unit according to the system objective function value, optimize and solve the objective function of the basin cascade hydropower station determined by the operation mode of determining electricity with water or the objective function of the basin cascade hydropower station determined by the operation mode of determining water with electricity, and obtain the objective function value of the basin cascade hydropower station, that is, obtain the optimal economic operation efficiency of the basin cascade hydropower station. The specific process is: Step 1: Use the initial state of the system to determine the flow and water head of the unit computer group, and use the flow or active power of the unit as the optimization variable, while recording the current period number as 0; Step 2: Determine whether the economic operation of the cascade hydropower stations in the last period is optimized. If so, output the optimal solution for each period, otherwise go to Step 3; Among them, the optimal solution is the optimal active power or optimal flow of each unit; Step 3: Randomly generate an initial population. Within the feasible domain of the given optimization variables, randomly generate an initial population of a certain size. Each individual in the population contains all the information of the candidate solution, that is, the active power or flow of each unit. Step 4: Determine the objective function according to the operation mode of the cascade hydropower stations in the basin, and determine the unit according to all the information of the candidate solution contained in each individual in the population and the system objective function value, and calculate the fitness of each individual in the population, that is, the objective function value; Step 5: Record the information of each individual in the population when its fitness is the highest, including its corresponding optimal solution and objective function value; Step 6: Check whether the maximum number of iterations has been reached. If so, stop the calculation, output the optimal solution and go to Step 11, otherwise go to Step 7; Step 7: Generate a new population based on the evolution mechanism of the gravitational search method and the previous generation population; Step 8: Calculate the fitness of the new population, and use the system objective function value determination unit to calculate the fitness of each individual in the new population, that is, the optimal active power or optimal flow of each unit in the current period; Step 9: Update the information of the individual with the highest fitness in the current population. If the best individual in the new population is better than the best individual in the previous generation population in terms of fitness, the best individual in the new population will be used as the historical best individual, otherwise the historical best individual will remain unchanged. Step 10: Increase the number of iterations by 1 and return to Step 6; Step 11: Calculate the initial state of the next period of the cascade hydropower station in the basin. The initial state of the next moment of the cascade hydropower station in the basin is calculated based on the output optimal solution, the hydraulic relationship model and the dynamic characteristic model of the cascade hydropower station in the basin. At the same time, add 1 to the current period number and enter Step 2 for iteration.

Citation Information

Patent Citations

  • Optimization method for operation mode of hydroelectric generating set

    CN103927592A

  • Hierarchical dimensionality reduction dynamic planning method for load optimization distribution of hydropower station

    CN112818549A

  • Long-term power generation optimal scheduling method and device for cascade hydropower stations

    CN117674293A