Desalting system, control method and blowdown system of steam generator of nuclear power plant

By setting up a desalination system of nuclear islands and conventional islands in the pressurized water reactor nuclear power unit, the automation and safety of desalination treatment have been achieved, the problems of frequent treatment of desalination beds and the risk of leakage of radioactive substances have been solved, and the operating costs have been reduced and manpower consumption.

CN118919118APending Publication Date: 2024-11-08CHINA NUCLEAR POWER ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410992932.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The desalination bed processing process of existing pressurized water reactor nuclear power units requires frequent resin replacement, which is time-consuming and labor-intensive, and has the potential leakage risk of radioactive substances. The management process is complex, resulting in high economic and labor costs.

Method used

Design a desalination system, by setting up a first and a second desalination system on the nuclear island and the conventional island, obtaining operational status information using the first detection unit and the first control unit, and switching to the nuclear island for processing when determining abnormal conditions , under normal circumstances, the desalting treatment is carried out on a conventional island, and the service life and flow distribution of the electrodeionization module are managed through the second detection unit and the second control unit.

Benefits of technology

It greatly reduces the maintenance frequency and service life of salt desalination equipment on the nuclear island, simplifies management processes, reduces economic and labor costs, and ensures nuclear safety and avoids the potential spread of radioactive materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118919118A_ABST
    Figure CN118919118A_ABST
Patent Text Reader

Abstract

The invention provides a desalting system, a first desalting subsystem and a second desalting subsystem of the desalting system are respectively positioned in a nuclear island and a conventional island, and a first detection unit is used for acquiring running condition information of the desalting system; the first control unit is used for judging whether an abnormal condition occurs or not according to the operation condition information, and controlling a second desalting subsystem located in the conventional island to perform desalting treatment on the sewage of the steam generator when the abnormal condition does not occur; and when an abnormal condition occurs, a first desalting subsystem located in the nuclear island is controlled to perform desalting treatment on the blow-down water of the steam generator. The desalting system is reasonable in layout arrangement, the system maintenance frequency is greatly reduced, the automation level is improved, and the economic cost and the labor cost of system operation can be effectively reduced while nuclear safety regulations are not broken through and potential diffusion of radioactive substances is avoided. The invention further provides a desalting system control method and a nuclear power plant steam generator blowdown system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention specifically relates to a desalination system, a control method and a steam generator blowdown system for a nuclear power plant. Background Art

[0002] The main function of the steam generator blowdown system of a pressurized water reactor nuclear power unit is to collect and treat the blowdown water of the steam generator. After cooling, decompression and continuous treatment, the blowdown water is sent to the condenser for reuse or discharged to the waste liquid system. The blowdown system has the functions of removing harmful deposits on the secondary side of the steam generator, removing impurities and ions enriched in the boiler water on the secondary side of the steam generator, so that the blowdown water is purified to reduce the discharge of radioactive substances into the environment, and can also monitor the leakage of the heat transfer tubes of the steam generator.

[0003] At present, the second-generation and third-generation domestically produced commercial pressurized water reactor nuclear power units in service or under construction all use desalination beds arranged inside the nuclear island to treat wastewater. During the operation of the power plant, each desalination bed needs to replace or regenerate the desalination resin multiple times in each refueling cycle. This treatment process requires the desalination bed to be operated to be removed from the operating state, and the entire process needs to be completed manually, which is time-consuming and labor-intensive. In addition, all desalination beds are located in the nuclear island control area. During the resin replacement and regeneration process, the management process is very complicated. From the perspective of nuclear safety, the desalination bed of the sewage system has the possibility of enriching the primary circuit and potentially leaking radioactive materials to the secondary circuit, so the desalination bed must also be placed inside the nuclear island. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a desalination system for the above-mentioned deficiencies in the prior art, which has a reasonable layout and greatly reduces the system maintenance frequency, improves the automation level, and can effectively reduce the economic cost and labor cost of system operation without breaking nuclear safety regulations and avoiding the potential spread of radioactive substances. The present invention also provides a desalination system control method and a nuclear power plant steam generator blowdown system.

[0005] The present invention provides a desalination system, comprising a first detection unit, a first control unit, a first desalination subsystem and a second desalination subsystem, wherein the first desalination subsystem and the second desalination subsystem are respectively located in a nuclear island and a conventional island, wherein the first detection unit is electrically connected to the first control unit for obtaining operation status information of the desalination system and sending the operation status information of the desalination system to the first control unit; the first control unit is used for judging whether an abnormal situation occurs according to the operation status information, and when no abnormal situation occurs, controlling the second desalination subsystem located in the conventional island to desalinate the wastewater from the steam generator; when an abnormal situation occurs, controlling the first desalination subsystem located in the nuclear island to desalinate the wastewater from the steam generator.

[0006] Furthermore, the desalination system also includes a first direct flow section and a second direct flow section, the first desalination subsystem and the first direct flow section are connected in parallel to form a nuclear island module, the second desalination subsystem and the second direct flow section are connected in parallel to form a conventional island module, the nuclear island module and the conventional island module are respectively located in the nuclear island and the conventional island, and are connected in series between the steam generator and the condenser in sequence, and the first control unit controls the wastewater of the steam generator to reach the condenser via the first direct flow section and the second desalination subsystem when it is determined that no abnormal situation occurs; and controls the wastewater of the steam generator to reach the condenser via the first desalination subsystem and the second direct flow section when it is determined that an abnormal situation occurs.

[0007] Furthermore, the desalination system also includes a second detection unit and a second control unit. The second desalination subsystem includes multiple electrodeionization modules, and each electrodeionization module is connected in parallel with each other. The second detection unit is electrically connected to the second control unit for obtaining the flow value of the steam generator wastewater and sending it to the second control unit. The second control unit is electrically connected to each electrodeionization module for turning on a set number of electrodeionization modules according to the flow value of the steam generator wastewater.

[0008] Furthermore, the second detection unit is also used to detect the service life of each electrodeionization module and send the detection result to the second control unit. The second control unit is also used to sort the service life of each electrodeionization module according to the detection result, and after obtaining the flow value of the steam generator wastewater, start a set number of electrodeionization modules with the longest service life in the sorting.

[0009] Furthermore, the second detection unit detects concentrated water generated by each electrodeionization module to obtain the service life of each electrodeionization module according to the concentrated water detection result.

[0010] Furthermore, the second detection unit detects the service life of each electrodeionization module and the flow value of the steam generator wastewater at set intervals, and sends the detection results and flow values ​​to the second control unit, so that the second control unit sorts the service life of each electrodeionization module according to the detection results at set intervals, and starts a set number of electrodeionization modules with the longest service life in the sorting according to the flow value.

[0011] Furthermore, the first desalination subsystem, the first direct flow section, the second desalination subsystem and the second direct flow section are all provided with valve bodies, and the first control unit is electrically connected to each of the valve bodies respectively to switch the flow direction of the steam generator wastewater by controlling the opening and closing of the valve bodies.

[0012] Furthermore, the first detection unit includes a first detection module and a second detection module, the first detection module is used to detect whether the radioactivity increases on the secondary side of the steam generator, and send a first abnormal operation signal to the first control unit when the radioactivity increases on the secondary side of the steam generator, the second detection module is used to detect whether the second desalination subsystem fails or is in a maintenance state, and send a second abnormal operation signal to the first control unit when the second desalination subsystem fails and / or is in a maintenance state, and the first control unit determines the occurrence of an abnormal situation based on the first abnormal operation signal and / or the second abnormal operation signal.

[0013] The present invention also provides a desalination system control method for controlling the operation of the above-mentioned desalination system, the method comprising the following steps:

[0014] The first detection unit obtains the operation status information of the desalination system;

[0015] The first control unit determines whether an abnormal situation occurs according to the operation situation information, and:

[0016] When no abnormal situation occurs, the second desalination subsystem located in the conventional island is controlled to desalinate the blowdown water of the steam generator;

[0017] When an abnormal situation occurs, the first desalination subsystem located in the nuclear island is controlled to desalinate the blowdown water of the steam generator.

[0018] Furthermore, the second desalination subsystem located in the conventional island is controlled to perform desalination treatment on the blowdown water of the steam generator, specifically comprising:

[0019] Control the blowdown water of the steam generator to reach the condenser via the first direct flow section and the second desalination subsystem;

[0020] The controlling of the first desalination subsystem located in the nuclear island to desalinate the blowdown water of the steam generator specifically includes:

[0021] The blowdown water of the steam generator is controlled to reach the condenser via the first desalination subsystem and the second direct flow section.

[0022] Further, the desalination system uses a plurality of electrodeionization modules connected in parallel to form the second desalination subsystem, and the desalination system also includes a second detection unit and a second control unit;

[0023] Before the blowdown water of the steam generator is controlled to reach the condenser via the first direct flow section and the second desalination subsystem, the method further comprises:

[0024] The second detection unit obtains the flow value of the steam generator wastewater;

[0025] The second control unit starts a set number of electrodeionization modules according to the flow value of the wastewater discharged from the steam generator.

[0026] Furthermore, before starting a set number of electrodeionization modules according to the flow rate value of the steam generator wastewater, the method further includes:

[0027] The second detection unit detects the service life of each electrodeionization module and sends the detection result to the second control unit;

[0028] The step of starting a set number of electrodeionization modules according to the flow rate value of the wastewater discharged from the steam generator specifically includes:

[0029] The second control unit ranks the service life of each electrodeionization module according to the detection result;

[0030] A set number of electrodeionization modules with the longest service life in the sequence are turned on.

[0031] Further, after the set number of electrodeionization modules are turned on according to the flow value of the steam generator wastewater, in the absence of abnormal conditions, the method further includes:

[0032] The second detection unit detects the service life of each electrodeionization module and the flow value of the wastewater discharged from the steam generator at set intervals, and sends the detection result and the flow value to the second control unit;

[0033] The second control unit sorts the service life of each electrodeionization module according to the detection result at set time intervals, and starts a set number of electrodeionization modules with the longest service life in the sorting according to the flow value.

[0034] Furthermore, the obtaining of the desalination system operation information specifically includes:

[0035] Detect whether there is an increase in radioactivity on the secondary side of the steam generator, detect whether there is a failure in the second desalination subsystem, and detect whether the second desalination subsystem is under maintenance;

[0036] Determine whether an abnormal situation occurs based on the operation status information, including:

[0037] When the operation status information indicates that radioactivity increases on the secondary side of the steam generator, and / or a fault occurs in the second desalination subsystem, and / or the second desalination subsystem is under maintenance, it is determined that an abnormal situation occurs.

[0038] The present invention also provides a nuclear power plant steam generator sewage discharge system, comprising a steam generator, a heat exchanger, a valve, a condenser and the above-mentioned desalination system, wherein the steam generator, the heat exchanger, the valve, the desalination system and the condenser are connected in series in sequence to form a sewage purification branch; another flow branch is opened at the downstream of the valve where it is connected to the desalination system, which is connected to the waste liquid treatment system as an unpurified sewage discharge branch.

[0039] The desalination system of the present invention adopts a method of setting up a second desalination subsystem in the conventional island to provide an optional scheme for switching control. First, the operating status information of the desalination system is obtained to determine whether there is an abnormal situation. Under normal operating conditions, the second desalination subsystem located in the conventional island is controlled to desalinate the wastewater from the steam generator. When an abnormal situation occurs, the first desalination subsystem located in the nuclear island is controlled to desalinate the wastewater from the steam generator.

[0040] Since under normal operating conditions, the wastewater from the steam generators in a pressurized water reactor nuclear power plant does not contain any radioactive substances in most operating states, the desalination system places the treatment process in the conventional island under this state, that is, the first desalination subsystem in the nuclear island only performs desalination treatment when an abnormal situation occurs. Therefore, it can greatly reduce the processing volume and usage time of the first desalination subsystem in the nuclear island, reduce the consumption of the first desalination subsystem, and greatly extend the use cycle of the first desalination subsystem between two overhauls, thereby minimizing the maintenance and overhaul frequency of the desalination equipment in the nuclear island.

[0041] Most of the desalination treatment is transferred to the second desalination subsystem of the conventional island. Even if the second desalination subsystem suffers routine wear and tear and needs maintenance and overhaul, since it is set in the conventional island, the management process is simpler. Therefore, both the treatment steps and the manpower, material resources and time required can be reduced, thereby reducing the economic cost of system operation, saving operating labor costs and improving the overall efficiency of the power plant.

[0042] In addition, once an abnormal situation occurs, the desalination process will be transferred to the nuclear island for completion, so the system safety can be fully guaranteed, and the existing nuclear safety system and nuclear safety regulations will not be violated, and the potential spread of radioactive substances can be avoided. In addition, the overall desalination system has little change to the main body of the steam generator blowdown system, and does not affect the original function of the blowdown system, which is conducive to reducing the overall operating cost of the power plant and improving the level of automation. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 It is a schematic diagram of the structure of the desalination system in Example 1 of the present invention.

[0044] In the figure: 1. Nuclear island module; 11. First desalination subsystem; 12. First direct flow section; 2. Conventional island module; 21. Second desalination subsystem; 22. Second direct flow section; 3. Steam generator; 4. Condenser; 5. Heat exchanger; 6. Valve; 7. Waste liquid treatment system. DETAILED DESCRIPTION

[0045] The following will be combined with the accompanying drawings in the present invention to clearly and completely describe the technical solutions in the invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of the present invention.

[0046] In the description of the present invention, it should be noted that the terms "upper", "lower" and the like indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience and simplification of the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.

[0047] In the description of the present invention, the terms “first”, “second” and “third” are used for descriptive purposes only and should not be understood as indicating or implying relative importance.

[0048] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connect", "set", "install", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0049] Example 1

[0050] The desalination system of this embodiment can be obtained by using the modification method in Example 2 without substantially changing the main structure of the original steam generator sewage discharge system of the pressurized water reactor nuclear power unit, and can be used to implement the control method in Example 3. The system includes a first detection unit, a first control unit, a first desalination subsystem 11 and a second desalination subsystem 21. The first desalination subsystem 11 and the second desalination subsystem 21 are respectively located in the nuclear island and the conventional island. The first detection unit is electrically connected to the first control unit, and is used to obtain the operation status information of the desalination system and send the operation status information of the desalination system to the first control unit; the first control unit is used to determine whether an abnormal situation occurs according to the operation status information, and when no abnormal situation occurs, control the second desalination subsystem 21 located in the conventional island to desalinate the sewage of the steam generator 3; when an abnormal situation occurs, control the first desalination subsystem 11 located in the nuclear island to desalinate the sewage of the steam generator 3.

[0051] In this embodiment, the first desalination subsystem 11 is the desalination bed and other equipment originally located in the nuclear island, and the second desalination subsystem 21 adopts an EDI desalter, that is, in this embodiment, a new desalination subsystem using an EDI device is set up in the conventional island. The newly added desalination subsystem is connected in parallel with the sewage return pipeline of the secondary deaerator as an optional bypass (that is, the pipeline located in the conventional island between the original desalination bed and the condenser 4). The second desalination subsystem 21 can replace the original seismic desalination bed (group) (that is, the first desalination subsystem 11) located in the nuclear island. The newly added desalination subsystem has the same or higher desalination capacity as the original desalination bed (group) located in the nuclear island, and also includes the necessary pre-filter and post-resin capture filter.

[0052] Since under normal operating conditions, the wastewater discharged from the steam generators in a pressurized water reactor nuclear power plant does not contain any radioactive substances in most operating states, the desalination system places the treatment process in the conventional island in this state, that is, the first desalination subsystem 11 in the nuclear island only performs desalination treatment when an abnormal situation occurs. Therefore, it can greatly reduce the processing volume and usage time of the first desalination subsystem 11 in the nuclear island, reduce the consumption of the first desalination subsystem 11, and greatly extend the use cycle of the first desalination subsystem 11 between two maintenances, thereby minimizing the maintenance and overhaul frequency of the desalination equipment in the nuclear island.

[0053] Most of the desalination treatment is transferred to the second desalination subsystem 12 of the conventional island. Even if the second desalination subsystem 12 suffers routine wear and tear and needs maintenance and overhaul, since it is set in the conventional island, the management process is simpler. Therefore, both the treatment steps and the required manpower, material resources and time can be reduced, thereby reducing the economic cost of system operation, saving operating labor costs and improving the overall efficiency of the power plant.

[0054] In the event of an abnormal situation, the desalination process will be transferred to the nuclear island for completion, so the system safety can be fully guaranteed, without breaking the existing nuclear safety system and nuclear safety regulations, and avoiding the potential spread of radioactive substances. In addition, the entire desalination system has little change to the main body of the steam generator blowdown system, and does not affect the original function of the blowdown system, which is conducive to reducing the overall operating cost of the power plant and improving the level of automation.

[0055] In this embodiment, the desalination system also includes a first direct flow section 12 and a second direct flow section 22. The first direct flow section 12 and the second direct flow section 22 are both pipelines that allow direct circulation of internal liquid (direct circulation is relative to the desalination equipment, which means that the liquid is not subjected to desalination treatment). The first desalination subsystem 11 and the first direct flow section 12 are connected in parallel to form a nuclear island module 1, and the second desalination subsystem 21 and the second direct flow section 22 are connected in parallel to form a conventional island module 2. The nuclear island module 1 and the conventional island module 2 are respectively located in the nuclear island and the conventional island, and are connected in series between the steam generator 3 and the condenser 4, that is, the steam generator 3, the nuclear island module 1, the conventional island module 2 and the condenser 4 are connected in series in sequence.

[0056] When it is determined that no abnormal situation occurs, the first control unit controls the wastewater of the steam generator 3 to reach the condenser 4 via the first direct flow section 12 and the second desalination subsystem 21; when it is determined that an abnormal situation occurs, the first control unit controls the wastewater of the steam generator 3 to reach the condenser 4 via the first desalination subsystem 11 and the second direct flow section 22.

[0057] In this embodiment, valve bodies are provided on the first desalination subsystem 11, the first direct flow section 12, the second desalination subsystem 21 and the second direct flow section 22, and the first control unit is electrically connected to each valve body, so as to switch the flow direction of the sewage discharged from the steam generator 3 by controlling the opening and closing of the valve body. Specifically, at least one valve body is provided on each of the first direct flow section 12 and the second direct flow section 22, and valve bodies are provided on both sides of the first desalination subsystem 11 and the second desalination subsystem 21. The first control unit is electrically connected to each valve body to control the opening and closing thereof. When it is determined that no abnormal situation occurs, the valve bodies on the first direct flow section 12 and the second desalination subsystem 21 are controlled to be opened, and the valve bodies on the first desalination subsystem 11 and the second direct flow section 22 are controlled to be closed, so that the sewage can reach the condenser 4 via the first direct flow section 12 and the second desalination subsystem 21; when it is determined that an abnormal situation occurs, the valve bodies on the first direct flow section 12 and the second desalination subsystem 21 are controlled to be closed, and the valve bodies on the first desalination subsystem 11 and the second direct flow section 22 are controlled to be opened, so that the sewage can reach the condenser 4 via the first desalination subsystem 11 and the second direct flow section 22.

[0058] In the present embodiment, the desalination system further includes a second detection unit and a second control unit. The second desalination subsystem 21 includes a plurality of electrodeionization modules (EDI modules), each of which is connected in parallel to each other. The second detection unit is electrically connected to the second control unit for obtaining the flow value of the wastewater discharged from the steam generator 3 and sending it to the second control unit. The second control unit is electrically connected to each electrodeionization module for opening a set number of electrodeionization modules according to the flow value of the wastewater discharged from the steam generator 3, so that when the flow rate of the system wastewater is low, only part of the EDI modules are put into use, thereby reasonably allocating the flow rate, further improving the use efficiency of the desalination equipment, and extending the maintenance cycle of the desalination subsystem. In the present embodiment, the second control unit may include a flow distributor, which connects each electrodeionization module, so as to realize the on-off switching of each module through the flow distributor. In the present embodiment, the processing flow capacity of a single electrodeionization module is about 3-10t / h. The number of modules opened is related to the total flow requirement and can be selected according to actual conditions.

[0059] In this embodiment, the second detection unit is also used to detect the service life of each electrodeionization module, and send the detection result to the second control unit. The second control unit is also used to sort the service life of each electrodeionization module according to the detection result, and after obtaining the flow value of the wastewater discharged from the steam generator 3, turn on the set number of electrodeionization modules with the highest service life in the sorting, that is, after obtaining the flow value of the wastewater discharged from the steam generator 3, if N electrodeionization modules need to be turned on, then (sorting the service life of each electrodeionization module according to the detection result means) sorting the service life of each electrodeionization module from high to low, and when turned on, turn on the first N electrodeionization modules in the sorting. When the system flow is low, the second control unit controls only part of the EDI modules to be put into use, and automatically gives priority to the use of EDI modules with a higher expected life, so that the maintenance cycle of the desalination subsystem is longer and the utilization rate is higher.

[0060] The use of EDI devices will inevitably produce concentrated water enriched with ions. This water can be sampled and monitored irregularly. The collected information can be used to identify the remaining life of the EDI device and can also be used as a basis for evaluating the health status of the secondary side of the steam generator of a nuclear power plant. Therefore, in this embodiment, the second detection unit uses a sampling monitoring module to detect the concentrated water produced by each electrodeionization module to obtain the service life of each electrodeionization module based on the concentrated water detection results. This concentrated water cannot be directly recycled into the secondary circuit, so it needs to be sent to the conventional island waste liquid system for treatment.

[0061] In this embodiment, when no abnormal situation occurs, the second detection unit detects the service life of each electrodeionization module and the flow value of the sewage discharged from the steam generator 3 at set intervals, and sends the detection result and the flow value to the second control unit, so that the second control unit sorts the service life of each electrodeionization module according to the detection result at set intervals, and starts the set number of electrodeionization modules with the highest service life in the sorting according to the flow value. That is, starting different electrodeionization modules in turn at different time periods is conducive to balancing the remaining life of all modules and avoiding the overall failure of the equipment due to the premature exhaustion of the life of some modules.

[0062] In this embodiment, the first detection unit includes a first detection module and a second detection module. The first detection module is used to detect whether the radioactivity increases on the secondary side of the steam generator 3, and send a first abnormal operation signal to the first control unit when the radioactivity increases on the secondary side of the steam generator 3. The second detection module is used to detect whether the second desalination subsystem 21 fails or is in a maintenance state, and send a second abnormal operation signal to the first control unit when the second desalination subsystem 21 fails and / or is in a maintenance state. The first control unit determines whether an abnormal situation occurs based on the first abnormal operation signal and / or the second abnormal operation signal.

[0063] The desalination system of this embodiment preferentially uses the newly added desalination subsystem to complete the treatment of wastewater. Only when the newly added desalination subsystem fails, is under maintenance, or the radioactivity increase alarm appears on the secondary side of the steam generator, will it switch to the original desalination bed located in the nuclear island to ensure the continuous operation of the power plant. When the power plant operation and maintenance personnel restore the availability of the newly added desalination subsystem or eliminate the possibility of radioactive contamination on the secondary side of the steam generator, it can automatically switch back to the newly added desalination subsystem. To ensure automatic control, some manual isolation valves on the original pipeline are replaced with electric or pneumatic isolation valves. These modified valves can be controlled manually or automatically. During the whole process, the water quality on the secondary side of the steam generator should be continuously monitored. The focus of the monitoring is whether the steam generator has leaked radioactive substances from the primary side to the secondary side. Once the radioactivity monitoring instrument alarms but is not serious enough to the accident level, the system should immediately switch to the original desalination bed located in the nuclear island for treatment. When the power plant operation personnel confirm that the problem has been solved, the system will be switched back to the newly added desalination subsystem through manual instructions. If the continuous monitoring instrument for water quality on the secondary side of the steam generator is not sensitive enough before the renovation, it will be necessary to replace it with a new high-precision instrument during the renovation process.

[0064] Combined with Figure 1 The specific usage of the desalination system of this embodiment is as follows:

[0065] The A series equipment and B series equipment and the pipes installed in these equipment in the figure are the classic architecture of the steam generator blowdown system frequently used in the domestic M310 type and Hualong One PWR nuclear power plants. In the A series equipment, A1 is a steam generator group (2 or 3 per PWR unit); A2 is a steam generator blowdown system heat exchanger group (2 per PWR unit); A3 is a steam generator blowdown system pressure reduction and flow control valve (2 per PWR unit); A4 is a steam generator blowdown system desalination bed group (2 cation beds and 2 mixed beds per PWR unit), as the first desalination subsystem 11 of this embodiment; A5 is a waste liquid treatment system; A6 is a condenser. In the B series equipment, B1 is a steam generator secondary side water quality radioactivity monitoring instrument, i.e., the first detection module in this embodiment; B2-B5 are manual regulating valve groups used to change the flow direction of the blowdown water, which need to be changed to electric or pneumatic valve groups. The C series equipment is a newly added component equipment, among which C1, C2, and C4 are automatic isolation valve groups used to change the flow direction of sewage; C3 is a desalinator using EDI located on the conventional island, that is, the second desalinization subsystem 21 in this embodiment.

[0066] The position of the sewage pipe near the condenser 4 is used as the second direct flow section 22 in this embodiment, and the EDI demineralizer C3 is installed in parallel. Electric isolation valves C2 and C4 are installed upstream and downstream of the demineralizer, respectively. The sewage pipe bypassed by the EDI demineralizer is also equipped with an electric isolation valve C1. The setting of these electric valves can ensure that the power plant can automatically or manually put the EDI demineralizer into operation or shut it off.

[0067] Condenser A6 is an important equipment in the secondary circuit and is also the main destination for recovered purified wastewater. Since the pressure bearing capacity of the commonly used EDI desalters on the market is generally low, the pressure of the purified wastewater flowing out of the EDI desalter outlet is also low. In this embodiment, the EDI desalter C3 is close to the unit secondary circuit condenser A6, so it can meet the flow requirements after purification. Compared with the nuclear island located near the upstream or far away from the condenser, it can avoid the situation where the total system flow cannot meet the requirements due to excessive resistance between the desalter and condenser 4. In addition, the normal operation of the EDI desalter also requires the configuration of relatively mature technical components such as electricity, water, instrumentation, and drainage, which will not be elaborated here.

[0068] Valves B2, B3, B4, and B5 are electric, pneumatic, or other automatic valves. The setting of these electric valves can ensure that the power plant can automatically or manually put the original desalination bed into operation or cut it out of operation, and can also automatically discharge the unpurified sewage to the waste liquid treatment system A5.

[0069] By changing the switch combination of valves B2, B3, B4, B5, C1, C2, and C4, the following working conditions can be changed:

[0070] Open B5, C2, and C4, and close other valves, i.e., use the ED I desalter C3 located in the conventional island to treat the sewage;

[0071] Open B2, B3, and C1, and close other valves, that is, use the desalting bed group A4 of the steam generator blowdown system located in the nuclear island to treat the blowdown water;

[0072] Open B4 and close other valves to discharge sewage to the waste liquid treatment system.

[0073] In this embodiment, the steam generator system continuously samples from the secondary side of the steam generator and sends the samples to the steam generator secondary side water quality radioactivity monitoring instrument B1 to collect data. The collected data will be used to judge the secondary loop water quality. When the radioactivity in the secondary loop water reaches a certain higher set value, it indicates that potential radioactivity may appear in the wastewater. At this time, the EDI desalter C3 should be immediately removed from the working sequence and the desalting bed group A4 of the steam generator wastewater system located in the nuclear island should be used instead.

[0074] The purpose of this design is to control all potential radioactive materials within the nuclear island. From a large number of actual operating conditions, the steam generator wastewater in existing pressurized water reactor nuclear power plants at home and abroad does not contain any radioactive materials under most operating conditions. Therefore, in general, the desalinator C3 using EDI located in the conventional island with better economic benefits and higher degree of automation is used to treat the wastewater. Only when radioactivity appears on the secondary side of the steam generator, the desalinator bed group A4 of the steam generator wastewater system located in the nuclear island is used instead. The automatic switching signal source comes from the water quality radioactivity monitoring instrument B1 on the secondary side of the steam generator (as well as some equipment used to monitor whether the desalinator C3 of EDI fails or is under maintenance). If the accuracy or sampling frequency of the existing radioactivity monitoring instrument does not meet the requirements of the technical transformation of the present disclosure, the instrument selection can be changed as needed.

[0075] Example 2

[0076] This embodiment provides a desalination system modification method, which is used to modify the original desalination system to obtain the desalination system in Embodiment 1. The method generally includes the following steps:

[0077] A first direct flow section 12 is connected in parallel to a first desalination subsystem 11 in the nuclear island to form a nuclear island module 1 located in the nuclear island;

[0078] In the secondary deaerator wastewater return pipe, the pipe section located in the conventional island and upstream of the condenser 4 is used as the second direct flow section 22, and the second desalination subsystem 21 is connected in parallel at the second direct flow section 22 to form a conventional island module 2 located in the conventional island.

[0079] In addition, the method further comprises the following steps:

[0080] Valve bodies are provided on both sides of the first desalination subsystem 11, both sides of the second desalination subsystem 21, the first direct flow section 12 and the second direct flow section 22;

[0081] The first control unit is electrically connected to each valve body so as to control the opening and closing of each valve body through the first control unit.

[0082] Combined with Figure 1 The specific details of the transformation method of this embodiment are as follows:

[0083] The A series equipment and B series equipment and the pipes installed in these equipment in the figure are the classic architecture of the steam generator blowdown system commonly used in the domestic M310 and Hualong One pressurized water reactor nuclear power plants. In this modification method, it is necessary to modify the B series equipment and add new C series equipment, as follows:

[0084] In the A series equipment, A1 is a steam generator group (2 or 3 per PWR unit); A2 is a steam generator blowdown system heat exchanger group (2 per PWR unit); A3 is a steam generator blowdown system pressure reducing and flow regulating valve (2 per PWR unit); A4 is a steam generator blowdown system desalination bed group (2 cation beds and 2 mixed beds per PWR unit), which serves as the first desalination subsystem 11 of this embodiment; A5 is a waste liquid treatment system; A6 is a condenser. In the B series equipment, B1 is a steam generator secondary side water quality radioactivity monitoring instrument, which needs to be modified and can be electrically connected to the first control unit or other control equipment to control the switching of the first desalination subsystem 11 and the second desalination subsystem 21; B2 to B5 are manual regulating valve groups used to change the flow direction of the blowdown water, which need to be changed to electric or pneumatic valve groups. The C series equipment is a newly added component equipment, among which C1, C2, and C4 are automatic isolation valve groups used to change the flow direction of sewage; C3 is a desalinator using EDI located on the conventional island, that is, the second desalinization subsystem 21 in this embodiment.

[0085] The transformation method of this embodiment, under the premise of not changing the main structure of the original steam generator sewage system of the pressurized water reactor nuclear power unit, installs an EDI desalter C3 in parallel at the position of the sewage pipe close to the condenser, that is, at the second direct flow section 22 between the first desalination subsystem 11 and the condenser 4, and installs electric isolation valves C2 and C4 respectively upstream and downstream of the desalter. The sewage pipe bypassed by the EDI desalter, that is, the second direct flow section 22, also needs to be equipped with an electric isolation valve C1. The setting of these electric valves can ensure that the power plant can put the EDI desalter into operation or cut off operation automatically or manually.

[0086] The EDI desalter C3 installed in parallel must be close to the secondary circuit condenser A6 of the unit. A6 is an important equipment in the secondary circuit and the main destination of the recovered purified wastewater. Since the pressure bearing capacity of the EDI desalters commonly used in the market is generally low, the pressure of the purified wastewater flowing out of the EDI desalter outlet is also low. If it is arranged near the upstream nuclear island or far away from the condenser, the total flow of the system may not meet the modification requirements due to the excessive resistance between the desalter and the condenser. The setting position of this embodiment is reasonable and can meet the requirements. The normal operation of the EDI desalter also requires the configuration of electricity, water, instrumentation, drainage and other functions, which are mature technologies and can be modified together with the C3 part, so they will not be elaborated here.

[0087] The original valves B2, B3, B4, and B5 are all manual valves. In this embodiment, these valves are replaced with electric, pneumatic, or other automatic valves. The setting of these electric valves can ensure that the power plant can automatically or manually put the original desalination bed into operation or cut out of operation, and can also automatically discharge unpurified sewage to the waste liquid treatment system A5.

[0088] The steam generator secondary side water quality radioactivity monitoring instrument B1 collects data, and the collected data will be used to judge the secondary circuit water quality. In this modification plan, the instrument needs to add the following functions: when the radioactivity in the secondary circuit water reaches a certain higher set value, it means that potential radioactivity may appear in the wastewater. At this time, the control unit should immediately cut off the working sequence of the EDI desalter C3 and use the steam generator wastewater desalination bed group A4 located in the nuclear island instead. The purpose of this design is to control all potential radioactive substances within the nuclear island. From a large number of actual operating conditions, the steam generator wastewater in the existing pressurized water reactor nuclear power plants at home and abroad does not contain any radioactive substances under most operating conditions. Therefore, the desalter C3 using EDI located in the conventional island with better economic benefits and higher degree of automation is generally used to treat the wastewater. Only when radioactivity appears on the secondary side of the steam generator, the steam generator wastewater desalination bed group A4 located in the nuclear island is used instead. The automatic switching signal source comes from the steam generator secondary side water quality radioactivity monitoring instrument B1. If the accuracy or sampling frequency of the existing radioactivity monitoring instrument does not meet the requirements of the technical modification disclosed in this disclosure, the instrument selection needs to be changed.

[0089] This embodiment provides a technical transformation method for using EDI desalters in the blowdown system of steam generators in nuclear power plants. The technical transformation is mainly aimed at the M310 and Hualong One nuclear power plants that are being built in large quantities in China. It will not cause changes to the existing pipelines, equipment, electrical, and instrumentation and control systems of the steam generator blowdown system, but only requires the addition of an additional non-seismic desalination subsystem to the conventional island. The newly added desalination subsystem is connected in parallel with the wastewater return pipe of the secondary circuit deaerator as an optional bypass. Without breaking the existing nuclear safety system, the economic cost of system operation can be reduced, the operating labor cost can be saved, and the overall efficiency of the power plant can be improved.

[0090] Example 3

[0091] The desalination system control method of this embodiment is used to control the operation of the desalination system in Example 1, and the method includes the following steps:

[0092] The first detection unit obtains the operation status information of the desalination system;

[0093] The first control unit determines whether an abnormal situation occurs according to the operation situation information, and:

[0094] When no abnormal situation occurs, the second desalination subsystem 21 located in the conventional island is controlled to desalinate the wastewater of the steam generator 3;

[0095] When an abnormal situation occurs, the first desalination subsystem 11 located in the nuclear island is controlled to desalinate the wastewater of the steam generator 3 .

[0096] Because under normal operating conditions, the steam generator wastewater in a pressurized water reactor nuclear power plant does not contain any radioactive substances in most operating states, the control method places the treatment process in the conventional island in this state, that is, the first desalination subsystem in the nuclear island only performs desalination treatment when an abnormal situation occurs. Therefore, compared with the traditional method of only desalting the steam generator wastewater in the nuclear island, it can greatly reduce the processing volume and usage time of the first desalination subsystem in the nuclear island, reduce the consumption of the first desalination subsystem, and greatly extend the use cycle of the first desalination subsystem between two overhauls, thereby minimizing the maintenance and overhaul frequency of the desalination equipment in the nuclear island.

[0097] Most of the desalination treatment is transferred to the second desalination subsystem of the conventional island. Even if the second desalination subsystem suffers routine wear and tear and needs maintenance and overhaul, since it is set in the conventional island, the management process is simpler. Therefore, both the treatment steps and the manpower, material resources and time required can be reduced, thereby reducing the economic cost of system operation, saving operating labor costs and improving the overall efficiency of the power plant.

[0098] In addition, once an abnormal situation occurs, the desalination process will be transferred to the nuclear island for completion, so the system safety can be fully guaranteed, and the existing nuclear safety system and nuclear safety regulations will not be violated, and the potential spread of radioactive substances can be avoided. In addition, the desalination system used in the method has little change to the main body of the steam generator sewage system, and does not affect the original function of the sewage system, which is conducive to reducing the overall operating cost of the power plant and improving the level of automation. The control method of this embodiment can adopt the desalination system in Example 3.

[0099] In this embodiment, the second desalination subsystem 21 located in the conventional island is controlled to perform desalination treatment on the wastewater of the steam generator 3, specifically including:

[0100] Control the blowdown water of the steam generator 3 to reach the condenser 4 via the first direct flow section 12 and the second desalination subsystem 21;

[0101] Controlling the first desalination subsystem 11 located in the nuclear island to desalinate the wastewater of the steam generator 3, specifically including:

[0102] The blowdown water of the control steam generator 3 reaches the condenser 4 via the first desalination subsystem 11 and the second direct flow section 22 .

[0103] The method of this embodiment belongs to the field of nuclear technology, wherein the second desalination subsystem 21 adopts an EDI desalter. This embodiment does not change the existing pipelines, equipment, electrical, and instrumentation systems of the steam generator blowdown system. Instead, the existing desalination equipment in the nuclear island is used as the first desalination subsystem 11, and only an additional non-seismic desalination subsystem is added to the conventional island part as the second desalination subsystem 21. The newly added desalination subsystem is connected in parallel with the wastewater return pipeline of the secondary deaerator as an optional bypass.

[0104] The second desalination subsystem 21 can replace the original seismic desalination bed (group) (first desalination subsystem 11) located in the nuclear island, that is, the newly added desalination subsystem has the same or higher desalination capacity as the original desalination bed (group) located in the nuclear island, and also includes the necessary pre-filter and post-resin capture filter.

[0105] In order to realize automatic control of the flow direction of sewage, in this embodiment, some manual isolation valves on the original desalination system pipelines should be replaced with electric or pneumatic isolation valves, and these modified valves can be controlled manually or automatically.

[0106] In this embodiment, the desalination system uses a plurality of electrodeionization modules connected in parallel to form a second desalination subsystem 21, and the desalination system also includes a second detection unit and a second control unit; before the wastewater of the steam generator 3 is controlled to reach the condenser 4 via the first direct flow section 12 and the second desalination subsystem 21, it also includes:

[0107] The second detection unit obtains the flow value of the wastewater discharged from the steam generator 3;

[0108] The second control unit turns on a set number of electrodeionization modules according to the flow value of the wastewater discharged from the steam generator 3 .

[0109] That is, multiple electrodeionization modules (EDI equipment or EDI modules) can be connected in parallel in the newly added desalination subsystem. The design of these modules and the opening of the corresponding flow should enable the entire system to operate continuously for several years without maintenance. This subsystem adopts an automatic parallel flow distributor so that when the system flow is low, only some EDI modules are put into use, thereby reasonably distributing the flow, further improving the use efficiency of the desalination equipment and extending the maintenance cycle of the desalination subsystem.

[0110] In this embodiment, before starting a set number of electrodeionization modules according to the flow rate value of the wastewater discharged from the steam generator 3, the method further includes:

[0111] The second detection unit detects the service life of each electrodeionization module and sends the detection result to the second control unit;

[0112] A set number of electrodeionization modules are turned on according to the flow value of the wastewater discharged from the steam generator 3, specifically including:

[0113] The second control unit obtains the service life of each electrodeionization module and sorts the modules according to their service life;

[0114] The set number of electrodeionization modules with the highest service life in the sequence are turned on.

[0115] This control method allows the use of EDI modules with a higher expected lifespan to be given priority when the flow rate is low, thereby extending the maintenance period of the desalination subsystem and increasing the availability. The use of EDI devices will inevitably produce concentrated water enriched with ions, which can be sampled and monitored irregularly. The collected information can be used to identify the remaining life of the EDI device and can also be used as a basis for evaluating the health status of the secondary side of the steam generator in a nuclear power plant. Therefore, in this embodiment, obtaining the service life of each electrodeionization module can specifically include using a sampling monitoring module to monitor the concentrated water information of each electrodeionization module, and obtaining the service life of each electrodeionization module based on the information. These concentrated waters cannot be directly recycled into the secondary circuit, so they need to be sent to the conventional island waste liquid system for treatment.

[0116] In this embodiment, after a set number of electrodeionization modules are turned on according to the flow rate value of the wastewater discharged from the steam generator 3, when no abnormal situation occurs, the following steps are also included:

[0117] The second detection unit detects the service life of each electrodeionization module and the flow value of the sewage discharged from the steam generator 3 at set intervals, and sends the detection result and the flow value to the second control unit;

[0118] The second control unit sorts the service life of each electrodeionization module according to the detection result at set time intervals, and starts a set number of electrodeionization modules with the longest service life in the sorting according to the flow value.

[0119] In this embodiment, obtaining the desalination system operation information specifically includes: detecting whether the radioactivity increases on the secondary side of the steam generator 3, detecting whether the second desalination subsystem 21 fails, and detecting whether the second desalination subsystem 21 is in a maintenance state;

[0120] Determining whether an abnormal situation occurs according to the operation status information specifically includes: determining that an abnormal situation occurs when the operation status information indicates that radioactivity increases on the secondary side of the steam generator 3, and / or a fault occurs in the second desalination subsystem 21, and / or the second desalination subsystem 21 is in an overhaul state.

[0121] That is, the water quality on the secondary side of the steam generator 3 should be continuously monitored, and the focus of the monitoring is whether there is leakage of radioactive materials from the primary side to the secondary side of the steam generator 3. Once the instrument monitoring radioactivity alarms but is not serious enough to reach the level of an accident, the system should immediately switch to the original desalination bed (i.e., the first desalination subsystem 11) located in the nuclear island for processing. When the power plant operator confirms that the problem has been solved, the system will be switched back to the newly added desalination subsystem (i.e., the second desalination subsystem 21) through manual instructions. If the continuous monitoring instrument for the water quality on the secondary side of the steam generator is not sensitive enough before the transformation, it is necessary to replace it with a new high-precision instrument during the transformation process.

[0122] By implementing the control method of this embodiment, during the operation of the power plant, the newly added desalination subsystem is preferentially used to complete the treatment of wastewater, and only when the newly added desalination subsystem fails, is under maintenance, or an alarm of increased radioactivity appears on the secondary side of steam generator 3, the desalination bed originally located in the nuclear island is switched to ensure the continuous operation of the power plant. When the power plant operation and maintenance personnel restore the availability of the newly added desalination subsystem or eliminate the possibility of radioactive contamination on the secondary side of steam generator 3, the newly added desalination subsystem can be automatically switched back to work.

[0123] Example 4

[0124] The steam generator sewage discharge system of this embodiment includes a steam generator 3, a heat exchanger 5, a valve 6, a condenser 4 and the desalination system in Embodiment 1. The steam generator 3, the heat exchanger 5, the valve 6, the desalination system and the condenser 4 are connected in series in sequence to form a sewage purification branch. Another flow branch is opened at the downstream of the valve 6 where the desalination system is connected, and is connected to the waste liquid treatment system 7 as an unpurified sewage discharge branch. Specifically, Figure 1 As shown, the steam generator 3 is a steam generator group A1 (2 or 3 per PWR unit); the heat exchanger 5 is a steam generator blowdown system heat exchanger group A2 (2 per PWR unit); a valve 6 is also provided between the heat exchanger 5 and the desalination system, which is a steam generator blowdown system pressure reducing and flow regulating valve A3 (2 per PWR unit); the first desalination subsystem 11 in the desalination system is a steam generator blowdown system desalination bed group A4 (2 cation beds and 2 mixed beds per PWR unit); the waste liquid treatment system is A5; the condenser 4 is A6; the second desalination subsystem 21 is a desalter C3 using EDI located in the conventional island.

[0125] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present invention, but the present invention is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and essence of the present invention, and these modifications and improvements are also considered to be within the scope of protection of the present invention.

Claims

1. A desalination system, characterized in that: It comprises a first detection unit, a first control unit, a first desalination subsystem (11) and a second desalination subsystem (21), The first desalination subsystem (11) and the second desalination subsystem (21) are located in the nuclear island and the conventional island respectively. The first detection unit is electrically connected to the first control unit, and is used to obtain the desalination system operation information, and send the desalination system operation information to the first control unit; The first control unit is used to determine whether an abnormal situation occurs based on the operating status information, and when no abnormal situation occurs, control the second desalination subsystem (21) located in the conventional island to desalinate the wastewater from the steam generator (3); when an abnormal situation occurs, control the first desalination subsystem (11) located in the nuclear island to desalinate the wastewater from the steam generator (3).

2. The desalination system according to claim 1, characterized in that: It also includes a first direct flow section (12) and a second direct flow section (22), The first desalination subsystem (11) and the first direct flow section (12) are connected in parallel to form a nuclear island module (1). The second desalination subsystem (21) and the second direct flow section (22) are connected in parallel to form a conventional island module (2), The nuclear island module (1) and the conventional island module (2) are located in the nuclear island and the conventional island, respectively, and are connected in series between the steam generator (3) and the condenser (4). The first control unit controls the wastewater of the steam generator (3) to reach the condenser (4) via the first direct flow section (12) and the second desalination subsystem (21) when it is determined that no abnormal situation has occurred; and controls the wastewater of the steam generator (3) to reach the condenser (4) via the first desalination subsystem (11) and the second direct flow section (22) when it is determined that an abnormal situation has occurred.

3. The desalination system according to claim 1 or 2, characterized in that: Also includes a second detection unit and a second control unit, The second desalination subsystem (21) comprises a plurality of electrodeionization modules, each of which is connected in parallel with each other. The second detection unit is electrically connected to the second control unit and is used to obtain the flow value of the sewage discharged from the steam generator (3) and send it to the second control unit. The second control unit is electrically connected to each electrodeionization module and is used to start a set number of electrodeionization modules according to the flow value of wastewater discharged from the steam generator (3).

4. The desalination system according to claim 3, characterized in that: The second detection unit is also used to detect the service life of each electrodeionization module and send the detection result to the second control unit. The second control unit is also used to sort the service life of each electrodeionization module according to the detection result, and after obtaining the flow value of the wastewater discharged from the steam generator (3), start a set number of electrodeionization modules with the longest service life in the sorting.

5. The desalination system according to claim 4, characterized in that: The second detection unit detects concentrated water generated by each electrodeionization module to obtain the service life of each electrodeionization module according to the concentrated water detection result.

6. The desalination system according to claim 4, characterized in that: The second detection unit detects the service life of each electrodeionization module and the flow value of the wastewater discharged from the steam generator (3) at set intervals, and sends the detection result and the flow value to the second control unit. The second control unit can sort the service life of each electrodeionization module according to the detection result at set time intervals, and start a set number of electrodeionization modules with the longest service life in the sorting according to the flow value.

7. The desalination system according to claim 2, characterized in that: The first desalination subsystem (11), the first direct flow section (12), the second desalination subsystem (21) and the second direct flow section (22) are all provided with valve bodies. The first control unit is electrically connected to each of the valve bodies respectively, so as to switch the flow direction of the wastewater discharged from the steam generator (3) by controlling the opening and closing of the valve bodies.

8. The desalination system according to claim 1, characterized in that: The first detection unit includes a first detection module and a second detection module. The first detection module is used to detect whether radioactivity increases on the secondary side of the steam generator (3), and to send a first abnormal operation signal to the first control unit when radioactivity increases on the secondary side of the steam generator (3). The second detection module is used to detect whether the second desalination subsystem (21) fails or is in a maintenance state, and send a second abnormal operation signal to the first control unit when the second desalination subsystem (21) fails and / or is in a maintenance state. The first control unit determines that an abnormal situation occurs according to the first abnormal operation signal and / or the second abnormal operation signal.

9. A desalination system control method, characterized in that: Used to control the operation of the desalination system according to any one of claims 1 to 8, the method comprises the following steps: The first detection unit obtains the operation status information of the desalination system; The first control unit determines whether an abnormal situation occurs according to the operation situation information, and: When no abnormal situation occurs, the second desalination subsystem (21) located in the conventional island is controlled to perform desalination treatment on the wastewater of the steam generator (3); When an abnormal situation occurs, the first desalination subsystem (11) located in the nuclear island is controlled to perform desalination treatment on the wastewater of the steam generator (3).

10. The desalination system control method according to claim 9, characterized in that: The method is used to control the operation of the desalination system according to claim 2, The control of the second desalination subsystem (21) located in the conventional island to desalinate the wastewater of the steam generator (3) specifically includes: Controlling the blowdown water of the steam generator (3) to reach the condenser (4) via the first direct flow section (12) and the second desalination subsystem (21); The control of the first desalination subsystem (11) located in the nuclear island to perform desalination treatment on the wastewater of the steam generator (3) specifically includes: The blowdown water of the steam generator (3) is controlled to reach the condenser (4) via the first desalination subsystem (11) and the second direct flow section (22).

11. The desalination system control method according to claim 9, characterized in that: The desalination system uses a plurality of electrodeionization modules connected in parallel to form the second desalination subsystem (21), and the desalination system also includes a second detection unit and a second control unit; Before the blowdown water of the control steam generator (3) reaches the condenser (4) via the first direct flow section (12) and the second desalination subsystem (21), the method further comprises: A second detection unit obtains a flow value of wastewater discharged from the steam generator (3); The second control unit starts a set number of electrodeionization modules according to the flow value of wastewater discharged from the steam generator (3).

12. The desalination system control method according to claim 11, characterized in that: Before starting a set number of electrodeionization modules according to the flow rate value of the wastewater discharged from the steam generator (3), the method further comprises: The second detection unit detects the service life of each electrodeionization module and sends the detection result to the second control unit; The step of starting a set number of electrodeionization modules according to the flow rate value of the wastewater discharged from the steam generator (3) specifically comprises: The second control unit ranks the service life of each electrodeionization module according to the detection result; A set number of electrodeionization modules with the longest service life in the sequence are turned on.

13. The desalination system control method according to claim 12, characterized in that: After the set number of electrodeionization modules are turned on according to the flow rate value of the wastewater discharged from the steam generator (3), and in the absence of any abnormal situation, the method further comprises: The second detection unit detects the service life of each electrodeionization module and the flow value of the wastewater discharged from the steam generator (3) at set intervals, and sends the detection result and the flow value to the second control unit; The second control unit sorts the service life of each electrodeionization module according to the detection result at set time intervals, and starts a set number of electrodeionization modules with the longest service life in the sorting according to the flow value.

14. The desalination system control method according to claim 9, characterized in that: The obtaining of the desalination system operation information specifically includes: Detecting whether radioactivity increases on the secondary side of the steam generator (3), detecting whether a fault occurs in the second desalination subsystem (21), and detecting whether the second desalination subsystem (21) is in an overhaul state; Determine whether an abnormal situation occurs based on the operation status information, including: When the operation status information indicates that radioactivity increases on the secondary side of the steam generator (3), and / or a fault occurs in the second desalination subsystem (21), and / or the second desalination subsystem (21) is in an overhaul state, it is determined that an abnormal situation occurs.

15. A nuclear power plant steam generator blowdown system, characterized in that: A desalination system comprising a steam generator (3), a heat exchanger (5), a valve (6), a condenser (4) and any one of claims 1 to 8, The steam generator (3), the heat exchanger (5), the valve (6), the desalination system and the condenser (4) are sequentially connected in series to form a sewage purification branch; Another flow branch is provided downstream of the valve (6) where it is connected to the desalination system and is connected to the waste liquid treatment system (7) as a discharge branch for raw sewage.