Method for improving utilization efficiency of equipment under influence of electric energy replacement and power generation access
By building an efficiency prediction model for power consumption and distribution equipment, optimizing distribution paths and power distribution, the low distribution network efficiency problem caused by the fluctuation of new energy generation in the power substitution system is solved, and the utilization rate of equipment and system is improved efficiency.
Patent Information
- Application Number
- CN202410943239.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the power substitution system, the fluctuation in new energy generation affects the fluctuation in the output of power equipment, resulting in low efficiency of the distribution network, and unreasonable distribution paths and power distribution schemes make the equipment performance utilization rate low.
By obtaining the parameters of the predicted new energy power generation, power consumption equipment and distribution equipment of the target power grid, building an efficiency prediction model of the power grid and the distribution network efficiency model of the power grid, determining the target power distribution equipment and distribution capacity, optimizing the distribution path and distribution path power distribution to improve distribution network efficiency.
It improves the distribution network efficiency under the situation of power substitution and new energy access, and improves the utilization rate of equipment and the overall operating efficiency of the system.
Smart Images

Figure CN118920449A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of equipment utilization efficiency, and in particular to a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access. Background Art
[0002] Electric energy substitution is the use of electric energy to replace scattered coal and fuel oil energy consumption in the terminal energy consumption link, such as electric heating, geothermal heat pumps, industrial electric boilers (kilns), agricultural electric irrigation and drainage, electric vehicles, shore power for ships at berth, airport bridge-mounted equipment, electric energy storage peak load regulation, etc. Electric energy substitution can realize the operation of various equipment through electric energy, increase the proportion of clean energy use, and improve the environmental friendliness of equipment operation.
[0003] When the electricity in the electric energy substitution system comes from new energy, the output of the power-consuming equipment will fluctuate accordingly due to the volatility of new energy power generation. This fluctuation may interact with the ambient temperature. At the same time, the distribution equipment that distributes electricity to the power-consuming equipment will also be affected to varying degrees. The use of unreasonable distribution paths and power distribution plans may lead to low equipment performance utilization and power utilization in the distribution network, thereby resulting in low efficiency of the distribution network. Summary of the invention
[0004] The embodiment of the present invention provides a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, so as to solve the problem of improving the efficiency of the distribution network under the conditions of electric energy substitution and new energy access.
[0005] The embodiment of the present invention provides a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, including:
[0006] Obtain the predicted renewable energy power generation, equipment parameters and environmental parameters of each power distribution equipment and power consumption equipment in the target power grid during the target period;
[0007] For each electrical device, based on the device parameters and environmental parameters of the electrical device, an efficiency prediction model of the electrical device in the target period is constructed;
[0008] For each power-consuming device, a distribution network efficiency model of the power-consuming device is constructed based on the efficiency prediction model of the power-consuming device, the device parameters of each power distribution device, and the environmental parameters;
[0009] Based on the efficiency models of each distribution network and the predicted renewable energy power generation, the target distribution equipment and allocated power corresponding to each power-consuming device are determined and used as the target distribution plan for the target power grid.
[0010] In a possible implementation, the equipment parameters of the electric equipment include a start / stop state and an operating power;
[0011] For each electrical device, based on the device parameters and environmental parameters of the electrical device, an efficiency prediction model for the electrical device in the target period is constructed, including:
[0012] Determine a startup power consumption model of the first electric device based on the start / stop state of the first electric device;
[0013] Determine an environmental yield loss model of the first electrical equipment based on the start / stop state and environmental parameters of the first electrical equipment;
[0014] A model of how the efficiency of the first electrical equipment varies with the allocated power is determined based on the startup power loss model, operating power and environmental output loss model of the first electrical equipment, and is used as an efficiency prediction model for the first electrical equipment in a target period.
[0015] In a possible implementation, before determining the target distribution equipment and the allocated power corresponding to each power-consuming equipment based on each distribution network efficiency model and the predicted renewable energy power generation, and using the target power distribution efficiency improvement plan as the target power grid, it also includes:
[0016] The allocated power constraint is determined based on the startup power loss model of each power-consuming device, so that the allocated power of each power-consuming device is not lower than the startup power of the power-consuming device.
[0017] In a possible implementation, when the first electrical equipment is a hot water electric boiler, the efficiency prediction model of the first electrical equipment in the target period is:
[0018]
[0019] ΔT2=ζ 降温 t
[0020] Among them, η 热水 is the predicted efficiency of the hot water boiler in the target period, ΔT1 is the heating temperature of the hot water boiler in the target period, ΔT2 is the cooling temperature of the hot water boiler in the target period, ζ 降温 is the cooling coefficient of the hot water electric boiler, C is the specific heat capacity of the liquid in the hot water electric boiler, V is the amount of water in the furnace of the hot water electric boiler, P is the allocated power of the hot water electric boiler, t is the duration of the target period, a is the start-stop state parameter of the hot water electric boiler, when the hot water electric boiler is in the start state, a=0, when the hot water electric boiler is in the stop state, a=1, P1 is the startup power consumption of the hot water electric boiler, and t1 is the startup time of the hot water electric boiler.
[0021] In a possible implementation, when the first electrical equipment is a hot water electric boiler, the equipment parameters include the surface area of the furnace wall, the thickness of the furnace wall, the material of the furnace wall and the amount of water in the furnace, and the environmental parameters include the ambient temperature;
[0022] The method also includes:
[0023] The cooling coefficient of the hot water electric boiler is found in a preset cooling coefficient comparison table based on the furnace wall surface area, furnace wall thickness, furnace wall material, water volume in the furnace and ambient temperature of the hot water electric boiler.
[0024] In a possible implementation, when the first electrical equipment is a steam electric boiler, the efficiency prediction model of the first electrical equipment in the target period is:
[0025]
[0026] Among them, η 蒸汽 is the predicted efficiency of the steam-fired boiler in the target period, m is the amount of steam generated by the steam-fired boiler in the target period, q is the steam heat release coefficient, P is the predicted renewable energy power generation, and t is the duration of the target period.
[0027] In a possible implementation, when the first electrical equipment is a steam electric boiler, the equipment parameters include heating power, water temperature in the furnace and water volume in the furnace;
[0028] The method also includes:
[0029] The time required for the steam electric boiler to enter the steam generation state is calculated based on the heating power of the steam electric boiler, the water temperature in the furnace, the water volume in the furnace, the temperature drop coefficient and the heating time formula; wherein the heating time formula is:
[0030]
[0031] Wherein, Δt is the time required for the steam electric boiler to enter the steam generation state, T0 is the steam generation temperature, T is the water temperature in the furnace, b is the temperature drop coefficient, p is the heating power of the steam electric boiler, ζ is the heat transfer coefficient of the steam electric boiler, C is the specific heat capacity of the liquid in the steam electric boiler, and V is the water volume in the furnace of the steam electric boiler;
[0032] Based on the time required to enter the steam generating state, a model is constructed to show how the amount of electricity required for the steam electric boiler to enter the steam generating state changes with the allocated electricity, and this model is used as the startup electricity loss model of the steam electric boiler.
[0033] In a possible implementation, for each power-consuming device, a distribution network efficiency model of the power-consuming device is constructed based on the efficiency prediction model of the power-consuming device, device parameters of each power distribution device, and environmental parameters, including:
[0034] For each power distribution device corresponding to the first power consumer, the distribution loss coefficient of the distribution device is determined based on the equipment parameters and environmental parameters of the distribution device, and the efficiency prediction model of the first power consumer is adjusted based on the distribution loss coefficient to obtain a model in which the efficiency of the first power consumer changes with the distributed power and the power distribution device, and the model is used as the distribution network efficiency model of the first power consumer.
[0035] In a possible implementation, determining a power distribution loss coefficient of the power distribution device based on device parameters and environmental parameters of the power distribution device includes:
[0036] Based on the equipment model and ambient temperature of the power distribution equipment, the power distribution loss coefficient of the power distribution equipment is searched in a preset power distribution loss coefficient comparison table.
[0037] In a possible implementation, based on the efficiency models of each distribution network and the predicted renewable energy power generation, the target distribution equipment and the distributed power corresponding to each power-consuming device are determined and used as the target distribution plan of the target power grid, including:
[0038] Based on the predicted renewable energy power generation, multiple candidate power distribution schemes are generated, and the power distribution efficiency of each power-consuming device under each candidate power distribution scheme is calculated based on each distribution network efficiency model; wherein the candidate power distribution schemes include:
[0039] For each candidate power distribution scheme, determining the system power distribution efficiency of the target power grid under the candidate power distribution scheme based on the power distribution efficiency of each power-consuming device under the candidate power distribution scheme;
[0040] Based on the power distribution efficiency of each system, a target power distribution scheme of the target power grid is selected from various candidate power distribution schemes.
[0041] The embodiment of the present invention provides a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access. Through equipment parameters and environmental parameters, an efficiency prediction model of power-consuming equipment in a target period is constructed, and the efficiency prediction model is converted into a distribution network efficiency model in combination with the equipment parameters and environmental parameters of the distribution equipment. The influence of the distribution path on the efficiency is added, and finally, the distribution path selection and power allocation are performed based on each distribution network efficiency model and the predicted new energy power generation, thereby improving the distribution efficiency of the target power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0043] Figure 1It is a flow chart of a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access provided by an embodiment of the present invention;
[0044] Figure 2 It is a structural schematic diagram of a device for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0045] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0046] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0047] Figure 1 The implementation flow chart of the method provided in the embodiment of the present invention is described in detail as follows:
[0048] Step 101, obtaining the predicted renewable energy power generation, equipment parameters and environmental parameters of each power distribution equipment and power consumption equipment in the target power grid during the target period.
[0049] In this embodiment, the target power grid generates electricity through new energy, and transmits electric energy to the power-consuming equipment in the system through the power distribution equipment, and the power-consuming equipment uses this electric energy for production and operation. The equipment parameters of the power distribution equipment and the power-consuming equipment affect the power distribution loss and power utilization capacity of the equipment respectively, and the different layout positions of each power distribution equipment and power-consuming equipment may lead to differences in the environmental parameters of each device, so that each device is affected by environmental factors to varying degrees, thereby affecting the operating effect produced after the power distribution equipment and the power-consuming equipment cooperate with each other. The distribution path is to transmit electric energy to the power-consuming equipment through different distribution equipment or a combination of distribution equipment. Through reasonable power distribution and distribution path selection, the overall operating efficiency of the system can be optimized.
[0050] The target period can be determined based on the prediction cycle of the power generation of new energy. For example, if the power generation status of photovoltaic power generation equipment in a certain area is predicted on a daily basis, the predicted power generation of new energy can be obtained with one day as the target period. Multiple periods can also be combined into a target period to increase the duration covered by this method. The power generation of new energy can be the power generation.
[0051] Step 102: for each electric device, based on the device parameters and environmental parameters of the electric device, construct an efficiency prediction model for the electric device in a target period.
[0052] In this embodiment, the efficiency prediction model of the electric device is used to predict the power efficiency of the electric device without considering the power distribution path.
[0053] Step 103 : for each power-consuming device, a distribution network efficiency model of the power-consuming device is constructed based on the efficiency prediction model of the power-consuming device, the device parameters of each power distribution device, and the environmental parameters.
[0054] In this embodiment, the distribution network efficiency model of the power consuming equipment adds the equipment parameters and environmental parameters of the power consuming equipment on the basis of the efficiency prediction model, and can predict the power efficiency of the power consuming equipment in combination with different power distribution paths.
[0055] Step 104, based on the efficiency models of each distribution network and the predicted renewable energy power generation, determine the target distribution equipment and the distributed power corresponding to each power-consuming device, and use them as the target distribution plan of the target power grid.
[0056] In a possible implementation, based on the efficiency models of each distribution network and the predicted renewable energy power generation, the target distribution equipment and the distributed power corresponding to each power-consuming device are determined and used as the target distribution plan of the target power grid, including:
[0057] Based on the predicted renewable energy power generation, multiple candidate power distribution schemes are generated, and the power distribution efficiency of each power-consuming device under each candidate power distribution scheme is calculated based on each distribution network efficiency model; the candidate power distribution schemes include
[0058] For each candidate power distribution scheme, determining the system power distribution efficiency of the target power grid under the candidate power distribution scheme based on the power distribution efficiency of each power-consuming device under the candidate power distribution scheme;
[0059] Based on the power distribution efficiency of each system, a target power distribution scheme of the target power grid is selected from various candidate power distribution schemes.
[0060] In this embodiment, the system power distribution efficiency refers to the ratio of the effective power produced by all power-consuming devices in the target power grid to the power consumption. In the case where there are multiple types of power-consuming devices, the output of different types of power-consuming devices can be converted uniformly.
[0061] In the case where the target period only includes a single renewable energy power forecast cycle, the electric boiler equipment with the highest predicted efficiency can be directly selected from various electric boiler equipment as the target electric boiler equipment, and all renewable energy power generation in the target period can be allocated to the target electric boiler equipment.
[0062] In the case where the target time period includes multiple new energy electricity forecast cycles, we can combine the timing relationship of the start and stop states of each electric boiler equipment to construct multiple start and stop state combinations, calculate the system efficiency of each start and stop state combination, and select the start and stop state combination with the highest system efficiency for electricity distribution. The system efficiency refers to the ratio of the total effective power of all electric boiler equipment in the electric boiler system to the power consumption. When only one electric boiler equipment produces heat in the system, the efficiency of the electric boiler equipment can be directly used as the system efficiency.
[0063] For example, there are three electric boiler devices, ABC, in the electric boiler system, the target period includes two new energy power forecast cycles, and only one electric boiler device is started in each cycle. Then the start-stop state combination of the electric boiler system can include:
[0064] The first cycle A starts, and the second cycle A starts;
[0065] The first cycle A starts, and the second cycle B starts;
[0066] The first cycle A starts, and the second cycle C starts;
[0067] The first cycle B starts, and the second cycle A starts;
[0068] The first cycle B starts, and the second cycle B starts;
[0069] The first cycle B starts, and the second cycle C starts;
[0070] The first cycle C starts, and the second cycle A starts;
[0071] The first cycle C starts, and the second cycle B starts;
[0072] The first cycle C starts, and the second cycle C starts.
[0073] When the number of electric boiler equipment increases, the number of electric boiler equipment started in each cycle increases, and the number of new energy power forecast cycles included in the target period increases, more start-stop state combinations may appear. By optimizing them, a more efficient power distribution plan can be found.
[0074] In addition, the equipment performance utilization rate can also be used as one of the optimization goals of power distribution. For example, weights can be set for system efficiency and equipment performance utilization rate, and the comprehensive score of the two can be used as an indicator for selecting a power distribution plan.
[0075] Specifically, the equipment performance utilization rate can be determined based on various indicators at the distribution network level, substation level, line level, etc. The weight of each indicator can be set according to actual needs, and the equipment performance utilization rate of the target power grid can be calculated by multiplication. The introduction and calculation formula of various indicators are as follows:
[0076] The power supply per unit transformer capacity represents the utilization efficiency of transformer equipment at each voltage level. The calculation formula is as follows:
[0077]
[0078] In the formula, k T Indicates the power supply per unit transformer capacity, S T1 is the total power supply of all transformers during the assessment period, in kWh, S T is the total transformation capacity of the transformer, in kVA.
[0079] The calculation formula of power grid equipment utilization is as follows:
[0080]
[0081] High-voltage distribution network level indicators:
[0082] 1. Load capacity ratio
[0083] The capacity-load ratio refers to the ratio of the total capacity of public substation equipment of the same voltage level in a certain power supply area to the corresponding total load. It shows the relationship between the installed capacity of substations in the area and the maximum actual operating capacity, describes whether the substation capacity put into operation in the power supply area is reasonable, and whether the margin of substation capacity is appropriate, and can be used to guide the reasonable control of investment scale. It is one of the important technical and economic indicators reflecting the power supply capacity of the power grid, and is the basis for macro-control of the total substation capacity and planning and arranging the substation capacity. Therefore, this concept is often used in power grid planning and design.
[0084] The formula for calculating the capacity load ratio is as follows:
[0085]
[0086] In the formula, R s is the capacity ratio; P max is the maximum predicted load of the entire network at this voltage level, kW; S ei is the main transformer capacity of substation i of this voltage level, kVA.
[0087] 2. Load peak-to-valley rate
[0088] The load peak-to-valley difference rate refers to the ratio of the load peak-to-valley difference to the maximum load within a certain time period. It is usually expressed in years and is used to indicate the fluctuation of the load curve of the power system. The formula is shown in 3-2.
[0089]
[0090] Substation level indicators:
[0091] (1) Annual maximum load rate of transformer (substation)
[0092] The annual maximum load rate of the substation reflects the load of the transformer at the peak moment. It refers to the ratio of the actual power carried by the substation at the maximum load of the entire network to its rated power, reflecting the relationship between the load and capacity of the substation at the maximum load of the entire network. The calculation formula is:
[0093]
[0094] (2) Substation capacity factor
[0095] Capacity factor is an internationally accepted indicator for calculating the utilization rate of power equipment, which depends on the ratio of the actual power of the substation to the maximum theoretical power of the substation. The calculation formula is:
[0096]
[0097] Where C is the capacity factor of the device;
[0098] T is time;
[0099] E is the actual power of the device within T time.
[0100] (3) Percentage of normal operation of substations
[0101] The normal operation ratio of substations refers to the proportion of substations that are operating normally at the moment of maximum load, which is used to reflect the degree of normal operation of substations. Normally operating substations refer to substations that are not light-loaded, heavy-loaded or overloaded at the moment of maximum load. Overloaded substations refer to substations with a load rate exceeding 100%. Heavy-loaded substations refer to substations with a load rate between 80% and 100%, and light-loaded substations refer to substations with a load rate not exceeding 20%.
[0102]
[0103] (4) Coordination between substation load factor and medium voltage outgoing line interval
[0104] The coordination degree between the substation load rate and the medium voltage outgoing line interval is the relationship between the utilization rate of the substation medium voltage outgoing line interval and the average load rate of the substation, which reflects the utilization of the medium voltage outgoing line in the area to a certain extent. The calculation formula is as follows:
[0105]
[0106] Indicators at the medium voltage distribution network level:
[0107] (1) Maximum line load rate
[0108] The maximum load rate of a line refers to the ratio of the actual power of the line at the maximum load moment to the continuous transmission power of the line, reflecting the relationship between the load and capacity of the line at the maximum load moment. The calculation formula is as follows. This study uses the average value of the maximum load rate of the line in the region.
[0109]
[0110] (2) Line equivalent average load rate
[0111] The equivalent average load rate of a single-circuit line refers to the ratio of the annual power consumption of the line to the product of the total capacity of the line and the annual operation time of the line. The calculation formula is as follows. The equivalent average load rate indicator of the line in this study is the average value of the equivalent average load rates of all lines in the region.
[0112]
[0113] (3) Proportion of normal line operation
[0114] The normal operation ratio of lines refers to the proportion of lines that are operating normally at the moment of maximum load, which is used to reflect the degree of normal operation of lines. Normal operation lines refer to lines that are not light-loaded, heavy-loaded or overloaded at the moment of maximum load. Overloaded lines refer to medium-voltage lines with a load rate exceeding 100%, heavy-loaded lines refer to medium-voltage lines with a load rate between 80% and 100%, and light-loaded lines refer to medium-voltage lines with a load rate not exceeding 20%.
[0115]
[0116] (4) Monthly power fluctuation rate of the line
[0117] The calculation method of the monthly power fluctuation rate of the line is the ratio of the standard deviation of the line load to the average value of the monthly power. This indicator examines the fluctuation of the average load of the line and can reflect the dynamic changes of the line power in the time dimension.
[0118]
[0119] Among them, η 线路 is the monthly power fluctuation rate of the line;
[0120] x1, x2…x n The monthly power consumption of the line;
[0121] n is the monthly power consumption of the line, n = 12;
[0122] P is the average value of electricity consumption in each month.
[0123] (5) Maximum load factor of distribution transformer
[0124] The maximum load factor of a distribution transformer refers to the ratio of the actual power of the distribution transformer at the maximum load moment to the continuous power delivered by the distribution transformer, reflecting the relationship between the load and capacity of the distribution transformer at the maximum load moment. The calculation formula is as follows. This study uses the average value of the maximum load factor of the distribution transformer in the region.
[0125]
[0126] (6) Equivalent average load factor of distribution transformer
[0127] The equivalent average load rate of a single distribution transformer refers to the ratio of the annual power consumption of the distribution transformer to the product of the total capacity of the distribution transformer and the annual operation time of the distribution transformer. The calculation formula is as follows. The equivalent average load rate indicator of the distribution transformer in this study is the average value of the equivalent average load rates of all distribution transformers in the region.
[0128]
[0129] (7) Percentage of normal operation of distribution transformers
[0130] The normal operation ratio of distribution transformers refers to the proportion of distribution transformers that operate normally at the maximum load moment, which is used to reflect the degree of normal operation of distribution transformers. Normally operating distribution transformers refer to distribution transformers that are not light-loaded, heavy-loaded, or overloaded at the maximum load moment. Overload distribution transformers refer to distribution transformers with a load rate exceeding 100%, heavy-load distribution transformers refer to distribution transformers with a load rate between 80% and 100%, and light-load distribution transformers refer to distribution transformers with a load rate not exceeding 20%.
[0131]
[0132] (8) Monthly power fluctuation rate of distribution transformer
[0133] The calculation method of the monthly power fluctuation rate of the distribution transformer is the ratio of the standard deviation of the power carried by the distribution transformer to the average value of the power in each month. This indicator examines the fluctuation of the average load of the distribution transformer and can reflect the dynamic changes of the power of the distribution transformer in the time dimension.
[0134]
[0135] Among them, η 配变 is the monthly power fluctuation rate of the distribution transformer;
[0136] x1, x2…x n To distribute and transform the monthly electricity;
[0137] n is the monthly power consumption of the line, n = 12;
[0138] P is the average value of electricity consumption in each month.
[0139] The embodiment of the present invention constructs an efficiency prediction model for electrical equipment in a target time period through equipment parameters and environmental parameters, and converts the efficiency prediction model into a distribution network efficiency model in combination with equipment parameters and environmental parameters of distribution equipment, adding the impact of distribution paths on efficiency. Finally, distribution path selection and power allocation are performed based on each distribution network efficiency model and predicted new energy power generation, thereby improving the distribution efficiency of the target power grid.
[0140] In a possible implementation, the equipment parameters of the electric equipment include a start / stop state and an operating power;
[0141] For each electrical device, based on the device parameters and environmental parameters of the electrical device, an efficiency prediction model for the electrical device in the target period is constructed, including:
[0142] Determine a startup power consumption model of the first electric device based on the start / stop state of the first electric device;
[0143] Determine an environmental yield loss model of the first electrical equipment based on the start / stop state and environmental parameters of the first electrical equipment;
[0144] A model of how the efficiency of the first electrical equipment varies with the allocated power is determined based on the startup power loss model, operating power and environmental output loss model of the first electrical equipment, and is used as an efficiency prediction model for the first electrical equipment in a target period.
[0145] In this embodiment, an electric boiler is used as an example to illustrate the construction process of the efficiency prediction model of the electric equipment. The equipment parameters of the electric boiler equipment will affect the electric heat conversion characteristics and heat preservation capacity of the electric boiler equipment, and the environmental parameters will affect the heat loss of the electric boiler equipment.
[0146] For hot water electric boilers, the temperature of the heating device needs to be higher than the water temperature in the furnace before heating can begin. For steam electric boilers, the water temperature in the furnace needs to reach a certain temperature before hot water can be produced. The power loss model is started based on the time and power consumption in this process.
[0147] During the heating process, the water temperature in the furnace is continuously affected by the ambient temperature. The environmental yield loss model can describe the specific changes in the water temperature in the furnace.
[0148] For each electric boiler, it can be assumed that a certain amount of power generation is allocated to the electric boiler equipment, and then the efficiency of the electric boiler equipment is quantitatively predicted based on the equipment parameters and environmental parameters. The power distribution effects are compared before the actual power distribution, so as to facilitate better power distribution in the future.
[0149] In a possible implementation, before determining the target distribution equipment and the allocated power corresponding to each power-consuming equipment based on each distribution network efficiency model and the predicted renewable energy power generation, and using the target power distribution efficiency improvement plan as the target power grid, it also includes:
[0150] The allocated power constraint is determined based on the startup power loss model of each power-consuming device, so that the allocated power of each power-consuming device is not lower than the startup power of the power-consuming device.
[0151] In this embodiment, the allocated power of each power-consuming device cannot be lower than the startup power of the power-consuming device, otherwise the power-consuming device cannot enter the production state and the efficiency is zero.
[0152] In a possible implementation, when the first electrical equipment is a hot water electric boiler, the efficiency prediction model of the first electrical equipment in the target period is:
[0153]
[0154] ΔT2=ζ 降温 t
[0155] Among them, η 热水 is the predicted efficiency of the hot water boiler in the target period, ΔT1 is the heating temperature of the hot water boiler in the target period, ΔT2 is the cooling temperature of the hot water boiler in the target period, ζ 降温 is the cooling coefficient of the hot water electric boiler, C is the specific heat capacity of the liquid in the hot water electric boiler, V is the amount of water in the furnace of the hot water electric boiler, P is the allocated power of the hot water electric boiler, t is the duration of the target period, a is the start-stop state parameter of the hot water electric boiler, when the hot water electric boiler is in the start state, a=0, when the hot water electric boiler is in the stop state, a=1, P1 is the startup power consumption of the hot water electric boiler, and t1 is the startup time of the hot water electric boiler.
[0156] In a possible implementation, when the first electrical equipment is a hot water electric boiler, the equipment parameters include the surface area of the furnace wall, the thickness of the furnace wall, the material of the furnace wall and the amount of water in the furnace, and the environmental parameters include the ambient temperature;
[0157] The method further includes:
[0158] The cooling coefficient of the hot water electric boiler is found in a preset cooling coefficient comparison table based on the furnace wall surface area, furnace wall thickness, furnace wall material, water volume in the furnace and ambient temperature of the hot water electric boiler.
[0159] In this embodiment, when the allocated power is known, the step of determining the predicted efficiency of the hot water boiler includes:
[0160] Calculate the total calorific value of the hot water boiler during the target period based on the equipment parameters and allocated power of the hot water boiler
[0161] Calculate the total heat dissipation of the hot water electric boiler in the target period based on the equipment parameters and environmental parameters of the hot water electric boiler;
[0162] The predicted efficiency of the hot water boiler during the target period is calculated based on the total heating value, total heat dissipation and allocated power of the hot water boiler.
[0163] In this embodiment, for the electric boiler equipment supplying hot water, the temperature change of the hot water can be used to describe the heat generated by the electric boiler equipment. The difference between the total heat generation and the total heat dissipation of the electric boiler equipment is the effective heating power of the electric boiler equipment, the allocated power is the power consumption of the electric boiler equipment, and the ratio of the effective heating power to the power consumption is the efficiency of the electric boiler equipment.
[0164] In a possible implementation, the equipment parameters include start / stop status, heating power, and water volume in the furnace;
[0165] Calculate the total calorific value of the hot water boiler during the target period based on the equipment parameters and allocated power of the hot water boiler, including:
[0166] The total calorific value of the hot water electric boiler in the target period is calculated based on the start and stop status of the hot water electric boiler, heating power, water volume in the furnace and the temperature rise formula; the temperature rise formula is:
[0167]
[0168] Among them, ΔT1 is the heating temperature of the hot water electric boiler in the target period, P is the allocated power, a is the start-stop state parameter of the hot water electric boiler, when the hot water electric boiler is in the start state, a=0, when the hot water electric boiler is in the stop state, a=1, P1 is the start-up power consumption of the hot water electric boiler, t is the duration of the target period, t1 is the start-up time of the hot water electric boiler, p is the heating power of the hot water electric boiler, ζ is the heat transfer coefficient of the hot water electric boiler, C is the specific heat capacity of the liquid in the hot water electric boiler, and V is the water volume in the furnace of the hot water electric boiler.
[0169] In this embodiment, the distributed power is instantaneous power, and the heating power of the electric boiler equipment refers to the instantaneous power of heat generated by resistance or electromagnetic effect in the heating state of the electric boiler.
[0170] When the hot water electric boiler is in a stopped state, it needs to start and consume a certain amount of electricity first. Therefore, the amount of electricity generated by renewable energy cannot be fully used for the heat generation of the hot water electric boiler. The amount of electricity generated by renewable energy minus the amount of electricity consumed by the hot water electric boiler when it is started is the amount of electricity that can be used for heating (since the amount of electricity generated by renewable energy is instantaneous power, the amount of electricity consumed by the hot water electric boiler when it is started can be converted into instantaneous power based on the duration of the target period, which is convenient for calculating the difference between the two). Similarly, it takes time to start the hot water electric boiler. Therefore, the hot water electric boiler cannot be completely in the heating state during the target period. The duration of the target period minus the time it takes to start the hot water electric boiler is the heating time of the hot water electric boiler. The product of the available electricity, heating time, heating power and heat transfer coefficient is the heat actually transferred to the liquid in the furnace during the target period. Combined with the volume and specific heat capacity of the liquid, the temperature rise of the liquid without considering heat loss can be calculated.
[0171] In a possible implementation, the equipment parameters further include the furnace wall surface area, the furnace wall thickness and the furnace wall material, and the environmental parameters include the ambient temperature;
[0172] The total heat dissipation of the hot water boiler during the target period is calculated based on the equipment parameters and environmental parameters of the hot water boiler, including:
[0173] Find the cooling coefficient of the hot water electric boiler in a preset cooling coefficient comparison table based on the furnace wall surface area, furnace wall thickness, furnace wall material, water volume in the furnace and ambient temperature of the hot water electric boiler;
[0174] Calculate the product of the cooling coefficient and the target period length to obtain the cooling temperature of the hot water boiler.
[0175] In this embodiment, the furnace wall surface area, furnace wall thickness, furnace wall material, furnace water volume and ambient temperature are all factors affecting the heat loss of the electric boiler equipment. The specific numerical correspondence between these factors and the temperature reduction coefficient can be obtained in advance through experiments and stored in the form of a comparison table for subsequent search and use. The temperature reduction coefficient represents the rate of temperature reduction, and the product of the temperature reduction coefficient and the target time period is the temperature reduction after the target time period.
[0176] In a possible implementation, the predicted efficiency of the hot water boiler in the target period is calculated based on the total heating capacity, total heat dissipation and allocated power of the hot water boiler, including:
[0177] The predicted efficiency of the hot water electric boiler in the target period is calculated based on the heating temperature, cooling temperature, water volume in the furnace, distributed power and hot water efficiency formula; the hot water efficiency formula is:
[0178]
[0179] Among them, η 热水is the predicted efficiency of the hot water electric boiler in the target period, ΔT1 is the heating temperature, ΔT2 is the cooling temperature, C is the specific heat capacity of the liquid in the hot water electric boiler, V is the amount of water in the furnace of the hot water electric boiler, P is the allocated power, and t is the duration of the target period.
[0180] In this embodiment, the difference between the heating temperature and the cooling temperature is the temperature that the hot water electric boiler can actually increase by utilizing the allocated power during the target period. The product of the actual heating temperature, specific heat capacity, and water volume represents the actual effective power. The product of the allocated power and the duration of the target period is the actual power consumption. At this time, the predicted efficiency of the hot water electric boiler during the target period can be calculated.
[0181] In a possible implementation, when the first electrical equipment is a steam electric boiler, the efficiency prediction model of the first electrical equipment in the target period is:
[0182]
[0183] Among them, η 蒸汽 is the predicted efficiency of the steam-electric boiler in the target period, m is the amount of steam generated by the steam-electric boiler in the target period, q is the steam heat release coefficient, P is the allocated power, and t is the duration of the target period.
[0184] In a possible implementation, when the first electrical equipment is a steam electric boiler, the equipment parameters include heating power, water temperature in the furnace and water volume in the furnace;
[0185] The method further includes:
[0186] The time required for the steam electric boiler to enter the steam generation state is calculated based on the heating power of the steam electric boiler, the water temperature in the furnace, the water volume in the furnace, the temperature drop coefficient and the heating time formula; wherein the heating time formula is:
[0187]
[0188] Wherein, Δt is the time required for the steam electric boiler to enter the steam generation state, T0 is the steam generation temperature, T is the water temperature in the furnace, b is the temperature drop coefficient, p is the heating power of the steam electric boiler, ζ is the heat transfer coefficient of the steam electric boiler, C is the specific heat capacity of the liquid in the steam electric boiler, and V is the water volume in the furnace of the steam electric boiler;
[0189] Based on the time required to enter the steam generating state, a model is constructed to show how the amount of electricity required for the steam electric boiler to enter the steam generating state changes with the allocated electricity, and this model is used as the startup electricity loss model of the steam electric boiler.
[0190] In this embodiment, when the allocated power is known, the step of determining the predicted efficiency of the steam electric boiler includes:
[0191] Determine the cooling coefficient of the steam electric boiler based on the equipment parameters and environmental parameters of the steam electric boiler
[0192] Calculate the amount of electricity and time required for the steam electric boiler to enter the steam generation state based on the equipment parameters and temperature drop coefficient of the steam electric boiler;
[0193] The amount of steam generated by the steam electric boiler in the target period is calculated based on the amount of electricity required for the steam electric boiler to enter the steam generating state, the time required to enter the steam generating state, and the allocated electricity;
[0194] The predicted efficiency of the steam electric boiler during the target period is calculated based on the amount of steam generated by the steam electric boiler during the target period and the allocated electricity.
[0195] In this embodiment, for an electric boiler supplying steam, the effective power generated by the electric boiler equipment is described by the steam quantity. At this time, the operating state of the electric boiler needs to be considered. When the electric boiler is not in a state of generating steam, the water in the furnace needs to be heated to boiling before steam can be generated, which consumes a lot of electricity. When the electric boiler is in a state of generating steam, the steam generation state of the electric boiler can be maintained with a small amount of electricity consumption.
[0196] In a possible implementation, the equipment parameters include the furnace wall surface area, the furnace wall thickness and the furnace wall material, and the environmental parameters include the ambient temperature;
[0197] The temperature reduction coefficient of the steam electric boiler is determined based on the equipment parameters and environmental parameters of the steam electric boiler, including:
[0198] The temperature reduction coefficient of the steam electric boiler is found in a preset temperature reduction coefficient comparison table based on the surface area of the furnace wall, the thickness of the furnace wall, the material of the furnace wall and the ambient temperature of the steam electric boiler.
[0199] In this embodiment, it is necessary to quantitatively calculate the amount of electricity and time required for the steam electric boiler to enter the steam generating state based on the temperature drop coefficient, so as to facilitate the subsequent accurate calculation of the amount of steam generated by the steam electric boiler.
[0200] The surface area of the furnace wall, the thickness of the furnace wall, the material of the furnace wall, the amount of water in the furnace and the ambient temperature are all factors that affect the heat loss of the electric boiler equipment. The specific numerical correspondence between these factors and the temperature reduction coefficient can be obtained in advance through experiments and stored in the form of a comparison table for subsequent search and use.
[0201] In a possible implementation, the equipment parameters include heating power, water temperature in the furnace and water volume in the furnace;
[0202] Based on the equipment parameters and temperature drop coefficient of the steam electric boiler, the amount of electricity and time required for the steam electric boiler to enter the steam generation state are calculated, including:
[0203] The time required for the steam electric boiler to enter the steam generation state is calculated based on the heating power of the steam electric boiler, the water temperature in the furnace, the water volume in the furnace, the temperature drop coefficient and the heating time formula; wherein the heating time formula is:
[0204]
[0205] Wherein, Δt is the time required for the steam electric boiler to enter the steam generation state, T0 is the steam generation temperature, T is the water temperature in the furnace, b is the temperature drop coefficient, p is the heating power of the steam electric boiler, ζ is the heat transfer coefficient of the steam electric boiler, C is the specific heat capacity of the liquid in the steam electric boiler, and V is the water volume in the furnace of the steam electric boiler;
[0206] Calculate the product of the allocated power and the time required to enter the steam generating state to obtain the power required for the steam electric boiler to enter the steam generating state.
[0207] In this embodiment, the difference between the steam generation temperature and the water temperature in the furnace is the heating temperature required for the steam electric boiler to enter the steam generation state. Taking into account the heat loss caused by the ambient temperature, the temperature drop coefficient is added to the above heating temperature as the actual heating temperature. Then, combined with the specific heat capacity, water volume, heating power and heat transfer coefficient, the time required for the liquid in the furnace to rise to the actual heating temperature can be determined, that is, the time required for the steam electric boiler to enter the steam generation state.
[0208] After determining the time required to enter the steam generating state, all the allocated electricity is used for the steam electric boiler, so the product of the allocated electricity and the time required to enter the steam generating state is the electricity required to enter the steam generating state.
[0209] In a possible implementation, the amount of steam generated by the steam electric boiler in the target period is calculated based on the amount of electricity required for the steam electric boiler to enter the steam generating state, the time required to enter the steam generating state, and the allocated electricity, including:
[0210] If the amount of electricity required for the steam electric boiler to enter the steam generation state is greater than the allocated electricity, the amount of steam generated by the steam electric boiler during the target period is 0;
[0211] If the amount of electricity required for the steam electric boiler to enter the steam generating state is not greater than the allocated electricity, the amount of steam generated by the steam electric boiler during the target period is calculated based on the amount of electricity required for the steam electric boiler to enter the steam generating state, the time required to enter the steam generating state, and the steam quantity formula; the steam quantity formula is:
[0212] m=(t-t2)m d
[0213] Where m is the amount of steam generated by the steam electric boiler during the target period, t is the duration of the target period, t2 is the time required for the steam electric boiler to enter the steam generation state, and md It is the amount of steam generated by the steam electric boiler per unit time.
[0214] In this embodiment, if the amount of electricity required for the steam electric boiler to enter the steam generating state is greater than the amount of electricity allocated in the target time period, it means that after all the allocated electricity is allocated to the steam electric boiler, the steam electric boiler still cannot enter the steam generating state, so it can be directly determined that the amount of steam generated by the steam electric boiler in the target time period is 0. Similarly, the amount of steam generated by the steam electric boiler in the target time period depends on the time required for the steam electric boiler to enter the steam generating state. If the time required for the steam electric boiler to enter the steam generating state is greater than or equal to the time of the target time period, it means that the steam electric boiler cannot enter the steam generating state in the entire target time period, and it can also be directly determined that the amount of steam generated by the steam electric boiler in the target time period is 0.
[0215] It takes 2260KJ of energy to evaporate 1kg of water into steam at the same temperature. 1kg of water is equal to 1L of water. Under normal pressure, a 1500W boiler heats water from 25℃ to 100℃ to turn it into steam in 10 minutes. The mass of water that needs to be heated is:
[0216] 4.2×75×V=1.5×10×60V=2.8571L
[0217] Since the energy consumption of maintaining the electric boiler equipment in the steam generating state is relatively small, the power consumption of the steam electric boiler equipment after entering the steam generating state is ignored in this embodiment.
[0218] In a possible implementation, the predicted efficiency of the steam electric boiler in the target period is calculated based on the amount of steam generated by the steam electric boiler in the target period and the amount of allocated electricity, including:
[0219] The predicted efficiency of the steam electric boiler in the target period is calculated based on the amount of steam generated by the steam electric boiler in the target period, the allocated power and the steam efficiency formula; the steam efficiency formula is:
[0220]
[0221] Among them, η 蒸汽 is the predicted efficiency of the steam-electric boiler in the target period, m is the amount of steam generated by the steam-electric boiler in the target period, q is the steam heat release coefficient, P is the allocated power, and t is the duration of the target period.
[0222] In this embodiment, the steam volume generated by the steam electric boiler in the target period is converted into the effective power generated by the steam electric boiler in the target period through the steam heat release coefficient, and the efficiency is calculated based on this. The steam heat release coefficient can be set according to the specific situation of the electric boiler equipment.
[0223] The above process can determine the influence of the predicted efficiency of the steam electric boiler on the allocated power, and build an efficiency prediction model.
[0224] In a possible implementation, for each power-consuming device, a distribution network efficiency model of the power-consuming device is constructed based on the efficiency prediction model of the power-consuming device, device parameters of each power distribution device, and environmental parameters, including:
[0225] For each power distribution device corresponding to the first power consumer, the distribution loss coefficient of the distribution device is determined based on the equipment parameters and environmental parameters of the distribution device, and the efficiency prediction model of the first power consumer is adjusted based on the distribution loss coefficient to obtain a model in which the efficiency of the first power consumer changes with the distributed power and the power distribution device, and the model is used as the distribution network efficiency model of the first power consumer.
[0226] In a possible implementation, determining a power distribution loss coefficient of the power distribution device based on device parameters and environmental parameters of the power distribution device includes:
[0227] Based on the equipment model and ambient temperature of the power distribution equipment, the power distribution loss coefficient of the power distribution equipment is searched in a preset power distribution loss coefficient comparison table.
[0228] In this embodiment, the equipment model and ambient temperature of the power distribution equipment are both factors affecting the power distribution loss coefficient. The specific numerical correspondence between these factors and the power distribution loss coefficient can be obtained in advance through experiments and stored in the form of a comparison table for subsequent search and use. The power distribution loss coefficient represents the ratio of the output power of the power distribution equipment to the input power. The product of the power distribution loss coefficient and the distributed power is the power actually obtained by the power-consuming equipment after power distribution.
[0229] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0230] The following is an embodiment of the device of the present invention. For details not described in detail, reference may be made to the corresponding method embodiments described above.
[0231] Figure 2 A schematic diagram of the structure of a device for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access provided by an embodiment of the present invention is shown. For the sake of convenience, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:
[0232] like Figure 2 As shown, a device 2 for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access includes:
[0233] An acquisition module 21 is used to acquire the predicted renewable energy power generation, equipment parameters and environmental parameters of each power distribution equipment and power consumption equipment in the target power grid during the target period;
[0234] The prediction module 22 is used to construct an efficiency prediction model of each electric device in a target period based on the device parameters and environmental parameters of the electric device;
[0235] The adjustment module 23 is used to construct a distribution network efficiency model of each power-consuming device based on the efficiency prediction model of the power-consuming device, the device parameters of each power distribution device and the environmental parameters;
[0236] The power distribution module 24 is used to determine the target power distribution equipment and the distributed power corresponding to each power-consuming device based on the efficiency models of each distribution network and the predicted power generation of new energy sources, and use it as the target power distribution plan of the target power grid.
[0237] In a possible implementation, the equipment parameters of the electric equipment include a start / stop state and an operating power;
[0238] The prediction module 22 is specifically used for:
[0239] Determine a startup power consumption model of the first electric device based on the start / stop state of the first electric device;
[0240] Determine an environmental yield loss model of the first electrical equipment based on the start / stop state and environmental parameters of the first electrical equipment;
[0241] A model of how the efficiency of the first electrical equipment varies with the allocated power is determined based on the startup power loss model, operating power and environmental output loss model of the first electrical equipment, and is used as an efficiency prediction model for the first electrical equipment in a target period.
[0242] In a possible implementation, the prediction module 22 is further configured to:
[0243] Before determining the target distribution equipment and allocated power corresponding to each power consumer based on each distribution network efficiency model and predicted renewable energy power generation, and using this as a distribution efficiency improvement plan for the target power grid, the allocated power constraint is determined based on the starting power loss model of each power consumer, so that the allocated power of each power consumer is not lower than the starting power of the power consumer.
[0244] In a possible implementation, when the first electrical equipment is a hot water electric boiler, the efficiency prediction model of the first electrical equipment in the target period is:
[0245]
[0246] ΔT2=ζ 降温 t
[0247] Among them, η 热水 is the predicted efficiency of the hot water boiler in the target period, ΔT1 is the heating temperature of the hot water boiler in the target period, ΔT2 is the cooling temperature of the hot water boiler in the target period, ζ 降温 is the cooling coefficient of the hot water electric boiler, C is the specific heat capacity of the liquid in the hot water electric boiler, V is the amount of water in the furnace of the hot water electric boiler, P is the allocated power of the hot water electric boiler, t is the duration of the target period, a is the start-stop state parameter of the hot water electric boiler, when the hot water electric boiler is in the start state, a=0, when the hot water electric boiler is in the stop state, a=1, P1 is the startup power consumption of the hot water electric boiler, and t1 is the startup time of the hot water electric boiler.
[0248] In a possible implementation, when the first electrical equipment is a hot water electric boiler, the equipment parameters include the surface area of the furnace wall, the thickness of the furnace wall, the material of the furnace wall and the amount of water in the furnace, and the environmental parameters include the ambient temperature;
[0249] The prediction module 22 is also used to:
[0250] The cooling coefficient of the hot water electric boiler is found in a preset cooling coefficient comparison table based on the furnace wall surface area, furnace wall thickness, furnace wall material, water volume in the furnace and ambient temperature of the hot water electric boiler.
[0251] In a possible implementation, when the first electrical equipment is a steam electric boiler, the efficiency prediction model of the first electrical equipment in the target period is:
[0252]
[0253] Among them, η 蒸汽 is the predicted efficiency of the steam-fired boiler in the target period, m is the amount of steam generated by the steam-fired boiler in the target period, q is the steam heat release coefficient, P is the predicted renewable energy power generation, and t is the duration of the target period.
[0254] In a possible implementation, when the first electrical equipment is a steam electric boiler, the equipment parameters include heating power, water temperature in the furnace and water volume in the furnace;
[0255] The prediction module 22 is also used to:
[0256] The time required for the steam electric boiler to enter the steam generation state is calculated based on the heating power of the steam electric boiler, the water temperature in the furnace, the water volume in the furnace, the temperature drop coefficient and the heating time formula; wherein the heating time formula is:
[0257]
[0258] Wherein, Δt is the time required for the steam electric boiler to enter the steam generation state, T0 is the steam generation temperature, T is the water temperature in the furnace, b is the temperature drop coefficient, p is the heating power of the steam electric boiler, ζ is the heat transfer coefficient of the steam electric boiler, C is the specific heat capacity of the liquid in the steam electric boiler, and V is the water volume in the furnace of the steam electric boiler;
[0259] Based on the time required to enter the steam generating state, a model is constructed to show how the amount of electricity required for the steam electric boiler to enter the steam generating state changes with the allocated electricity, and this model is used as the startup electricity loss model of the steam electric boiler.
[0260] In a possible implementation, the adjustment module 23 is specifically configured to:
[0261] For each power distribution device corresponding to the first power consumer, the distribution loss coefficient of the distribution device is determined based on the equipment parameters and environmental parameters of the distribution device, and the efficiency prediction model of the first power consumer is adjusted based on the distribution loss coefficient to obtain a model in which the efficiency of the first power consumer changes with the distributed power and the power distribution device, and the model is used as the distribution network efficiency model of the first power consumer.
[0262] In a possible implementation, the adjustment module 23 is specifically configured to:
[0263] Based on the equipment model and ambient temperature of the power distribution equipment, the power distribution loss coefficient of the power distribution equipment is searched in a preset power distribution loss coefficient comparison table.
[0264] In a possible implementation, the power distribution module 24 is specifically used for:
[0265] Based on the predicted renewable energy power generation, multiple candidate power distribution schemes are generated, and the power distribution efficiency of each power-consuming device under each candidate power distribution scheme is calculated based on each distribution network efficiency model; the candidate power distribution schemes include
[0266] For each candidate power distribution scheme, determining the system power distribution efficiency of the target power grid under the candidate power distribution scheme based on the power distribution efficiency of each power-consuming device under the candidate power distribution scheme;
[0267] Based on the power distribution efficiency of each system, a target power distribution scheme of the target power grid is selected from various candidate power distribution schemes.
[0268] The embodiment of the present invention constructs an efficiency prediction model for electrical equipment in a target time period through equipment parameters and environmental parameters, and converts the efficiency prediction model into a distribution network efficiency model in combination with equipment parameters and environmental parameters of distribution equipment, adding the impact of distribution paths on efficiency. Finally, distribution path selection and power allocation are performed based on each distribution network efficiency model and predicted new energy power generation, thereby improving the distribution efficiency of the target power grid.
[0269] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0270] Those of ordinary skill in the art will appreciate that the templates, units, and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0271] If the module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, it can implement the steps of each of the above-mentioned embodiments of the method for improving the utilization efficiency of equipment under the influence of electric energy substitution and power generation access. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electric carrier signal, telecommunication signal and software distribution medium.
[0272] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, It is characterized in that include: Obtain the predicted renewable energy power generation, equipment parameters and environmental parameters of each power distribution equipment and power consumption equipment in the target power grid during the target period; For each electrical device, based on the device parameters and environmental parameters of the electrical device, construct an efficiency prediction model for the electrical device in the target time period; For each power-consuming device, a distribution network efficiency model of the power-consuming device is constructed based on the efficiency prediction model of the power-consuming device, the device parameters of each power distribution device, and the environmental parameters; Based on each distribution network efficiency model and the predicted renewable energy power generation, the target distribution equipment and the distributed power corresponding to each power-consuming device are determined and used as the target distribution plan of the target power grid.
2. According to claim 1, a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, It is characterized in that The equipment parameters of the electrical equipment include start / stop status and operating power; The step of constructing, for each electric device, an efficiency prediction model of the electric device in the target time period based on the device parameters and environmental parameters of the electric device, includes: Determining a startup power consumption model of the first electric device based on the start / stop state of the first electric device; Determine an environmental yield loss model of the first electrical equipment based on the start / stop state and environmental parameters of the first electrical equipment; A model of how the efficiency of the first electrical device changes with the allocated power is determined based on the startup power loss model, operating power and environmental output loss model of the first electrical device, and is used as an efficiency prediction model for the first electrical device in the target time period.
3. According to claim 2, a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, It is characterized in that Before determining the target distribution equipment and the distributed power corresponding to each power-consuming equipment based on each distribution network efficiency model and the predicted renewable energy power generation, and using them as the distribution efficiency improvement plan for the target power grid, the method further includes: The allocated power constraint is determined based on the startup power loss model of each power-consuming device, so that the allocated power of each power-consuming device is not lower than the startup power of the power-consuming device.
4. According to claim 1, a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, It is characterized in that When the first electrical equipment is a hot water electric boiler, the efficiency prediction model of the first electrical equipment in the target period is: ΔT 2 =ζ 降温 t Among them, η 热水 is the predicted efficiency of the hot water boiler in the target period, ΔT 1 is the heating temperature of the hot water boiler in the target period, ΔT 2 is the cooling temperature of the hot water boiler in the target period, 降温 is the cooling coefficient of the hot water electric boiler, C is the specific heat capacity of the liquid in the hot water electric boiler, V is the amount of water in the furnace of the hot water electric boiler, P is the allocated power of the hot water electric boiler, t is the duration of the target period, a is the start-stop state parameter of the hot water electric boiler, when the hot water electric boiler is in the start state, a=0, when the hot water electric boiler is in the stop state, a=1, P 1 is the startup power consumption of the hot water electric boiler, t 1 It is the time taken to start the hot water electric boiler.
5. According to claim 4, a method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access, It is characterized in that When the first electrical equipment is a hot water electric boiler, the equipment parameters include the surface area of the furnace wall, the thickness of the furnace wall, the material of the furnace wall and the amount of water in the furnace, and the environmental parameters include the ambient temperature; The method further comprises: The temperature reduction coefficient of the hot water electric boiler is searched in a preset temperature reduction coefficient comparison table based on the furnace wall surface area, furnace wall thickness, furnace wall material, water volume in the furnace and ambient temperature of the hot water electric boiler.
6. A method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access according to claim 1, It is characterized in that When the first electrical equipment is a steam electric boiler, the efficiency prediction model of the first electrical equipment in the target period is: Among them, η 蒸汽 is the predicted efficiency of the steam-electric boiler in the target period, m is the amount of steam generated by the steam-electric boiler in the target period, q is the steam heat release coefficient, P is the predicted new energy power generation, and t is the duration of the target period.
7. A method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access according to claim 6, It is characterized in that When the first electrical equipment is a steam electric boiler, the equipment parameters include heating power, water temperature in the furnace and water volume in the furnace; The method further comprises: The time required for the steam electric boiler to enter the steam generating state is calculated based on the heating power of the steam electric boiler, the water temperature in the furnace, the water volume in the furnace, the temperature drop coefficient and the heating time formula; wherein the heating time formula is: Wherein, Δt is the time required for the steam electric boiler to enter the steam generation state, T 0 is the steam generation temperature, T is the water temperature in the furnace, b is the temperature drop coefficient, p is the heating power of the steam electric boiler, ζ is the heat transfer coefficient of the steam electric boiler, C is the specific heat capacity of the liquid in the steam electric boiler, and V is the water volume in the furnace of the steam electric boiler; Based on the time required to enter the steam generating state, a model is constructed in which the amount of electricity required for the steam electric boiler to enter the steam generating state varies with the allocated electricity, and is used as a startup electricity loss model for the steam electric boiler.
8. A method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access according to claim 1, It is characterized in that The method of constructing a distribution network efficiency model for each power-consuming device based on the efficiency prediction model of the power-consuming device, the device parameters of each power distribution device, and the environmental parameters includes: For each power distribution device corresponding to the first power consumer, the distribution loss coefficient of the distribution device is determined based on the equipment parameters and environmental parameters of the distribution device, and the efficiency prediction model of the first power consumer is adjusted based on the distribution loss coefficient to obtain a model in which the efficiency of the first power consumer changes with the distributed power and the power distribution device, and the model is used as the distribution network efficiency model of the first power consumer.
9. A method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access according to claim 8, It is characterized in that The determining of the power distribution loss coefficient of the power distribution equipment based on the equipment parameters and environmental parameters of the power distribution equipment includes: Based on the equipment model and ambient temperature of the power distribution equipment, the power distribution loss coefficient of the power distribution equipment is searched in a preset power distribution loss coefficient comparison table.
10. A method for improving equipment utilization efficiency under the influence of electric energy substitution and power generation access according to claim 8, It is characterized in that The target distribution equipment and the distributed power quantity corresponding to each power-consuming equipment are determined based on each distribution network efficiency model and the predicted new energy power generation, and used as the target distribution scheme of the target power grid, including: Based on the predicted renewable energy power generation, multiple candidate power distribution schemes are generated, and the power distribution efficiency of each power-consuming device under each candidate power distribution scheme is calculated based on each distribution network efficiency model; wherein the candidate power distribution schemes include For each candidate power distribution scheme, determining the system power distribution efficiency of the target power grid under the candidate power distribution scheme based on the power distribution efficiency of each power-consuming device under the candidate power distribution scheme; Based on the power distribution efficiencies of the various systems, a target power distribution scheme of the target power grid is selected from various candidate power distribution schemes.
Citation Information
Patent Citations
Power grid dispatching method and device, equipment and storage medium
CN117277439A