Power transmission network frame extension planning method, device and equipment and storage medium

By constructing the uncertain set of photovoltaic output and building an annual equivalent investment operation cost objective function, the problem of failure to consider the load capacity of the transmission grid in the existing technology is solved, and the photovoltaic grid connection position, capacity and transmission grid are realized The collaborative planning of frame expansion optimizes the expansion plan of the transmission grid frame, and improves the bearing capacity and system stability of new energy.

CN118920570APending Publication Date: 2024-11-08GUANGDONG POWER GRID CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410956380.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing technology failed to effectively consider the impact of the new energy carrying capacity of the transmission grid and the rapid growth of the photovoltaic power station capacity on the expansion of the transmission grid, resulting in the inability to coordinate the optimization of the photovoltaic grid connection location and capacity and the expansion of the transmission grid. .

Method used

Based on the growth rate and uncertain fluctuation of photovoltaic output, the uncertain set of photovoltaic output is constructed, combined with the expansion cost of the transmission grid, the power generation cost of the thermal power unit and the power abandonment cost of the photovoltaic power generation base, the annual equivalent investment operation cost is constructed as the target function. , form a transmission grid expansion planning model, and solve the model to realize the coordinated planning of photovoltaic grid connection location and capacity and transmission grid expansion.

Benefits of technology

The coordinated planning of the photovoltaic grid-connected location, capacity and expansion of the transmission grid frame is realized, the expansion plan of the transmission grid frame is optimized, the bearing capacity of new energy and the stability of the system are improved, and the expansion cost is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920570A_ABST
    Figure CN118920570A_ABST
Patent Text Reader

Abstract

The invention discloses a power transmission network frame extension planning method, device and equipment and a storage medium. The power transmission network frame extension planning method comprises the following steps: constructing a photovoltaic output uncertainty set of a power transmission network frame based on the growth rate of photovoltaic output and the uncertain fluctuation degree of the photovoltaic output; based on the expansion cost of the power transmission network frame, the power generation cost of the thermal power generating unit and the power abandoning cost of the photovoltaic power generation base, constructing annual equivalent investment and operation cost as a target function; forming a power transmission network frame expansion planning model by the expansion constraint of the power transmission network frame, the power transmission network safe operation constraint, the photovoltaic power generation base operation constraint, the constraint between the power generation cost and the active power of the thermal power generating unit at the set node, the photovoltaic output uncertainty set and the target function; and solving the power transmission network frame extension planning model to obtain power transmission network frame extension parameters. According to the technical scheme provided by the embodiment of the invention, the collaborative planning of the photovoltaic grid-connected position and capacity and the power transmission grid frame expansion is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission networks, and in particular to a power transmission network frame expansion planning method, device, equipment and storage medium. Background Art

[0002] As new energy technologies are vigorously developed, photovoltaic power generation, which is widely distributed and rich in resources, has developed rapidly in recent years. However, the disorderly planning and construction of photovoltaic power stations and the phenomenon of abandoned light have become increasingly prominent.

[0003] In order to improve the above shortcomings, the existing technology constructs a photovoltaic output uncertainty set based on the pre-given photovoltaic power station power generation capacity and the degree of photovoltaic output uncertainty fluctuation. This method makes the fluctuation range of photovoltaic output a given constant interval, resulting in the inability to consider the new energy carrying capacity of the transmission grid in the planning, and ignoring the impact of the rapid growth of photovoltaic power station capacity and the change in the degree of fluctuation in the planning year on the consumption of new energy and the expansion of the transmission grid.

[0004] In addition, the existing transmission grid expansion planning model with large-scale photovoltaic power plants usually only plans the expansion of transmission lines when the grid-connected nodes of photovoltaic power plants are known, but does not simultaneously carry out coordinated optimization planning of the grid-connected location and capacity of large-scale photovoltaic power plants and the expansion of transmission grids. Therefore, how to achieve the coordinated planning of photovoltaic grid-connected location and capacity and the expansion of transmission grids has attracted the attention of technicians. Summary of the invention

[0005] The present invention provides a transmission network expansion planning method, device, equipment and storage medium to achieve the coordinated planning of photovoltaic grid-connected position and capacity and transmission network expansion.

[0006] According to one aspect of the present invention, a method for planning a power transmission network expansion is provided, comprising:

[0007] Based on the growth rate of photovoltaic output and the uncertainty fluctuation degree of photovoltaic output, the photovoltaic output uncertainty set of the transmission grid is constructed;

[0008] Based on the expansion cost of the transmission grid, the power generation cost of thermal power units, and the power abandonment cost of photovoltaic power generation bases, the annual equivalent investment operation cost is constructed as the objective function;

[0009] The transmission network expansion planning model is composed of the transmission network expansion constraints, the transmission network safety operation constraints, the photovoltaic power generation base operation constraints, the constraints between the power generation cost and the active power of the thermal power unit at the set node, and the photovoltaic output uncertainty set, together with the objective function.

[0010] Solve the transmission grid expansion planning model to obtain transmission grid expansion parameters.

[0011] According to another aspect of the present invention, there is provided a transmission network expansion planning device, comprising:

[0012] An uncertainty set determination module is used to construct a photovoltaic output uncertainty set of a transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output;

[0013] An objective function construction module is used to construct the annual equivalent investment operation cost as the objective function based on the expansion cost of the transmission grid, the power generation cost of thermal power units, and the power abandonment cost of photovoltaic power generation bases;

[0014] An expansion planning model building module is used to form a transmission network expansion planning model by combining the expansion constraints of the transmission network, the safe operation constraints of the transmission network, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power unit at the set node, and the photovoltaic output uncertainty set with the objective function;

[0015] The expansion parameter determination module is used to solve the transmission network expansion planning model to obtain the transmission network expansion parameters.

[0016] According to another aspect of the present invention, an electronic device is provided, the electronic device comprising:

[0017] at least one processor; and

[0018] a memory communicatively connected to the at least one processor; wherein,

[0019] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the transmission network expansion planning method described in any embodiment of the present invention.

[0020] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the transmission network expansion planning method described in any embodiment of the present invention when executed.

[0021] According to another aspect of the present invention, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the computer program implements the transmission network expansion planning method of any embodiment of the present disclosure.

[0022] The technical solution of the embodiment of the present invention constructs a photovoltaic output uncertainty set of the transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, and constructs an annual equivalent investment operation cost as an objective function based on the expansion cost of the transmission grid, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases. Finally, the transmission grid expansion planning model is formed by the expansion constraints of the transmission grid, the safe operation constraints of the transmission grid, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power units at the set nodes, and the photovoltaic output uncertainty set, together with the objective function. Finally, the transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters, so as to realize the coordinated planning of photovoltaic grid-connected position and capacity and transmission grid expansion.

[0023] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0025] Figure 1 is a flow chart of a transmission network expansion planning method provided according to Embodiment 1 of the present invention;

[0026] Figure 2 is a flow chart of a transmission network expansion planning method provided according to Embodiment 2 of the present invention;

[0027] Figure 3 is a structural schematic diagram of a transmission network expansion planning device provided according to Embodiment 3 of the present invention;

[0028] Figure 4 It is a structural schematic diagram of an electronic device for implementing the transmission network expansion planning method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0029] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0031] Embodiment 1

[0032] Figure 1 A flowchart of a transmission grid expansion planning method is provided for the first embodiment of the present invention. This embodiment can be applied to the coordinated planning of photovoltaic grid-connected locations and capacities and transmission grid expansion. The method can be executed by a transmission grid expansion planning device, which can be implemented in the form of hardware and / or software. The transmission grid expansion planning device can be configured in various general-purpose computing devices. Figure 1 As shown, the method includes:

[0033] S110. Based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, construct a photovoltaic output uncertainty set of the transmission grid.

[0034] The photovoltaic carrying capacity of the transmission grid consists of two parts, namely, the extent to which photovoltaic growth can be coped with, and the extent to which photovoltaic output uncertainty fluctuations can be coped with. It is an indicator used to measure the transmission grid's ability to absorb photovoltaic growth and its ability to withstand photovoltaic output uncertainty. The box uncertainty sets used in existing technologies to describe photovoltaic output uncertainty are all constructed based on the pre-given photovoltaic power station power generation capacity and the degree of photovoltaic output uncertainty fluctuation. The photovoltaic output fluctuation range is a given constant interval. This will result in the inability to consider the new energy carrying capacity of the transmission grid in the planning, ignoring the impact of the rapid growth of photovoltaic power station capacity and changes in the degree of fluctuation in the planning year on the absorption of new energy and the expansion of the transmission grid.

[0035] In an embodiment of the present invention, in order to overcome the above-mentioned problem, two variables, namely the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, are introduced, and the variable range of the maximum photovoltaic active output is determined based on the initial expected value of the maximum photovoltaic active output, the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output.

[0036] S120. Based on the expansion cost of the transmission grid, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases, the annual equivalent investment operation cost is constructed as the objective function.

[0037] In the embodiment of the present invention, based on the proposed photovoltaic output uncertainty set considering the new energy carrying capacity, the annual equivalent investment operation cost is used as the objective function, which includes the expansion cost of the transmission grid, the power generation cost of the thermal power unit and the power abandonment cost of the photovoltaic power generation base. The objective function can be set as a two-layer function, the inner layer can be used to find the worst photovoltaic output scenario that maximizes the annual equivalent investment operation cost, and the outer layer is used to find the collaborative planning scheme that minimizes the annual equivalent investment operation cost under the worst photovoltaic output scenario.

[0038] S130, the transmission network expansion planning model is composed of the transmission network expansion constraints, the transmission network safe operation constraints, the photovoltaic power generation base operation constraints, the constraints between the power generation cost and the active power of the thermal power units at the set nodes, and the photovoltaic output uncertainty set, together with the objective function.

[0039] In the process of transmission grid expansion, it is necessary to consider the expansion of the transmission grid, the safe operation of the transmission grid, the operation of the photovoltaic power generation base, the constraints between the power generation cost and active power of the thermal power units at the set nodes, and the constraints of the photovoltaic output uncertainty set. Therefore, the above constraints need to be constructed in advance.

[0040] In an embodiment of the present invention, the pre-constructed transmission network expansion constraints, transmission network safety operation constraints, photovoltaic power generation base operation constraints, constraints between power generation cost and active power of thermal power units at set nodes, and photovoltaic output uncertainty sets are combined with the objective function to form a transmission network expansion planning model.

[0041] S140, solving the transmission network expansion planning model to obtain transmission network expansion parameters.

[0042] In an embodiment of the present invention, the transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters. Since the above constraints contain nonlinearity, the nonlinear terms in the constraints can be converted into linear forms by introducing variables. Furthermore, in order to reduce the complexity of the solution, the feasible domain of the model can be reduced according to the distance relationship between the node where the photovoltaic power generation base is located and the photovoltaic grid-connected node. Finally, the transmission grid expansion parameters are obtained by calculating the model after the feasible domain is reduced.

[0043] Optionally, the transmission grid expansion parameters include at least one of the growth rate of photovoltaic output, the degree of uncertainty fluctuation of photovoltaic output, photovoltaic grid connection points, photovoltaic grid connection capacity and transmission grid line expansion parameters.

[0044] The technical solution of the embodiment of the present invention constructs a photovoltaic output uncertainty set of the transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, and constructs an annual equivalent investment operation cost as an objective function based on the expansion cost of the transmission grid, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases. Finally, the transmission grid expansion planning model is formed by the expansion constraints of the transmission grid, the safe operation constraints of the transmission grid, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power units at the set nodes, and the photovoltaic output uncertainty set, together with the objective function. Finally, the transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters, so as to realize the coordinated planning of photovoltaic grid-connected position and capacity and transmission grid expansion.

[0045] Embodiment 2

[0046] Figure 2 This is a flowchart of a transmission grid expansion planning method provided in the second embodiment of the present invention. This embodiment further refines the above embodiment and provides specific steps for constructing a photovoltaic output uncertainty set of the transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, as well as specific steps for solving the transmission grid expansion planning model and obtaining transmission grid expansion parameters. Figure 2 As shown, the method includes:

[0047] S210: Determine a variable range of the maximum photovoltaic active output based on an initial expected value of the maximum photovoltaic active output, a growth rate of the photovoltaic output, and a degree of uncertainty fluctuation of the photovoltaic output.

[0048] The photovoltaic carrying capacity of the transmission grid consists of two parts, namely, the extent to which the photovoltaic growth can be coped with and the extent to which the photovoltaic output uncertainty fluctuation can be coped with. It is an indicator used to measure the transmission grid's ability to absorb photovoltaic growth and its ability to withstand the uncertainty of photovoltaic output. Therefore, based on the traditional uncertainty set reflecting the photovoltaic output fluctuation as shown in formula (1), two variables μ and ε are introduced to describe the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, respectively, as shown in formula (2). Compared with formula (1), the maximum active output of photovoltaic at this time P REmaxi,s The fluctuation range is no longer a given range, but a range that can be changed and optimized.

[0049] Φ={P REmaxi,s |P RE0i,s (1-ε0)≤P REmaxi,s ≤P RE0i,s (1+ε0)} (1)

[0050]

[0051] Where P REmaxi,sis the maximum available active power output of the photovoltaic power generation base at node i under scenario s; P RE0i,s P REmaxi,s The initial expected value of; ε0 is the given deviation rate used to describe the uncertain fluctuation range of the random variable; the variable μ is the growth rate of photovoltaic output; the variable ε is the degree of uncertain fluctuation of the random variable; ε max is the maximum value of ε; μ max is the maximum value of μ.

[0052] S220. Construct a photovoltaic carrying capacity index for the transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output.

[0053] Since the photovoltaic carrying capacity is related to μ and ε, the larger the μ and ε, the more photovoltaic capacity the transmission grid can absorb and the larger the range of uncertain fluctuations in photovoltaic output that can be tolerated. Therefore, a photovoltaic carrying capacity index for the transmission grid is constructed, as shown in formula (3).

[0054] Q ca =με (3)

[0055] S230. Based on the photovoltaic carrying capacity index and the variable interval, construct the photovoltaic output uncertainty set of the transmission grid.

[0056] At the same time, the proposed photovoltaic carrying capacity index (3) is combined with formula (2) to obtain the photovoltaic output uncertainty set considering the photovoltaic carrying capacity, as shown in formula (4).

[0057]

[0058] In the formula, Q ca It is the photovoltaic load-bearing capacity index, and the larger the value, the higher the load-bearing capacity; Q camin / Q camax It is the minimum / maximum value of the photovoltaic carrying capacity required in the plan.

[0059] S240. Based on the expansion cost of the transmission grid, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases, the annual equivalent investment operating cost is constructed as the objective function.

[0060] Based on the proposed light output uncertainty set considering the carrying capacity of new energy, a robust optimization model for coordinated planning of large-scale transmission network expansion is established with the goal of minimizing the annual equivalent investment operating cost. The grid connection point location and capacity of large-scale centralized photovoltaic power generation bases and the expansion of the transmission network are coordinated and optimized. The objective function annual equivalent investment operating cost includes the expansion cost of the transmission network, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases, as shown in formula (5). Among them, the established robust optimization model is a two-layer optimization model. The inner optimization model seeks the worst photovoltaic output scenario that maximizes the annual equivalent investment operating cost, and the outer optimization model seeks the coordinated planning scheme that minimizes the annual equivalent investment operating cost under the worst photovoltaic output scenario.

[0061]

[0062] In the formula, C in / C op is the annual equivalent investment / operating cost; α is the capital recovery coefficient, and α=r(1+r) T1 / [(1+r) T1 -1], where r is the discount rate, which is 8%, and T1 is the operating life of the new line; C Bij is the unit length investment cost of the transmission corridor ij; L ij is the length of the transmission corridor ij; x ij T represents the number of lines that need to be expanded in the transmission corridor ij; a is the number of hours in a year, i.e. 8760; S is the number of scenarios describing the uncertain fluctuation of the output of the photovoltaic power station; F Gi,s is the power generation cost of the thermal power unit at node i under scenario s, which is related to the active output P Gi,s The quadratic function of can be transformed into a convex inequality constraint (6) through piecewise linearization; REi,s is the injected active power of the photovoltaic power generation base at node i under scenario s; C RE is the unit power curtailment cost of photovoltaic power.

[0063] F Gi,s ≥Q lg P Gi,s +M lg ,lg=1,2,… (6)

[0064] In the formula, Q lg / M lg They are the slope / intercept of the lg-th segment of the linear function respectively.

[0065] S250. The expansion constraints of the transmission network are constituted by the investment cost constraints of the transmission lines, the number of lines in each transmission corridor, the number of grid connection points of the photovoltaic power generation base, and the number of new lines connecting the photovoltaic power generation bases.

[0066] In the actual transmission grid expansion planning, the investment cost of transmission lines has certain restrictions, as shown in formula (7). At the same time, the number of lines allowed to be put into operation in each transmission corridor is limited, as shown in formula (8); ij is an integer variable. In order to facilitate the subsequent processing of non-convex constraints and reduce the number of 0-1 variables, x ij Expressed in binary form, as shown in formula (9); when u ij = 0, x 0ij +x ij =0, indicating that there is no transmission corridor between nodes i and j; when u ij =1, 1≤x 0ij +x ij ≤N ijmax , indicating that there is at least one transmission line in the transmission corridor between nodes i and j. In addition, the number of grid connection points of each photovoltaic power generation base to be planned and the number of new lines connecting the photovoltaic power generation bases are also limited, as shown in formula (10). The above multiple restrictions together constitute the expansion constraints of the transmission network.

[0067] ∑ ij C Bij L ij x ij ≤C inmax (7)

[0068] u ij ≤x ij0 +x ij ≤N ijmax u ij , u ij ∈{0,1} (8)

[0069]

[0070]

[0071] In the formula, C inmax is the upper limit of the investment cost of the transmission line; binary variable u ij Indicates whether there is a transmission corridor ij; x ij0 N represents the number of transmission lines built in the transmission corridor ij; ijmax is the upper limit of the number of lines allowed to be put into operation in the transmission corridor ij; n ijm is an auxiliary 0-1 variable; M L is a given non-negative integer that needs to satisfy N ijmax ≤2 ML+1 -1;N Pmax N is the upper limit of the number of grid-connected points of the i-th photovoltaic power generation base; AmaxThe upper limit of the number of new lines connecting photovoltaic power generation bases; Ω RE It is a collection of photovoltaic power generation bases.

[0072] S260. The operating flow constraints of the transmission corridor, the voltage amplitude and phase angle constraints, the reactive load power constraints at the set nodes, and the operating constraints of the thermal power units constitute the safe operation constraints of the transmission network.

[0073] The node power balance equation of the transmission network is shown in formula (11):

[0074]

[0075] Where P Gi,s / Q Gi,s is the injected active / reactive power of the thermal power unit at node i under scenario s; Q REi,s is the injected reactive power of the photovoltaic power generation base at node i under scenario s; P Li,s / Q Li,s is the active / reactive load power of node i in scenario s; P ij,s / Q ij,s is the active / reactive power transmitted by transmission corridor ij under scenario s; j∈i represents all nodes j that may be connected to node i.

[0076] Based on the linearized AC power flow equation and the extended planning variables of the transmission grid, the operating power flow constraints of the transmission corridor are shown in Equations (12)-(14). At the same time, the voltage amplitude and phase angle constraints and the reactive load power constraints at the set nodes need to satisfy Equations (15) and (16).

[0077]

[0078]

[0079]

[0080]

[0081]

[0082] Where U i,s / θ i,s is the voltage amplitude / phase angle of node i in scenario s; U j,s / θ j,s is the voltage amplitude / phase angle of node j in scenario s; g ij / b ij is the conductance / susceptance of a single transmission line; is the active / reactive power of a single line in transmission corridor ij under scenario s; is the maximum transmission power of a single line in the transmission corridor ij; θ ijmin / θ ijmax is the minimum / maximum phase angle difference; U imin / U imax is the minimum / maximum voltage amplitude; U ref,s / θ ref,s is the voltage amplitude / phase angle of the reference node in scenario s; is the load power factor angle of node i; M is a large constant.

[0083] The operating constraints of the thermal power unit are shown in formula (17).

[0084]

[0085] Where P Gimin / P Gimax is the minimum / maximum active output of the thermal power unit at node i; Q Gimin / Q Gimax is the minimum / maximum reactive power output of the thermal power unit at node i. The operating power flow constraints, voltage amplitude and phase angle constraints of the transmission corridor described by the above formula, the reactive load power constraints at the set nodes, and the operating constraints of the thermal power units constitute the safe operation constraints of the transmission network.

[0086] S270: The active power output constraint of the optical service power generation base and the reactive power output constraint of the optical service power generation base constitute the operation constraint of the photovoltaic power generation base.

[0087] The active and reactive outputs of the photovoltaic power generation base need to meet the following operating constraints:

[0088]

[0089] In the formula, is the minimum / maximum power factor angle of the photovoltaic power generation base at node i. The active output constraint of the above-mentioned optical service power generation base and the reactive output constraint of the optical service power generation base constitute the operation constraint of the photovoltaic power generation base.

[0090] S280, the transmission network expansion planning model is composed of the transmission network expansion constraints, transmission network safety operation constraints, photovoltaic power generation base operation constraints, thermal power units at set nodes between the power generation cost and active power constraints and photovoltaic output uncertainty set, together with the objective function.

[0091] In the embodiment of the present invention, based on the proposed photovoltaic output uncertainty set considering the new energy carrying capacity, with formula (5) as the objective function and formulas (4) and (6)-(18) as constraints, a grid expansion planning model is established to coordinate the location and capacity of large-scale photovoltaic grid connection and the expansion of the transmission grid.

[0092] S290. Convert the transmission grid expansion planning model from a two-layer mixed integer nonlinear form to a two-layer mixed integer linear form.

[0093] In the embodiment of the present invention, the above-mentioned power grid expansion planning model contains nonlinear parts. For example, the photovoltaic output uncertainty set (4) and the constraint condition (14) contain a large number of nonlinear terms, and the established transmission grid expansion planning model is a two-layer optimization model, which is difficult to solve directly, efficiently and accurately. Therefore, it is necessary to further reconstruct and transform the transmission grid expansion planning model before directly and efficiently solving it. Specifically, the nonlinear part can be converted into a linear part by introducing variables.

[0094] Optionally, the transmission grid expansion planning model is converted from a two-layer mixed integer nonlinear form to a two-layer mixed integer linear form, including:

[0095] By introducing variables, the uncertainty set of photovoltaic output of the transmission grid contained in the transmission grid expansion planning model is converted from nonlinear form to linear form;

[0096] By introducing intermediate variables, the nonlinear terms in the transmission network safe operation constraints contained in the transmission network expansion planning model are converted into linear terms.

[0097] In this optional embodiment, a specific method for converting the transmission grid expansion planning model from a two-layer mixed integer nonlinear form to a two-layer mixed integer linear form is provided: first, since the proposed photovoltaic output uncertainty set (4) considering the new energy carrying capacity contains a nonlinear term of με, it is necessary to introduce a variable δ=με to convert equation (4) into a linear and easier to solve equation (19).

[0098]

[0099] In the formula, satisfying Q ca =δ, that is, δ is also an indicator of new energy carrying capacity.

[0100] Furthermore, the operation flow constraints of the transmission corridor included in the safe operation constraints of the transmission network contain nonlinear terms, as shown in formula (14). The nonlinear terms contain the multiplication of binary variables and continuous variables, and the intermediate variables are introduced. and Equation (14) is equivalently transformed into equation (20), and the introduced quadratic equation is transformed into linear constraints (21) and (22) using the big-M method.

[0101]

[0102] At this point, the original two-level mixed integer nonlinear model is equivalently transformed into a two-level mixed integer linear programming model (23).

[0103]

[0104] Wherein, (6)-(13), (15)-(22) refer to formulas (6)-(13) and (15)-(22) provided in the preceding part of this embodiment.

[0105] S291. According to the preset maximum distance between the node where the photovoltaic power generation base is located and the photovoltaic grid-connected node, the feasible domain of the converted transmission network expansion planning model is reduced.

[0106] In the embodiment of the present invention, in order to reduce the complexity of solving the optimization planning problem, for the node i where the photovoltaic power generation base to be planned and connected to the grid is located, only the node i that satisfies the discriminant The grid-connected node j is considered to be connected to the node i where the photovoltaic power generation base is located by a transmission line, that is, it is considered as a candidate grid-connected node for the photovoltaic power generation base at the node i; where x i / y i is the horizontal / vertical coordinate of node i, x j / y j is the horizontal / vertical coordinate of node j, L max is the maximum distance between the node i where the photovoltaic power generation base is located and the grid-connected node j that may be connected by a line. Through the above processing, the number of binary variables in the proposed model is reduced, the feasible domain of the optimization planning problem is further reduced, and the difficulty of solving the model is reduced.

[0107] S292. Solve the transmission network expansion planning model after reducing the feasible domain to obtain the transmission network expansion parameters.

[0108] In the embodiment of the present invention, the transmission grid expansion planning model after the feasible domain is reduced obtains the transmission grid expansion parameters, wherein the transmission grid expansion parameters include at least one of the growth rate of photovoltaic output, the degree of uncertainty fluctuation of photovoltaic output, photovoltaic grid connection point, photovoltaic grid connection capacity and transmission grid line expansion parameters.

[0109] Optionally, the transmission grid expansion planning model after the feasible region is reduced is solved to obtain transmission grid expansion parameters, including:

[0110] The Karush-Kuhn-Tucker condition is used to convert the inner layer of the transmission network expansion planning model after the feasible domain is reduced into an inner layer constraint, so that the transmission network expansion planning model after the feasible domain is reduced is converted from a double-layer mixed integer linear form to a single-layer mixed integer linear form.

[0111] The single-layer mixed integer linear form transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters.

[0112] In this optional embodiment, a specific method for solving the transmission network expansion planning model after reducing the feasible domain and obtaining the transmission network expansion parameters is provided: the robust optimization model (23) after reconstruction, convexification and feasible domain reduction is a two-layer min-max mixed integer linear programming model, which is difficult to solve directly. If a dual transformation is used, bilinear terms will appear in the objective function of the dual problem, making the optimization problem complicated. Since the inner max model in formula (23) is a linear convex programming model, the Karush-Kuhn-Tucker condition is first used to equivalently transform the inner max problem into a set of constraints, and merge it with the outer min problem to obtain a single-layer optimization model, such as formula (24).

[0113]

[0114] In the formula, λ 1i,s , 2i,s , 3i,s are the Lagrange multipliers introduced by the Karush-Kuhn-Tucker condition for the inner max model inequality constraint; the 5th to 7th lines of the constraint condition are the complementary relaxation constraints in the Karush-Kuhn-Tucker condition; the 8th line of the constraint condition is the first-order derivative condition of the Lagrange function in the Karush-Kuhn-Tucker condition. Among them, (6)-(13), (15)-(22) refer to the formulas (6)-(13) and (15)-(22) provided in the previous part of this embodiment.

[0115] In the single-level optimization model (24) obtained by Karush-Kuhn-Tucker condition transformation, the complementary relaxation constraint contains a quadratic term, which can be further introduced into the auxiliary 0-1 variable z 1i,s 、z 2i,s and z 3i,s , and linearized by the big-M method, and finally transformed the original complex two-level robust optimization model into a single-level mixed integer linear programming model that is easy to solve, as shown in equation (25). Therefore, the GUROBI solver in the mature commercial optimization software GAMS can be called to efficiently solve (25).

[0116]

[0117] Wherein, (6)-(13), (15)-(22) refer to formulas (6)-(13) and (15)-(22) provided in the preceding part of this embodiment.

[0118] The technical solution of the embodiment of the present invention constructs a photovoltaic output uncertainty set of the transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, and constructs an annual equivalent investment operation cost as an objective function based on the expansion cost of the transmission grid, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases. Finally, the transmission grid expansion planning model is formed by the expansion constraints of the transmission grid, the safe operation constraints of the transmission grid, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power units at the set nodes, and the photovoltaic output uncertainty set, together with the objective function. Finally, the transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters, so as to realize the coordinated planning of photovoltaic grid-connected position and capacity and transmission grid expansion.

[0119] Embodiment 3

[0120] Figure 3 This is a schematic diagram of the structure of a transmission network expansion planning device provided in Embodiment 3 of the present invention. Figure 3 As shown, the device comprises:

[0121] The uncertainty set determination module 310 is used to construct the photovoltaic output uncertainty set of the transmission grid based on the growth rate of photovoltaic output and the uncertainty fluctuation degree of photovoltaic output;

[0122] An objective function construction module 320 is used to construct an annual equivalent investment operation cost as an objective function based on the expansion cost of the transmission grid, the power generation cost of the thermal power unit, and the power abandonment cost of the photovoltaic power generation base;

[0123] An expansion planning model building module 330 is used to form a transmission network expansion planning model by combining the expansion constraints of the transmission network, the safe operation constraints of the transmission network, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power unit at the set node, and the photovoltaic output uncertainty set with the objective function;

[0124] The expansion parameter determination module 340 is used to solve the transmission network expansion planning model to obtain the transmission network expansion parameters.

[0125] The technical solution of the embodiment of the present invention constructs a photovoltaic output uncertainty set of the transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, and constructs an annual equivalent investment operation cost as an objective function based on the expansion cost of the transmission grid, the power generation cost of thermal power units and the power abandonment cost of photovoltaic power generation bases. Finally, the transmission grid expansion planning model is formed by the expansion constraints of the transmission grid, the safe operation constraints of the transmission grid, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power units at the set nodes, and the photovoltaic output uncertainty set, together with the objective function. Finally, the transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters, so as to realize the coordinated planning of photovoltaic grid-connected position and capacity and transmission grid expansion.

[0126] Optionally, the uncertain set determination module 310 is specifically configured to:

[0127] Based on the initial expected value of the maximum active power output of photovoltaic power, the growth rate of photovoltaic power output and the degree of uncertainty fluctuation of photovoltaic power output, the variable range of the maximum active power output of photovoltaic power is determined;

[0128] According to the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, the photovoltaic carrying capacity index of the transmission grid is constructed;

[0129] Based on the photovoltaic carrying capacity index and the variable interval, a photovoltaic output uncertainty set of the transmission grid is constructed.

[0130] Optionally, the transmission grid expansion planning device further includes:

[0131] The first constraint construction module is used to form the expansion constraint of the transmission network frame by the investment cost constraint of the transmission line, the number of lines in each transmission corridor, the number of grid connection points of the photovoltaic power generation base, and the number of new lines connecting the photovoltaic power generation base;

[0132] A second constraint building module is used to form the safe operation constraints of the transmission network by the operation flow constraints of the transmission corridor, the voltage amplitude and phase angle constraints, the reactive load power constraints at the set nodes, and the operation constraints of the thermal power units;

[0133] The third constraint construction module is used to form the operation constraint of the photovoltaic power generation base by the active power output constraint of the optical service power generation base and the reactive power output constraint of the optical service power generation base.

[0134] Optionally, the extended parameter determination module 340 includes:

[0135] A model linearization unit, used for converting the transmission grid expansion planning model from a double-layer mixed integer nonlinear form to a double-layer mixed integer linear form;

[0136] A feasible domain reduction unit is used to reduce the feasible domain of the converted transmission grid expansion planning model according to a preset maximum distance between the node where the photovoltaic power generation base is located and the photovoltaic grid-connected node;

[0137] The expansion parameter determination unit is used to solve the transmission network expansion planning model after the feasible domain is reduced to obtain the transmission network expansion parameters.

[0138] Optional, model linearization unit, specifically used for:

[0139] By introducing variables, the uncertainty set of photovoltaic output of the transmission grid contained in the transmission grid expansion planning model is converted from nonlinear form to linear form;

[0140] By introducing intermediate variables, the nonlinear terms in the transmission network safe operation constraints contained in the transmission network expansion planning model are converted into linear terms.

[0141] Optionally, an extended parameter determination unit is specifically used to:

[0142] The Karush-Kuhn-Tucker condition is used to convert the inner layer of the transmission network expansion planning model after the feasible domain is reduced into an inner layer constraint, so that the transmission network expansion planning model after the feasible domain is reduced is converted from a double-layer mixed integer linear form to a single-layer mixed integer linear form.

[0143] A single-layer mixed integer linear form transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters.

[0144] Optionally, the transmission grid expansion parameters include at least one of the growth rate of photovoltaic output, the degree of uncertainty fluctuation of photovoltaic output, photovoltaic grid connection points, photovoltaic grid connection capacity and transmission grid line expansion parameters.

[0145] The transmission network expansion planning device provided in the embodiment of the present invention can execute the transmission network expansion planning method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.

[0146] In the technical solution of the present invention, the collection, storage, use, processing, transmission, provision and disclosure of user personal information involved are in compliance with the provisions of relevant laws and regulations and do not violate public order and good morals.

[0147] Embodiment 4

[0148] According to an embodiment of the present invention, the present invention also provides an electronic device, a readable storage medium and a computer program product.

[0149] Figure 4A schematic diagram of the structure of an electronic device 10 that can be used to implement an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, applicators, blade applicators, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.

[0150] like Figure 4 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.

[0151] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0152] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as a transmission grid expansion planning method.

[0153] In some embodiments, the transmission grid expansion planning method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the transmission grid expansion planning method described above may be performed. Alternatively, in other embodiments, the processor 11 may be configured to execute the transmission grid expansion planning method in any other appropriate manner (e.g., by means of firmware).

[0154] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0155] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or application.

[0156] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0157] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).

[0158] The systems and techniques described herein may be implemented in a computing system that includes a backend component (e.g., as a data applier), or a computing system that includes a middleware component (e.g., an application applier), or a computing system that includes a frontend component (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with an implementation of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.

[0159] A computing system may include a client and an application server. The client and the application server are generally remote from each other and usually interact through a communication network. The relationship between the client and the application server is generated by computer programs running on corresponding computers and having a client-application server relationship with each other. The application server may be a cloud application server, also known as a cloud computing application server or a cloud host, which is a host product in a cloud computing application system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS applications.

[0160] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.

[0161] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A transmission network expansion planning method, characterized in that: include: Based on the growth rate of photovoltaic output and the uncertainty fluctuation degree of photovoltaic output, the photovoltaic output uncertainty set of the transmission grid is constructed; Based on the expansion cost of the transmission grid, the power generation cost of thermal power units, and the power abandonment cost of photovoltaic power generation bases, the annual equivalent investment operation cost is constructed as the objective function; The transmission network expansion planning model is composed of the transmission network expansion constraints, the transmission network safety operation constraints, the photovoltaic power generation base operation constraints, the constraints between the power generation cost and the active power of the thermal power unit at the set node, and the photovoltaic output uncertainty set, together with the objective function. Solve the transmission grid expansion planning model to obtain transmission grid expansion parameters.

2. The method according to claim 1, characterized in that Based on the growth rate of photovoltaic output and the uncertainty fluctuation degree of photovoltaic output, the photovoltaic output uncertainty set of the transmission grid is constructed, including: Based on the initial expected value of the maximum active power output of photovoltaic power, the growth rate of photovoltaic power output and the degree of uncertainty fluctuation of photovoltaic power output, the variable range of the maximum active power output of photovoltaic power is determined; According to the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output, the photovoltaic carrying capacity index of the transmission grid is constructed; Based on the photovoltaic carrying capacity index and the variable interval, a photovoltaic output uncertainty set of the transmission grid is constructed.

3. The method according to claim 1, characterized in that Before the transmission network expansion planning model is formed by the transmission network expansion constraint, the transmission network safe operation constraint, the photovoltaic power generation base operation constraint, the power generation cost and active power constraint of the thermal power unit at the set node and the photovoltaic output uncertainty set, together with the objective function, the following is also included: The expansion constraint of the transmission grid is constituted by the investment cost constraint of the transmission line, the number of lines in each transmission corridor, the number of grid connection points of the photovoltaic power generation base, and the number of new lines connecting the photovoltaic power generation base. The transmission network safety operation constraints are formed by the operation flow constraints of the transmission corridor, the voltage amplitude and phase angle constraints, the reactive load power constraints at the set nodes, and the operation constraints of the thermal power units; The operation constraints of the photovoltaic power generation base are composed of the active power output constraints of the optical service power generation base and the reactive power output constraints of the optical service power generation base.

4. The method according to claim 1, characterized in that: Solving the transmission grid expansion planning model to obtain transmission grid expansion parameters includes: The transmission grid expansion planning model is converted from a double-layer mixed integer nonlinear form to a double-layer mixed integer linear form; According to the preset maximum distance between the node where the photovoltaic power generation base is located and the photovoltaic grid-connected node, the feasible domain of the converted transmission grid expansion planning model is reduced; Solve the transmission network expansion planning model after reducing the feasible region to obtain the transmission network expansion parameters.

5. The method according to claim 4, characterized in that The transmission grid expansion planning model is converted from a two-layer mixed integer nonlinear form to a two-layer mixed integer linear form, including: By introducing variables, the uncertainty set of photovoltaic output of the transmission grid contained in the transmission grid expansion planning model is converted from nonlinear form to linear form; By introducing intermediate variables, the nonlinear terms in the transmission network safe operation constraints contained in the transmission network expansion planning model are converted into linear terms.

6. The method according to claim 4, characterized in that Solving the transmission network expansion planning model after reducing the feasible region, and obtaining the transmission network expansion parameters, including: The Karush-Kuhn-Tucker condition is used to convert the inner layer of the transmission network expansion planning model after the feasible domain is reduced into an inner layer constraint, so that the transmission network expansion planning model after the feasible domain is reduced is converted from a double-layer mixed integer linear form to a single-layer mixed integer linear form. A single-layer mixed integer linear form transmission grid expansion planning model is solved to obtain the transmission grid expansion parameters.

7. The method according to claim 1, characterized in that The transmission grid expansion parameters include at least one of the growth rate of photovoltaic output, the degree of uncertainty fluctuation of photovoltaic output, photovoltaic grid connection points, photovoltaic grid connection capacity and transmission grid line expansion parameters.

8. A transmission network expansion planning device, characterized in that: include: An uncertainty set determination module is used to construct a photovoltaic output uncertainty set of a transmission grid based on the growth rate of photovoltaic output and the degree of uncertainty fluctuation of photovoltaic output; An objective function construction module is used to construct the annual equivalent investment operation cost as the objective function based on the expansion cost of the transmission grid, the power generation cost of thermal power units, and the power abandonment cost of photovoltaic power generation bases; An expansion planning model building module is used to form a transmission network expansion planning model by combining the expansion constraints of the transmission network, the safe operation constraints of the transmission network, the operation constraints of the photovoltaic power generation base, the constraints between the power generation cost and the active power of the thermal power unit at the set node, and the photovoltaic output uncertainty set with the objective function; The expansion parameter determination module is used to solve the transmission network expansion planning model to obtain the transmission network expansion parameters.

9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the transmission network expansion planning method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the transmission network expansion planning method according to any one of claims 1 to 7 when executed.