Multi-time-scale electric power and electric quantity operation planning method and device, medium and product
Through the multi-time power operation planning method, taking into account extreme weather factors, a power scheduling model was established, which solved the problem of weak power supply guarantee of the power system after the new energy grid was connected to the grid, and improved the stability of the power system and the power supply decision-making ability.
Patent Information
- Application Number
- CN202410944270.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-08
AI Technical Summary
The high proportion of new energy grid connection brings problems of weak power supply guarantee and insufficient power supply reliability to the operation of the power system, especially in extreme weather, which has led to the threat of safe and stable power supply.
By using multi-time scale power operation planning method, short-term and long-term power scheduling operation planning model is established by obtaining the output data of new energy units, and using CPLEX planning solver to solve it, obtaining the power scheduling operation arrangement plan under different time scales, considering Extreme weather factors, extract the intraday new energy output and load sequences of typical days, use the K-means algorithm for clustering, and establish a multi-time scale power operation planning decision model.
It has achieved a high proportion of power generation planning and arrangements for new energy power systems in extreme weather, improved the power supply decision-making ability, provided guidance on power balance in new power systems, and enhanced the power supply reliability and stability of the power system.
Smart Images

Figure CN118920600A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power system dispatching automation, and in particular to a multi-time scale power and electricity operation planning method, device, medium and product. Background Art
[0002] At present, carbon emissions from the power industry account for more than 40% of China's total. To achieve the goal, it is necessary to actively promote the construction of a new power system based on clean energy such as wind power and photovoltaics on the basis of strengthening the clean and efficient use of traditional coal-fired power generation. However, the high proportion of new energy grid connection has brought considerable challenges to the operation of the power system: from the perspective of short-term power balance, the output of new energy units is affected by various factors such as weather and shows greater volatility and randomness, and the power system may face the risk of weak power supply security and insufficient power supply reliability; from the perspective of long-term power balance, the output of new energy shows strong seasonal characteristics, and the power supply characteristics may be significantly mismatched with the load demand, and the long-term power supply faces challenges; in recent years, with the intensification of global warming, ocean current changes, and air pressure changes, extreme weather has become more frequent, and the prediction of new energy output has become more difficult, and the safe and stable supply of electricity is under great threat. In the future, the proportion of new energy in the power system will gradually increase. On the whole, the problem of insufficient power supply will become increasingly prominent. Therefore, it is necessary to study a set of multi-time scale power and electricity operation planning decision-making technologies considering extreme weather to improve the decision-making ability of power supply under extreme weather factors. Summary of the invention
[0003] The purpose of this application is to provide a multi-time scale electric power operation planning method, device, medium and product, which can realize the planning and arrangement of power generation of high proportion of new energy power system under extreme weather factors.
[0004] To achieve the above objectives, this application provides the following solutions:
[0005] In a first aspect, the present application provides a multi-time scale power and electricity operation planning method, comprising:
[0006] Obtain output data of new energy units;
[0007] Based on the output data of the new energy units, the daily new energy output and load sequence of the corresponding typical day is obtained; the typical day includes: quarterly typical day and extreme weather typical day, and the extreme weather typical day includes: low output typical day and anti-peak typical day;
[0008] Based on all the intra-day renewable energy outputs and the load sequence, a short-term power dispatching operation planning model is established with hourly granularity; the short-term power dispatching operation planning model includes: a short-term power dispatching operation planning cost function and short-term power dispatching operation planning constraints;
[0009] Based on all the daily renewable energy outputs and the load sequence, a long-term power dispatching operation planning model is established with a monthly granularity; the long-term power dispatching operation planning model includes: a long-term power dispatching operation planning cost function and a long-term power dispatching operation planning constraint condition;
[0010] Based on the short-term power dispatching operation planning model and the long-term power dispatching operation planning model, a multi-time scale power quantity operation planning decision model is established;
[0011] The CPLEX planning solver is used to solve the multi-time scale power and electricity operation planning decision model to obtain the power and electricity dispatching operation arrangement plans under different time scales.
[0012] Optionally, based on the output data of the new energy units, the daily new energy output and load sequence of a typical day is obtained, including:
[0013] Based on the output data of new energy units, the K-means algorithm is used to calculate the daily new energy output and load series of typical days in each quarter with season as the distinction standard;
[0014] Based on the output data of new energy units, the daily new energy output and load sequence of typical extreme weather days are extracted; the extraction process of the daily new energy output and load sequence of typical low output days includes:
[0015] Determine the intraday new energy output and load sequence on which the intraday new energy output is lower than the first preset multiple of the rated output level as the intraday new energy output and load sequence on the low-output typical day;
[0016] The process of extracting the intraday renewable energy output and load sequence on a typical day of anti-peak load regulation includes:
[0017] The daily new energy output and load sequence in which the output of new energy during the peak load period is lower than the second preset multiple of the daily output level is determined as the daily new energy output and load sequence of the typical anti-peak regulation day.
[0018] Optionally, the short-term power dispatch operation planning cost function includes:
[0019]
[0020]
[0021] Among them, C1 is the short-term power dispatching operation planning cost; T is the short-term power dispatching operation planning cycle; C o,t is the operating cost at time t; C DG,t is the cost of the new energy unit at time t; C load,tis the load cost at time t; N s is the scene type; p n is the probability of the nth scenario occurring; C G,t is the operating cost of the thermal power unit; C N,t is the operating cost of the nuclear power unit; C erss,t is the operating cost of the energy storage power station; N G is the number of thermal power units; and are the power generation cost coefficients of the i1th thermal power unit; is the power generation capacity of the i1th thermal power unit at time t under the nth scenario; is the cost coefficient of the i1th thermal power unit; is the start / stop status of the i1th thermal power unit at time t-1; is the start / stop status of the i1th thermal power unit at time t; N N is the number of nuclear power units; is the power generation capacity of the i2th nuclear power unit at time t under the nth scenario; For Operating costs under For Maintenance costs under is the cost coefficient of the i2th nuclear power unit; is the start / stop status of the i2th nuclear power unit at time t-1; is the start / stop status of the i2th nuclear power unit at time t; N erss is the number of energy storage power stations, which include electrochemical energy storage power stations and pumped storage power stations; is the power of the i3th energy storage power station at time t in the nth scenario; For Operating costs under N bi For Maintenance cost under bt is the depreciation rate of the electrochemical energy storage power station; is the start / stop status of the i4th electrochemical energy storage power station at time t in the nth scenario; N DG is the number of new energy units; is the power generation capacity of the i5th renewable energy unit at time t in the nth scenario; For Operating costs under is the cost coefficient of the i5th new energy unit; is the start / stop status of the i5th new energy unit at time t-1 in the nth scenario; k c,DG The penalty cost coefficient for curtailing wind and solar power; is the predicted power of the new energy unit at time t in the nth scenario; P DG,t,n is the power generation capacity of the new energy unit at time t in the nth scenario; k c,load is the load abandonment cost coefficient; P loss,t,n is the load shedding amount at time t in the nth scenario.
[0022] Optionally, the short-term power dispatch operation planning constraints include: power balance constraints, short-term power balance constraints, unit output and ramp constraints, new energy output constraints, pumped storage constraints, electrochemical energy storage constraints, system spare capacity constraints and regulation limit constraints;
[0023] The power balance constraints include:
[0024]
[0025] Among them, P load,t,n is the basic load not affected by electricity price at time t in the nth scenario; ΔP loss,t,n is the load shedding amount at time t in the nth scenario;
[0026] The short-term power balance constraints include:
[0027]
[0028] Where N is the number of units; P i,t is the power generation of the i-th unit at time t; Δt is the time period length; E i is the target power value of the i-th unit in the scheduling period;
[0029] The unit output and climbing constraints include:
[0030]
[0031] Among them, u ji,t is the start / stop status of the i-th unit of the j-th type at time t; is the minimum power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; P ji,t,n is the power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; is the maximum power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; P ji,t-1,n is the power generation capacity of the i-th unit of the j-th type at time t-1 in the n-th scenario; R ji is the ramp rate of the i-th unit of the j-th type; u ji,t-1 is the start / stop status of the i-th unit of the j-th type at time t-1;
[0032] The new energy output constraints include:
[0033]
[0034] The pumped storage constraints include:
[0035]
[0036] in, is the discharge power of the pumped storage power station at time t in the nth scenario; is the maximum discharge power of the pumped storage power station at time t in the nth scenario; is the charging power of the pumped storage power station at time t in the nth scenario; is the maximum charging power of the pumped storage power station at time t in the nth scenario; V is the minimum water storage capacity of the pumped storage power station at time t in the nth scenario; water,t,n is the water storage capacity of the pumped storage power station at time t under the nth scenario; is the maximum water storage capacity of the pumped storage power station at time t under the nth scenario; is the discharge power of the pumped storage power station at time t-1 in the nth scenario; ΔP R is the ramp rate of the pumped storage power station; is the charging power of the pumped storage power station at time t-1 in the nth scenario; V water,t-1,n is the water storage capacity of the pumped storage power station at time t-1 in the nth scenario; CH cha The conversion factor between electricity and water consumption when charging a pumped storage power station; is the charging efficiency of the pumped storage power station; CH dis It is the conversion coefficient between the electricity consumption and water consumption when the pumped storage power station discharges; The discharge efficiency of the pumped storage power station;
[0037] The electrochemical energy storage constraints include:
[0038]
[0039] in, is the discharge power of the electrochemical energy storage power station at time t in the nth scenario; is the rated discharge power of the inverter; is the charging power of the electrochemical energy storage power station at time t in the nth scenario; is the rated charging power of the inverter; SOC is the minimum state of charge of the electrochemical energy storage power station at time t in the nth scenario; t,n is the state of charge of the electrochemical energy storage power station at time t in the nth scenario; SOC is the maximum value of the state of charge of the electrochemical energy storage power station at time t in the nth scenario; t-1,n is the state of charge of the electrochemical energy storage power station at time t-1 in the nth scenario; The charging efficiency of the electrochemical energy storage power station; is the discharge efficiency of the electrochemical energy storage power station;
[0040] The system spare capacity constraints include:
[0041]
[0042] Where J is the number of unit types; P re N is the system positive spinning reserve; re Negative spinning reserve for the system;
[0043] The adjustment limit constraints include:
[0044]
[0045] Among them, P ji,t,bs is the base output of the i-th unit of the j-th type at time t; ψ i is the flexible adjustment capacity limit of the i-th unit; P erss,t,n P is the power generation power of the energy storage power station at time t in the nth scenario; erss,t,bs is the base output of the energy storage power station at time t; ψ erss This is due to the limited flexible adjustment capabilities of energy storage power stations.
[0046] Optionally, the long-term long-force scheduling operation planning cost function includes:
[0047]
[0048] Where, M is the total number of months, M = 12; is the unit electricity cost of the i1th thermal power unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i1th thermal power unit in the mth month under the long-term time scale; is the unit electricity cost of the i5th new energy unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i5th renewable energy unit in the mth month under the long-term time scale; is the unit electricity cost of the i2th nuclear power unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i2th nuclear power unit in the mth month under the long-term time scale; is the unit electricity cost of the i3th energy storage power station in the mth month under the long-term time scale; is the monthly electricity consumption of the i3th energy storage power station in the mth month under the long-term time scale; Closs,m is the unit electricity cost of load abandonment in month m; E loss,m is the monthly electricity consumption of abandoned load in the mth month.
[0049] Optionally, the long-term power dispatch operation planning constraints include: long-term power balance constraints, thermal power unit utilization hours constraints and new energy unit energy constraints;
[0050] The long-term power balance constraints include:
[0051]
[0052] Among them, L m is the monthly load power in month m;
[0053] The utilization hours constraints of the thermal power units include:
[0054]
[0055] in, is the lower limit of annual utilization hours of the i1th thermal power unit; is the installed capacity of the i1th thermal power unit; is the upper limit of the annual utilization hours of the i1th thermal power unit;
[0056] The energy constraints of the new energy units include:
[0057]
[0058] in, is the amount of power abandoned by the i5th renewable energy unit in the mth month under the long-term time scale; It is the predicted power of the i5th new energy unit in the mth month under the long-term time scale.
[0059] In a second aspect, the present application provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement any of the multi-time-scale power and electricity operation planning methods described above.
[0060] In a third aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the multi-time-scale electric power operation planning methods described above.
[0061] In a fourth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the multi-time-scale power and electricity operation planning method described in any one of the above items.
[0062] According to the specific embodiments provided in this application, this application discloses the following technical effects:
[0063] The present application discloses a multi-time scale electric power operation planning method, device, medium and product. The comprehensive decision-making takes into account the power generation plan arrangement of a high proportion of new energy power system under extreme weather factors, which has guiding significance for the electric power balance decision of the new power system. According to the above power system power plan arrangement, it can provide a reference basis for the establishment of a supply guarantee system for the new power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0065] Figure 1 A schematic diagram of a multi-time scale power and electricity operation planning method flow chart provided in an embodiment of the present application;
[0066] Figure 2 A schematic diagram of the decision-making process for multi-time-scale power operation planning considering extreme weather;
[0067] Figure 3 It is the clustering curve of four seasons load;
[0068] Figure 4 It is a clustering curve diagram of new energy output in four seasons;
[0069] Figure 5 This is the new energy output and load curve for a typical low-output day;
[0070] Figure 6 This is the new energy output and load curve for a typical day of anti-peak regulation;
[0071] Figure 7 This is a diagram of the planning decision results for a typical day in spring;
[0072] Figure 8 This is a diagram of the planning decision results for a typical day operation in summer;
[0073] Fig. 9 This is a diagram of the planning decision results for a typical day in autumn;
[0074] Fig.10 This is a diagram of the planning decision results for a typical winter day operation;
[0075] Fig.11 This is a diagram of the planning results for a typical low-output operation decision;
[0076] Fig.12 This is the result diagram of the decision-making planning of the typical day of anti-peak load regulation;
[0077] Fig.13 This is a diagram of the decision-making and planning results for long-term operations;
[0078] Fig.14 A schematic diagram of the structure of a computer device provided in one embodiment of the present application. DETAILED DESCRIPTION
[0079] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0080] The purpose of this application is to provide a multi-time scale power and electricity operation planning method, device, medium and product, aiming to realize the planning and arrangement of power generation of high proportion of new energy power system under extreme weather factors.
[0081] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0082] In an exemplary embodiment, Figure 1 and Figure 2 As shown, the multi-time scale power and electricity operation planning method in this embodiment includes:
[0083] Step 1: Obtain output data of new energy units.
[0084] Step 2: Based on the output data of the new energy units, obtain the daily new energy output and load sequence corresponding to the typical day.
[0085] Among them, typical days include: quarterly typical days and extreme weather typical days; extreme weather typical days include: low-output typical days and anti-peak typical days.
[0086] As an optional implementation, step 2 includes:
[0087] Step 21: Based on the output data of the new energy units and taking the season as the distinction standard, the K-means algorithm is used to calculate the daily new energy output and load series of typical days in each quarter.
[0088] Step 22: Based on the output data of the new energy units, extract the daily new energy output and load sequence of the typical extreme weather day; wherein, the process of extracting the daily new energy output and load sequence of the typical low output day includes:
[0089] The intraday new energy output and load sequence for which the intraday new energy output is lower than the first preset multiple of the rated output level is determined as the intraday new energy output and load sequence for the low-output typical day.
[0090] The process of extracting the intraday renewable energy output and load sequence on a typical day of anti-peak load regulation includes:
[0091] The daily new energy output and load sequence in which the output of new energy during the peak load period is lower than the second preset multiple of the daily output level is determined as the daily new energy output and load sequence of the typical anti-peak regulation day.
[0092] Specifically, when extreme weather occurs, when the output of a new energy day is lower than α (0≤α<1) times (i.e., the first preset multiple) of the rated output level, it can be defined as a new energy low output scenario, and the day can be defined as a low output typical day, that is:
[0093] E d <αE max .
[0094] Among them, E d Contribute to the new energy future; max It is the rated output level of new energy.
[0095] When extreme weather occurs, when the output of renewable energy during the peak load period is lower than β (0≤β<1) times (i.e., the second preset multiple) of the daily output level, it can be defined as a renewable energy anti-peak load scenario, and the day can be defined as a typical anti-peak load day, that is:
[0096]
[0097] in, is the output of renewable energy during the peak load period; t1~t2 is the peak load period; E t,d Contribute to the new energy sun at time t.
[0098] Step 3: Based on all daily renewable energy output and load sequences, establish a short-term power dispatching and operation planning model with hourly granularity.
[0099] Among them, the short-term power dispatching and operation planning model includes: short-term power dispatching and operation planning cost function and short-term power dispatching and operation planning constraint conditions.
[0100] Step 4: Based on all daily renewable energy output and load sequences, a long-term power dispatching and operation planning model is established with monthly granularity.
[0101] Among them, the long-term power dispatching and operation planning model includes: long-term power dispatching and operation planning cost function and long-term power dispatching and operation planning constraints.
[0102] Step 5: Based on the short-term power dispatching operation planning model and the long-term power dispatching operation planning model, a multi-time scale power quantity operation planning decision model is established.
[0103] Step 6: Use the CPLEX planning solver to solve the multi-time scale power and electricity operation planning decision model to obtain the power and electricity dispatching and operation arrangement plans under different time scales.
[0104] As an optional implementation, the short-term power dispatch operation planning cost function includes:
[0105]
[0106] Among them, C1 is the short-term power dispatching operation planning cost; T is the short-term power dispatching operation planning cycle; C o,t is the operating cost at time t; C DG,t is the cost of the new energy unit at time t; C load,t is the load cost at time t; N s is the scene type; p n is the probability of the nth scenario occurring; C G,t is the operating cost of the thermal power unit; C N,t is the operating cost of the nuclear power unit; C erss,t is the operating cost of the energy storage power station; N G is the number of thermal power units; and are the power generation cost coefficients of the i1th thermal power unit; is the power generation capacity of the i1th thermal power unit at time t under the nth scenario; is the cost coefficient of the i1th thermal power unit; is the start / stop status of the i1th thermal power unit at time t-1; is the start / stop status of the i1th thermal power unit at time t; N N is the number of nuclear power units; is the power generation capacity of the i2th nuclear power unit at time t under the nth scenario; For Operating costs under For Maintenance costs under is the cost coefficient of the i2th nuclear power unit; is the start / stop status of the i2th nuclear power unit at time t-1; is the start / stop status of the i2th nuclear power unit at time t; N erss is the number of energy storage power stations, which include electrochemical energy storage power stations and pumped storage power stations; is the power of the i3th energy storage power station at time t in the nth scenario; For Operating costs under N bi For Maintenance cost under bt is the depreciation rate of the electrochemical energy storage power station; is the start / stop status of the i4th electrochemical energy storage power station at time t in the nth scenario; N DG is the number of new energy units; is the power generation capacity of the i5th renewable energy unit at time t in the nth scenario; For Operating costs under is the cost coefficient of the i5th new energy unit; is the start / stop status of the i5th new energy unit at time t-1 in the nth scenario; k c,DG The penalty cost coefficient for curtailing wind and solar power; is the predicted power of the new energy unit at time t in the nth scenario; P DG,t,n is the power generation capacity of the new energy unit at time t in the nth scenario; k c,load is the load abandonment cost coefficient; P loss,t,n is the load shedding amount at time t in the nth scenario.
[0107] As an optional implementation method, the short-term power dispatching operation planning constraints include: power balance constraints, short-term electricity balance constraints, unit output and ramp constraints, new energy output constraints, pumped storage constraints, electrochemical energy storage constraints, system spare capacity constraints and regulation limit constraints.
[0108] Power balancing constraints include:
[0109]
[0110] Among them, P load,t,n is the basic load not affected by electricity price at time t in the nth scenario; ΔP loss,t,n is the load shedding amount at time t in the nth scenario.
[0111] Short-term power balance constraints include:
[0112]
[0113] Where N is the number of units; P i,t is the power generation of the i-th unit at time t; Δt is the time period length; E i is the target power value of the i-th unit in the scheduling period.
[0114] Unit output and climbing constraints include:
[0115]
[0116] Among them, u ji,t is the start / stop status of the i-th unit of the j-th type at time t; is the minimum power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; P ji,t,n is the power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; is the maximum power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; P ji,t-1,n is the power generation capacity of the i-th unit of the j-th type at time t-1 in the n-th scenario; R ji is the ramp rate of the i-th unit of the j-th type; u ji,t-1 It is the start / stop status of the i-th unit of the j-th type at time t-1.
[0117] New energy output constraints include:
[0118]
[0119] Pumped storage constraints include:
[0120]
[0121] in, is the discharge power of the pumped storage power station at time t in the nth scenario; is the maximum discharge power of the pumped storage power station at time t in the nth scenario; is the charging power of the pumped storage power station at time t in the nth scenario; is the maximum charging power of the pumped storage power station at time t in the nth scenario; V is the minimum water storage capacity of the pumped storage power station at time t in the nth scenario; water,t,n is the water storage capacity of the pumped storage power station at time t under the nth scenario; is the maximum water storage capacity of the pumped storage power station at time t under the nth scenario; is the discharge power of the pumped storage power station at time t-1 in the nth scenario; ΔP R is the ramp rate of the pumped storage power station; is the charging power of the pumped storage power station at time t-1 in the nth scenario; V water,t-1,n is the water storage capacity of the pumped storage power station at time t-1 in the nth scenario; CH cha The conversion factor between electricity and water consumption when charging a pumped storage power station; is the charging efficiency of the pumped storage power station; CH dis It is the conversion coefficient between the electricity consumption and water consumption when the pumped storage power station discharges; is the discharge efficiency of the pumped storage power station.
[0122] Electrochemical energy storage constraints include:
[0123]
[0124] in, is the discharge power of the electrochemical energy storage power station at time t in the nth scenario; is the rated discharge power of the inverter; is the charging power of the electrochemical energy storage power station at time t in the nth scenario; is the rated charging power of the inverter; SOC is the minimum state of charge of the electrochemical energy storage power station at time t in the nth scenario; t,n is the state of charge of the electrochemical energy storage power station at time t in the nth scenario; SOC is the maximum value of the state of charge of the electrochemical energy storage power station at time t in the nth scenario; t-1,n is the state of charge of the electrochemical energy storage power station at time t-1 in the nth scenario; The charging efficiency of the electrochemical energy storage power station; is the discharge efficiency of the electrochemical energy storage power station.
[0125] System spare capacity constraints include:
[0126]
[0127] Where J is the number of unit types; P re N is the system positive spinning reserve; re It is the negative spinning reserve of the system.
[0128] The adjustment limit constraints include:
[0129]
[0130] Among them, P ji,t,bs is the base output of the i-th unit of the j-th type at time t; ψ i is the flexible adjustment capacity limit of the i-th unit; P erss,t,n P is the power generation power of the energy storage power station at time t in the nth scenario; erss,t,bs is the base output of the energy storage power station at time t; ψ erss This is due to the limited flexible adjustment capabilities of energy storage power stations.
[0131] As an optional implementation, the long-term long-power dispatch operation planning cost function includes:
[0132]
[0133] Where, M is the total number of months, M = 12; is the unit electricity cost of the i1th thermal power unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i1th thermal power unit in the mth month under the long-term time scale; is the unit electricity cost of the i5th new energy unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i5th renewable energy unit in the mth month under the long-term time scale; is the unit electricity cost of the i2th nuclear power unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i2th nuclear power unit in the mth month under the long-term time scale; is the unit electricity cost of the i3th energy storage power station in the mth month under the long-term time scale; is the monthly electricity consumption of the i3th energy storage power station in the mth month under the long-term time scale; C loss,m is the unit electricity cost of load abandonment in month m; E loss,m is the monthly electricity consumption of abandoned load in the mth month.
[0134] As an optional implementation method, the long-term power dispatching operation planning constraints include: long-term power balance constraints, thermal power unit utilization hours constraints and new energy unit energy constraints.
[0135] Long-term power balance constraints include:
[0136]
[0137] Among them, L m is the monthly load power in month m.
[0138] Constraints on the utilization hours of thermal power units include:
[0139]
[0140] in, is the lower limit of annual utilization hours of the i1th thermal power unit; is the installed capacity of the i1th thermal power unit; It is the upper limit of annual utilization hours of the i1th thermal power unit.
[0141] Energy constraints for new energy units include:
[0142]
[0143] in, is the amount of power abandoned by the i5th renewable energy unit in the mth month under the long-term time scale; It is the predicted power of the i5th new energy unit in the mth month under the long-term time scale. Specific embodiments
[0145] The specific embodiment uses the actual operation data of a provincial power grid. First, the output of new energy units is divided into two subcategories: seasonal typical days and extreme weather typical days. The seasonal typical days are obtained by clustering algorithm K-means, and the first preset multiple and the second preset multiple of the extreme weather typical day are extracted. The results are as follows: Figure 3-Figure 6 Then, the multi-time scale power and electricity operation planning decision model is solved to obtain the power system operation planning decision under different time scales. The results are shown in Figure 7-Figure 13 shown.
[0146] From the results of short-term power operation planning and decision-making, it can be seen that in the average situation represented by the typical days of the season, the summer load is significantly higher than that in other seasons, so there is a phenomenon of load abandonment, reflecting that the power supply pressure brought by the high temperature in summer is relatively large, and the extreme situations represented by the typical days of anti-peak regulation and low output have all experienced load abandonment. It is worth noting that the load abandonment is concentrated in the afternoon to midnight period. From the results of long-term power operation planning and decision-making, it can be seen that the load abandonment phenomenon is very obvious in this time scale, and the proportion of load is higher than 20%. In addition, based on the simulation results of the two time scales, in the case of load abandonment, the output of pumped storage and electrochemical energy storage almost reaches the limit value throughout the entire period, which shows the strong adjustment effect of energy storage power sources on the power system.
[0147] In an exemplary embodiment, a computer device is provided, including: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement a multi-time-scale power and electricity operation planning method.
[0148] In an exemplary embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, a multi-time-scale power and electricity operation planning method is implemented.
[0149] In an exemplary embodiment, a computer program product is provided, including a computer program, which implements a multi-time-scale power and electricity operation planning method when executed by a processor.
[0150] In an exemplary embodiment, a computer device is provided. The computer device may be a server or a terminal. The internal structure diagram thereof may be as follows: Fig.14As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a multi-time scale power and electricity operation planning method is implemented.
[0151] Those skilled in the art will understand that Fig.14 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0152] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0153] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0154] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0155] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0156] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A multi-time scale power and electricity operation planning method, characterized in that: The method comprises: Obtain output data of new energy units; Based on the output data of the new energy units, the daily new energy output and load sequence of the corresponding typical day is obtained; the typical day includes: quarterly typical day and extreme weather typical day, and the extreme weather typical day includes: low output typical day and anti-peak typical day; Based on all the intra-day renewable energy outputs and the load sequence, a short-term power dispatching operation planning model is established with hourly granularity; the short-term power dispatching operation planning model includes: a short-term power dispatching operation planning cost function and short-term power dispatching operation planning constraints; Based on all the daily renewable energy outputs and the load sequence, a long-term power dispatching operation planning model is established with a monthly granularity; the long-term power dispatching operation planning model includes: a long-term power dispatching operation planning cost function and a long-term power dispatching operation planning constraint condition; Based on the short-term power dispatching operation planning model and the long-term power dispatching operation planning model, a multi-time scale power quantity operation planning decision model is established; The CPLEX planning solver is used to solve the multi-time scale power and electricity operation planning decision model to obtain the power and electricity dispatching operation arrangement plans under different time scales.
2. The multi-time scale power and electricity operation planning method according to claim 1 is characterized in that: Based on the output data of new energy units, the daily new energy output and load sequence of typical days are obtained, including: Based on the output data of new energy units, the K-means algorithm is used to calculate the daily new energy output and load series of typical days in each quarter with season as the distinction standard; Based on the output data of new energy units, the daily new energy output and load sequence of typical extreme weather days are extracted; the extraction process of the daily new energy output and load sequence of typical low output days includes: Determine the intraday new energy output and load sequence on which the intraday new energy output is lower than the first preset multiple of the rated output level as the intraday new energy output and load sequence on the low-output typical day; The process of extracting the intraday renewable energy output and load sequence on a typical day of anti-peak load regulation includes: The daily new energy output and load sequence in which the output of new energy during the peak load period is lower than the second preset multiple of the daily output level is determined as the daily new energy output and load sequence of the typical anti-peak regulation day.
3. The multi-time scale power and electricity operation planning method according to claim 1 is characterized in that: The short-term power dispatch operation planning cost function includes: Among them, C1 is the short-term power dispatching operation planning cost; T is the short-term power dispatching operation planning cycle; C o,t is the operating cost at time t; C DG,t is the cost of the new energy unit at time t; C load,t is the load cost at time t; N s is the scene type; p n is the probability of the nth scenario occurring; C G,t is the operating cost of the thermal power unit; C N,t is the operating cost of the nuclear power unit; C erss,t is the operating cost of the energy storage power station; N G is the number of thermal power units; and are the power generation cost coefficients of the i1th thermal power unit; is the power generation capacity of the i1th thermal power unit at time t under the nth scenario; is the cost coefficient of the i1th thermal power unit; is the start / stop status of the i1th thermal power unit at time t-1; is the start / stop status of the i1th thermal power unit at time t; N N is the number of nuclear power units; is the power generation capacity of the i2th nuclear power unit at time t under the nth scenario; For Operating costs under For Maintenance costs under is the cost coefficient of the i2th nuclear power unit; is the start / stop status of the i2th nuclear power unit at time t-1; is the start / stop status of the i2th nuclear power unit at time t; N erss is the number of energy storage power stations, which include electrochemical energy storage power stations and pumped storage power stations; is the power of the i3th energy storage power station at time t in the nth scenario; For Operating costs under N bi For Maintenance cost under bt is the depreciation rate of the electrochemical energy storage power station; is the start / stop status of the i4th electrochemical energy storage power station at time t in the nth scenario; N DG is the number of new energy units; is the power generation capacity of the i5th renewable energy unit at time t in the nth scenario; For Operating costs under is the cost coefficient of the i5th new energy unit; is the start / stop status of the i5th new energy unit at time t-1 in the nth scenario; k c,DG The penalty cost coefficient for curtailing wind and solar power; is the predicted power of the new energy unit at time t in the nth scenario; P DG,t,n is the power generation capacity of the new energy unit at time t in the nth scenario; k c,load is the load abandonment cost coefficient; P loss,t,n is the load shedding amount at time t in the nth scenario.
4. The multi-time scale power and electricity operation planning method according to claim 3 is characterized in that: The short-term power dispatch operation planning constraints include: power balance constraints, short-term power balance constraints, unit output and ramp constraints, new energy output constraints, pumped storage constraints, electrochemical energy storage constraints, system spare capacity constraints and regulation limit constraints; The power balance constraints include: Among them, P load,t,n is the basic load not affected by electricity price at time t in the nth scenario; ΔP loss,t,n is the load shedding amount at time t in the nth scenario; The short-term power balance constraints include: Where N is the number of units; P i,t is the power generation of the i-th unit at time t; Δt is the time period length; E i is the target power value of the i-th unit in the scheduling period; The unit output and climbing constraints include: Among them, u ji,t is the start / stop status of the i-th unit of the j-th type at time t; is the minimum power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; P ji,t,n is the power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; is the maximum power generation capacity of the i-th unit of the j-th type at time t in the n-th scenario; P ji,t-1,n is the power generation capacity of the i-th unit of the j-th type at time t-1 in the n-th scenario; R ji is the ramp rate of the i-th unit of the j-th type; u ji,t-1 is the start / stop status of the i-th unit of the j-th type at time t-1; The new energy output constraints include: The pumped storage constraints include: in, is the discharge power of the pumped storage power station at time t in the nth scenario; is the maximum discharge power of the pumped storage power station at time t in the nth scenario; is the charging power of the pumped storage power station at time t in the nth scenario; is the maximum charging power of the pumped storage power station at time t in the nth scenario; V is the minimum water storage capacity of the pumped storage power station at time t in the nth scenario; water,t,n is the water storage capacity of the pumped storage power station at time t under the nth scenario; is the maximum water storage capacity of the pumped storage power station at time t under the nth scenario; is the discharge power of the pumped storage power station at time t-1 in the nth scenario; ΔP R is the ramp rate of the pumped storage power station; is the charging power of the pumped storage power station at time t-1 in the nth scenario; V water,t-1,n is the water storage capacity of the pumped storage power station at time t-1 in the nth scenario; CH cha The conversion factor between electricity and water consumption when charging a pumped storage power station; is the charging efficiency of the pumped storage power station; CH dis It is the conversion coefficient between the electricity consumption and water consumption when the pumped storage power station discharges; The discharge efficiency of the pumped storage power station; The electrochemical energy storage constraints include: in, is the discharge power of the electrochemical energy storage power station at time t in the nth scenario; is the rated discharge power of the inverter; is the charging power of the electrochemical energy storage power station at time t in the nth scenario; is the rated charging power of the inverter; SOC is the minimum state of charge of the electrochemical energy storage power station at time t in the nth scenario; t,n is the state of charge of the electrochemical energy storage power station at time t in the nth scenario; SOC is the maximum value of the state of charge of the electrochemical energy storage power station at time t in the nth scenario; t-1,n is the state of charge of the electrochemical energy storage power station at time t-1 in the nth scenario; The charging efficiency of the electrochemical energy storage power station; is the discharge efficiency of the electrochemical energy storage power station; The system spare capacity constraints include: Where J is the number of unit types; P re N is the system positive spinning reserve; re Negative spinning reserve for the system; The adjustment restriction constraints include: Among them, P ji,t,bs is the base output of the i-th unit of the j-th type at time t; ψ i is the flexible adjustment capacity limit of the i-th unit; P erss,t,n P is the power generation power of the energy storage power station at time t in the nth scenario; erss,t,bs is the base output of the energy storage power station at time t; ψ erss This is due to the limited flexible adjustment capabilities of energy storage power stations.
5. The multi-time scale power and electricity operation planning method according to claim 4 is characterized in that: The long-term long-power dispatch operation planning cost function includes: Where, M is the total number of months, M = 12; is the unit electricity cost of the i1th thermal power unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i1th thermal power unit in the mth month under the long-term time scale; is the unit electricity cost of the i5th new energy unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i5th renewable energy unit in the mth month under the long-term time scale; is the unit electricity cost of the i2th nuclear power unit in the mth month under the long-term time scale; is the monthly electricity consumption of the i2th nuclear power unit in the mth month under the long-term time scale; is the unit electricity cost of the i3th energy storage power station in the mth month under the long-term time scale; is the monthly electricity consumption of the i3th energy storage power station in the mth month under the long-term time scale; C loss,m is the unit electricity cost of load abandonment in month m; E loss,m is the monthly electricity consumption of abandoned load in the mth month.
6. The multi-time scale power and electricity operation planning method according to claim 5 is characterized in that: The long-term power dispatching operation planning constraints include: long-term power balance constraints, thermal power unit utilization hours constraints and new energy unit energy constraints; The long-term power balance constraints include: Among them, L m is the monthly load power in month m; The utilization hours constraints of the thermal power units include: in, is the lower limit of annual utilization hours of the i1th thermal power unit; is the installed capacity of the i1th thermal power unit; is the upper limit of the annual utilization hours of the i1th thermal power unit; The energy constraints of the new energy units include: in, is the amount of power abandoned by the i5th renewable energy unit in the mth month under the long-term time scale; It is the predicted power of the i5th new energy unit in the mth month under the long-term time scale.
7. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the multi-time-scale power and electricity operation planning method as described in any one of claims 1-6.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the multi-time-scale electric power operation planning method described in any one of claims 1-6 is implemented.
9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the multi-time-scale electric power operation planning method described in any one of claims 1-6 is implemented.
Citation Information
Cited By
Energy system low-carbon transformation path planning method and device and computer equipment
CN119578679A
Novel power system multi-source multi-time scale scheduling method, device and medium
CN119864879A
A novel multi-source multi-time scale scheduling method for power systems, device and medium
CN119864879B