Construction method for large concentric different-diameter equipment parts
By dividing super-large concentric reducer equipment components into straight sections and variable diameter sections, and forming teams to weld on the factory, the problem of production and transportation difficulties on the construction site is solved, and an efficient and safe construction process is achieved, reducing the Cost and improve equipment quality.
Patent Information
- Application Number
- CN202411327163.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-12
AI Technical Summary
The diameter-reducing section of super-large concentric reducer equipment is difficult to produce and install at the construction site, transportation and road planning are difficult to supply the finished product, and uncertain supply cycle affects the construction cycle.
The equipment components are divided into straight sections and variable diameter sections in the axial direction, and divided into multiple splicing units in the circumference, and factory prefabricated and on-site team welding are carried out, and a modular construction method is adopted to reduce transportation and welding costs.
It improves construction efficiency and safety, shortens construction periods, reduces machinery and labor costs, ensures equipment quality and safety, avoids large-scale transportation approval and road coordination issues, and significantly saves transportation costs.
Smart Images

Figure CN118926760A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of chemical industry, and in particular to a construction method for large-scale concentric equipment components with different diameters. Background Art
[0002] Currently, reducers are supplied as finished products. Large-sized pipe fittings are mostly made on site. However, there is no reference method for making concentric reducer transition sections with a diameter of 11 meters and a thickness of 32 mm on site. When the suppliers supply the finished products, transportation methods and road planning are extremely difficult. Therefore, a construction method is urgently needed to solve the problems faced in the production and installation of reducer sections of super-large concentric reducer equipment. Summary of the invention
[0003] In order to solve the technical problems that the reducing section of super-large concentric reducing equipment cannot be manufactured and installed on site, the impact on road traffic caused by the over-limit transportation of the reducing section of super-large concentric reducing equipment when it is delivered by the supplier as a finished product, and the impact on the construction period caused by the uncertain supply cycle, the present invention proposes a construction method for large concentric different-diameter equipment components.
[0004] The technical solution of the present invention is achieved in this way: A construction method for large-scale concentric and unequal-diameter equipment components comprises the following steps: S1. Module division: Use drawings to divide the equipment components into two parts in the axial direction: a straight section and a reduced diameter section, and divide the straight section and the reduced diameter section into multiple splicing units at equal intervals in the circumferential direction; S2, factory prefabrication: select the cut-to-size plate according to the size of the splicing unit and press it into shape; S3. Ground teaming: Transport the splicing units of the prefabricated equipment components to the construction site, and assemble the splicing units in the variable diameter section and the straight section and weld the vertical welds at the construction site.
[0005] S4. Hoisting and teaming: Hoist the straight section after teaming welding to the top of the reducing section and then team it up, and perform circular weld welding.
[0006] Furthermore, in step S1, the straight section is divided into 3 splicing units, and the variable diameter section is divided into 16 splicing units.
[0007] Furthermore, the factory prefabrication of step S2 includes the following steps: (1) Material inspection: Check the plate size corresponding to each splicing unit; (2) Blanking of embryonic plates: Blank the corresponding embryonic plates in sequence according to the arrangement order of the splicing units in the straight section and the variable diameter section; (3) Pressing and forming: The blanks corresponding to each splicing unit are sent into the plate rolling machine for arc shaping.
[0008] (4) Numbering: The pressed and formed splicing units in the straight section and the variable diameter section are pre-assembled separately. After the assembly is completed, each splicing unit is marked with a position number, and a team mark is made on the welds of two adjacent splicing units.
[0009] Furthermore, in the step (2), after the blank is cut, the blanks corresponding to the splicing units in the straight section and the reduced diameter section are spot welded on the mold respectively, and the overall unfolded surface dimensions of the straight section and the reduced diameter section are checked, and then the weld groove is processed into a V-shaped groove, and then the spot welding part is ground and polished.
[0010] Furthermore, in step S3, before the straight sections and the diameter-changing sections are grouped separately, a grouping platform is first set up, and a positioning template is made of steel plates on the platform.
[0011] Furthermore, in step S3, the straight section and the variable diameter section are grouped in the following method: first, the first splicing unit and the second splicing unit are grouped at the same time, and the grouping marks of the weld positions of the first splicing unit and the second splicing unit are kept overlapping. After the grouping is completed, the on-site steel sections are used for internal support, and then the remaining splicing units are grouped in turn, wherein a group of internal support is added when three splicing units are grouped together.
[0012] Furthermore, in step S3, after the straight section and the diameter-reducing section are assembled, a dimension check is first performed, and after the dimension check is correct, vertical weld welding is performed.
[0013] Furthermore, in step S3, when welding the vertical weld, a symmetrical welding and layered welding method is adopted.
[0014] The present invention has the following beneficial effects: 1. Construction method of large concentric equipment parts with different diameters The overall construction process is basically completed on the team platform, which is efficient and safe.
[0015] 2. The construction method of large concentric and different diameter equipment components adopts the construction method of prefabricated groups in units, which greatly shortens the overall construction period.
[0016] 3. The construction method of large concentric and unequal diameter equipment components adopts on-site unit welding, which eliminates the transportation and secondary transportation costs of large components. Since they are transported in small units, small unit components can be prefabricated in the processing plant, which greatly reduces the machinery and labor costs and greatly improves the mechanization degree of equipment component production.
[0017] 4. The construction method of large concentric and different diameter equipment parts is to weld them directly on the teaming platform, which greatly ensures the overall quality and safety of the equipment.
[0018] 5. The construction method of large concentric and unequal diameter equipment components solves the problem of large-scale transportation and the inability to manufacture large components, and eliminates the approval process and road and bridge reinforcement procedures during the transportation of large components, greatly reducing construction costs and transportation road coordination, saving large-scale transportation costs, etc. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the principle of dividing the straight section and the variable diameter section of the present invention; Figure 2 This is a schematic diagram of the principle of dividing the variable diameter section of the present invention; Figure 3 This is a straight section principle diagram of the present invention; Figure 4 This is a schematic diagram of the assembly principle of the straight section and the reduced diameter section of the present invention. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] A relatively specific embodiment of the present invention provides a construction method for large-scale concentric and unequal-diameter equipment components, the overall concept of which is: rearrange the large components on the drawings, divide them into a number of unit components using the drawings, process the unit components, transport the processed unit components to the construction site, assemble them on the erected construction platform and fixtures to achieve the required equipment components, and finally assemble and weld and hoist them with the equipment to achieve the purpose of equipment installation, including step S1, module division; step S2, factory prefabrication; step S3, ground teaming and step S4, hoisting teaming.
[0022] Step S1, module division: using drawings, the equipment components are divided into two parts in the axial direction, namely, a straight section 2 and a reduced diameter section 1, and the straight section 2 and the reduced diameter section 1 are divided into a plurality of splicing units 3 at equal intervals in the circumferential direction.
[0023] Specifically in this embodiment, the large parts of the equipment are rearranged on the drawing, and are decomposed into two parts, the straight section 2 and the reduced diameter section 1, in the axial direction, and then the straight section 2 and the reduced diameter section 1 are respectively divided into a plurality of splicing units 3 in the circumferential direction. The splitting is carried out under the premise of not changing the original design, and the materials required for the splicing units 3 after unpacking have a large supply or a standard supply in the market.
[0024] In this embodiment, the straight section 2 is divided into three splicing units 3 , and the diameter-changing section 1 is divided into 16 splicing units 3 .
[0025] Step S2, factory prefabrication: select a fixed-length plate according to the size of the splicing unit 3, and perform press molding.
[0026] Preferably, the factory prefabrication in step S2 includes the following steps: (1) Material inspection: Check the plate size corresponding to each splicing unit 3; (2) Blanking of embryonic plates: Blanking of corresponding embryonic plates is performed in sequence according to the arrangement order of the splicing units 3 in the straight section 2 and the diameter-changing section 1; (3) Pressing and forming: The blanks corresponding to each splicing unit 3 are respectively sent into the plate rolling machine for arc shaping.
[0027] (4) Numbering: The splicing units 3 pressed and formed in the straight section 2 and the diameter-changing section 1 are pre-assembled respectively. After the assembly is completed, each splicing unit 3 is marked with a position number, and a team mark is made on the welds of two adjacent splicing units 3.
[0028] There are no less than two groups of grouping marks on two adjacent welds. After the pre-assembly is completed, the splicing unit 3 is removed.
[0029] On this basis, in step (2), after the blank is cut, the blanks corresponding to the splicing units 3 in the straight section 2 and the variable diameter section 1 are spot welded on the mold respectively, and the overall unfolded surface dimensions of the straight section 2 and the variable diameter section 1 are checked, and then the weld groove is processed into a V-shaped groove, and then the spot welding part is ground and polished.
[0030] In this embodiment, in step S3, before the straight section 2 and the variable diameter section 1 are respectively grouped, a grouping platform is first set up, and a positioning template is made of steel plates on the platform, and the splicing units 3 transported to the site, corresponding to the straight section 2 and the variable diameter section 1, are classified according to the position numbers.
[0031] In this embodiment, before the processed unit components are transported to the construction site, a construction platform and the positioning fixtures of the unit components are set up. When the arc-shaped plates are transported to the site, they are assembled and welded according to the layout drawing. When assembling, the positions are determined according to the mark on the standard plate. When each standard plate is matched, it is assembled according to the assembly mark. The purpose of this is to minimize the manufacturing error of the processed parts, so that it is more convenient to assemble the plates with the subsequent equipment.
[0032] The straight section is directly assembled on the platform, and 150mm-200mm is left at the vertical weld port; the variable diameter section is assembled and welded with 1 to 16 arc plates according to the layout drawing, and the overall position is adjusted after completion.
[0033] Among them, in the step S3, the straight section 2 and the variable diameter section 1 are teamed according to the following method: first, the first splicing unit 3 and the second splicing unit 3 are teamed at the same time, and the teaming marks of the weld positions of the first splicing unit 3 and the second splicing unit 3 are kept overlapping. After the teaming is completed, the on-site steel sections are used for internal support, and then the remaining splicing units 3 are teamed in turn. Among them, when three splicing units 3 are teamed each time, a group of internal supports is added to prevent collapse.
[0034] On this basis, in step S3, after the straight section 2 and the variable diameter section 1 are teamed, the size is checked first, and after the size is checked, the vertical weld is welded. When welding the vertical weld, a symmetrical welding and layered welding method is adopted.
[0035] When welding the vertical seams of the variable diameter section 1 in this example, a method of welding multiple groups of vertical seams simultaneously is adopted, and the welding is divided into at least four groups.
[0036] After welding is completed, internal parts and external ladders are added inside, and finally the components are hoisted to the installation location for assembly welding.
[0037] The technical solution claimed for protection of the present invention is further clearly and completely described below in conjunction with a relatively specific embodiment.
[0038] Figure 1 is the overall disassembly schematic of the equipment components, which is divided into two parts: the straight section is DN8800*1500*32mm, and the variable diameter section is DN11000*8800*2250*32mm. Figure 2 is the decomposition schematic of the variable diameter section. The largest diameter in the figure is DN11000, and its circumference is calculated to be 11032*3.14=34640.48mm. Dividing it into 16 equal parts has a side length of exactly 2165.03mm. Among the supplied steel plate models, the 2200*32mm fixed-length plate is easy to purchase, so this solution is selected to split the variable diameter section. Figure 3 is the straight section splitting schematic, Figure 3 The size of the middle plate is 1500*9400*32mm cut-length plate for processing. This type of plate is easy to purchase in the supplied steel plate models of 2200*32mm cut-length plate.
[0039] The principle of splitting the diameter section and the variable diameter section is based on two points: (1) the original design is not changed. (2) the materials used after splitting are available in large quantities or standard sources on the market.
[0040] Factory pressing of equipment parts: According to the above-mentioned purchase of fixed-length plates, the plates are transported to the plate pressing plant. The difficulty in making equipment components lies mainly in the production of the curved plates of the variable diameter section. The following mainly discusses the production of the curved plates: First, the size of the plates is checked according to the layout drawing of the variable diameter section, and the blanks are cut according to the layout drawing; secondly, all 16 blanks are completed in the same way; the 16 blanks are spot welded on the mold again, and the size of the overall unfolded surface of the variable diameter section is checked; then the weld groove is processed into a V-shaped groove; after the spot welding part is polished smooth with a grinder again, the 16 processed blanks are sent to the plate rolling machine one by one for arc plasticity; finally, the processed curved plates are pre-assembled. After the assembly is completed, each piece is marked with a position number, and a mountain pair mark is made on each adjacent two welds, and the pair mark is not less than 2 groups; the pre-assembled 16 curved plates are dismantled and loaded and transported to the construction site.
[0041] On-site assembly of equipment components: Production of variable diameter sections: Set up an assembly platform, and make a DN11000 positioning template with steel plates on the platform; classify the 16 curved plates transported to the site according to the position numbers.
[0042] Pair the first and second curved plates. When pairing curved plates, please note the following: (1) Pair the first and second curved plates at the same time; (2) The first and second curved plates must be located adjacent to each other; (3) The pairing marks of the weld positions of the first and second curved plates must completely overlap. After pairing, use the steel sections on site for internal support to prevent collapse; pair 3-16 curved plates in sequence, and add one set of internal support for each group of 3 plates. After all pairs are paired, check the dimensions, and after checking that they are correct, perform weld welding; welding is symmetrical, layered, and multiple groups of seams are welded simultaneously, with at least four groups of welding. Production of straight sections: Pair welding is performed according to the pairing method of curved plates. Lift the straight section above the reducer for annular weld pair welding.
[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction method for large concentric equipment components with different diameters. It is characterized in that The steps include: S1. Module division: Use drawings to divide the equipment components into two parts in the axial direction: a straight section and a reduced diameter section, and divide the straight section and the reduced diameter section into multiple splicing units at equal intervals in the circumferential direction; S2, factory prefabrication: select the cut-to-size plate according to the size of the splicing unit and press it into shape; S3, ground teaming: transport the splicing units of the prefabricated equipment components to the construction site, and perform teaming and vertical weld welding of the splicing units in the variable diameter section and the straight section at the construction site; S4. Hoisting and teaming: Hoist the straight section after teaming welding to the top of the reducing section and then team it up, and perform circular weld welding.
2. A construction method for large concentric and unequal diameter equipment components according to claim 1, It is characterized in that In the step S1, the straight section is divided into 3 splicing units, and the variable diameter section is divided into 16 splicing units.
3. A construction method for large concentric equipment components of different diameters according to claim 1 or 2, It is characterized in that The factory prefabrication of step S2 comprises the following steps: (1) Material inspection: Check the plate size corresponding to each splicing unit; (2) Blanking of embryonic plates: Blank the corresponding embryonic plates in sequence according to the arrangement order of the splicing units in the straight section and the variable diameter section; (3) Pressing and forming: The blanks corresponding to each splicing unit are sent into the plate rolling machine for arc shaping; (4) Numbering: The pressed and formed splicing units in the straight section and the variable diameter section are pre-assembled separately. After the assembly is completed, each splicing unit is marked with a position number, and a team mark is made on the welds of two adjacent splicing units.
4. A construction method for large concentric and unequal diameter equipment components according to claim 3, It is characterized in that In the step (2), after the blank is cut, the blanks corresponding to the splicing units in the straight section and the reduced diameter section are spot welded on the mold respectively, and the overall unfolded surface dimensions of the straight section and the reduced diameter section are checked, and then the weld groove is processed into a V-shaped groove, and then the spot welding part is ground and polished.
5. A construction method for large concentric equipment components with different diameters according to claim 1 or 4, It is characterized in that In step S3, before the straight section and the diameter-changing section are grouped separately, a grouping platform is first set up, and a positioning template is made of steel plates on the platform.
6. A construction method for large concentric and unequal diameter equipment components according to claim 5, It is characterized in that In step S3, the straight section and the variable diameter section are grouped in the following manner: first, the first splicing unit and the second splicing unit are grouped at the same time, and the grouping marks of the weld positions of the first splicing unit and the second splicing unit are kept overlapping. After the grouping is completed, the on-site steel sections are used for internal support, and then the remaining splicing units are grouped in turn. Among them, when three splicing units are grouped together, one group of internal support is added.
7. A construction method for large concentric and unequal diameter equipment components according to claim 6, It is characterized in that In step S3, after the straight section and the diameter-reducing section are assembled, a dimension check is first performed, and after the dimension check is correct, vertical weld welding is performed.
8. A construction method for large concentric and unequal diameter equipment components according to claim 7, It is characterized in that In step S3, when welding the vertical weld, a symmetrical welding and layered welding method is adopted.