Predictive energy management method and system, storage medium and vehicle
By generating and weighting the cost and time of multiple planned driving routes, selecting the optimal route and adjusting the energy distribution strategy, the challenges of new energy commercial vehicles in taking into account both cost and timeliness are solved, and personalized energy management is achieved.
Patent Information
- Application Number
- CN202411327530.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-12
AI Technical Summary
The foreseeable energy management strategies of existing new energy commercial vehicles are difficult to take into account both vehicle power and energy utilization, resulting in the lowest cost solution that may extend the time to arrive at the destination and cannot meet driving needs.
By obtaining the current location and destination location of the vehicle, multiple planned driving routes are generated, section information and road speed limit values are obtained, the total driving cost and time of each route are estimated, weighted calculations are performed, the optimal route is selected and the energy distribution is adjusted. Strategy, pre-adjust in combination with road changes.
It achieves a balance between ensuring cost and timeliness, provides personalized energy distribution and optimal driving routes, and meets the driver's different driving needs.
Smart Images

Figure CN118928444A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of vehicle technology, and in particular to a predictive energy management method, system, storage medium and vehicle. Background Art
[0002] With the implementation of policies related to carbon emission reduction and the promotion and application of new energy commercial vehicles, the sales of new energy commercial vehicles have increased significantly. Different from traditional fuel vehicles, the energy supply and energy efficiency of new energy commercial vehicles are more likely to attract attention from all parties.
[0003] At present, in the research process of new energy vehicles, how to improve the energy utilization rate of the vehicle and solve the energy supply of the vehicle as much as possible while ensuring the vehicle's power has become an increasingly important issue that needs to be solved. Therefore, it is necessary to formulate a predictive energy management strategy. The existing predictive energy management strategy mainly focuses on the energy distribution between the vehicle's power components, and strives to achieve energy saving and cost optimization as much as possible while meeting the vehicle's required torque. For example, for plug-in hybrid heavy-duty new energy truck models, the general predictive energy management strategy mainly calculates the optimal fuel cost plus the optimal electricity cost from the vehicle's departure point to the destination. However, the lowest-cost fuel and power distribution plan may require a long time to charge during driving, which greatly prolongs the time to reach the destination and cannot meet the corresponding driving needs. Summary of the invention
[0004] The purpose of the embodiments of the present application is to provide a predictive energy management method, system, storage medium and vehicle that can take into account both cost and driving timeliness and balance the driver's needs for vehicle cost and timeliness.
[0005] One aspect of an embodiment of the present application provides a predictive energy management method. The method includes: obtaining the current position and destination position of the vehicle; generating multiple planned driving routes based on the current position and the destination position; for each of the planned driving routes, obtaining the road section information and road speed limit value within a predetermined distance in front of the vehicle, the road section information includes the road section length and the road section slope; estimating the total driving cost of each of the planned driving routes and the total driving time of each of the planned driving routes based on the road section information, set vehicle speed and the road speed limit value of each of the planned driving routes; in response to the driver's demand for cost and timeliness, weighted calculation of the total driving cost and the total driving time of each of the planned driving routes is performed to obtain a weighted value for each of the planned driving routes; selecting the planned driving route corresponding to the smallest weighted value as the optimal driving route; adjusting the energy allocation strategy according to the optimal driving route.
[0006] Furthermore, adjusting the energy distribution strategy according to the optimal driving route includes: determining a planned vehicle speed for the road ahead according to the optimal driving route; and pre-adjusting energy distribution according to the planned vehicle speed and in combination with changes in the road shape of the road ahead.
[0007] The method also includes: reconstructing the road section based on the road section information to obtain reconstructed road section information, wherein the reconstructed road section information includes the reconstructed road section length and the reconstructed road section average slope; wherein the total driving cost of each planned driving route is estimated based on the reconstructed road section information of each planned driving route, the set vehicle speed and the road speed limit value.
[0008] Furthermore, before reconstructing the road section, the method further includes: performing road filtering on each road on the planned driving route to filter out short-distance uneven roads on the road.
[0009] Furthermore, the reconstructing the road section based on the road section information includes: classifying the road section according to the upper driving slope threshold and the lower driving slope threshold based on the road section slope; and merging continuous road sections belonging to the same road section classification.
[0010] Furthermore, the road section classification based on the road section slope and according to the upper driving slope threshold and the lower driving slope threshold includes: when the road section slope is less than the lower driving slope threshold, the road section corresponding to the road section slope is classified as a downhill road; when the road section slope is between the lower driving slope threshold and the upper driving slope threshold, the road section corresponding to the road section slope is classified as a flat road; when the road section slope is greater than the upper driving slope threshold, the road section corresponding to the road section slope is classified as an uphill road.
[0011] Furthermore, the estimating the total driving cost of each of the planned driving routes includes: estimating the energy consumption of each of the planned driving routes based on the reconstructed road section information of each of the planned driving routes, the set vehicle speed and the road speed limit; calculating the energy consumption cost of each of the planned driving routes based on the energy consumption of each of the planned driving routes; estimating the road cost of each of the planned driving routes, the road cost including highway tolls; and obtaining the total driving cost of each of the planned driving routes based on the energy consumption cost and the road cost of each of the planned driving routes.
[0012] Furthermore, the estimation of the energy consumption of each of the planned driving routes includes: for each of the planned driving routes, based on the average slope of the reconstructed road section, the set vehicle speed and the road speed limit value, calculating the driving force of the vehicle in each of the reconstructed road sections; estimating the mechanical power of the vehicle in each of the reconstructed road sections based on the driving force, the set vehicle speed and the road speed limit value in each of the reconstructed road sections; converting the mechanical power of the vehicle in each of the reconstructed road sections according to a predetermined conversion coefficient to obtain the electric power of the motor in each of the reconstructed road sections; calculating the driving time in each of the reconstructed road sections according to the length of the reconstructed road section, the set vehicle speed and the road speed limit value; calculating the energy consumption within a predetermined distance ahead of the vehicle based on the electric power and the driving time in each of the reconstructed road sections, and then obtaining the energy consumption of each of the planned driving routes.
[0013] Furthermore, the estimating the total driving time of each of the planned driving routes includes: estimating the normal driving time of the vehicle in each of the planned driving routes based on the total mileage between the current position and the destination position and the estimated average vehicle speed; estimating the energy replenishment time in each of the planned driving routes based on the energy consumption of each of the planned driving routes; and obtaining the total driving time of each of the planned driving routes based on the normal driving time and the energy replenishment time in each of the planned driving routes.
[0014] Furthermore, the method also includes: pre-dimensionalizing the cost and time to obtain weight proportional coefficients of cost and time; weighted calculation of the total driving cost and the total driving time of each planned driving route to obtain a weighted value for each planned driving route includes: obtaining the respective weights of the cost and time set by the user; calculating the weighted value of each planned driving route based on the total driving cost and the total driving time of each planned driving route, and based on the respective weights of the cost and time set by the user and the weight proportional coefficients of cost and time.
[0015] Another aspect of an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the predictive energy management method as described above are implemented.
[0016] Another aspect of an embodiment of the present application provides a predictive energy management system, including a memory, a processor, and a computer program stored in the memory, wherein the processor executes the computer program to implement the steps of the predictive energy management method as described above.
[0017] Another aspect of an embodiment of the present application provides a vehicle, comprising the predictive energy management system and a vehicle controller as described above, wherein the predictive energy management system is used to send a selected optimal driving route to the vehicle controller, and the vehicle controller is used to adjust the energy distribution strategy based on the optimal driving route.
[0018] The predictive energy management method, system, storage medium and vehicle of one or more embodiments of the present application estimate the total driving cost and total driving time for each of the multiple planned driving routes generated based on the current position and destination position of the vehicle. The total driving cost and total driving time of each planned driving route can be weighted according to the driver's expectations, and the planned driving route corresponding to the weighted minimum value is used as the optimal driving route, thereby taking into account both cost and timeliness, balancing the driver's needs for vehicle cost and timeliness, and making personalized energy allocation optimal driving route recommendations, thereby meeting the different driving needs of the driver. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a flow chart of a predictive energy management method according to an embodiment of the present application.
[0020] Figure 2 This is a schematic diagram of the road segment classification and reconstruction according to an embodiment of the present application.
[0021] Figure 3 A schematic diagram of road filtering according to an embodiment of the present application.
[0022] Figure 4 A schematic block diagram of a predictive energy management system according to an embodiment of the present application.
[0023] Figure 5 A schematic block diagram of a vehicle according to an embodiment of the present application. DETAILED DESCRIPTION
[0024] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present application. Instead, they are merely examples of devices consistent with some aspects of the present application as detailed in the appended claims.
[0025] The predictive energy management method, system, storage medium and vehicle of the present application are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the features of the following embodiments and implementations can be combined with each other.
[0026] Figure 1A flowchart of a predictive energy management method according to an embodiment of the present application is disclosed. Figure 1 As shown, the predictive energy management method of one embodiment of the present application may include steps S11 to S17.
[0027] In step S11 , the current position and destination position of the vehicle are acquired.
[0028] In step S12, a plurality of planned driving routes are generated based on the current position and the destination position.
[0029] In step S13, for each planned driving route, the road section information and the road speed limit value within a predetermined distance ahead of the vehicle are obtained, and the road section information includes the road section length and the road section slope.
[0030] The map box can be used to receive road information within a few kilometers ahead of the vehicle. For example, the map box can send the road information 100 km ahead of the vehicle in the form of a data array, and each data array contains the road information of a road section.
[0031] In step S14, the total travel cost and the total travel time of each planned travel route are estimated based on the road section information, the set vehicle speed and the road speed limit value of each planned travel route.
[0032] In step S15, in response to the driver's demand for cost and timeliness, a weighted calculation is performed on the total driving cost and total driving time of each planned driving route to obtain a weighted value for each planned driving route.
[0033] In step S16, the planned driving route corresponding to the smallest weighted value is selected as the optimal driving route.
[0034] In step S17, the energy distribution strategy is adjusted according to the optimal driving route.
[0035] In some embodiments, step S17 may further include step S171 and step S172.
[0036] In step S171, the planned vehicle speed on the road ahead is determined according to the optimal driving route.
[0037] In step S172, energy distribution is pre-adjusted according to the planned vehicle speed and in combination with changes in the road shape ahead.
[0038] In some embodiments, the predictive energy management method of the present application also includes step S21 and step S22.
[0039] In step S21, the road section may be reconstructed based on the road section information to obtain reconstructed road section information. The reconstructed road section information may include the reconstructed road section length and the reconstructed road section average slope.
[0040] The following will introduce in detail how to reconstruct the road segment based on the road segment information.
[0041] In some embodiments, road sections may be classified based on the road section slope according to an upper driving slope threshold and a lower driving slope threshold; then, continuous road sections belonging to the same road section classification may be merged to achieve reconstruction of the road sections.
[0042] The purpose of road segment reconstruction is to manage the road within a predetermined distance ahead of the vehicle in sections according to the upper and lower slope thresholds. Figure 2 The schematic diagram of the road segment classification reconstruction of an embodiment of the present application is disclosed. Figure 2 As shown, in some embodiments, when the road segment slope is less than the driving lower limit slope threshold, the road segment corresponding to the road segment slope is classified as a downhill road, for example, the road segment classification value can be recorded as 0; when the road segment slope is between the driving lower limit slope threshold and the driving upper limit slope threshold, the road segment corresponding to the road segment slope is classified as a flat road, for example, the road segment classification value can be recorded as 1; when the road segment slope is greater than the driving upper limit slope threshold, the road segment corresponding to the road segment slope is classified as an uphill road, for example, the road segment classification value can be recorded as 2. If there are multiple downhill sections in succession within 100 km ahead of the vehicle, these multiple consecutive downhill sections are merged into a long downhill section; similarly, if there are multiple flat road sections in succession, these multiple consecutive flat road sections are merged into a long flat road section; if there are multiple uphill sections in succession, these multiple consecutive uphill sections are merged into a long uphill section. After the reconstruction of the road sections is completed, the section length and average slope of the merged downhill section, the section length of the merged flat road section, and the section length and average slope of the merged uphill section can be obtained. The average slope of the merged downhill section can be obtained by calculating the average slope of these multiple continuous downhill sections; similarly, the average slope of the merged uphill section can be obtained by calculating the average slope of these multiple continuous uphill sections.
[0043] In step S14, the total travel cost of each planned driving route may be estimated based on the reconstructed road section information, the set vehicle speed and the road speed limit value of each planned driving route.
[0044] In some embodiments, before reconstructing the road section, the predictive energy management method of the present application may further include step S22.
[0045] In step S22, road filtering is performed on each road on the planned driving route to filter out short-distance uneven roads on the road.
[0046] The principle of road filtering is to filter out the uneven road in a short distance ahead of the vehicle without affecting the overall slope change trend of the road ahead, so as to smooth the road, thereby maintaining the flatness of the road and facilitating the control and management of subsequent road section reconstruction.
[0047] Figure 3 A schematic diagram of road filtering according to an embodiment of the present application is disclosed. Figure 3 As shown, for example, there is a small section of sunken road on a certain section of original road within 100 km in front of the vehicle. The small section of sunken road can be filtered. After the road filtering process, the depression is filtered out on the filtered road, so that the entire road becomes a flat road, which is convenient for subsequent road section classification.
[0048] For example, by setting thresholds such as length, width and / or depth, it can be determined whether there are short-distance bumps (i.e., potholes or bumps) or long-distance uphill or downhill slopes on the driving road.
[0049] In some embodiments, estimating the total driving cost of each planned driving route in step S14 may further include steps S141 to S144.
[0050] In step S141 , the energy consumption of each planned driving route is estimated based on the reconstructed road segment information, the set vehicle speed and the road speed limit value of each planned driving route.
[0051] Specifically, for each planned driving route, the driving force of the vehicle on each reconstructed road section is calculated based on the reconstructed average slope of the road section, the set vehicle speed and the road speed limit.
[0052] The formula for calculating the driving force is as follows:
[0053] F=δ·m·a+m·g·sinθ+μ·m·g·cosθ+C d AV 2 / 21.15
[0054] Among them, F represents the driving force, and the four items on the right side of the equation respectively represent the vehicle acceleration resistance, vehicle slope resistance, vehicle rolling resistance, and vehicle wind resistance. δ represents the rotational mass inertia coefficient, m represents the weight of the vehicle, a represents the vehicle acceleration, g represents the acceleration of gravity, θ represents the slope of the road section, μ represents the rolling resistance coefficient of the vehicle tire, A represents the frontal area of the vehicle, and C represents the rolling resistance coefficient of the vehicle tire. drepresents the drag coefficient, and V represents the vehicle speed. Under normal circumstances, the vehicle speed is the set speed, but when the set speed is higher than the road speed limit, the vehicle speed is the road speed limit. In addition, when there is congestion, the recommended speed during congestion can be used. Depending on weather factors, different values of the rolling resistance coefficient μ can be assigned to the vehicle's tires.
[0055] In addition, in order to further simplify the calculation model of the driving force of a vehicle traveling long distances, the vehicle traveling long distances can be regarded as traveling at a constant speed. Therefore, the acceleration of the vehicle can be regarded as 0, and the calculation formula of the driving force can ignore the acceleration resistance of the vehicle.
[0056] After the driving force of the vehicle during driving is calculated based on the above formula, the mechanical power of the vehicle in each reconstructed road section can be estimated based on the driving force of each reconstructed road section, the set vehicle speed and the road speed limit value, as shown in the following formula:
[0057] P=F×V
[0058] Among them, P represents the mechanical power of the vehicle, F represents the driving force of the vehicle during driving, and V represents the vehicle speed. Under normal circumstances, the vehicle speed is the set speed, but when the set speed is higher than the road speed limit, the vehicle speed is the road speed limit.
[0059] Then, the mechanical power of the vehicle at each reconstructed road section may be converted according to a predetermined conversion coefficient to obtain the electrical power of the motor at each reconstructed road section.
[0060] The travel time on each reconstructed road section can be calculated based on the reconstructed road section length, the set vehicle speed and the road speed limit value.
[0061] Finally, the energy consumption of each road section can be calculated based on the electric power and driving time of each road section after reconstruction. By superimposing the energy consumption of each road section, the energy consumption within a predetermined distance in front of the vehicle can be obtained, and then the energy consumption of each planned driving route can be obtained.
[0062] In step S142, the energy consumption cost of each planned driving route is calculated based on the energy consumption of each planned driving route.
[0063] In step S143, the road cost of each planned driving route is estimated, where the road cost includes highway tolls.
[0064] In step S144, the total travel cost of each planned travel route is obtained based on the energy consumption cost of each planned travel route calculated in step S142 and the road cost of each planned travel route calculated in step S143.
[0065] In some embodiments, estimating the total travel time of each planned travel route in step S14 may further include steps S145 to S147.
[0066] In step S145 , the normal driving time T1 of the vehicle in each planned driving route may be estimated based on the total mileage between the current location and the destination location and the estimated average vehicle speed.
[0067] For example, the estimated average speed may be obtained by taking the average value of the set speed in the entire journey from the current location to the destination location (when the set speed is higher than the road speed limit, the road speed limit is selected as the speed value for the road section).
[0068] In step S146 , the energy replenishment time in each planned driving route is estimated based on the energy consumption of each planned driving route.
[0069] For example, if a planned driving route requires n1 refueling, and the time for each refueling is set to t1, then the total required refueling time T21 = n1*t1; if each planned driving route requires n2 battery replacements, and the time for each battery replacement is set to t2, then the total required battery replacement time T22 = n2*t2; if each planned driving route requires n3 charging times, and the charging amount each time is Q1, Q2, ...Qn (kwh, kilowatt-hours), and the charging rate is set to P (kw), then the total required charging time T23 = (Q1+Q2+...+Qn) / P.
[0070] Therefore, the energy replenishment time T2 in each planned driving route can be expressed as follows:
[0071] T2=T21+T22+T23
[0072] In step S147, the total driving time of each planned driving route is obtained based on the normal driving time and the energy replenishment time in each planned driving route.
[0073] The total travel time for each planned travel route can be expressed as follows:
[0074] T=T1+T2
[0075] In some embodiments, the predictive energy management method of the present application may further include step S31.
[0076] In step S31 , the cost and time efficiency may be dimensionally transformed in advance to obtain the weight proportional coefficient f of the cost and time efficiency.
[0077] Step S15 of performing weighted calculation on the total driving cost and total driving time of each planned driving route to obtain the weighted value of each planned driving route may further include: obtaining the weights of the cost and time set by the user; calculating the weighted value of each planned driving route based on the total driving cost and total driving time of each planned driving route, and based on the weights of the cost and time set by the user and the weight ratio coefficient of the cost and time.
[0078] For example, the driver can set the weights of cost and timeliness on the in-vehicle large screen. For example, the weights can be set to 5 levels: Level 1: cost weight W1 = 0%, timeliness weight W2 = 100%; Level 2: cost weight W1 = 20%, timeliness weight W2 = 80%; ... Level 5: cost weight W1 = 100%, timeliness weight W2 = 0%. Therefore, the weighted value of each planned driving route can be expressed as follows:
[0079] E=C×W1+T×W2×f
[0080] Among them, E represents the weighted value of the planned driving route, C represents the total driving cost of the planned driving route, W1 represents the cost weight, T represents the total driving time of the planned driving route, W2 represents the timeliness weight, and f represents the weight ratio coefficient of cost and timeliness.
[0081] Based on the above-mentioned cost and timeliness calculation method, the predictive energy method of the present application can estimate the cost and timeliness of each planned driving route, and finally select the planned driving route with the smallest weighted value E as the optimal driving route in terms of cost and timeliness.
[0082] The predictive energy management method of the present application estimates the total driving cost and total driving time for each of the multiple planned driving routes generated based on the current position of the vehicle and the destination position. It can perform weighted calculations on the total driving cost and total driving time of each planned driving route according to the driver's expectations, and take the planned driving route corresponding to the weighted minimum value as the optimal driving route, thereby taking both cost and timeliness into account at the same time, balancing the driver's needs for vehicle cost and timeliness, and making personalized recommendations for optimal energy allocation routes, thereby meeting the different driving needs of the driver.
[0083] The present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the predictive energy management method described above are implemented.
[0084] The present application also provides a predictive energy management system. Figure 4 A schematic block diagram of a predictive energy management system according to an embodiment of the present application is disclosed. Figure 4As shown, a predictive energy management system 400 of an embodiment of the present application includes a processor 401, an internal bus 402, a network interface 403, a memory 404, and a non-volatile memory 405, and may also include hardware required for other services. The processor 401 can read the corresponding computer program from the non-volatile memory 405 into the memory 404 and then run it to implement the steps of the predictive energy management method as described above. Of course, in addition to the software implementation, the present application does not exclude other implementation methods, such as logic devices or a combination of software and hardware, etc., that is to say, the execution subject of the following processing flow is not limited to each logic unit, but can also be hardware or logic components.
[0085] The predictive energy management system 400 of the present application can have similar beneficial technical effects as the predictive energy management method described above, so it will not be repeated here.
[0086] The present application also provides a vehicle. Figure 5 A schematic block diagram of a vehicle 500 according to an embodiment of the present application is disclosed. Figure 5 As shown, the vehicle 500 includes the predictive energy management system 400 and the vehicle controller 502 as described above. The predictive energy management system 400 can send the selected optimal driving route to the vehicle controller 502, and the vehicle controller 502 can adjust the energy distribution strategy of the vehicle based on the optimal driving route.
[0087] In some embodiments, the vehicle of the present application also includes a navigation APP 503 and a map box 504. The navigation APP 503 can be in the vehicle. After the driver can input the destination location through the vehicle-mounted large screen, the navigation APP 503 can generate multiple planned driving routes according to the current location of the vehicle and the destination location, and can send multiple planned driving routes to the predictive energy management system 400. The predictive energy management system 400 can receive the road section information within several kilometers ahead of the vehicle sent by the map box 504 (using the Adamis protocol) based on the received multiple planned driving routes, and the map box 504 can send the road section information in the form of a data array. The predictive energy management system 400 can estimate the cost and timeliness of each planned driving route, and finally select the planned driving route with the smallest weighted value E as the optimal driving route in terms of cost and timeliness, and can return the cost and timeliness optimal driving route, the total driving cost and the total driving time to the navigation APP 503, which is displayed on the vehicle-mounted large screen of the vehicle by the navigation APP 503.
[0088] The above is a detailed introduction to the predictive energy management method, system, storage medium and vehicle provided in the embodiments of the present application. Specific examples are used herein to illustrate the predictive energy management method, system, storage medium and vehicle in the embodiments of the present application. The description of the above embodiments is only used to help understand the core idea of the present application and is not intended to limit the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the spirit and principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications should also fall within the scope of protection of the claims attached to the present application.
Claims
1. A predictive energy management method, characterized in that: include: Get the current location and destination location of the vehicle; generating a plurality of planned driving routes based on the current location and the destination location; For each of the planned driving routes, obtaining road section information and road speed limit value within a predetermined distance ahead of the vehicle, wherein the road section information includes the length of the road section and the slope of the road section; estimating the total travel cost of each of the planned driving routes and the total travel time of each of the planned driving routes based on the road section information, the set vehicle speed and the road speed limit value of each of the planned driving routes; In response to the driver's demand for cost and time efficiency, weighted calculation is performed on the total driving cost and the total driving time of each planned driving route to obtain a weighted value of each planned driving route; Selecting the planned driving route corresponding to the smallest weighted value as the optimal driving route; The energy distribution strategy is adjusted according to the optimal driving route.
2. The method according to claim 1, characterized in that The adjusting the energy distribution strategy according to the optimal driving route includes: Determining a planned vehicle speed on the road ahead according to the optimal driving route; The energy distribution is pre-adjusted according to the planned vehicle speed and in combination with the change in the road shape ahead.
3. The method according to claim 1, characterized in that Also includes: Reconstructing the road section based on the road section information to obtain reconstructed road section information, wherein the reconstructed road section information includes a reconstructed road section length and a reconstructed road section average slope; Wherein, estimating the total driving cost of each planned driving route based on the road section information, the set vehicle speed and the road speed limit value of each planned driving route includes: The total travel cost of each of the planned driving routes is estimated based on the reconstructed road segment information, the set vehicle speed and the road speed limit value of each of the planned driving routes.
4. The method according to claim 3, characterized in that Before reconstructing the road segment, the method further includes: Road filtering is performed on each road on the planned driving route to filter out short-distance bumpy roads on the road.
5. The method according to claim 3, characterized in that The reconstructing the road section based on the road section information comprises: Based on the road section slope, classifying the road section according to an upper driving slope threshold and a lower driving slope threshold; Merge consecutive road segments that belong to the same road segment classification.
6. The method according to claim 5, characterized in that The classifying of the road sections according to the upper driving limit slope threshold and the lower driving limit slope threshold based on the road section slope includes: When the road section slope is less than the driving lower limit slope threshold, the road section corresponding to the road section slope is classified as a downhill road; When the road section slope is between the lower driving limit slope threshold and the upper driving limit slope threshold, the road section corresponding to the road section slope is classified as a flat road; When the road section slope is greater than the upper travel limit slope threshold, the road section corresponding to the road section slope is classified as an uphill road.
7. The method according to claim 3, characterized in that The estimating the total driving cost of each of the planned driving routes includes: estimating the energy consumption of each of the planned driving routes based on the reconstructed road segment information of each of the planned driving routes, the set vehicle speed and the road speed limit; Calculating the energy consumption cost of each of the planned driving routes based on the energy consumption of each of the planned driving routes; estimating the road cost of each of the planned driving routes, wherein the road cost includes highway tolls; The total driving cost of each planned driving route is obtained based on the energy consumption cost and the road cost of each planned driving route.
8. The method according to claim 7, characterized in that The estimating the energy consumption of each of the planned driving routes includes: For each of the planned driving routes, the driving force of the vehicle on each reconstructed road section is calculated based on the average slope of the reconstructed road section, the set vehicle speed and the road speed limit value; estimating the mechanical power of the vehicle at each reconstructed road section based on the driving force at each reconstructed road section, the set vehicle speed and the road speed limit value; The mechanical power of the vehicle at each reconstructed road section is converted according to a predetermined conversion coefficient to obtain the electric power of the motor at each reconstructed road section; Calculating the travel time on each reconstructed road section according to the reconstructed road section length, the set vehicle speed and the road speed limit value; The energy consumption within a predetermined distance ahead of the vehicle is calculated based on the electric power and the driving time of each reconstructed road section, and then the energy consumption of each planned driving route is obtained.
9. The method according to claim 7, characterized in that The estimating the total travel time of each of the planned travel routes includes: estimating a normal driving time of the vehicle in each of the planned driving routes based on the total mileage and the estimated average vehicle speed between the current location and the destination location; estimating the energy replenishment time in each of the planned driving routes based on the energy consumption of each of the planned driving routes; The total driving time of each planned driving route is obtained based on the normal driving time and the energy replenishment time in each planned driving route.
10. The method according to claim 1, characterized in that Also includes: Perform dimensionless processing on cost and timeliness in advance to obtain weight ratio coefficients of cost and timeliness; The weighted calculation of the total travel cost and the total travel time of each of the planned travel routes to obtain a weighted value of each of the planned travel routes includes: Get the weights of cost and timeliness set by the user; The weighted value of each planned driving route is calculated based on the total driving cost and the total driving time of each planned driving route, and based on the respective weights of cost and time set by the user and the weight ratio coefficient of cost and time.
11. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the predictive energy management method according to any one of claims 1 to 10 are implemented.
12. A predictive energy management system, comprising a memory, a processor, and a computer program stored in the memory, characterized in that: The processor executes the computer program to implement the steps of the predictive energy management method according to any one of claims 1 to 10.
13. A vehicle, characterized in that: It includes the predictive energy management system and vehicle controller as described in claim 12, wherein the predictive energy management system is used to send the selected optimal driving route to the vehicle controller, and the vehicle controller is used to adjust the energy distribution strategy according to the optimal driving route.