Concrete faced rockfill dam structure adopting cemented sand gravel to protect downstream face and construction method

By setting up cemented gravel protective layer and embedded drainage pipes on the downstream of the panel rock pile dam, combined with reinforced concrete panels and grouting technology, the problem of dam collapse in the panel rock pile dam under flood exceeding the standard is solved, improving impact resistance and simplifying Construction has been carried out to reduce the risk of dam collapse.

CN118932944APending Publication Date: 2024-11-12POWERCHINA HUADONG ENG CORP LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411054852.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The panel rock dam lacks anti-impact capability when encountering floods exceed the standard, and is prone to dam collapse accidents, threatening the lives and property of downstream residents.

Method used

A layer of cemented gravel protective layer is set up on the downstream of the panel stone pile dam, and drainage is achieved through embedded drainage pipes, combining reinforced concrete panels and grouting technology to enhance impact resistance.

Benefits of technology

It effectively improves the resistance of panel rock pile dams to floods exceeding the standard, reduces the possibility of dam collapse, and expands the application scenarios of cemented gravel in water conservancy projects, simplifies the construction process, and reduces project slag abandonment and investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932944A_ABST
    Figure CN118932944A_ABST
Patent Text Reader

Abstract

The invention relates to a concrete faced rockfill dam structure adopting cemented sand gravel to protect a downstream face and a construction method. The method is suitable for the technical field of water conservancy and hydropower engineering. The technical problem to be solved by the invention is to provide the concrete faced rockfill dam structure adopting the cemented sand gravel to protect the downstream surface and the construction method. According to the technical scheme, the concrete faced rockfill dam structure adopting the cemented sand gravel to protect the downstream face comprises a concrete faced rockfill dam body, a cemented sand gravel protective layer is arranged on the downstream face of the concrete faced rockfill dam body, and the cemented sand gravel protective layer extends to the bottom from the top of the downstream face to completely cover downstream rockfill.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy and hydropower engineering, and in particular to a face rockfill dam structure and a construction method for protecting a downstream surface by using cemented gravel. Background Art

[0002] In water conservancy and hydropower projects, the panel rockfill dam is a commonly used dam type with good stability and seismic resistance. The reinforced concrete panel is set on the upstream side of the rockfill dam, which makes it have good anti-seepage performance. The downstream side of the panel rockfill dam is generally only equipped with simple slope protection measures such as frame beams and dry stone masonry, which does not have anti-scouring capabilities. However, in recent years, with the changes in climate conditions such as global warming, extreme weather has become more and more frequent, and the probability of reservoir dams encountering excessive floods has greatly increased. Once the reservoir water level exceeds the elevation of the panel rockfill dam top, the panel dam will fail, causing serious damage to the lives and property of people downstream. Summary of the invention

[0003] The present invention provides a panel rockfill dam structure and a construction method for protecting the downstream surface by using cemented gravel, so as to improve the resistance of the panel rockfill dam when encountering excessive flood and reduce the possibility of dam failure.

[0004] The technical solution adopted by the present invention is as follows:

[0005] A panel rockfill dam structure using cemented gravel to protect the downstream face comprises a panel rockfill dam body, the downstream face of the panel rockfill dam body is provided with a cemented gravel protective layer, the cemented gravel protective layer extends from the top to the bottom of the downstream face to completely cover the downstream rockfill.

[0006] In a further embodiment, the cemented gravel protective layer is provided with a group of drainage holes.

[0007] In a further solution, the drainage hole is realized by pre-buried drainage pipes, the drainage pipes penetrate into the rockfill area for a certain distance, and the inner ends are wrapped with geotextile.

[0008] In a further solution, the drainage pipe gradually decreases in height from the inside to the outside.

[0009] In a further solution, the strength grade of the cemented gravel ranges from C4 to C10, and the lower the elevation, the higher the strength grade selected.

[0010] In a further solution, the aggregate of the cemented gravel is highly weathered excavated material, the particle size and gradation of which are equivalent to those of rockfill material, and the mud content is ≤8%.

[0011] In a further embodiment, the bottom of the downstream surface is grooved and the groove is backfilled with cemented gravel.

[0012] In a further solution, the main body of the panel rockfill dam includes an upstream rockfill stacked on the ground foundation, a downstream rockfill stacked behind the upstream rockfill, a transition material, a cushion material and a concrete panel laid in sequence on the water-facing surface of the upstream rockfill, and consolidation grouting and curtain grouting are performed at the toe plate at the bottom of the panel.

[0013] Another technical solution of the present invention is: a method for constructing a face rockfill dam using cemented gravel to protect the downstream surface, comprising:

[0014] S1. Excavate the dam foundation according to the excavation principles given in the design drawings. The toe plate of the reinforced concrete panel needs to be excavated to the weakly weathered bedrock surface, and the rest of the parts need to be cleared of fully weathered soil layers and weak structural surfaces;

[0015] S2. Filling shall be carried out according to the designed section. The order of cushion material, transition material and adjacent main rockfill shall be coarse first and fine later, and rockfill material shall be first and cemented gravel later. The main rockfill, transition layer, cushion layer and cemented gravel shall be constructed level and evenly. The filling position, size and material gradation shall all meet the design requirements. The transition material shall not encroach on the cushion material, and the rockfill shall not encroach on the transition material and cemented gravel protective layer.

[0016] S3. Cemented gravel is prepared by machine mixing, and the transportation and rolling equipment are the same as other dam materials. The process parameters are selected through production tests. It is required that the upper layer of cemented gravel should be laid before the initial setting of the current layer of cemented gravel. After the initial setting and before the final setting, it is necessary to first lay 3cm~5cm cement mortar and then lay the cemented gravel. After the final setting, it is necessary to first chisel or flush the roughness and lay 3cm~5cm cement mortar before laying the cemented gravel.

[0017] S4. Drainage pipes are pre-buried in layers of cemented gravel to form drainage holes according to the designed elevation. Drainage pipes are pre-buried before the corresponding cemented gravel rolling construction. The cemented drainage pipes penetrate a certain distance into the rockfill area, and the inner end is wrapped with geotextile;

[0018] S5. After the dam is filled to a certain height, the reinforced concrete panel on the upstream side is poured. The steel bar production, installation, concrete strength grade and thickness must meet the design requirements. When the concrete strength at the toe plate of the panel reaches more than 70% of the design strength, consolidation grouting and curtain grouting construction are carried out in the corresponding parts. The grouting pressure should be controlled and observation should be strengthened to prevent the toe plate from lifting.

[0019] In a further solution, S6, a groove is cut at the bottom of the downstream surface, and the groove is backfilled with cemented gravel.

[0020] The beneficial effects of the present invention are as follows: (1) the present invention utilizes cemented gravel to improve the anti-impact performance of the downstream surface of the panel rockfill dam, so that the panel rockfill dam will not collapse when encountering excessive flood water; (2) the new dam-building material cemented gravel is innovatively applied to the panel rockfill dam project, expanding the application scenarios of cemented gravel; (3) the cemented gravel is laid and rolled up synchronously with the other dam materials, the construction method and construction equipment are consistent, and the construction is simple; (4) the strength grade requirement of cemented gravel is lower than that of concrete, and strongly weathered excavated materials can be selected to reduce engineering waste and save investment. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a cross-sectional view of a face rockfill dam structure provided by an embodiment of the present invention.

[0022] Figure 2 It is a cross-sectional view of a cemented gravel protective layer according to an embodiment of the present invention.

[0023] The attached drawings are marked with: 1. Concrete panel, 2. Cushion material, 3. Transition material, 4. Upstream rockfill, 5. Downstream rockfill, 6. Cemented gravel protective layer, 7. Consolidation grouting, 8. Curtain grouting, 9. Drainage holes and grooves 10. DETAILED DESCRIPTION

[0024] In order to enable ordinary technicians in the field to more clearly understand the objectives, technical solutions and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments, but the present invention is not limited to the following embodiments.

[0025] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0026] like Figure 1 As shown, a panel rockfill dam structure using cemented gravel to protect the downstream surface has a panel rockfill dam body, which includes an upstream rockfill 4 piled on the ground foundation, a downstream rockfill 5 piled behind the upstream rockfill 4, a transition material 3, a cushion material 2 and a concrete panel 1 laid in sequence on the water-facing surface of the upstream rockfill, and a consolidation grouting 7 and a curtain grouting 8 are arranged at the toe plate at the bottom of the concrete panel 1. A cemented gravel protective layer 6 is arranged on the downstream surface of the panel rockfill dam body, i.e., the downstream dam slope. Figure 1 As shown, in order to prevent the foot from being damaged after the flood is discharged, a groove is engraved at the bottom of the downstream surface, and the groove 10 is backfilled with cemented gravel.

[0027] like Figure 2 As shown, in order to ensure smooth drainage, a group of drainage holes 9 are set on the cemented gravel protective layer 6.

[0028] Furthermore, the thickness of the reinforced concrete face plate 1 and the strength, particle size and gradation of the cushion material 2, transition material 3, upstream rockfill 4 and downstream rockfill 5 must meet the relevant requirements of the specification, and the slope of the face plate rockfill dam must meet the dam slope stability requirements.

[0029] Furthermore, the strength grade of cemented gravel can be selected from C4 to C10. The lower the elevation, the greater the flow velocity of the slope after the reservoir water overflows the dam, and the greater the strength grade of cemented gravel. Aggregates for cemented gravel can be selected from highly weathered excavated materials, with a particle size and gradation equivalent to that of downstream rockfill 5, and a mud content of no more than 8%, which can reduce engineering waste and save investment.

[0030] Furthermore, the drainage holes of the cemented gravel protective layer 6 are realized by pre-buried drainage pipes, which need to have a certain strength to avoid being crushed and damaged, and the inner end of the drainage pipe is not less than 1m deep into the rockfill area, and the inner end is wrapped with geotextile. In order to increase the drainage speed, the height of the drainage pipe is gradually reduced from the inside to the outside.

[0031] The present invention also provides a construction method for the construction of the above-mentioned face rockfill dam structure using cemented gravel to protect the downstream surface, comprising:

[0032] 1. Excavate the dam foundation according to the excavation principles given in the design drawings. The toe plate position of the reinforced concrete panel 1 needs to be excavated to the weakly weathered bedrock surface, and the rest of the parts need to be cleared of fully weathered soil layers and weak structural surfaces.

[0033] 2. Fill according to the designed section. The order of laying cushion material 2, transition material 3 and adjacent upstream rockfill 4 should be coarse first and fine later, with rockfill 5 first and cemented gravel later. The main rockfill (i.e. upstream rockfill 4 and downstream rockfill 5) and transition layer 3, cushion layer 2 and cemented gravel should be constructed in a level and balanced manner. The filling position, size, material gradation, etc. should all meet the design requirements. Transition material 3 shall not encroach on cushion material 2, upstream rockfill 4 shall not encroach on transition material 3, and downstream rockfill 5 shall not encroach on cemented gravel protective layer 6.

[0034] 3. The cemented gravel is prepared by machine mixing, and the transportation and rolling equipment are the same as the other dam materials. The process parameters are selected through production tests. It is required that the upper layer of cemented gravel should be laid before the initial setting of the current layer of cemented gravel. After the initial setting and before the final setting, it is necessary to first lay 3cm~5cm cement mortar and then lay the cemented gravel. After the final setting, it is necessary to chisel or flush the roughness and lay 3cm~5cm cement mortar before laying the cemented gravel;

[0035] 4. Pre-buried drainage pipes are placed in layers of cemented gravel according to the designed elevation to form drainage holes 9. The drainage pipes are pre-buried before the corresponding cemented gravel rolling construction. The cemented drainage pipes penetrate into the rockfill area for a certain distance, and the inner ends are wrapped with geotextiles.

[0036] 5. After the dam is filled to a certain height, the reinforced concrete panel 1 on the upstream side is poured. The steel bar production, installation, concrete strength grade and thickness must meet the design requirements. When the concrete strength at the panel toe plate reaches more than 70% of the design strength, the consolidation grouting 7 and curtain grouting 8 of the corresponding parts are carried out successively. The grouting pressure should be controlled and observation should be strengthened to prevent the toe plate from lifting.

[0037] Furthermore, the above construction method also includes:

[0038] 6. Carve a groove at the bottom of the downstream surface and backfill the groove with cemented sand and gravel.

[0039] The above is only a preferred embodiment of the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A face rockfill dam structure using cemented gravel to protect the downstream surface, comprising a face rockfill dam body, characterized in that: A cemented gravel protective layer (6) is provided on the downstream surface of the main body of the face rockfill dam. The cemented gravel protective layer (6) extends from the top to the bottom of the downstream surface and completely covers the downstream rockfill (5).

2. A concrete face rockfill dam structure using cemented gravel to protect the downstream surface according to claim 1, characterized in that: The cemented gravel protective layer is provided with a group of drainage holes (9).

3. A face rockfill dam structure using cemented gravel to protect the downstream surface according to claim 2, characterized in that: The drainage hole (9) is realized by pre-buried drainage pipes, which penetrate into the rockfill area for a certain distance and have geotextile wrapped around the inner end.

4. A face rockfill dam structure using cemented gravel to protect the downstream surface according to claim 3, characterized in that: The drain pipe gradually decreases in height from the inside to the outside.

5. The concrete face rockfill dam structure using cemented gravel to protect the downstream surface according to claim 1, characterized in that: The strength grade of the cemented gravel ranges from C4 to C10, and the lower the elevation, the higher the strength grade selected.

6. A concrete face rockfill dam structure using cemented gravel to protect the downstream surface according to claim 5, characterized in that: The aggregate of the cemented gravel is highly weathered excavated material, the particle size and gradation of which are equivalent to those of rockfill material, and the mud content is ≤8%.

7. The concrete face rockfill dam structure using cemented gravel to protect the downstream surface according to claim 1, characterized in that: The bottom of the downstream surface is grooved, and the groove (10) is backfilled with cemented sand and gravel.

8. A concrete face rockfill dam structure using cemented gravel to protect the downstream surface according to any one of claims 1 to 7, characterized in that: The panel rockfill dam body comprises an upstream rockfill (4) stacked on a ground foundation, a downstream rockfill (5) stacked on the rear side of the upstream rockfill (4), a transition material (3), a cushion material (2) and a concrete panel (1) sequentially laid on the water-facing surface of the upstream rockfill, and consolidation grouting (7) and curtain grouting (8) are performed at the toe plate at the bottom of the panel.

9. A method for constructing a face rockfill dam using cemented gravel to protect the downstream surface, characterized in that: include: S1. Excavate the dam foundation according to the excavation principles given in the design drawings. The toe plate of the reinforced concrete panel needs to be excavated to the weakly weathered bedrock surface, and the rest of the parts need to be cleared of fully weathered soil layers and weak structural surfaces; S2. Filling shall be carried out according to the designed section. The order of cushion material, transition material and adjacent main rockfill shall be coarse first and fine later, and rockfill material shall be first and cemented gravel later. The main rockfill, transition layer, cushion layer and cemented gravel shall be constructed level and evenly. The filling position, size and material gradation shall all meet the design requirements. The transition material shall not encroach on the cushion area, and the rockfill shall not encroach on the transition layer area and cemented gravel protective layer. S3. Cemented gravel is prepared by machine mixing, and the transportation and rolling equipment are the same as other dam materials. The process parameters are selected through production tests. It is required that the upper layer of cemented gravel should be laid before the initial setting of the current layer of cemented gravel. After the initial setting and before the final setting, it is necessary to first lay 3cm~5cm cement mortar and then lay the cemented gravel. After the final setting, it is necessary to first chisel or flush the roughness and lay 3cm~5cm cement mortar before laying the cemented gravel. S4. Drainage pipes are pre-buried in layers of cemented gravel to form drainage holes according to the designed elevation. Drainage pipes are pre-buried before the corresponding cemented gravel rolling construction. The cemented drainage pipes penetrate a certain distance into the rockfill area, and the inner end is wrapped with geotextile; S5. After the dam is filled to a certain height, the reinforced concrete panel on the upstream side is poured. The steel bar production, installation, concrete strength grade and thickness must meet the design requirements. When the concrete strength at the toe plate of the panel reaches more than 70% of the design strength, consolidation grouting and curtain grouting construction are carried out in the corresponding parts. The grouting pressure should be controlled and observation should be strengthened to prevent the toe plate from lifting.

10. A method for constructing a face rockfill dam using cemented gravel to protect the downstream surface as claimed in claim 9, characterized in that: Also includes: S6. Carve a groove at the bottom of the downstream surface and backfill the groove with cemented sand and gravel.

Citation Information

Patent Citations

  • Preparation method for pulp-added and vibrated gelatinized sand gravels and product

    CN103964770A

  • Local high-modulus face rockfill dam

    CN106120662A

  • All-material dam

    CN212477618U

  • Slope protection structure

    CN218148132U

  • Low-blending-amount cemented sand gravel damming

    CN219908814U