Method for solving local seepage drainage of upstream type tailing dam through vibration liquefaction

By using vibration liquefaction technology in the tailings pond, the problem of water-permeable layer drainage caused by fine-grain tailings in upstream tailings dams is solved, and the rapid reduction of infiltration lines and the improvement of dam safety is achieved. It has a strong adaptability and wide application value.

CN118933136APending Publication Date: 2024-11-12LANGFANG ZHONGTIE PROSPECTING RECONNAISSANCE CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411430230.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The upstream tailings dam is difficult to drain due to the impermeable layer formed by fine-grain tailings, and the infiltration line is relatively high, threatening the safety of the dam body.

Method used

Vibration liquefaction technology is adopted, by installing vibrators in the tailings pond, vibrating loads are generated to liquefy fine tailings, increase pore water pressure, and quickly discharge water with the seepage pipe to reduce the wetting line.

Benefits of technology

It effectively reduces the height of local infiltration lines, improves the drainage and consolidation performance of tailings ponds, enhances the shear strength of the dam body, reduces the risk of penetration and deformation, and has low construction costs and high efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933136A_ABST
    Figure CN118933136A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of civil engineering and mine engineering, and discloses a method for solving local seepage drainage of an upstream type tailing dam through vibration liquefaction, and the method comprises the following steps: step 1, determining an area with a relatively high seepage line according to tailing pond seepage line monitoring data; 2, slope drilling is conducted in the area, a seepage drainage pipe is arranged at the elevation angle of 5-7 degrees, the seepage drainage pipe is composed of a non-hole section, a hole opening section and a closed section, the non-hole section is located above the infiltration line, the hole opening section is located below the infiltration line, and the closed section is arranged at the tail end of the seepage drainage pipe; thirdly, a plurality of vibrators are installed in the perforated section of the seepage drainage pipe, the frequency of the vibrators ranges from 1000 Hz to 2500 Hz, the vibrators are arranged at intervals in the axis direction of the seepage drainage pipe, and the distance between the vibrators is not smaller than 3 m; fourthly, a plurality of drainage holes are formed in the top of the perforated section of the seepage drainage pipe. Through a vibration liquefaction technology, local fine-grain tailings are liquefied, pore water is rapidly discharged, the height of an infiltration line is reduced, and the local seepage drainage effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering and mining engineering, and in particular to a method for solving the local seepage drainage of an upstream tailings dam by utilizing vibration liquefaction. Background Art

[0002] With the development of mining, the number of tailings ponds at home and abroad has increased year by year. Among the methods of tailings pond construction, the upstream dam construction method is widely used due to its simple process, economic rationality, and local materials. The upstream dam construction method refers to the dam construction method of piling tailings upstream of the initial dam, and the tailings form a sub-dam of the accumulation dam through natural sedimentation. According to statistics, in my country's non-ferrous metal industry, upstream tailings dams account for more than 90%.

[0003] The utilization rate of mineral products has gradually increased, and the particle size of tailings has gradually become finer. Some non-ferrous metal tailings have reached the level of tailings sand, tailings soil or even finer particle sizes. For example, the main particle group of tailings sand of a copper mine is in the range of 0.074-0.25mm, the content is more than 50%, the unevenness coefficient is between 3-8, the particle size range is small, and the soil particles are uniform; the main particle group of tailings soil is 0.005-0.074mm, the content is more than 60%, the unevenness coefficient is between 3-7, the particle size range is small, and the particles are relatively single. In order to ensure the normal production and discharge of mining enterprises, hydrocyclones are generally used to sort coarse and fine particles. Coarse particles are used to fill the accumulation dam, and fine particles are pumped into the reservoir. However, the problems caused by this damming method are also gradually increasing. A large amount of fine tailings enter the reservoir, forming a series of impermeable lenses, which makes drainage difficult and the infiltration line remains high for a long time, seriously threatening the safety of the dam.

[0004] Common methods for lowering the seepage line include slope drainage, siphon drainage, radial well drainage, etc. These drainage methods have a certain effect on tailings silt and fine sand with large permeability coefficients; but for tailings layers with finer particle sizes, the drainage effect is poor. For tailings with low local permeability coefficients, the present invention proposes for the first time a method for solving the local drainage problem of upstream tailings dams by using vibration liquefaction. This method is highly targeted, low-cost, and highly efficient, and can reduce the height of the local seepage line in a short time. Summary of the invention

[0005] In view of the shortcomings of the prior art, the present invention provides a method for solving the local seepage drainage of upstream tailings dams by using vibration liquefaction, which solves the problem of poor permeability and high infiltration line in local areas of upstream tailings dams, resulting in difficulty in drainage and potential safety hazards of the dam body.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for solving the local seepage drainage of upstream tailings dams by using vibration liquefaction, comprising the following steps: Step 1: According to the monitoring data of the tailings pond infiltration line, determine the area where the infiltration line is high; Step 2: Slope drilling is performed in the area, and the drainage pipe is laid out at an elevation angle of 5° to 7°. The drainage pipe consists of a non-porous section, an open-pored section, and a closed section. The non-porous section is located above the infiltration line, the open-pored section is located below the infiltration line, and the closed section is arranged at the end of the drainage pipe; Step 3: Install multiple vibrators inside the opening section of the drainage pipe, the frequency of the vibrators is 1000-2500 Hz, and the vibrators are arranged at intervals along the axis of the drainage pipe, with a spacing of not less than 3 meters; Step 4: A plurality of drainage holes are provided at the top of the opening section of the drainage pipe. The opening area is within a 120° range of the top of the drainage pipe. The diameter of the drainage hole is 8 mm and is covered with a stainless steel filter.

[0007] Preferably, the length of the non-porous section of the drainage pipe is determined according to the height of the infiltration line, and the non-porous section is connected to the drainage ditch outside the reservoir to drain the water.

[0008] Preferably, the stainless steel filter is fixed to the outside of the opening section of the drainage pipe by means of door nails or pipe clamps to ensure that the filter is flat, wrinkle-free and seamless.

[0009] Preferably, the drainage holes are distributed along the longitudinal axis of the drainage pipe, the spacing between the drainage holes is 40 to 50 mm, and the drainage holes face upwards of the drainage pipe.

[0010] Preferably, the vibration frequency of the vibrator is regulated by an external frequency conversion control unit, and the vibration frequency is adjusted according to the particle size composition of the tailings particles.

[0011] Preferably, the vibrator is connected to the top of the drainage pipe via a fixing bolt, the fixing bolt is installed in the wall of the opening section, and the vibrator is connected to the drainage pipe via an insulating hose, and a cable is arranged inside the insulating hose.

[0012] Preferably, the spacing between the vibrators is selected based on the permeability of the tailings. For fine-grained tailings with poor permeability, the spacing between the vibrators is 3 meters; for fine tailings with good permeability, the spacing between the vibrators is 5 meters.

[0013] Preferably, the length of the closed section is greater than or equal to 3 meters, and a closing device is provided at the end of the closed section.

[0014] Preferably, the drilling process adopts non-coring drilling technology, and the casing is followed. The diameter of the casing is 50 to 70 mm larger than the drainage pipe. The angle and depth are controlled during the drilling process, and the changes in formation water content are recorded.

[0015] Preferably, the segments of the drainage pipe are connected by hot-melt welding, and the end face is flattened by a milling cutter before welding. During welding, it is ensured that the opening section remains upward, and the outlet of the drainage pipe is connected to the drainage ditch on the slope of the dam body.

[0016] The present invention provides a method for solving the local drainage of upstream tailings dam by using vibration liquefaction. It has the following beneficial effects: 1. The present invention uses vibration liquefaction technology to liquefy local fine-grained tailings, quickly discharge pore water, reduce the height of the infiltration line, and improve the local drainage effect.

[0017] 2. After the infiltration line of the present invention is lowered, the consolidation speed of the tailings in the tailings pond is accelerated, the mechanical indicators of the tailings are improved, the shear strength of the dam body is enhanced, and the risk of seepage deformation is reduced.

[0018] 3. Compared with traditional drainage methods, the vibration liquefaction technology of the present invention is not restricted by construction conditions, can achieve obvious results in a short time, and has a low construction cost.

[0019] 4. The present invention accelerates the discharge of pore water through vibration liquefaction, and the drainage and consolidation performance of the tailings pond is significantly improved, which is conducive to rapid dam construction and ensures the production efficiency of mining enterprises.

[0020] 5. This technology can effectively deal with the drainage problem of fine-grained tailings in tailings ponds and has strong adaptability and wide application value. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A schematic diagram of the planar layout adopted by the method of the present invention; Figure 2 for Figure 1 Middle AA section Figure 3 A longitudinal section view of an opening section of a seepage drainage pipe used in the method of the present invention; Figure 4 for Figure 3 Middle BB section; Figure 5 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] Please refer to the attached Figure 1-5The present invention relates to a method for solving local drainage of upstream tailings dams by using vibration liquefaction, aiming to solve the problem that the local impermeable layer formed by the deposition of fine-grained tailings leads to difficulty in drainage of tailings ponds and a high infiltration line, thereby affecting the safety and stability of tailings ponds. Through the present invention, the vibration liquefaction effect generated by the vibrator is used to liquefy the fine-grained tailings in the local area, increase the pore water pressure, and accelerate the discharge of pore water, thereby quickly reducing the infiltration line, improving drainage efficiency, and improving the safety of the tailings pond.

[0024] In the upstream tailings dam, the particle size of the tailings particles gradually becomes finer, and it is easy to form a lens (impermeable layer) in the fine-grained tailings layer, which makes it impossible for water to penetrate and discharge, thereby raising the infiltration line. Traditional drainage methods (such as slope drainage, siphon drainage, etc.) have a good effect on coarse-grained tailings, but for fine-grained tailings, especially tailings silt sand and tailings silt soil, due to their poor permeability, they often cannot effectively reduce the infiltration line. The present invention solves the problem of local drainage difficulties in fine-grained tailings through the vibration liquefaction effect of the vibrator.

[0025] The principle of vibration liquefaction is that the vibrator generates vibration load in the tailings dam, which increases the pore water pressure between the tailings particles and causes local liquefaction of the tailings particles. This process breaks the interaction between fine tailings particles and enhances the fluidity of pore water. The pore water is discharged from the tailings dam through the seepage pipe under greater pressure, thereby lowering the water level in the dam and reducing the seepage pressure of the tailings dam.

[0026] 2. Implementation steps (1) Determine the area where the infiltration line is high According to the monitoring data of the tailings pond's seepage line, the changes of the seepage line inside the tailings pond are analyzed to determine the local areas with poor drainage. By marking the range of higher seepage lines on the plane and section, the specific areas that need drainage treatment are determined to ensure that the treatment effect is concentrated in the location with the most serious problem.

[0027] (2) Drilling construction and drainage pipe layout Slope drilling is carried out in the determined local poor drainage area. The drainage pipe is laid out at an elevation angle of 5° to 7°. The reasonable layout of the drainage pipe is ensured by controlling the drilling angle and depth. The drainage pipe design is divided into three parts: non-porous section, open-pored section and closed section.

[0028] Non-porous section: The non-porous section is set above the infiltration line. Its function is to guide the discharged pore water to the drainage ditch outside the reservoir area to avoid water accumulation in the reservoir.

[0029] Opening section: The opening section is located below the infiltration line, and the pore water enters the drainage pipe through the drainage holes. The drainage holes are distributed within 120° of the top of the drainage pipe, with a hole diameter of 8mm and a hole spacing of 40-50mm. The outside of the opening section is covered with a stainless steel filter screen, which is fixed by door nails or pipe clamps to prevent tailings from clogging the drainage holes.

[0030] Closed section: The closed section is located at the end of the drainage pipe, with a length of not less than 3 meters, to prevent tailings from entering the drainage pipe during construction.

[0031] (3) Install the vibrator 3 to 5 vibrators are installed inside the opening section of the drainage pipe along the axial direction of the drainage pipe. The vibration frequency of the vibrator is 1000 to 2500 Hz, which is adjusted by an external frequency conversion control unit to adapt to the particle size composition and permeability of different tailings. The vibrator is connected to the top of the drainage pipe through a fixing bolt, and the cable is protected by an insulating hose to ensure the safe operation of the vibrator. The spacing of the vibrators is adjusted according to the permeability of the tailings. For tailings silt and tailings silty clay with poor permeability, the spacing of the vibrators is set to 3 meters; for tailings silt sand and tailings fine sand with good permeability, the spacing of the vibrators can be set to 5 meters to ensure that the vibration effect covers the entire local area.

[0032] (4) Vibration liquefaction treatment After the vibrator is started, a vibration load is generated to act between the tailings particles, forming excess pore water pressure. As the vibration liquefaction proceeds, the fine-grained tailings in the local area are liquefied, and the fluidity of the pore water is enhanced. The pore water enters the drainage pipe through the drainage hole and is discharged from the reservoir along the drainage pipe. The vibration frequency is adjusted according to the particle size and permeability of the tailings to ensure that the water in the liquefied area can be effectively discharged and the infiltration line can be quickly reduced.

[0033] (5) Drainage pipe connection and well washing Each segment of the drainage pipe is connected by hot-melt welding. Before welding, a milling cutter is used to flatten the end surface to ensure that the welding surface is smooth and neat. The drainage hole is kept upward, and the outlet of the drainage pipe is connected to the drainage ditch on the slope of the dam body. After the drainage pipe is installed, it is immediately washed with clean water. Washing the well can remove the tailings in the pipe, improve the permeability of the tailings around the pipe, and ensure smooth drainage.

[0034] Embodiment 1: Application scenarios: The tailings pond of a copper mine adopts the upstream damming method. The tailings particles are mainly fine particles, among which tailings sand and tailings soil account for the main proportion. Due to the fineness of the tailings particle size, the tailings pond has formed impermeable lenses in some parts during the long-term discharge process, resulting in poor drainage in the pond and the continuous increase of the infiltration line. In some areas, the infiltration line is even close to the surface of the dam body. The high operation of the infiltration line increases the risk of landslide and damage of the tailings dam body, and effective drainage measures are urgently needed to reduce the infiltration line.

[0035] The traditional drainage method is not effective for the fine-grained tailings of the tailings pond, and the tailings layer has poor permeability and cannot effectively reduce the water level in the pond. Therefore, the project decided to adopt the method of the present invention to solve the problem of local drainage difficulties in the tailings pond through vibration liquefaction technology.

[0036] The embodiment of the present invention provides a method for solving the local seepage drainage of upstream tailings dam by using vibration liquefaction, comprising the following steps: (1) Determine the area where the infiltration line is high According to the monitoring data of the tailings pond, after analysis, several areas with high infiltration lines in the tailings pond were identified, mainly concentrated on the slope of the dam body and local sedimentation areas. Combined with the monitoring data, the specific treatment scope was circled on the plan and section drawings.

[0037] (2) Drilling construction and drainage pipe layout According to the location of the infiltration line, drilling construction is carried out in the area that needs to be treated, and the arrangement method is adopted with an elevation angle of 5° to 7°. A drainage pipe is arranged at each treatment point, and the drainage pipe includes a non-porous section, an open hole section and a closed section: The non-porous section is 3 meters long and is located above the infiltration line, used to drain moisture from the reservoir.

[0038] The opening section is located below the infiltration line, the opening area is within the 120° range of the top of the drainage pipe, the drainage hole diameter is 8mm, and the drainage hole spacing is 40mm. To prevent the drainage holes from being blocked by tailings, the opening section is covered with a stainless steel filter, which is fixed to the outside of the drainage pipe by a pipe clamp.

[0039] The length of the closed section is 3 meters to prevent tailings from entering the drainage pipe during construction.

[0040] During construction, the non-coring drilling technology is used when drilling holes, and the casing is followed to ensure the quality of the drilling. The diameter of the casing is about 50mm larger than the diameter of the drainage pipe to ensure that the drainage pipe can be placed smoothly.

[0041] (3) Install the vibrator Four vibrators are installed inside the opening section of the drainage pipe along the axial direction of the drainage pipe. The vibrators are fixed to the drainage pipe by bolts with a spacing of 3 meters. The vibration frequency of the vibrator is initially set to 1500Hz and is precisely adjusted by an external frequency conversion control unit to ensure the best vibration effect. The vibrator is connected through an insulating hose, and the cable is placed inside the hose.

[0042] (4) Vibration liquefaction treatment After the equipment is debugged, start the vibrator. During operation, the vibrator generates vibration loads, and the fine tailings are affected by the vibration liquefaction effect. The pore water pressure in the local area increases, and the pore water is forced to flow and is discharged into the drainage pipe through the drainage hole, and finally guided to the outside of the reservoir through the drainage ditch.

[0043] To ensure the best drainage effect, the vibration frequency was gradually increased from 1000Hz to 2500Hz until the water discharge caused by vibration reached the best. After a few days of operation, the water level in the reservoir began to drop, the infiltration line lowered, and the water content in the dam body decreased significantly.

[0044] (5) Well washing and subsequent monitoring After the drainage pipe is installed, the well is immediately washed with clean water to remove the tailings that may remain in the pipe to increase the permeability of the tailings around the pipe. After the drainage system is put into operation, monitoring data shows that the infiltration line in the tailings pond has been significantly reduced, and the local infiltration line has dropped by 1.5 meters, and the overall water level has been significantly reduced.

[0045] Experimental results: After three months of drainage and treatment, the method of the present invention effectively solved the local drainage problem of the tailings pond. The infiltration line of the tailings pond dropped significantly, and the permeability of the dam body was significantly improved. Due to the reduction of water in the reservoir, the consolidation efficiency of the tailings was improved, and the stability of the tailings pond was significantly improved. Engineering monitoring showed that the shear strength of the tailings pond was significantly enhanced, and the risk of seepage damage was greatly reduced.

[0046] Embodiment 2: Application scenarios: In a certain mountainous area, there is a medium-sized reservoir constructed of a mixture of earth and rock. During its long-term operation, the earth-rock dam gradually began to seep water in some areas due to the foundation settlement and differences in earth-rock structure, especially in the lower middle part of the dam body. This indicates that the soil layer in this area has poor water permeability and the infiltration line gradually rises. This local seepage phenomenon not only affects the stability of the dam body, but may also increase the risk of landslide and collapse of the dam body during heavy rain or water storage periods.

[0047] Traditional drainage methods are difficult to effectively solve this type of problem, especially for clay layers with low permeability, where water cannot be effectively discharged. In order to reduce the seepage deformation of the dam body and lower the infiltration line, the vibration liquefaction drainage technology proposed in the present invention is used to locally solve the seepage problem and enhance the impermeability and stability of the dam body.

[0048] The embodiment of the present invention provides a method for solving the local seepage drainage of upstream tailings dam by using vibration liquefaction, comprising the following steps: (1) Determine the high infiltration line and water seepage area By monitoring the water seepage in the dam body and combining the data from groundwater monitoring wells, we identified an area in the middle of the dam body where the infiltration line was abnormally elevated, especially in the middle and lower parts near the downstream of the dam body where water seepage was more serious. The water seepage points and high areas of the infiltration line were the key areas for treatment.

[0049] (2) Drilling and drainage pipe layout According to the survey data, drilling was carried out in the middle and lower part of the dam body where the infiltration line was higher. The drilling angle was controlled at 5° to 7°, and drainage pipes were arranged in each borehole. The design of the drainage pipes was similar to that of the first embodiment, and was divided into a non-porous section, an open-pored section, and a closed section: The non-porous section is used to drain water to the drainage ditch outside the dam.

[0050] The opening section is located below the seepage area of ​​the dam body and is responsible for collecting local seepage. The diameter of the drainage hole is 8mm, the spacing is 40-50mm, and the hole position is set at the 120° area at the top of the drainage pipe. The opening section is covered with a stainless steel filter.

[0051] The sealing section is located at the end of the drainage pipe to prevent fine particles from entering the pipe.

[0052] During the construction process, the drilling adopts non-coring drilling technology to ensure precise control of the angle and depth of the drilling hole, while the casing follows up to prevent the collapse of the hole wall.

[0053] (3) Install the vibrator Four vibrators were installed inside the opening section of the drainage pipe along the direction of the pipe, with a spacing of 3 meters. Considering the poor local permeability of the earth dam, the initial vibration frequency was set to 1200Hz and gradually adjusted according to the seepage situation on site. The vibrator was connected to the control unit through an insulating hose, and the cable was laid inside the insulating hose to ensure the safety of power transmission.

[0054] (4) Vibration liquefaction treatment After the vibrator is started, the local soil layer of the dam body begins to vibrate. The vibration load acts on the soil layer in the seepage area, causing the local clay particles to liquefy, forming excess pore water pressure, promoting pore water to enter the seepage pipe through the drainage hole, and finally discharged into the drainage ditch outside the dam body. The vibration frequency is adjusted and gradually increased to 1800Hz to ensure the best drainage effect.

[0055] The entire vibration liquefaction process lasted for several days. After several adjustments, the water seepage in the dam body was significantly reduced, the infiltration line gradually lowered, and monitoring data showed that the moisture content in the seepage area dropped significantly.

[0056] (5) Drainage pipe connection and well washing The drainage pipes are connected by hot-melt welding. Before welding, ensure that the end faces of the pipes are flat and smooth. All drainage pipes are led out of the dam through drainage ditches. After the drainage pipes are installed, they are immediately washed with clean water to remove fine soil particles that may enter the pipes, ensure smooth drainage, and further improve the drainage effect.

[0057] After two months of treatment, the local seepage of the earth-rock dam has been significantly improved, the infiltration line has dropped by about 2 meters, and the water seepage in the area that was originally severely seeping has been greatly reduced. The water content of the soil layer of the dam body has been significantly reduced, and there has been no more seepage on the surface, and the stability of the dam body has been effectively improved.

[0058] Engineering monitoring shows that the earth-rock dam’s anti-permeability has been significantly improved, the consolidation of local soil has been enhanced, the safety of the dam body has been significantly improved, the risk of seepage damage has been reduced, and the overall reservoir operation has become more stable.

[0059] Through the vibration liquefaction drainage technology of the present invention, the local seepage problem of the earth-rock dam has been effectively controlled, the infiltration line has been significantly reduced, and the anti-seepage ability and overall stability of the dam body have been improved. The present invention is not only suitable for the drainage and treatment of tailings dams, but also has good application prospects in the field of seepage treatment of earth-rock dams and other water conservancy projects, and can effectively improve the safety and operational stability of various dam structures.

[0060] Embodiment three: Application Background: During the construction of a large-scale urban underground integrated pipeline corridor, a large area of ​​foundation pit was excavated. The soil layer around the foundation pit is high-water content silt and clay with poor permeability, resulting in a large amount of water accumulation in the foundation pit. Especially in the rainy season and when the groundwater level is high, the problem of water accumulation in the foundation pit is more serious, affecting the construction progress and safety. At the same time, the infiltration line of the side wall of the foundation pit is high, increasing the risk of foundation pit collapse. Traditional drainage methods such as open ditch drainage and deep well precipitation cannot effectively solve the problem of groundwater infiltration due to the poor permeability of the soil layer and low drainage efficiency.

[0061] In order to solve this problem, the project decided to adopt the vibration liquefaction drainage technology of the present invention, arrange drainage pipes and vibrators around the foundation pit, drain the accumulated water inside and outside the foundation pit through vibration liquefaction, lower the infiltration line, and ensure the safety of construction in the foundation pit.

[0062] The embodiment of the present invention provides a method for solving the local seepage drainage of upstream tailings dam by using vibration liquefaction, comprising the following steps: (1) Determine the water seepage area Through the foundation pit drainage test and soil permeability test, the areas around the foundation pit and at the bottom with serious water seepage were identified. The soil layer on the side walls of the foundation pit is mainly silt and clay, with a low permeability coefficient, and water is not easy to drain out, especially in the area near the groundwater level at the bottom of the foundation pit, where water accumulation is most serious. Based on the monitoring data, the key treatment areas of the side walls and bottom of the foundation pit are delineated.

[0063] (2) Drilling and drainage pipe layout Drilling construction is carried out on the side walls and bottom of the foundation pit, and the drainage pipe is laid at an angle of 5° to 7° to ensure that water can be discharged smoothly through the drainage pipe. The drainage pipe is divided into a non-porous section, an open hole section and a closed section: Non-porous section: located in the higher soil layer outside the side wall of the foundation pit, which guides out the discharged pore water.

[0064] Opening section: Located in the area with higher foundation pit infiltration line, arranged in the side wall and bottom water accumulation area, the drainage hole diameter is 8mm, the spacing is 50mm, and the opening section is wrapped with stainless steel filter to prevent soil from clogging the drainage holes.

[0065] Closed section: It is set at the end of the drainage pipe to prevent mud and sand from entering the drainage pipe during construction.

[0066] During construction, the non-coring drilling technology is used to ensure that the angle and depth of the borehole are accurate so that the drainage pipe can be accurately laid out in the waterlogged area. During the drilling process, the casing is followed to prevent the soil layer on the side wall of the foundation pit from collapsing or deforming.

[0067] (3) Install the vibrator Vibrators are installed inside the opening section of the drainage pipe along the axial direction of the pipe. The spacing between the vibrators is 3 meters, and the initial vibration frequency is set to 1500Hz. The vibration frequency is adjusted by the frequency conversion control unit to adapt to the permeability characteristics of different soil layers in the foundation pit. The vibrator is fixed inside the drainage pipe by bolts, and the cable is protected by an insulating hose and connected to an external power supply to ensure the normal operation of the vibrator.

[0068] (4) Vibration liquefaction treatment After the vibrator is started, the vibration load generated acts on the soil layers on the side walls and bottom of the foundation pit, especially the silt and clay layers. The vibration load liquefies the soil particles, forming excess pore water pressure, which promotes the accumulated water to enter the drainage pipe through the drainage holes and drain out of the foundation pit. After frequency adjustment, the vibration frequency gradually increases to 2000Hz to ensure the best drainage effect.

[0069] As the vibration liquefaction treatment proceeds, the moisture inside and outside the foundation pit is gradually discharged, the water level on the side walls and bottom of the foundation pit drops significantly, the infiltration line is lowered, and the water accumulation in the foundation pit is effectively controlled.

[0070] (5) Drainage pipe connection and well washing The drainage pipe is connected by hot-melt welding to ensure that each connection point is well sealed. After installation, clean water is immediately used to wash the well to remove the sediment particles that may enter the pipe to ensure smooth drainage. The outlet of the drainage pipe is connected to the drainage system outside the foundation pit to guide the water in the foundation pit to the drainage ditch, further ensuring a dry environment in the foundation pit.

[0071] Results Analysis After two weeks of operation of the vibration liquefaction treatment and drainage system, the water in the foundation pit was basically removed, the infiltration line was significantly lowered, the stability of the side walls of the foundation pit was enhanced, and the water content of the soil was significantly reduced. Monitoring data showed that the groundwater level around the foundation pit dropped by 1.2 meters, the water in the foundation pit was greatly reduced, and the construction conditions were significantly improved.

[0072] Due to the reduction of water pressure on the side walls of the foundation pit, the infiltration line is lowered, and the stability of the soil layer around the foundation pit is improved, avoiding the risk of foundation pit collapse or side wall sliding, and ensuring the safety of construction in the foundation pit.

[0073] This example demonstrates the application effect of vibration liquefaction drainage technology in urban underground foundation pit engineering. This technology not only effectively solves the problems of water accumulation and high infiltration line in the foundation pit, but also significantly improves the stability of the side walls of the foundation pit, prevents potential safety hazards such as collapse or slippage, and ensures smooth construction. This method has a wide range of application prospects and is particularly suitable for water seepage treatment in complex environments such as urban underground engineering and deep foundation pit drainage.

[0074] Table 1 Comparison table of experimental data of embodiment Experimental Project Example 1 (Tailing Dam) Example 2 (Earth-Rock Dam) Example 3 (foundation pit drainage) Wetting line lowering height (m) 1.5 2 1.2 Time to remove accumulated water (days) 10 15 14 Drainage efficiency improvement rate (%) 85 90 80 Soil stability improvement rate (%) 70 75 65 Construction cost reduction rate (%) 30 25 20 Wetting line lowering height (m): Example 1 (tailings dam): The infiltration line was lowered by 1.5 meters, indicating that the application of vibration liquefaction drainage technology in the tailings dam can effectively lower the infiltration line and improve the drainage problem in the local area of ​​the tailings dam.

[0075] Example 2 (earth-rock dam): It was reduced by 2.0 meters, and the effect was significantly better than that of the tailings dam, because the soil structure of the earth-rock dam is more conducive to drainage and the effect of vibration liquefaction is more obvious.

[0076] Embodiment 3 (foundation pit drainage): It was lowered by 1.2 meters. The foundation pit was seriously flooded and the soil was highly sticky, so the effect was slightly weaker. However, it still achieved the expected goal and reduced the impact of waterlogging on construction.

[0077] Time to remove accumulated water (days): Example 1 (tailings dam): The water was removed within 10 days, indicating that the permeability of the tailings pond was poor, but through the vibration liquefaction technology, the time for removing the water was relatively short.

[0078] Example 2 (earth-rock dam): The drainage time is 15 days. Due to the complex soil structure of the earth-rock dam, the water is discharged slowly, but it is still relatively efficient after controlling the vibration frequency.

[0079] Example 3 (Drainage of foundation pit): 14 days. Due to the low-lying terrain and poor soil permeability, the drainage of water in the foundation pit was a little slow, but it basically met the construction progress requirements.

[0080] Drainage efficiency improvement rate (%): Example 1 (tailings dam): The drainage efficiency is increased by 85%, indicating that the drainage capacity is greatly improved through vibration liquefaction, especially in the fine-grained tailings layer, where vibration liquefaction significantly enhances the drainage effect.

[0081] Example 2 (earth-rock dam): Improved by 90%. The drainage system of the earth-rock dam has a good effect. Through vibration liquefaction, the drainage efficiency is further improved, approaching the highest expected effect.

[0082] Example 3 (Pit Drainage): Improved by 80%. Despite the low soil permeability, the vibration liquefaction technology significantly improved the drainage capacity of the pit.

[0083] Soil stability improvement rate (%): Example 1 (tailings dam): Improved by 70%. After drainage, the consolidation of the tailings is improved and the overall stability of the tailings pond is greatly improved.

[0084] Example 2 (earth-rock dam): Improved by 75%. Through drainage technology, the soil consolidation and stability in the local area of ​​the earth-rock dam are significantly improved, and the ability to resist seepage damage is enhanced.

[0085] Example 3 (pit drainage): Improved by 65%, less water in the pit, reduced risk of sidewall slip and collapse, and enhanced soil stability.

[0086] Construction cost reduction rate (%): Example 1 (tailings dam): The construction cost is reduced by 30%. The vibration liquefaction technology is flexible in construction and low in cost. Compared with the traditional drainage method, it saves a lot of construction costs.

[0087] Example 2 (earth-rock dam): The cost is reduced by 25%. Although the construction of earth-rock dam is relatively complex, the vibration liquefaction method still significantly reduces the overall construction cost.

[0088] Example 3 (foundation pit drainage): Reduced by 20%. In urban underground foundation pit drainage projects, the cost advantage of vibration liquefaction technology is reflected in the simplification of the construction procedures of the drainage system while ensuring the drainage effect.

[0089] Overall, the vibration liquefaction drainage technology has performed well in different application scenarios. For tailings dams, earth-rock dams and foundation pit drainage problems, it can effectively reduce the infiltration line, speed up drainage, improve soil stability, and has a significant effect on saving construction costs.

[0090] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for solving local seepage drainage of upstream tailings dam using vibration liquefaction, characterized in that: The following steps are involved: Step 1: According to the monitoring data of the tailings pond infiltration line, determine the area where the infiltration line is high; Step 2: Slope drilling is performed in the area, and the drainage pipe is laid out at an elevation angle of 5° to 7°. The drainage pipe consists of a non-porous section, an open-pored section, and a closed section. The non-porous section is located above the infiltration line, the open-pored section is located below the infiltration line, and the closed section is arranged at the end of the drainage pipe; Step 3: Install multiple vibrators inside the opening section of the drainage pipe, the frequency of the vibrators is 1000-2500 Hz, and the vibrators are arranged at intervals along the axis of the drainage pipe, with a spacing of not less than 3 meters; Step 4: A plurality of drainage holes are provided at the top of the opening section of the drainage pipe. The opening area is within a 120° range of the top of the drainage pipe. The diameter of the drainage hole is 8 mm and is covered with a stainless steel filter.

2. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The length of the non-porous section of the drainage pipe is determined according to the height of the infiltration line, and the non-porous section is connected to the drainage ditch outside the reservoir to drain the water.

3. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The stainless steel filter is fixed to the outside of the opening section of the drainage pipe by means of door nails or pipe clamps to ensure that the filter is flat, wrinkle-free and seamless.

4. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The drainage holes are distributed along the longitudinal axis of the drainage pipe, the spacing between the drainage holes is 40-50 mm, and the drainage holes face upwards of the drainage pipe.

5. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The vibration frequency of the vibrator is adjusted by an external frequency conversion control unit, and the vibration frequency is adjusted according to the particle size composition of the tailings particles.

6. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The vibrator is connected to the top of the seepage drainage pipe through a fixing bolt, the fixing bolt is installed in the wall of the opening section, and the vibrator is connected to the seepage drainage pipe through an insulating hose, and a cable is arranged inside the insulating hose.

7. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The spacing between the vibrators is selected according to the permeability of the tailings. For fine-grained tailings with poor permeability, the spacing between the vibrators is 3 meters; for tailings fine sand with good permeability, the spacing between the vibrators is 5 meters.

8. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The length of the closed section is greater than or equal to 3 meters, and a closing device is provided at the end of the closed section.

9. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The drilling process adopts non-coring drilling technology and follows with casing. The diameter of the casing is 50 to 70 mm larger than the drainage pipe. The angle and depth are controlled during the drilling process, and the changes in formation water content are recorded.

10. The method for solving local seepage drainage of upstream tailings dam by using vibration liquefaction according to claim 1, characterized in that: The segments of the drainage pipe are connected by hot-melt welding. The end face is cut flat by a milling cutter before welding. During welding, the opening section is ensured to be kept facing upward, and the outlet of the drainage pipe is connected to the drainage ditch on the slope of the dam body.

Citation Information

Cited By

  • Mine roadbed three-dimensional seepage drainage monitoring method and system

    CN119880063A