A mobile prefabricated mortar tank construction method

CN118933350BActive Publication Date: 2026-11-03CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411186342.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2026-11-03
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

现有砂浆罐无法移动,无法重复使用,导致施工效率低且材料浪费严重。

Method used

A construction method for a mobile precast mortar tank is provided, which involves determining the fixed position using a line-laying device, laying a waterproof tarpaulin, assembling the precast mortar tank's components, and fixing an anti-stick layer on the surface to ensure sealing and facilitate disassembly and relocation.

Benefits of technology

It enables flexible location selection of mortar tanks, improves construction efficiency, reduces labor and material costs, and allows for recycling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933350B_ABST
    Figure CN118933350B_ABST
Patent Text Reader

Abstract

The application provides a mobile prefabricated mortar tank construction method, and belongs to the technical field of prefabricated mortar tank movement, and comprises the following steps: cleaning a construction site, tamping the ground, and performing line release through a line release device after calibrating a horizontal plane; fixing embedded parts on the horizontal plane after line release, and laying waterproof oilcloth; formwork pouring, and fixing an anti-sticking layer on the surface; moving first, second and third combined parts that constitute the prefabricated mortar tank to the construction site, and fixedly connecting the first and second combined parts and the embedded parts; installing a positioning assembly on the top of the first and second combined parts, and inserting and fixing; checking the sealing performance of the assembled mortar tank after water injection, completing construction; and moving after disassembly when the mortar tank is used up. The application can solve the problems that existing mortar tanks cannot be moved and reused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of mobile precast mortar tank technology, and more specifically, relates to a construction method for mobile precast mortar tanks. Background Technology

[0002] In the construction industry, mortar tanks are widely used as key equipment around individual buildings to improve the efficiency and convenience of plastering operations. To ensure the stable operation of mortar tanks and effectively distribute their loads, a dedicated foundation structure is usually constructed beneath them, mainly including two types: brick masonry mortar tank foundations and cast-in-place concrete mortar tank foundations.

[0003] Brick-built mortar tank foundations have been widely used in previous projects due to their readily available materials and simple construction. However, once built, these foundations remain stationary and cannot adapt to the dynamic changes in construction site conditions. As the project progresses, the distance workers need to travel to pick up materials using wheelbarrows may gradually increase, causing the originally selected mortar tank foundations to no longer meet the actual needs and affecting construction efficiency.

[0004] On the other hand, while cast-in-place concrete mortar tank foundations offer higher load-bearing capacity and stability, they also face the problem of being immovable. More importantly, whether brick or cast-in-place concrete foundations, it is difficult to reuse materials after the project is completed. These foundation structures often require manual demolition, during which materials are often damaged and cannot be effectively recycled, increasing construction costs and wasting resources. Summary of the Invention

[0005] In view of this, the present invention provides a construction method for a mobile precast mortar tank, which can solve the problems of existing mortar tanks being unable to be moved or reused.

[0006] This invention is implemented as follows:

[0007] This invention provides a construction method for a mobile precast mortar tank, comprising the following specific steps:

[0008] S10: Clean the construction site, compact the ground, calibrate the level, and then lay out the lines using a line-laying device. The range of the lines should match the size of the mortar tank.

[0009] S20: Fix the embedded parts on the horizontal plane after the line is laid out, and lay a waterproof tarpaulin to fix the waterproof tarpaulin to the embedded parts.

[0010] S30: According to the drawings of the precast mortar tank, each part of its structure is cast using templates, and an anti-sticking layer is fixed on the surface;

[0011] S40: Move the first assembly, the second assembly, and the third assembly that make up the precast mortar tank to the construction site, and fix the first assembly and the second assembly to the embedded part.

[0012] S50: Install positioning components on the top of the first and second combined components so that the third combined component can be quickly connected and fixed to the top of the first and second combined components.

[0013] S60: After filling with water, check the sealing of the assembled mortar tank. Once it is confirmed to be completely sealed, complete the construction of the mortar tank.

[0014] S70: After the mortar tank is used up, it shall be disassembled and moved.

[0015] Based on the above technical solution, the construction method of a mobile precast mortar tank of the present invention can be further improved as follows:

[0016] The line-laying device includes a central shaft, a support assembly, a level assembly, and a marking assembly. The central shaft is positioned at the center, the support assembly is fixed to the side wall of the central shaft, and the marking assembly is fitted onto the central shaft and limited and supported by the support assembly. The support assembly is used to determine the horizontal plane on which the marking assembly rotates on the side wall of the central shaft. The level assembly is connected to the top of the central shaft, and the level assembly is used to ensure the verticality of the central shaft and to keep the central shaft fixed by gravity.

[0017] The central shaft includes a fixed rod, a slide rail, and an insertion drill. The insertion drill is fixed to the top of the fixed rod and is used to fix the wire laying device on the ground. The fixed rod is a vertical rod structure, and the slide rail is set on the side wall of the fixed rod. The insertion drill is a hexagonal structure with a channel running from the bottom to the top, which is used to remove the soil at the bottom when rotating and drilling downwards into the ground.

[0018] The support assembly is fixed to the upper and lower sides of the slide rail, including a fixed part and a movable part. The fixed part is fixed to the bottom of the slide rail and is flush with the bottom edge of the slide rail. The movable part is fixed to the top of the slide rail by threads and is flush with the top edge of the slide rail. The diameter of the fixed part is larger than the diameter of the movable part. The top of the slide rail is provided with threads, and the threads match the threads on the inner wall of the movable part.

[0019] The marking assembly is sleeved on the slide rail and fixed within the slide rail by the fixing member and the movable member; the fixing member is used to support the weight of the marking assembly; the marking assembly includes an inner rotating ring, a gear, an outer rotating ring, and a support rod, the gear includes a fixed gear and a rotating gear, the fixed gear is fixed to the outer wall of the slide rail, the rotating gear is fixed to the inner wall of the inner rotating ring, and the fixed gear and the rotating gear are meshed; the height of the fixed gear and the rotating gear is the same as the height between the fixing member and the movable member; the outer rotating ring is a double-ring structure, with four triangular irons symmetrically fixed inside, all of which are equilateral triangles, and the corresponding positions of adjacent triangular irons are spaced 90° apart; two corners of each triangular iron are fixed to the double ring of the outer rotating ring, and the other corner is located at the center of the double ring of the outer rotating ring; nozzles are fixed to the bottom of the three corners of each triangular iron, the nozzles contain marking powder, and the bottom of the nozzles points vertically downwards, for marking lines on the horizontal plane by spraying marking powder;

[0020] The level assembly includes a support rod, a plumb line, and weights. A plug is fixed to the top of the central shaft, and a through hole is provided at the center of the support rod. The support rod is fixed to the top of the central shaft by inserting the plug through the through hole. The weights are fixed to the left and right sides of the support rod symmetrically through the plumb line. The gravity of the weights at the symmetrical positions keeps the central shaft in a vertically downward state.

[0021] The outer diameter and inner diameter of the outer rotating ring are the same as the outer diameter and inner diameter of the precast mortar tank, respectively.

[0022] Furthermore, the specific steps for cleaning the construction site, compacting the ground, calibrating the level, and then using a layout device to lay out the lines, with the layout range matching the size of the mortar tank, are as follows:

[0023] The first step is to remove debris and trash from the site, and check the ground for any obvious potholes or cracks and repair them accordingly.

[0024] The second step is to use a vibratory tamper to evenly compact the entire ground surface to improve its density and load-bearing capacity.

[0025] The third step is to calibrate the levelness of the ground using an optical level.

[0026] The fourth step is to move the wire-laying device to the construction site for assembly;

[0027] The fifth step is to quickly lay out lines on the ground to determine the fixed positions of the embedded parts;

[0028] The specific steps for moving the wire-laying device to the construction site for assembly include:

[0029] The first step is to select the center of the mortar tank installation and insert the fixing rod vertically into the ground corresponding to the center;

[0030] The second step is to fix the scribing assembly to the fixing member and to screw the movable member to the top of the scribing assembly.

[0031] The third step is to fix the level assembly to the top of the fixed rod, and adjust the position of the plumb line and the weight so that the fixed rod is always perpendicular to the ground.

[0032] The fourth step is to place marking powder inside the nozzle;

[0033] The specific steps for quickly laying out lines on the ground to determine the fixed positions of the embedded parts include:

[0034] Rotate the scribing assembly to mark the starting point of the four triangular irons at the angles away from the outer rotating ring. Thereafter, mark the positions of the four triangular irons at the angles away from the outer rotating ring every 1 / 12 of the gear circumference, and perform multiple rotations for calibration.

[0035] The central shaft, the support assembly, and the scribing assembly are all made of lightweight materials.

[0036] Furthermore, the embedded parts include 12 units, each fixed at the marked position of the marking assembly; each embedded part includes a fixing part and a clamping part, the fixing part is a four-sided pyramid structure, embedded at the marked position; the clamping part is disposed on the top of the fixing part, the clamping part includes a compression plate and a connecting spring, one end of the connecting spring is fixed to both sides of the top of the fixing part, and the other end is connected to the compression plate; there are at least two compression plates and connecting springs, the two compression plates are inclined, and the included angle between their contacting top inner walls is 30-60°.

[0037] Furthermore, the specific steps for fixing the embedded parts on the horizontal plane after the layout include:

[0038] The first step is to dig a hole with a diameter larger than the bottom diameter of the fixing part at each of the 12 positions marked when the marking component is used to lay out the lines. After the fixing part is pre-buried in the corresponding hole, the area around the hole is compacted.

[0039] The second step is to adjust the embedded parts to be vertically upward during the compaction process;

[0040] The specific steps for laying the waterproof tarpaulin and fixing it to the embedded part include:

[0041] The first step is to draw a circle on the top of the waterproof tarpaulin that is identical to the inner and outer walls of the bottom of the mortar tank using a compass;

[0042] The second step is to draw points in the middle of the two circles according to the positions of the 12 marks;

[0043] The third step is to draw cross lines at 12 points, with the cross lines confined between two circles;

[0044] Fourth step, fix the waterproof tarpaulin on the horizontal surface, with each corresponding cross line passing through the embedded part;

[0045] Fifth step: tidy up the edges of the cross lines.

[0046] Furthermore, the first and second assembled components are symmetrical structures, each being a semi-circular structure cast in concrete, with an inward recess on one side and an outward protrusion on the other side. The inward recess and the outward protrusion are correspondingly arranged to splice and fix the first and second assembled components together. The diameter of the recess and the protrusion is smaller than the outer wall diameter of the first and second assembled components, but larger than the inner wall diameter of the first and second assembled components.

[0047] The top of the first assembly and the second assembly are provided with downward-facing insertion slots;

[0048] The bottom center of the first assembly and the second assembly each have six grooves evenly distributed, and the size of the grooves is the same as the size of the pressing part;

[0049] The third assembly is a ring-shaped structure with a plug-in protrusion at its bottom. The plug-in protrusion has the same size as the plug-in slots at the top of the first and second assemblies. The top of the third assembly is provided with a lifting ring, which is used to facilitate lifting the third assembly for installation.

[0050] The bottom of the concave surface of the first and second combined components is provided with an inwardly recessed double-layered annular groove, and a rubber ring of the same shape is fixed thereon during installation to seal the bottom of the mortar tank composed of the first and second combined components.

[0051] The beneficial effects of adopting the above-mentioned improvement scheme are as follows: the symmetrical structure facilitates the installation and disassembly of the mortar tank, and the protrusions and recesses facilitate the docking of the first and second combined components, the docking of the first and third combined components, and the docking of the second and third combined components.

[0052] The annular third assembly is designed to prevent the first and second assemblies from separating from the top during use, thus extending their service life after installation.

[0053] Furthermore, the specific steps of casting each part of the structure according to the drawings of the precast mortar tank using templates and fixing an anti-adhesion layer on the surface include:

[0054] The first step is to clean the mold, ensuring that the inner surface of the mold is clean, free of oil and dust;

[0055] The second step is to install each part of the template according to the dimensions in the drawings, ensuring that the template is firmly fixed and accurately assembled according to the design dimensions.

[0056] The third step is to use a level and measuring tools to check the alignment of the template to ensure that it meets the design requirements in all directions;

[0057] The fourth step is to support the formwork to ensure its stability during the pouring process;

[0058] Fifth step, evenly apply an anti-stick coating material to the inner surface of the template;

[0059] The sixth step is to mix cement, sand, gravel, and water according to the mixing ratio requirements, and stir them into a uniform concrete.

[0060] Step 7: Pour the concrete into the formwork, ensuring that each part is filled evenly. Use a vibrator to vibrate the concrete to remove air bubbles and ensure that the concrete is dense.

[0061] Step 8: Use a scraper or trowel to smooth the concrete surface, ensuring it is smooth and flat.

[0062] The ninth step is to cure the poured concrete and keep it moist.

[0063] Step 10: After the concrete reaches its design strength, remove the formwork according to the specified time.

[0064] Step 11: Check whether the surface of the precast mortar tank after demolding meets the requirements and ensures that there are no defects;

[0065] Step 12: Fix the anti-stick layer on the surface of each part of the precast mortar tank.

[0066] The beneficial effects of adopting the above-mentioned improved solution are as follows: Furthermore, the material of the anti-stick layer is polytetrafluoroethylene, polyurethane, epoxy resin, silicone rubber, or a special anti-stick coating.

[0067] Furthermore, the specific steps for fixing the first assembled component and the second assembled component to the embedded part include:

[0068] The first step is to lift the first assembly and then adjust its position on top of the embedded part accordingly.

[0069] The second step is to slowly lower the assembly by swaying it left and right until it aligns with the six pre-embedded parts before placing it down.

[0070] Third, repeat the above process to fix the second assembly to the corresponding 6 embedded parts;

[0071] Fourth, the construction workers enter the structure composed of the first and second combined components and fix the rubber ring in the double-layer ring groove.

[0072] The beneficial effects of adopting the above-mentioned improvement scheme are as follows: by setting the first and second combined components to be fixedly connected with the embedded parts, the shaking of the first and second combined components during use is avoided, and the risk of collapse of the first and second combined components is reduced.

[0073] The rubber ring prevents cement from overflowing from the bottom of the first and second assembly components.

[0074] Furthermore, the rubber ring is made of chloroprene rubber, butyl rubber, or ethylene propylene rubber.

[0075] Furthermore, the positioning component includes docking ears and guide ropes. The docking ears include at least one set, with each set including two, which are respectively fixed at corresponding positions on the first assembly, the second assembly, and the third assembly. One end of the guide rope is fixed in the docking ears on the first assembly and the second assembly, and the other end passes through the docking ear on the corresponding third assembly.

[0076] The beneficial effects of adopting the above-mentioned improvement scheme are as follows: by setting up a positioning component, it is convenient to dock the third assembly above the first and second assemblies, reducing the time spent repeatedly during hoisting and improving efficiency.

[0077] Furthermore, the specific steps for installing positioning components on the top of the first and second assembled components, so that the third assembled component can be quickly connected and fixed to the top of the first and second assembled components, include:

[0078] The third assembly is lifted so that the guide rope passes through the docking lug on the third assembly. The guide rope is then retracted inward to guide the third assembly to the corresponding position for insertion and fixation.

[0079] Compared with existing technologies, the beneficial effects of the mobile precast mortar tank construction method provided by this invention are:

[0080] Freedom of site selection: The first, second and third assembly components can be hoisted and assembled at any time for installation and disassembly, and the installation site can be freely selected according to the user's wishes.

[0081] High efficiency and low labor costs: This invention allows for fast installation and dismantling, saving labor costs. Compared to traditional manual layout and masonry, or formwork and concrete pouring, it only requires prefabricated concrete components that are transported by truck for immediate hoisting and assembly, saving time.

[0082] Material saving: This invention saves materials, allowing for one-time installation and repeated use. After the project is completed, the detachable components can be hoisted away, reducing the footprint, and stored in a warehouse for reuse at the next construction site.

[0083] High precision and convenient construction: The present invention uses a positioning component to facilitate the docking of the third assembly with the first and second assemblies during hoisting, thereby improving docking accuracy and reducing docking time. Attached Figure Description

[0084] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0085] Figure 1 A schematic diagram of a construction method for a mobile precast mortar tank;

[0086] Figure 2 This is a schematic diagram of a line-laying device in a mobile precast mortar tank construction method.

[0087] Figure 3 This is a schematic vertical cross-sectional view of a line-laying device in a mobile precast mortar tank construction method.

[0088] Figure 4 This is a schematic cross-sectional view of a line-laying device in a mobile precast mortar tank construction method.

[0089] Figure 5 This is a schematic diagram of embedded parts in a construction method for a mobile precast mortar tank;

[0090] Figure 6 A schematic diagram of a precast mortar tank for a mobile precast mortar tank construction method;

[0091] The attached diagram lists the components represented by each number as follows:

[0092] 10. Line laying device; 11. Central shaft; 111. Fixed rod; 112. Slide rail; 113. Insertion drill; 12. Support assembly; 121. Fixing part; 122. Moving part; 13. Level assembly; 131. Support rod; 132. Plumb line; 133. Weight; 14. Marking assembly; 141. Inner rotating ring; 142. Gear; 1421. Fixed gear; 1422. Rotating gear; 143. Outer rotating ring; 144. Support rod; 20. Embedded part; 21. Fixing part; 22. Pressing part; 221. Compression plate; 222. Connecting spring; 30. First assembly; 40. Second assembly; 50. Third assembly; 60. Positioning assembly; 61. Docking lug; 62. Guide rope. Detailed Implementation

[0093] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings.

[0094] like Figure 1 , Figure 5 , Figure 6 The image shown is a first embodiment of a construction method for a mobile precast mortar tank provided by the present invention. In this embodiment, the following specific steps are included:

[0095] S10: Clean the construction site, compact the ground, and after calibrating the horizontal plane, lay out the lines using the line laying device 10. The range of the lines should match the size of the mortar tank.

[0096] S20: Fix the embedded part 20 on the horizontal plane after the line is laid out, and lay a waterproof tarpaulin to fix the waterproof tarpaulin to the embedded part 20.

[0097] S30: According to the drawings of the precast mortar tank, each part of its structure is cast using templates, and an anti-sticking layer is fixed on the surface;

[0098] S40: Move the first assembly 30, the second assembly 40 and the third assembly 50 that make up the precast mortar tank to the construction site, and fix the first assembly 30 and the second assembly 40 to the embedded part 20.

[0099] S50: A positioning component 60 is installed on the top of the first assembly 30 and the second assembly 40 so that the third assembly 50 can be quickly connected and fixed to the top of the first assembly 30 and the second assembly 40.

[0100] S60: After filling with water, check the sealing of the assembled mortar tank. Once it is confirmed to be completely sealed, complete the construction of the mortar tank.

[0101] S70: After the mortar tank has been used up, disassemble and move it.

[0102] like Figure 2 , Figure 3 , Figure 4 In the above technical solution, the line-laying device 10 includes a central shaft 11, a support assembly 12, a level assembly 13, and a line-marking assembly 14. The central shaft 11 is located at the center position. The support assembly 12 is fixed to the side wall of the central shaft 11. The line-marking assembly 14 is sleeved on the central shaft 11 and is limited and supported by the support assembly 12. The support assembly 12 is used to determine the horizontal plane on which the line-marking assembly 14 rotates on the side wall of the central shaft 11. The top of the central shaft 11 is connected to the level assembly 13, which is used to ensure the verticality of the central shaft 11 and to keep the central shaft 11 fixed by gravity.

[0103] The central shaft 11 includes a fixed rod 111, a slide rail 112, and an insertion drill 113. The insertion drill 113 is fixed to the top of the fixed rod 111 and is used to fix the wire laying device 10 to the ground. The fixed rod 111 is a vertical rod structure, and the slide rail 112 is set on the side wall of the fixed rod 111. The insertion drill 113 is a hexagonal structure with a channel running from the bottom to the top, which is used to remove the soil at the bottom when rotating and drilling downwards into the ground.

[0104] The support assembly 12 is fixed on the upper and lower sides of the slide rail 112, including a fixed part 121 and a movable part 122. The fixed part 121 is fixed to the bottom of the slide rail 112 and is flush with the bottom edge of the slide rail 112. The movable part 122 is fixed to the top of the slide rail 112 by threads and is flush with the top edge of the slide rail 112. The diameter of the fixed part 121 is larger than the diameter of the movable part 122. The top of the slide rail 112 is provided with threads that match the threads on the inner wall of the movable part 122.

[0105] The marking assembly 14 is sleeved on the slide rail 112 and fixed in the slide rail 112 by the fixing member 121 and the movable member 122; the fixing member 121 is used to support the weight of the marking assembly 14; the marking assembly 14 includes an inner rotating ring 141, a gear 142, an outer rotating ring 143 and a support rod 144, the gear 142 includes a fixed gear 1421 and a rotating gear 1422, the fixed gear 1421 is fixed on the outer wall of the slide rail 112, the rotating gear 1422 is fixed on the inner wall of the inner rotating ring 141, and the fixed gear 1421 and the rotating gear 1422 are meshed together; the fixed gear 1421... 421. The height of the rotating gear 1422 is the same as the height between the fixed part 121 and the movable part 122; the outer rotating ring 143 is a double-ring structure, with four triangular irons symmetrically fixed inside. The triangular irons are all equilateral triangles, and the corresponding positions of adjacent triangular irons are spaced 90° apart; two corners of the triangular irons are fixed to the double ring of the outer rotating ring 143, and the other corner is set at the center of the double ring of the outer rotating ring 143; nozzles are fixed at the bottom of the three corners of the triangular irons, and marking powder is placed inside the nozzles. The bottom of the nozzles is vertically downward, and they are used to mark lines on the horizontal plane by spraying marking powder.

[0106] The level assembly 13 includes a support rod 131, a plumb line 132, and a weight 133. A plug rod is fixed to the top of the central shaft 11. A through hole is provided at the center of the support rod 131. The support rod 131 is fixed to the top of the central shaft 11 by inserting the plug rod through the through hole. Weights 133 are fixed to the left and right sides of the support rod 131 symmetrically through the plumb line 132. The gravity of the weights 133 at the symmetrical positions keeps the central shaft 11 in a vertically downward state.

[0107] The outer diameter and inner diameter of the outer rotating ring 143 are the same as the outer diameter and inner diameter of the precast mortar tank, respectively.

[0108] Furthermore, in the above technical solution, the specific steps for cleaning the construction site, compacting the ground, calibrating the horizontal plane, and then using the layout device 10 to lay out the lines, with the layout range matching the size of the mortar tank, are as follows:

[0109] The first step is to remove debris and trash from the site, and check the ground for any obvious potholes or cracks and repair them accordingly.

[0110] The second step is to use a vibratory tamper to evenly compact the entire ground surface to improve its density and load-bearing capacity.

[0111] The third step is to calibrate the levelness of the ground using an optical level.

[0112] The fourth step is to move the wire laying device 10 to the construction site for assembly;

[0113] The fifth step is to quickly lay out lines on the ground to determine the fixed position of the embedded part 20;

[0114] The specific steps for moving the wire-laying device 10 to the construction site for assembly include:

[0115] First, select the center of the mortar tank installation and insert the fixing rod 111 vertically into the ground corresponding to the center;

[0116] The second step is to fix the scribing assembly 14 to the fixing member 121 and screw the movable member 122 to the top of the scribing assembly 14.

[0117] The third step is to fix the level assembly 13 to the top of the fixed rod 111, and adjust the position of the plumb line 132 and the weight 133 so that the fixed rod 111 is always perpendicular to the ground.

[0118] The fourth step involves placing marking powder inside the nozzle;

[0119] The specific steps for quickly laying out lines on the ground and determining the fixed position of the embedded part 20 include:

[0120] Rotate the scribing assembly 14 to mark the starting point of the four triangles at the corners away from the outer rotating ring 143. Thereafter, mark the corners of the four triangles away from the outer rotating ring 143 every 1 / 12 of the circumference of the gear 142, and perform multiple rotations for calibration.

[0121] The central axis 11, support assembly 12, and scribing assembly 14 are all made of lightweight materials.

[0122] The lightweight materials are composed of materials such as aluminum alloy, magnesium alloy, and carbon fiber.

[0123] Furthermore, in the above technical solution, the embedded parts 20 include 12 units, which are respectively fixed at the marked positions of the marking assembly 14; the embedded parts 20 include a fixing part 21 and a pressing part 22. The fixing part 21 is a four-sided pyramid structure and is embedded at the marked position; the pressing part 22 is disposed on the top of the fixing part 21. The pressing part 22 includes a compression plate 221 and a connecting spring 222. One end of the connecting spring 222 is fixed to the top two sides of the fixing part 21, and the other end is connected to the compression plate 221; there are at least two compression plates 221 and connecting springs 222. The two compression plates 221 are inclined and the included angle between their contacting top inner walls is 30-60°.

[0124] Furthermore, in the above technical solution, the specific steps for fixing the embedded part 20 on the horizontal plane after the layout include:

[0125] The first step is to dig a hole with a diameter larger than the bottom diameter of the fixing part 21 at each of the 12 positions marked when the marking component 14 is used for marking. After the fixing part 21 is pre-embedded in the corresponding hole, the area around the hole is compacted.

[0126] The second step is to adjust the embedded part 20 vertically upwards during the compaction process;

[0127] The specific steps for laying waterproof tarpaulin and fixing it to the embedded part 20 include:

[0128] The first step is to draw a circle on the top of the waterproof tarpaulin that is identical to the inner and outer walls of the bottom of the mortar tank using a compass.

[0129] The second step is to draw points in the middle of the two circles according to the positions of the 12 marks;

[0130] The third step is to draw cross lines at each of the 12 points, with the cross lines confined between the two circles;

[0131] The fourth step is to fix the waterproof tarpaulin on the horizontal surface, with each corresponding cross line passing through the embedded part 20;

[0132] Fifth step: tidy up the edges of the cross lines.

[0133] Furthermore, in the above technical solution, the first assembly component 30 and the second assembly component 40 are symmetrical structures, each being a semi-arc structure cast in concrete. One side of each component has an inward recess, and the other side has an outward protrusion. The inward recess and the outward protrusion are correspondingly arranged to splice and fix the first assembly component 30 and the second assembly component 40. The diameter of the recess and the protrusion is smaller than the outer wall diameter of the first assembly component 30 and the second assembly component 40, but larger than the inner wall diameter of the first assembly component 30 and the second assembly component 40.

[0134] The top of the first assembly 30 and the second assembly 40 are provided with downward insertion slots;

[0135] The bottom center of the first assembly 30 and the second assembly 40 each has 6 grooves evenly distributed, and the size of the grooves is the same as the size of the pressing part 22.

[0136] The third assembly 50 has a ring-shaped structure with a plug-in protrusion at its bottom. The plug-in protrusion has the same size as the plug-in slots at the top of the first assembly 30 and the second assembly 40. The top of the third assembly 50 is provided with a lifting ring, which is used to facilitate the installation of the third assembly 50 after it is lifted.

[0137] The bottom of the concave surfaces of the first assembly component 30 and the second assembly component 40 are provided with inwardly recessed double-layer annular grooves. During installation, rubber rings of the same shape are fixed to seal the bottom of the mortar tank composed of the first assembly component 30 and the second assembly component 40.

[0138] Furthermore, in the above technical solution, the specific steps of casting templates for each part of the precast mortar tank according to its drawings and fixing an anti-adhesion layer on the surface include:

[0139] The first step is to clean the mold, ensuring that the inner surface of the mold is clean, free of oil and dust;

[0140] The second step is to install each part of the template according to the dimensions in the drawings, ensuring that the template is firmly fixed and accurately assembled according to the design dimensions.

[0141] The third step is to use a level and measuring tools to check the alignment of the template to ensure that it meets the design requirements in all directions;

[0142] The fourth step is to support the formwork to ensure its stability during the pouring process;

[0143] Fifth step, evenly apply an anti-stick coating material to the inner surface of the template;

[0144] The sixth step is to mix cement, sand, gravel, and water according to the mixing ratio requirements, and stir them into a uniform concrete.

[0145] Step 7: Pour the concrete into the formwork, ensuring that each part is filled evenly. Use a vibrator to vibrate the concrete to remove air bubbles and ensure that the concrete is dense.

[0146] Step 8: Use a scraper or trowel to smooth the concrete surface, ensuring it is smooth and flat.

[0147] The ninth step is to cure the poured concrete and keep it moist.

[0148] Step 10: After the concrete reaches its design strength, remove the formwork according to the specified time.

[0149] Step 11: Check whether the surface of the precast mortar tank after demolding meets the requirements and ensures that there are no defects;

[0150] Step 12: Fix the anti-stick layer on the surface of each part of the precast mortar tank.

[0151] Furthermore, in the above technical solution, the specific steps for fixing the first assembly 30 and the second assembly 40 to the embedded part 20 include:

[0152] The first step is to lift the first assembly component 30 and then adjust its position on top of the embedded part 20 accordingly.

[0153] The second step is to slowly lower the assembly by swaying it left and right until the first assembly 30 is aligned with the six embedded parts 20 before lowering it.

[0154] Third, repeat the above process to fix the second assembly 40 to the corresponding 6 embedded parts 20;

[0155] The fourth step involves the construction workers entering the structure composed of the first assembly component 30 and the second assembly component 40, and fixing the rubber ring in the double-layered annular groove.

[0156] Furthermore, in the above technical solution, the positioning component 60 includes a docking ear 61 and a guide rope 62. The docking ear 61 includes at least one set, and each set includes two, which are respectively fixed at corresponding positions of the first assembly component 30, the second assembly component 40 and the third assembly component 50. One end of the guide rope 62 is fixed in the docking ear 61 on the first assembly component 30 and the second assembly component 40, and the other end passes through the docking ear 61 on the corresponding third assembly component 50.

[0157] Furthermore, in the above technical solution, the specific steps for installing a positioning component 60 on the top of the first assembly component 30 and the second assembly component 40, so that the third assembly component 50 can be quickly connected and fixed with the top of the first assembly component 30 and the second assembly component 40, include:

[0158] The third assembly 50 is lifted so that the guide rope 62 passes through the docking lug 61 on the third assembly 50. The guide rope 62 is then retracted inward to guide the third assembly 50 to the corresponding position for insertion and fixation.

[0159] The second embodiment of the construction method for a mobile precast mortar tank provided by the present invention includes the following specific steps:

[0160] Construction preparation

[0161] Before construction, the following preparatory work needs to be carried out:

[0162] Personnel training: All personnel involved in the construction should receive training on equipment use, safe operation, and emergency response.

[0163] Equipment inspection: Conduct a comprehensive inspection of the line-laying device, concrete pouring equipment, and other construction tools to ensure they are in good working order.

[0164] Materials preparation: Prepare the necessary cement, sand, gravel, water, and other auxiliary materials and tools in advance.

[0165] Construction steps

[0166] Clean up the construction site

[0167] Site cleanup: Remove debris and garbage from the construction site to ensure the construction area is clean and tidy.

[0168] Inspect the ground: Check the ground for obvious potholes and cracks, and make necessary repairs to ensure a solid foundation.

[0169] Ground compaction and calibration

[0170] Ground compaction: Use a vibratory rammer to evenly compact the entire ground surface, improving its density and load-bearing capacity.

[0171] Leveling calibration: The ground level is calibrated using an optical level to ensure the accuracy of subsequent construction.

[0172] Line laying: Line laying device assembly: Move the line laying device 10 to the construction site for assembly.

[0173] The fixing rod 111 is inserted vertically into the center of the ground.

[0174] The marking assembly 14 is fixed to the fixing member 121, and the movable member 122 is screwed in place.

[0175] The level assembly 13 is fixed to the top of the fixed rod 111 to ensure that it is vertical.

[0176] Quickly mark the line: Rotate the marking assembly 14 to mark the starting points of the four triangle irons, and make continuous markings to determine the fixed position of the embedded part 20.

[0177] Fixed embedded parts 20

[0178] Dig a hole at the marked location, bury the fixing part 21, ensuring it is vertically upward, and compact the surrounding area.

[0179] Installation of clamping part 22: Set the clamping part 22 on top of the fixing part 21 to ensure its stability.

[0180] Lay waterproof tarpaulin

[0181] Preparation of waterproof tarpaulin: Draw a circle on the top of the waterproof tarpaulin that is the same as the inner and outer walls of the bottom of the mortar tank, and draw a cross line at the marked position.

[0182] Waterproof tarpaulin fixing: Fix the waterproof tarpaulin on a horizontal surface, ensuring that the cross lines pass through the position of the embedded part 20.

[0183] Formwork casting: Mold cleaning: Clean the mold to ensure it is free of oil and dust.

[0184] Template setup: Install the template according to the dimensions in the drawings, and check the alignment with a level.

[0185] Concrete pouring: Pour the mixed concrete into the formwork, use a vibrator to remove air bubbles, and keep it moist until it reaches the design strength.

[0186] Assemble mobile mortar tank

[0187] Connection of the first and second combined components: The first combined component 30 and the second combined component 40 are fixedly connected to the embedded part 20 to ensure their alignment.

[0188] Positioning component installation: Install positioning component 60 on top of first assembly 30 and second assembly 40, and quickly mate and insert third assembly 50 to fix it in place.

[0189] Sealing inspection: Water injection inspection: Fill the mortar tank with water to check its sealing performance. After confirming that there is no leakage, the construction is completed.

[0190] Disassembly and relocation

[0191] Disassembly after use: After the mortar tank is used up, disassemble it in reverse order and move each component to the new construction site.

[0192] Specifically, the principle of this invention is:

[0193] During use, the construction site is cleaned, the ground is compacted, and after leveling, a line is laid out using the line-laying device 10, with the line range matching the size of the mortar tank. Embedded parts 20 are fixed on the leveled surface after laying out the line, and waterproof tarpaulin is laid, with the tarpaulin and embedded parts 20 fixedly connected. Each part of the precast mortar tank is cast using templates according to the drawings, and an anti-adhesive layer is fixed to the surface. The first assembly 30, second assembly 40, and third assembly 50 that make up the precast mortar tank are moved to the construction site, and the first assembly 30 and second assembly 40 are fixedly connected to the embedded parts 20. Positioning components 60 are installed on the tops of the first assembly 30 and second assembly 40, allowing the third assembly 50 to quickly align with and be fixed to the tops of the first assembly 30 and second assembly 40. After filling with water, the sealing of the assembled mortar tank is checked, and construction of the mortar tank is completed once a complete seal is confirmed. After the mortar tank is used up, it is disassembled and moved.

Claims

1. A construction method for a mobile precast mortar tank, characterized in that, The specific steps include the following: S10: Clean the construction site, compact the ground, and after calibrating the horizontal plane, lay out the lines using the laying-out device (10). The range of the laying-out lines should match the size of the mortar tank. S20: Fix the embedded part (20) on the horizontal plane after the line is laid out, and lay a waterproof tarpaulin to fix the waterproof tarpaulin to the embedded part (20); S30: According to the drawings of the precast mortar tank, each part of its structure is cast using templates, and an anti-sticking layer is fixed on the surface; S40: Move the first assembly (30), the second assembly (40) and the third assembly (50) that make up the precast mortar tank to the construction site, and fix the first assembly (30) and the second assembly (40) to the embedded part (20); S50: Install positioning components (60) on the top of the first assembly (30) and the second assembly (40) so that the third assembly (50) can be quickly connected and fixed with the top of the first assembly (30) and the second assembly (40); S60: After filling with water, check the sealing of the assembled mortar tank. Once it is confirmed to be completely sealed, complete the construction of the mortar tank. S70: After the mortar tank has been used up, disassemble and move it; The line-laying device (10) includes a central shaft (11), a support assembly (12), a level assembly (13), and a line-marking assembly (14). The central shaft (11) is located at the center. The support assembly (12) is fixed to the side wall of the central shaft (11). The line-marking assembly (14) is sleeved on the central shaft (11) and is limited and supported by the support assembly (12). The support assembly (12) is used to determine the horizontal plane on which the line-marking assembly (14) rotates on the side wall of the central shaft (11). The level assembly (13) is connected to the top of the central shaft (11). The level assembly (13) is used to ensure the verticality of the central shaft (11) and to keep the central shaft (11) fixed by gravity. The central shaft (11) includes a fixed rod (111), a slide rail (112), and an insertion drill (113). The insertion drill (113) is fixed to the top of the fixed rod (111) and is used to fix the wire laying device (10) on the ground. The fixed rod (111) is a vertical rod structure, and the slide rail (112) is set on the side wall of the fixed rod (111). The insertion drill (113) is a hexagonal structure with a channel running from the bottom to the top, which is used to remove the soil at the bottom when rotating the drill hole downwards. The support assembly (12) is fixed on the upper and lower sides of the slide rail (112), including a fixing member (121) and a movable member (122). The fixing member (121) is fixed to the bottom of the slide rail (112) and is flush with the bottom edge of the slide rail (112). The movable member (122) is fixed to the top of the slide rail (112) by threads and is flush with the top edge of the slide rail (112). The diameter of the fixing member (121) is larger than the diameter of the movable member (122). The top of the slide rail (112) is provided with threads, and the threads match the threads on the inner wall of the movable member (122). The marking assembly (14) is sleeved on the slide rail (112) and fixed in the slide rail (112) by the fixing member (121) and the movable member (122); the fixing member (121) is used to support the weight of the marking assembly (14); the marking assembly (14) includes an inner rotating ring (141), a gear (142), an outer rotating ring (143), and a support rod (144). The gear (142) includes a fixed gear (1421) and a rotating gear (1422). The fixed gear (1421) is fixed on the outer wall of the slide rail (112), and the rotating gear (1422) is fixed on the inner wall of the inner rotating ring (141). The fixed gear (1421) and the rotating gear... (1422) Meshing connection; the height of the fixed gear (1421) and the rotating gear (1422) is the same as the height between the fixed part (121) and the moving part (122); the outer rotating ring (143) is a double ring structure, and four triangular irons are symmetrically fixed inside it. The triangular irons are all equilateral triangles, and the corresponding positions of adjacent triangular irons are spaced 90° apart; two of the corners of the triangular irons are fixed to the double ring of the outer rotating ring (143), and the other corner is set at the center of the double ring of the outer rotating ring (143); nozzles are fixed at the bottom of the three corners of the triangular irons, and marking powder is placed inside the nozzles. The bottom of the nozzles is vertically downward and used to mark the horizontal plane by spraying marking powder; The level assembly (13) includes a support rod (131), a plumb line (132), and a weight (133). A plug is fixed to the top of the central shaft (11). A through hole is provided at the center of the support rod (131). The support rod (131) is fixed to the top of the central shaft (11) by inserting the plug through the through hole. The weight (133) is fixed to the left and right sides of the support rod (131) symmetrically through the plumb line (132). The weight (133) is kept vertically downward by the gravity of the weight (133) at the symmetrical positions. The outer diameter and inner diameter of the outer rotating ring (143) are the same as the outer diameter and inner diameter of the precast mortar tank, respectively.

2. The construction method of a mobile precast mortar tank according to claim 1, characterized in that, The specific steps for cleaning the construction site, compacting the ground, calibrating the horizontal plane, and then laying out lines using a line-laying device (10) to match the size of the mortar tank are as follows: The first step is to remove debris and trash from the site, and check the ground for any obvious potholes or cracks and repair them accordingly. The second step is to use a vibratory tamper to evenly compact the entire ground surface to improve its density and load-bearing capacity. The third step is to calibrate the levelness of the ground using an optical level. The fourth step is to move the wire-laying device (10) to the construction site for assembly; The fifth step is to quickly lay out lines on the ground to determine the fixed position of the embedded part (20); The specific steps for moving the wire-laying device (10) to the construction site for assembly include: First, select the center of the mortar tank installation and insert the fixing rod (111) vertically into the ground corresponding to the center; The second step is to fix the scribing assembly (14) on the fixing member (121) and screw the movable member (122) on the top of the scribing assembly (14); The third step is to fix the level assembly (13) to the top of the fixed rod (111), and adjust the position of the plumb line (132) and the weight (133) so that the fixed rod (111) is always perpendicular to the ground. The fourth step is to place marking powder inside the nozzle; The specific steps for quickly laying out lines on the ground to determine the fixed position of the embedded part (20) include: Rotate the scribing assembly (14) to mark the starting point of the four triangular irons at the angles away from the outer rotating ring (143). Thereafter, mark the positions of the four triangular irons at the angles away from the outer rotating ring (143) every 1 / 12 of the circumference of the gear (142), and perform multiple rotations for calibration. The central shaft (11), the support assembly (12), and the scribing assembly (14) are all made of lightweight materials.

3. The construction method of a mobile precast mortar tank according to claim 2, characterized in that, The embedded parts (20) include 12 units, which are fixed at the marked positions of the marking assembly (14); the embedded parts (20) include a fixing part (21) and a pressing part (22). The fixing part (21) is a four-sided pyramid structure and is embedded at the marked position; the pressing part (22) is disposed on the top of the fixing part (21). The pressing part (22) includes a compression plate (221) and a connecting spring (222). One end of the connecting spring (222) is fixed to the top two sides of the fixing part (21), and the other end is connected to the compression plate (221); there are at least two compression plates (221) and connecting springs (222). The two compression plates (221) are inclined and the included angle between their contacting top inner walls is 30-60°.

4. The construction method of a mobile precast mortar tank according to claim 3, characterized in that, The specific steps for fixing the embedded part (20) on the horizontal plane after the layout include: First, dig a hole with a diameter larger than the bottom diameter of the fixing part (21) at each of the 12 positions marked when the marking component (14) lays out the line. After pre-burying the fixing part (21) in the corresponding hole, compact the area around the hole. The second step is to adjust the embedded part (20) to be vertically upward during the compaction process; The specific steps for laying the waterproof tarpaulin and fixing it to the embedded part (20) include: The first step is to draw a circle on the top of the waterproof tarpaulin that is identical to the inner and outer walls of the bottom of the mortar tank using a compass; The second step is to draw points in the middle of the two circles according to the positions of the 12 marks; The third step is to draw cross lines at 12 points, with the cross lines confined between two circles; Fourth step, fix the waterproof tarpaulin on the horizontal surface, with each corresponding cross line passing through the embedded part (20); Fifth step: tidy up the edges of the cross lines.

5. The construction method of a mobile precast mortar tank according to claim 4, characterized in that, The first assembly (30) and the second assembly (40) are symmetrical structures, each being a semi-circular structure cast in concrete. One side of each assembly has an inward recess, and the other side has an outward protrusion. The inward recess and the outward protrusion are arranged correspondingly to splice and fix the first assembly (30) and the second assembly (40). The diameter of the recess and the protrusion is smaller than the outer wall diameter of the first assembly (30) and the second assembly (40), and larger than the inner wall diameter of the first assembly (30) and the second assembly (40). The top of the first assembly component (30) and the second assembly component (40) are provided with downward insertion slots; The bottom center of the first assembly (30) and the second assembly (40) are each evenly distributed with 6 grooves, and the size of the grooves is the same as the size of the pressing part (22); The third assembly (50) has a ring-shaped structure with a plug-in protrusion at its bottom. The plug-in protrusion has the same size as the plug-in slots at the top of the first assembly (30) and the second assembly (40). The top of the third assembly (50) is provided with a lifting ring, which is used to facilitate the installation of the third assembly (50) after it is lifted. The bottom of the concave surface of the first assembly (30) and the second assembly (40) is provided with an inwardly recessed double-layer annular groove, and a rubber ring of the same shape is fixed thereon during installation to seal the bottom of the mortar tank composed of the first assembly (30) and the second assembly (40).

6. The construction method of a mobile precast mortar tank according to claim 5, characterized in that, The specific steps of casting each part of the precast mortar tank according to the drawings and fixing the anti-adhesion layer on the surface include: The first step is to clean the mold, ensuring that the inner surface of the mold is clean, free of oil and dust; The second step is to install each part of the template according to the dimensions in the drawings, ensuring that the template is firmly fixed and accurately assembled according to the design dimensions. The third step is to use a level and measuring tools to check the alignment of the template to ensure that it meets the design requirements in all directions; The fourth step is to support the formwork to ensure its stability during the pouring process; Fifth step, evenly apply an anti-stick coating material to the inner surface of the template; The sixth step is to mix cement, sand, gravel, and water according to the mixing ratio requirements, and stir them into a uniform concrete. Step 7: Pour the concrete into the formwork, ensuring that each part is filled evenly. Use a vibrator to vibrate the concrete to remove air bubbles and ensure that the concrete is dense. Step 8: Use a scraper or trowel to smooth the concrete surface, ensuring it is smooth and flat. The ninth step is to cure the poured concrete and keep it moist. Step 10: After the concrete reaches its design strength, remove the formwork according to the specified time. Step 11: Check whether the surface of the precast mortar tank after demolding meets the requirements and ensures that there are no defects; Step 12: Fix the anti-stick layer on the surface of each part of the precast mortar tank.

7. A construction method for a mobile precast mortar tank according to claim 6, characterized in that, The specific steps for fixing the first assembly (30) and the second assembly (40) to the embedded part (20) include: First, lift the first assembly component (30) and set it at the top adjustment position of the embedded part (20); The second step is to slowly lower the first assembly (30) and align it with the six pre-embedded parts (20) by swaying it left and right before lowering it. The third step is to repeat the above process to fix the second combined component (40) and the corresponding 6 embedded parts (20); Fourth step: Construction workers enter the structure composed of the first combined component (30) and the second combined component (40) and fix the rubber ring in the double-layer ring groove.

8. A construction method for a mobile precast mortar tank according to claim 7, characterized in that, The positioning component (60) includes a docking ear (61) and a guide rope (62). The docking ear (61) includes at least one set, with each set including two, which are fixed at corresponding positions on the first assembly (30), the second assembly (40), and the third assembly (50). One end of the guide rope (62) is fixed in the docking ear (61) on the first assembly (30) and the second assembly (40), and the other end passes through the docking ear (61) on the corresponding third assembly (50).

9. A construction method for a mobile precast mortar tank according to claim 8, characterized in that, The specific steps for installing positioning components (60) on the top of the first assembly (30) and the second assembly (40) to enable the third assembly (50) to quickly align and fix with the top of the first assembly (30) and the second assembly (40) include: The third assembly (50) is lifted so that the guide rope (62) passes through the docking lug (61) on the third assembly (50), and the guide rope (62) is retracted inward to guide the third assembly (50) to the corresponding position for insertion and fixation.

Citation Information

Patent Citations

  • Construction method of cement tank

    CN112281900A

  • Assembly type stock bin

    CN216240006U