Fabricated large-section tunnel steel arch structure

Through the prefabricated large-section tunnel steel arch structure, the central support body, floating connecting frame and drive mechanism are used to adjust the support relationship of the tunnel surrounding rock, which solves the problems of stress concentration and landslide in the construction of large-section tunnels, and achieves safe and reliable Support effect.

CN118933911APending Publication Date: 2024-11-12CHINA MCC17 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411031019.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the construction of large-section tunnels, complex geological conditions lead to stress concentration and surrounding rock damage, causing landslide risks. It is difficult for the existing support structure to effectively adjust stress to ensure construction safety.

Method used

Adopt the prefabricated large-section tunnel steel arch structure, including a symmetrically arranged central support body, floating connecting frame, drive truss and support frame, and adjust the abutment relationship between the central support body and surrounding rock through the drive mechanism to ensure the support structure flexibility and stability.

Benefits of technology

Effectively eliminate stress concentration, reduce landslide risks, ensure the safety and stability of tunnel support, adapt to the deformation of tunnel surrounding rocks, and improve construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933911A_ABST
    Figure CN118933911A_ABST
Patent Text Reader

Abstract

The invention relates to an assembly type large-section tunnel steel arch structure which comprises center supporting bodies symmetrically arranged on the two sides of a tunnel. The floating connecting frame is arranged on the center supporting bodies, and connection between the center supporting bodies on the two sides of the tunnel is achieved. The driving trusses are connected with the center supporting body and symmetrically arranged on the two sides of the tunnel. The supporting frames are arranged on the two sides of the tunnel, the driving trusses are hinged to the supporting frames, and hinge shafts are arranged in the extending direction of the tunnel. The driving mechanism drives the driving truss to rotate around the hinge shaft and drives the center supporting bodies to abut against the tunnel surrounding rock, and the driving mechanism drives the center supporting bodies on the two sides of the tunnel to be away from each other, so that the center supporting bodies abut against the inner side wall of the tunnel surrounding rock. The distance between the two sets of center supporting bodies can be increased or decreased according to deformation of the tunnel, so that the problems of collapse and the like caused by stress concentration after tunnel surrounding rock is damaged are solved, and the supporting safety of the tunnel is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel steel arch reinforcement, and in particular to an assembled large-section tunnel steel arch structure. Background Art

[0002] In recent years, with the rapid development of the national economy, the traffic volume of inter-city trunk lines, urban expressways and national trunk roads in developed areas has increased rapidly. Two-way four-lane and six-lane roads can no longer meet the requirements of traffic growth, and two-way eight-lane roads are required to adapt to it, so two-way eight-lane highway tunnels will appear accordingly. Two-way eight-lane highway tunnels are super-large cross-section tunnels. Since there are few engineering practice samples of this type of tunnel and there are no specifications to guide the design and construction, it is urgent and important to study the key technologies of this type of tunnel arch.

[0003] In the actual construction of super-large section or large section tunnels, excavation construction is generally carried out through step construction technology, and then the tunnel support is carried out simultaneously. The overall construction of the large section tunnel is realized by alternating excavation and support. For the surrounding rock of large section tunnels, especially large section tunnels with complex geological conditions, on the one hand, they are subjected to complex ground stress, and on the other hand, excavation causes stress concentration and stress redistribution, causing the destruction of surrounding rock in a certain range and forming a loose circle. The fragmented surrounding rock is mostly fractured rock mass or fragmented rock mass after destruction. These rock mass structures restrict construction safety. Therefore, various support methods and support structures are adopted during the construction process. If the support structure is unreasonable, it will cause large deformation of the fragmented surrounding rock tunnel. The stress of the surrounding rock deformation is applied to the support structure, which is easy to cause stress concentration, and then lead to support collapse. Summary of the invention

[0004] The purpose of the present invention is to provide an assembled large-section tunnel steel arch structure, which can adjust the support pressure on the tunnel surrounding rock and can also deform according to the deformation of the tunnel to eliminate the problems such as landslides caused by stress concentration after the tunnel surrounding rock is damaged, thereby ensuring the support safety of the tunnel.

[0005] The technical solution adopted by the present invention is as follows: an assembled large-section tunnel steel arch structure, comprising

[0006] The central support body is provided with two groups, which are symmetrically arranged on both sides of the tunnel;

[0007] A floating connection frame is arranged on the central support body and realizes the connection between the central support bodies on both sides of the tunnel;

[0008] A driving truss is connected to the central supporting body and is symmetrically arranged at two sides of the tunnel;

[0009] Support frames are arranged at both sides of the tunnel, and the driving trusses are hingedly arranged on the support frames and the hinge axes are arranged along the extension direction of the tunnel;

[0010] The driving mechanism drives the driving truss to rotate around the hinge shaft and links the central supporting body to abut against the tunnel surrounding rock.

[0011] The present invention also has the following features:

[0012] In a preferred embodiment of the invention: it also includes two groups of auxiliary support bodies, which are arranged in the front and rear directions of the central support body and are respectively arranged on both sides of the tunnel, and the extension direction of the auxiliary support bodies is consistent with the extension direction of the central support body, and the two groups of auxiliary support bodies are respectively provided with prying frames, the prying frames are hinged to the support frames and the hinge axes are arranged along the extension direction of the tunnel, and the driving mechanism drives the prying frame to rotate around the hinge axis and links the two groups of auxiliary support bodies to move away from each other and against the surrounding rock of the tunnel.

[0013] In a preferred embodiment of the invention: the extending ends of the two groups of auxiliary supporting bodies are respectively provided with connecting parts, which are connected to the central supporting bodies on the adjacent sides. When the two groups of auxiliary supporting bodies are far apart, the two groups of central supporting bodies are connected by the connecting parts.

[0014] In a preferred embodiment of the invention: the driving mechanism drives the prying frame to rotate around the hinge axis and the driving truss to rotate around the hinge axis forward and backward.

[0015] In a preferred embodiment of the invention: the central support body and the auxiliary support body are both in the shape of an arc plate, and the cross-section is I-shaped, one end of the central support body and the auxiliary support body are movably mounted on the support frame, and when the driving mechanism drives the driving truss and the prying frame to rotate around the hinge axis, one end of the central support body and the auxiliary support body are located on the support frame and rotate.

[0016] In a preferred embodiment of the invention: a first arc-shaped head is provided at one end of the central support body, a second arc-shaped head is provided at one end of the auxiliary support body, a first support groove is provided on the support frame, the first support groove is arranged horizontally and along the extension direction of the tunnel, the cross-section of the first support groove is semicircular, and the first arc-shaped head and the second arc-shaped head are clamped in the first support groove.

[0017] In a preferred embodiment of the invention: the driving mechanism comprises a driving roller near the middle section of the driving truss and the prying frame, the driving roller is horizontal and arranged along the extension direction of the tunnel, the driving roller is rotatably mounted on the roller frame, the vertical sliding member is arranged on the linkage body, an elastic support body is arranged between the linkage body and the roller frame, the linkage body extends vertically downward and a linkage roller is arranged at the extension end, the linkage roller is horizontal and arranged along the width direction of the tunnel;

[0018] The driving mechanism also includes a first driving wedge and a second driving wedge;

[0019] The first driving wedge is provided with a first inclined surface and a first plane, and the first inclined surface and the first plane are respectively against the linkage roller on the driving truss;

[0020] The second driving wedge is provided with a second inclined surface and a second plane, and the second inclined surface and the second plane are respectively against the linkage roller on the prying frame.

[0021] In a preferred embodiment of the invention: a linkage support roller is also arranged in parallel beside the driving roller, and the linkage support roller is respectively arranged on the lower rail surface of the driving truss and the prying frame, and the lower rail surface of the driving truss and the prying frame are respectively provided with a first arc surface and a second arc surface, and the driving roller is respectively against the first arc surface and the second arc surface;

[0022] One end of the first driving wedge block and the second driving wedge block are connected as a whole, and the first driving wedge block and the second driving wedge block slide along a track, and the track is horizontal and arranged along the extension direction of the tunnel.

[0023] The extended end of the driving truss is provided with a first prying roller, the first prying roller is arranged in parallel with the driving roller, and the roller body of the first prying roller abuts against the lower rail surface of the central supporting body; the extended end of the prying frame is provided with a second prying roller, the second prying roller is arranged in parallel with the first prying roller, and the roller body of the second prying roller abuts against the lower rail surface of the auxiliary supporting body;

[0024] The connecting portion includes a connecting roller disposed at the extended end of the auxiliary supporting body, the connecting roller is arranged in parallel with the first prying roller, and the roller body of the connecting roller abuts against the lower rail surface of the central supporting body on both sides of the tunnel respectively.

[0025] In a preferred embodiment of the invention: the floating connecting frame includes at least two groups of support units, and the support units are arranged on both sides of the extension end of the central support body on both sides of the tunnel. The support units are arc-shaped as a whole and are provided with at least four groups of floating connecting rollers. The floating connecting rollers are arranged horizontally and along the extension direction of the tunnel. The four groups of floating connecting rollers are arranged in pairs in the up and down directions, and the two groups of floating connecting rollers located above are respectively against the upper rail surface of the extension end of the central support body.

[0026] Technical Effects

[0027] The steel arch structure includes central support bodies symmetrically arranged on both sides of the tunnel, which can realize the preliminary support of the tunnel surrounding rock with a large cross section, and the extension ends of the two sets of central support bodies are connected by a floating connecting frame, so that the two sets of central support bodies form a whole, thereby improving the stability of the structure. The driving mechanism drives the driving truss to rotate around the hinge axis, so that the central support bodies on both sides of the tunnel can be linked to move away from each other, so that the central support body abuts against the inner side wall of the tunnel surrounding rock, and then when the tunnel is deformed, the spacing between the two sets of central support bodies can be increased or decreased according to the deformation of the tunnel, so as to eliminate the problems such as collapse caused by stress concentration after the tunnel surrounding rock is destroyed, and ensure the support safety of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the structure of the assembled large-section tunnel steel arch structure in one embodiment of the present invention. Figure 1 ;

[0029] Figure 2 This is a schematic diagram of the structure of the assembled large-section tunnel steel arch structure in one embodiment of the present invention. Figure 2 ;

[0030] Figure 3 It is a front view of an assembled large-section tunnel steel arch structure in one embodiment of the present invention;

[0031] Figure 4 It is a partial structural cross-sectional schematic diagram of an assembled large-section tunnel steel arch structure in one embodiment of the present invention;

[0032] Figure 5 This is a schematic diagram of the partial structure of the central support body, the driving truss and the support frame in the assembled large-section tunnel steel arch structure in one embodiment of the present invention. Figure 1 ;

[0033] Figure 6 This is a schematic diagram of the partial structure of the central support body, the driving truss and the support frame in the assembled large-section tunnel steel arch structure in one embodiment of the present invention. Figure 2 ;

[0034] Figure 7 It is a partial structural schematic diagram of the cooperation between the auxiliary support body, the prying frame and the supporting frame in the assembled large-section tunnel steel arch frame structure in one embodiment of the present invention. DETAILED DESCRIPTION

[0035] In order to make the purpose and advantages of the present invention more clearly understood, the present invention is specifically described in conjunction with the following embodiments. It should be understood that the following text is only used to describe one or several specific embodiments of the present invention, and does not strictly limit the scope of protection of the specific claims of the present invention. As used herein, the terms "parallel" and "perpendicular" are not limited to their strict geometric definitions, but include tolerances for reasonable and inconsistent machining or human errors;

[0036] The following is combined with Figures 1 to 7 , the assembled large-section tunnel steel arch structure of the present invention is described in detail:

[0037] In the actual construction of large-section tunnels, step-by-step block construction is generally adopted. For example, in the actual construction of large-section tunnels in urban roads, CRD tunnel construction is often adopted. The CRD method follows the construction principle of "small division, short steps, short cycles, fast closure, frequent measurement, and strong support". From top to bottom, blocks are formed into rings, and support is provided as the excavation progresses, and initial support is provided in a timely manner. The CRD method is suitable for excavation with a large span and strict control over the settlement and deformation of the surrounding rock. When the CRD method is used for excavation, each step of the excavation is closed into a ring, which has the advantages of both the step method and the double-side wall pilot pit method, is conducive to the stability of the surrounding rock and ensures construction safety. During the actual construction of the above-mentioned large-section tunnel, when the support structure is used to support the tunnel in sections, it is necessary to ensure that the support structure is easy to install and the reliability of the tunnel support is ensured. When supporting the large-section tunnel, especially when the tunnel in expansive soil is actually supported, the excavation of the tunnel during actual construction causes stress concentration and stress redistribution, causing damage to the surrounding rock in a certain range, and the tunnel surrounding rock will form a loose circle. The fragmented surrounding rock is mostly fractured rock mass or fragmented rock mass after destruction. These rock mass structures restrict construction safety. Once the support structure is unreasonable, it will cause large deformation of the fragmented surrounding rock tunnel. The stress of the deformation of the surrounding rock is applied to the support structure, which is easy to cause stress concentration, and then lead to support collapse. For this purpose, the present invention proposes an assembled large-section tunnel steel arch frame structure.

[0038] The steel arch structure specifically includes a central support body 100, which is provided with two groups and is symmetrically arranged on both sides of the tunnel; a floating connecting frame 200, which is arranged on the central support body 100 and realizes the connection between the central support bodies 100 on both sides of the tunnel; a driving truss 300, which is connected to the central support body 100 and is symmetrically arranged on both sides of the tunnel; a supporting frame 400, which is arranged on both sides of the tunnel, and the driving truss 300 is hingedly arranged on the supporting frame 400 and the hinge axis is arranged along the extension direction of the tunnel; the driving mechanism drives the driving truss 300 to rotate around the hinge axis and links the central support body 100 to abut against the surrounding rock of the tunnel.

[0039] In one embodiment, the central support body 100 is an arc plate-shaped structure as a whole, and the cross-section is an I-shaped structure, which has excellent bending resistance and is very suitable for tunnel support. The central support body 100 can be a PC prefabricated part or a steel structure. Its structure is stable and has stronger supporting capacity. The floating connecting frame 200 is arranged between the central support bodies 100 on both sides of the tunnel, which can realize the floating connection between the two groups of central support bodies 100, and can form a semi-circular whole between the floating connecting frames 200 on both sides, thereby forming a continuous arch support structure to ensure the reliability of tunnel position support.

[0040] In one embodiment, when implementing tunnel surrounding rock support, the central support body 100 is a unit arch frame structure that constitutes the steel arch frame structure. The unit arch frame structure is arranged along the extension direction of the tunnel, and the structure of the unit arch frame structure in each section of the tunnel is consistent, and the size can be adaptively adjusted according to the change in the size of the tunnel.

[0041] In one embodiment, the sizes of various components in the steel arch frame structure, including the central support body 100, the floating connecting frame 200, the driving truss 300 and the support frame 400 at each stage, should be consistent, which can effectively reduce the actual production cost of each component and effectively improve the production efficiency and assembly efficiency. Since there is a certain pressure relief distance between each component when each steel arch frame structure is actually installed, the actual production error can be effectively eliminated.

[0042] In one embodiment, the driving mechanism is started to drive the truss 300 to rotate around the hinge axis, so that the central support body 100 abuts against the tunnel surrounding rock, thereby supporting the tunnel surrounding rock. By adjusting the central support body 100, when it is actually installed in the tunnel, it is convenient to introduce it into the tunnel without being expanded. When a segment of the steel arch structure is installed, the size of the central support frame 100 can be enlarged by starting the driving mechanism, thereby implementing effective support for the surrounding rock.

[0043] In one embodiment, the steel arch structure also includes two groups of auxiliary support bodies 500, which are arranged in the front and rear directions of the central support body 100 and are respectively arranged on both sides of the tunnel, and the extension direction of the auxiliary support body 500 is consistent with the extension direction of the central support body 100. The two groups of auxiliary support bodies 500 are respectively provided with prying frames 600, and the prying frames 600 are hinged to the support frame 400 and the hinge axis is arranged along the extension direction of the tunnel. The driving mechanism drives the prying frame 600 to rotate around the hinge axis and link the two groups of auxiliary support bodies 500 to move away from each other and against the surrounding rock of the tunnel.

[0044] The two groups of auxiliary support bodies 500 are arranged in the front and rear directions of the central support body 100, and one ends of the two groups of auxiliary support bodies 500 are arranged on both sides of the tunnel. The extension direction of the auxiliary support body 500 is consistent with the extension direction of the central support body 100. The auxiliary support body 500 is an arc-shaped plate as a whole, and the cross-section is an I-shaped, which can effectively improve the bending resistance of the auxiliary support body 500. The extension length of the auxiliary support body 500 is more than one quarter of the arc. The auxiliary support bodies 500 arranged on both sides of the tunnel can form more than one semicircular arc, and cooperate with the central support body 100 to further reliably support the surrounding rock of the tunnel.

[0045] When actually supporting the surrounding rock, the driving mechanism is started to drive the prying frame 600 to rotate around the intersection axis, thereby linking the free ends of the two groups of auxiliary support bodies 500 to move away from each other and abut against the surrounding rock to cooperate with the central support body 100 to achieve further support for the surrounding rock.

[0046] In one embodiment, the extending ends of the two groups of auxiliary support bodies 500 are respectively provided with connecting parts, and the connecting parts are connected to the central support body 100 on the adjacent side. When the two groups of auxiliary support bodies 500 are far away from each other, the ends of the free ends of the two groups of central support bodies 100 connected by the connecting parts are far away from each other.

[0047] The connecting part is connected to the central support body 100 on the adjacent side. When the driving mechanism drives the two groups of auxiliary support bodies 500 to move away from each other, the two groups of central support bodies 100 are moved away from each other through the connecting part, so that the central support body 100 can support the surrounding rock of the tunnel. In combination with the two groups of auxiliary support bodies 500, the surrounding rock of a section of the tunnel can be supported.

[0048] In one embodiment, the driving mechanism drives the prying frame 600 to rotate around the hinge axis and the driving truss 300 to rotate around the hinge axis.

[0049] In order to implement the support of the surrounding rock of a section, when the above-mentioned driving rod mechanism is started, the prying frame 600 is first driven around the axis to make the two groups of auxiliary support bodies 500 move away from each other to implement the support of the surrounding rock, and then the truss 300 is driven around the axis to make the two groups of central support bodies 100 work, and then further support the surrounding rock is implemented. This step-by-step driving method can reduce the adjustment resistance of the actual support and drive the two groups of central support bodies 100 and the two groups of auxiliary support bodies 500 with a reliable line of sight.

[0050] In one embodiment, the central support body 100 and the auxiliary support body 500 are both in the shape of an arc plate, and the cross-section is I-shaped. One end of the central support body 100 and the auxiliary support body 500 are movably mounted on the support frame 400. When the driving mechanism drives the driving truss 300 and the prying frame 600 to rotate around the hinge axis, one end of the central support body 100 and the auxiliary support body 500 are located on the support frame 400 and rotate.

[0051] When the driving mechanism is driven, the driving truss 300 and the prying frame 600 rotate around the hinge axis, thereby linking one end of the central support body 100 and the auxiliary support body 500 to rotate on the support frame 400, so that the extended ends of the central support body 100 and the auxiliary support body 500 are tilted, and then the central support body 100 and the auxiliary support body 500 can be abutted against the surrounding rock to implement support for the surrounding rock.

[0052] In one embodiment, a first arc-shaped head 110 is provided at one end of the central support body 100, a second arc-shaped head 510 is provided at one end of the auxiliary support body 500, and a first support groove 410 is provided on the support frame 400. The first support groove 410 is arranged horizontally and along the extension direction of the tunnel. The cross-section of the first support groove 410 is semicircular, and the first arc-shaped head 110 and the second arc-shaped head 510 are clamped in the first support groove 410.

[0053] In one embodiment, the cross-section of the first support groove 410 is arc-shaped, and the cross-sections of the second arc-shaped head 510 at one end of the auxiliary support body 500 and the first arc-shaped head 110 at one end of the central support body 100 are consistent with the cross-sectional profile of the first support groove 410. Therefore, after one end of the central support body 100 and the auxiliary support body 500 are arranged in the first support groove 410, when the driving mechanism drives the driving truss 300 and the prying frame 600 to rotate around the hinge axis, one end of the central support body 100 and the auxiliary support body 500 can be in an active state on the support frame 400. Through the arrangement of this mechanism, the installation of the central support body 100 and the auxiliary support body 500 can be facilitated, the installation steps can be simplified, and the construction efficiency can be improved.

[0054] In one embodiment, in order to drive the driving truss 300 and the prying frame 600 around the hinge axis, the driving mechanism includes a driving roller 710 near the middle section of the driving truss 300 and the prying frame 600, the driving roller 710 is horizontally arranged along the extension direction of the tunnel, the driving roller 710 is rotatably mounted on the roller frame 720, the vertical sliding is arranged on the linkage body 730, an elastic support body 740 is arranged between the linkage body 730 and the roller frame 720, the linkage body 730 extends vertically downward and a linkage roller 750 is arranged at the extension end, and the linkage roller 750 is horizontally arranged along the width direction of the tunnel.

[0055] In one embodiment, by driving the interlocking roller 750, the roller frame 720 is lifted, and then the elastic support body 740 is compressed. When compressed to a certain extent, the driving roller 710 can be linked to move vertically upward, and then the driving truss 300 and the prying frame 600 are driven to rotate around the hinge axis, so as to link the central support body 100 and the auxiliary support body 500 to deflect in the first support groove 410 on the support frame 400, so that the overhanging ends of the central support body 100 and the auxiliary support body 500 are tilted, thereby implementing support for the surrounding rock.

[0056] In one embodiment, the elastic support body 740 can be a high-elasticity, large-sized metal spring. Through the elastic support body 740, the entire steel arch frame structure can have a certain deformable space, which can effectively absorb the compressive stress of the tunnel surrounding rock and avoid the collapse of the steel arch frame structure.

[0057] In one embodiment, the elastic support body 740 may be a high-density sleeper or a corresponding high-elasticity building material.

[0058] In one embodiment, in order to drive the interlocking roller 750 so that the interlocking roller 750 moves vertically, the driving mechanism also includes a first driving wedge 760 and a second driving wedge 770; the first driving wedge 760 is provided with a first inclined surface 761 and a first plane 762, and the first inclined surface 761 and the first plane 762 respectively abut against the interlocking roller 750 on the driving truss 300; the second driving wedge 770 is provided with a second inclined surface 771 and a second plane 772, and the second inclined surface 771 and the second plane 772 respectively abut against the interlocking roller 750 on the prying frame 600.

[0059] In one embodiment, the first driving wedge 760 and the second driving wedge 770 can be connected as a whole, and the first driving wedge 760 and the second driving wedge 770 can move horizontally. By driving the first driving wedge 760 and the second driving wedge 770, the vertical driving of the linkage roller 750 on the prying frame 600 and the driving truss 300 can be linked to drive the overhanging ends of the central support body 100 and the auxiliary support body 500 to tilt up, thereby implementing support for the surrounding rock.

[0060] In one embodiment, the distance between the second inclined surface 771 and the interlocking roller 750 is smaller than the distance between the first inclined surface 761 and the interlocking roller 750. When the first driving wedge block 760 and the second driving wedge block 770 move synchronously, the second inclined surface 771 first drives the interlocking roller 750 to move up, and then the first inclined surface 761 drives the interlocking roller 750 to move up, thereby achieving the purpose of the driving mechanism driving the prying frame 600 to rotate around the hinge axis and driving the truss 300 to rotate around the hinge axis.

[0061] In one embodiment, when the first plane 762 and the second plane 772 are respectively in contact with the interlocking roller 750 , the central supporting body 100 and the auxiliary supporting body 500 are kept in a state of supporting the surrounding rock.

[0062] In one embodiment, a linkage support roller 711 is further arranged in parallel beside the driving roller 710 , and the linkage support roller 711 is respectively arranged on the lower rail surface of the central supporting body 100 and the auxiliary supporting body 500 .

[0063] When the driving mechanism drives the prying frame 600 forward and backward to rotate around the hinge axis and drives the truss 300 to rotate around the hinge axis, the linked support roller 711 can implement preliminary driving of the central support body 100 and the auxiliary support body 500. As the driving roller 710 continues to be vertical, the central support body 100 and the auxiliary support body 500 are further propped up to provide further support for the surrounding rock.

[0064] In one embodiment, the lower rail surfaces of the driving truss 300 and the prying frame 600 are respectively provided with a first arc surface 310 and a second arc surface 610 , and the driving roller 710 abuts against the first arc surface 310 and the second arc surface 610 .

[0065] In one embodiment, when the driving roller 710 abuts against the first curved surface 310 and the second curved surface 610, as the driving roller 710 moves vertically, the angle change of the driving truss 300 and the prying frame 600 around the axis can be caused to fluctuate, thereby changing and adjusting the posture of the central support body 100 and the auxiliary support body 500 to be opened.

[0066] In one embodiment, one end of the first driving wedge 760 and the second driving wedge 770 are connected as a whole, and the first driving wedge 760 and the second driving wedge 770 slide along a track 780, and the track 780 is horizontally arranged along the extension direction of the tunnel.

[0067] After the installation of a section of the steel arch frame is completed, a cylinder is arranged on the track, one end of the cylinder is fixed, and the piston rod of the cylinder is pressed against one end of the first driving wedge block 760 and the second driving wedge block 770. The cylinder is started to make the first driving wedge block 760 and the second driving wedge block 770 slide along the track 780, thereby driving the driving truss 300 and the prying frame 600 around the axis, thereby expanding the central support body 100 and the auxiliary support body 500 to support the surrounding rock of the tunnel.

[0068] In one embodiment, in order to implement the first prying roller 320, the extended end of the driving truss 300 is provided with a first prying roller 320, the first prying roller 320 is arranged in parallel with the driving roller 710, and the roller body of the first prying roller 320 abuts against the lower rail surface of the driving truss 300, and the extended end of the prying frame 600 is provided with a second prying roller 620, the second prying roller 620 is arranged in parallel with the first prying roller 320, and the roller body of the second prying roller 620 abuts against the lower rail surface of the prying frame 600.

[0069] When the driving truss 300 and the prying frame 600 rotate around the axis, the central support body 100 and the auxiliary support body 500 can be pried by the first prying roller 320 and the second prying roller 620, so that the two groups of central support bodies 100 and the two groups of auxiliary support bodies 500 are spread apart to support the surrounding rock.

[0070] As a further preferred embodiment of the present invention, the connecting portion includes a connecting roller 520 arranged at the extending end of the auxiliary support body 500, the connecting roller 520 is arranged parallel to the first prying roller 320, and the roller body of the connecting roller 520 is respectively against the lower rail surface of the central support body 100 on both sides of the tunnel.

[0071] In one embodiment, the connecting roller 520 abuts against the lower rail surface of the central support body 100 , and when the prying frame 600 rotates around the axis, the auxiliary support body 500 is pried, and then the central support body 100 is initially opened.

[0072] In one embodiment, the floating connecting frame 200 includes at least two groups of support units, and the support units are arranged on both sides of the extension end of the central support body 100 on both sides of the tunnel. The support units are arc-shaped as a whole and are provided with at least four groups of floating connecting rollers 210. The floating connecting rollers 210 are arranged horizontally and along the extension direction of the tunnel. The four groups of floating connecting rollers 210 are arranged in pairs in the up and down directions, and the two groups of floating connecting rollers 210 located at the top are respectively against the upper rail surface of the extension end of the central support body 100.

[0073] The floating connecting frame 200 includes floating connecting rollers 210 arranged in pairs in the vertical direction, which can make the floating connecting frame 200 located on the extended end of the central support body 100 present a floating posture, and then when the central support body 100 is tilted away around one end, the two groups of central support bodies 100 can still be connected as a whole, so as to provide real-time overall support for the surrounding rock and ensure the reliability of the surrounding rock support.

[0074] In summary, the steel arch structure includes central support bodies 100 symmetrically arranged on both sides of the tunnel, which can achieve preliminary support for large-section tunnel surrounding rocks, and the extended ends of the two groups of central support bodies 100 are connected by a floating connecting frame 200, so that the two groups of central support bodies 100 form a whole, thereby improving the stability of the structure. The driving truss 300 is driven by the driving mechanism to rotate around the hinge axis, thereby linking the central support bodies 100 on both sides of the tunnel to move away from each other, so that the central support body 100 abuts against the inner wall of the tunnel surrounding rock. When the tunnel is deformed, the spacing between the two groups of central support bodies 100 can be increased or decreased according to the deformation of the tunnel, so as to eliminate the problems such as collapse caused by stress concentration after the tunnel surrounding rock is destroyed, thereby ensuring the support safety of the tunnel.

[0075] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. An assembled large-section tunnel steel arch structure, Features: include The central support body (100) is provided in two groups and is symmetrically arranged at both sides of the tunnel; A floating connection frame (200) is arranged on the central support body (100) and realizes the connection between the central support bodies (100) on both sides of the tunnel; A driving truss (300) connected to the central support body (100) and symmetrically arranged at two sides of the tunnel; A support frame (400) is arranged at two sides of the tunnel, and the driving truss (300) is hingedly arranged on the support frame (400) and the hinge axis is arranged along the extension direction of the tunnel; The driving mechanism drives the driving truss (300) to rotate around the hinge axis and links the central supporting body (100) to abut against the tunnel surrounding rock.

2. The assembled large-section tunnel steel arch structure according to claim 1, Features: It also includes two groups of auxiliary support bodies (500), which are arranged in the front and rear directions of the central support body (100) and are respectively arranged at two sides of the tunnel, and the extension direction of the auxiliary support body (500) is consistent with the extension direction of the central support body (100); The two groups of auxiliary support bodies (500) are respectively provided with a prying frame (600), the prying frame (600) is hinged to the support frame (400), and the hinge axis is arranged along the extension direction of the tunnel, and the driving mechanism drives the prying frame (600) to rotate around the hinge axis and link the two groups of auxiliary support bodies (500) to move away from each other and abut against the tunnel surrounding rock.

3. The assembled large-section tunnel steel arch structure according to claim 2, Features: The extending ends of the two groups of auxiliary support bodies (500) are respectively provided with connecting parts, and the connecting parts are connected to the central support bodies (100) on the adjacent sides. When the two groups of auxiliary support bodies (500) are far apart, the two groups of central support bodies (100) are connected to each other through the connecting parts.

4. The assembled large-section tunnel steel arch structure according to claim 3, Features: The driving mechanism drives the prying frame (600) to rotate around the hinge axis and the driving truss (300) to rotate around the hinge axis.

5. The assembled large-section tunnel steel arch structure according to claim 2, Features: The central support body (100) and the auxiliary support body (500) are both in the shape of an arc plate, and the cross section is in the shape of an I-beam, and one end of the central support body (100) and the auxiliary support body (500) are movably mounted on the support frame (400); When the driving mechanism drives the driving truss (300) and the prying frame (600) to rotate around the hinge axis, one end of the central support body (100) and the auxiliary support body (500) are located on the support frame (400) and rotate.

6. The assembled large-section tunnel steel arch structure according to claim 5, Features: A first arc-shaped head (110) is provided at one end of the central support body (100), a second arc-shaped head (510) is provided at one end of the auxiliary support body (500), a first support groove (410) is provided on the support frame (400), the first support groove (410) is arranged horizontally and along the extension direction of the tunnel, the cross-section of the first support groove (410) is semicircular, and the first arc-shaped head (110) and the second arc-shaped head (510) are clamped in the first support groove (410).

7. The assembled large-section tunnel steel arch structure according to claim 4, Features: The driving mechanism comprises a driving roller (710) located near the middle section of the driving truss (300) and the prying frame (600), the driving roller (710) being arranged horizontally and along the extension direction of the tunnel, the driving roller (710) being rotatably mounted on a roller frame (720), the roller frame (720) being vertically slidably arranged on a linkage body (730), an elastic support body (740) being arranged between the linkage body (730) and the roller frame (720), the linkage body (730) extending vertically downward and a linkage roller (750) being arranged at the extension end, the linkage roller (750) being arranged horizontally and along the width direction of the tunnel; The driving mechanism further comprises a first driving wedge (760) and a second driving wedge (770); The first driving wedge block (760) is provided with a first inclined surface (761) and a first plane (762), and the first inclined surface (761) and the first plane (762) are respectively in contact with the linkage roller (750) on the driving truss (300); The second driving wedge block (770) is provided with a second inclined surface (771) and a second plane (772), and the second inclined surface (771) and the second plane (772) respectively abut against the linkage roller (750) on the prying frame (600).

8. The assembled large-section tunnel steel arch structure according to claim 7, Features: A linked support roller (711) is also arranged in parallel beside the driving roller (710), and the linked support roller (711) is respectively arranged on the lower rail surface of the central support body (100) and the auxiliary support body (500); The lower rail surfaces of the driving truss (300) and the prying frame (600) are respectively provided with a first arc surface (310) and a second arc surface (610), and the driving roller (710) is respectively in contact with the first arc surface (310) and the second arc surface (610); One end of the first driving wedge (760) and the second driving wedge (770) are connected as a whole, and the first driving wedge (760) and the second driving wedge (770) slide along a track (780), and the track (780) is horizontal and arranged along the extension direction of the tunnel.

9. The assembled large-section tunnel steel arch structure according to claim 7, Features: The extended end of the driving truss (300) is provided with a first prying roller (320), the first prying roller (320) is arranged in parallel with the driving roller (710), and the roller body of the first prying roller (320) abuts against the lower rail surface of the central supporting body (100); The extended end of the prying frame (600) is provided with a second prying roller (620), the second prying roller (620) is arranged in parallel with the first prying roller (320), and the roller body of the second prying roller (620) abuts against the lower rail surface of the auxiliary supporting body (500); The connecting portion comprises a connecting roller (520) arranged at the extended end of the auxiliary supporting body (500), the connecting roller (520) being arranged in parallel with the first prying roller (320), and the roller body of the connecting roller (520) respectively abuts against the lower rail surface of the central supporting body (100) on both sides of the tunnel.

10. The assembled large-section tunnel steel arch structure according to claim 1, Features: The floating connection frame (200) comprises at least two groups of support units, the support units are arranged on both sides of the extension end of the central support body (100) on both sides of the tunnel, the support units are arc-shaped as a whole and are provided with at least four groups of floating connection rollers (210), the floating connection rollers (210) are arranged horizontally and along the extension direction of the tunnel, the four groups of floating connection rollers (210) are arranged in pairs in the vertical direction, and the two groups of floating connection rollers (210) located at the top are respectively against the upper rail surface of the extension end of the central support body (100).