Preparation method of parallel sample with consistency of shale oil reservoir rock
By cutting the core samples of the shale oil reservoir into sheets and cutting them in a perpendicular direction to the lamination surface, consistent parallel samples were prepared, which solved the problem of sample rupture and consistency in the prior art, and improved the success of sample preparation rate and efficiency.
Patent Information
- Application Number
- CN202310532993.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-12
AI Technical Summary
It is difficult to prepare parallel samples of mud shale oil and gas reservoirs that meet the experimental requirements in the prior art. The samples are prone to rupture and irregular in shape during the smashing process, and the physical properties and pore characteristics of the parallel samples cannot be guaranteed.
By cutting the frozen shale oil reservoir core samples into sheet samples along the lamination surface, and cutting them in the direction perpendicular to the lamination surface using a cutting tool, 2 or 3 parallel samples are prepared to ensure the consistency of the samples. Sex assessment meets the requirements.
It improves the success rate and efficiency of sample preparation, ensures that the sample is regular in appearance and does not produce cracks, meets the consistency requirements of geological analysis, and can efficiently prepare parallel samples that meet the experimental requirements.
Smart Images

Figure CN118937022A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and gas exploration and development experimental testing, and in particular to a method for preparing parallel samples of shale oil reservoir rocks with consistency. Background Art
[0002] In recent years, shale oil has become one of the hot spots of oil and gas exploration and development in China. Geological experiments are the basis of shale oil exploration and development. Qualified experimental samples are the prerequisite for the smooth implementation of experimental analysis and ensuring the accuracy of analytical data. Parallel samples are often used in experimental analysis, requiring the consistency of lithology, physical properties and pore characteristics between parallel samples. However, due to the poor homogeneity of shale, dense lithology, and developed bedding fractures, it is difficult to prepare parallel samples that meet the experimental requirements using the previous sandstone preparation method. Therefore, there is a lack of an effective shale parallel sample preparation method.
[0003] In the past, the preparation of block samples was mainly based on hammering. The required samples were hammered at different positions on one end of a full-diameter sample. For sandstone with good homogeneity, the parallel samples hammered have good consistency. Sandstone has good diagenesis and undeveloped bedding fissures, so the samples hammered will not produce cracks or breakage. For layered shale, according to the above preparation, a sheet sample of suitable thickness can be taken along the bedding, and the required sample is prepared on this sample by hammering. However, due to the development of shale layered bedding, it will be broken along the bedding plane during the hammering process, producing irregular thin slice samples with jagged edge bedding. Moreover, the thin slice sample will also produce microcracks that cannot be distinguished by the naked eye under the action of the external force of hammering, and the pore structure will change. Therefore, it is difficult to prepare samples that can meet the needs of geological analysis by hammering. Even if parallel samples are prepared by hammering on the same sheet sample, the relative position relationship between the samples cannot be determined, and the consistency of physical properties and pore characteristics between parallel samples cannot be guaranteed. Summary of the invention
[0004] The present invention proposes a method for preparing parallel samples of shale oil reservoir rocks with consistency, so as to solve the problem that in the past, when preparing shale oil and gas reservoir rock samples, the method of smashing is adopted, the samples and parallel samples are broken and shattered along the bedding, the sample shapes are irregular, and jagged thin slices are formed, which leads to changes in the pore structure of the samples and cannot meet the requirements of subsequent experiments. At the same time, the consistency between parallel samples (consistency refers to the same or similar rock properties, and the rock properties mainly include lithology, physical properties, seepage characteristics, pore structure, fluid distribution, etc.) cannot be guaranteed.
[0005] According to one aspect of the present invention, a method for preparing parallel samples of shale oil reservoir rocks having consistency is provided, comprising:
[0006] Obtain frozen shale oil reservoir core samples from the work area;
[0007] The core sample is formed into a full-diameter sheet core sample of a predetermined thickness along the core bedding plane;
[0008] The flaky core sample is prepared into 2 parallel samples or 3 parallel samples;
[0009] The method for preparing two parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample in a direction perpendicular to the bedding plane to form two parts of the sample, selecting one part of the sample, cutting it into a rectangular parallelepiped sample, and then cutting it into two parallel samples;
[0010] The method for preparing three parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample at 1 / 3 of the diameter in a direction perpendicular to the bedding plane to form two parts of the sample, selecting a relatively larger sample and cutting it into three parallel samples;
[0011] The consistency of all the parallel samples is evaluated, and if all the parallel samples meet the consistency requirements, the parallel sample preparation is completed.
[0012] Preferably, the method of selecting a portion of the samples, cutting them into rectangular parallelepiped samples, and then cutting them into two parallel samples comprises:
[0013] Performing a second cutting on a portion of the selected samples, wherein the tangent line of the second cutting is parallel to the tangent line of the first cutting, and the distance between the tangent line of the first cutting and the tangent line of the second cutting is 20 mm to 25 mm;
[0014] Perform a third cut on the arc-shaped parts at both ends of a portion of the sample with cutting lines on both sides, with the tangent line of the third cut being perpendicular to the tangent lines of the first and second cuts, so that the portion of the sample forms a rectangular parallelepiped sample with a length of 50 mm to 60 mm and a width of 20 mm to 25 mm;
[0015] The rectangular sample is cut for the fourth time from the middle part, so that the rectangular sample forms two parallel samples, wherein the tangent line of the fourth cutting is perpendicular to the tangent line of the first cutting.
[0016] Preferably, the method of selecting a portion of the samples, cutting them into rectangular parallelepiped samples, and then cutting them into two parallel samples comprises:
[0017] Performing a second cutting on a portion of the selected samples, wherein the tangent line of the second cutting is parallel to the tangent line of the first cutting, and the distance between the tangent line of the first cutting and the tangent line of the second cutting is 40 mm to 60 mm;
[0018] Perform a third cut on the arc-shaped parts at both ends of a portion of the sample with cutting lines on both sides, with the tangent line of the third cut being perpendicular to the tangent lines of the first and second cuts, so that the portion of the sample forms a rectangular or cube sample with a length of 40 mm to 60 mm and a width of 20 mm to 40 mm;
[0019] The rectangular or cube sample is cut for the fourth time from the middle part, so that the rectangular sample forms two parallel samples, wherein the tangent line of the fourth cutting is parallel to the tangent line of the first cutting.
[0020] Preferably, the method of selecting a relatively larger sample and cutting it into three parallel samples comprises:
[0021] Performing a second cutting on a portion of the selected samples, wherein the tangent line of the second cutting is parallel to the tangent line of the first cutting, and the distance between the tangent line of the first cutting and the tangent line of the second cutting is 40 mm to 60 mm;
[0022] The sample cut for the second time is cut for the third time along the middle position to form two samples, and the tangent line of the third cutting is parallel to the tangent line of the first cutting;
[0023] The arc-shaped parts at both ends of the relatively larger sample of the two samples formed after the third cutting are cut for the fourth time to form a sample with a length of 50 mm to 60 mm, and the tangent of the fourth cutting is perpendicular to the tangent of the first cutting. The sample after the fourth cutting is cut for the fifth time from the middle position, and the tangent of the fifth cutting is parallel to the tangent of the fourth cutting, so that the relatively larger sample forms two parallel samples with a length of 25 mm to 30 mm.
[0024] The arc-shaped parts at both ends of the relatively smaller sample of the two samples formed after the third cutting are cut for the sixth time, and the tangent line of the sixth cutting is perpendicular to the tangent line of the second cutting, so that this part of the sample forms a third parallel sample with a length of 25mm to 30mm.
[0025] Preferably, the method for assessing the consistency of all parallel samples comprises:
[0026] All the parallel samples are evaluated for consistency using the physical property method and / or the pore structure method. If the consistency evaluation results of the physical property method and / or the pore structure method for all the parallel samples meet the requirements, then all the parallel samples meet the consistency requirements.
[0027] Preferably, the method for evaluating the consistency of all parallel samples using a physical property method comprises:
[0028] Performing porosity analysis on all the parallel samples to determine the porosity of each parallel sample;
[0029] If the porosity difference between each of the parallel samples is ≤1%, the consistency assessment results of all the parallel samples meet the requirements.
[0030] Preferably, the method for evaluating the consistency of all parallel samples using the pore structure method comprises:
[0031] Performing nuclear magnetic resonance analysis on all the parallel samples to obtain T2 spectrum distributions of all the parallel samples;
[0032] According to the T2 spectrum distribution, determine whether the NMR T2 of all the parallel samples satisfies formula (1) and formula (2). If yes, the consistency assessment results of all the parallel samples meet the requirements;
[0033] log(T A95 )-log(T B95 )≤±0.2 (1);
[0034] log(T A5 )-log(T B5 )≤±0.2 (2);
[0035] Where:
[0036] T A5 is the relaxation time corresponding to 5% of the cumulative porosity component of the NMR T2 spectrum of parallel sample A, ms;
[0037] T A95 is the relaxation time corresponding to 95% of the cumulative porosity component of the NMR T2 spectrum of parallel sample A, ms;
[0038] T B5 is the relaxation time corresponding to 5% of the cumulative porosity component of the NMR T2 spectrum of parallel sample B, ms;
[0039] T B95 is the relaxation time corresponding to 95% of the cumulative porosity component of the NMR T2 spectrum of parallel sample B, ms.
[0040] Preferably, the cutting tool comprises: a motor, a saw blade, a sample holder, a roller, a roller fixing frame and a curved arm;
[0041] The motor is connected to the saw blade via an output shaft, the motor is used to drive the saw blade to rotate along a concentric axis, and the saw blade is used to cut the core sample;
[0042] The sample holder is connected to the top shaft of the curved arm, the bottom end of the curved arm is connected to the roller shaft, and the curved arm and the roller are perpendicular to each other;
[0043] The two end shafts of the roller are connected to the roller fixing frame.
[0044] Preferably, the sample holder comprises: a bottom plate, a side plate and a fixed ejector pin;
[0045] The side plate is connected to the top surface of the bottom plate, the side plate and the bottom plate are perpendicular to each other, a cutting groove is provided on the bottom plate, and the bottom surface of the bottom plate is connected to the curved arm;
[0046] The body of the fixed ejector pin is L-shaped, one arm of the fixed ejector pin is connected to the side plate, and the end of the other arm is located above the top surface of the bottom plate.
[0047] The present invention has at least the following beneficial effects:
[0048] The present invention proposes a method for preparing parallel samples with consistency for shale oil reservoir rocks. The method comprises the following steps: cutting a core sample into flaky core samples along a bedding plane, and then using a cutting tool to cut the flaky core samples in a direction perpendicular to the bedding plane according to a predetermined rule. Each core sample has good consistency, and the samples can be replaced with each other. The sample preparation success rate and efficiency are high, the sample shape is regular and no cracks will be generated, and the experimental requirements can be well met. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] The accompanying drawings herein are incorporated into and constitute a part of the specification. These drawings illustrate embodiments consistent with the present invention and, together with the specification, are used to explain the technical solutions of the present invention.
[0050] Figure 1 A flow chart showing a method for preparing parallel samples of shale oil reservoir rocks having consistency according to an embodiment of the present invention;
[0051] Figure 2 A schematic diagram showing the cutting of two parallel samples according to an embodiment of the present invention is shown;
[0052] Figure 3 A schematic diagram showing the cutting of three parallel samples according to an embodiment of the present invention is shown;
[0053] Figure 4 A schematic structural diagram of a cutting tool according to an embodiment of the present invention is shown;
[0054] Figure 5 A schematic structural diagram of a clamp according to an embodiment of the present invention is shown;
[0055] Figure 6 A group of parallel sample nuclear magnetic resonance T2 spectrum distribution diagrams according to an embodiment of the present invention are shown.
[0056] In the figure, 1-flaky core sample, 2-cutting line, 3-cutting sequence number, 4-parallel sample, 5-saw blade, 6-motor, 7-roller, 8-roller fixing frame, 9-bend arm, 10-bottom plate, 11-side plate, 12-fixed ejector pin, 13-cutting groove. DETAILED DESCRIPTION
[0057] Various exemplary embodiments, features and aspects of the present invention will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.
[0058] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.
[0059] The term "and / or" herein is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the term "at least one" herein represents any combination of at least two of any one or more of a plurality of. For example, including at least one of A, B, and C can represent including any one or more elements selected from the set consisting of A, B, and C.
[0060] In addition, in order to better illustrate the present invention, numerous specific details are provided in the following specific embodiments. It should be understood by those skilled in the art that the present invention can be implemented without certain specific details. In some examples, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present invention.
[0061] Figure 1 A flow chart showing a method for preparing parallel samples of shale oil reservoir rocks having consistency according to an embodiment of the present invention; Figure 2 A schematic diagram showing the cutting of two parallel samples according to an embodiment of the present invention is shown; Figure 3 A schematic diagram showing the cutting of three parallel samples according to an embodiment of the present invention is shown; Figure 4 A schematic structural diagram of a cutting tool according to an embodiment of the present invention is shown; Figure 5 A schematic structural diagram of a clamp according to an embodiment of the present invention is shown; Figure 6 A group of parallel sample NMR T2 spectrum distribution diagrams according to an embodiment of the present invention are shown. Figure 1-6As shown, a method for preparing parallel samples of shale oil reservoir rock with consistency includes: step S01: obtaining a frozen shale oil reservoir core sample in a work area; step S02: preparing the core sample into a full-diameter flaky core sample of a predetermined thickness along the core bedding plane; step S03: preparing the flaky core sample into two parallel samples or three parallel samples; wherein the method for preparing two parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample in a direction perpendicular to the bedding plane to form two parts of the sample, selecting one part of the sample, cutting it into a rectangular sample, and then cutting it into two parallel samples; wherein the method for preparing three parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample in a direction perpendicular to the bedding plane at 1 / 3 of the diameter to form two parts of the sample, selecting a relatively larger sample, and cutting it into three parallel samples; step S04: evaluating the consistency of all the parallel samples, and if all the parallel samples meet the consistency requirements, the parallel sample preparation is completed.
[0062] The method for preparing parallel samples of shale oil reservoir rocks with consistency provided by the embodiment of the present invention specifically comprises the following steps:
[0063] Step S01: Obtain frozen shale oil reservoir core samples from the work area.
[0064] In the embodiment of the present invention, the shale oil reservoir core sample has developed bedding. Under the action of external force, the core sample will break or shatter along the bedding plane. For fresh core samples (i.e., the oil and water in the sample are not lost in large quantities), the water in the core sample acts as a consolidating adhesive, bonding and consolidating the particles and the bedding together, which can resist the external force to the greatest extent. The hardness of the frozen core sample increases, and the resistance to crushing is enhanced, which can improve the success rate of parallel sample preparation.
[0065] The full-diameter (or bulk) core samples of the shale oil reservoir from which the parallel samples are to be prepared are frozen by using liquid nitrogen or dry ice or a freezer, and the freezing temperature is ≤-40°C.
[0066] Step S02: along the core bedding plane, the core sample is made into a full-diameter sheet core sample of a predetermined thickness.
[0067] In the embodiment of the present invention, at the sampling depth of the full-diameter core sample of the frozen shale oil reservoir, a special core chopper is used to cut it into a full-diameter sheet core sample with a thickness of 15mm to 20mm along the core bedding plane.
[0068] Mudstone and shale are flaky structures, and a machete can be used to easily cut core samples of the required thickness, generally split along the bedding plane. Mudstone can be cut into core samples of the required thickness using cutting tools. The sample thickness can be determined according to the sample requirements of different analysis items. The dimensions given in this patent meet the required mass of block samples in the range of 15g to 35g. There are special requirements for sample mass and sample geometry. The dimensions can be changed according to actual conditions, but the positional contact relationship between parallel samples cannot be changed.
[0069] Step S03: preparing the flaky core sample into two parallel samples or three parallel samples; wherein the method for preparing the flaky core sample into two parallel samples comprises: using a cutting tool to perform a first cutting on the flaky core sample in a direction perpendicular to the bedding plane to form two parts of the sample, selecting one part of the sample, cutting it into a rectangular sample, and then cutting it into two parallel samples.
[0070] In the present invention, the method of selecting a part of the samples, cutting it into a rectangular sample, and then cutting it into two parallel samples includes: cutting the selected part of the samples for a second time, wherein the tangent of the second cut is parallel to the tangent of the first cut, and the distance between the tangent of the first cut and the tangent of the second cut is 20mm to 25mm; cutting the arc parts at both ends of a part of the samples having cutting lines on both sides for a third time, wherein the tangent of the third cut is perpendicular to the tangents of the first and second cuts, so that the part of the samples forms a rectangular sample with a length of 50mm to 60mm and a width of 20mm to 25mm; cutting the rectangular sample for a fourth time from the middle part, so that the rectangular sample forms two parallel samples, wherein the tangent of the fourth cut is perpendicular to the tangent of the first cut.
[0071] In the embodiment of the present invention, there are generally two specifications for coring shale oil reservoirs, conventional coring with a diameter of 100 mm and pressure-maintaining coring with a diameter of 80 mm. For the preparation of two parallel samples, two semicircular cores of the two specifications can meet the requirements for the preparation of parallel samples. The other semicircles are permanently retained in the core library according to the relevant core management regulations for future core observation, description and other research.
[0072] like Figure 2 The left picture in the figure shows the first cutting preparation method for two parallel samples. Figure 2In the left figure, 1 is a flaky core sample, 2 is a cutting line, 3 is a cutting sequence number, and 4 is a parallel sample; that is, the dotted line is a cutting line, and ①-④ is a cutting sequence, that is, during the first cutting, the flaky core sample is cut into two roughly identical parts along the dotted line ①; any part Y is taken and cut for the second time along the dotted line ②, and the distance between the position of the dotted line ② and the dotted line ① of the second cutting is 20mm-25mm, and the dotted line ① and the dotted line ② are parallel to each other; after the second cutting is completed, a relatively large part of the sample Y divided into two parts again, that is, the part of the sample Y1 with cutting lines ① and ② on both sides is cut for the third time along the dotted line ③, and the arc parts at both ends of Y1 are removed to form a rectangular sample Y2 with a length of 50mm-60mm and a width of 20mm-25mm; finally, Y2 is cut for the fourth time along the dotted line ④, so as to be evenly divided into two parallel samples.
[0073] In the present invention, the method of selecting a part of the samples, cutting it into a rectangular sample, and then cutting it into two parallel samples includes: cutting the selected part of the samples for a second time, wherein the tangent of the second cut is parallel to the tangent of the first cut, and the distance between the tangent of the first cut and the tangent of the second cut is 40mm to 60mm; cutting the arc parts at both ends of a part of the samples having cutting lines on both sides for a third time, wherein the tangent of the third cut is perpendicular to the tangents of the first and second cuts, so that the part of the samples forms a rectangular or cube sample with a length of 40mm to 60mm and a width of 20mm to 40mm; cutting the rectangular or cube sample for a fourth time from the middle part, so that the rectangular sample forms two parallel samples, wherein the tangent of the fourth cut is parallel to the tangent of the first cut.
[0074] In the embodiment of the present invention, Figure 2 The right figure in the figure shows the second cutting preparation method for two parallel samples. The dotted line in the figure is the cutting line, and ①-④ are the cutting sequence numbers, that is, during the first cutting, the flaky core sample is cut into two roughly identical parts along the dotted line ①; any part Y is taken and cut for the second time along the dotted line ②, and the distance between the dotted line ② and the dotted line ① of the second cutting is 40mm-60mm, and the dotted line ① and the dotted line ② are parallel to each other; after the second cutting is completed, a relatively larger part of the sample Y divided into two parts again, that is, the part of the sample Y1 with cutting lines ① and ② on both sides, is cut for the third time along the dotted line ③, and the arc parts at both ends of Y1 are removed to form a rectangular or cube sample Y2 with a length of 40mm-60mm and a width of 20mm-40mm; finally, Y2 is cut for the fourth time along the dotted line ④, so as to evenly divide it into two parallel samples.
[0075] In the present invention, the method for preparing three parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample at 1 / 3 of the diameter in a direction perpendicular to the bedding plane to form two parts of the sample, selecting a relatively larger sample and cutting it into three parallel samples.
[0076] In the present invention, the method of selecting a relatively larger sample and cutting it into three parallel samples comprises: performing a second cutting on a portion of the selected samples, wherein the tangent of the second cutting is parallel to the tangent of the first cutting, and the distance between the tangent of the first cutting and the tangent of the second cutting is 40 mm to 60 mm; performing a third cutting along the middle position of the sample after the second cutting to form two samples, wherein the tangent of the third cutting is parallel to the tangent of the first cutting; performing a fourth cutting on the arc-shaped portions at both ends of the relatively larger sample of the two samples formed after the third cutting. Cut to form a sample with a length of 50mm to 60mm, the tangent of the fourth cut is perpendicular to the tangent of the first cut, and then the sample after the fourth cut is cut for the fifth time from the middle position, the tangent of the fifth cut is parallel to the tangent of the fourth cut, so that the relatively large sample forms two parallel samples with a length of 25mm to 30mm; the arc-shaped parts at both ends of the relatively smaller sample of the two samples formed after the third cut are cut for the sixth time, the tangent of the sixth cut is perpendicular to the tangent of the second cut, so that this part of the sample forms a third parallel sample with a length of 25mm to 30mm.
[0077] In the embodiment of the present invention, Figure 3 The figure shows the cutting preparation method of three parallel samples. The dotted line in the figure is the cutting line, and ①-⑥ are the cutting sequence numbers. That is, in the first cutting, the flaky core sample is cut into two parts along the dotted line ①, where the position of the dotted line ① is at 1 / 3 of the diameter of the flaky core sample perpendicular to it, that is, the flaky core sample is cut at a diameter ratio of 1:3. A relatively small part of the sample is retained, and the larger part of the sample is cut into three parallel samples.
[0078] Take a larger portion of sample Y and cut it for the second time along dotted line ②. The distance between dotted line ② and dotted line ① is 40mm to 60mm, and dotted line ① is parallel to dotted line ②. After the second cutting is completed, a relatively larger portion of sample Y divided into two parts again, that is, the portion of sample Y1 with cutting lines ① and ② on both sides, is cut for the third time along dotted line ③, so that sample Y1 is formed into two samples y1 and y2 of equal width.
[0079] Of the two samples y1 and y2 with equal width, the relatively larger sample y1 is cut for the fourth time along the dotted line ④, i.e., the arc-shaped parts at both ends are cut off to form a sample y3 with a length of 50 mm to 60 mm. The sample y3 is cut for the fifth time along the middle position, i.e., the dotted line ⑤, to form two parallel samples of 25 mm to 30 mm in length.
[0080] The sample y2 is cut for the sixth time along the dotted line ⑥, that is, the arc-shaped parts at both ends are cut off to form a third parallel sample with a length of 25 mm to 30 mm.
[0081] Step S04: Evaluate the consistency of all the parallel samples. If all the parallel samples meet the consistency requirements, the parallel sample preparation is completed.
[0082] In the present invention, the method for evaluating the consistency of all parallel samples includes: evaluating the consistency of all the parallel samples using the physical property method and / or the pore structure method. If the consistency evaluation results of the physical property method and the consistency evaluation results of the pore structure method of all the parallel samples meet the requirements, then all the parallel samples meet the consistency requirements.
[0083] In the present invention, the method for evaluating the consistency of all parallel samples using physical property methods includes: performing porosity analysis on all the parallel samples to determine the porosity of each parallel sample; if the porosity difference between each parallel sample is ≤1%, the consistency of all the parallel samples meets the requirements.
[0084] In the embodiment of the present invention, the consistency assessment of parallel samples is one of the methods for assessing the consistency between parallel samples or for quality control, and the purpose is to screen out parallel samples with consistency, which is conducive to the analysis, application and research of the data analyzed between parallel samples. Since parallel samples are adjacent samples at the same depth, they have experienced the same sedimentation, diagenesis and reservoir formation, the porosity between samples is consistent, and the degree of similarity of other lithologies will be very high. In addition, porosity is the most conventional analysis technology in rock geological experiments, with a high penetration rate. The use of this parameter for parallel sample consistency assessment is highly operational and can meet most experimental requirements.
[0085] Porosity analysis needs to be carried out in accordance with relevant standards. Carrying out porosity analysis cannot affect the target analysis tasks of the prepared parallel samples. Porosity analysis should be carried out at a selected time according to the specific circumstances of the analysis project using parallel samples. Some porosity analysis may be carried out before the parallel sample analysis project, some during the parallel sample analysis project, and some after the parallel sample analysis project is completed. For example, porosity analysis must be carried out for saturation analysis, and porosity analysis is included in saturation analysis; mercury injection analysis requires porosity data, and porosity analysis must be carried out before mercury injection.
[0086] Parallel samples with the same lithology and porosity difference ≤ 1% are parallel samples with good consistency and meet the consistency requirements. Otherwise, they are parallel samples with poor consistency and need to be re-prepared.
[0087] In the present invention, the method for evaluating the consistency of all parallel samples using the pore structure method comprises: performing nuclear magnetic resonance analysis on all parallel samples to obtain T2 spectrum distribution of all parallel samples; judging whether the nuclear magnetic resonance T2 of all parallel samples satisfies formula (1) and formula (2) according to the T2 spectrum distribution, and if so, the consistency evaluation results of all parallel samples meet the requirements;
[0088] log(T A95 )-log(T B95 )≤±0.2 (1);
[0089] log(T A5 )-log(T B5 )≤±0.2 (2);
[0090] Where: T A5 is the relaxation time corresponding to 5% of the cumulative porosity component of the NMR T2 spectrum of parallel sample A, ms; T A95 is the relaxation time corresponding to 95% of the cumulative porosity component of the NMR T2 spectrum of parallel sample A, ms; T B5 is the relaxation time corresponding to 5% of the cumulative porosity component of the NMR T2 spectrum of parallel sample B, ms; T B95 is the relaxation time corresponding to 95% of the cumulative porosity component of the NMR T2 spectrum of parallel sample B, ms.
[0091] In an embodiment of the present invention, the relaxation time of the nuclear magnetic resonance T2 spectrum is in a constant proportional function relationship with the pore size of the rock, and the ratio of the different pore size distributions of the rock to the different relaxation time distributions of the T2 spectrum is a constant (C value). Therefore, under the condition of unknown C value, the nuclear magnetic resonance T2 spectrum reflects the relative relationship of the fluid distribution in the different pore sizes of the rock. The main research object of the pore structure is the pore size distribution, so the pore size distribution is generally referred to as the pore structure. At present, the resonance frequency of the nuclear magnetic resonance equipment ranges from 2MHz to 20MHz. Some nuclear magnetic equipment can detect crystal water and organic matter and asphalt. When the nuclear magnetic T2 spectrum measured by the equipment is used for consistency assessment, the crystal water and organic matter and asphalt parts can be ignored, and only the pore part occupied by the fluid can be considered. Many properties of rocks are determined by the pore structure. It is more reliable to use the nuclear magnetic T2 spectrum, that is, the pore structure to assess the consistency of parallel samples.
[0092] All the prepared parallel samples are subjected to nuclear magnetic resonance analysis to obtain the T2 spectrum distribution of each parallel sample; all the parallel samples are judged whether they satisfy equations (1) and (2) in pairs, that is, according to the relaxation time values corresponding to the 5% and 95% cumulative porosity components of the two parallel samples A and B on the T2 spectrum, they are substituted into equations (1) and (2) for calculation. If the results are both less than or equal to ±0.2, they are two parallel samples with good consistency, and the consistency assessment results of the two parallel samples meet the requirements. If the number of parallel samples is greater than two, then after two of the parallel samples A and B meet the consistency assessment requirements, arbitrarily select one of them, that is, A or B, and conduct consistency assessment with the third parallel sample, that is: substitute the relaxation time corresponding to the 5% and 95% cumulative porosity components of the nuclear magnetic resonance T2 spectrum of the parallel sample A or B and the relaxation time corresponding to the 5% and 95% cumulative porosity components of the nuclear magnetic resonance T2 spectrum of the third parallel sample into equations (1) and (2). If both equations (1) and (2) are satisfied, it means that the third parallel sample meets the consistency with the parallel samples A and B. This is done by analogy to complete the consistency assessment of all parallel samples.
[0093] Nuclear magnetic resonance T2 spectroscopy, also known as the pore structure method, is an advanced screening of the similarity between parallel samples, with the aim of satisfying experiments with higher requirements for the similarity of parallel samples.
[0094] Whether to use physical property method or nuclear magnetic resonance T2 spectrum method (pore structure method) or both methods for parallel sample consistency assessment needs to be determined according to experimental conditions. The physical property method is relatively simple and has a high popularity rate. For parallel samples prepared at the same depth in the same well with a porosity of ≤1%, the parallel sample consistency is very high. Nuclear magnetic resonance T2 spectrum method is more advanced than physical property method, but the analysis cost is higher, and it can be selected according to specific experimental requirements.
[0095] In this embodiment of the present invention, 13 shale oil reservoir core samples were obtained after freezing in the work area, and each core sample was prepared into two parallel samples using the method of step S03; porosity analysis was performed on each parallel sample, and the porosity results of each parallel sample were determined as shown in Table 1 below.
[0096] Table 1: Comparison of parallel sample analysis data
[0097]
[0098] As shown in Table 1, except for one mud-sand interlayer sample with a large porosity difference, the porosity differences between the parallel samples of the remaining core samples are all less than 1%, and most of them are less than 0.5%. Core sample No. 1 of this batch is a parallel sample with poor consistency, and the rest are parallel samples with good consistency, that is, they meet the consistency requirements.
[0099] A group of parallel samples were randomly selected from the layered samples in Table 1, and NMR analysis was performed to obtain the NMR T2 spectrum distribution, such as Figure 6 As shown in the figure, the peak distribution of T2 spectra of the two groups of samples is consistent, and the T2 spectrum distribution is almost overlapping, with high similarity. The pore structure of each group of samples is also similar or the same, that is, the pore component of each relaxation time is basically the same. From the T2 spectrum, the amplitudes of different relaxation times are slightly different. The reason is that the individual differences of each group of samples lead to different fluid contents in the shale, and it may also be caused by interference or errors in sample measurement.
[0100] According to formulas (1) and (2), it can be determined that the logarithmic difference of relaxation time at 5% of the cumulative porosity component of the NMR T2 spectra of parallel samples A and B is 0, and the logarithmic difference of relaxation time at 95% of the cumulative porosity component of the NMR T2 spectra of parallel samples A and B is 0.0021, which is much smaller than 0.2. It can be seen that this group of parallel samples has a high consistency, which is equivalent to the same sample, and the two samples have the same pore structure.
[0101] It can be seen from the evaluation results of the above physical property method and pore structure method that the parallel samples prepared by the method of the present invention meet the lithology consistency, the porosity difference satisfies ≤1%, and the nuclear magnetic T2 spectrum also has a high consistency.
[0102] The parallel samples have approximately identical pore structures, and many properties of rocks are controlled by the pore structure. Therefore, the porosity difference of the above-mentioned parallel samples is ≤1%. At the same time, the nuclear magnetic resonance T2 spectra of the parallel samples are in good agreement, which proves that the two evaluation methods, i.e., using the physical property method to evaluate the consistency of parallel samples and / or using the nuclear magnetic resonance T2 spectrum method to evaluate the consistency of parallel samples, are both feasible and reliable.
[0103] In the present invention and Figure 4 , 5 In the embodiment, the cutting tool comprises: a motor 6, a saw blade 5, a sample holder, a roller 7, a roller fixing frame 8 and a curved arm 9; the motor 6 is connected to the saw blade 5 via an output shaft, the motor 6 is used to drive the saw blade 5 to rotate along a concentric axis, and the saw blade 5 is used to cut the core sample; the sample holder is connected to the top axis of the curved arm 9, the bottom end of the curved arm 9 is connected to the roller 7 axis, the curved arm 9 and the roller 7 are perpendicular to each other; the two end axes of the roller 7 are connected to the roller fixing frame 8.
[0104] In the present invention, the sample holder comprises: a bottom plate 10, a side plate 11 and a fixed ejector pin 12; the side plate 11 is connected to the top surface of the bottom plate 10, the side plate 11 and the bottom plate 10 are perpendicular to each other, a cutting groove 13 is provided on the bottom plate 10, and the bottom surface of the bottom plate 10 is connected to the curved arm 9; the body of the fixed ejector pin 12 is L-shaped, one arm of the fixed ejector pin 12 is connected to the side plate 11, and the end of the other arm is located above the top surface of the bottom plate 10.
[0105] In the embodiment of the present invention, the material of the fixed ejector pin 12 is a material such as metal or plastic with a certain elasticity. In the initial state, the end of the support arm of the fixed ejector pin 12 away from the side plate 11 is in contact with or has a certain gap with the top surface of the bottom plate 10. The body of the saw blade 5 is circular, and the output shaft of the motor 6 passes through the center of the saw blade 5 and is connected to the saw blade 5. When the motor 6 is started, it drives the saw blade 5 to rotate clockwise or counterclockwise with the center of the circle as the axis.
[0106] When cutting a flaky core sample, lift the fixed ejector pin 12 upward so that the end of the arm of the fixed ejector pin 12 is away from the top surface of the base plate 10; place the flaky core sample on the top surface of the base plate 10, and align the cutting line of the flaky core sample with the cutting groove 13 on the base plate 10; release the fixed ejector pin 12 so that the end of the arm of the fixed ejector pin 12 contacts the top surface of the flaky core sample, and under the elastic release of the fixed ejector pin 12, the flaky core sample is pressed against the top surface of the base plate 10 to fix it and prevent it from slipping, and to ensure that the core does not move or roll under the condition of force cutting. Among them, the end position of the fixed ejector pin 12 does not correspond to the cutting groove 13 to prevent it from forming an obstacle during cutting. The angle and position between the base plate 10 and the horizontal line are adjusted by the crank arm 9 and the roller 7 connected by the rotating shaft to facilitate the operator to cut.
[0107] The motor 6 is started, and the motor 6 drives the saw blade 5 to rotate, and the saw blade 5 is perpendicular to the bedding and bedding end of the core sample, and cuts along the cutting line of the sheet core sample, and the cutting sequence is performed according to the above steps. The cutting groove 13 is used to prevent the saw blade 5 from cutting the bottom plate 10.
[0108] It can be understood that the above-mentioned various method embodiments mentioned in the present invention can be combined with each other to form a combined embodiment without violating the principle logic. Due to space limitations, the present invention will not go into details.
[0109] Those skilled in the art will appreciate that, in the above method of specific implementation, the order in which the steps are written does not imply a strict execution order and does not constitute any limitation on the implementation process. The specific execution order of the steps should be determined by their functions and possible internal logic.
[0110] The present invention prepares a disc-shaped (or circular block-shaped) sample of the required thickness along the horizontal bedding plane after deep freezing the core sample to be taken, cuts the sheet sample into two parts (two samples) with a core cutting tool in a direction perpendicular to the bedding and the bedding end face, takes a sample of suitable size, cuts the core sample into samples of a certain length and width, and then cuts the sample into two or three samples from the middle, and then determines the consistency between the parallel samples according to the lithology and porosity and nuclear magnetic T2 spectrum between the parallel samples. The cutting tool used in the present invention has high cutting efficiency and is easy to use, can avoid breaking the sample by smashing, greatly improves the success rate of the sample, and can prepare parallel samples of any position according to demand.
[0111] The parallel samples prepared by the method of the present invention have good consistency, regular appearance, can be replaced with each other, and the samples will not produce cracks and breakage, and the success rate of sample preparation is high. It avoids the problem that the previous method of preparing samples by smashing leads to cracks in the samples, causing the samples to deform, and it is difficult to prepare qualified parallel samples on a circular sample. It can well meet the requirements of different experiments for parallel samples, and can prepare single or multiple samples with consistent parallel sample requirements. The method provided by the present invention has a short experimental cycle, high production efficiency, is non-toxic and harmless, and complies with the HSE safety, health and environmental protection concept.
[0112] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A method for preparing parallel samples of shale oil reservoir rocks with consistency, characterized in that: include: Obtain frozen shale oil reservoir core samples from the work area; The core sample is formed into a full-diameter sheet core sample of a predetermined thickness along the core bedding plane; The flaky core sample is prepared into 2 parallel samples or 3 parallel samples; The method for preparing two parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample in a direction perpendicular to the bedding plane to form two parts of the sample, selecting one part of the sample, cutting it into a rectangular parallelepiped sample, and then cutting it into two parallel samples; The method for preparing three parallel samples includes: using a cutting tool to perform a first cutting on the flaky core sample at 1 / 3 of the diameter in a direction perpendicular to the bedding plane to form two parts of the sample, selecting a relatively larger sample and cutting it into three parallel samples; The consistency of all the parallel samples is evaluated, and if all the parallel samples meet the consistency requirements, the parallel sample preparation is completed.
2. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 1, characterized in that: The method of selecting a portion of the samples, cutting the portion into rectangular parallelepiped samples, and then cutting the portion into two parallel samples comprises: Performing a second cutting on a portion of the selected samples, wherein the tangent line of the second cutting is parallel to the tangent line of the first cutting, and the distance between the tangent line of the first cutting and the tangent line of the second cutting is 20 mm to 25 mm; Perform a third cut on the arc-shaped parts at both ends of a portion of the sample with cutting lines on both sides, with the tangent line of the third cut being perpendicular to the tangent lines of the first and second cuts, so that the portion of the sample forms a rectangular parallelepiped sample with a length of 50 mm to 60 mm and a width of 20 mm to 25 mm; The rectangular sample is cut for the fourth time from the middle part, so that the rectangular sample forms two parallel samples, wherein the tangent line of the fourth cutting is perpendicular to the tangent line of the first cutting.
3. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 1, characterized in that: The method of selecting a portion of the samples, cutting the portion into rectangular parallelepiped samples, and then cutting the portion into two parallel samples comprises: Performing a second cutting on a portion of the selected samples, wherein the tangent line of the second cutting is parallel to the tangent line of the first cutting, and the distance between the tangent line of the first cutting and the tangent line of the second cutting is 40 mm to 60 mm; Perform a third cut on the arc-shaped parts at both ends of a portion of the sample with cutting lines on both sides, with the tangent line of the third cut being perpendicular to the tangent lines of the first and second cuts, so that the portion of the sample forms a rectangular or cube sample with a length of 40 mm to 60 mm and a width of 20 mm to 40 mm; The rectangular or cube sample is cut for the fourth time from the middle part, so that the rectangular sample forms two parallel samples, wherein the tangent line of the fourth cutting is parallel to the tangent line of the first cutting.
4. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 1, characterized in that: The method of selecting a relatively larger sample and cutting it into three parallel samples comprises: Performing a second cutting on a portion of the selected samples, wherein the tangent line of the second cutting is parallel to the tangent line of the first cutting, and the distance between the tangent line of the first cutting and the tangent line of the second cutting is 40 mm to 60 mm; The sample cut for the second time is cut along the middle position for the third time to form two samples, and the tangent line of the third cutting is parallel to the tangent line of the first cutting; The arc-shaped parts at both ends of the relatively larger sample of the two samples formed after the third cutting are cut for the fourth time to form a sample with a length of 50 mm to 60 mm, and the tangent of the fourth cutting is perpendicular to the tangent of the first cutting. The sample after the fourth cutting is cut for the fifth time from the middle position, and the tangent of the fifth cutting is parallel to the tangent of the fourth cutting, so that the relatively larger sample forms two parallel samples with a length of 25 mm to 30 mm. The arc-shaped parts at both ends of the relatively smaller sample of the two samples formed after the third cutting are cut for the sixth time, and the tangent line of the sixth cutting is perpendicular to the tangent line of the second cutting, so that this part of the sample forms a third parallel sample with a length of 25mm to 30mm.
5. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 1, characterized in that: The method for evaluating the consistency of all parallel samples comprises: All the parallel samples are evaluated for consistency using the physical property method and / or the pore structure method. If the consistency evaluation results of the physical property method and / or the pore structure method for all the parallel samples meet the requirements, then all the parallel samples meet the consistency requirements.
6. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 5, characterized in that: The method for evaluating the consistency of all parallel samples using the physical property method comprises: Performing porosity analysis on all the parallel samples to determine the porosity of each parallel sample; If the porosity difference between each of the parallel samples is ≤1%, the consistency assessment results of all the parallel samples meet the requirements.
7. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 5, characterized in that: The method for evaluating the consistency of all parallel samples using the pore structure method comprises: Performing nuclear magnetic resonance analysis on all the parallel samples to obtain T2 spectrum distributions of all the parallel samples; According to the T2 spectrum distribution, determine whether the NMR T2 of all the parallel samples satisfies formula (1) and formula (2). If yes, the consistency assessment results of all the parallel samples meet the requirements; log(T A95 )-log(T B95 )≤±0.2 (1); Where: T A5 is the relaxation time corresponding to 5% of the cumulative porosity component of the NMR T2 spectrum of parallel sample A, ms; T A95 is the relaxation time corresponding to 95% of the cumulative porosity component of the NMR T2 spectrum of parallel sample A, ms; T B5 is the relaxation time corresponding to 5% of the cumulative porosity component of the NMR T2 spectrum of parallel sample B, ms; T B95 is the relaxation time corresponding to 95% of the cumulative porosity component of the NMR T2 spectrum of parallel sample B, ms.
8. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to any one of claims 1 to 7, characterized in that: The cutting tool comprises: a motor (6), a saw blade (5), a sample holder, a roller (7), a roller fixing frame (8) and a curved arm (9); The motor (6) is connected to the saw blade (5) via an output shaft, the motor (6) is used to drive the saw blade (5) to rotate along a coaxial axis, and the saw blade (5) is used to cut a core sample; The sample holder is connected to the top axis of the curved arm (9), the bottom end of the curved arm (9) is connected to the roller (7) axis, and the curved arm (9) and the roller (7) are perpendicular to each other; The two end shafts of the roller (7) are connected to the roller fixing frame (8).
9. The method for preparing parallel samples of shale oil reservoir rocks having consistency according to claim 8, characterized in that: The sample holder comprises: a bottom plate (10), a side plate (11) and a fixed ejector pin (12); The side plate (11) is connected to the top surface of the bottom plate (10), the side plate (11) and the bottom plate (10) are perpendicular to each other, a cutting groove (13) is provided on the bottom plate (10), and the bottom surface of the bottom plate (10) is connected to the curved arm (9); The body of the fixed ejector pin (12) is L-shaped, one arm of the fixed ejector pin (12) is connected to the side plate (11), and the end of the other arm is located above the top surface of the bottom plate (10).
Citation Information
Cited By
Quantitative characterization method for full pore size distribution and connectivity of shale
CN121049327A
