Full-loop verification device and method suitable for relay protection of new-generation intelligent substation

By designing a full loop verification device in the new generation of intelligent substations, using the acquisition interface, FPGA and fault simulation module for message processing and logic verification, the relay protection device cannot be verified under the SV and GOOSE common port transmission architecture. The problem of this problem realizes the stability of logical functions and communication links, and simplifies the debugging process.

CN118937832APending Publication Date: 2024-11-12HANGZHOU ZHONGDIAN TIANHENG POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410836841.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the new generation of smart substations, due to the abolition of process layer networking, the relay protection device cannot perform full loop verification under the SV and GOOSE common port transmission architecture, resulting in difficulty in adjusting test and verification.

Method used

A full loop verification device is designed, including a collection interface module, FPGA module, fault simulation module and driver module. By receiving and analyzing messages, simulating fault conditions, performing logical function verification, and displaying verification through the operation display interface result.

Benefits of technology

The full loop verification of the relay protection device under the SV and GOOSE common port architecture is realized, ensuring the correctness of the protection logic and the stability of the communication link, and simplifying the debugging process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118937832A_ABST
    Figure CN118937832A_ABST
Patent Text Reader

Abstract

The invention relates to a full-loop verification device and method suitable for relay protection of a new-generation intelligent substation, and the method comprises the steps: firstly analyzing GOOSE and SV configuration information of a verification interval according to a substation configuration file, caching and forwarding a GOOSE message of a relay protection device; it is ensured that a protection device GOOSE link received by an acquisition execution unit is not interrupted when function verification of the protection device is carried out, and the correctness of a loop is verified; the SV and GOOSE of the simulation acquisition execution unit are output to the relay protection device, and a GOOSE message output by the protection device is analyzed to check the correctness of the logic function of the relay protection device; and analyzing the GOOSE message of the acquisition execution unit to verify the correctness of the execution logic of the acquisition execution unit. Through loop correctness verification, relay protection device function logic verification and acquisition execution unit execution logic verification, full-loop verification of new-generation transformer substation relay protection is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of relay protection for power systems, and in particular to a full-loop verification device and method suitable for relay protection of a new generation of intelligent substations. Background Art

[0002] like Figure 1 As shown in the figure, in the traditional smart substation, the relay protection device is connected to the merging unit and the smart terminal in the outdoor cabinet through SV point-to-point optical fiber communication and GOOSE point-to-point optical fiber communication respectively. Figure 2 As shown in the figure, the new generation of smart substations cancels the process layer networking and uses SV and GOOSE common port transmission to achieve interval point-to-point transmission. While simplifying the substation network architecture, it also brings new problems to the functional debugging and verification of the substation relay protection device. The relay protection device in the substation is arranged in the protection room, and the acquisition execution unit is installed close to the primary side of the switch. When the tester is used to apply the fault quantity on the relay protection device side, it is necessary to disconnect the connecting optical fiber between it and the acquisition execution unit. The GOOSE communication between the relay protection device and the acquisition execution unit is interrupted, and the correctness of the entire circuit from the relay protection device outlet to the acquisition execution unit cannot be verified; when the tester is used to apply the fault on the acquisition execution unit side, the tester cannot check the action behavior of the relay protection device while applying the fault quantity, which brings great inconvenience to the debugging of the relay protection device. Summary of the invention

[0003] In view of the problems existing in the prior art, the present invention provides a full-circuit verification device and method suitable for a new generation of intelligent substation relay protection, which solves the problem that the new generation of intelligent substations are affected by the common port of SV and GOOSE, causing the full circuit of the substation relay protection to be unable to be verified.

[0004] To achieve the above object, the present invention provides a full-circuit verification device suitable for a new generation of intelligent substation relay protection, comprising:

[0005] A collection interface module, which is used for point-to-point access to the message transmission optical fiber of the relay protection device and the collection execution unit;

[0006] The FPGA module is used to receive the GOOSE message sent by the relay protection device and the SV message and GOOSE message sent by the acquisition execution unit through the acquisition interface module, and send the received message to the drive module;

[0007] The fault simulation module is used to import and parse the substation configuration file, configure the substation interval configuration information that needs to be verified, simulate the acquisition execution unit based on the parsing result to generate simulated SV message and GOOSE message, and send them to the drive module;

[0008] A driver module, which is used to cache the GOOSE messages from the relay protection device sent by the FPGA module, filter the SV messages and GOOSE messages from the acquisition execution unit sent by the FPGA module, and receive simulated SV messages and GOOSE messages sent by the fault simulation module;

[0009] The driving module is also used to send the cached GOOSE message from the relay protection device and the simulated SV message and GOOSE message to the FPGA, and the FPGA is also used to send the GOOSE message from the relay protection device to the acquisition execution unit, and send the simulated SV message and GOOSE message to the relay protection device;

[0010] And an operation display interface, which is used for user interaction and verification result display.

[0011] Further, the driver module filters the SV message and the GOOSE message sent by the FPGA module from the acquisition execution unit, including:

[0012] The SV message is discarded.

[0013] The GOOSE message is cached and parsed to determine the correctness of the GOOSE command executed by the acquisition execution unit, but the GOOSE message is not forwarded to the relay protection device.

[0014] The present invention also provides a full-loop verification method applicable to relay protection of a new generation of intelligent substations, which is based on the full-loop verification device as described above and includes the following steps:

[0015] Import the substation configuration file, parse and obtain the relay protection device and acquisition execution unit configuration information corresponding to the substation bay that needs to be verified;

[0016] Access to the message transmission optical fiber of the verification interval relay protection device and the acquisition execution unit;

[0017] According to the parsed configuration information, the received GOOSE message of the relay protection device is cached and forwarded to the acquisition execution unit;

[0018] According to the parsed configuration information, the simulation acquisition execution unit applies simulated SV messages and GOOSE messages to the relay protection device to verify the logical function of the relay protection device;

[0019] The acquisition execution unit receives the GOOSE message from the relay protection device forwarded by the full-circuit verification device and performs the exit or alarm operation to verify the correctness of the full circuit;

[0020] The full-loop verification device analyzes the cached GOOSE messages from the relay protection device, determines and displays the timing of the relay protection action logic and the correctness of the logic execution;

[0021] The full-loop verification device analyzes the GOOSE message output by the acquisition execution unit, determines and displays the correctness of the execution of the protection GOOSE command by the acquisition execution unit.

[0022] Furthermore, the GOOSE messages from the relay protection device forwarded to the acquisition execution unit, as well as the simulated SV messages and GOOSE messages applied to the relay protection device, are consistent with the sending frame sequence and frame interval of the original messages, ensuring that the communication link between the acquisition execution unit and the relay protection device is not interrupted.

[0023] The above technical solution of the present invention has the following beneficial technical effects:

[0024] The solution of the present invention receives the GOOSE message output by the relay protection device and transparently forwards it to the acquisition execution unit to verify the correctness of the GOOSE execution output by the relay protection device; at the same time, the SV message and GOOSE message of the acquisition execution unit are simulated and output to the relay protection device to simulate the fault condition and verify the correctness of the protection logic. In particular, while applying the simulated fault quantity to the relay protection device, the GOOSE message output by the protection device is sent to the acquisition execution unit, ensuring that the acquisition execution unit GOOSE is not disconnected when verifying the protection common function under the architecture of SV and GOOSE common port, and can verify the entire relay protection circuit. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the network architecture of the original smart substation relay protection device.

[0026] Figure 2 This is a schematic diagram of the network architecture of the relay protection device part of the new generation of smart substation.

[0027] Figure 3 It is a schematic diagram of a full-circuit verification method for relay protection of a new generation of intelligent substations in an embodiment of the present invention. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0029] An embodiment of the present invention provides a full-loop verification device applicable to relay protection of a new generation of intelligent substations, which is described by taking a single bay of a substation line protection as an example, and includes:

[0030] A collection interface module, which is used for point-to-point access to the message transmission optical fiber of the line protection device and the line interval collection execution unit;

[0031] FPGA module, which is used to receive the GOOSE tripping and other message commands sent by the line protection device and the SV message and GOOSE message sent by the line interval acquisition execution unit through the acquisition interface module, and send the received message to the drive module;

[0032] The fault simulation module is used to import and parse the substation configuration file, select the line protection device and acquisition execution unit that need to be verified, and configure the corresponding interval configuration information. Based on the analysis results, various fault conditions of the line are simulated, such as single-phase grounding, two-phase grounding, etc. The simulation acquisition execution unit generates simulated SV messages and GOOSE messages, and sends them to the drive module;

[0033] A driver module, which is used to cache the GOOSE messages from the line protection device sent by the FPGA module, filter the SV messages and GOOSE messages from the line interval acquisition execution unit sent by the FPGA module, and receive simulated SV messages and GOOSE messages sent by the fault simulation module;

[0034] The driving module is also used to send the cached GOOSE message from the line protection device and the simulated SV message and GOOSE message to the FPGA, and the FPGA is also used to send the GOOSE message from the line protection device to the line interval acquisition execution unit, and send the simulated SV message and GOOSE message to the line protection device;

[0035] And an operation display interface, which is used for user interaction and verification result display.

[0036] As a preferred implementation scheme, the driver module filters the SV message and the GOOSE message sent by the FPGA module from the line interval acquisition execution unit, including:

[0037] The SV message is discarded.

[0038] The GOOSE message is cached and parsed to determine the correctness of the line interval acquisition execution unit's execution of the protection GOOSE command, but the GOOSE message is not forwarded to the line protection device.

[0039] The embodiment of the present invention also provides a full-loop verification method applicable to a new generation of intelligent substation relay protection, which is based on the full-loop verification device as above. Figure 3 As shown, the following steps are included:

[0040] Import the substation configuration file, parse and obtain the line protection device and line interval acquisition execution unit configuration information corresponding to the substation interval that needs to be verified;

[0041] Message transmission optical fiber for access to the verification interval line protection device and the line interval collection execution unit;

[0042] According to the parsed configuration information, the received GOOSE message of the line protection device is cached and forwarded to the line interval set execution unit;

[0043] According to the parsed configuration information, the simulated line interval acquisition execution unit applies simulated SV messages and GOOSE messages to the line protection device, that is, applies fault current, voltage and switch position signals to verify the logical function of the line protection device;

[0044] The line interval acquisition execution unit receives the GOOSE message from the line protection device forwarded by the full circuit verification device and executes the exit or alarm operation, acts on the tripping, trips the switch once, and verifies the correctness of the whole circuit;

[0045] The full-circuit verification device analyzes the cached GOOSE messages from the line protection device, including the line tripping order, closing order, and the interval from the fault time to the tripping time, etc., to determine and display the timing of the line protection action logic and the correctness of the logic execution;

[0046] The full-circuit verification device analyzes the GOOSE messages output by the line interval acquisition execution unit, such as the circuit breaker position, etc., and determines and displays the correctness of the line interval acquisition execution unit's execution of the protection GOOSE command.

[0047] As a preferred implementation scheme, the GOOSE messages from the line protection device forwarded to the line interval acquisition execution unit, as well as the simulated SV messages and GOOSE messages applied to the line protection device, are consistent with the sending frame sequence and frame interval of the original messages, ensuring that the communication link between the line interval acquisition execution unit and the line protection device is not interrupted.

[0048] The full-loop verification device and the corresponding verification method disclosed in the embodiment of the present invention can be point-to-point connected with the line protection device and the line interval acquisition execution unit at the same time, and simulate the acquisition execution unit to output SV and GOOSE messages while forwarding the GOOSE messages of the line protection device to the acquisition execution unit. While the communication link between the two is not interrupted, different fault quantities are simulated and applied, which can simultaneously verify the logical correctness of the line protection device, the correctness of the full loop of the line interval, and the correctness of the feedback message of the line interval acquisition execution unit.

[0049] It should be understood that the above specific embodiments of the present invention only illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. A full-circuit verification device suitable for relay protection of a new generation of intelligent substations, characterized in that: include: A collection interface module, which is used for point-to-point access to the message transmission optical fiber of the relay protection device and the collection execution unit; The FPGA module is used to receive the GOOSE message sent by the relay protection device and the SV message and GOOSE message sent by the acquisition execution unit through the acquisition interface module, and send the received message to the drive module; The fault simulation module is used to import and parse the substation configuration file, configure the substation interval configuration information that needs to be verified, simulate the acquisition execution unit based on the parsing result to generate simulated SV message and GOOSE message, and send them to the drive module; A driver module, which is used to cache the GOOSE messages from the relay protection device sent by the FPGA module, filter the SV messages and GOOSE messages from the acquisition execution unit sent by the FPGA module, and receive simulated SV messages and GOOSE messages sent by the fault simulation module; The driving module is also used to send the cached GOOSE message from the relay protection device and the simulated SV message and GOOSE message to the FPGA, and the FPGA is also used to send the GOOSE message from the relay protection device to the acquisition execution unit, and send the simulated SV message and GOOSE message to the relay protection device; And an operation display interface, which is used for user interaction and verification result display.

2. The full-circuit verification device for relay protection of a new generation of intelligent substations according to claim 1 is characterized in that: The driver module filters the SV message and the GOOSE message sent by the FPGA module from the acquisition execution unit, including: The SV message is discarded. The GOOSE message is cached and parsed to determine the correctness of the GOOSE command executed by the acquisition execution unit, but the GOOSE message is not forwarded to the relay protection device.

3. A full-loop verification method for relay protection of a new generation of intelligent substations, based on the full-loop verification device according to claim 1, characterized in that: The steps include: Import the substation configuration file, parse and obtain the relay protection device and acquisition execution unit configuration information corresponding to the substation bay that needs to be verified; Access to the message transmission optical fiber of the verification interval relay protection device and the acquisition execution unit; According to the parsed configuration information, the received GOOSE message of the relay protection device is cached and forwarded to the acquisition execution unit; According to the parsed configuration information, the simulation acquisition execution unit applies simulated SV messages and GOOSE messages to the relay protection device to verify the logical function of the relay protection device; The acquisition execution unit receives the GOOSE message from the relay protection device forwarded by the full-circuit verification device and performs the exit or alarm operation to verify the correctness of the full circuit; The full-loop verification device analyzes the cached GOOSE messages from the relay protection device, determines and displays the timing of the relay protection action logic and the correctness of the logic execution; The full-loop verification device analyzes the GOOSE message output by the acquisition execution unit, determines and displays the correctness of the execution of the protection GOOSE command by the acquisition execution unit.

4. The full-circuit verification method for relay protection of a new generation of intelligent substations according to claim 3 is characterized in that: The GOOSE messages from the relay protection device forwarded to the acquisition execution unit, as well as the simulated SV messages and GOOSE messages applied to the relay protection device, are consistent with the sending frame sequence and frame interval of the original messages, ensuring that the communication link between the acquisition execution unit and the relay protection device is not interrupted.