Control system for frequency conversion communication device of interlayer equipment
By using sub-item progress monitoring and control variable generation modules in the frequency conversion communication device of the mezzanine equipment, the problem that the backup control end cannot obtain the main and user-side processing achievement is solved, ensuring the normal operation of the glass production line and improving operational fluency.
Patent Information
- Application Number
- CN202410987494.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
AI Technical Summary
In the event of a communication network failure, the backup control end of the frequency converter communication device of the mezzanine device cannot obtain the original control signal processing degree of the main terminal, resulting in the original control parameters being inconsistent with the current completion degree, affecting the operational fluency of the glass production line.
A system including PLC control module, switch, screen operation group and control circuit was designed. The laminated glass production line was obtained through the sub-item progress monitoring end, the monitoring data processing module, the variable reset analysis module and the control variable generation module. Process progress and update the control parameters of the backup section in the event of a network failure to make it consistent with the current completion degree to re-output the control command.
The parameter inconsistency caused by the use of the original control signal performed in the backup part is avoided, and the normal processing process of the glass production line is ensured and the smooth operation is improved.
Smart Images

Figure CN118938793A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of control systems, in particular to a control system for a variable frequency communication device of a sandwich device. Background Art
[0002] The variable frequency communication device of the sandwich equipment is mainly used in the industrial automation control and transmission system. It uses variable frequency speed regulation technology and PLC to control the frequency converter for network communication, and then achieves signal control transmission for the industrial automation control and transmission system. The technical disadvantage of this technology is that when a communication network fails, it is necessary to shut down for line inspection and verify the communication address errors, which is easy to affect the normal operation process. Although the existing technology is equipped with a spare control end to solve the problem of long-term shutdown during the above-mentioned verification, there is still a technical problem, that is, when the spare part continues to read the control signal executed last time, it is impossible to obtain the processing completion degree of the original content of the control signal through the main end. In the unreset state, it is easy for the subsequent spare part to re-execute the original control command generated by the common end, so that the original control parameters and the current completion degree are not at the same benchmark, causing interference with the processing process of the glass production line, so that the operation smoothness during the processing of laminated glass will still be affected. Summary of the invention
[0003] In view of the problems in the prior art, the present invention provides a control system for a variable frequency communication device of a sandwich device.
[0004] The technical solution adopted by the present invention to solve its technical problems is: a control system for a variable frequency communication device of a laminated equipment, comprising a PLC control module, a switch, a screen operation group and a control circuit, wherein the PLC control module is composed of three groups of PLC control inverters for controlling the operation of a laminated glass production line, and the three groups of PLC control inverters are respectively set as a first control end, a second control end and a third control end, wherein the first control end is a main part, and the second control end and the third control end are standby parts, the switch is connected to the screen operation group signal, and the screen operation group is connected to the control circuit signal, and when a communication network fault is repaired, the screen operation group is used to convert the switch quantity to send an operation signal to the standby part of the PLC control module when the main end of the PLC control module fails;
[0005] The signal at one end of the screen operation group is connected to a sub-item progress monitoring end, a monitoring data processing module, a variable reset analysis module and a control variable generation module. The sub-item progress monitoring end is arranged in the laminated glass production line, and is used to obtain the completion progress of each stage of the laminated glass production line after receiving the control signal. After the monitoring data processing module reads the sub-item progress monitoring end to obtain the processing progress of each stage of the laminated glass, it constructs the control variables according to the current processing progress of each stage of the laminated glass. The variable reset analysis module compares the constructed control variables with the existing control parameters of the spare part. When the comparison result between the control variables obtained by the control variable generation module and the existing control parameters of the spare part is not uniform, the control parameters of the spare part of the PLC control module are updated according to the current operation progress, and the control parameters are sent to the spare part of the PLC control module, so that the PLC control module re-outputs the control command according to the completed operation progress.
[0006] Preferably, the sub-item progress monitoring end includes a data acquisition module and a hardware monitoring module, wherein the hardware monitoring module corresponds to the inner sheet loading conveying end, the outer sheet loading conveying end, the glass cleaning end, the gluing and bonding end, the glass pressing end and the sheet unloading and flipping end in the laminated glass production line, and the hardware monitoring module is used to obtain the processing progress completed by each processing end of the laminated glass production line, and the data acquisition module is used to obtain the execution parameters re-sent to the laminated glass production line after the spare part of the PLC control module is converted.
[0007] Preferably, the monitoring data processing module includes a signal receiver, a microprocessor and a RAM storage module. The receiving end of the signal receiver is not connected to the sub-item progress monitoring end signal through the original communication network of the glass production line. The RAM storage module temporarily stores the data obtained by the data acquisition module and the hardware monitoring module.
[0008] Preferably, the screen operation group consists of three groups of operation screens, which respectively correspond to the first control terminal, the second control terminal and the third control terminal in the PLC control module, two of which are used to send control signals to the second control terminal and the third control terminal during communication network fault repair, and the other group of operation screens is used to input normal operation signals to the first control terminal when the communication network is operating normally.
[0009] Preferably, the control circuit is connected to a signal receiving end of a laminated glass production line. After the PLC control module obtains the control signal input by the screen operation group, the control circuit is used to control any device end in the laminated glass production line to complete a processing operation corresponding to the control signal.
[0010] Compared with the prior art, the beneficial effect of the present invention is as follows: by setting a sub-item progress monitoring end as the monitoring end of the laminated glass production line, that is, after the main part of the PLC control module fails, the sub-item progress monitoring end obtains the completion progress of each stage of the laminated glass production line after receiving the control signal and uploads it to the sub-item progress monitoring end, so that the sub-item progress monitoring end constructs a control variable according to the current processing progress of each stage of the laminated glass, and then compares the constructed control variable with the existing control parameters of the spare part through the variable reset analysis module and sends it to the control variable generation module. When the control variable generation module obtains that the comparison result of the control variable with the existing control parameters of the spare part is in a non-uniform state, the control parameters of the spare part of the PLC control module are reset and updated according to the current operation progress, and the control parameters are sent to the spare part of the PLC control module, so that the PLC control module re-outputs the control command according to the completed operation progress, thereby avoiding the spare part still using the original control signal executed last time, causing the original control parameters and the current completion degree to be not at the same benchmark, thereby interfering with the processing process of the glass production line. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0012] Figure 1 It is a system composition diagram of the present invention;
[0013] Figure 2 It is a system flow chart of the present invention.
[0014] In the figure: 1. PLC control module; 2. Switch; 3. Screen operation group; 4. Control circuit; 5. Sub-item progress monitoring terminal; 6. Monitoring data processing module; 7. Variable reset analysis module; 8. Control variable generation module. DETAILED DESCRIPTION
[0015] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0016] Example 1
[0017] like Figure 1-Figure 2As shown, a control system for a variable frequency communication device for laminated equipment described in the present invention includes a PLC control module 1, a switch 2, a screen operation group 3 and a control circuit 4. The PLC control module 1 is composed of three groups of PLC control inverters for controlling the operation of the laminated glass production line. The three groups of PLC control inverters are respectively set as a first control end, a second control end and a third control end, wherein the first control end is a main part, and the second control end and the third control end are used as backup parts. The switch 2 is connected to the screen operation group 3 by signal, and the screen operation group 3 is connected to the control circuit 4 by signal. When the communication network fails, the screen operation group 3 is used to convert the switch quantity to send an operation signal to the backup part of the PLC control module 1 when the main end of the PLC control module 1 fails.
[0018] In this embodiment, the switch 2 is used to connect the electrical signal path between the screen operation group 3 and the PLC control module 1, that is, when a communication network failure occurs in the first control terminal used for the main part of the PLC control module 1, the switching response signal of the screen operation group 3 is triggered, and the screen operation group 3 sends an electrical signal to either the second control terminal or the third control terminal used for the backup part in the PLC control module 1 through the switch 2, that is, the screen operation group 3 sends a monitoring command to the sub-item progress monitoring terminal 5 at the same time, and the current completion progress is monitored and obtained through the sub-item progress monitoring terminal 5, which is used to determine whether the original control parameters generated by the main part obtained by the backup part are at the same benchmark as the current completion degree.
[0019] In an optional implementation of the present embodiment, one end of the screen operation group 3 is signal-connected to a sub-item progress monitoring end 5, a monitoring data processing module 6, a variable reset analysis module 7, and a control variable generation module 8. The sub-item progress monitoring end 5 is arranged on the laminated glass production line, and is used to obtain the completion progress of each stage of the laminated glass production line after receiving the control signal. After the monitoring data processing module 6 reads the sub-item progress monitoring end 5 to obtain the processing progress of each stage of the laminated glass, it constructs the control variable according to the current processing progress of each stage of the laminated glass. The variable reset analysis module 7 compares the constructed control variable with the existing control parameter of the spare part. When the control variable generation module 8 obtains the control variable and the existing control parameter of the spare part, the comparison result is in a non-uniform state (for example, when the completion progress of each device end is 3%, a fault occurs, and the spare part still continues the initial control command of the original main part, that is, the control parameter comparison result is in a non-uniform state), the control parameter of the spare part of the PLC control module 1 is updated according to the current operation progress, and the control parameter is sent to the spare part of the PLC control module 1, so that the PLC control module 1 re-outputs the control command according to the completed operation progress.
[0020] In this embodiment, because the prior art uses a standby control terminal to shut down the interlayer equipment frequency conversion communication device, it is impossible to obtain the degree of completion of the processing of the original content of the control signal through the main end. Therefore, in an unreset state, it is easy for the subsequent standby part to re-execute the original control command generated by the common end, so that the original control parameters and the current completion degree are not at the same benchmark, which will still interfere with the normal progress of the production line processing. For this reason, the present invention solves this technical problem by setting a sub-item progress monitoring terminal 5, a monitoring data processing module 6, a variable reset analysis module 7 and a control variable generation module 8.
[0021] In an optional implementation of the present embodiment, the sub-item progress monitoring terminal 5 includes a data acquisition module and a hardware monitoring module, wherein the hardware monitoring module corresponds to the inner sheet loading conveying terminal, the outer sheet loading conveying terminal, the glass cleaning terminal, the gluing and plying terminal, the glass flattening terminal and the sheet unloading and flipping terminal in the laminated glass production line, the hardware monitoring module is used to obtain the processing progress completed by each processing terminal of the laminated glass production line, the data acquisition module is used to obtain the execution parameters resent to the laminated glass production line after the spare part of the PLC control module 1 is converted, and the RAM storage module temporarily stores the data obtained by the data acquisition module and the hardware monitoring module.
[0022] In this embodiment, the sub-item progress monitoring terminal 5 specifically corresponds to the monitoring range in the production line, including the inner sheet-on-sheet conveying terminal, the outer sheet-on-sheet conveying terminal, the glass cleaning terminal, the gluing and bonding terminal, the glass flattening terminal, and the unloading and flipping terminal. Among them, the hardware monitoring module is a data monitoring terminal with a cloud server, which is used to collect the operating data of the glass production line equipment, and the data acquisition module uses a signal transmitter. The signal transmitter part is connected to the PLC control module 1, which is used to process the control command issued by the PLC control module 1 into a signal parameter, that is, the hardware monitoring module obtains the inner sheet-on-sheet conveying terminal, the outer sheet-on-sheet conveying terminal, the glass cleaning terminal, the gluing and bonding terminal, the glass flattening terminal, and the unloading and flipping terminal. The completion progress of the end, the gluing and splicing end, the glass pressing end and the unloading and flipping end is monitored, and the completion progress parameters are read by the data acquisition module in the monitoring data processing module 6. At the same time, the data acquisition module synchronously reads the original control parameters of the main end currently executed by the standby part, and then the variable reset analysis module 7 compares the current original control parameters with the completion progress obtained by the hardware monitoring module. After analyzing the phase difference, the control variable generation module 8 re-plans the control variables that meet the current completion progress according to the phase difference, and then controls the control parameters of the standby part to be reset, and selects the control variables that meet the current completion progress to continue to complete the control.
[0023] In this embodiment, the monitoring of the inner sheet loading conveying end and the outer sheet loading conveying end by the sub-item progress monitoring end 5 includes the number of inner sheets and outer sheets that have been completed and the number of unfinished loading, and the operating position of the loading equipment when they are currently in the inner sheet and outer sheet. The monitoring of the glass cleaning end by the sub-item progress monitoring end 5 includes the number of completed cleanings of the inner and outer sheets of glass and the number of unfinished cleanings. The monitoring of the film joining end and the flattening end by the sub-item progress monitoring end 5 includes the number of completed joining and flattening of the inner and outer sheets of glass and the number of unfinished joining and flattening. The monitoring of the film unloading and flipping end by the sub-item progress monitoring end 5 includes the number of laminated glasses that have been unloaded and the number of laminated glasses that have not been completed. After the main part of the PLC control module 1 fails, the sub-item progress monitoring end 5 obtains the control signal received by the laminated glass production line, and the completion progress of each stage of the above-mentioned processing end is uploaded to the sub-item progress monitoring end 5.
[0024] In an optional implementation of the present embodiment, the monitoring data processing module 6 includes a signal receiver, a microprocessor and a RAM storage module. The receiving end of the signal receiver is not connected to the sub-item progress monitoring end 5 through the original communication network of the glass production line. The RAM storage module temporarily stores the data obtained by the data acquisition module and the hardware monitoring module.
[0025] In this embodiment, the monitoring data processing module 6 obtains the progress parameters of the monitoring collection through the set signal receiver 5. At the same time, the receiving end of the signal receiver is connected through the cloud platform end signal provided in the sub-item progress monitoring terminal 5, and does not go through the original communication network of the glass production line and the sub-item progress monitoring terminal 5 signal processing, which can avoid the inability to perform stable signal transmission when the original communication network fails. After the signal receiver obtains the completion progress of each equipment end of the glass production line monitored by the sub-item progress monitoring terminal 5, the monitoring data is uploaded to the microprocessor. After the microprocessor digitizes this part of the monitoring data, it is substituted into the RAM storage module for temporary data storage within the current fault cycle, so as to recalculate the control variables when switching the spare part in the PLC control module 1, and use it as a reference value for updating the control amount of the spare part.
[0026] In an optional implementation of the present embodiment, the screen operation group 3 is composed of three groups of operation screens, which respectively correspond to the first control terminal, the second control terminal and the third control terminal in the PLC control module 1. Two groups of operation screens are used to send control signals to the second control terminal and the third control terminal when repairing communication network faults, and the other group of operation screens is used to input normal operation signals to the first control terminal when the communication network is operating normally.
[0027] In an optional implementation of the present embodiment, the control circuit 4 is connected to the signal receiving end of the laminated glass production line. After the PLC control module 1 obtains the control signal input by the screen operation group 3, the control circuit 4 is used to control any device end in the laminated glass production line to complete the processing operation of the corresponding control signal.
[0028] The working principle and use process of the present invention are as follows: after the main part of the PLC control module 1 fails, the sub-item progress monitoring terminal 5 obtains the completion progress of each stage of the laminated glass production line after receiving the control signal and uploads it to the sub-item progress monitoring terminal 5, and the monitoring data processing module 6 constructs the control variable according to the current processing progress of each stage of the laminated glass, and then the variable reset analysis module 7 compares the constructed control variable with the existing control parameter of the spare part of the PLC control module 1 and sends it to the control variable generation module 8. When the control variable generation module 8 obtains that the comparison result of the control variable and the existing control parameter of the spare part is not in a uniform state, an overlap error occurs. At this time, the control operation command of the spare part of the PLC control module 1 is suspended, and the control parameters of the spare part of the PLC control module 1 are reset and updated according to the current operation progress, and the control parameters are sent to the spare part of the PLC control module 1, so that the PLC control module 1 re-outputs the control command according to the completed operation progress, so as to avoid the spare part still using the original control signal executed last time, resulting in the original control parameters and the current completion degree not being at the same benchmark, and thus will not interfere with the processing process of the glass production line.
[0029] Example 2
[0030] like Figure 1-Figure 2 As shown, a control system for a variable frequency communication device for laminated equipment described in the present invention includes a PLC control module 1, a switch 2, a screen operation group 3 and a control circuit 4. The PLC control module 1 is composed of three groups of PLC control inverters for controlling the operation of the laminated glass production line. The three groups of PLC control inverters are respectively set as a first control end, a second control end and a third control end, wherein the first control end is a main part, and the second control end and the third control end are used as backup parts. The switch 2 is connected to the screen operation group 3 by signal, and the screen operation group 3 is connected to the control circuit 4 by signal. When the communication network fails, the screen operation group 3 is used to convert the switch quantity to send an operation signal to the backup part of the PLC control module 1 when the main end of the PLC control module 1 fails.
[0031] In this embodiment, the same points as those in Embodiment 1 are not repeated here, but the difference from the embodiment is that after the main part of the PLC control module 1 fails, the sub-item progress monitoring terminal 5 obtains the completion progress of each stage of the laminated glass production line after receiving the control signal and uploads it to the sub-item progress monitoring terminal, and the monitoring data processing module 6 constructs the control variables according to the current processing progress of each stage of the laminated glass, and then the variable reset analysis module 7 compares the constructed control variables with the existing control parameters of the spare part of the PLC control module 1 and sends them to the control variable generation module 8. When the control variable generation module 8 obtains that the comparison result of the control variables and the existing control parameters of the spare part is in a unified state, a continue processing signal is sent to the spare part of the PLC control module 1 through the screen operation group 3, so that the spare part of the PLC control module 1 continues to complete the processing according to the original progress.
[0032] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A control system for a variable frequency communication device of a sandwich device, comprising a PLC control module (1), a switch (2), a screen operation group (3) and a control circuit (4), characterized in that: The PLC control module (1) is composed of three groups of PLC control inverters for controlling the operation of the laminated glass production line. The three groups of PLC control inverters are respectively set as a first control end, a second control end and a third control end, wherein the first control end is a main part, and the second control end and the third control end are standby parts. The switch (2) is connected to the screen operation group (3) by signal, and the screen operation group (3) is connected to the control circuit (4) by signal. When the communication network fails, the screen operation group (3) is used to convert the switch quantity to send an operation signal to the standby part of the PLC control module (1) when the main end of the PLC control module (1) fails; One end of the screen operation group (3) is signal-connected to a sub-item progress monitoring end (5), a monitoring data processing module (6), a variable resetting analysis module (7) and a control variable generating module (8). The sub-item progress monitoring end (5) is arranged on the laminated glass production line and is used to obtain the completion progress of each stage of the laminated glass production line after receiving the control signal. After the monitoring data processing module (6) reads the sub-item progress monitoring end (5) to obtain the processing progress of each stage of the laminated glass, it constructs the control variable according to the current processing progress of each stage of the laminated glass. The variable resetting analysis module (7) compares the constructed control variable with the existing control parameter of the spare part. When the comparison result between the control variable obtained by the control variable generating module (8) and the existing control parameter of the spare part is not uniform, the control parameter of the spare part of the PLC control module (1) is updated according to the current operation progress, and the control parameter is sent to the spare part of the PLC control module (1), so that the PLC control module (1) re-outputs the control command according to the completed operation progress.
2. A control system for a variable frequency communication device for interlayer equipment according to claim 1, characterized in that: The sub-item progress monitoring terminal (5) includes a data acquisition module and a hardware monitoring module, wherein the hardware monitoring module corresponds to the inner sheet loading conveying terminal, the outer sheet loading conveying terminal, the glass cleaning terminal, the gluing and bonding terminal, the glass flattening terminal and the sheet unloading and flipping terminal in the laminated glass production line, the hardware monitoring module is used to obtain the processing progress completed by each processing terminal of the laminated glass production line, and the data acquisition module is used to obtain the execution parameters resent to the laminated glass production line after the spare part of the PLC control module (1) is converted.
3. A control system for a variable frequency communication device for interlayer equipment according to claim 1, characterized in that: The monitoring data processing module (6) comprises a signal receiver, a microprocessor and a RAM storage module. The receiving end of the signal receiver is not connected to the sub-item progress monitoring end (5) by signal through the original communication network of the glass production line. The RAM storage module temporarily stores the data obtained by the data acquisition module and the hardware monitoring module.
4. A control system for a variable frequency communication device for interlayer equipment according to claim 1, characterized in that: The screen operation group (3) is composed of three groups of operation screens, which respectively correspond to the first control terminal, the second control terminal and the third control terminal in the PLC control module (1). Two groups of the operation screens are used to send control signals to the second control terminal and the third control terminal when troubleshooting the communication network, and the other group of operation screens is used to input normal operation signals to the first control terminal when the communication network is operating normally.
5. A control system for a variable frequency communication device for interlayer equipment according to claim 1, characterized in that: The control circuit (4) is connected to a signal receiving end of a laminated glass production line. After the PLC control module (1) obtains the control signal input by the screen operation group (3), the control circuit (4) is used to control any device end in the laminated glass production line to complete a processing operation corresponding to the control signal.
