Intelligent monitoring system and prediction method for embankment settlement based on inversion parameter correction
By integrating the embankment settlement monitoring unit and data analysis unit in the embankment settlement intelligent monitoring system, the inversion parameter correction technology is used to realize real-time monitoring and accurate prediction of embankment settlement, and the existing technology is solved by not real-time monitoring and low prediction accuracy. The problem of the problem has improved the accuracy and efficiency of embankment settlement monitoring.
Patent Information
- Application Number
- CN202410973579.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-12
AI Technical Summary
The existing embankment settlement monitoring methods rely on manual observation and regular inspection, making it difficult to achieve real-time monitoring and early warning, and the data analysis and prediction accuracy are not high, so it cannot accurately reflect the dynamic changes in embankment settlement.
An intelligent embankment settlement monitoring system based on inversion parameter correction was designed, integrating embankment settlement monitoring unit and data analysis unit. Data is collected in real time through a variety of sensors and satellite signal transmission technologies, and data analysis unit is used to classify, analyze and predict data. , combine the visual module to display the settlement situation, and correct the prediction model through iterative calculations to improve prediction accuracy.
Real-time monitoring and accurate prediction of embankment settlement is achieved, the accuracy and efficiency of monitoring is improved, and reliable data support is provided to engineers to ensure the stability and safety of embankments.
Smart Images

Figure CN118940488A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of embankment settlement detection, and in particular relates to an embankment settlement intelligent monitoring system and a prediction method based on inversion parameter correction. Background Art
[0002] Embankment settlement is an important factor affecting the stability and safety of embankments, especially in soft soil areas. With the increase in traffic volume and the frequent passage of heavy vehicles, the settlement problem of embankments has become increasingly prominent. Traditional monitoring methods often rely on manual observation and regular testing. The data collection and processing process is cumbersome, making it difficult to achieve real-time monitoring and early warning. At the same time, traditional methods have limitations in data analysis and prediction, and cannot accurately reflect the dynamic changes of embankment settlement, making it difficult to take effective preventive measures in time in actual projects.
[0003] In recent years, with the development of science and technology, intelligent monitoring systems have been widely used in the engineering field. Intelligent monitoring systems can realize real-time monitoring and prediction of embankment settlement by integrating a variety of sensors, data acquisition and analysis technologies. The use of advanced sensor technology, such as settlement meters and image acquisition equipment, combined with satellite signal transmission and reception technology, can obtain high-precision settlement data and image information. The data analysis system receives, verifies, classifies and processes the collected data, uses visualization modules to display the dynamic changes of embankment settlement, and predicts future settlement through a new settlement prediction model. The application of these technologies has greatly improved the accuracy and efficiency of monitoring, allowing engineering personnel to grasp the settlement of embankments in a timely manner and take corresponding measures. However, the existing intelligent monitoring systems and prediction methods still have some shortcomings. Problems such as complex data processing, low accuracy of prediction models and insufficient system integration limit their application in actual engineering. Therefore, there is an urgent need for an efficient, accurate and integrated intelligent monitoring system and prediction method for embankment settlement to meet the needs of modern engineering for embankment settlement monitoring and early warning. Summary of the invention
[0004] In order to solve the above problems, the present invention provides an intelligent monitoring system and prediction method for embankment settlement based on inversion parameter correction.
[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0006] An intelligent monitoring system for embankment settlement based on inversion parameter correction includes an embankment settlement monitoring unit and a data analysis unit. The embankment settlement monitoring unit includes an embankment settlement monitoring module, a data acquisition module, an image acquisition module, and a communication module. The embankment settlement monitoring module is arranged in the embankment and is connected to the data acquisition module. The data acquisition module sends monitoring data to the data analysis unit through the communication module. The image acquisition module sends image information to the data analysis unit through the communication module. The data analysis unit is used to analyze and predict the monitoring data and images of the embankment settlement monitoring unit.
[0007] Furthermore, the embankment settlement monitoring module includes three settlement meters, namely, a first settlement meter, a second settlement meter and a third settlement meter set at three monitoring points of the embankment, the first settlement meter and the third settlement meter are set at both sides of the embankment, and the second settlement meter is set at the center of the embankment; the three settlement meters are connected to the data acquisition module through wires, respectively. The wires are covered with PVC steel wire hoses for protection.
[0008] Furthermore, the communication module includes a Beidou monitoring terminal located on one side of the embankment, and the Beidou monitoring terminal includes a Beidou antenna, an ARM processor, a communication antenna and a voltage stabilizer. The voltage stabilizer is arranged in a circuit composed of the Beidou antenna, the ARM processor, the communication antenna and a power supply, and is used to provide a stable voltage; the Beidou antenna for capturing monitoring data and image information is connected to the ARM processor, and the satellite data is output through the communication antenna after being processed by the ARM. Each monitoring point is equipped with a Beidou antenna for monitoring the settlement.
[0009] Further, the data analysis unit includes a data receiving module, a data checking module, a data classification module, an analysis and processing module, a visualization module and a settlement prediction module. The data receiving module is connected to the data checking module, the data classification module and the analysis and processing module respectively. The data checking module removes abnormal values after receiving the detection data. The data classification module classifies the data according to the measurement point position after removing the abnormal values. Finally, the analysis and processing module processes the data of the classification number, draws a chart and presents it in the visualization module. The settlement prediction module performs parameter inversion and prediction based on the processed data, and the prediction result is presented through the visualization module.
[0010] The data receiving module receives the monitoring data and image information transmitted by the communication module;
[0011] The data checking module pre-processes the data received by the data receiving module and checks whether there are abnormal values;
[0012] The data classification module classifies and compiles the monitoring data and image information of each monitoring point;
[0013] The analysis and processing module sorts the monitoring data of each monitoring point in time sequence, processes the settlement data of multiple monitoring points at the same time, and analyzes the relationship between embankment settlement and time;
[0014] The visualization module displays the embankment settlement data in a graphical manner, including displaying the time series changes of each monitoring point and a multi-point comparative distribution diagram;
[0015] The settlement prediction module estimates the settlement of the embankment at a certain point in the future and provides an early warning reference for operators;
[0016] Among them, the time series changes reflect the trend of settlement changes at a certain monitoring point in a certain period of time along with the time series, and the multi-point comparison distribution map reflects the state of a certain subsidence section in the embankment at that moment by comparing the data of multiple monitoring points at the same moment.
[0017] Furthermore, it also includes a background monitoring unit, which includes an alarm module, a display module, a cloud module and a central processing unit module. The alarm module, the display module, the cloud module and the central processing unit module are all connected to the data analysis unit. The warning indicators of the alarm module are presented through the display module. The monitoring data and warning indicators at each fixed interval are uploaded to the cloud for real-time backup through the cloud module. The central processing unit maintains the overall operating efficiency of the background detection unit;
[0018] The alarm module extracts indicators for early warning based on the monitoring data received from the data analysis unit, and classifies the impact of the early warning indicators on the road operation status. For each early warning indicator, combined with historical data and road structure characteristics, a threshold system of early warning indicators is established to remind the back-end operator to observe the embankment conditions in real time and take countermeasures;
[0019] The display module displays the monitoring information and performs related operations;
[0020] The cloud module uploads the monitoring information to the cloud server;
[0021] The central processing unit module is communicatively connected to the display module, the alarm module and the cloud module.
[0022] The present invention also provides an intelligent prediction method for embankment settlement based on inversion parameter correction, which uses the above-mentioned intelligent monitoring system for embankment settlement based on inversion parameter correction to perform prediction, including the following steps:
[0023] Step S100: determining embankment parameters, atmospheric parameters and mechanical parameters of embankment soil;
[0024] Step S200: assuming the data monitored by the embankment settlement monitoring unit as the settlement prediction value of the settlement prediction model, and performing parameter inversion in the settlement prediction model;
[0025] Step S300: Based on the parameters in the inverse settlement prediction model, the predicted settlement value of the embankment calculated by the settlement prediction model is compared with the monitored settlement value of the embankment, and the parameters in the prediction model are modified, and the calculation is iterated until the error between the predicted settlement value of the embankment and the monitored settlement value is less than 2%;
[0026] Step S400: The corrected soil inversion parameters are again introduced into the settlement prediction model to predict the settlement of the embankment at a certain time point in the future.
[0027] Furthermore, in step S100, the embankment parameters include the embankment height H and its top load q, and the atmospheric parameters include the atmospheric constant R, the atmospheric pressure u atm and the mass of air molecules M; the mechanical parameters of the embankment soil include the porosity n of the soil, the saturation S of the soil r , gas permeability coefficient k a , water permeability coefficient k w , the coefficient of change of air volume relative to the change of effective stress Coefficient of change of air volume relative to change in suction Pore water pressure in soil a , initial pore water pressure in soil Pore gas pressure in soil w and the initial pore gas pressure in the soil
[0028] Furthermore, in step 200, the calculation formula of the settlement prediction model is as follows:.
[0029]
[0030] Where: S y (t) is the predicted settlement value of the embankment;
[0031] t is time, that is, the time interval between monitoring points (year, month, day);
[0032] z is the depth of a point vertically downward from the top of the embankment.
[0033] Further, in step 300, the embankment settlement prediction value calculated by the settlement prediction model is compared with the embankment settlement monitoring value to correct the physical and mechanical parameters of the soil, and the method of iterative calculation until the error between the embankment settlement prediction value and the monitoring value is less than 2% is as follows:
[0034] (1) The embankment settlement monitoring value is assumed to be the predicted value of the settlement prediction model;
[0035] S j (t) = S y (t)
[0036] (2) Inverse the parameters in the settlement prediction model;
[0037]
[0038] (3) Calculate the predicted value of the settlement prediction model based on the inversion parameters;
[0039]
[0040] (4) Iterative calculation of the monitored values of embankment settlement and the predicted values of the settlement prediction model reduces the prediction error and corrects the parameters in the prediction model;
[0041] like
[0042] Correction of parameters in settlement prediction models
[0043]
[0044] Based on the parameters corrected for the i-th time, the predicted value of the settlement prediction model is calculated by inversion parameters;
[0045]
[0046] like
[0047] Stop iterative calculation
[0048] Where: S j (t) is the settlement monitoring value of the embankment;
[0049] S y (t) is the predicted settlement value of the embankment;
[0050] is the predicted value of embankment settlement calculated at the i-th iteration;
[0051] is the coefficient of change of air volume relative to the change of suction in the first inversion;
[0052] is the volume change coefficient of the air corrected for the ith time relative to the change in suction;
[0053] is the coefficient of change of air volume relative to the effective stress change in the first inversion;
[0054] is the volume change coefficient of the air corrected for the ith time relative to the effective stress change;
[0055] is the pore water pressure in the soil from the first inversion;
[0056] is the pore water pressure in the soil after the i-th correction;
[0057] is the initial pore water pressure in the soil from the first inversion;
[0058] is the initial pore water pressure in the soil after the i-th correction;
[0059] is the pore gas pressure in the soil obtained by the first inversion;
[0060] is the pore gas pressure in the soil after the i-th correction;
[0061] is the initial pore gas pressure in the soil from the first inversion;
[0062] is the initial pore gas pressure in the soil after the i-th correction;
[0063] (5) Repeat steps (1) to (4) until the error between the monitored value and the predicted value is less than 2%.
[0064] Furthermore, in step 400, the corrected soil inversion parameters are again introduced into the settlement prediction model, and the method for predicting the embankment settlement at a certain time point in the future is as follows:
[0065]
[0066] Where: S Y (t) is the predicted settlement of the embankment;
[0067] t y To predict a certain point in time in the future (year, month, day).
[0068] Compared with the prior art, the present invention has the following technical advances:
[0069] The present invention collects monitoring data and image information through an integrated embankment settlement monitoring unit and transmits it to a data analysis unit, uses the data analysis unit to classify, analyze and predict the monitoring data and image information, and finally transmits them to a background monitoring unit for display and warning, stores data and uploads them; accurately predicts and warns embankment settlement through a settlement prediction model, provides reliable data support for engineering personnel, and can warn staff to take timely measures to ensure the stability and safety of the embankment. In view of the shortcomings of existing embankment settlement monitoring methods, such as complex data processing and low prediction accuracy, the present invention adopts data transmission technology to realize real-time data collection, transmission, analysis and prediction, thereby improving the accuracy and efficiency of embankment settlement monitoring. The present invention has reasonable design, simple operation, and good economy, and is suitable for settlement monitoring and early warning of various embankment projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0070] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.
[0071] In the attached picture:
[0072] Figure 1 A logical architecture diagram of an intelligent monitoring system and prediction method for embankment settlement based on inversion parameter correction provided by an embodiment of the present invention;
[0073] Figure 2 It is a schematic diagram of the arrangement of the embankment settlement monitoring module in the embankment according to an embodiment of the present invention;
[0074] Figure 3 A comparison diagram of predicted settlement and measured settlement in an embodiment of the present invention;
[0075] In the figure:
[0076] 1- first sedimentation meter; 2- second sedimentation meter; 3- third sedimentation meter. DETAILED DESCRIPTION
[0077] The following specific embodiments may be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments. The embodiments of the present invention will be described below in conjunction with the accompanying drawings.
[0078] like Figure 1 As shown, an intelligent monitoring system for embankment settlement based on inversion parameter correction provided by an embodiment of the present invention includes an embankment settlement monitoring unit and a data analysis unit, wherein the embankment settlement monitoring unit includes an embankment settlement monitoring module, a data acquisition module, an image acquisition module, and a communication module, wherein the embankment settlement monitoring module is arranged in the embankment and connected to the data acquisition module; the data acquisition module sends the monitoring data to the data analysis unit through the communication module, and the data acquisition module converts the original data into sorted data reflecting the embankment settlement characteristics according to the measurement principles and related formulas of different instruments, and stores the data in a database; the image acquisition module sends the image information to the data analysis unit through the communication module, and collects images of the embankment area according to the set frequency through the image acquisition module, and sends these images to the data analysis unit in correspondence with the sampling time points; the data analysis unit is used to analyze and predict the monitoring data and images of the embankment settlement monitoring unit.
[0079] As a preferred solution, Figure 2As shown, the embankment settlement monitoring module includes three settlement meters, namely, the first settlement meter, the second settlement meter and the third settlement meter set at three monitoring points of the embankment, the first settlement meter and the third settlement meter are set on both sides of the embankment respectively, and the second settlement meter is set at the center of the embankment; the three settlement meters are connected to the data acquisition module through wires respectively. During the construction process, the three settlement meters are placed at the predetermined positions, and the PVC steel wire hose is covered outside the wire for protection.
[0080] In the specific design, the communication module includes a Beidou monitoring terminal located on one side of the embankment, which is used to receive satellite data and transmit it to the data analysis unit; the Beidou monitoring terminal includes a Beidou antenna, an ARM processor, a communication antenna and a voltage regulator. The voltage regulator is arranged in a circuit composed of a Beidou antenna, an ARM processor, a communication antenna and a power supply to provide a stable voltage; the Beidou antenna used to capture satellite data (including monitoring data and image information) is connected to the ARM processor, and the satellite data is output through the communication antenna after being processed by the ARM. Each monitoring point is equipped with a Beidou antenna to monitor the settlement situation.
[0081] Among them, the data analysis unit includes a data receiving module, a data verification module, a data classification module, an analysis and processing module, a visualization module and a settlement prediction module. The data receiving module is connected to the data verification module, the data classification module and the analysis and processing module respectively. The data verification module removes abnormal values after receiving the detection data. The data classification module classifies the data according to the measurement point location after removing the abnormal value data. Finally, the analysis and processing module processes the data of the classification number, draws a chart and presents it in the visualization module. The settlement prediction module performs parameter inversion and prediction based on the processed data, and the prediction result is presented through the visualization module. The data receiving module receives the communication module. The monitoring data and image information transmitted in blocks; the data verification module pre-processes the data and verifies whether there are abnormal values; the data classification module classifies and compiles the monitoring data and image information of each monitoring point; the analysis and processing module sorts the monitoring data of each monitoring point in time series, processes the settlement data of multiple monitoring points at the same time, and analyzes the relationship between embankment settlement and time; the visualization module displays the embankment settlement data in a graphical way, including displaying the time series changes of each monitoring point and multi-point comparative distribution diagram; the settlement prediction module is based on the settlement prediction model of the one-dimensional consolidation theory of unsaturated soil, estimates the embankment settlement at a certain point in the future, and provides an early warning reference for operators.
[0082] The above scheme is further optimized, and also includes a background monitoring unit, which includes an alarm module, a display module, a cloud module and a central processing unit module. The alarm module, the display module, the cloud module and the central processing unit module are all connected to the data analysis unit. The warning indicators of the alarm module are presented through the display module. The monitoring data and warning indicators at each fixed interval are uploaded to the cloud through the cloud module for real-time backup. The central processing unit maintains the overall operating efficiency of the background detection unit. The cloud module can upload the monitoring information to the cloud server; the alarm module can extract the indicators used for warning according to the monitoring data received from the data analysis unit, and classify the degree of influence of the warning indicators on the road operation status. For each warning indicator, combined with historical data and road structure characteristics, a threshold system of warning indicators is established to remind the background operator to observe the embankment situation in real time and take countermeasures; the display module can display the monitoring information and perform related operations; the central processing unit module is connected to the display module, the alarm module and the cloud module to ensure the normal operation of the system. Among them, the display module can use a touch screen, which is more intuitive to observe and more convenient to operate on the touch screen.
[0083] The present invention also provides an intelligent prediction method for embankment settlement based on inversion parameter correction, which uses the above-mentioned intelligent monitoring system for embankment settlement based on inversion parameter correction to perform prediction, including the following steps:
[0084] Step S100: Determine the embankment parameters, atmospheric parameters and mechanical parameters of the embankment soil; the specific parameters are as follows:
[0085] The embankment parameters include the embankment height H and its top load q, and the atmospheric parameters include the atmospheric constant R, atmospheric pressure u atm and the mass of air molecules M; the mechanical parameters of the embankment soil include the porosity n of the soil, the saturation S of the soil r , gas permeability coefficient k a , water permeability coefficient k w , the coefficient of change of air volume relative to the change of effective stress Coefficient of change of air volume relative to change in suction Pore water pressure in soil a , initial pore water pressure in soil Pore gas pressure in soil w and the initial pore gas pressure in the soil
[0086] Step S200: Assume the data monitored by the embankment settlement monitoring unit as the settlement prediction value of the settlement prediction model, and perform parameter inversion in the settlement prediction model; the calculation formula of the settlement prediction model is as follows:.
[0087]
[0088] Where: S y (t) is the predicted settlement value of the embankment;
[0089] t is time, that is, the time interval between monitoring points (year, month, day);
[0090] z is the depth of a point vertically downward from the top of the embankment.
[0091] Step S300: Based on the parameters in the inverse settlement prediction model, the predicted settlement value of the embankment calculated by the settlement prediction model is compared with the monitored settlement value of the embankment, and the parameters in the prediction model are modified, and the calculation is iterated until the error between the predicted settlement value of the embankment and the monitored settlement value is less than 2%. The specific method is as follows:
[0092] (1) The embankment settlement monitoring value is assumed to be the predicted value of the settlement prediction model;
[0093] S j (t) = S y (t)
[0094] (2) Inverse the parameters in the settlement prediction model;
[0095]
[0096] (3) Calculate the predicted value of the settlement prediction model based on the inversion parameters;
[0097]
[0098] (4) Iterative calculation of the monitored values of embankment settlement and the predicted values of the settlement prediction model reduces the prediction error and corrects the parameters in the prediction model;
[0099] like
[0100] Correction of parameters in settlement prediction models
[0101]
[0102] Based on the parameters corrected for the i-th time, the predicted value of the settlement prediction model is calculated by inversion parameters;
[0103]
[0104] like
[0105] Stop iterative calculation
[0106] Where: S j (t) is the settlement monitoring value of the embankment;
[0107] S y(t) is the predicted settlement value of the embankment;
[0108] is the predicted value of embankment settlement calculated at the i-th iteration;
[0109] is the coefficient of change of air volume relative to the change of suction in the first inversion;
[0110] is the volume change coefficient of the air corrected for the ith time relative to the change in suction;
[0111] is the coefficient of change of air volume relative to the effective stress change in the first inversion;
[0112] is the volume change coefficient of the air corrected for the ith time relative to the effective stress change;
[0113] is the pore water pressure in the soil from the first inversion;
[0114] is the pore water pressure in the soil after the i-th correction;
[0115] is the initial pore water pressure in the soil from the first inversion;
[0116] is the initial pore water pressure in the soil after the i-th correction;
[0117] is the pore gas pressure in the soil obtained by the first inversion;
[0118] is the pore gas pressure in the soil after the i-th correction;
[0119] is the initial pore gas pressure in the soil from the first inversion;
[0120] is the initial pore gas pressure in the soil after the i-th correction;
[0121] (5) Repeat steps (1) to (4) until the error between the monitored value and the predicted value is less than 2%.
[0122] Step S400: The corrected soil inversion parameters are brought back into the settlement prediction model to predict the embankment settlement at a certain point in the future. The specific method is as follows:
[0123]
[0124] Where: S Y(t) is the predicted settlement of the embankment;
[0125] t y To predict a certain point in time in the future (year, month, day).
[0126] The specific embodiments are as follows:
[0127] Four typical cases of settlement at different locations of embankments were selected. The cases were from the vertical settlement analysis results of different locations of embankments by Zhu et al. (2020) (Zhu, C., Zhou, X., Wang, S., 2020. Foundation treatment assessment and postconstructions settlement prediction of a loess high fill embankment: a case study. Shock and Vibration, 2020 (1): 8864690.) to verify the effectiveness of the one-dimensional consolidation prediction model for unsaturated soils. The initial material and physical parameters (initial parameters without parameter inversion and iterative correction) are as follows:
[0128]
[0129] The embankment parameters include the embankment height H and its top load q = 100 kPa. The atmospheric parameters include the atmospheric constant R, the atmospheric pressure uatm and the air molecular mass M. These atmospheric parameters are common sense parameters known to engineers and technicians in this field. The mechanical parameters of the embankment soil include the porosity n, the soil saturation Sr, the air permeability coefficient ka, the water permeability coefficient kw, the volume change coefficient of air relative to the effective stress change Coefficient of change of air volume relative to change in suction These mechanical parameters can be obtained by engineering personnel based on the soil conditions of the project construction site through on-site tests or indoor tests (both are basic tests obtained by engineering and technical personnel at the project site). For specific parameter values, please refer to the test process in the "Code for Geotechnical Engineering Investigation (GB50021-2022)" to obtain the parameters.
[0130] from Figure 3 It can be seen that the settlement prediction value obtained by using the one-dimensional consolidation prediction model of unsaturated soil is almost completely consistent with the measured value trend, which verifies the rationality and feasibility of the method.
[0131] The present invention realizes real-time monitoring and accurate prediction of embankment settlement by integrating multiple advanced technologies, improves the accuracy and efficiency of data processing and prediction, and is suitable for monitoring and analyzing various embankment geometries and soil parameters. Aiming at the shortcomings of existing embankment settlement monitoring methods, such as complex data processing and low prediction accuracy, the present invention realizes real-time data collection, analysis and prediction through an intelligent monitoring system, thereby improving the accuracy and efficiency of embankment settlement monitoring. The present invention has the advantages of reasonable design, simple operation and good economy, is suitable for settlement monitoring and early warning of various embankment projects, and has broad engineering application prospects.
[0132] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of protection of the claims of the present invention.
Claims
1. An intelligent monitoring system for embankment settlement based on inversion parameter correction, characterized in that: It includes an embankment settlement monitoring unit and a data analysis unit. The embankment settlement monitoring unit includes an embankment settlement monitoring module, a data acquisition module, an image acquisition module, and a communication module. The embankment settlement monitoring module is arranged in the embankment and is connected to the data acquisition module. The data acquisition module sends the monitoring data to the data analysis unit through the communication module. The image acquisition module sends the image information to the data analysis unit through the communication module. The data analysis unit is used to analyze and predict the monitoring data and images of the embankment settlement monitoring unit.
2. The intelligent monitoring system for embankment settlement based on inversion parameter correction according to claim 1 is characterized in that: The embankment settlement monitoring module includes three settlement meters, namely a first settlement meter, a second settlement meter and a third settlement meter arranged at three monitoring points of the embankment. The first settlement meter and the third settlement meter are arranged on both sides of the embankment respectively, and the second settlement meter is arranged in the center of the embankment; the three settlement meters are connected to the data acquisition module through wires respectively.
3. The intelligent monitoring system for embankment settlement based on inversion parameter correction according to claim 2 is characterized in that: The communication module includes a Beidou monitoring terminal located on one side of the embankment, and the Beidou monitoring terminal includes a Beidou antenna, an ARM processor, a communication antenna and a voltage stabilizer. The voltage stabilizer is arranged in a circuit composed of the Beidou antenna, the ARM processor, the communication antenna and a power supply, and is used to provide a stable voltage; the Beidou antenna used to capture monitoring data and image information is connected to the ARM processor, and the satellite data is output through the communication antenna after being processed by the ARM. Each monitoring point is equipped with a Beidou antenna for monitoring the settlement situation.
4. The intelligent monitoring system for embankment settlement based on inversion parameter correction according to claim 3 is characterized in that: The data analysis unit includes a data receiving module, a data checking module, a data classification module, an analysis and processing module, a visualization module and a settlement prediction module. The data receiving module is connected to the data checking module, the data classification module and the analysis and processing module respectively. The data checking module removes abnormal values after receiving the detection data. The data classification module classifies the data according to the measurement point position after removing the abnormal values. Finally, the analysis and processing module processes the data of the classification number, draws a chart and presents it in the visualization module. The settlement prediction module performs parameter inversion and prediction based on the processed data, and the prediction result is presented through the visualization module. The data receiving module receives the monitoring data and image information transmitted by the communication module; The data checking module pre-processes the data received by the data receiving module and checks whether there are abnormal values; The data classification module classifies and compiles the monitoring data and image information of each monitoring point; The analysis and processing module sorts the monitoring data of each monitoring point in time sequence, processes the settlement data of multiple monitoring points at the same time, and analyzes the relationship between embankment settlement and time; The visualization module displays the embankment settlement data in a graphical manner, including displaying the time series changes of each monitoring point and a multi-point comparative distribution diagram; The settlement prediction module estimates the settlement of the embankment at a certain point in the future and provides an early warning reference for operators.
5. The intelligent monitoring system for embankment settlement based on inversion parameter correction according to claim 4 is characterized in that: It also includes a background monitoring unit, which includes an alarm module, a display module, a cloud module and a central processing unit module. The alarm module, the display module, the cloud module and the central processing unit module are all connected to the data analysis unit. The warning indicators of the alarm module are presented through the display module. The monitoring data and warning indicators at each fixed interval are uploaded to the cloud for real-time backup through the cloud module. The central processing unit maintains the overall operating efficiency of the background detection unit; The alarm module extracts indicators for early warning based on the monitoring data received from the data analysis unit, and classifies the impact of the early warning indicators on the road operation status. For each early warning indicator, combined with historical data and road structure characteristics, a threshold system of early warning indicators is established to remind the back-end operator to observe the embankment conditions in real time and take countermeasures; The display module displays the monitoring information and performs related operations; The cloud module uploads the monitoring information to the cloud server; The central processing unit module is communicatively connected to the display module, the alarm module and the cloud module.
6. An intelligent prediction method for embankment settlement based on inversion parameter correction, characterized in that: The prediction is performed using the intelligent monitoring system for embankment settlement based on inversion parameter correction as described in any one of claims 1 to 5, comprising the following steps: Step S100: determining embankment parameters, atmospheric parameters and mechanical parameters of embankment soil; Step S200: assuming the data monitored by the embankment settlement monitoring unit as the settlement prediction value of the settlement prediction model, and performing parameter inversion in the settlement prediction model; Step S300: Based on the parameters in the inverse settlement prediction model, the predicted settlement value of the embankment calculated by the settlement prediction model is compared with the monitored settlement value of the embankment, and the parameters in the prediction model are modified, and the calculation is iterated until the error between the predicted settlement value of the embankment and the monitored settlement value is less than 2%; Step S400: The corrected soil inversion parameters are again introduced into the settlement prediction model to predict the settlement of the embankment at a certain time point in the future.
7. The intelligent prediction method for embankment settlement based on inversion parameter correction according to claim 6 is characterized by: In step S100, the embankment parameters include the embankment height H and its top load q, and the atmospheric parameters include the atmospheric constant R, atmospheric pressure u atm and the mass of air molecules M; the mechanical parameters of the embankment soil include the porosity n of the soil, the saturation S of the soil r , gas permeability coefficient k a , water permeability coefficient k w , the coefficient of change of air volume relative to the change of effective stress Coefficient of change of air volume relative to change in suction Pore water pressure in soil a , initial pore water pressure in soil Pore gas pressure in soil w and the initial pore gas pressure in the soil 8. The intelligent prediction method for embankment settlement based on inversion parameter correction according to claim 7 is characterized in that: In step 300, the embankment settlement prediction value calculated by the settlement prediction model is compared with the embankment settlement monitoring value to correct the physical and mechanical parameters of the soil, and the method of iterative calculation until the error between the embankment settlement prediction value and the monitoring value is less than 2% is as follows: (1) The embankment settlement monitoring value is assumed to be the predicted value of the settlement prediction model; S j (t)=S y (t) (2) Inverse the parameters in the settlement prediction model; (3) Calculate the predicted value of the settlement prediction model based on the inversion parameters; (4) Iterative calculation of the monitored values of embankment settlement and the predicted values of the settlement prediction model reduces the prediction error and corrects the parameters in the prediction model; like Correction of parameters in settlement prediction models Based on the parameters corrected for the i-th time, the predicted value of the settlement prediction model is calculated by inversion parameters; like Stop iterative calculation Where: S j (t) is the settlement monitoring value of the embankment; S y (t) is the predicted settlement value of the embankment; is the predicted value of embankment settlement calculated for the i-th iteration; is the coefficient of change of air volume relative to the change of suction in the first inversion; is the volume change coefficient of the air corrected for the ith time relative to the change in suction; is the coefficient of change of air volume relative to the effective stress change in the first inversion; is the volume change coefficient of the air corrected for the ith time relative to the effective stress change; is the pore water pressure in the soil from the first inversion; is the pore water pressure in the soil after the i-th correction; is the initial pore water pressure in the soil from the first inversion; is the initial pore water pressure in the soil after the i-th correction; is the pore gas pressure in the soil obtained by the first inversion; is the pore gas pressure in the soil after the i-th correction; is the initial pore gas pressure in the soil from the first inversion; is the initial pore gas pressure in the soil after the i-th correction; (5) Repeat steps (1) to (4) until the error between the monitored value and the predicted value is less than 2%.
9. The intelligent prediction method for embankment settlement based on inversion parameter correction according to claim 8 is characterized in that: In step 400, the corrected soil inversion parameters are again introduced into the settlement prediction model, and the method for predicting the embankment settlement at a certain time point in the future is as follows: Where: S Y (t) is the predicted settlement of the embankment; t y To predict a certain point in time in the future (year, month, day).
Citation Information
Cited By
Side slope rock-soil body parameter inversion method based on time sequence correlation analysis
CN119691871A
