Port equipment fault early warning method and system

Through the data governance methods of big data and IoT perception capabilities, flexible early warning rule templates and multi-dimensional equipment management indicator data model are built, which solves the shortcomings of existing port equipment fault warning systems in data processing and real-time performance, and achieves efficient Accurate fault warning and equipment management.

CN118940864AInactive Publication Date: 2024-11-12YANTAI PORT GRP CO LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411418528.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing port equipment fault warning system has shortcomings in data processing capabilities, early warning model application, real-time and accuracy, and it is difficult to effectively process massive data and achieve true real-time early warning, and the model is poor in versatility and robustness.

Method used

Adopt data governance methods with big data and IoT perception capabilities, through data integration, standardization and metadata management, build flexible early warning rule templates, monitor equipment status in real time, automatically update early warning business models, and use multi-dimensional device management indicator data model to perform data Analyze and early warning business model construction.

Benefits of technology

It improves the real-time and accuracy of data processing, enhances the universality and robustness of the early warning system, can identify equipment failures in real time and provide accurate early warnings, adapt to changes in equipment status, and improves equipment management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940864A_ABST
    Figure CN118940864A_ABST
Patent Text Reader

Abstract

The invention discloses a port equipment fault early warning method and system, and relates to the field of port equipment. In order to solve the defects that an existing equipment fault early warning method is poor in real-time performance, accuracy, universality and robustness, equipment information in all service systems is collected and gathered; performing data management on the equipment information; pre-warning rules and threshold values are preset according to the equipment information and the business indexes; performing mapping association on the early warning rule template and an early warning object; identifying a service range influenced by an equipment state according to the equipment information, performing label definition on the equipment information, performing label rule calculation on the equipment information according to a service range rule, and synchronously updating the information into the equipment information; and according to the identified business range, early warning information is automatically synchronized to a corresponding business department and / or a person in charge, and the business department and / or the person in charge perform early warning processing after receiving the early warning. The method is mainly used for early warning of port equipment faults.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of port equipment, and in particular to a port equipment fault early warning method and system thereof. Background Art

[0002] At present, the judgment and early warning of whether port equipment is faulty need to rely on the effective collection and integration of data from various devices, including real-time data (such as sensor data) and historical data. The collected raw data is usually huge in quantity and variety, and may contain noise and outliers. The existing equipment failure early warning system uses big data processing technology (Hadoop, Spark, etc.) to clean, denoise, convert and standardize the data to extract valuable information. At the same time, data analysis technology (data mining, machine learning, etc.) is used to conduct in-depth analysis of the processed data to discover the signs and laws of equipment failure. Based on data analysis, an effective fault early warning model is constructed, involving steps such as feature selection, model training, and parameter optimization, and the early warning model is deployed in the production environment for real-time monitoring. When the monitored data meets the conditions of the early warning model, the system needs to automatically trigger the early warning mechanism and promptly notify relevant personnel to handle it.

[0003] The existing equipment failure early warning system mainly adopts the technical solution based on the mechanism model. It mainly includes two stages: 1. Residual generation stage: Establish an accurate mathematical model through the equipment operation mechanism to estimate the system output, and compare it with the actual measurement value to obtain the residual. The model constructed in this stage is also called the residual generator.

[0004] 2. Residual evaluation stage: Analyze the residuals to determine whether the process has failed and further identify the type of failure.

[0005] This type of method is closely integrated with control theory, and mainly uses three specific methods: parameter estimation, state estimation, and equivalent space to realize the construction of residual sequence. Among them, the state estimation method is the most commonly used, which can be implemented using an observer or a Kalman filter. This technical solution based on the mechanism model has a wide range of applications in the field of equipment failure warning, and has achieved good results in practical applications. However, the above equipment failure warning method still has the following problems when warning equipment failures of port equipment: 1. Data processing capabilities With the development of big data technology, the data processing capability of equipment fault warning has been significantly improved. Through technologies such as cloud computing and edge computing, rapid processing and analysis of massive data can be achieved. However, with the increase in the number of equipment and the continuous enrichment of monitoring data, data processing capabilities still face challenges, especially how to further improve data processing efficiency while ensuring real-time and accuracy is an urgent problem to be solved.

[0006] 2. Application of early warning model The early warning model is the core of the equipment failure early warning system. At present, early warning models based on artificial intelligence technologies such as machine learning and deep learning have been applied in many fields. These models can learn the operating rules and failure modes of equipment based on historical data, thereby achieving accurate early warning of equipment failures. However, the training and tuning of the model requires a lot of data and time, and the versatility and robustness of the model is also a problem that needs to be solved.

[0007] 3. Real-time challenges Equipment failure warning systems need to achieve real-time monitoring and early warning of equipment status. However, in practical applications, due to limitations such as network delays and data processing speed, it is often difficult to achieve true real-time warnings, which affects the effectiveness of warnings.

[0008] 4. Accuracy issues The accuracy of equipment failure warning is an important indicator for evaluating the performance of the warning system. However, due to the complexity and uncertainty of equipment operation, as well as the influence of factors such as noise and interference in monitoring data, the accuracy of warning is often unsatisfactory.

[0009] Therefore, there is a need for a port equipment failure warning method and system that can be used for various equipment, has flexible and configurable warning rules, can provide real-time warning of equipment failures and can self-learn and update models, has accurate prediction results, fast prediction speed, and can handle the complexity of equipment. Summary of the invention

[0010] In order to solve the defects of existing equipment failure early warning methods such as poor real-time performance, poor accuracy, poor versatility and poor robustness, the present invention provides a port equipment failure early warning method and system which can be commonly used in various equipment, has flexible and configurable early warning rules, can warn of equipment failures in real time and can self-learn and update models, has accurate prediction results, fast prediction speed, and can handle the complexity of equipment.

[0011] A port equipment failure early warning method according to the present invention comprises the following steps: S1. Collect and aggregate equipment information from various business systems; S2. Performing data management on the device information; the data management includes data integration, data development, data standardization, data normalization, data storage, metadata management and / or data security management; S3. Preset warning rules and thresholds based on device information and business indicators; S4. Map and associate the warning rule template with the warning object; S5. Identify the business scope affected by the device status based on the device information, define tags for the device information, calculate the tag rules for the device information based on the business scope rules, and update them to the device information synchronously; S6. According to the identified business scope, the warning information is automatically synchronized to the corresponding business department and / or responsible person. After receiving the warning, the business department and / or responsible person will handle the warning.

[0012] Furthermore: the equipment information includes basic equipment information, real-time location information, equipment status information, equipment maintenance plan, maintenance execution progress and / or maintenance end time information, and the basic equipment information includes equipment name, purchase time and / or production time.

[0013] Furthermore: the warning rule refers to the definition of warning conditions, factors and thresholds for specific business indicators created based on the warning rule template; different warning rules are configured for different business indicators of the same type of indicator based on the definition of the warning rule; the template of the warning rule refers to the warning rule group shared by indicators of the same type, that is, the warning rule only needs to be configured once for the same type of indicator.

[0014] Further: the template of the warning rule allows modification, and the modification steps are consistent with the creation steps; select the warning rule template and set the basic information, configure the monitoring rule details, and save after the configuration is completed to generate a new warning rule information; The warning rule information is a status of a warning trigger result, supports the definition of a warning level, and supports sending a warning notification to a department / person responsible for warning processing, and the department / person responsible for warning processing may be one or more.

[0015] Further: a plurality of the warning rules form a warning rule list, and the warning rule list supports viewing, manual configuration and / or automatic generation.

[0016] A port equipment failure early warning system described in the present invention includes a terminal device, a data middle station, a DTU, a cloud server and a mobile device. The data middle station is used to collect and aggregate equipment information in various business systems. The terminal device is connected to the DTU for two-way communication, the DTU is connected to the cloud server for two-way communication, and the cloud server is connected to the mobile device for two-way communication.

[0017] Further: the communication mode of the DTU includes a transparent transmission mode and a polling mode. When the DTU is used as the master station, the polling transparent transmission mode is adopted, and when the cloud server is used as the master station, the transparent transmission mode is adopted.

[0018] Further: the data middle platform includes a basic platform and a data governance platform, and the data governance platform includes a metadata management module, a data integration development module, a multi-dimensional equipment management indicator data model, a data standardization module and a data security management module; The basic platform is used to obtain equipment management indicator data of the transactional business system and collect it into the basic data base of the data center; The metadata management module is used to define and manage various elements of data governance and create metadata standardization rules; The data integration development module is used to process, handle, convert and / or integrate the equipment management indicator data according to the metadata standardization rules to generate standardized data; The multi-dimensional equipment management indicator data model is used to retrieve and calculate corresponding data according to the user's customized requirements, thereby generating analysis results; The data standardization module is used to sort out the integrated equipment management indicator data according to the business management requirements and corresponding data specifications, establish a unified equipment management indicator data standard system, and formulate equipment management indicator data standards; The data security management module is used for data encryption and data authority configuration.

[0019] Furthermore: the equipment management indicator data standard includes classification standards, metadata management standards, data exchange standards, and data quality management standards.

[0020] Further: the multi-dimensional equipment management indicator data model includes an operation data layer, a common dimension data layer and a data application layer; The operation data layer is used to integrate the equipment management data into the same data source, and the multi-dimensional equipment management indicator data model is the same as the business system; The public dimension data layer is used to process the data of the operation data layer into a unified standard equipment dimension table and equipment management indicator fact table. The multi-dimensional equipment management indicator data model designs the dimension table and fact table according to the data analysis business requirements; The data application layer is used to perform a unified design according to the device management data analysis process and requirements to meet the business objectives of the device management data application.

[0021] The beneficial effects of the present invention are: Based on the early warning capability of big data and IoT perception, the present invention solves the problems of poor real-time, high efficiency and accuracy of traditional data processing methods, assists in statistical prediction of management equipment failure analysis, and thus improves the efficiency of corresponding equipment management and business processing level. The specific advantages include the following: 1. Data-driven methods do not require in-depth understanding of the physical mechanisms inside the device, but rely on a large amount of data collected from actual operation, which is more versatile and flexible; 2. It can learn from equipment operation data in real time and update the early warning business model to adapt to changes in equipment status and continuously improve prediction accuracy; 3. By mining the potential relationships in the data, the warning rule template is mapped and associated with the warning object to establish a warning business model, which can handle the complexity of the actual equipment operation status; 4. Data collection and processing: effectively collect data from equipment, and clean, integrate and process the data to eliminate noise and redundancy and extract valuable information; 5. Construction of early warning business model: Based on the IoT terminal data of the business system (equipment management system), the fault characteristics are extracted from the equipment information obtained synchronously through real-time data to build an early warning business model for identifying faults. The early warning business model can predict when the equipment may fail based on the current status of the equipment; 6. Real-time monitoring and updating: The system needs to monitor the operating status of the equipment in real time and update the early warning business model in time according to the actual situation to ensure the accuracy of the early warning. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a flow chart of the port equipment failure early warning method; Figure 2 It is a connection block diagram of the information collection and aggregation module; Figure 3 yes Figure 2 The transparent transmission mode connection diagram of DTU in the figure; Figure 4 This is the interface diagram of the warning rule template list; Figure 5 This is the interface diagram of the warning rule instance list; Figure 6 It is a cross-sectional view for creating alert rules; Figure 7 This is the early warning trigger status configuration interface diagram; Figure 8 This is a diagram of the business indicator management configuration interface; Fig. 9 This is a new interface diagram for early warning and penalty rules; Fig.10 This is a schematic diagram of the main interface. DETAILED DESCRIPTION

[0023] The following are only preferred specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a technician familiar with the technical field within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. The embodiments described below are only used to explain the present invention and cannot be interpreted as limitations on the present invention. The protection scope of the present invention should be based on the protection scope of the claims. The embodiments of the present invention are described in detail below. In order to facilitate the description of the present invention and simplify the description, the technical terms used in the specification of the present invention should be interpreted in a broad sense, including but not limited to conventional replacement schemes not mentioned in this application, and also including direct implementation methods and indirect implementation methods.

[0024] Example 1 Combination Figure 1-Figure 10 This embodiment describes a port equipment failure early warning method disclosed in this embodiment, including the following steps: S1. Collect and aggregate equipment information from various business systems; S2. Performing data management on the device information; the data management includes data integration, data development, data standardization, data normalization, data storage, metadata management and / or data security management; S3. Preset warning rules and thresholds based on device information and business indicators; S4. Map and associate the warning rule template with the warning object; It supports editing of warning rule templates and setting of warning thresholds. Warning rule templates and threshold warnings can be adjusted, turned on and off.

[0025] 1. Alert rule template configuration An early warning rule template refers to an early warning rule group shared by indicators of the same type. That is, for indicators of the same type, you only need to configure the early warning rule once to implement data early warning monitoring of that indicator type.

[0026] like Figure 4 The displayed warning rule template list can display all configured warning rule templates, manage rule templates by directory, and create new rule templates.

[0027] First, configure basic information and select monitoring items that require early warning monitoring. In the indicator monitoring scenario, the fields in the monitoring items are the attribute fields defined by the indicator; secondly, configure the early warning rules. After the configuration is completed, a new rule template can be generated.

[0028] The template of the warning rule can be modified. The steps are the same as when creating a new one. The basic information and status of the template can be edited. The warning rules generated before the template is edited will not be affected. The newly created warning rules after the template is edited will automatically reference the edited rule template.

[0029] 2. Warning rule instance configuration Warning rules refer to the definition of warning conditions, factors and thresholds for specific business indicators based on warning rule templates. Based on the definition of warning rules, different warning rules can be configured for different business indicators of the same type of indicators.

[0030] The warning rule list allows you to view all warning rule information that is manually configured / automatically generated, and manage them by directory. Figure 5 As shown, warning rules can be created manually or automatically triggered by monitoring indicator data.

[0031] like Figure 6 As shown, select the warning rule template and set the basic information. The second step is to configure the warning rule details. After the configuration is completed, save it to generate a new warning rule information.

[0032] like Figure 7 As shown, as a preset trigger result state, the warning level can be defined, and the responsible department / person for warning processing can be sent. At the same time, multiple warning notification recipients can be set, and one of them can be set as the warning responsible person.

[0033] Warning rules can be modified. The steps are the same as when creating a new one. The basic information and status of the warning rules can be edited and maintained, and the rule details can also be modified. After editing and saving, the rules will take effect immediately.

[0034] 3. Early warning start and stop management like Figure 8 As shown, the system can set the early warning control switch of the indicator, which can turn the early warning on or off. There is a "Disable" button in the corresponding early warning indicator operation bar, which can be selected to change the status to invalid.

[0035] The association mapping between warning rules and warning objects: like Fig. 9 As shown in the figure, the warning rules and the warning objects involved in the rules are mapped and associated. The warning trigger rule configuration refers to the condition configuration for triggering the alarm. Multiple monitoring fields can be referenced at the same time to configure the trigger conditions and thresholds. This configuration capability is supported in both the alarm rule template setting and the alarm rule setting.

[0036] The data indicators acquired in real time are monitored through the existing supporting application system. When the trigger conditions and thresholds are reached, early warnings are sent to the corresponding managers through the application system.

[0037] The early warning trigger rule factor is the core element of the indicator data monitoring trigger, which meets the alarm trigger diversity of port production and operation indicators through diversified configuration capabilities. The trigger conditions and thresholds are configured through the supporting existing application system, and the trigger is triggered when the corresponding real-time indicator data reaches the conditions and thresholds.

[0038] The alarm triggering rules support the simultaneous selection of multiple monitoring data fields and their threshold settings; support the definition and configuration of multiple alarm levels; support the configuration of alarm names and alarm descriptions, and support the insertion of dynamic variable data in static text; support the setting of multiple alarm notification recipients, and set one of them as the alarm responsible person.

[0039] For one indicator data, multiple alarm triggering rules can be configured. Each rule can select different fields and thresholds, and the rules can be modified. The modifications will take effect immediately after submission.

[0040] S5. Identify the business scope affected by the device status based on the device information, define tags for the device information, calculate the tag rules for the device information based on the business scope rules, and update them to the device information synchronously; The equipment data is obtained through the equipment management system, and specific business scenarios and business scopes are designed according to the early warning application system, and the indicator definitions in the scenarios, namely the label definitions, are specified.

[0041] Tag rules generally refer to the indicator rules for a specific device fault monitoring. Tags are a business definition of indicators. Warning rules generally refer to the general term for warning processing mechanisms. Usually, warning rules include all tag rules.

[0042] Business scope identification is based on equipment attributes, maintenance plans, early warning rules, etc. The system automatically identifies the business scope affected by the equipment status, such as production, safety and environment, etc.

[0043] Define labels for equipment attribute information, calculate label rules for equipment attributes, maintenance content, and warning settings according to business scope rules, and update them to equipment information synchronously. The system can automatically identify business scopes according to corresponding rules.

[0044] S6. According to the identified business scope, the warning information is automatically synchronized to the corresponding business department and / or responsible person. After receiving the warning, the business department and / or responsible person will handle the warning.

[0045] Information synchronization and message reminders are after setting the warning rules. The system will automatically synchronize the warning information to the relevant business departments and individuals according to the identified business scope.

[0046] like Fig.10 As shown, after receiving the warning, the responsible person will handle the warning in the personal center.

[0047] Example 2 This embodiment is explained in conjunction with Example 1. This embodiment discloses a port equipment failure warning system, including a terminal device, a data middle station, a DTU, a cloud server and a mobile device. The data middle station is used to collect and aggregate equipment information in various business systems. The terminal device is connected to the DTU for two-way communication, the DTU is connected to the cloud server for two-way communication, and the cloud server is connected to the mobile device for two-way communication.

[0048] like Figure 2 and Figure 3 The connection block diagram of the information collection and aggregation module shown in the figure collects and aggregates equipment information from the business system related to the equipment in the terminal equipment. The equipment information includes basic equipment information, real-time location information, equipment status information, equipment maintenance plan, maintenance execution progress and / or maintenance end time information, etc. The basic equipment information includes equipment name, purchase time and / or production time. The information collection and aggregation module supports the connection between the terminal equipment and the equipment system, configures the application system information through the interface, supports setting the frequency of system data collection, and collects data according to different time frequencies. The application system refers to the existing data application system, which can configure warning conditions, thresholds and other rules, and display warning information.

[0049] The information collection and aggregation module supports equipment maintenance reminders and maintenance status sharing functions, matches the maintenance plan with the equipment's production time, and automatically sends maintenance reminders according to the plan requirements. During maintenance, the maintenance status needs to be shared with the planner.

[0050] By configuring the data collection rules of your own equipment on the platform, you can realize functions such as data collection and alarm push of terminal devices. There are two technical solutions: edge computing and cloud polling.

[0051] like Figure 2 and Figure 3 As shown in the figure, DTU supports reporting reply data that meets the reporting conditions to the cloud server. At this time, DTU acts as the master station. It also supports transparent transmission mode, that is, the reply information of the terminal device is not filtered and directly transmitted to the cloud server. At this time, the cloud server acts as the master station.

[0052] Data Governance: A data middle platform system is provided, which provides a unified data base for the horizontal data interaction and collaboration of various business systems of the port. Through the basic platform and data governance platform, data services such as data collection, data governance, data storage, data sharing and exchange, data management, and data services are realized to achieve unified management of data tools.

[0053] The data middle platform is used to perform data governance on indicator-related data. The data governance platform includes a metadata management module, a data integration development module, a multi-dimensional equipment management indicator data model, a data standardization module and a data security management module; the data governance process includes data integration, specification design, data development, data storage, metadata management, data security management and other processes, and an integrated and highly integrated data governance platform tool system is provided through the data middle platform.

[0054] 1. Metadata management module Provides target query function and manages the business systems and original data models associated with all data used in the equipment management special analysis. The business system includes the business system and original data model where the equipment management data is located. Query and manage the data structure and model used in the hierarchical data governance process. The metadata management module is the data knowledge management module in the data governance process. Subsequent data processing, data governance and data sharing work are all based on metadata to provide basic capabilities.

[0055] 2. Data hierarchical model design Provide a multi-dimensional equipment management indicator data model that meets the general data governance process hierarchy. The layers include the operation data layer (ODS layer), the common dimension data layer (CDM layer), and the data application layer (ADS layer). According to the data application requirements of the equipment management analysis indicators, the query delay, concurrency and other factors of data access are comprehensively considered to complete the design of the data model, including the data model (conceptual, logical, physical), mapping relationship, and output the corresponding equipment management analysis data model.

[0056] In order to solve the problem of multiple business systems and multiple data structures, the ODS layer basically directly integrates data into the same data source on a one-to-one basis, and the data model is generally the same as that of the business system. The CDM layer processes the data of the ODS layer into a unified standard equipment dimension data table and an equipment management indicator fact table. The data model designs the dimension table and fact table according to the data analysis business requirements. The ADS layer is the data layer that is ultimately oriented to the data analysis application system, that is, the data application layer data model. It needs to be uniformly designed according to the specific equipment management data analysis process and requirements to meet the business objectives of the equipment management data application.

[0057] The hierarchical model design solves the three-level hierarchical conversion from the business system data model to the data analysis system data model. The main goal is to improve the efficiency of equipment management data statistics and data analysis.

[0058] 3.Data integration development module The data integration development module is based on the data governance platform. It collects and synchronizes data from business systems and external platforms, collects equipment management indicator data scattered in business systems and files into the data base of the basic platform, and performs necessary conversions on data types to prepare for subsequent data processing, mining, and application.

[0059] Data development and integration is the actual technical implementation process of equipment management data from the business system to the operation data layer (ODS layer), then to the common dimension data layer (CDM layer), and then to the data application layer (ADS layer) through data conversion tools according to the designed three-layer model.

[0060] Processing from business system to ODS layer: The data source is the scattered business system data and some manual data related to equipment management. The data target is the centralized big data component Hive entity storage. The data is directly integrated without conversion.

[0061] Processing from ODS layer to CDM layer: The data source model of the ODS layer is the data related to equipment management, which conforms to the original business system data structure with the characteristics of the transactional system. The CDM data target model is a designed data structure of the equipment dimension table and the equipment management indicator fact table that conforms to the analytical requirements. The data conversion process first converts and extracts the dimension table data, and then associates the dimension table to convert, calculate and extract the fields of the fact table. In addition, in this process, data quality rules must be defined during data conversion, such as cleaning the non-standard equipment data contained in the data source according to the equipment dimension data defined by the data standard process, adding default values ​​to the null value data of various data sources, and performing data quality rule conversion processing on the data that does not meet the verification results of various data sources, etc. This layer of data storage also uses the big data component Hive to improve data conversion efficiency.

[0062] Processing from CDM layer to ADS layer: The equipment management data in the CDM layer data source is already atomic data that meets data standards and can be used as data assets. In order to further improve the efficiency of data query, statistics, and analysis, further application design is done based on the four main models of equipment management analysis. In the ADS layer, separate application tables are designed for situations where the atomic indicator data volume in the CDM layer is large and the calculation of data analysis indicators is complex. For example, in the equipment management indicator application model, real-time collection of management indicators that require early warning in the equipment can be performed, and the results can be designed into an ADS layer data table that meets the use of the application system. Therefore, the data target is the application data table of each data analysis model after design, and the new big data component ClickHouse is selected for entity storage in order to improve query and statistical efficiency. Data conversion is mainly for aggregation and summary and application-layer derived indicators that require complex calculation formulas.

[0063] In order to solve the problems of large data volume, multiple data conversion rules, and large amount of data development code, data conversion tools are provided in data integration development work. Data integration development is achieved through low-threshold drag-and-drop configuration data orchestration services, which makes it convenient for business personnel to quickly develop their own big data applications.

[0064] In order to achieve better usage purposes, the tool must also provide support for real-time monitoring of integrated tasks, support reporting and error handling of the integrated task execution process and results, and provide data integrity check reporting capabilities.

[0065] 4. Data standards and data planning process The data standardization module sorts out the integrated equipment management indicator data according to the business management requirements and corresponding data specifications, establishes a unified equipment management indicator data standard system, and formulates standards for equipment management indicator data classification, metadata management, data exchange, data quality management, etc. to effectively ensure data quality.

[0066] Data standards and planning capabilities support data planning, custom data models, unified data standards, visual data modeling, data labeling and other functions, open up the data governance link from the data source to the standard layer and application layer, and implement data standards and data assets. Data standardization is achieved through relationship modeling and dimensional modeling; the indicator system is standardized through indicator construction, eliminating ambiguity, unifying the caliber and calculation logic, and providing thematic data query and mining services to the outside world.

[0067] 5. Data security management module Provide comprehensive data security strategies to conduct data permission management, sensitive data desensitization, and data classification and grading management, etc., to ensure storage security and access security of data during its life cycle.

Claims

1. A port equipment failure early warning method, characterized in that: The steps include: S1. Collect and aggregate equipment information from various business systems; S2. Performing data management on the device information; the data management includes data integration, data development, data standardization, data normalization, data storage, metadata management and / or data security management; S3. Preset warning rules and thresholds based on device information and business indicators; S4. Map and associate the warning rule template with the warning object; S5. Identify the business scope affected by the device status based on the device information, define tags for the device information, calculate the tag rules for the device information based on the business scope rules, and update them to the device information synchronously; S6. According to the identified business scope, the warning information is automatically synchronized to the corresponding business department and / or responsible person. After receiving the warning, the business department and / or responsible person will handle the warning.

2. A port equipment failure early warning method according to claim 1, characterized in that: The equipment information includes basic equipment information, real-time location information, equipment status information, equipment maintenance plan, maintenance execution progress and / or maintenance completion time information. The basic equipment information includes equipment name, purchase time and / or production time.

3. A port equipment failure early warning method according to claim 1, characterized in that: The warning rule refers to the definition of warning conditions, factors and thresholds for specific business indicators created based on the warning rule template; different warning rules are configured for different business indicators of the same type of indicator based on the definition of the warning rule; the template of the warning rule refers to the warning rule group shared by indicators of the same type, that is, the warning rule only needs to be configured once for the same type of indicator.

4. A port equipment failure early warning method according to claim 1, characterized in that: The template of the warning rule can be modified, and the modification steps are the same as the creation steps; select the warning rule template and set the basic information, configure the monitoring rule details, and save after the configuration is completed to generate a new warning rule information; The warning rule information is a status of a warning trigger result, supports the definition of a warning level, and supports sending a warning notification to a department / person responsible for warning processing, and the department / person responsible for warning processing may be one or more.

5. A port equipment failure early warning method according to claim 1, characterized in that: A plurality of the warning rules form a warning rule list, and the warning rule list supports viewing, manual configuration and / or automatic generation.

6. A port equipment failure early warning system, characterized in that: It includes terminal equipment, data center, DTU, cloud server and mobile device. The data center is used to collect and aggregate device information in various business systems. The terminal equipment is connected to the DTU in a two-way communication manner, the DTU is connected to the cloud server in a two-way communication manner, and the cloud server is connected to the mobile device in a two-way communication manner.

7. A port equipment failure early warning system according to claim 6, characterized in that: The communication modes of the DTU include transparent transmission mode and polling mode. When the DTU acts as the master station, the polling transparent transmission mode is adopted, and when the cloud server acts as the master station, the transparent transmission mode is adopted.

8. A port equipment failure early warning system according to claim 6, characterized in that: The data middle platform includes a basic platform and a data governance platform. The data governance platform includes a metadata management module, a data integration development module, a multi-dimensional equipment management indicator data model, a data standardization module and a data security management module; The basic platform is used to obtain equipment management indicator data of the transactional business system and collect it into the basic data base of the data center; The metadata management module is used to define and manage various elements of data governance and create metadata standardization rules; The data integration development module is used to process, handle, convert and / or integrate the equipment management indicator data according to the metadata standardization rules to generate standardized data; The multi-dimensional equipment management indicator data model is used to retrieve and calculate corresponding data according to the user's customized requirements, thereby generating analysis results; The data standardization module is used to sort out the integrated equipment management indicator data according to the business management requirements and corresponding data specifications, establish a unified equipment management indicator data standard system, and formulate equipment management indicator data standards; The data security management module is used for data encryption and data authority configuration.

9. A port equipment failure early warning system according to claim 8, characterized in that: The equipment management indicator data standards include classification standards, metadata management standards, data exchange standards, and data quality management standards.

10. A port equipment failure early warning system according to claim 8, characterized in that: The multi-dimensional equipment management indicator data model includes an operation data layer, a common dimension data layer and a data application layer; The operation data layer is used to integrate the equipment management data into the same data source, and the multi-dimensional equipment management indicator data model is the same as the business system; The public dimension data layer is used to process the data of the operation data layer into a unified standard equipment dimension table and equipment management indicator fact table. The multi-dimensional equipment management indicator data model designs the dimension table and fact table according to the data analysis business requirements; The data application layer is used to perform a unified design according to the device management data analysis process and requirements to meet the business objectives of the device management data application.

Citation Information

Patent Citations

  • Complaint service warning monitoring method

    CN107147521A

  • Data management method and device based on artificial intelligence, electronic equipment and medium

    CN115062081A

  • Mine safety production risk monitoring and early warning system and method

    CN116579601A

  • Label calculation method based on user-defined rule tree analysis

    CN117472954A

  • Power grid resource dynamic threshold early warning method and system based on big data

    CN117710143A