Electromechanical equipment operation data processing method and system and storage medium

Through multi-dimensional analysis and comprehensive impact scores, the data acquisition scheme and maintenance terminal allocation of electromechanical equipment are dynamically adjusted, which solves the flexibility of data processing methods in the existing technology, and improves the adaptability and efficiency of electromechanical equipment operation system.

CN118941006AInactive Publication Date: 2024-11-12GUANGZHOU GUANDA MECHANICAL & ELECTRICAL EQUIPMENT ENGINEERING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410947870.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The data processing methods in existing mechanical and electrical equipment operating systems lack flexibility and cannot be adapted to actual needs, resulting in waste of resources and reduced production efficiency.

Method used

A multi-dimensional analysis method is used to calculate the comprehensive impact score based on the influencing factors of electromechanical equipment on the system and the influencing factors of faults, determine the data acquisition plan and maintenance terminal allocation, and realize dynamic adjustments of real-time, periodic acquisition and manual inspection.

Benefits of technology

It improves the adaptability and efficiency of data processing of electromechanical equipment, reduces resource waste, and ensures the stable operation and production efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941006A_ABST
    Figure CN118941006A_ABST
Patent Text Reader

Abstract

The invention relates to an electromechanical equipment operation data processing method and system and a storage medium. The method comprises the steps of performing multi-dimensional analysis on target electromechanical equipment; executing a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment, and generating a to-be-pushed first to-be-processed work order or a to-be-pushed second to-be-processed work order; when the to-be-pushed first to-be-processed work order is generated, determining a target maintenance terminal receiving the to-be-pushed first to-be-processed work order; and when the to-be-pushed second to-be-processed work order is generated, determining a target maintenance terminal receiving the to-be-pushed second to-be-processed work order. Therefore, a corresponding data processing scheme is formulated for the target electromechanical equipment according to the actual condition of the electromechanical operation system, so that the operation data processing scheme of the target electromechanical equipment is adaptively adjusted according to the actual requirement of the current electromechanical operation system, and the stable operation of the electromechanical operation system is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electromechanical equipment data processing, and in particular to an electromechanical equipment operation data processing method, system and storage medium. Background Art

[0002] The widespread application of electromechanical equipment in industrial production has replaced manual labor, reduced costs, and improved production efficiency. Advanced electromechanical equipment not only improves productivity and the working environment, but also completes tasks that human labor cannot accomplish. As one of the national industrial foundations, electromechanical equipment directly affects the development of the national economy, the level of science and technology, and the strength of national defense. Electromechanical equipment generally refers to machinery, electrical appliances, and electrical automation equipment. In order to ensure the normal operation of the operating system, it is necessary to conduct technical monitoring and data collection on electromechanical equipment, detect problems in a timely manner, and perform maintenance and repairs to ensure smooth production operations.

[0003] However, currently in the electromechanical operation system, a fixed method is usually adopted to collect and process the operation data of each electromechanical device in the electromechanical operation system, and prediction is made based on the collected operation data to obtain the predicted fault severity, and then the order of processing the work order is determined based on the severity;

[0004] It can be seen from the above process that although the above method can realize comprehensive monitoring of all electromechanical equipment in the electromechanical operation system and prioritize the processing of fault work orders from high to low according to the severity of the fault, the overall flexibility is low and the adaptability is poor, which cannot meet the actual use needs of the electromechanical operation system; for example, in the production system, the operation data of all production electromechanical equipment are uniformly collected and processed in a fixed manner, and the work orders are processed in sequence from high severity to low severity according to the predicted fault severity; but if the electromechanical equipment has little impact on the actual work of the electromechanical operation system, the data is collected and processed in the same fixed manner as the electromechanical equipment with a large impact, and the work orders obtained after processing are arranged in a unified manner, which will undoubtedly increase a lot of unnecessary computing resources and seriously affect the subsequent production efficiency, which is not conducive to the actual operation of the electromechanical operation system; therefore, the above method has the problem of being unable to be adaptively adjusted according to the actual needs of the current electromechanical operation system and having a low degree of flexibility. Summary of the invention

[0005] In order to solve the problem that the prior art cannot perform adaptive adjustments according to the actual needs of the current electromechanical operation system and has a low degree of flexibility, the present application provides an electromechanical equipment operation data processing method, system and storage medium.

[0006] In the first aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:

[0007] A method for processing electromechanical equipment operation data comprises the following steps:

[0008] Conduct multi-dimensional analysis of target electromechanical equipment;

[0009] Execute a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment to generate a first pending work order to be pushed or a second pending work order to be pushed; wherein the second pending work order to be pushed includes a preset deadline T 截止 and processing time T 时长 ;

[0010] When generating the first work order to be pushed, if N=0, T 剩余 > the first preset time, and M< the first preset number, determine the target maintenance terminal that receives the first pending work order to be pushed; wherein N and M represent the number of the first pending work order and the second pending work order under each of the target maintenance terminals in the preset area, respectively, and N=0 or N=1; T 剩余 represents the actual remaining time of the second work order to be processed in each of the target maintenance terminals in the preset area, and T 剩余 =T 截止 -T 当前 , T 当前 is the current real time;

[0011] When generating the second pending work order to be pushed, if Determine a target maintenance terminal to receive the second work order to be pushed; wherein, is the actual remaining time of the second work order to be pushed; T 总用时 is the preset deadline T for the second work order to be pushed under the target maintenance terminal in the preset area. 截止 The processing time of each previous second pending work order T 时长 sum.

[0012] In a preferred example, the present application can be further configured to: perform multi-dimensional analysis on the target electromechanical device, including:

[0013] Acquire a first influencing factor of the target electromechanical device on the electromechanical operation system when the target electromechanical device is in a normal state; wherein the first influencing factor includes the process position of the target electromechanical device in the electromechanical operation system, work efficiency, work plan correlation, intelligence level and / or the degree of dependence of the electromechanical operation system on the target electromechanical device;

[0014] Acquire a second influencing factor of the target electromechanical equipment on the electromechanical operation system and personnel when the target electromechanical equipment is in a fault state; wherein the second influencing factor includes downtime, revenue loss, safety risk, maintenance cost, personnel efficiency and / or environmental impact of the electromechanical operation system, and obtain the second influencing factor;

[0015] A comprehensive impact score of the target electromechanical equipment on the electromechanical operation system is calculated according to the first influencing factor and the second influencing factor, and the multi-dimensional analysis result is determined based on the comprehensive impact score.

[0016] In a preferred example, the present application may be further configured as follows: executing a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment to obtain a first work order to be pushed or a second work order to be pushed, including:

[0017] Based on the multi-dimensional analysis results, determine the operation data collection scheme of the target electromechanical equipment; wherein the operation data collection scheme includes real-time collection of the operation data of the target electromechanical equipment and periodic collection according to a preset sampling period;

[0018] When the operation data collection scheme is to collect the operation data of the target electromechanical equipment in real time, generating a first work order to be processed based on a first fault prediction result corresponding to the operation data collected in real time;

[0019] When the operation data collection scheme is to periodically collect the operation data of the target electromechanical equipment according to a preset sampling period, a second work order to be processed is generated based on a second fault prediction result corresponding to the periodically collected operation data.

[0020] In a preferred example, the present application may be further configured as follows: based on the multi-dimensional analysis result, determining the operation data collection scheme of the target electromechanical equipment, including:

[0021] If the comprehensive impact score of the multi-dimensional analysis result is greater than a first preset score value, determining to collect the operating data of the target electromechanical equipment in real time;

[0022] If the comprehensive impact score of the multi-dimensional analysis result is greater than a second preset score value, determining to periodically collect the operating data of the target electromechanical equipment according to a preset sampling period;

[0023] If the comprehensive impact score of the multi-dimensional analysis result is greater than a third preset score value, it is determined to adopt a manual regular inspection method to collect the operating data of the target electromechanical equipment; wherein the first preset score value is greater than the second preset score value, and the second preset score value is greater than the third preset score value.

[0024] In a preferred example, the present application may be further configured to: determine a target maintenance terminal for receiving the first work order to be pushed, including:

[0025] Obtaining the number a of target maintenance terminals capable of receiving the first work order to be pushed;

[0026] If a>1, the route distance between each target maintenance terminal corresponding to the number and the target electromechanical equipment corresponding to the first work order to be pushed is calculated, and the target maintenance terminal with the shortest route distance is determined as the target maintenance terminal for receiving the first work order to be pushed;

[0027] If a=1, the target maintenance terminal is determined to be the target maintenance terminal that receives the first work order to be pushed;

[0028] If a=0, a target maintenance terminal allocation request is sent to the superior management post corresponding to the target electromechanical equipment of the first pending work order to be pushed, and when the target maintenance terminal allocation confirmation request returned by the superior management post is obtained, the target maintenance terminal corresponding to the target maintenance terminal allocation confirmation request is determined as the target maintenance terminal for receiving the first pending work order to be pushed.

[0029] In a preferred example, the present application may be further configured as follows: after determining the target maintenance terminal receiving the first work order to be pushed, the application may further include:

[0030] Sending the first pending work order and prompt information to be pushed to the target maintenance terminal, and receiving in real time a click operation of the user of the target maintenance terminal on the first pending work order or prompt information within half an hour;

[0031] Based on the click operation, the display screen of the target maintenance terminal is jumped to the first display screen, wherein the first display screen includes a first area and a second area, the first area is used to display the first to-be-processed work order, the second area is used to display the real-time route distance between the target maintenance terminal and the target electromechanical equipment, and the first area is located above the second area;

[0032] After the real-time route distance meets the preset distance, maintenance information of the user of the target maintenance terminal on the first work order to be processed is obtained; wherein the maintenance information of the first work order to be processed includes a first maintenance score of the user, and the first maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the first work order to be processed.

[0033] In a preferred example, the present application may be further configured to: determine a target maintenance terminal for receiving the second work order to be pushed, including:

[0034] Get T 总用时 The number of corresponding target maintenance terminals b;

[0035] If b>1, calculate the idle time T of each target maintenance terminal 空闲 , The idle time T 空闲 The largest number of target maintenance terminals are determined as target maintenance terminals that receive the second work orders to be pushed;

[0036] If b=1, the target maintenance terminal is determined to be the target maintenance terminal receiving the second work order to be pushed;

[0037] If b=0, a target maintenance terminal for receiving the second work order to be pushed is determined according to the preset deadline of the second work order to be pushed, the current real time, and the second preset time;

[0038] Wherein, determining a target maintenance terminal for receiving the second work order to be pushed according to the preset deadline of the second work order to be pushed, the current real time and the second preset time includes:

[0039] If T 截止 -T 当前 > the second preset time, repeat the above steps; wherein the second preset time > the processing time T of the second work order to be pushed 时长 ;

[0040] If T 截止 -T 当前 ≤the second preset time, obtain and send a target maintenance terminal allocation request to the superior management post corresponding to the target electromechanical equipment of the first pending work order to be pushed, and when the target maintenance terminal allocation confirmation request returned by the superior management post is obtained, the target maintenance terminal corresponding to the target maintenance terminal allocation confirmation request is determined as the target maintenance terminal for receiving the second pending work order to be pushed.

[0041] In a preferred example, the present application may be further configured as follows: after determining the target maintenance terminal receiving the second work order to be pushed, the method further includes:

[0042] Sending the second work order to be pushed to the target maintenance terminal;

[0043] According to the preset deadline T in the second pending work order 截止and the location information of the target electromechanical equipment and the location information of the target maintenance terminal, and dynamically sorting all the second work orders to be processed of the target maintenance terminal in the preset area in real time to obtain a dynamic order list;

[0044] Real-time reception of the user of the target maintenance terminal in the preset area at the preset deadline T 截止 The previous click operation on the first second pending work order in the dynamic order list;

[0045] Based on the click operation, the display screen of the target maintenance terminal is jumped to the second display screen, wherein the second display screen includes a first area and a second area, the first area is used to display the first second to-be-processed work order in the dynamic order list, and the second area is used to display the real-time route distance between the target maintenance terminal and the target electromechanical equipment, and the first area is located above the second area;

[0046] After the real-time route distance meets the preset distance, maintenance information of the user of the target maintenance terminal on the second work order to be processed is obtained; wherein the maintenance information of the second work order to be processed includes a second maintenance score of the user, and the second maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the second work order to be processed.

[0047] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions:

[0048] A system for processing electromechanical equipment operation data, comprising:

[0049] An acquisition module, used to perform multi-dimensional analysis on the target electromechanical equipment;

[0050] An execution module is used to execute a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment, and generate a first pending work order to be pushed or a second pending work order to be pushed; wherein the second pending work order to be pushed includes a preset deadline T 截止 and processing time T 时长 ;

[0051] The first determination module is used to generate the first work order to be pushed, if N=0, T 剩余 > the first preset time, and M< the first preset number, determine the target maintenance terminal that receives the first pending work order to be pushed; wherein N and M represent the number of the first pending work order and the second pending work order under each of the target maintenance terminals in the preset area, respectively, and N=0 or N=1; T 剩余represents the actual remaining time of the second work order to be processed under each target maintenance terminal in the preset area, and T 剩余 =T 截止 -T 当前 , T 当前 is the current real time;

[0052] The second determination module is used to generate the second pending work order to be pushed. Determine a target maintenance terminal to receive the second work order to be pushed; wherein, is the actual remaining time of the second work order to be pushed; T 总用时 is the preset deadline T for the second work order to be pushed under the target maintenance terminal in the preset area. 截止 The processing time of each previous second pending work order T 时长 sum.

[0053] On the third aspect, the above-mentioned purpose of the present application is achieved through the following technical solutions:

[0054] A storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned method for processing running data of an electromechanical device are implemented.

[0055] In summary, the present application provides a method, system and storage medium for processing electromechanical equipment operation data, which have the following beneficial technical effects:

[0056] By considering the multi-faceted impact of the target electromechanical equipment on the electromechanical operation system, a multi-dimensional analysis of the target electromechanical equipment is achieved, so that a corresponding data processing plan is formulated for the target electromechanical equipment according to the actual situation of the electromechanical operation system, so as to adaptively adjust the operation data processing plan of the target electromechanical equipment according to the actual needs of the current electromechanical operation system, and achieve a flexible working effect, so as to ensure the stable and reliable operation of the electromechanical operation system, avoid adding unnecessary computing resources in actual work, and prevent the impact on subsequent production efficiency, so as to ensure the stable operation of the electromechanical operation system; and based on the actual work needs of the electromechanical operation system, reduce costs and losses, and rationalize and improve the efficiency of users of each target maintenance terminal, etc., the comprehensive consideration of various aspects of work arrangement optimization is taken into account, so that the first work order to be pushed and the second work order to be pushed are accurately and reasonably allocated, the work arrangement is optimized and the normal operation of the electromechanical operation system is stabilized; so as to achieve the adaptive adjustment of the data processing plan according to the actual needs of the current electromechanical operation system, reduce production costs and achieve flexible working effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1It is a flow chart for implementing the method for processing electromechanical equipment operation data in this embodiment.

[0058] Figure 2 It is a flow chart for implementing step S10 of the method for processing electromechanical equipment operation data in this embodiment.

[0059] Figure 3 It is a flow chart for implementing step S20 of the method for processing electromechanical equipment operation data in this embodiment. DETAILED DESCRIPTION

[0060] The present application is further described in detail below in conjunction with the accompanying drawings.

[0061] In one embodiment, if Figure 1 As shown, the present application discloses a method for processing electromechanical equipment operation data, which specifically includes the following steps:

[0062] S10: Conduct multi-dimensional analysis of target electromechanical equipment;

[0063] The multi-dimensional analysis means that when the target electromechanical equipment is in a normal state and / or a fault state, the first influencing factor and / or the second influencing factor of the electromechanical operation system are analyzed based on the target electromechanical equipment, so as to obtain a multi-dimensional analysis result. The electromechanical operation system includes several target electromechanical equipment. For example, the electromechanical operation system is a production operation system, and the target electromechanical equipment included in the production operation system includes an injection molding machine, a packaging machine, and a conveyor, etc.;

[0064] Specifically, by analyzing the various aspects of the target electromechanical equipment's impact on the electromechanical operation system when the target electromechanical equipment is in a normal state and a faulty state, a dimensional analysis is performed on the target electromechanical equipment to achieve accurate planning and precise positioning of the target electromechanical equipment according to the actual situation of the electromechanical operation system, thereby facilitating the formulation of corresponding data processing plans, so as to adaptively adjust the operation data processing plans of the target electromechanical equipment according to the actual needs of the current electromechanical operation system, achieve flexible working effects, ensure the stable and reliable operation of the electromechanical operation system, avoid adding unnecessary computing resources in actual work, prevent affecting subsequent production efficiency, and ensure the stable operation of the electromechanical operation system.

[0065] In a preferred example, the present application can be further configured to: perform multi-dimensional analysis on the target electromechanical device, such as Figure 2 As shown, including:

[0066] S11: Acquire a first influencing factor of the target electromechanical device on the electromechanical operation system when the target electromechanical device is in a normal state; wherein the first influencing factor includes the process position of the target electromechanical device in the electromechanical operation system, work efficiency, work plan correlation, intelligence level and / or the degree of dependence of the electromechanical operation system on the target electromechanical device;

[0067] Among them, according to actual needs, by obtaining various aspects of the impact of the target electromechanical equipment on the electromechanical operation system when the target electromechanical equipment is in a normal state, the target electromechanical equipment is comprehensively considered in combination with the electromechanical operation system, so as to ensure that the operation data of the target electromechanical equipment is processed accordingly according to the actual needs of the current electromechanical operation system, so as to achieve a humanized and flexible working effect. Specifically:

[0068] Electromechanical equipment process location analysis includes: determining the specific location and role of the equipment in the electromechanical system, such as the welding process in the automobile production line. And / or, analyzing the key nodes and impact range of the equipment in the production process. For example, determining the key role of the welding equipment in the entire production line, and what impact will it have on the entire production line if it fails.

[0069] For example, in an automobile manufacturing plant, the welding robot is the key equipment in the entire car body welding process. Its failure will cause the entire production line to stop, causing serious impact on production progress.

[0070] Work efficiency analysis includes: evaluating the production capacity, production efficiency and resource utilization of the equipment, such as daily production volume, troubleshooting time, average operating time, etc., and / or comparing the actual capacity of the equipment with the designed capacity and analyzing the reasons for capacity loss. By comparing the actual number of welding and troubleshooting time of the robot, we can evaluate whether its work efficiency meets expectations.

[0071] Work plan relevance analysis: Check the importance and urgency of electromechanical equipment in the production plan, and / or analyze the impact of equipment failure on the production plan and develop corresponding backup plans.

[0072] The intelligence level analysis includes: evaluating whether the equipment has intelligent functions such as automation, remote monitoring, predictive maintenance, etc. And / or, analyzing the impact of the intelligence level on production efficiency and reliability.

[0073] For example, evaluate whether the welding robot has the functions of automatically adjusting welding parameters and automatically identifying welding positions.

[0074] The electromechanical system dependency analysis includes: determining the criticality and replacement difficulty of electromechanical equipment in the system, such as the dependence on electricity, gas source, etc., and / or analyzing the impact of equipment failure on the stability of the entire system, such as evaluating the coupling and impact relationship between the system and the equipment.

[0075] For example: evaluate the welding robot's dependence on resources such as electricity and gas, and the system's support for the normal operation of the robot.

[0076] S12: Obtain a second influencing factor of the target electromechanical equipment on the electromechanical operation system and personnel when the target electromechanical equipment is in a fault state; wherein the second influencing factor includes downtime, revenue loss, safety risk, maintenance cost, personnel efficiency and / or environmental impact of the electromechanical operation system, and obtain the second influencing factor;

[0077] Among them, according to actual needs, by obtaining various aspects of the impact of the target electromechanical equipment on the electromechanical operation system when the target electromechanical equipment is in a fault state, the target electromechanical equipment is comprehensively considered in combination with the electromechanical operation system, so as to ensure that the operation data of the target electromechanical equipment is processed accordingly according to the actual needs of the current electromechanical operation system, so as to achieve a humanized and flexible working effect. Specifically:

[0078] Downtime analysis: record the downtime and frequency caused by equipment failure, and analyze the time cost affecting production.

[0079] Lost Profit Analysis: Estimate the loss of profit caused by downtime to production, such as lost production and reduced revenue.

[0080] Safety Risk Analysis: Assess the potential safety risks of equipment failure, such as the impact on employee safety and equipment integrity.

[0081] Maintenance cost analysis: Analyze repair costs and maintenance costs, and evaluate maintenance efficiency.

[0082] Personnel efficiency analysis: Evaluate the human input and efficiency in the maintenance process.

[0083] Environmental impact analysis: Analyze the impact of equipment failure on the environment, such as waste emissions.

[0084] For example, when a welding robot fails, downtime is recorded, production losses are estimated, repair costs and personnel input are assessed, and the impact of the failure on employee safety and the environment is evaluated.

[0085] S13: Calculate the comprehensive impact score of the target electromechanical equipment on the electromechanical operation system according to the first influencing factor and the second influencing factor, and determine the multi-dimensional analysis result based on the comprehensive impact score.

[0086] Calculating a comprehensive impact score of the target electromechanical equipment on the electromechanical operation system according to the first impact factor and the second impact factor includes:

[0087]

[0088] In the formula, S represents the comprehensive impact score of electromechanical equipment on the electromechanical operation system;

[0089] P i Represents the values ​​of various primary influencing factors, such as process location, work efficiency, work plan relevance, intelligence level, and dependency level;

[0090] w i Represents the weight of each primary influencing factor; weights of process location, work efficiency, work plan relevance, intelligence level, and dependency level;

[0091] Q j Represents the values ​​of various secondary influencing factors; values ​​of downtime, revenue loss, safety risk, maintenance cost, personnel efficiency, and environmental impact;

[0092] w j Represents the weight of each secondary influencing factor; weight of downtime, revenue loss, safety risk, maintenance cost, personnel efficiency, and environmental impact;

[0093] n represents the number of first influencing factors, and m represents the number of second influencing factors.

[0094] In this embodiment, the first influencing factor and the second influencing factor are comprehensively considered, so as to achieve adaptive processing of the operating data of the target electromechanical equipment.

[0095] like Figure 3 As shown, S20: Execute the processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment to generate a first to-be-processed work order or a second to-be-processed work order to be pushed; wherein the second to-be-processed work order includes a preset deadline T 截止 and processing time T 时长 ;

[0096] In a preferred example, the present application may be further configured as follows: executing a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment to obtain a first to-be-processed work order or a second to-be-processed work order to be pushed, including:

[0097] S21: Based on the multi-dimensional analysis results, determine the operation data collection scheme of the target electromechanical equipment; wherein the operation data collection scheme includes real-time collection of the operation data of the target electromechanical equipment and periodic collection according to a preset sampling period; specifically, including:

[0098] S211: If the comprehensive impact score of the multi-dimensional analysis result is greater than a first preset score value, determining to collect the operating data of the target electromechanical equipment in real time;

[0099] S212: If the comprehensive impact score of the multi-dimensional analysis result is greater than a second preset score value, determining to periodically collect the operating data of the target electromechanical equipment according to a preset sampling period;

[0100] S213: If the comprehensive impact score of the multi-dimensional analysis result is greater than a third preset score value, determine to adopt a manual periodic inspection method to collect the operating data of the target electromechanical equipment; wherein the first preset score value is greater than the second preset score value, and the second preset score value is greater than the third preset score value.

[0101] S22: when the operation data collection scheme is to collect the operation data of the target electromechanical equipment in real time, generating a first work order to be processed based on a first fault prediction result corresponding to the operation data collected in real time;

[0102] include:

[0103] S221: Acquire the historical abnormal operation data of the corresponding target electromechanical equipment, and train the historical abnormal operation data to obtain a fault prediction model; including

[0104] S221-1: Extract features from historical abnormal operation data to obtain abnormal features;

[0105] S221-2: Determine a corresponding fault event based on the abnormal feature;

[0106] Among them, the fault events include historical equipment detection data, historical fault time, historical fault cause, historical fault type, historical fault level, historical fault impact, historical fault repair measures and other data information when the target electromechanical equipment has a historical fault.

[0107] S221-3: Construct abnormal features and fault events into an event set, and use the event set for training to obtain the fault prediction model.

[0108] Specifically, considering that the amount of data in the abnormal data set itself may be relatively large and it cannot clearly reflect the abnormality of the data, it is converted into abnormal features. By finding the corresponding relationship between the abnormal features and the fault events, there is no need to analyze the complex relationship between the various sensor data. Therefore, it has a more accurate prediction accuracy.

[0109] S222: using the fault prediction model to perform fault prediction on the real-time collected operation data to obtain the first fault prediction result; wherein the first fault prediction result includes the fault type, the corresponding faulty device, and the fault location;

[0110] S223: Generate the first work order to be processed based on the first fault prediction result.

[0111] S23: When the operation data collection scheme is to periodically collect the operation data of the target electromechanical equipment according to a preset sampling period, a second work order to be processed is generated based on the second fault prediction result corresponding to the periodically collected operation data.

[0112] S231: Detecting whether there is abnormal data in the periodically collected operation data; including:

[0113] S231-1: extracting features from the periodically collected operation data to obtain data features;

[0114] S231-2: Use the isolation forest algorithm to detect anomalies in data features, and determine whether there are anomalies based on the anomaly detection results; if the returned result contains -1, it means that there is abnormal data; otherwise, it means that there is no abnormal data

[0115] S232: If yes, plotting the operation data collected in the period to obtain a current abnormality chart;

[0116] S233: Determine the second fault prediction result according to the current abnormal chart and similar historical abnormal charts; wherein the second fault prediction result includes fault information and maintenance information; including:

[0117] S233-1: Determine a plurality of similar historical abnormal charts based on the operation trend represented by the current abnormal chart;

[0118] S233-2: Determine corresponding fault information and maintenance information based on similarities between the plurality of similar historical abnormality graphs and the current abnormality graph;

[0119] S233-3: Output the fault information and the maintenance information to obtain the second fault prediction result.

[0120] Specifically, by analyzing according to the chart, historical fault information and maintenance information can be quickly found, thereby determining the current fault information and facilitating maintenance of the fault information.

[0121] S234: Based on the second fault prediction result, generate a second work order to be pushed.

[0122] S30: When generating the first work order to be pushed, if N=0, T 剩余 > the first preset time, and M< the first preset number, determine the target maintenance terminal that receives the first pending work order to be pushed; wherein N and M represent the number of the first pending work order and the second pending work order under each of the target maintenance terminals in the preset area, respectively, and N=0 or N=1; T 剩余 represents the actual remaining time of the second work order to be processed under each target maintenance terminal in the preset area, and T 剩余 =T 截止 -T 当前 , T 当前 is the current real time;

[0123] If N=1, it is determined that the user of the target maintenance terminal does not meet the acceptance criteria of the first work order to be processed.

[0124] Not pushing the first to-be-processed work order to the target maintenance terminal;

[0125] If N = 0, T 剩 ≤ the first preset time, it is determined that the user of the target maintenance terminal does not meet the receiving criteria of the first work order to be processed, and the first work order to be processed is not pushed to the target maintenance terminal;

[0126] If N = 0, T 剩 >a first preset time, and M≥a first preset number, it is determined that the user of the target maintenance terminal does not meet the receiving criteria of the first work order to be processed, and the first work order to be processed is not pushed to the target maintenance terminal.

[0127] In this embodiment, in order to ensure the actual work needs based on the electromechanical operation system and to reduce costs and losses and other considerations, it is ensured that the first work order to be processed does not exist in the target maintenance terminal that receives the first work order to be processed, so that the user can process the first work order to be processed immediately after receiving it.

[0128] In a preferred example, the present application may be further configured to: determine a target maintenance terminal for receiving the first work order to be pushed, including:

[0129] S31: Acquire the number a of target maintenance terminals capable of receiving the first work order to be pushed;

[0130] It should be noted that the number a means that N=0, T 剩余 >first preset time, M<first preset number, and the target maintenance terminal is within the preset area. By obtaining the number a of target maintenance terminals that can receive the first work order to be pushed, the target maintenance terminal that actually processes the first work order to be processed is further determined, thereby improving the processing efficiency of the first work order to be processed.

[0131] S32: if a>1, according to the routes between each target maintenance terminal corresponding to the number and the target electromechanical equipment corresponding to the first work order to be pushed, calculate the route distance between each target maintenance terminal and the target electromechanical equipment, and determine the target maintenance terminal with the shortest route distance as the target maintenance terminal for receiving the first work order to be pushed;

[0132] Specifically, if there are multiple users who can receive the first work order to be processed, the real-time distance between the target maintenance terminal and the target electromechanical equipment in the preset area is used to determine the user who holds the target maintenance terminal with the shortest distance to the target electromechanical equipment, and then the first work order to be processed is sent to the target maintenance terminal to ensure that the first work order to be processed can be processed quickly and the impact on the electromechanical operation system is reduced.

[0133] S33: if a=1, determining that the target maintenance terminal is the target maintenance terminal that receives the first work order to be pushed;

[0134] S34: If a=0, a target maintenance terminal allocation request is sent to the superior management post corresponding to the target electromechanical equipment of the first work order to be pushed, and when the target maintenance terminal allocation confirmation request returned by the superior management post is obtained, the target maintenance terminal corresponding to the target maintenance terminal allocation confirmation request is determined as the target maintenance terminal for receiving the first work order to be pushed.

[0135] It should be noted that since no user capable of receiving the first work order to be processed is detected in the preset area, in order to prevent serious impact, it is necessary to send a target maintenance terminal allocation request to the user terminal of the superior management position corresponding to the target electromechanical equipment of the first work order to be pushed, so that the user of the superior management position can contact the user of the corresponding target maintenance terminal in time to quickly process the first work order to be processed.

[0136] In a preferred example, the present application may be further configured as follows: after determining the target maintenance terminal receiving the first work order to be pushed, the application may further include:

[0137] S35: sending the first pending work order and prompt information to be pushed to the target maintenance terminal, and receiving in real time a click operation of the user of the target maintenance terminal on the first pending work order or prompt information within half an hour;

[0138] It should be noted that since the first pending work order is a work order generated based on the actual needs of the target electromechanical equipment for the electromechanical operation system, that is, the target electromechanical equipment of the first pending work order is particularly critical and important for the current electromechanical operation system, in order to avoid serious impact, the work order needs to be processed quickly. Therefore, by receiving the user of the target maintenance terminal clicks on the first pending work order or prompt information within half an hour, the user can be further urged to process the first pending work order.

[0139] Among them, if the user of the target maintenance terminal does not receive a click operation on the first pending work order or prompt information within half an hour, the first pending work order will be deleted from the target maintenance terminal, and unprocessed information will be generated. The deleted first pending work order and the unprocessed information will be sent to the superior management position corresponding to the target electromechanical equipment of the first pending work order, so as to be reallocated based on the allocation request returned by the superior management position.

[0140] It should be noted that the user of the target maintenance terminal represents the user who performs maintenance on the target electromechanical equipment. After determining the identity information of the user of the target maintenance terminal, the position association relationship of the users stored in the same directory can be obtained. The position association relationship refers to the user's peer position and superior management position, thereby determining the superior management position corresponding to the target electromechanical equipment.

[0141] For example, after determining that the identity of the user of the target maintenance terminal is a, the position association relationship corresponding to a may include a's colleague of the same level, ie, ordinary maintenance worker b, and a's superior management position, ie, shift leader c.

[0142] S36: Based on the click operation, jump the display screen of the target maintenance terminal to a first display screen, wherein the first display screen includes a first area and a second area, the first area is used to display the first to-be-processed work order, the second area is used to display the real-time route distance between the target maintenance terminal and the target electromechanical equipment, and the first area is located above the second area;

[0143] It should be noted that after the user clicks on the pushed first pending work order or prompt information, it means that the user is aware of the situation and jumps the display screen of the target maintenance terminal to the first display screen, thereby urging and guiding the target maintenance terminal to go to the maintenance location to execute the first pending work order, avoiding situations such as "stealing chickens" and "fishing".

[0144] S37: After the real-time route distance meets the preset distance, obtain the maintenance information of the user of the target maintenance terminal on the first work order to be processed; wherein, the maintenance information of the first work order to be processed includes the first maintenance score of the user, and the first maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the first work order to be processed.

[0145] It should be noted that, by displaying the real-time route distance between the target maintenance terminal and the target electromechanical equipment in real time, the user is urged to quickly judge whether the real-time route distance meets the preset distance, so as to obtain the maintenance information of the user of the target maintenance terminal on the first pending work order in real time after the preset distance is met. Since the maintenance information of the first pending work order includes the first maintenance score of the user, the user can be comprehensively evaluated and analyzed according to the first maintenance score information.

[0146] The first maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the first pending work order, including:

[0147] Calculate the first response score according to the response time node corresponding to the click operation time within half an hour;

[0148] Calculating a first execution score according to the maintenance time of the user and the next generation time of the first to-be-processed work order;

[0149] The first maintenance score is calculated by weighted summing the first response score, the weight corresponding to the first response score, the first execution score, and the weight corresponding to the first execution score.

[0150] S40: When generating the second work order to be pushed, if Determine a target maintenance terminal to receive the second work order to be pushed; wherein, is the actual remaining time of the second work order to be pushed; T 总用时 The target maintenance terminal is in the preset area and is within the preset deadline T of the second work order to be pushed. 截止 The processing time of each previous second pending work order T 时长 sum.

[0151] If T 时长 >W T剩余 -T 总用时 , determining that the user of the target maintenance terminal does not meet the receiving criteria of the second work order to be pushed, and not pushing the second work order to be pushed to the target maintenance terminal.

[0152] In this embodiment, in order to ensure the rationalization and efficiency of work arrangements for users of each target maintenance terminal, it is ensured that the target maintenance terminal receiving the second work order to be pushed has sufficient time to complete each second work order to be pushed before the preset deadline, thereby avoiding unreasonable work order allocation, improving the user's work performance, and avoiding the impact of unreasonable allocation on work mentality.

[0153] In a preferred example, the present application may be further configured to: determine a target maintenance terminal for receiving the second work order to be pushed, including:

[0154] S41: Get T 总用时 The number of corresponding target maintenance terminals b;

[0155] It should be noted that the number b means that T 时长 ≤W T剩余 -T 总用时 , and the target maintenance terminal is within the preset area, by obtaining the number b of the target maintenance terminals that can receive the second work order to be pushed, the target maintenance terminal that actually processes the second work order to be processed is further determined, thereby improving the processing efficiency of the second work order to be processed.

[0156] S42: If b>1, calculate the idle time T of each target maintenance terminal 空闲 , T 空闲 =W T剩余 -T 总用时 ; and the idle time T 空闲 The largest number of target maintenance terminals are determined as target maintenance terminals that receive the second work orders to be pushed;

[0157] Specifically, if there are multiple users who can receive the second work order to be processed, according to the idle time T of each target maintenance terminal 空闲 , and then determine the idle time T 空闲 The largest number of users will send the second pending work order to the target maintenance terminal to ensure that the second pending work order can be processed quickly and efficiently, and optimize the work order allocation process to reasonably allocate the data of the second pending work order of each user at that time node and optimize the work arrangement of the user.

[0158] S43: if b=1, determining that the target maintenance terminal is the target maintenance terminal that receives the second work order to be pushed;

[0159] S44: if b=0, determining a target maintenance terminal for receiving the second work order to be pushed according to the preset deadline of the second work order to be pushed, the current real time, and the second preset time;

[0160] S441: If T 截止 -T 当前 > the second preset time, repeat the above steps S41-S44; wherein the second preset time > the processing time T of the second work order to be pushed 时长 ;

[0161] S442: If T 截止 -T 当前 ≤the second preset time, obtain and send a target maintenance terminal allocation request to the superior management post corresponding to the target electromechanical equipment of the first pending work order to be pushed, and when the target maintenance terminal allocation confirmation request returned by the superior management post is obtained, the target maintenance terminal corresponding to the target maintenance terminal allocation confirmation request is determined as the target maintenance terminal for receiving the second pending work order to be pushed.

[0162] It should be noted that since no user who is capable of receiving the second work order to be processed is detected in the preset area, in order to prevent the user from being troubled or irritated due to too many work orders, the preset deadline and the current real-time time are compared with the second preset time. If it is greater than the second preset time, it means that the current time is sufficient and continue to wait for a suitable user. If it is less than the second preset time, it means that the current time is not sufficient to avoid affecting subsequent work. Therefore, it is necessary to send a target maintenance terminal allocation request to the user terminal of the superior management position corresponding to the target electromechanical equipment of the second work order to be pushed, so that the superior management position can coordinate and process it.

[0163] In a preferred example, the present application may be further configured as follows: after determining the target maintenance terminal receiving the second work order to be pushed, the method further includes:

[0164] S45: Sending the second work order to be pushed to the target maintenance terminal;

[0165] S46: According to the preset deadline T in the second to-be-processed work order 截止 and the location information of the target electromechanical equipment and the location information of the target maintenance terminal, and dynamically sorting all the second work orders to be processed of the target maintenance terminal in the preset area in real time to obtain a dynamic order list;

[0166] It should be noted that due to the different locations of users, the distances between them and the target electromechanical equipment in the order list will also be different. In order to improve the processing efficiency of users, the preset deadline T in the second to-be-processed work order is used. 截止 , and the real-time distance obtained based on the location information of the target electromechanical equipment and the location information of the target maintenance terminal, all the second work orders to be processed of the target maintenance terminal in the preset area are dynamically sorted in real time to obtain a dynamic order list, so as to facilitate users to process the work orders in sequence, wherein the preset area can be set as needed, such as the range area of ​​the electromechanical operation system.

[0167] S47: receiving in real time the information received by the user of the target maintenance terminal in the preset area at the preset deadline T 截止 The previous click operation on the first second pending work order in the dynamic order list;

[0168] Specifically, since the first second pending work order in the order list is generated based on a comprehensive consideration of the preset deadline of the second pending work order and the real-time distance between the user and the maintenance location, it is possible to prevent work order delays and unreasonable processing paths, thereby optimizing work arrangements.

[0169] S48: Based on the click operation, the display screen of the target maintenance terminal is jumped to a second display screen, wherein the second display screen includes a first area and a second area, the first area is used to display the first second to-be-processed work order in the dynamic order list, and the second area is used to display the real-time route distance between the target maintenance terminal and the target electromechanical equipment, and the first area is located above the second area;

[0170] It should be noted that after the user clicks on the first second pending work order, it means that the user is ready to execute the work order, and the display screen of the target maintenance terminal is jumped to the second display screen, thereby urging and guiding the target maintenance terminal to go to the maintenance location to execute the second pending work order, avoiding situations such as "stealing chickens" and "fishing".

[0171] S49: After the real-time route distance meets the preset distance, obtain the maintenance information of the user of the target maintenance terminal on the second work order to be processed; wherein the maintenance information of the second work order to be processed includes the second maintenance score of the user, and the second maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the second work order to be processed.

[0172] It should be noted that, by displaying the real-time route distance between the target maintenance terminal and the target electromechanical equipment in real time, the user is urged to quickly judge whether the real-time route distance meets the preset distance, so as to obtain the maintenance information of the user of the target maintenance terminal on the first pending work order in real time after the preset distance is met. Since the maintenance information of the first pending work order includes the first maintenance score of the user, the user can be comprehensively evaluated and analyzed according to the first maintenance score information.

[0173] The second maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the second work order to be processed, including:

[0174] Calculating a second response score according to the time of the click operation and a preset deadline;

[0175] Calculating a second execution score according to the maintenance time of the user and the next generation time of the second work order to be processed;

[0176] The second maintenance score is calculated by weighted summing the second response score, the weight corresponding to the second response score, the second execution score, and the weight corresponding to the second execution score.

[0177] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions:

[0178] A system for processing electromechanical equipment operation data, comprising:

[0179] an acquisition module, configured to perform a multi-dimensional analysis on the target electromechanical equipment; wherein the multi-dimensional analysis includes a process position analysis of the target electromechanical equipment in the electromechanical operation system, a work efficiency analysis, a work plan correlation analysis, an intelligence degree analysis, an analysis of the degree of dependence of the electromechanical operation system on the target electromechanical equipment, and one or more of a downtime analysis, a revenue loss analysis, a safety risk analysis, a maintenance cost analysis, a personnel efficiency analysis, and an environmental impact analysis of the electromechanical operation system when the target electromechanical equipment is in a fault state;

[0180] An execution module is used to execute a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment, and generate a first pending work order to be pushed or a second pending work order to be pushed; wherein the second pending work order to be pushed includes a preset deadline T 截止 and processing time T 时长 ;

[0181] The first determination module is used to generate the first work order to be pushed, if N=0, T 剩余> the first preset time, and M< the first preset number, determine the target maintenance terminal that receives the first pending work order to be pushed; wherein N and M represent the number of the first pending work order and the second pending work order under each of the target maintenance terminals in the preset area, respectively, and N=0 or N=1; T 剩余 represents the actual remaining time of the second work order to be processed under each target maintenance terminal in the preset area, and T 剩余 =T 截止 -T 当前 , T 当前 is the current real time;

[0182] The second determination module is used to generate the second pending work order to be pushed. Determine a target maintenance terminal to receive the second work order to be pushed; wherein, is the actual remaining time of the second work order to be pushed; T 总用时 The target maintenance terminal is in the preset area and is within the preset deadline T of the second work order to be pushed. 截止 The processing time of each previous second pending work order T 时长 sum.

[0183] On the third aspect, the above-mentioned purpose of the present application is achieved through the following technical solutions:

[0184] A storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned method for processing running data of an electromechanical device are implemented.

[0185] For the specific definition of the system, please refer to the definition of the method above, which will not be repeated here. Each module in the above system can be implemented in whole or in part by software, hardware and a combination thereof. The above modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0186] In one embodiment, a computer device is provided, which may be a server. The computer device includes a processor, a memory, a network interface, and a database connected via a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store electromagnetic induction control data during wireless charging. The network interface of the computer device is used to communicate with an external terminal via a network connection. The computer program is executed by the processor to implement the method.

[0187] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above electromagnetic induction control method for wireless charging are implemented.

[0188] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0189] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.

[0190] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for processing electromechanical equipment operation data, characterized in that: The following steps are involved: Conduct multi-dimensional analysis of target electromechanical equipment; Execute a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment to generate a first pending work order to be pushed or a second pending work order to be pushed; wherein the second pending work order to be pushed includes a preset deadline T 截止 and processing time T 时长 ; When generating the first work order to be pushed, if N=0, T 剩余 > the first preset time, and M< the first preset number, determine the target maintenance terminal that receives the first pending work order to be pushed; wherein N and M represent the number of the first pending work order and the second pending work order under each of the target maintenance terminals in the preset area, respectively, and N=0 or N=1; T 剩余 represents the actual remaining time of the second work order to be processed in each of the target maintenance terminals in the preset area, and T 剩余 =T 截止 -T 当前 , T 当前 is the current real time; When generating the second pending work order to be pushed, if Determine a target maintenance terminal to receive the second work order to be pushed; wherein, is the actual remaining time of the second work order to be pushed; T 总用时 is the preset deadline T for the second work order to be pushed under the target maintenance terminal in the preset area. 截止 The processing time of each previous second pending work order T 时长 sum.

2. A method for processing electromechanical equipment operation data according to claim 1, characterized in that: Conduct multi-dimensional analysis of target electromechanical equipment, including: Acquire a first influencing factor of the target electromechanical device on the electromechanical operation system when the target electromechanical device is in a normal state; wherein the first influencing factor includes the process position of the target electromechanical device in the electromechanical operation system, work efficiency, work plan correlation, intelligence level and / or the degree of dependence of the electromechanical operation system on the target electromechanical device; Acquire a second influencing factor of the target electromechanical equipment on the electromechanical operation system and personnel when the target electromechanical equipment is in a fault state; wherein the second influencing factor includes downtime, revenue loss, safety risk, maintenance cost, personnel efficiency and / or environmental impact of the electromechanical operation system, and obtain the second influencing factor; A comprehensive impact score of the target electromechanical equipment on the electromechanical operation system is calculated according to the first influencing factor and the second influencing factor, and the multi-dimensional analysis result is determined based on the comprehensive impact score.

3. A method for processing electromechanical equipment operation data according to claim 1, characterized in that: Executing a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment to obtain a first work order to be pushed or a second work order to be pushed, including: Based on the multi-dimensional analysis results, determine the operation data collection scheme of the target electromechanical equipment; wherein the operation data collection scheme includes real-time collection of the operation data of the target electromechanical equipment and periodic collection according to a preset sampling period; When the operation data collection scheme is to collect the operation data of the target electromechanical equipment in real time, generating a first work order to be processed based on a first fault prediction result corresponding to the operation data collected in real time; When the operation data collection scheme is to periodically collect the operation data of the target electromechanical equipment according to a preset sampling period, a second work order to be processed is generated based on a second fault prediction result corresponding to the periodically collected operation data.

4. A method for processing electromechanical equipment operation data according to claim 3, characterized in that: Based on the multi-dimensional analysis results, determining an operation data collection scheme for the target electromechanical equipment includes: If the comprehensive impact score of the multi-dimensional analysis result is greater than a first preset score value, determining to collect the operating data of the target electromechanical equipment in real time; If the comprehensive impact score of the multi-dimensional analysis result is greater than a second preset score value, determining to periodically collect the operating data of the target electromechanical equipment according to a preset sampling period; If the comprehensive impact score of the multi-dimensional analysis result is greater than a third preset score value, it is determined to adopt a manual regular inspection method to collect the operating data of the target electromechanical equipment; wherein the first preset score value is greater than the second preset score value, and the second preset score value is greater than the third preset score value.

5. The method for processing electromechanical equipment operation data according to claim 1, characterized in that: Determining a target maintenance terminal for receiving the first work order to be pushed includes: Obtaining the number a of target maintenance terminals capable of receiving the first work order to be pushed; If a>1, the route distance between each target maintenance terminal corresponding to the number and the target electromechanical equipment corresponding to the first work order to be pushed is calculated, and the target maintenance terminal with the shortest route distance is determined as the target maintenance terminal for receiving the first work order to be pushed; If a=1, the target maintenance terminal is determined to be the target maintenance terminal that receives the first work order to be pushed; If a=0, a target maintenance terminal allocation request is sent to the superior management post corresponding to the target electromechanical equipment of the first pending work order to be pushed, and when the target maintenance terminal allocation confirmation request returned by the superior management post is obtained, the target maintenance terminal corresponding to the target maintenance terminal allocation confirmation request is determined as the target maintenance terminal for receiving the first pending work order to be pushed.

6. A method for processing electromechanical equipment operation data according to claim 5, characterized in that: After determining the target maintenance terminal for receiving the first work order to be pushed, the method further includes: Sending the first pending work order and prompt information to be pushed to the target maintenance terminal, and receiving in real time a click operation of the user of the target maintenance terminal on the first pending work order or prompt information within half an hour; Based on the click operation, the display screen of the target maintenance terminal is jumped to the first display screen, wherein the first display screen includes a first area and a second area, the first area is used to display the first to-be-processed work order, the second area is used to display the real-time route distance between the target maintenance terminal and the target electromechanical equipment, and the first area is located above the second area; After the real-time route distance meets the preset distance, maintenance information of the user of the target maintenance terminal on the first work order to be processed is obtained; wherein the maintenance information of the first work order to be processed includes a first maintenance score of the user, and the first maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the first work order to be processed.

7. A method for processing electromechanical equipment operation data according to claim 1, characterized in that: Determining a target maintenance terminal for receiving the second work order to be pushed includes: Get T 总用时 The number of corresponding target maintenance terminals b; If b>1, calculate the idle time T of each target maintenance terminal 空闲 , The idle time T 空闲 The largest number of target maintenance terminals are determined as target maintenance terminals that receive the second work orders to be pushed; If b=1, the target maintenance terminal is determined to be the target maintenance terminal receiving the second work order to be pushed; If b=0, a target maintenance terminal for receiving the second work order to be pushed is determined according to the preset deadline of the second work order to be pushed, the current real time, and the second preset time; Wherein, determining a target maintenance terminal for receiving the second work order to be pushed according to the preset deadline of the second work order to be pushed, the current real time and the second preset time includes: If T 截止 -T 当前 > the second preset time, repeat the above steps; wherein the second preset time > the processing time T of the second work order to be pushed 时长 ; If T 截止 -T 当前 ≤the second preset time, obtain and send a target maintenance terminal allocation request to the superior management post corresponding to the target electromechanical equipment of the first pending work order to be pushed, and when the target maintenance terminal allocation confirmation request returned by the superior management post is obtained, the target maintenance terminal corresponding to the target maintenance terminal allocation confirmation request is determined as the target maintenance terminal for receiving the second pending work order to be pushed.

8. A method for processing electromechanical equipment operation data according to claim 7, characterized in that: After determining the target maintenance terminal for receiving the second work order to be pushed, the method further includes: Sending the second work order to be pushed to the target maintenance terminal; According to the preset deadline T in the second pending work order 截止 and the location information of the target electromechanical equipment and the location information of the target maintenance terminal, and dynamically sorting all the second work orders to be processed of the target maintenance terminal in the preset area in real time to obtain a dynamic order list; Real-time reception of the user of the target maintenance terminal in the preset area at the preset deadline T 截止 The previous click operation on the first second pending work order in the dynamic order list; Based on the click operation, the display screen of the target maintenance terminal is jumped to the second display screen, wherein the second display screen includes a first area and a second area, the first area is used to display the first second to-be-processed work order in the dynamic order list, and the second area is used to display the real-time route distance between the target maintenance terminal and the target electromechanical equipment, and the first area is located above the second area; After the real-time route distance meets the preset distance, maintenance information of the user of the target maintenance terminal on the second work order to be processed is obtained; wherein the maintenance information of the second work order to be processed includes a second maintenance score of the user, and the second maintenance score is determined according to the time of the click operation, the maintenance time, and the next generation time of the second work order to be processed.

9. A system for processing electromechanical equipment operation data, characterized in that: include: An acquisition module, used to perform multi-dimensional analysis on the target electromechanical equipment; An execution module is used to execute a processing scheme corresponding to the multi-dimensional analysis result on the operation data of the target electromechanical equipment, and generate a first pending work order to be pushed or a second pending work order to be pushed; wherein the second pending work order to be pushed includes a preset deadline T 截止 and processing time T 时长 ; The first determination module is used to generate the first work order to be pushed, if N=0, T 剩余 > the first preset time, and M< the first preset number, determine the target maintenance terminal that receives the first pending work order to be pushed; wherein N and M represent the number of the first pending work order and the second pending work order under each of the target maintenance terminals in the preset area, respectively, and N=0 or N=1; T 剩余 represents the actual remaining time of the second work order to be processed under each target maintenance terminal in the preset area, and T 剩余 =T 截止 -T 当前 , T 当前 is the current real time; The second determination module is used to generate the second pending work order to be pushed. Determine a target maintenance terminal to receive the second work order to be pushed; wherein, is the actual remaining time of the second work order to be pushed; T 总用时 is the preset deadline T for the second work order to be pushed under the target maintenance terminal in the preset area. 截止 The processing time of each previous second pending work order T 时长 sum.

10. A storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method for processing electromechanical equipment operation data as claimed in any one of claims 1 to 8 are implemented.

Citation Information

Patent Citations

  • Electromechanical equipment intelligent operation and maintenance method, system and equipment and storage medium

    CN109754094A

  • Fault data processing method and device and computer device

    CN110675079A

  • Intelligent work order pushing method and device

    CN113516340A

  • Intelligent patrol point inspection method and system for open pit coal mine equipment

    CN117372193A

  • Emergency intelligent order priority management system for work orders of operation and maintenance department

    CN117592736A